Loading...
Res 10-017RESOLUTION NO. 10 -017 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA RESCINDING RESOLUTION 08 -083 AND ADOPTING A 2010 -11 MASTER SCHEDULE OF FEES WHEREAS, the City Council of the City of Poway has the authority to establish fees for City services; and WHEREAS, the City Council finds it necessary to recover the costs for City services; and WHEREAS, an updated fee schedule has been developed which is consistent with the City Council's direction regarding cost recovery, which is set forth in the attached Master Schedule of Fees; and WHEREAS, the proposed fees do not exceed the reasonable costs of providing the services for which the fees are imposed; and WHEREAS, the proposed fees will supersede any previously established fee for the specified City services; and WHEREAS, a duly noticed public hearing has been held, allowing for public comment on the establishment of said fees. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Poway as follows: Section 1. The foregoing recitals are true and correct, and the City Council so finds and determines that the fees shown in the attached Master Fee Schedule (Exhibit 1) are hereby adopted and supersede any previously established fee for the identified City service. Section 2 . Resolution 08 -083 adopting a Master Fee Schedule is hereby rescinded effective July 6, 2010. Section 3. The fees shown in Exhibit 1 of the attached Master Fee Schedule shall become effective July 6, 2010. Section 4 . The provisions of Resolution No. 09 -063, establishing certain permit fee waivers and reductions for property owners affected by the Witch Creek Fire, shall continue in full force and effect. Resolution No.10 -017 May 4, 2010 Section 5 . Any revised development fees contained in the Master Fee Schedule set forth in Exhibit 1 shall not apply to any project for which a substantially completed application, as determined by the Director of Development Services, for Building Permit, Development Review, Conditional Use Permit, Minor Conditional Use Permit, Variance or Minor Development Review application has been submitted prior to the effective date of this Resolution. However, if the applicant does not obtain approval of the application within one year of submittal, or if the approval of the application expires and no Building Permit is obtained prior to its expiration, then any re- submittal of the application or submittal of a new application would be subject to the Building Permit fees in effect at the time of Building Permit application. PASSED, ADOPTED, AND APPROVED by the City Council of the City of Poway, State of California this 4 th day of May 2010. Don Higginson, Mayor ATTEST: da . Troyan, MMC, City Clerk Resolution No.10 -017 May 4, 2010 STATE OF CALIFORNIA ) ) SS. COUNTY OF SAN DIEGO) I, Linda A. Troyan, MMC, City Clerk of the City of Poway, do hereby certify under penalty of perjury that the foregoing Resolution No. 10 -017 was duly adopted by the City Council at a meeting of said City Council held on the 4 th day of May 2010, and that it was so adopted by the following vote: AYES: Boyack, Cunningham, Rexford, Kruse, Higginson NOES: None ABSENT: None DISQUALIFIED: None Lind A. Troyan, MMC, City Clerk Ci of Poway Master Fee Schedule Effective July 6, 2010 service Description' '' -Fee Administrative Services REGULATORY LICENSING $ 259 New License Amusement Establishments $ 77 Renewal $ 50 New License (Per Penal Code 326.5) Bingo License $ 50 Renewal (Per Penal Code 326.5) $ 21 New License Add Staff Worker $ 15 Renewal Carnival /Go -Cart Centers Temporary S 217 New License S 217 New License Permanent S 35 Renewal Dance License S 259 New License Class A -Daily /Nightly S 77 Renewal S 259 New License Class B - 3 Days /Nights in a Calendar Week S 77 Renewal Class C - One Day/Night Only S 259 New License $ 259 New License Class D - Fraternal, Social Club $ 77 Renewal $ 259 New License Juvenile Class A $ 77 Renewal Juvenile Class B $ 259 New License Entertainment License $ 259 New License Class I (Professional) $ 77 Renewal $ 259 New License Class II (Topless) $ 77 Renewal $ 259 New License Class III (Non - Professional) $ 77 Renewal $ 457 New License Firearms Sales License $ 275 Renewal Holistic Health Practitioner $ 15 New License $ 273 New License Junk Yards / Auto Wrecking $ 91 Renewal $ 377 New License Massage Establishments $ 177 Renewal $ 123 New License Massage Technician $ 108 Renewal Merchandise Coupon Book $ 303 New License $ 480 New License Secondhand Dealers $ 280 Renewal $ 105 New License Solicitor's License $ 105 Renewal $ 105 New License Solicitor's ID Card $ 105 Renewal $ 105 New License Solicitor's License (Charitable) $ 105 Renewal Master Fee Schedule Table 1, Effective July 6, 2010 Page 1 of 17 Service Description `Fee Administrative Services BUSINESS REGISTRATIONS $ 100 New Certificate Business Certification $ 15 Renewal OTHER $ 25 City Fee (Addt'I $32 collected for Fingerprinting State fee) Photos $ 15 UTILITY RELATED FEES Hardship Variance processing fee $ 100 Tag Fee $ 32 Turn - offs /Restoration of Service $ 54 After Hours - Weekdays & Saturdays $ 70 After Hours - Sundays & Holidays $ 86 Hydrant Meter Billing /Closing Account $ 96 Customer Request for Meter Testing $ 70 GENERAL OVERHEAD (all departments) 12% applied to contract/materials costs and fully- weighted personnel costs. Master Fee Schedule Table 1, Effective July 6, 2010 Page 2 of 17 Master Fee Schedule Effective July 6, 2010 Service Description Fee Community Services FACILITY USE fees vary by category of organization as follows: A: Local Public Agency (City & PUSD) B: LPA social / Non - resident PA meetings C'. NP Social ) Youth Leagues 1 PA Affiliates / Poway Chamber of Commerce D: Resident E: Resident Local Business / Non - resident Non - profit F: Non - resident individual and business N /A: Indicates facilitiy is NOT AVAILABLE for use by certain categories of organizations Community Park Per Hour N/C A $ 34 B (hourly rate) Auditorium S 52 C (hourly rate) S 69 D (hourly rate) $ 103 E (hourly rate) S 121 F (hour) rate) N/C A $ 27 B (hourly rate) $ 41 C (hourly rate) Bill Bond Hall Room 1 $ 54 D (hourly rate) $ 80 E (hourly rate) $ 94 F (hour) rate) N/C A N/C B (hourly rate) Bill Bond Room 2 $ 30 C (hourly rate) $ 41 D (hourly rate) $ 61 E (hourly rate) $ 71 F (hour) rate) N/C A N/C B (hourly rate) Bill Bond Room 3 $ 30 C (hourly rate) $ 41 D (hourly rate) $ 61 E (hourly rate) $ 71 F (hour) rate) N/C A N/C B (hourly rate) Nutrition Room $ 21 C (hourly rate) $ 28 D (hourly rate) $ 43 E (hourly rate) $ 49 F (hour) rate) Master Fee Schedule Table 1, Effective July 6, 2010 Page 3 of 17 Service'Description -, :. Fee Community Services N/C A $ 14 B (hourly rate) $ 21 C (hourly rate) Kitchen (large) $ 28 D (hourly rate) $ 42 E (hourly rate) $ 49 F (hour) rate) N/C A N/C B (hourly rate) Activity Room 1 $ 21 C (hourly rate) $ 28 D (hourly rate) $ 42 E (hourly rate) $ 49 F (hour) rate) N/C A N/C B (hourly rate) Activity Room 2 $ 21 C (hourly rate) $ 28 D (hourly rate) S 42 E (hourly rate) S 49 F (hour) rate) Dog Park N/C A $ 6 B (hourly rate) Dog Park 1 $ 8 C (hourly rate) $ 11 D (hourly rate) $ 18 E (hourly rate) $ 21 F (hour) rate) N/C A $ 6 B (hourly rate) Dog Park 2 $ 8 C (hourly rate) $ 11 D (hourly rate) $ 18 E (hourly rate) $ 21 F (hour) rate) N/C A $ 6 B (hourly rate) Dog Park 3 $ 8 C (hourly rate) $ 11 D (hourly rate) $ 18 E (hourly rate) $ 21 F (hour) rate) N/C A $ 5 B (hourly rate) Park Area $ 8 C (hourly rate) $ 10 D (hourly rate) $ 17 E (hourly rate) $ 19 F (hour) rate) N/C A $ 5 B (hourly rate) Bocce Courts $ 8 C (hourly rate) $ 10 D (hourly rate) $ 16 E (hourly rate) $ 19 F (hour) rate) Master Fee Schedule Table 1, Effective July 6, 2010 Page 4 of 17 Service Description Fee CommunityYervices Gymnasiums N/C A $ 24 B (hourly rate) Twin Peaks Gymnasium $ 37 C (hourly rate) $ 49 D (hourly rate) $ 73 E (hourly rate) S 86 F (hour) rate N/C A S 24 B (hourly rate) S 37 C (hourly rate) Meadowbrook Gymnasium S 49 D (hourly rate) $ 73 E (hourly rate) $ 86 F (hour) rate) N/C A N/C B $ 27 C (hourly rate) Stage/Activity Room S $ 36 D (hourly rate) $ 53 E (hourly rate) $ 63 F (hourly rate) Old Poway Park N/C A $ 21 B (hourly rate) $ 31 C (hourly rate) Templars Hall $ 43 D (hourly rate) $ 64 E (hourly rate) $ 74 F hour) rate) N/C A S 10 B (hourly rate) Gazebo $ 17 C (hourly rate) $ 22 D (hourly rate) $ 32 E (hourly rate) $ 38 F (hour) rate) N/C A N/C B Porter House -Great Room $ 22 C (hourly rate) $ 30 D (hourly rate) $ 45 E (hourly rate) $ 52 F (hour) rate) N/C A N/C B Porter House - Parlour $ 22 C (hourly rate) $ 30 D (hourly rate) $ 45 E (hourly rate) $ 52 F (hour) rate) N/C A N/C B Porter House - Kitchen $ 22 C (hourly rate) $ 30 D (hourly rate) $ 45 E (hourly rate) $ 52 F (hourly rate) Master Fee Schedule Table 1, Effective July 6, 2010 Page 5 of 17 Service Description Fee Community Services Lake Powa N/C A $ 22 B (hourly rate) Pavilion and Outdoor Area $ 33 C (hourly rate) $ 44 D (hourly rate) $ 66 E (hourly rate) $ 77 F hour) rate) N/C A $ 10 B (hourly rate) $ 16 C (hourly rate) Pavilion Outdoor Area $ 21 D (hourly rate) $ 31 E (hourly rate) $ 37 F hour) rate) N/C A $ 10 B (hourly rate) $ 16 C (hourly rate) Gazebo Area $ 21 D (hourly rate) $ 31 E (hourly rate) $ 37 F hour) rate) N/C A $ 5 B (hourly rate) $ 7 C (hourly rate) Park Area $ 10 D (hourly rate) $ 16 E (hourly rate) $ 18 F hour) rate) N/C A $ 8 B (hourly rate) $ 13 C (hourly rate) Archery Range $ 17 D (hourly rate) $ 26 E (hourly rate) $ 30 F hour) rate) N/C A $ 10 B (hourly rate) Fire Ring Areas 3, 5, 18 $ 16 C (hourly rate) $ 21 D (hourly rate) $ 31 E (hourly rate) $ 37 F hour) rate) N/C A $ 52 B flat fee Deep Pt BBQ Area - Flat Fee $ 78 C flat fee $ 105 D flat fee $ 157 E flat fee $ 183 F flat fee N/C A N/A B $ 3 C (hourly rate) Concession N/A D N/A E N/A F Master Fee Schedule Table 1, Effective July 6, 2010 Page 6 of 17 Service Description Fee Community Services Poway Athletic Fields N/C A S 8 B (hourly rate) Baseball field use (unlined, unmarked) $ 13 C (hourly rate) $ 17 D (hourly rate) $ 25 E (hourly rate) $ 29 F (hour) rate) N/C A $ 6 B (hourly rate) Soccer field use (unlined, unmarked) $ 8 C (hourly rate) $ 11 D (hourly rate) $ 18 E (hourly rate) $ 21 F hour) rate) N/C A $ 4 B (hourly rate) Basketball court use $ 6 C (hourly rate) $ 8 D (hourly rate) $ 13 E (hourly rate) S 14 F hour) rate) N/C A $ 16 B (hourly rate) Ballfield Lights $ 16 C (hourly rate) $ 16 D (hourly rate) $ 16 E (hourly rate) $ 16 F (hour) rate) N/C A $ 18 B (hourly rate) Soccer Field Lights $ 18 C (hourly rate) $ 18 D (hourly rate) $ 18 E (hourly rate) $ 18 F (hour) rate) Master Fee Schedule Table 1, Effective July 6, 2010 Page 7 of 17 Service Description Fee Community Services ,. Poway Center for Performing Arts N/C A Center: five -hour minimum S 940 Non - Profit Group hourly rate 51,410 For - Profit Group hourly rate N/C A Center: additional hours S 210 Non - Profit Group hourly rate S 340 For - Profit Group hourly rate N/C A Center: 12 -hour flat fee $1,670 Non - Profit Group hourly rate $2,560 For - Profit Group hourly rate N/C A Courtyard -with Performance /Exhibition only $ 52 Non - Profit Group hourly rate $ 78 For - Profit Group hourly rate N/C A Lobby - with Performance /Exhibition only $ 78 Non - Profit Group hourly rate $ 105 For - Profit Grou hour) rate N/C A Lobby - Art Receptions (four hour block) $ 150 Non - Profit Group hourly rate $ 150 For - Profit Group hourly rate N/C A Green Room (meetings) $ 26 Non - Profit Group hourly rate $ 26 For - Profit Group hourly rate N/C A Green Room (receptions) $ 52 Non - Profit Group hourly rate $ 78 For - Profit Group hourly rate City Hall Rental N/C A $ 114 B (hourly rate) $ 171 C (hourly rate) Chambers $ 228 D (hourly rate) $ 343 E (hourly rate) $ 399 F (hour) rate) N/C A $ 48 B (hourly rate) $ 71 C (hourly rate) Courtyard $ 95 D (hourly rate) $ 143 E (hourly rate) $ 167 F (hour) rate N/C A $ 22 B (hourly rate) $ 32 C (hourly rate) Kitchen $ 44 D (hourly rate) $ 65 E (hourly rate) $ 76 F (hour) rate) Master Fee Schedule Table 1, Effective July 6, 2010 Page 8 of 17 Master Fee Schedule Effective July 6, 2010 Service Description Fee Community Services Permits Airbounce Permit Fee $ 31 Alcohol Permit Established by the Joint Powers Insurance Authority Rental Deposits Indoor Spaces, Onqoinq Nonprofit Meetin s $ 25 refundable rental deposit Cleaning /Damage Deposits Indoor Spaces $ 100 refundable cleaning /damage deposit Indoor Spaces when serving food $ 200 refundable cleaning /damage deposit Indoor Spaces when serving alcohol $ 300 refundable cleaning /damage deposit Commercial Filmin $ 200 refundable cleaning /damage deposit Cancellation Fees - if applicable (call 858 -668 -4595 for deadline details) Rented Facilities (excludes PCPA and Swim) $ 25 Class Withdrawal by Participant $ 15 Processing Fees Air Bounce $ 3 Facilities Use Permit (FUP) $ 3 Refund - Facility Use Applications $ 16 Commercial Filmin $ 3 Staffing Fees - Per Hour Park Ranger during nonregular hours $ 43 per hour Recreation Leader 1 during nonre ular hours $ 30 per hour Poway Youth Sports Associated Organized League Play Organized League Play Regular Season Fields No Charge Lighting $ 12 Off - Season Fields $ 3 Other Fees Contract Class Registration Established by Contract Group Liability Insurance Fee Established by Joint Powers Ins, Authority Non - R esident Re istra $ 10 Special Use Fee: Commercial Advertising and Motion Pictures (this fee is in addition to existing fees) Non - published Print (maximum of 8 hours) No Charge Published Print Maximum of 8 hours $ 188 Additional Hours $ 63 Outside normal hours $ 63 Plus overtime staffing fees Commercial Film Maximum of 8 hours $ 376 Additional Hours $ 63 Outside normal hours $ 63 Plus overtime staffing fees Recreation (201) Gyms 3 on 3 Basketball $ 68 Gyms Youth VB League $ 26 4th of Jul - Ages 12 and up 2 Master Fee Schedule Table 1, Effective July 6, 2010 Page 9 of 17 Service Description Fee Community Services Lake Operations (202) Family Campouts (up to 5 family members) $ 52 Each additional family member (if more than 5) $ 10 Youth Fishing Derby (in addition to Fishing Permit Fee) No Charge 2 -Day Fishing Derby (each day) Adult (In addition to Fishing Permit Fee) $ 10 Youth In addition to Fishing Permit Fee $ 5 Catfish Craze Adult (In addition to Fishing Permit Fee) $ 10 Youth In addition to Fishing Permit Fee $ 5 Boating Permits Motorboat Full Day $ 24 Half Day $ 18 Per Hour $ 13 Senior /Military Full Day $ 16 Senior /Military 1/2 Day $ 11 Rowboat Full Day $ 16 Half Day $ 9 Per Hour $ 8 Senior /Military Full Day $ 10 Senior /Military 1/2 Day $ 6 Pedal boat Per Hour $ 13 Per 1/2 Hour $ 8 Fishing Permits Youth (7 & Under) No Charge Youth (8 -15) $ 3 Adult (16 & Older) $ 6 Senior $ 3 Military $ 4 Bass Season Monthly Pass $ 90 Sold by month, not prorated for mid-month sales Trout Season Monthly Pass $ 42 Sold by month, not prorated for mid-month sales 10-Day Youth /Senior Pass $ 27 Archery Range Card $ 10 Nonresident Parking Fees Auto - Weekends $ 5 Motorcycles $ 2 RVs / Buses $ 5 Non - resident employees @ Poway Business $ 3 Functions Master Fee Schedule Table 1, Effective July 6, 2010 Page 10 of 17 Service Description Fee Community Services Aquatics (203) Cleaning /Damage Deposit - Swim Meets $ 200 refundable cleaning /damage deposit Cancellation Fee - Swim Meets $ 200 Youth Day - Prepurchase $ 13 Youth Day - Day of Event $ 17 Youth Day - Aftercare $ 5 Water Aerobics No Charge Swim -in Movie - Youth /Senior $ 3 Swim -in Movie - Adult $ 4 Swim -in Movie - Family $ 12 Birthday Parties $ 52 Community Park Swim Center Daily Admission - Resident Youth /Senior $ 2 Adult $ 2.50 Daily Admission Non - Resident Youth /Senior $ 4 Adult $ 5 Family Swim - Sat/Sun 10:30 a.m. to 1 p.m. Resident $ 8 Non - Resident $ 11 Lap Passes - Resident Youth /Senior $ 20 Adult $ 25 Lap Passes - Nonresident Youth /Seior $ 40 Adult $ 50 Season Pass - Resident Youth / Senior $ 73 Adult $ 94 Family $ 157 Season Pass - Non - Resident Youth / Senior $ 105 Adult $ 125 Family $ 256 Annual Pass - Resident Youth / Senior $ 183 Adult $ 225 Family $ 392 Annual Pass - Non - Resident Youth /Senior $ 261 Adult $ 355 Famil $ 643 Team Use During Closed Hours Pool Fee - Resident - Exclusive $ 39 per hour Pool Fee - Resident - Shared $ 21 per hour Pool Fee - Non - Resident - Exclusive $ 50 per hour Pool Fee - Non - Resident - Shared $ 33 per hour Master Fee Schedule Table 1, Effective July 6, 2010 Page 11 of 17 Service Description Fee ' • Community Services Community Park Swim Center continued Tournament Fees Resident Teams $ 57 per hour Non - Resident Teams $ 78 per hour Preparation Fee - Resident $ 157 flat fee Preparation Fee - Non - Resident $ 314 flat fee Team Use During Open Hours Lane Use - Hourly - Resident $ 5 (at least 51 % Poway residents) Lane Use - Hourly - Non - Resident $ 6 (less than 51% Poway residents) Swim Lessons - Per Meeting $ 6.50 Private Lessons $ 26 Locker Rentals $ 0.25 Performing Arts Center (204) Rental Deposits First day $ 300 Each additional day $ 150 Cleaning /Damage Deposits PCPA $ 300 refundable cleaning /damage deposit Cancellation Fees - if applicable PCPA Full deposit forfeit Staffing Fees - Per Hour Technical Theatre Coordinator acting as TES in $ 42 per hour excess of twelve (12) hours Stage Technician eight (8) hours/day & Art $ 23 per hour Receptions -Level 1 Stage Technician in excess of eight (8) hours /day- $ 34 per hour Level Front of House Coordinator in excess of 5 hours & $ 23 per hour Art Receptions Box Office Attendant in excess of 4 hours $ 17 perhour Ticketing Fees Consignment - First show -. $ 100 Consignment - Each additional show $ 52 Consignment - Returned unused tickets $ 0.25 each Handling - In- person and by -phone $ 5 each Online Purchases $ 3 each Other Fees Non - Intermission Fee $ 150 Merchandise Sales Commission 15% Nonprofit/ 20% For Profit Commission - Facility Art Displays 15% Nonprofit / 20% For Profit Piano Tuning Actual cost Additional Equipment Actual cost Canopy Use $ 261 Master Fee Schedule Table 1, Effective July 6, 2010 Page 12 of 17 Service Description fee Community Services ' Old Poway Park (205) 15% of Gross Sales (Non- Profit Groups) 4th of July - Booths 20% of Gross Sales For - Profit Groups Train Song Festival - Booths $ 37 Rendezvous in Poway Tour Program $ 4 15% of Gross Sales (Non - Profit Groups) Christmas in the Park — Booths 20% of Gross Sales For- Profit Groups Tour Pro ram (City receives $1.50 $ 4 Interpretive Services (0207) No Charge Non - Profit Group Earth Arbor Day Booth $ 37 Commercial Class Registration Stargazing $ 3 Insects at Night $ 3 Hoot, Howl & Prowl $ 5 School Program $ 4 .,Eveninq Wildlife Program $ 2 Community Park (208) Contract Class Recital Fee $ 3 Skate Park Programs No Charge Day Camp $ 125 Day Camp - CIT $ 52 Candyland Youth $ 5 Cand land Adult $ 3 Master Fee Schedule Table 1, Effective July 6, 2010 Page 13 of 17 Master Fee Schedule Effective July 6, 2010 Service Description_ , Fee ` Safety Services Annual CFC Permit and Inspection Fees (as listed within PMC 15.24.150)' 1 -3 permits for the same occupancy are charged at 100 %. Each permit in excess of 3 for the same occupancy will be charged 50% of the listed amounts for the remaining permit fee(s) If compliance issues are noted during the initial inspection, a second (follow -up) inspection will be conducted at no additional cost. If identified issues are not resolved during the second inspection, all subsequent (third and beyond) inspections are subject to the reinspection fee. $ 105 Initial Fee Aerosol products $ 52 Reinspection $ 105 Initial Fee Amusement buildings $ 52 Reinspection $ 163 Initial Fee Aviation facilities $ 82 Reinspection $ 163 Initial Fee Carnivals and fairs $ 82 Reinspection $ 82 Initial Fee Cellulose nitrate film $ 41 Reinspection $ 52 Initial Fee Christmas Tree Lots $ 26 Reinspection $ 117 Initial Fee Combustible dust - producing operations $ 59 Reinspection $ 117 Initial Fee Combustible fibers $ 52 Reinspection Compressed gases $ 117 Initial Fee One Type $ 52 Reinspection $ 117 Initial Fee Multiple Types $ 59 Reinspection Cryogenic liquids $ 117 Initial Fee One Type $ 52 Reinspection $ 187 Initial Fee Multiple Types $ 82 Reinspection $ 117 Initial Fee Cutting and Welding $ 52 Reinspection $ 117 Initial Fee Dry cleaning plants $ 52 Reinspection $ 105 Initial Fee Exhibits and trade shows $ 52 Reinspection $ 59 Initial Fee Explosives $ 29 Reinspection Master Fee Schedule Table 1, Effective July 6, 2010 Page 14 of 17 Service Description Fee Safety Services Flammable and combustible liquids $ 59 Initial Fee >5 gallons < 30 gallons Class 1 $ 29 Reinspection $ 117 Initial Fee >30 gallons Class 1 $ 59 Reinspection $ 117 Initial Fee >25 gallons < 120 gallons Class II or III $ 52 Reinspection $ 117 Initial Fee >120 gallons Class II or III $ 59 Reinspection $ 105 Initial Fee Floor finishing $ 52 Reinspection $ 82 Initial Fee Fruit and crop ripening $ 41 Reinspection $ 105 Initial Fee Fumigation and thermal insecticidal fogging $ 52 Reinspection Green waste Recycling, Mulching, $ 163 Initial Fee Composting Operations $ 82 Reinspection Hazardous materials $ 117 Initial Fee One Product $ 59 Reinspection $ 117 Initial Fee Multiple Products $ 59 Reinspection HPM facilities $ 210 Initial Fee Single Product $ 105 Reinspection $ 235 Initial Fee Multiple Products $ 117 Reinspection High -Pile Storage $ 117 Initial Fee 501 - 20,000 square feet $ 52 Reinspection $ 176 Initial Fee >20,000 square feet $ 88 Reinspection $ .82 Initial Fee' Hot work operations $ 41 Reinspection $ 117 Initial Fee Industrial ovens $ 52 Reinspection Liquid- or gas - fueled vehicles or equipment in $ 117 Initial Fee assembly buildings $ 52 Reinspection $ 117 Initial Fee LP -gas $ 52 Reinspection $ 187 Initial Fee Lumber yards and woodworking plants $ 105 Reinspection $ 82 Initial Fee Magnesium $ 41 Reinspection $ 117 Initial Fee Miscellaneous combustible storage $ 52 Reinspection $ 82 Initial Fee Open burning $ 41 Reinspection $ 82 Initial Fee Open flames and torches $ 41 Reinspection Master Fee Schedule Table 1, Effective July 6, 2010 Page 15 of 17 Service Description Fee Safety Services" $ 82 Initial Fee Open flames and candles $ 41 Reinspection $ 140 Initial Fee Organic coatings O $ 70 Reinspection Places of assembly $ 82 Initial Fee 50 to 300 $ 41 Reinspection $ 163 Initial Fee More than 300 $ 82 Reinspection $ 163 Initial Fee Pyrotechnic special effects material $ 82 Reinspection $ 82 Initial Fee Pyroxylin plastics $ 41 Reinspection $ 100 Initial Fee Refrigeration equipment $ 52 Reinspection Repair garages and Motor Fuel- dispensing $ 117 Initial Fee facilities $ 52 Reinspection $ 117 Initial Fee Spraying or Dipping Operations $ 52 Reinspection $ 117 Initial Fee Storage of Scrap Tires and Tire Byproducts $ 59 Reinspection Temporary membrane structures, tents and canopies $ 82 Initial Fee Normal Business Hours $ 41 Reinspection $ 152 Initial Fee Non - business hours $ 76 Reinspection $ 210 Initial Fee Tire - Building plants $ 82 Reinspection $ 187 Initial Fee Waste handling $ 82 Reinspection $ 117 Initial Fee Wood products $ 52 Reinspection Annual Multi- family Inspection Fees $ 82 Initial Fee 1 -14 Units $ 38 Reinspection $ 153 Initial Fee 15 -50 Units $ 64 Reinspection $ 153 Initial Fee Each Additional 50 or part thereof $ 64 Reinspection "Annual Permit and Inspection Fees are being phased in to achieve 100% cost - recovery over a three -year period. 2011 rates will be at 100% cost recovery. Master Fee Schedule Table 1, Effective July 6, 2010 Page 16 of 17. 1 _ x, F %Mce_Discriptlion i_ a , i ^. ;a`' — P� a, $afet" fer3ices Emergency Medical Services and Ambulance Transport $ 1,029 Resident Base Charge- Advanced Life Support $ 1,366 Non - resident 418 per day $ 866 Resident Base Charge -Basic Life Support $ 1,196 Non - resident 157 per day(excludes expendable materials) $ 150 Resident Treatment and Release $ 150 Non - resident $ 16 Resident Per -Mile Charge $ 16 Non - resident N/C All response fees pertain to responses within a 12 -month $ 66 Resident Oxygen $ 66 Non - resident Apparatus /Equipment/Personnel Standby & Engine, Ladder, or Brush Company Paramedic Unit Utility Vehicle $ 121 per hour $ 71 per hour $ 35 per hour $ 97 oer hour Training Tower Facility Environmental Room $ 209 per day Tower and Drill Ground $ 418 per day Artificial Smoke $ 16 per hour Ventilation Prop $ 157 per day(excludes expendable materials) Draftin /Pum Test Pit $ 52 per apparatus /per da False Alarm (within a 12 month period) First response N/C Second response N/C All response fees pertain to responses within a 12 -month Third response $ 75 period Fourth response $ 150 Master Fee Schedule Table 1, Effective July 6, 2010 Page 17 of 17 City of Poway Master Fee. Schedule Effective July 6, 2010 Service;Description ! Fee: -,. safety services Plan Check & Inspection "(Development) Fees Fire Alarm and Extinguisher Systems $ 449 Initial Inspection Monitoring Non - Addressable Systems $ 152 Reinspection & Resubmittals $ 601 Initial Inspection Monitoring Addressable Systems $ 225 Reinspection & Resubmittals Clean Agent Fire Extinguishing Systems $ 531 Initial Inspection FM 200 System $ 199 Reinspection & Resubmittals $ 398 Initial Inspection ntergen, Argon, Halon Systems $ 133 Reinspection & Resubmittals Commercial Automatic Fire Sprinkler System 60% of CBC Plan Check fee Under round Mains Plan Check and Inspection $ 303 Initial Inspection Underground Fire Service Main -per system $ 152 Reinspection &Resubmittals $ 303 Initial Inspection Underground Fire Service Main -Fire Pumps $ 152 Reinspection &Resubmittals Residential Sprinkler Systems Inspection $ 265 Initial Inspection Under 10,000 Square Feet $ 133 .Reinspection & Resubmittals $ 398 Initial Inspection 10,000 Square Feet and over $ 199 Reinspection & Resubmittals Residential Sprinkler S stems Plan Review $ 225 Initial Inspection $ 265 Initial Inspection Alteration to Sprinkler System more than s heads $ 133 Reinspection & Resubmittals Compressed Gas Systems - per system $ 303 Initial Inspection Less than 12,000 cubic feet $ 152 Reinspection & Resubmittals $ 449 Initial Inspection More than 12,000 cubic.feet $ 152 Reinspection & Resubmittals High-Piled Combustible Stock Storage Plan Check & Inspection $ 303 Initial Inspection Less than 20,000 SF $ 152 Reinspection & Resubmittals $ 531 Initial Inspection Greater than 20,000 SF $ 152. Reinspection &Resubmittals $ 303 Initial Inspection Spray Booths Plan Check & Inspection -per unit $ 152 Reinspection & Resubmittals Underground Tanks $ 152 Initial Inspection (per tank) Underground Tank Plan Check $ 152 Reinspection & Resubmittals (per tank) $ 398 Initial Inspection (per tank) Underground Tank Installation Field Inspection $ 152 Reinspection & Resubmittals (per tank) $ 398 Initial Inspection (per tank) Underground Tank Removal $ 152 Reinspection & Resubmittals (per tank) Master Fee Schedule Table 2, Effective July 6, 2010 Page 1 of 7 - Servile Description ; ; , Safetyfervices Plan$hech & Inspection (Development) Fees.;'.: " Tenant Im rovement Initial Plan Submittal $ 0.06 per square foot, with $250 minimum $ 133 Initial Inspection Tenant Improvement Field Inspection $ 66 Reinspection &Resubmittals $ 133 Initial Inspection Hood & Duct System Plan Check /Inspection $ 66 Reinspection &Resubmittals Plan Check/Inspection Commercial Bldgs (new 50% of CBC construction) Plan Check - Residential Buildings $ 0.06 per s uare foot, with $250 minimum $ 133 Initial Inspection Inspection of Residential Building $ 66 Reinspection &Resubmittals Tract Map- Subdivision Minor (up to 5 lots) $ $ 265 133 Initial Inspection Reinspection &Resubmittals Tract Map- Subdivision Major (more than 5 lots) $ $ 601 152 Initial Inspection Reinspection &Resubmittals $ 303 Initial Inspection Tentative Parcel Map $ 152 Reinspection & Resubmittals $ 265 Initial Inspection Water Tanks $ 133 Reinspection & Resubmittals Fire Prevention Time /Materials per hour $ 133 Initial Inspection Master Fee Schedule Table 2, Effective July 6, 2010 Page 2 of 7 Master Fee Schedule Table 2, Effective July 6, 2010 Page 3 of 7 City of Poway Master Fee Schedule Effective July 6, 2010 fervice'De'scri tion a Fee' Development services,' *Designated fees shall be doubled if construction starts or if use is established before a permit is issued. * *If grading is done prior to obtaining a Grading Permit, a deposit of $3,000 will be required Administrative Clearin Permit* 695 Conditional Use Permit (CUP)* $ 3,299 Concurrent with another land use permit* $ 1,597 Modification or Revocation* $ 1,942 Time Extension $ 504 Minor Modification (Staff A roval * $ 319 Minor Conditional Use Permit* $ 1,542 Concurrent with another land use permit* $ 799 Modification or Revocation* $ 664 Time Extension $ 479 Minor Modification Staff Approval)* $ 504 Development Review" City Council Approval* $ 1,622 Modification or Revocation* $ 1,143 Time Extension $ 479 Administrative Approval* $ 1,143 Modification or Revocation* $ 504 Time Extension $ 160 Minor Development Review* City Council Approval Single Family Residence (SFR) Hillside Ridgeline Review Not within a Subdivision* $ 2,366 Within a Subdivision* $ 1,622 Modification* $ 823 Construction of addition to single family home, a detached accessory bldg, or $ 823 reconstruction of a single family home* Adding a gate to a road* $ 799 Modification unless otherwise indicated* $ 504 Time Extension $ 479 Administrative Approval Single Family Residence Not within a Subdivision* $ 1,942 Within a Subdivision* $ 863 Modification* $ 504 Recreation Court $ 479 Construction of an addition to a single family home, a detached accessory building or $ 479 reconstruction of a single family home* Master Fee Schedule Table 2, Effective July 6, 2010 Page 3 of 7 Service Description Fee Development Services Minor Development Review* (continued) Remodeling, alteration, or addition of commercial or industrial buildings of less than 10,000 square feet or 25% of the existing $ 1,622 building square footage, whichever is less* Modification to a commercial or industrial $ 823 approval* Second dwelling unit* $ 823 Utility box (Without another land use permit)* $ 756 Telecommunications facility* $ 743 Amateur Radio Antenna* $ 719 Modification, unless otherwise indicated* $ 264 Time Extension, unless otherwise indicated $ 160 Variance Without another land use permit* $ 799 Concurrent with another land use permit* $ 319 Specific Plan Initiation of Specific Plan $ 479 Specific Plan $ 5,000 Deposit, full cost recovery Specific Plan Amendment $ 2,875 General Plan and Zoning Ordinance Pre - General Plan Amendment (PGPA) $ 479 General Plan Amendment (GPA) $ 1,917 Zone Change (ZC) Amendment to land use map $ 1,917 GPA and ZC $ 5,000 Deposit, full cost recovery Zoninq Ordinance Amendment text chance) $ 6,000 Deposit, full cost recove Development Agreement Not in conjunction with a project $ 5,000 Deposit, full cost recovery In conjunction with a project $ 3,000 Deposit, full cost recovery Modification to existinq a reement $ 2,000 Deposit, full cost recovery Annexation $ 5,000 Deposit, full cost recovery Signs Sign Permit* $ 72 Comprehensive Sign Program (CSP)* $ 573 Modification to CSP* $ 430 Miscellaneous Permits & Activities Home Occupation Permit* $ 103 Administrative Outdoor Display Permit* $ 221 Temporary Use Permit (TUP) City Council Approval* $ 466 All other TUPs* $ 172 Landscape Plan Check & Inspection Flat fee / Deposit, full cost recovery (Refer to Resolution 92 -187) Tree Removal Permit* $ 102 Administrative Remedy Letter $ 294 Appeals to City Council or Project Rehearing $ 765 Appeals for Wildfire Defensible Space Program $ 200 Pre-Application Review N/C Master Fee Schedule Table 2, Effective July 6, 2010 Page 4 of 7 Service Description Fee Development Services Miscellaneous Permits & Activities (continued) Pre - Development Conference N/C Lighting Exemption City Council Approval" $ 736 Administrative Approval' $ 294 Underground Waiver City Council Approval' $ 1,178 Administrative Approval` $ 294 Renaming existing streets (city Council Approval) $ 600 Deposit, full cost recovery Research (requires written request to the Director) $ 500 Deposit, full cost recovery Le al Publication $ 225 Subdivision Review Tentative Parcel Map $ 2,711 Modification $ 1,145 Time Extension $ 494 Tentative Tract Map $ 4,174 Modification $ 1,928 Time extension $ 494 Environmental Review Categorical Exemption $ 79 Negative Declaration $ 635 Initial deposit equivalent to contract cost plus 10% for staff time, full Environmental Impact Report cost recovery Subdivision Plan Check & Inspection (See Schedule 2) Grading Permit` $ 264 Grading & Stormwater Plan Check & Processing $1 - $25,000 (up to 3 plan checks)" $ 1,367 $1 - $25,000 (each additional plan check over 3) $ 205 15% of original plan check $25,001 - $100,000 $ 3,000 Deposit, full cost recovery $100,001 - $500,000 $ 5,000 Deposit, full cost recovery Over $500,000 $10,000 Deposit, full cost recove Grading Inspection $1 -$25,000 $ 659 $25,001 - $100,000 $ 5,000 Deposit, full cost recovery $100,001 - $500,000 $ 10,000 Deposit, full cost recovery Over $500,000 $ 15,000 Deposit, full cost recove Improvement Plan Check and Processing $1 - $25,000 (up to 3 plan checks) $ 1,128 $1 - $25,000 (each additional plan check over 3) $ 169 15% of original plan check $25,001 - $100,000 $ 2,500 Deposit, full cost recovery $100,001 - $500,000 $ 3,000 Deposit, full cost recovery Over $500,000 $ 5,000 Deposit, full cost recove Improvement Inspection $1 -$25,000 $ 659 $25,001 - $100,000 $ 5,000 Deposit, full cost recovery $100,001 - $500,000 $ 10,000 Deposit, full cost recovery Over $500,000 $ 15,000 Deposit, full cost recove Master Fee Schedule Table 2, Effective July 6, 2010 Page 5 of 7 - Service Description Fee Development Services Pool Dirt Plan Check $ 132 Final Map $ 1,100 per sheet Soils Report Review (subject to additional fee for review by consultant currently on contract) 1 -3 Houses $ 132 plus consultant fees 4 -30 Houses or 1 -3 Commercial /Industrial Lots $ 132 plus consultant fees Project w/ Improvements up to $5,000,000 $ 132 plus consultant fees Special Project w /Improvements > $5,000,000 $ 132 plus consultant fees Soils Compaction Report Review (subject to add'I fee for review by consultant currently on contract) 1 -3 Houses $ 132 plus consultant fees 4 -30 Houses or 1 -3 Commercial /Industrial Lots $ 132 plus consultant fees Project w/ Improvements up to $5,000,000 $ 132 plus consultant fees Special Project w /Improvements > $5,000,000 $ 132 plus consultant fees Stormwater Pollution Review Inspection SFR Room Addition $ 527 SFR Without Grading $ 1,318 SFR With Grading $ 1,054 Commercial / Industrial $ 2,636 Construction Change $ 395 Inspection Overtime (min 3 hrs) $ 395 Sewer Video Inspection $ 395 Miscellaneous Subdivision Activities Flood Plain Permit major w /engineering study" $ 770 Flood Plain Permit minor, no engineering study' $ 231 Boundary Adjustment $ 1,232 Certificate of Compliance $ 770 Lot Merger (w /o Parcel Map) flat fee $ 770 Easement Dedication $ 770 Reimbursement A reement $ 770 Right -of -Way Permits Right -of -Way (ROW) Permit Fee $ 136 ROW Inspection - driveways or sewer lateral $ 273 ROW Inspection - All Others $ 273 $ 109 Dirt moved out of Poway Pool Dirt Inspection $ 218 Dirt on Site Miscellaneous Subdivision Activities Temporary Water and Sewer $ 2,617 Moving Permit - Single $ 16 Moving Permit - Annual $ 90 Easement Vacations - Summary $ 462 without public hearing Easement Vacations - Summary $ 462 with public hearing Residential Water System Analysis 1 -4 lots /units $ 300 plus consultant fees 5 -30 lots /units $ 300 plus consultant fees 31 -100 lots /units $ 300 plus consultant fees Greater than 200 lots /units $ 300 plus consultant fees Commercial /Industrial Water System Analysis (subject to abtl'I fee for review by consultant currently on contract) One fire service $ 300 plus consultant fees Two fire services $ 300 plus consultant fees More than 2 services or looped onsite system $ 300 plus consultant fees Master Fee Schedule Table 2, Effective July 6, 2010 Page 6 of 7 Service Description Fee Development Services Miscellaneous Subdivision Activities (continued) Plan Sheet Copies - Up to 24" x 36" $ 12 Plan Sheet Copies - Oversized $ 15 Blasting Permits $ 308 Encroachment Removal Agreement $ 308 Standard Agreement Time Extension $ 308 Certificate of Correction Final /Parcel Ma $ 308 Miscellaneous Water and Sewer Fees Refer to Resolution 91 -123, Table 1 Meter and Lateral Regular and Temporary Water Connections Installation Charge Cross Connection Refer to Resolution 91 -123, Table 4 North Basin Surcharge $ 1,000 Refer to Resolution 96 -096 Indirect Benefit Fee $ 500 Refer to Resolution 96 -096 Sewer Line Charge /Extension $2,00045,600 Refer to Resolution 96 -096 Sewer Inspection Fee $ 25 Refer to Resolution 96 -096 Sewer Construction Fee $ 50 Refer to Resolution 96 -096 Other Fees Abandoned Vehicle Abatement (Applicable Plus towing and dismantling fees as charged by towing when the County reimbursement program $ 179 service. ends) Nuisance Abatement $ 178 Weed Abatement (per property) $ 175 $ 100 1st violation $ 200 2nd violation within 1 year of the 1 st Citation Appeal $ 500 3rd violation within 1 year of the 1 st - $ 1,000 Each add l violation within 1 yr of 1st Alarm Permit $ 69 City receives 60 %, alarm company receives 40% Late Fee Penalty $ 69 City receives 60 %, alarm company receives 40% Permits under Developer Deposits (Time /Material) Development Permits & Review $ 160 per hour Sign Permits $ 143 per hour Miscellaneous Permits & Activities $ 147 per hour Subdivision. Review $ 157 per hour Environmental Review $ 159 per hour Subdivision Plan Check & Inspection $ 132 per hour Miscellaneous Subdivision Activities $ 154 per hour Contracted Building Services $ 143 per hour Pre - Application Conferences $ 142 per hour NPDES / JURMP Activities $ 132 per hour Traffic Control Review $ 133 per hour Other Activities Right of Way $ 109 per hour Pool Dirt $ 104 per hour Traffic Control Review $ 103 per hour Landscape Plan Review $ 152 per hour Other Fee Activities (abatements, false $ 139 per hour alarms, etc.) Misc. Meetings, Complaints $ 111 per hour Long-range Planning $ 176 per hour Master Fee Schedule Table 2, Effective July 6, 2010 Page 7 of 7 Master Fee Schedule Table 3, Effective July 6, 2010 Page 1 of 1 City of Poway Master Fee Schedule Effective July 6, 2010 Service Description., .. Fee Development Services - Development Impact Fees Water System Capacity Fees Refer to Ordinance 684 Sewer Connection Fees Refer to Ordinance 684 & Resolution 96 -096 Traffic Mitigation Fee Refer to Resolution P -08 -36 and Resolution 10 -016 Park Mitigation Fee Refer to Resolution P -08 -36 Habitat Mitigation Fee Refer to Resolution P -08 -36 Housing In -Lieu Fee Refer to Resolution P -10 -08 effective May 14, 2010 Fire Protection Impact Fee Refer to Resolution P -08 -36 Drainage Fees Refer to Ordinances 29 & 358 Water Offset Fee Refer to Ordinance 704 Master Fee Schedule Table 3, Effective July 6, 2010 Page 1 of 1 Note: A Building Permit shall include only a single issuance fee if the permit has a combination of activities, i.e. Building, Plumbing, Electrical or Mechanical. Expedited processing is only available for unusual circumstances as deemed appropriate by City Staff. Charges for expedited services shall be determined by using an hourly rate of two times the current preferred hourly rate as established by EsGil Corporation. Projects requiring additional inspections, additional re- inspection or additional plan check of revised plans shall be determined using the current preferred hourly rate established by EsGil Corporation (one -hour minimum). Master Fee Schedule Table 4, Effective July 6, 2010 Page 1 of 1 City of Poway Master Fee Schedule Effective July 6, 2010 Service Description ' Fee Development services - Building Division ' Building Plan Review and Inspection (See Schedule 1) Valuation $1 to $500 $ 25.44 for first $500 plus $3.18 each add'I $100 or fraction Valuation $501 to $2,000 $ 25.44 thereof, to and including $2,000 Valuation $2,001 to $25,000 $ 76.80 for first $2,000 plus $14 for each add'I $1,000 or fraction thereof, to and including $25,000 $ 398.80 for first $25,000 plus $9.54 for each add'I $1,000 or Valuation $25,001 to $50,000 fraction thereof, to and including $50,000 $ 637.30 for first $50,000 plus $6.60 each add'I $1,000 or Valuation $50,001 to $100,000 fraction thereof, to and including $100,000 Valuation $100,001 to $500,000 $ 987.30 for first $100,000 plus $5.36 for each add'I $1,000 or fraction thereof, to and including $500,000 Valuation $500,001 to $1,000,000 $3,131.30 for first $500,000 plus $4.45 each add'I $1,000 or fraction thereof, to and including $1,000,000 Valuation $1,000,000 and greater $5,356.30 for first $1,000,000 plus $2.86 each add'I $1,000 or fraction thereof. Individual Permits Permit Issuance $ 45 per permit Plumbing Permit $ 175 Electrical permit $ 175 Mechanical permit $ 175 Water heater permit $ 85 Solar Water Heater $ 130 Solar Photovoltaic System $ 130 In Combination with Building Permit Plumbing permit 6% of Building Permit Fee Multi - Family Plumbing permit 10% of Building Permit Fee Electrical permit 6% of Building Permit Fee Multi - Family Electrical permit 10% of Building Permit Fee Mechanical permit 6% of Building Permit Fee Multi - Family Mechanical permit 10% of Building Permit Fee Energy Compliance Fee . 15% of Building Permit Fee Disabled Access Compliance Fee (applies to Commercial, Industrial, Assembly, Educational 10% of Building Permit Fee and Multi - Family type projects as required by State Building Code. Plan Check Fee (Residential sub - division or tract o 75 /o of Building Permit Fees development projects may have production units 25% of Plumbing, Electrical or Mechanical Fee (when plan that are duplicates of the model units reduced to check is required for an individual permit) 30% of the permit fee.) The total permit fee for solar energy system installation shall be reduced by 25 %. Note: A Building Permit shall include only a single issuance fee if the permit has a combination of activities, i.e. Building, Plumbing, Electrical or Mechanical. Expedited processing is only available for unusual circumstances as deemed appropriate by City Staff. Charges for expedited services shall be determined by using an hourly rate of two times the current preferred hourly rate as established by EsGil Corporation. Projects requiring additional inspections, additional re- inspection or additional plan check of revised plans shall be determined using the current preferred hourly rate established by EsGil Corporation (one -hour minimum). Master Fee Schedule Table 4, Effective July 6, 2010 Page 1 of 1 Master Fee Schedule Schedule 1, Effective July 6, 2010 Page 1 of 5 City of Poway Master Fee Schedule Effective July 6, 2010 ' Development Services - Building Division - Valuation The Building Valuation Table is used to calculate the estimated construction value of buildings in the permit process. This number is then used to calculate permit and plan check fees the City charges to recover its costs. Occupancy Type of Construction Valuation Apartment Houses 'Type I or II -F. R. $120.83 Apartment Houses Type V or III (Masonry) $98.66 Apartment Houses Type V Wood Frame $90.90 Apartment Houses Type I Basement Garage $4213 Banks 'Type I or II -F.R $164.07 Banks Type II 1 -Hour $120.83 Banks Type II -N $117.51 Banks Type III 1 -Hour $13103 Banks Type III -N $128.59 Banks Type V 1 -Hour $120.83 Banks Type V -N $116.40 Car Washes Type III 1 -Hour $77.60 Car Washes Type III -N $74.27 Car Washes Type V 1 -Hour $66.51 Car Washes Type V -N $62.08 Churches Type I or II -F.R. $109.75 Churches Type II 1 -Hour $83.14 Churches Type II -N $78.71 Churches Type III 1 -Hour $89.79 Churches Type III -N $85.36 Churches Type V 1 -Hour $84.25 Churches Type V -N $78.71 Convalescent Hospitals 'Type I or II -F.R. $154.09 Convalescent Hospitals Type II 1 -Hour $107.53 Convalescent Hospitals Type III 1 -Hour $109.75 Convalescent Hospitals Type V 1 -Hour $103.10 Dwellings "* Type V Adobe $135.24 Dwellings * ** Type V Masonry $107.53 Dwellings ' ** Type V Wood Frame $101.99 Dwellings "' Basements (semi- finished) $25.50 Dwellings "' Additions - Wood Frame $121.94 Dwellings * *' Solariums $103.10 Dwellings "' Cabana - Pool House (Type V) $9534 Fire Stations Type I or II -F.R. $126.38 Fire Stations Type II 1 -Hour $83.14 Fire Stations Type II -N $78.71 Fire Stations Type III 1 -Hour $90.90 Fire Stations Type III -N $87.58 Fire Stations Type V 1 -Hour $85.36 Fire Stations Type V -N $80.92 Fitness Centers Same values as Office Buildings Hospitals 'Type I or II -F.R $180.69 Hospitals Type III 1 -Hour $149.65 Hospitals Type V 1 -Hour $143.00 Master Fee Schedule Schedule 1, Effective July 6, 2010 Page 1 of 5 Master Fee Schedule Schedule 1, Effective July 6, 2010 Page 2 of 5 Development Services - Building Division - Valuation The Building Valuation Table is used to calculate the estimated construction value of buildings in the permit process. This number is then used to calculate permit and plan check fees the City charges to recover its costs. Occupancy Type of Construction Valuation Hotels & Motels 'Type I or II -F.R. $111.96 Hotels & Motels Type III 1 -Hour $97.55 Hotels & Motels Type III -N $92.01 Hotels & Motels Type V 1 -Hour $84.25 Hotels & Motels Type V -N $83.14 Industrial Plants Type I or II -F.R. $63.19 Industrial Plants Type II 1 -Hour $44.34 Industrial Plants Type 11 N (Stock) $41.02 Industrial Plants Type III 1 -Hour $48.78 Industrial Plants Type III -N $45.45 Industrial Plants Tilt -up $33.26 Industrial Plants Type V 1 -Hour $45.45 Industrial Plants Type V -N $42.13 Medical Offices 'Type I or II -F.R $133.03 Medical Offices Type II 1 -Hour $101.99 Medical Offices Type II -N $97.55 Medical Offices Type III 1 -Hour $110.86 Medical Offices Type III -N $103.10 Medical Offices Type V 1 -Hour $99.77 Medical Offices Type V -N $96.44 Offices 'Type I or II -F.R. $118.62 Offices Type II 1 -Hour $79.82 Offices Type II -N $75.38 Offices Type III 1 -Hour $85.36 Offices Type III -N $82.03 Offices Type V 1 -Hour $79.82 Offices Type V -N $75.38 Private Garages Wood Frame - Finished $26.61 Private Garages Wood Frame - Unfinished $26.61 Private Garages Masonry $31.04 Private Garages Open Carports $18.85 Public Buildings "Type I or II -F.R. $136.35 Public Buildings Type 11 1 -Hour $110.86 Public Buildings Type II -N $106.42 Public Buildings Type III 1 -Hour $115.29 Public Buildings Type III -N $110.86 Public Buildings Type V 1 -Hour $105.31 Public Buildings Type V -N $101.99 Public Garages 'Type I or II -F.R. $54.32 Public Garages "Type I or II Open Parking $41.02 Public Garages Type II -N $31.04 Public Garages Type III 1 -Hour $41.02 Public Garages Type III -N $36.58 Public Garages Type V 1 -Hour $37.69 Restaurants Type III 1 -Hour $108.64 Restaurants Type III -N $104.20 Restaurants Type V 1 -Hour $98.66 Restaurants Type V -N $95.34 Master Fee Schedule Schedule 1, Effective July 6, 2010 Page 2 of 5 Development Ileniices -Building Division..- Valuation Building Valuation Table is used to calculate the estimated construction value of buildings in the iit process. This number is then used to calculate permit and plan check fees the City charges to ver its costs. Schools Type I or II -F. R. $123.05 Schools Type II 1 -Hour $84.25 Schools Type III 1 -Hour $8979 Schools Type III -N $86.47 Schools Type V 1 -Hour $84.25 Schools Type V -N $80.92 Service Stations Type II -N $7427 Service Stations Type It 1 -Hour $77.60 Service Stations Type V 1 -Hour $66.51 Service Stations Canopies $31.04 Stores *Type I or II -F.R $90.90 Stores Type II 1 -Hour $55.43 Stores Type II -N $54.32 Stores Type III 1 -Hour $67.62 Stores Type III -N $64.30 Stores Type V 1 -Hour $57.64 Stores Type V -N $53.21 Stores Retail Garden Center (Type V -N) $44.10 Theatres Type I or II -F.R. $121.94 Theatres Type III 1 -Hour $88.68 Theatres Type III -N $84.25 Theatres Type V 1 -Hour $83.14 Theatres Type V -N $78.71 Warehouses ** Type I or II -F.R. $54.32 Warehouses ** Type II 1 -Hour $32.15 Warehouses ** Type II -N $31.04 Warehouses ** Type III 1 -Hour $36.58 Warehouses ** Type III -N $35.47 Warehouses ** Type V 1 -Hour $32.15 Warehouses ** Type V -N $31.04 MISCELLANEOUS Agricultural Building $18.85 Aluminum Siding $5.54 Antennas Radio over 30 ft. high $3,569.54 Antennas Dish, 10 ft, dia. w /decoder $4,339.98 Awning or Canopy (supported by building) Aluminum $21.06 Awning or Canopy (supported by building) Canvas $8.87 Balcony $14.41 Decks (wood) $14.41 Demolition of Building $4.43 Master Fee Schedule Schedule 1, Effective July 6, 2010 Page 3 of 5 - Development Services Building Division - Valuation, , , The Building Valuation Table is used to calculate the estimated construction value of buildings in the permit process. This number is then used to calculate permit and plan check fees the City charges to recover its costs. Fence or Freestanding Wall Fence or Freestanding Wall Fence or Freestanding Wall Fence or Freestanding Wall Fence or Freestanding Wall Foundation Only (25% of value of whole building). Remainder of building will be valued at 75% of the building Wood or Chain Link Wood Frame with Stucco Wire Masonry Wrought Iron $2.22 $5.54 $2.22 $8.87 $5.54 Manufactured Housing (25% of value of "site built" house) Mobile Home ining Wall rofing (1 square = 100 square feet) rofing (1 square = 100 square feet) rofing (1 square = 100 square feet) rofing (1 square = 100 square feet) rofing (1 square = 100 square feet) rofing (1 square = 100 square feet) rofing (1 square = 100 square feet) rofing (1 square = 100 square feet) rofing (1 square = 100, square feet) Structure Replacement ias (Steam) or Hot Tub ( "Jacuzzi ® ") Wood Frame with Cover Metal Frame with Cover Wood Frame Cover & Walls Metal Frame Cover & Walls Screen or Plastic Walls Inside Outside Concrete or Masonry Built -up Composition Shingles Fiberglass Shingles Asbestos Cement Shingles Wood Shingles (Class C min) Wood Shakes (Class C min) Aluminum Shingles Clay Tile Concrete Tile one and Brick Veneer orage Racks ' per CF vimming Pool (per sf surface area) Vinyl -lined vimming Pool (per sf surface area) Gunite vimming Pool (per sf surface area) Fiberglass Medical offices, restaurants, Want Improvements hazardous 'h' occupancies Want Improvements Other such as stores & offices General Additions and Modifiers re Sprinkler System r Conditioning - Commercial r Conditioning- Residential replace- Concrete or masonry replace - prefabricated metal le Foundations Cast -in -place concrete piles le Foundatio Steel piles Master Fee Schedule Schedule 1, Lnectve July b, Zu - lu $5.54 $24.39 $24.39 $8.87 $11.09 $12.19 $14.41 $3.33 $3.33 $3.33 $17.74 $135.24 $126.38 $126.38 $300.42 $300.42 $300.42 $453.40 $380.23 $321.48 $14.41 $8,909.44 $7,309.80 $14.41 $8.87 $1 11 $34.37 $37.69 $41.02 $46.56 $34.37 $2.88 $4.66 $3.88 $3,569.54 $2,426.62 $23.28 $57.64 Page 4 of 5 Development Services - Building Division - Valuation The Building Valuation Table is used to calculate the estimated construction value of buildings in the permit process. This number is then used to calculate permit and plan check fees the City charges to recover its costs. Occupancy Type of Construction Valuation Alterations to Existing Structures (with no additional Floor Area or Roof Cover) Interior Partition $53.21 Install Windows or Sliding Glass Doors $16.63 Close Exterior Wall Opening $15.52 Shell Buildings 80% of completed * *Deduct 11 percent for mini - warehouses. ** *For subdivisions with 10 or more single - family dwellings which have plan check and building permit issuances in groups of 10 or more, the valuation of the plan check and building permit fees may be decreased by 10 percent. Master Fee Schedule Schedule 1, Effective July 6, 2010 Page 5 of 5 Master Fee Schedule Schedule 2, Effective July 6, 2010 Page 1 of 6 City of Poway Master Fee Schedule Effective July 6, 2010 Development Services - Engineering Division - Unit.Price List This list is used to calculate project valuations for assigning permit, deposit and security requirements for plan check and inspection services. _ _. Item _ _ ._ __ - -- - -__.. Desiription _._ _ Unit - - -- - Price EROSION CONTROL AND LANDSCAPING Gravel Bags EA $3.00 Straw Bales EA $8.00 Fiber Rolls LF $3.00 Silt Fencing LF $2.00 Hydroseeding SF $0.33 Fiber Mat SF $0.50 Bonded Fiber Matrix SF $0.11 Plastic Sheeting Visquene SF $0.40 Landscape R Irrigation Slope erosion control SF $1.21 Stabilized Construction Entrance SF $2.20 Concrete Washout EA $825.00 Inlet Protection EA $125.00 Desilting Basin Temporary construction bmp EA $4,200.00 Shrubs 1 gallon EA $2.00 5 gallon EA $20.00 Tree Planting 15 gallon EA $85.00 24" box EA $250.00 36" box EA $350.00 Tree Removal EA $500.00 GRADING Clearing and Grubbing SF $0.45 Cribwall SF $24.00 Embankment 1-1,000 CY $16.00 1,001 - 20,000 CY $12.00 20,001 - 50,000 CY $6.50 50,001 - 100,000 CY $4.50 100,001- 500,000 CY $3.70 over 500,000 CY $3.00 Import or Export CY $12.00 Retaining Walls Masonry SF $28.00 Rock Excavation Blasting CY $37.00 Rock Excavation No Blasting CY $18.00 Structure Excavation CY $35.00 Subdrain 4" w/ rock and fabric LF $30.00 Subdrain 6" w /rock and fabric LF $35.00 Master Fee Schedule Schedule 2, Effective July 6, 2010 Page 1 of 6 Development Services - Engineering Division - Unit Price List This list is used to calculate project valuations for assigning permit, deposit and security requirements for plan check and inspection services. Item Description ' ' Unit Price PAVING A. C. Asphalt Concrete SF /IN $0.50 A. B. Aggregate Base SF /IN $0.20 C.T.B. Cement Treated Base SF /IN $0.25 D. G. Decomposed Granite Ton $24.00 P.C.C. Portland Cement Concrete SF /IN $1.25 Pavement Crack Sealing LF $1.50 Pavement Reinforcing Fabric SY $1.20 Pavement Removal Existing AC SF $1.45 Existing PCC SF $2.50 Existing AC Berm LF $3.10 Saw Cut Existing Paving LF $2.65 Grinding Existing Paving SF $2.35 Sub grade Preparation SF $0.40 STREETS Dikes, AC 6" Type "A" " D" "E" LF $9.50 8" Type "B" "C" LF $11.00 Concrete Stamped Pattern SF $6.00 Cross Gutter 7" PCC SF $8.00 Curb 6" PCC LF $16.00 8" PCC LF $18.00 Curb and Gutter 6" PCC LF $21.00 8" PCC LF $24.00 Gutter 18" Wide, 6" PCC LF $12.00 Driveway 5 1/2" PCC SF $7.00 Fence Chain Link 4' High LF $12.00 5' High LF $14.00 6' High LF $15.00 Fence Wood 6' High LF $22.00 Guard Post & Barricade 20 LF $630.00 Guardrail LF $30.00 Header 2" x 6" Redwood LF $5.00 Street Lights 90 Watt - L.P.S.V. EA $4,300.00 180 Watt- L.P.S.V. EA $4,500.00 Loop Detector Replacement EA $450.00 Metal Beam Barricade LF $37.90 Monuments EA $425.00 Master Fee Schedule Schedule 2, Effective July 6, 2010 Page 2 of 6 Development $ervices - Engineering Division - Unit Price List This list is used to calculate project valuations for assigning permit, deposit and security requirements for plan check and inspection services. Item Description Unit Price STREETS (continued) Pavement Legends EA $200.00 Pavement Markers EA $5.50 Pedestrian Ramp EA $1,200.00 Regulatory Signs Stop, Speed Limit, No Parking, etc. EA $185.00 Removal Existing Curb LF $3.80 Existing Curb and Gutter LF $4.75 Sidewalk SF $1.50 Sidewalk 4" PCC SF $5.00 Street Name Sign EA $200.00 Striping 4" White LF $0.50 8" White LF $0.50 4" Double Yellow LF $0.60 4" White Skip LF $0.35 Traffic Control Lane Closure Per Day EA $500.00 Traffic Signal EA $127,000 Trail Pedestrian /Equestrian LF $12.00 Trench Restoration, Asphalt LF $24.00 Wall Cut -off Pavement EA $800.00 Cleanout Cleanout (Sewer Force Main) Cradle (concrete) Dead End Cap Encasement (concrete) Lateral Manhole (adjust rim to grade) Pressure Sewer Pipe 4" - 30' long 6" - 30' long 8 1, PVC 1D" PVC 12" PVC 15" PVC 18" PVC 21" PVC 4 " 6" EA EA LF EA LF EA EA LF LF LF LF LF LF EA EA LF LF $800.00 $1,050.00 $32.50 $315.00 $37.00 $1,335.00 $1,850.00 $50.00 $68.00 $76.00 $97.00 $108.00 $117.00 $3,250.00 $450.00 $52.00 $70.00 Master Fee Schedule Schedule 2, Effective July 6, 2010 Page 3 of 6 Development Services - Engineering Division - Unit Price List This list is used to calculate project valuations for assigning permit, deposit and security requirements for plan check and inspection services. Item _ Descriptt ion .__ _ - -- - Unit - - — Price - SEWER (continued) Protective Slab Concrete LF $11.50 Shoring Over 5 feet deep LF $11.50 Stub & Plug 6" or 8" EA $150.00 Tie -in to Existing Manhole EA $1,350.00 Wall concrete anchor CY $930.00 Cut -off EA $1,470.00 WATER Adjust to Grade valve, blow -off, or MAR EA $200.00 Air & Vacuum Valve Assembly EA $2,200.00 Anchor Block EA $660.00 Backflow Prevention Assembly EA $1,650.00 Blow -off Assembly 2 EA $1,254.00 4" EA $2,321.00 Cut -off Wall EA $140.00 Fire Hydrant Assembly EA $3,500.00 Fire Hydrant Relocation EA $2,200.00 Fittings, bend, tee, flange, etc 8" EA $185.00 10" EA $215.00 12" EA $250.00 Main, All Materials 4" LF $38.00 6" LF $50.00 8" LF $58.00 10" LF $63.00 12" LF $70.00 16" LF $89.00 20" LF $100.00 Manual Air Release Assembly EA $1,420.00 Pipe, Steel 6" LF $60.00 8" LF $75.00 Post Indicator Valve EA $1,050.00 Protection Post 4" x 85 steel EA $170.00 Reducer EA $215.00 Relocate Water Meter EA $720.00 Master Fee Schedule Schedule 2, Effective July 6, 2010 Page 4 of 6 Development Services - Engineering Division - Unit Price List This list is used to calculate project valuations for assigning permit, deposit and security requirements for plan check and inspection services. Item Description Unit Price WATER (continued) Service 1" EA $1,700.00 11/2" EA $2,200.00 2" EA $2,800.00 Tie -In to Main Daytime 4 "- 8" EA $650.00 Daytime 10" - up EA $900.00 Nighttime 4"- 8" EA $1,200.00 Nighttime 10" - up EA $2,000.00 Thrust Block EA $250.00 WATER (Continued) Valve Assembly, Gate 4" EA $550.00 6" EA $950.00 8" EA $1,410.00 10" EA $1,720.00 12" EA $1,915.00 Valve Assembly, Butterfly 14" EA $2,120.00 16" EA $3,180.00 STORM DRAIN AC Spillway EA $320.00 Channel Lining SF $8.00 Clean Outs Type "A" EA $4,200.00 Type "B" EA $4,500.00 Culvert Pipe (all materials) 3" (private only) LF $12.00 4" (private only) LF $16.00 6" (private only) LF $20.00 8" (private only) LF $24.00 12" (private only) LF $32.00 18" LF $80.00 24" LF $100.00 30" LF $120.00 36" LF $140.00 42" LF $160.00 48" LF $180.00 54" LF $200.00 60" LF $220.00 66" LF $240.00 72" LF $260.00 Cast in Place PCC Structures 0 -20 CY $550.00 20+ CY $440.00 Master Fee Schedule Schedule 2, Effective July 6, 2010 Page 5 of 6 Development Services - Engineering Division —Unit Price list This list is used to calculate project valuations for assigning permit, deposit and security requirements for plan check and inspection services. Item Description Unit Price STORM DRAIN (continued) Ditch Concrete brow LF $20.00 Earthen LF $6.00 Energy Dissipater D -41 EA $8,200.00 Headwalls Gravity type EA $3,000.00 Wing Type 12" - 36" pipe EA $3,600.00 Wing Type 42" - 84" pipe EA $4,800.00 1" Type EA $4,100.00 Inlets Private Catch Basin <12" EA $105.00 Private Catch Basin 12 "x12" EA $265.00 Private Catch Basin 18 "x18" EA $475.00 Catch Basin Type "F" EA $4,000.00 Catch Basin Type "G" EA $4,800.00 Catch Basin Type T' EA $5,500.00 CSP Inlet EA $2,100.00 Curb Inlet Type A, B. C, L =4' to 10' EA $4,600.00 Type A, B. C, L =11' to 20' EA $5,000.00 Type A, B, C, L =21' to 28' EA $5,900.00 Inlet Apron EA $1,700.00 Lug All types EA $1,200.00 Outlets Sidewalk Underdrain pipe EA $420.00 Sidewalk Underdrain type "A" EA $2,100.00 Pipe Collar EA $1,580.00 RipRap Placed CY $150.00 Engineering Fabric SF $0.12 Velocity Reducing Ring Up to 36" EA $160.00 Over 36" EA $370.00 Wall Curtain EA $600.00 Cut -off Drain EA $650.00 NOTE: Cost Estimates for bonding and securities for improvements shall include a 10% contingency amount added to the construction estimate. Total amount (construction plus contingency) should be rounded to the next highest $100 for the bond amount. Master Fee Schedule Schedule 2, Effective July 6, 2010 Page 6 of 6