Loading...
Item 6 - Visual Slideshow presented by Staff at MeetingCUP18-019 St. Bartholomew Expansion Zoning MapN Project Site16275 PomeradoFirst Church Christ ScientistCity of San DiegoRR-C ZoneN Pomerado RoadN Proposed Parking Lot after Demolition of Parish HallN Proposed Parish Community Center - Phase 2-ARoof TerraceLower Level Floor PlanProposed ParishCommunity CenterFrontFrontN Proposed Parish Community Center - Phase 2-AWest ElevationSouth Elevation North ElevationEast ElevationExiting Admin. CenterExiting Admin. Center Proposed Parish Community Center - Phase 2-BLower Level Floor Plan Upper Level Floor PlanFrontFrontEnclose Roof DeckParish Hall Extension West ElevationSouth ElevationNorth ElevationEast ElevationParish Hall ExtensionParish Hall Extension Requested 29-footFront Yard Setback (FYSB)Required 40-footFront Yard Setback (FYSB)Site Plan, Phase 3, and Requested Setback VariancePomerado RoadNExisting36-foot FYSBExisting29-foot FYSBPhase 3- Increase Preschool from 82 to 154 Students Neighborhood MeetingConcernTraffic on Pomerado RoadƒThe additional traffic generated by the expanded project is below the threshold for generating a traffic studyNoise from Additional Children and HVACs Impacting Neighboring ResidencesƒNoise Study determined that the project would comply with the Noise standards in the Poway Municipal Code and the General PlanView of the New 2-story Parish Community Center and Reduction of TreesƒArchitectural siding and roofing materials the same as existing structures on-siteƒTrees to be removed to be replaced at approximately 1:1 ratio.ƒAdditional trees and landscaping will be planted along Pomerado Road to soften the appearance of the building. Discussion