Loading...
Item 3 - City Reservoir LandscapingAGENDA REPORT aF Al ]Eo _CIT'Y OF POWAY c �� tiFc '•...,...s Baa ��'S� ' � THE TO Honorable Mayor and Members of the�City Council FROM: James L. Bowersox,, City Man INITIATED BY Lee Lewis, Director of-Community Service Daniel W., Cannon, Landscape Facilities Mana er40G DATE: August .21, 1986 SUBJECT': 'City 'Reservoir Landscaping BACKGROUND' - City Council directed staff to develop,a landscape plan for the city's reservoirs to reduce the.visual impact to Poway residents FINDINGS The City of Poway has nine water holding reservoir sites located in various.' areas of the•. city. All of the reservoirs, due to height and location,-have some degree of visual :impact ' on. the :public. With the exception of'Welton and Celestial reservoirs, all of the reservoirs need landscaping to mitigate the visual impact. Reservoirs Es ola reservoir has the -least a F p mount of visual impact ...compared . to the other reservoir sites. Espola reservoir was.constructed in a three-sided ravine ,leaving only the west side. visable. The west side .of the reservoir was landscapedin the early 1970's with'35 pepper trees The t-re6s are well established and require occasional hand watering during the summer. The pepper trees; . have screened the: reservoir to the west and staff is not proposing any additional landscaping. Boca Raton reservoir is visable by most of north county because it was constructed on the top of a lone peak.. The reservoir has IS pine:' trees, four shrubs and the. banks` have been planted with ice plant. There is no irrigation. Signal Master has maintained the. landscaping for several years. Many of the previously planted pine trees were lost to the bore beatle and the pine tip moth.. ACTION, AUG211986, ITEM 3 Workshop Agenda Report August 21 1986 Page 2 Boca Raton reservoir landscape installation need 1. automatic irrigation $1,200 2 landscape 25-15 gallon eucalyptus 21500 32-5 gallon acacias 640 total $41340 Skyridge reservoir is in the backyard of a High Valley resident and can beseenby the residents of High Valley.. The reservoir was J.andscaped with monterey pines in the mid -1960's and over the past 10. years, 20 mature pines have died. Staff has recently planted 181 eucalyptus,.. 18 acacias, and 5 coulter pines and installed a manual irrigation system Additional landscaping is required to the south of.the reservoir. Skyridge reservoir landscape installation needs 1. automatic irrigation $ 400 2 landscape 15-1.5. gallon eucalyptus 1x500 15-5 gallon =acacias 300. total $2F200' Welton reservoir was constructed and Landscaped in .1981 and can -be, seen by most residents living near the site. Boyle Engineering designed the landscaping to blend.in with the surrounding vegetation. The irrigation system was extensive, providing two pumps and overhead watering to the three acre site. Staff 'maintained the landscape to the design criteria until the City Council requested additional landscaping to reduce the visual impact. Staff installed 50 eucalyptus and 30 acacias and an automatic drip irrigation system. The landscaping was completed in November 1985 and no additional, landscaping is required.. Pomerado reservoir was constructed in 1982 without landscaping. The reservoir can be seen by anyone traveling or living along Pomerado Road between the hospital and South Poway. The reservoir is also visable to the residents in the Standard Pacific Development. Pomerado reservoir will be bordered by residential housing on all, sides within the next two years Improvements to the Pomerado reservoir site are proposed to be completed in two phases. The first phase would be to landscape the site. The second phase would be to fence the site for public safety and security and to landscape the property boundary. Pomerado reservoir landscape installation needs 1. automatic irrigation $2,000 ....,2, --landscape 42 acacias 840 29-15 gallon: eucalyptus 2,900- 100- 1 gallon eucalyptus (slopes) 500 total $6,240 Phase two is; to be accomplished by the developer or by the city at the time of development.: ...., o - inoc ., 1 T F til. Workshop Agenda Report August 21, 1986 Page 3 Celestial reservoir was :constructed and landscaped .in 1962.. The reservoir site has 50, mature eucalyptus trees on the property boundary, reducing the visual impact. The reservoir can be seen frou limited areas along Pomerado Road and from higher elevations in west Poway. Anirrigation system was installed in the chain link fence bordering the reservoir in the mid -1960's but has been abandoned. The reservoir is visable to the surrounding neighborhood and additional landscaping is needed. Celestial reservoir, landscapeinstallation needs 1. automatic irrigation 2. landscape 60-5 gallon acacias $1,500' 1,200' total $2,700 Boulder Mountain reservoirs were constructed in 1960 and 1975. The 98 eucalyptus trees were planted at different times. The first group of trees surrounding the south tanks were, planted in 'the late 1960's and the trees surrounding the north tank were planted and irrigated in 1981 -. The site requires an automatic irrigation system to be installed along with additional landscaping to reduce the visibility of the reservoir.. Boulder Mountain reservoirs landscape installation needs 1. automatic irrigation - two systems need to be installed due to the size of the project site to include power, valves, clocks and drip line. $3,000 2. landscape 75 acacias 1,500 total $4,500 Blue Crystal reservoir is surrounded on three sides by hills with the west side visable. The reservoir can be seen in. selected areas along Garden Road and. Poway Road. There is no landscaping, power, or water outlet at the reservoir. Blue Crystal reservoir landscape installation needs 1. manual irrigation tapping off the tank for water, valves and drip line. The asphalt would need to be cut and replaced for the water lines., $ 700 2. landscape 17-15 gallon eucalyptus 1,700 16- 5 gallon acacias 800 total $3,200 AUG 21 1986 ITEM. 3 Workshop Agenda Report August 21, 1985 Page. 4 Alta Mira reservoir was constructed and landscaped in 1982..The reservoir can be seen by residents living in the. area of Poway High School or on view lots in High Valley.. 'The' reservoir has 32 eucalyptus trees and 7 pine trees and an automatic irrigation system. The landscaping does -not eliminate the visibility of the reservoir. Alta Mira reservoir landscape installation needs to automatic irrigation - the majority.of the system has been installed and can f be modified to a drip system. $ 500 3, 2. landscape 30-15 p gallon eucalyptus 3,000: 3 40- 5 gallon acacias - $00 total $4,300 Staff is proposing the use of eucalyptus camaldulensis: (red gumY to screen the upper half of the reservoirs and acacia baileyana to screen the lower half; of the reservoirs. Staff is also proposing that all reservoir, landscaping be automatically irrigated with a drip irrigation system. Reservoir landscaping cost summary Espola Boca Raton - 4,340 Skyridge 2,-200 Welton _ a - f Pomerado 5,240 Celestial. 2;700 Boulder Mountain 4,500. Blue Crystal 3,200 Alta Mira 4,300` sub total design and engineering cost _ 8 g 'percent 2,199 total project cost $29,6.7.9 RECOMMENDATION It is recommended that the .City Council receive the report and provide staff with additional direction. JLB:DLL DWC:sf _ Attachment Reservoir _ location -map AUG 2 x..1996 I T E M 3 WATER RESERVOIR LOCATIONS