Loading...
Off Docket - Pomerado Hospital Traffic SignalAGENDA REPORT OF PO`��_ CITY OF POWAY C I TO: Honorable Mayor and Members of the City Council FROM: James L. Bowersox, City Mana ,* INITIATED BY: Alan D. Archibald, Director. Public Services/City Enginee Wm. E. Blakesley, Assistant City Engineer DATE: February_ 14,-1984 i SUBJECT: Pomerado Hospital Traffic Signal BACKGROUND Based on a petition submitted by the Northern San Diego County Hospital District in April 1982, the 1982-83 Capital Improvement budget included a project to installa traffic signal at the intersection of Pomerado Road with the entry into Pomerado Hospital. After an initial study, the project design was initiated in July 1982, with the provision that the project include traffic control for the two private driveways and the west - side of the intersection opposite the hospital Total project costs were estimated at that time to be $90,500, with the Hospital District approving their contribution of $60,000 or the actual cost of the signal hardware, whichever was greater. FINDINGS Pians and specifications are completed and ready for bidding, with an estimated construction cost of $93,716 of which the traffic signal portion is estimated to be $71,200 (Attachment 1) Total project costs, including engineering, right-of-way documents, and contingencies are estimated at $127,000. The City Manager's office is working with the involved parties to finalize the mutual easement agreements. RECOMMENDATION It is recommended that the City Council authorize staff to advertise for bids to construct.the project as designed, with a bid opening date of March'29, 1984. JLB:ADA:WEB pw Attachment 1: Engineering Estimate OFF -DOCKET ITEM FERRYMAN & STEPHENSON INC: Q COST & QUANTITY ESTI pBl 1 1 Q MATE /CStR 988, preclEe�r CIRCULATION RAMP & TRAFFIC SIGNAL IMPROVEMENTS AT POMERADO ROAD AND POMERADO HOSPITAL- ENTRANCE ,oe No. 052-224-228 . LiU4tTS SUBTOTAL' ' F R OM SM - ITEM M ITEM QUANTITY UNIT PRICE COST Exp. ®r, `MLE ATE ; i 0-07-83 CHECK DATE REV. $Y DATE CHICK DATE_ COMMENTSs- D ESiCaI EO �Y' ArP. il' TYr$ O p CYT'. SUB TOTAL TOTAL Est. test $93,716.50 :� OF 1 FEB 14 1984 ITEM I Clearing & Grubbing _ Lump Sum L.S. 6,000 00 2 U classified Excavation 135 CY 6.:.50 877 50 3 Brow Ditch, T pe 3 95 LF 9.00 855 00 4 2111 x 15" CSPA 50. LF .54.00. 22700 00 5 Straight Headwall, Type B 2 EA 1000.00. 21000 00 6 Transition Section Lump .Sum L.S. 300 .12048 00 00 7 2-1/2" P.M. Irrigation Sleeve 13.1 LF 8..00., 8* 6" Concrete Curb 154 LF 9.00: 12386 QO 9 Asphalt Concrete 85 TON 50.60.. 42250 00 10 Aggregate- Base, Class 11 80 TON 20.00 19600 00 11 12 Traffic Signal & Safety Li2htin2 Si2ning & Stri i n . Lump .Lump Sum Sum L_S: L. S-. =�.9;— 71,2000 1250.0 QO _ Exp. ®r, `MLE ATE ; i 0-07-83 CHECK DATE REV. $Y DATE CHICK DATE_ COMMENTSs- D ESiCaI EO �Y' ArP. il' TYr$ O p CYT'. SUB TOTAL TOTAL Est. test $93,716.50 :� OF 1 FEB 14 1984 ITEM