12-02-14 Agenda PacketCITY COUNCIL REGULAR MEETING
AGENDA
December 2, 2014-7:00 P.M.
A SPECIAL MEETING WILL BE HELD AT 6:00P.M.
(SEE SEPARATE AGENDA)
City Council Chambers
13325 Civic Center Drive , Poway , CA 92064
THE CITY COUNCIL ALSO SITS AS THE CITY OF POWAY PLANNING COMMISSION, POWAY H OUSING AUTHORITY,
PUBLIC FINANCING AUTHORITY AND SUCCESSOR AGENCY TO THE POWAY REDEVELOPMENT AGENCY
CALL TO ORDER
ROLL CALL Cunningham , Vaus , Mullin , Grosch , Higginson
PLEDGE OF ALLEGIANCE Deputy Mayor Grosc h
PRESENTATIONS
Presentation of Maintenance Superintendents Association (MSA) Perpetual Trophy for
Skills Competition at the Annual Training & Equipment Show to Public Works Streets
and Storm Water Crews .
PUBLIC ORAL COMMUNICATIONS
Persons speaking during Public Oral Communications may address the Council on any
subject matter within the Council 's jurisdiction that is not listed as an item on the
agenda. State law generally prohibits the Council from taking action on any issue not
included on the agenda . Your concerns will be referred to staff. Comments are limited
to three (3) minutes.
NOTE: The agenda is posted and provided 7 days prior to the City Council meeting. By State law,
items can be added up to 72 hours prior to the meeting. Items with a "#"symbol are in
preparation. If items are added after original agenda is posted, new items will be listed on an
Amended Agenda posted the Friday prior to the meeting.
For your convenience, a complete Agenda Packet is available for
public review at City Hall and on the City's website at www.poway.org.
Page 1
City of Poway-City Council Agenda -December 2, 2014
1. CONSENT CALENDAR (Approved By Roll Call Vote)
The Consent Calendar may be enacted in one motion by the Council without discussion
unless a Councilmember, a member of the public , or City staff requests that an item be
removed for discussion .
1.1 Approval of Reading by Title only and Waiver of Reading in full of Ordinances on
Agenda.
1.2 Ratification/Approval of Warrant Registers for the periods of October 20 through
October 24 , 2014 and October 27 through October 31 , 2014 .
1.3 Approval of the October 21 , 2014 Special and Regular City Council Minutes.
1.4 Approval of Local Appointments List for 2015.
1.5 Award of Agreement to RJM Design Group, Inc., for As-Needed Landscape
Architectural Design Services ; RFP 15-007 .
1.6 Rejection of Proposal for Trucking and Operator Services ; RFP 15-009.
1.7 Approval of Exclusive Negotiating Rights Agreement between the Poway Housing
Authority and Habitat for Humanity.
1.8 Adoption of a Resolution Authorizing the Execution of the Agreement for the
Housing-Related Parks Program Grant, and Appropriation of Funds to Capital
Improvement Project 1698B.
1.9 State Department of Finance Determination-Authorization of the State Transfer of
Smith Judgment Fund .
1.10 Approval of Parcel Map for Tentative Parcel Map 11-01 ; Bill Yen , Applicant.
1.11 Second Reading and Adoption of Ordinance 772 entitled , "An Ordinance of the
City of Poway , California , Amending Sections 13.04 .190 and 13 .11 .100 of the
Poway Municipal Code relating to Temporary Water and Sewer Connections ."
2. ORDINANCE (Ordinance(s) t hat do not requ ire a Publ ic Heari ng )
2.1 None .
3. PUBLIC HEARING
3.1 Approval of Environmental Assessment , Conditional Use Permit 14-005, Minor
Development Review Application 14-025, and Variance 14-009. A request for
approval to establish an animal day care and kennel business on a developed
commercial site located at 12255 Poway Road , in the Community Business Zone .
Morningstar Real Estate Services , Applicant.
Page 2
City of Poway-City Council Agenda-December 2, 2014
City Manager's Recommendation: Take public input; close the public hearing
and adopt a resolution entitled "A Resolution of the City Council of the City of
Poway, California , Adopting a Negative Declaration for Conditional Use Permit 14-
005 , Minor Development Review Application 14-025, and Variance 14-009" and a
resolution entitled "A Resolution of the City Council of the City of Poway , California,
Approving Conditional Use Permit 14-005 , Minor Development Review Application
14 -025 , and Variance 14-009 Assessor's Parcel Number 317-151-60."
4. STAFF REPORT
4 .1 City of Poway Habitat Acquisition Strategy .
City Manager's Recommendation: Receive and file report .
4 .2 Approval of Agreement for Financial Advisor Services.
City Manager's Recommendation: Authorize the City Manager to enter into an
agreement with KNN Public Finance for financial advisor services .
5. WORKSHOP
5.1 Recommendations for Water and Sewer Rate Adjustments.
City Manager's Recommendation : Direct staff to proceed with the Prop 218
process to implement the recommended rate changes , effective in March 2015 .
6. MAYOR AND CITY COUNCIL-INITIATED ITEMS
JIM CUNNINGHAM
6 .1 "Hike , Bike and Ride across Poway." (verbal report)
STEVE VAUS
6 .2 Water Saving Tips . (verbal report)
JOHN MULLIN
DAVE GROSCH
DON HIGGINSON
7 . CITY MANAGER ITEMS
Page 3
City of Poway-City Council Agenda-December 2, 2014
8. CITY ATTORNEY ITEMS
ADJOURNMENT
The Poway City Council welcomes you and encourages you r continued
i nterest and involvement in the City's decision-making process.
The City of Poway complies with the Americans with Disabilities Act. Upon request this
agenda will be made available in appropriate alternative formats to persons with disabili ties
as required by section 202 of the American with Disabilities Act o f 1990. Any person with a
disability who requires a modification or accommodation in order to participate in a
meeting should direct such request to the City Clerk's Office at 858-668-4530 at least
State of California
County of San Diego
24 hours before the meeting, if possible.
)
) ss.
)
AFFIDAVIT OF POSTING
I, Sheila R. Cobian, City Clerk of the City of Poway, hereby declare under penalty of perjury that
this notice of a Regular Meeting as called by the City Council of the City of Poway was posted and
provided on November 25, 2014, at 3:30p.m. Said meeting to be held at 7:00p.m ., December 2,
2014, in the Poway City Council Chambers, 13325 Civic Center Drive, Poway, California. Said
notice was posted on the Bulletin Board at the entrance to City Hall.
Page4
Item 1.1·
Approval of Reading by Title
Only and Waiver of Reading in
Full of Ordinances on Agenda.
1 of 25
APPROVED D
APPROVED AS AMENDED D
City of Poway
COUNCil AGENDA REPORT
(SEE MINUTES)
DENIED D
REMOVED D
CONTINUED ____ _
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
RESOLUTION NO. ___ _
December 2, 2014
Honorable Mayor and Members of the City Council
Daniel Singer, City Manager ~i)
Scott Edwards, Director of Administrative Services~
Andrew White, Finance Manager CIV
Ratification of Warrant Registers for the Periods of October
20 through October 24, 2014 and October 27 through
October 31, 2014
The attached warrant register reports for the periods of October 20 through October 24,
2014 and October 27 through October 31, 2014, are submitted to the City Council for
ratification/approval.
Recommended Action:
It is recommended that the City Council ratify/approve the warrant registers for the
periods of October 20 through October 24, 2014 and October 27 through October 31,
2014.
Background:
Weekly registers of audited demands are periodically submitted to the City Council by
the Director of Administrative Services for ratification/approval.
Findings:
Date
October 20 through October 24
Amount
$2,600,925.10
Warrants for amounts in excess of $100,000 for this period include:
Warrant
Freddie Mac Investment
Check Number
00903218
Amount
$2,001 ,083.33
December 2, 2014 Item# 1.2
2 of25
Warrant Report
December 2, 2014
Page 2
Date
October 27 through October 31
Amount
$2,574,887.18
Warrants for amounts in excess of $100,000 for this period include:
Warrant
November 2014 Medical Insurance Premium
September 2014 Water Purchase
Payroll 10-17-14, Retirement
Payroll10-31-14
Fiscal Impact:
Check Number
00228660
00228753
00903219
00903220
Amount
$ 202,712.93
$1,350,859.92
$ 149,502.36
$ 452,153.27
The total amount of warrants for the period of October 20 through October 24, 2014, is
$2,600,925.1 0.
The total amount of warrants for the period of October 27 through October 31, 2014, is
$2,574,887.18.
Environmental Review:
This item is not subject to CEQA review.
Public Notification:
None
Attachments:
Warrant Register for the period of October 20 through October 24, 2014
Warrant Register for the period of October 27 through October 31, 2014
December 2, 2014 Item # 1.2
w The City of Poway Director of Administrative Services Submits the Following Register of Run Date: 23-0ct-14
0 Demands for the period 10120!2014 -10/2412014 and Recommends its Ratification/Approval: Page: 1 of 14 .... ....,
c.n
Check
Number Date Payee/Vendor Invoice Comment Fund Orgn Acct Prof!. CheckAmt
00228522 23-0ct-14 @00010119 3M Cogent, Inc. 239661 September 2014 Fingerprinting 100 0101 4934 100 9.10
00228523 @00004762 Abean a Industries 953634 Chemicals for Pool 100 0203 4502 400 592.19
954566 Chemicals for Pool 100 0203 4502 400 454.47
Total for Check 00228523 1,046.66
00228524 23-0ct-14 -----Patient ..... Overpayment on account 100 8141 45.00
00228525 @00002106 Airgas USA, LLC 9031874906 Chemicals for Pool 100 0203 4502 400 335.62
9032160200 Chemicals for Pool 100 0203 4502 400 389.50
9921776889 Safety Supplies 100 0501 4750 200 1,345.25
9921776890 Safety Supplies 100 0503 4750 200 505.25
9921807605 WTP: cylinders rented-air, C02, propane, 02 510 0402 4760 300 137.75
Total for Check 00228525 2,713.37
00228526 23-0ct-14 @00000079 Allstar Fire Equipment, Inc 176525 SCBA Repairs 100 0501 4308 200 343.35
176743 SCBA Repairs 100 0501 4308 200 153.08
Total for Check 00228526 496.43
00228527 23-0ct-14 @00010815 American Construction and Supply Inc. 40601017141601 Alta Mira Reservoir: Handhole covers: 510 0402 4760 300 1,106.51
00228528 -----Ames, Brett 21802700-1 0 Closing Balance Refund, Over Payment 510 8120 43.78
00228529 @00000152 Aramark Refreshment Services 1267427 Monthly Cappuccino Equip Lease-PCPA-11/1 100 0204 4936 400 49.00
00228530 @00005241 Aramark Uniform Services Inc 588-6854642 Fleets: Uniforms, mats, shop towels 611 0413 4928 300 8.78
588-6854642 Fleets: Uniforms, mats, shop towels 100 0419 4120 300 36.00
588-6861193 Parks: Uniforms & mats 100 0419 4120 300 1.84
588-6861193 Parks: Uniforms & mats 100 0418 4928 300 14.03
588-6872464 Parks: Uniforms & mats 100 0419 4120 300 1.84 c 588-6872464 Parks: Uniforms & mats 100 0418 4928 300 14.03 CD
(") 588-6877097 Fleets: Uniforms, mats, shop towels 100 0419 4120 300 39.85 CD
3 588-6877097 Fleets: Uniforms, mats, shop towels 611 0413 4928 300 8.78
C" 588-6877098 Wk 10/8/14: Meter Readers uniforms 510 0401 4928 300 2.64 CD ..,
588-6877099 Wk 10/8/14: Util Sys & WTP uniforms; mats 510 0402 4928 300 16.21 ....,
...., 588-6877099 Wk 10/8/14: Util Sys & WTP uniforms; mats 510 0401 4928 300 13.87
0 ..a. 588-6877099 Wk 10/8/14: Util Sys & WTP uniforms; mats 100 0419 4120 300 6.72
,f:l. 588-6877100 Warehouse: Uniforms 510 0410 4928 300 1.32
;:::; 588-6877101 Facilities: Uniforms & mats 100 0419 4928 300 4.42
CD 588-6877101 Facilities: Uniforms & mats 100 0419 4120 300 3.05 3
=It 588-6877103 Wk 10/8/14: WW Collect & Recycled uniforms 510 0406 4928 300 2.37
..a. 588-6877103 Wk 10/8/14: WW Collect & Recycled uniforms 520 0405 4928 300 13.17 ....,
588-6877104 Streets: Uniforms 100 0418 4928 300 18.20
.llb
0
Register of Demands Page 2 of 14
Warrants From 10/2012014-10124/2014 -N Check
U'l
0
CD
C')
CD
3
C"
CD
Number
00228530
Date PaJ!f!!~!'dor Invoice Comment Fund Orgn Acct Prog
23-0ct-14 @00005241 Aramark Uniform Services Inc 588-6877105 Parks: Uniforms & mats 100 0418 4928 300
588-6877105 Parks: Uniforms & mats 100 0419 4120 300
588-6877106 Facilities: Mats 100 0419 4120 300
588-6877108 Stormwater: Uniforms 231 0412 4928 300
588-6881441 Weekly Mat Service-PCPA 100 0204 4928 400
588-6883745 Parks: Uniforms & mats 100 0419 4120 300
588-6883745 Parks: Uniforms & mats 100 0418 4928 300
588-6883746 Towels & Mats 100 0501 4928 200
588-6883747 Towels & Mats 100 0501 4928 200
588-6883749 Towels & Mats 100 0501 4928 200
588-6888417 Fleets: Uniforms, mats, shop towels 100 0419 4120 300
588-6888417 Fleets: Uniforms, mats, shop towels 611 0413 4928 300
588-6888418 Wk 10/15/14: Meter Readers uniforms 510 0401 4928 300
588-6888419 Wk 10/15/14: Util Sys & WTP uniforms; mats 100 0419 4120 300
588-6888419 Wk 10/15/14: Uti I Sys & WTP uniforms; mats 510 0401 4928 300
588-6888419 Wk 10/15/14: Util Sys & WTP uniforms; mats 510 0402 4928 300
588-6888420 Warehouse: Uniforms 510 0410 4928 300
588-6888421 Facilities: Uniforms & mats 100 0419 4928 300
588-6888421 Facilities: Uniforms & mats 100 0419 4120 300
588-6888422 Wk 10/15/14: Water Distribution uniforms 510 0404 4928 300
588-6888423 Wk 10/15/14: WW Collect & Recycled uniforms 520 0405 4928 300
588-6888423 Wk 10/15/14: WW Collect & Recycled uniforms 510 0406 4928 300
588-6888424 Streets: Uniforms 100 0418 4928 300
588-6888425 Parks: Uniforms & mats 100 0418 4928 300
588-6888425 Parks: Uniforms & mats 100 0419 4120 300
588-6888426 Facilities: Mats 100 0419 4120 300
588-6888427 Weekly Mat Service-Lake 100 0202 4928 400
588-6888428 Stormwater: Uniforms 231 0412 4928 300
588-6892790 Weekly Mat Service-PCPA 100 0204 4928 400
Total for Check 00228530
CheckAmt
15.17
7.74
143.24
13.85
14.78
1.84
14.03
19.09
5.50
20.83
36.00
8.78
2.64
6.72
13.87
16.21
1.32
4.42
5.42
15.57
13.17
2.37
17.91
15.17
7.74
143.24
5.16
13.85
14.78
807.53
..,00228531 23-0ct-14@00010111 AT&T 5776453 858-679-2710CommParkFaxline-9/14 100 0208 3310 400 47.56
w 5813904 858-487-5798 Sta #2 100 0501 3310 200 16.98
N
0 ..a.
.llb
;::;
CD
3
=It
..a.
N
5813905
5819291
5819317
5819323
5819324
5819332
5819335
858-668-1726 100
858-486-0169 100
858-486-0228 WTP SCADA/911 modem line 510
858-486-4810 PCPA Alarm Line-9/14 100
858-486-5694 611
858-513-0625 Lake Phone Line -10/14 100
Library Alarm Lines (858-513-1785) Oct 2014 100
0106 3310 100 1,205.87
0418 2200 300 15.21
0402 3310 300 17.07
0204 3310 400 32.95
0413 3310 300 16.99
0202 3310 400 62.80
0206 3310 400 62.55
CJI
Register of Demands Page 3 of 14
0 Warrants From 10/20/2014-/0/24/20/4 -Check N
CJI Number Date PaJ:_ee/Vendor Invoice Comment Fund Orfi.n Acct Prof!. CheckAmt
00228531 23-0ct-14 @00010111 AT&T 5819338 858-513-3835 100 0418 2200 300 16.67
5819340 858-513-8221 100 0418 2200 300 16.67
5822852 858-513-4376 100 0400 3310 300 62.25
Total for Check 00228531 1,573.57
00228532 23-0ct-14 @00006936 Aztec Landscaping Inc. 0026761-IN Landscape Maintenance: Poway Water Treatm 510 0402 4116 300 153.37
00228533 @00010876 Blue Tarp Financial Inc. 31511663 26 Gal. Spot Sprayer 100 8644 -11.75
31511663 26 Gal. Spot Sprayer 231 0412 4760 300 146.99
31511663 26 Gal. Spot Sprayer 231 0412 4760 300 11.75
Total for Check 00228533 146.99
00228534 23-0ct-14 @00004317 Boot World Inc 1114681-IN Dock Attendant Boots 100 0202 4928 400 170.00
1114844-IN Safety shoes 100 0419 4928 300 168.11
1114844-1 N-A FY15 safety shoes allowance 510 0404 4928 300 155.50
Total for Check 00228534 493.61
00228535 23-0ct-14 @00000659 Bowers, Robert 0014-3789-8443 Reimbursement-UST Exam Fee 2014 611 0413 4908 300 75.00
00228536 @00006685 Brenntag Pacific, Inc. BPI209195 WTP: calcium hypochlorite empty drums returne510 0402 4502 300 -80.00
BPI461434 WTP: calcium hypochlorite granules -3 drums 510 0402 4502 300 894.24
Total for Check 00228536 814.24
00228537 23-0ct-14 @00010463 C.A. Short Company 1052926 Employee Service Award 100 0101 4506 100 163.59
00228538 @00004756 Cal-State Auto Parts Inc 397291 Units #76 & #776: Batteries 611 0413 4799 300 184.17
00228539 @00006901 California Commercial Asphalt, LLC 144103 1/2 Type Ill 211 0411 4520 300 270.37
00228540 @00005556 Cannon Pacific Services, Inc 999554 Special Sweeps 211 0411 4332 300 101.72
999556 Street Sweeping 211 0411 4332 300 17,619.83
Total for Check 00228540 17,721.55
000228541 23-0ct-14 @00011155 Career Survival Group POWAY 2014-1 Training presentation 100 0501 4908 200 5,000.00
~ 00228542 @00011052 Carollo Engineers Inc. 0137513 Water Distribution System Maintenance 1701A 1000P 1714B 600 20,885.00
CD 0137593 Water Treatment Plant Maintenance and 1704A 1000P 1714B 600 4,243.25 3
C"
CD
Total for Check 00228542 25,128.25 ..,
N00228543 23-0ct-14 @00000507 Char1es P Crowley Co 20609 WTP: Pulsafeeder 0-ring gaskets 510 0402 4760 300 192.48
~00228544 @00011152 Garnishment Recipient PPE 10/12/14 Payroll Garnishment 100 8620 92.30
~00228545 @00005793 Christophiades, Arthur 3013.200-10.14 Instructor Payment Fall 2014 100 0208 4118 400 1,443.00
~00228546 @00007044 CL2B 2328 WTP: PM kits (5) 510 0402 4760 300 761.45
;::; 2329 WTP: AAA1160 PM kits 510
CD
0402 4760 300 728.95
3 Total for Check 00228546 1,490.40
:t:t
...a,00228547 23-0ct-14 @00010834 Clinical Laboratory of San Bernardino Inc. 938769 FY2014/2015 Monthly Wastewater Analysis 520 0403 1708 300 112.00
i-.loo228548 @00005666 Conder, Christopher UTIL MGMT Tuition Reimbursement 100 0101 4926 100 91.18
0')
Register of Demands Page 4 of 14
0 Warrants From 1012012014-1012412014 -Check N
U'l Number Date PaJ!.ee/Vendor Invoice Comment Fund Orfi.n Acct Profi. CheckAmt
00228549 23-0ct-14 @00010175 Corodata Media Storage Inc. DS1264589 Backup Data Storage September 2014 100 0104 4120 100 143.87
00228550 @00000737 Corodata Records Management Inc. RS4114456 9/1/14-9/30/14 100 0011 4120 100 1,249.60
00228551 @00011158 Courtesy Refrigeration Inc. 72841 Concession Refrigerator Repair-PCPA 100 0204 4308 400 423.30
00228552 @00000949 Culligan Water Conditioning 970063 FY 2014/2015 Water Softener System rent: 510 0402 4502 300 250.00
00228553 @00005305 Curtis Engineering Corp 14062 Unit #1 0: Crane Inspection 611 0413 4312 300 500.00
00228554 @00000443 Department of Fish & Game IMPORT 12/17/14 Importation Permit-12/17/14 Trout 100 0202 5730 400 48.25
IMPORT 12/29/14 Importation Permit-12/29/14 Trout 100 0202 5730 400 48.25
IMPORT-12/3/14 Importation Permit-12/3/14 Trout 100 0202 5730 400 48.25
Total for Check 00228554 144.75
00228555 23-0ct-14 @00004462 Department of Industrial Relations (Accounting) E1219875SD Annual Elevator lnspection-PCPA 100 0204 5730 400 225.00
E1219880SD Annual Stair Lift lnspection-PCPA 100 0204 5730 400 125.00
Total for Check 00228555 350.00
00228556 23-0ct-14 @00010701 DHK Engineers, Inc. 4058 WTP chlorine scrubber: Pilot Traverse test 8/4/ 510 0402 4120 300 975.00
00228557 @00004897 Diamond Environmental Services 278775 Event Portable Service-Blue Sky (10/10-10/13) 100 0207 4120 400 142.40
282010 Portable Services -Blue Sky 100 0207 4120 400 240.34
284823 Kumeyaay restroom svc 9/19/14-10/16/14 100 0418 4120 300 81.65
284824 Iron Min Trail restroom svc 9/19/14-10/16/14 100 0418 4120 300 532.36
Total for Check 00228557 996.75
00228558 23-0ct-14 @00010930 Division of the State Architect FY15 QTR1 FEES FY15 SB 1186 Disability Access Fees Jui-Sep 2 283 8636 99.60
00228559 @00006995 Enniss Inc. 395026 dump fees -three loads 211 0411 4520 300 120.00
00228560 @00006933 Fastenal Company CAPOW32151 LS-2: circulating pump mount 520 0403 4760 300 458.58
CAPOW32201 1" gate opening galvanized steel carabiner 510 0402 4760 300 124.33
CAPOW32249 WTP: delicate task wipes 510 0402 4760 300 205.60
Total for Check 00228560 788.51
~00228561 23-0ct-14 -----Faucher, Kenneth & Patricia RW14-0216 Security release for ROW #14-0216 762 0399 5980 900 5,000.00
~ 00228562 @00000897 Fed Ex 2-816-72467A Shipping -Hardware Repair 100 0104 3320 100 14.09
3 2-816-72467B Shipping of operating supplies 100 0501 4710 200 12.75
tr Total for Check 00228562 26.84 CD .....
~Noo228563 23-0ct-14 @00001144 Ferguson Waterworks 0490354 1 OOWs: brass nipple gbl; brass meter flange 510 0404 4760 300 270.88
N 0491019 0 WW Collection: Northcrest job coupling 520 0405 4760 300 64.37
...a. Total for Check 00228563 335.25 .1)1.
S"oo228564 23-0ct-14 -----Fess Parker Santa Barbara Hotel 87877715 Hotel for conference 10/29/14-10/31/14 100 0107 3140 100 465.74
3 00228565 Finley, G 32731700-13 Closing Balance Refund, Over Payment 327317510 8120 7.25
=It 00228566 @00000915 Fire Etc. 67117 Equipment 100 0501 4760 200 525.16
...a. 67311 PPE Equipment 100 0501 4760 200 650.88
N
...... Register of Demands Page 5 of 14
0 Warrants From !012012014-10/2412014 -Check N
Ul Date Payee/Vend()!___ ____ Invoice Comment Fund Orgn Acct Prog Number CheckAmt -
Total for Check 00228566 1,176.04
00228567 23-0ct-14 @00004918 First Bankcard Center 63084240 09/14 Mastercard charges 100 0013 3140 100 711.89
63084240 09/14 Mastercard charges 100 0013 4710 100 2.99
Total for Check 00228567 714.88
00228568 23-0ct-14 @00004918 First Bankcard Center 72989173 09/14 Mastercard charges 100 0011 3140 100 450.00
72989173 09/14 Mastercard charges 100 0013 3140 100 480.00
72989173 09/14 Mastercard charges 100 0013 4924 100 75.00
Total for Check 00228568 1,005.00
00228569 23-0ct-14 @00004918 First Bankcard Center 26563926-1 0/14 Administrative Services Director credit card 100 0106 6122B 100 278.42
26563926-10/14 Administrative Services Director credit card 100 0101 4934 100 395.00
26563926-10/14 Administrative Services Director credit card 100 0101 4924 100 170.00
26563926-10/14 Administrative Services Director credit card 100 0106 6122B 100 19.28
26563926-10/14 Administrative Services Director credit card 100 0106 6122B 100 8.24
26563926-10/14 Administrative Services Director credit card 100 8644 -27.52
26563926-10/14 Administrative Services Director credit card 100 0101 4908 100 232.45
26563926-10/14 Administrative Services Director credit card 100 0104 3140 100 25.00
26563926-10/14 Administrative Services Director credit card 100 0104 4760 100 120.96
26563926-10/14 Administrative Services Director credit card 100 0104 4308 100 194.74
26563926-10/14 Administrative Services Director credit card 100 0106 6122B 100 118.07
26563926-10/14 Administrative Services Director credit card 100 0104 4760 100 49.68
Total for Check 00228569 1,584.32
00228570 23-0ct-14 @00004918 First Bankcard Center 09451222 10/14 Director's MasterCard Statement 100 0419 4308 300 528.39
09451222 10/14 Director's MasterCard Statement 520 0405 4924 300 38.18
09451222 10/14 Director's MasterCard Statement 100 0010 4904 100 79.90
0 Total for Check 00228570 646.47 (I)
(")
~ 00228571 23-0ct-14 @00004918 First Bankcard Center 52305721-10/14 Oct 2014 CSD Credit Card (Robin Bettin) 100 0010 4904 100 500.00
C" 52305721-10/14 Oct 2014 CSD Credit Card (Robin Bettin) 100 0200 4904 400 1,000.00
(I)
""' Total for Check 00228571 1,500.00
N
~00228572 23-0ct-14 @00000183 Fleet Pride/Associated Truck Parts 64381823 Unit #925: Check Valve 611 0413 4799 300 26.08
~00228573 @00004097 For Parents' and Kids' Sake 2015 GRANT Domestic Violence Prevention Program 100 0101 4908 100 5,000.00
~00228574 @00001085 Garnishment Recipient PPE 10/12/14 Payroll Garnishment 100 8620 121.40
(j) 00228575 PPE 10/12/14 Payroll Garnishment 100 8620 35.00
3 00228576 @00001109 Full Compass Systems Ltd. 5286507 Gaffers Tape-PCPA 100 8644 -32.97
~ 5286507 Gaffers Tape-PCPA 100 0204 4760 400 469.54 -5286507 Gaffers Tape-PCPA 100 0204 4760 400 32.97
N 5293738 Microphone Cables-PCPA 100 0204 4760 400 187.71
0) Register of Demands Page 6 of 14
0 Warrants From 10!2012014-10/2412014 -Check N c.n Number Date PaJ!.ee/Vendor Invoice Comment Fund OrG_n Acct Pros. CheckAmt
00228576 23-0ct-14 @00001109 Full Compass Systems Ltd. 5293738 Microphone Cables-PCPA 100 0204 4760 400 13.73
5293738 Microphone Cables-PCPA 100 8644 -13.73
Total for Check 00228576 657.25
00228577 23-0ct-14 @00006090 Gary F. Hoyt, Landscape Architecture Inc. CP-1969 landscape architect plan check & inspect servic 763 0399 5920 900 648.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5910 900 144.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5920 900 72.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5920 900 144.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5910 900 288.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5920 900 144.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5910 900 180.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5920 900 36.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5910 900 288.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5920 900 288.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5920 900 216.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5920 900 144.00
CP-1969 landscape architect plan check & inspect servic 763 0399 5920 900 216.00
Total for Check 00228577 2,808.00
00228578 23-0ct-14 -----George Weir Asphalt Cons!. 49901400-43 Closing Balance Refund, Deposit 49901400-43 510 8661 1,200.00
49901400-43 Closing Balance Refund, Deposit 49901400-43 510 8120 -388.35
Total for Check 00228578 811.65
00228579 23-0ct-14 @00001207 Grainger Inc 9556937804 WTP: mise supplies 510 0402 4760 300 55.21
9559654141 WTP: disinfecting wipes 510 0402 4760 300 170.17
9563214635 Dock Supplies 100 0202 4760 400 67.72
Total for Check 00228579 293.10
5?oo228580 23-0ct-14 @00001447 Heaviland Enterprises Inc 11230 FY15 Landscape Maintenance Service: 510 0402 4116 300 1,028.00
C') 11234 Arbolitos Park: Turf & Turf Irrigation Maintenanc 100 0418 4116 300 1,369.19 (1)
3 Total for Check 00228580 2,397.19
I:T
~ 00228581 23-0ct-14 @00001645 Home Depot Commercial Account 0212789 tie downs 100 0419 4516 300 14.98
N 0220254 misc. main!. supplies 100 0419 4760 300 30.59
N 1212782 0 measuring tape 100 0419 4516 300 30.77
...a. 1220242 Small tools & supplies 100 0419 4516 300 97.12 ~
Small tools & supplies 1220242 100 0419 4760 300 10.17 ;::; 1220243 Water Dis!: screws; washers; 3.56x3.56.96" lum510 0404 4760 300 89.25 (1)
3 2212764 Water Dis!: 1 "x18" galv nipple; 3/8"x20' rebar 510 0404 4760 300 21.74
=It 3212760 Level for Unit #1 0 611 0413 4799 300 10.20 ...a.
N 3220160 Water Dis!: 3/8"x1 0' rebar; 12" blades 510 0404 4760 300 24.83
4212383 Wireless Antenna Hardware -Angle Brackets 100 0106 6122B 100 77.63
CD
Register of Demands Page 7 of 14
0 Warrants From 10120/2014-10124/2014 -Check N
C1l Number Date Paf.ee/Vendor Invoice Comment Fund Orfi.n Acct Prof!. CheckAmt
00228581 23-0ct-14 @00001645 Home Depot Commercial Account 4220038 Water Dist: brass nozzle; organizer bins 510 0404 4760 300 77.92
7212711 PCPA wall repair 100 0419 4760 300 42.54
9220276 Taoe measure for Unit #53 231 0412 4516 300 21.57
Total for Check 00228581 549.31
00228582 23-0ct-14 @00007019 Imperial Sprinkler Supply, Inc. 2098226-00 Irrigation supplies 100 0418 4770 300 143.59
00228583 @00006463 lnfoSend 84478 Mailing Statements 9/16/14 to 9/30/14 100 0102 4120 100 2,518.31
00228584 @00006476 Ingersoll-Rand Company 22772776 37126711 Gasket Kit 510 0406 4760 300 196.40
00228585 @00001328 Intermountain Radiator 22925 Unit #82: Radiator 611 0413 4799 300 156.60
00228586 @00003995 J J Keller & Associates Inc 9100354747 OSHA Inc Tracker Full License-1/1/15-12/31/ 100 0101 4120 100 425.00
00228587 @00010262 JCB Leasing 8367 Channel mower: bearings & knives 100 8644 -144.00
8367 Channel mower: bearings & knives 231 0412 4308 300 1,865.75
8367 Channel mower: bearings & knives 231 0412 4308 300 144.00
Total for Check 00228587 1,865.75
00228588 23-0ct-14 @00007056 JCI Jones Chemicals, Inc. 635709 FY 2014/2015 Chlorine 510 0402 4502 300 2,897.90
00228589 @00001306 JRC Printing LLC 33823 Printing Kumeyaay Brochures 100 0207 4922 400 297.00
33826 EMS Forms 100 0503 4922 200 291.60
33862 Business cards 100 0011 4922 100 34.56
33862 Business cards 100 0204 4922 400 145.80
Total for Check 00228589 768.96
00228590 23-0ct-14 @00001341 Kaiser Foundation Health Plan Inc 104676-1114 Medical Insurance Premiums-November 2014 100 8720C 4,306.54
104676-1114 Medical Insurance Premiums-November 2014 100 8720B 47,132.56
104676-71114 COBRA Medical Insurance Premiums-Novemb 100 8720C 519.25
Total for Check 00228590 51,958.35
00228591 23-0ct-14 @00010749 MaiiFinance, Inc. H4933746 Postage Machine Lease Payment-November 2100 0106 4308 100 209.56
l\?oo228592 @00007230 Martinez, Rosa 10132014 Notary Licensing 100 0101 4908 100 437.90
2 00228593 -----Martinez, Erica 2008895.001 Partial Ref for Purch Ins Prmt #13941-less gues 100 8632 7000 32.00
3 00228594 @00001673 McDougal Love Eckis Boehmer & Foley 86747 Professional services through 9/30/14 100 0012 1702C 100 2,927.20
C' 86748 Professional services through 9/30/14 100 0012 1702C 100 208.00 C1) .., 86749 Professional services through 9/30/14 100 0012 1702C 100 521.95
N
86750 Retainer Fee FY 14-15 100 0012 1702A 100 12,000.00
N 86751 Professional services through 9/30/14 100 0012 1702C 100 272.00 0
~
.l:lo 86813 Professional services through 9/30/14 100 0012 1702C 100 1,056.00
::; 86900 LOCC Annual Conference Reimbursements 100 0012 3140 100 1 '140.42
C1)
Total for Check 00228594 18,125.57 3
=l:t:oo228595 23-0ct-14 @00001840 Napa Auto Parts/Poway 981696 Red-n-tacky grease 231 0412 4760 300 58.22
N 982656 Unit #1 0: Starter button 611 0413 4799 300 9.04
983004 Wheel weights 611 0413 4799 300 51.95
..a. Register of Demands Page 8 of 14
0 Warrants From 10/20/2014-10/2412014
S. Check
1\) u.Number Date Payee/Vendor Invoice Comment Fund Orgn Acct Prog
00228595 23-0ct-14 @00001840 Napa Auto Parts/Poway 983046 Belts 611 0413 4 799 300
00228596 23-0ct-14 @00005825 Neal Electric, Inc
00228597 @00006611 Network Printing
00228598 @00005537 Ninyo & Moore
00228599 23-0ct-14 @00004716 North County Rebuilders
00228600 @00000775 Office Depot Business Services Division
c
CD n
CD
3
C"'
CD
""' ~
1\) 00228601
~00228602
~00228603
(D00228604
3
=It
..a.
1\)
23-0ct-14 @00002007
@00006746
@00002214
Pacific Pipeline Supply
PARS
Payco Specialties Inc
@00002313 Petty Cash Fire Department
983249 Unit #82: Thermostat & housing 611 0413 4799 300
983655 Unit#12: Belts 611 0413 4799 300
983757
61720
52976
183534
183569
85420
730906579-001
730906579-001
730906579-002
732011456-001
732011456-001
734140022-001
7350927 44-001
735116137-001
735303032-001
735405872-001
735405872-001
735493121-001
735493362-001
735508539-001
735601255-001
736229882-001
736229949-001
B1500775
300715
29845
P1500029-3
FDPC-10/17/2014
FDPC-10/17/2014
FDPC-10/17/2014
FDPC-10/17/2014
FDPC-10/17/2014
Unit #28: vacuum connection 611 0413 4799 300
Total for Check 00228595
Tower Smoke Installation 100 0501 4304 200
Teen Night Out Flyer 100 0208 4922 400
Soils and Materials Testing Services 1801A 1000P 1799 600
Inspection & Materials Testing Services 211 0411 4320B 300
Total for Check 00228598
Unit #922: diagnose cab tilt motor 611 0413 4312 300
Wall calendars; static wipes 510 0401 4710 300
Wall calendars; static wipes 510 0402 4710 300
WTP: Desk pad calendars 510 0402 4710 300
Office Supplies -Blue Sky & Lake 100 0207 4710 400
Office Supplies -Blue Sky & Lake 100 0202 4710 400
WW Collection: mar1<ers, pencils, canned duster520 0405 4710 300
Office Supplies 100 0501 4710 200
Copy paper for Admin. Services 100 0106 4710 100
Office supplies 100 0301 4710 100
Office supplies 510 0410 4710 300
Office supplies 100 0418 4710 300
Office Supplies 100 0103 4710 100
Office Supplies 100 0103 4710 100
WTP: tabs; printer toner 510 0402 4710 300
Office Supplies -2nd Floor 100 0304 4710 100
Comm Park Office Supplies 100 0208 4710 400
Comm Park Office Supplies 100 0208 4710 400
Office supplies 100 0011 4710 100
Total for Check 00228600
Water Dis!: waterline replacement kit; accessori 510 0404 4760 300
Monthly Admin Fee-Aug 2014 100
FY14-15 Citywide Striping Project
Petty Cash Fire Dept.
Petty Cash Fire Dept.
Petty Cash Fire Dept.
Petty Cash Fire Dept.
Petty Cash Fire Dept.
211
100
100
100
100
100
8719
0411 4330 300
0502 4904 200
0501 4760 200
0501 1394 200
0501 4304 200
0503 4908 200
CheckAmt
111.22
13.48
58.84
3.01
305.76
1,494.92
616.00
1,762.25
18,951.50
20,713.75
85.00
13.09
106.92
29.16
18.13
249.73
112.50
139.73
180.63
77.61
22.04
45.46
6.90
42.00
159.47
61.04
138.50
68.39
208.71
1,680.01
812.43
2,500.00
33,260.43
27.76
27.60
128.35
33.33
17.00
~
~
Register of Demands Page 9 of 14
Warrants From 10/20/2014-10124120/4
S, Check
1\) u.Number Date Payee/Vendor Invoice Comment Fund Orgn Acct Prog
c
CD
(")
CD
3
0"
00228605 23-0ct-14 @00002314 Petty Cash General
00228606 23-0ct-14 @00005507 Plastifab
00228607 @00000173 Poway Center for the Performing Arts Foundation
00228608 @00002702 Poway Firefighters Association
00228609 @00002741 Poway Unified School District
00228610 @0001 0911 R & B Pinto Properties LLC
00228611 @00002867 RDO Equipment Company Inc
00228612 @00002239 Rex Trophies
00228613 @00003764 Road One
Total for Check 00228604
10-17-2014 Petty Cash General 100 0010 3140 100
10-17-2014 Petty Cash General 100 0101 4934 100
10-17-2014 Petty Cash General 100 0101 4934 100
10-17-2014 Petty Cash General 100 0101 4934 100
10-17-2014 Petty Cash General 100 0101 3140 100
10-17-2014 Petty Cash General 100 0013 3140 100
10-17-2014 Petty Cash General 100 0010 3140 100
10-17-2014 Petty Cash General 100 0010 3140 100
10-17-2014 Petty Cash General 100 0013 3140 100
10-17-2014 Petty Cash General 100 0010 3140 100
10-17-2014 Petty Cash General 100 0104 3140 100
10-17-2014 Petty Cash General 100 0101 4934 100
10-17-2014 Petty Cash General 100 0301 3110 100
10-17-2014 Petty Cash General 100 0301 3110 100
10-17-2014 Petty Cash General 100 0301 3140 100
Total for Check 00228605
98974 Apparatus Parts 100 0501 4308 200
10152014 Foundation ticket sales transfer-PCPA 100 8641
PPE 10/12/14 Fire Association dues for PPE 10/12/14 100 8615
16276 Maintenance: various school fields 100 0418 4914 300
LKCONC OCT81214 Weekly Concession Payment 100 8647
P37118 WERK-BRAU #PRB336 Pavement Bucket 211 0411 6199 300
101314 Community Relations 100 0010 4904 100
568618 Mowing Excavator Crosthwaite to Old Pomerad 231 0412 4120 300
568619 Mowing Excavator Old Pomerado to Arikara 231 0412 4120 300
568624 Mowing Excavator Arikara to Whispering Tree 231 0412 4120 300
Total for Check 00228613
CheckAmt
234.04
21.49
41.02
15.85
39.39
50.00
29.92
14.49
9.98
225.00
61.24
45.66
25.07
35.22
25.20
6.00
645.53
664.20
14,463.00
1,693.52
17,125.00
2,226.40
3,375.00
107.63
224.00
224.00
224.00
672.00
CD 00228614 23-0ct-14 @00006418 Rochester Midland Corporation 1135298 Handsfree restroom billing thru October 100 0419 4114 300 657.75
~----------------~~------------------------------------------------------------------------~~------------------------------------------------
_1\) 00228615 @00005968 Garnishment Recipient PPE 10/12/14 Payroll Garnishment 100 8620 353.54
1\) 00228616 @00000627 San Diego County Treasurer-Tax Collector 2771700800-1014 Property Tax 100 0106 5730 100 118.72
~00228617 2771700890-1014 Property Tax 100 0106 5730 100 9.38
~ 00228618 @00002318 San Diego Gas & Electric 0704702278-1014 Training Tower 100 0501 2110 200 2,994.04
a;-11183824010/14 16275 Espola 9/10/14-10/9/14 100 0418 2110 300 120.57
3 1453224891-1014 13094 Civic Center Or-Monthly Electric Pool-9/1100 0203 2110 400 7,546.42
~ 23194668910/14 12325 Crosthwaite Cir 9/11/14-10/10/14 510 0410 2110 300 186.42
~ 264803272-10/14 Meadowbrook Field Lights Oct 2014 100 0201 2110 400 1,060.40
1\) 320896888-10/14 Skate Park Lights Oct 2014 100 0208 2110 400 337.03
..a. Register of Demands Page 10 of 14
N Warrants From 10/2012014-1012412014
S. Check
N u.Number Date Payee/Vendor Invoice Comment Fund Orgn Acct Prog
c
(I)
(")
(I)
3
C"
(I) ...
N
N
0 ..a.
-l=lo
<D
3
=It
..a.
N
00228618 23-0ct-14 @00002318 San Diego Gas & Electric
00228619 23-0ct-14 @00002312 San Diego Gas & Electric/Sundry
3222233251.1014 14560 Lake Poway Rd-Monthly Electric-Lake -1 00
324308441 10/14 14022 1/2 Pomerado 9/10/14-10/9/14 100
373257630 10/14 12207 Old Pomerado 9/11/14-10/10/14 100
416396102 10/14 15001 Hwy 67 9/11/14-10/10/14 100
482624663 1 0/14 12490 1/2 Old Pomerado 9/11/14-10/10/14 100
483014507 10/14 14283 Silver Ridge 9/11/14-10/10/14 100
6015334224-1014 13104 Silver Lake Or-Monthly Electric Service-9 100
640251669 10/14 13544 Aubrey 9/14/14-10/13/14 100
712609287 10/14 15003 1/2 Pomerado 9/15/14-10/14/14 100
820582715 10/14 14467 Lake Poway Rd 9/11/14-10/10/14 100
8208113748.1014 15498 Espola Rd-PCPA Monthly Electric-9/14 100
824654248 10/14 14795 1/2 Silverset 9/15-14-10/14/14 100
867977376 10/14 13250 Pomerado 9/10/14-10/9/14 100
93746846010/14 137431/2 Carriage9/15/14-10/14/14 100
9532131079-1014 Sta #3 100
995229760 10/14 14401 Pomerado 9/14/14-10/13/14 100
9958016173-1014 14135 Midland Rd-Monthly Electric-Veterans Pk 100
0679332006-1014 Group Sundry Bill 100
0679332006-1014 Group Sundry Bill 100
3150777677-1014 Group Sundry Bill 275
3150777677-1014 Group Sundry Bill 100
3150777677-1014 Group Sundry Bill 275
3619489005-1014 Group Sundry Bill 510
3619489005-1014 Group Sundry Bill 611
3619489005-1014 Group Sundry Bill 265
3619489005-1014 Group Sundry Bill 269
3619489005-1014 Group Sundry Bill 264
3619489005-1014 Group Sundry Bill 100
3619489005-1014 Group Sundry Bill 100
3619489005-1014 Group Sundry Bill 275
3619489005-1014 Group Sundry Bill 100
3619489005-1014 Group Sundry Bill 263
3871898157-1014 Group Sundry Bill 100
3871898157-1014 Group Sundry Bill 100
3871898157-1014 Group Sundry Bill 100
3871898157-1014 Group Sundry Bill 100
3871898157-1014 Group Sundry Bill 100
7003797598-1014 Group Sundry Bill 264
0202 2110 400
0418 2110 300
0418 2110 300
0418 2110 300
0418 2110 300
0418 2110 300
0207 2110 400
0418 2110 300
0418 2110 300
0400 2110 300
0204 2110 400
0418 2110 300
0418 2110 300
0418 2110 300
0501 2110 200
0418 2110 300
0205 2110 400
Total for Check 00228618
0204 2110 400
0205 2110 400
0470 2130 300
0205 2110 400
0470 2120 300
0404 2110 300
0413 2110 300
0423 2110 300
0425 2110 300
0422 2110 300
0418 2110 300
0205 2110 400
0470 2120 300
0208 2110 400
0421 2110 300
0202 2110 400
0106 2110 100
0208 2110 400
0501 2110 200
0204 2110 400
0422 2110 300
CheckAmt
1,038.55
8.32
28.66
7.00
92.91
9.10
129.07
1,071.90
7.00
1,475.54
16,289.32
365.06
9.10
214.17
3,761.82
449.39
93.68
37,295.47
29.73
110.58
25,550.84
531.45
1,917.76
8.85
1,009.30
8.05
111.66
69.33
504.65
273.35
2,180.41
28.14
45.49
437.14
296.57
86.37
61.48
175.05
17.17
~
Register of Demands Page 11 of 14
w Warrants From 10/20/2014-10/24/2014
0 Check -N fJ!Number Date PaJ:_ee/Vendor Invoice Comment Fund OrG.n Acct ProG. CheckAmt
00228619 23-0ct-14 @00002312 San Diego Gas & Electric/Sundry 7003797598-1014 Group Sundry Bill 100 0202 2110 400 1,904.31
7003797598-1014 Group Sundry Bill 267 0424 2110 300 15.58
7003797598-1014 Group Sundry Bill 100 0501 2110 200 4,679.63
7003797598-1014 Group Sundry Bill 263 0421 2110 300 40.80
7003797 598-1 014 Group Sundry Bill 100 0204 2110 400 310.33
7003797 598-1 014 Group Sundry Bill 100 0418 2110 300 214.43
7003797598-1014 Group Sundry Bill 100 0205 2110 400 1,407.57
7003797598-1014 Group Sundry Bill 100 0208 2110 400 3,028.15
7003797598-1014 Group Sundry Bill 275 0470 2120 300 328.60
Total for Check 00228619 45,382.77
00228620 23-0ct-14 @00006857 Savmart Pharmaceutical Service 585984 EMS Supplies 100 0503 4740 200 204.12
00228621 @00011090 Schneider Electric Buildings Americas Inc. 557571 City Hall: Replacement Actuators 100 0419 4302 300 56.89
557571 City Hall: Replacement Actuators 100 8644 -56.89
557571 City Hall: Replacement Actuators 100 0419 4302 300 711.21
Total for Check 00228621 711.21
00228622 23-0ct-14 @00004843 SCS Tracer Environmental 0241521 SEPT 2014: Prof Svcs-OSHA site visit assist 510 0401 4120 300 405.40
00228623 @00002814 Sharp Rees-Stealy Medical Center 2761272670 Pre-employment Physical 100 0101 4916 100 390.00
2761272672 Pre-employment Physical 100 0101 4916 100 461.00
2761273564 Pre-employment Physical 100 0101 4916 100 454.00
2761273896 9/10/14: 0405 employee DMV medical exam 520 0405 4916 300 110.00
2761274186 Pre-employment Physical 100 0101 4916 100 58.00
2761274830 Pre-employment Physical 100 0101 4916 100 368.00
2761275327 Omori DMV Exam 100 0418 4916 300 110.00
2761275895 Staff TB Re-testing 100 0200 4916 400 36.00
2761276013 Fitness for Duty 100 0101 4916 100 285.00
0 2761278468 Pre-employment Physical 100 0101 4916 100 58.00
CD 2761278642 Pre-employment Physical 100 0101 4916 100 58.00 C')
CD 2761279283 Pre-employment Physical 100 0101 4916 100 58.00 3
C" 2761279604 Pre-employment Physical 100 0101 4916 100 94.00
CD .., Total for Check 00228623 2,540.00
N
N00228624 23-0ct-14 @00004422 Simplot Partners 202024129 Lake Poway: Fertilizer 100 0418 4770 300 968.43
~00228625 @00006465 So Cal Signs, Inc. 3498 R. Martinez Plate 100 0011 4710 100 37.00
.1:1> 3517 Employee Nameplate 100 0101 4710 100 20.00
;:::; Total for Check 00228625 57.00 CD
!00228626 23-0ct-14 @00003023 South Bay Foundry Incorporated 0145371-IN 22" and 36" Sewer Lids, Frames, Bolts, Covers 520 8189 8,002.80
~ 0145666-IN 22" and 36" Sewer Lids, Frames, Bolts, Covers 520 8189 2,935.44
N Total for Check 00228626 10,938.24
~
Register of Demands Page 12 of 14
.f:lo. Warrants From 1012012014-10124/2014
S. Check
N u.Number Date Payee/Vendor Invoice Comment Fund Orgn Acct Prog
00228627 23-0ct-14 @00007160 Specialty Electric Supply Co. 7148-525928 FS#3: lamps, sensor 100 0419 4760 300
00228628 @00005541 Statewide Safety & Signs, Inc 3854/1 Paint 211 0411 4520 300
00228629 23-0ct-14 -----Stevenson, Lyn
00228630 Summit Hotels TRS 110 LLC
00228631 @0001 0936 TelePacific Communications
00228632 @00011 019 TriZetto Provider Solutions
00228633 @00004950 Truesdail Laboratories, Inc
00228634 @0001 0371 U.S. Bank Corporate Payment System
00228635 23-0ct-14 @00007243 U.S. Bank N.A
00228636
00228637
000228638
(!)
(")
(!)
3
C"
(!) ..,
N
1\)00228639
~00228640
.f:lo.
s-
;00228641
~00228642
N
@00002466 Underground Service Alert
@00002473
23-0ct-14 @00000248
@00010879
23-0ct-14 @00006718
@00010115
Uniforms Plus
Union Bank
United Concordia Dental Plans of CA
Univar USA
UT Community Press
59706/1 Signs 211 0411 4514 300
2008902.001
15605780-01
60326236-0
2V4P101400
091412
4555679376-0914
4555679376-0914
4555679376-0914
4555679376-0914
4555679376-0914
4555679376-0914
4555679376-0914
4555679376-0914
4555679376-0914
4555679376-0914
4555679376-0914
4555679376-0914
PPE 10/12/14
PPE 10/12/14
920140526
36278
36279
36782
36824
887230
098976665
098976665
SD739728
99199
99199
Total for Check 00228628
Refund for Pavilion Permit 14244 100 0202 7471 400
Refund Overpayment-15605780-01 510 8120
City Hall Internet Connection-October 2014 100 0106 2200 100
September Electronic Claims 100 0102 4120 100
FY2014/2015 Potable Water Analytical Lab Ser 510 0402 4120 300
Credit card charges for Safety Services 100 0503 4908 200
Credit card charges for Safety Services 100 0501 4308 200
Credit card charges for Safety Services 100 0501 3130 200
Credit card charges for Safety Services 100 0501 4760 200
Credit card charges for Safety Services 100 0502 4908 200
Credit card charges for Safety Services 100 0501 4920 200
Credit card charges for Safety Services 100 0501 4120 200
Credit card charges for Safety Services 100 0501 4908 200
Credit card charges for Safety Services 100 0502 4 710 200
Credit card charges for Safety Services 100 0501 4304 200
Credit card charges for Safety Services 100 0503 4760 200
Credit card charges for Safety Services 100 0502 4 760 200
Total for Check 00228634
PARS contributions-PPE 10/12/14, Plan #6746 100 8721
PARS employee/er contributions, Plan #674602100 8724
SEPT 2014: POW47 new ticket charges (99) 510 0404 4924 300
Uniforms
Uniforms
100 0501 4928 200
Uniforms
Uniforms
Trustee Fee 07/01/14-09/30/14
Dental Insurance Premium-Nov. 2014
Dental Insurance Premium-Nov. 2014
100 0501 4928 200
100 0501 4928 200
100 0501 4928 200
Total for Check 00228638
100 0103 7411 100
100 8727A
100 87278
Total for Check 00228640
FY 2014/2015 Sodium Hydroxide (Caustic Soda510 0402 4502 300
Legals -14-108 100 0011 4932 100
Legals -14-108 100 0011 4932 100
CheckAmt -284.63
118.13
82.40
200.53
200.00
1,687.96
1,039.23
23.01
8,153.06
112.85
249.05
162.75
156.41
168.00
392.23
159.92
427.98
6.79
82.34
322.50
406.43
2,647.25
50,971.64
2,395.52
148.50
123.18
754.33
400.10
754.33
2,031.94
625.00
16,964.40
47.73
17,012.13
6,038.34
71.30
71.30
-I.
Register of Demands Page 13 of 14
U'l Warrants From 1012012014-1012412014
0 Check -1\) U'INumber Date PaJ:.ee/Vendor Invoice Comment Fund Orfi.n Acct Prof!. CheckAmt
Total for Check 00228642 142.60
00228643 23-0ct-14 -----Van Herpe, Chad 2008908.001 Deposit Return Permit# 14433-0PP 100 0205 7471 400 200.00
00228644 @00003270 Verizon Wireless 9732867537 Public Works cell/wireless charges -8/29-9/28/1510 0401 3311 300 159.73
9732867537 Public Works cell/wireless charges -8/29-9/28/1275 0470 2200 300 38.01
9732867537 Public Works cell/wireless charges-8/29-9/28/1510 0401 2200 300 38.01
9732867537 Public Works cell/wireless charges-8/29-9/28/1211 0411 3311 300 0.76
9732867537 Public Works cell/wireless charges -8/29-9/28/1231 0412 2200 300 38.01
9732867537 Public Works cell/wireless charges -8/29-9/28/1231 0412 3311 300 1.38
9732867537 Public Works cell/wireless charges-8/29-9/28/1611 0413 3311 300 0.81
9732867537 Public Works cell/wireless charges -8/29-9/28/1100 0417 3311 300 0.19
9732867537 Public Works cell/wireless charges-8/29-9/28/1100 0419 3311 300 15.28
9732867537 Public Works cell/wireless charges -8/29-9/28/1510 0402 2200 300 38.01
9732867537 Public Works cell/wireless charges -8/29-9/28/1510 0402 3311 300 8.15
9732867537 Public Works cell/wireless charges -8/29-9/28/1510 0404 2200 300 152.04
9732867537 Public Works cell/wireless charges-8/29-9/28/1510 0404 3311 300 6.50
9732867537 Public Works cell/wireless charges -8/29-9/28/1520 0405 2200 300 152.04
9732867537 Public Works cell/wireless charges -8/29-9/28/1520 0405 3311 300 7.73
9732867537 Public Works cell/wireless charges -8/29-9/28/1100 0419 2200 300 38.01
9732867537 Public Works cell/wireless charges-8/29-9/28/1100 0418 3311 300 8.73
9732867537 Public Works cell/wireless charges -8/29-9/28/1510 0406 2200 300 38.01
Total for Check 00228644 741.40
00228645 23-0ct-14 @00003270 Verizon Wireless 9732967950 Cardiac Telementry 100 0503 3311 200 103.17
00228646 9733339693 MIFI for Back-up lnternet-PCPA Box Office 100 0204 2200 400 38.01
00228647 @00002663 Village Lock and Key 8150 Keys for Facility Tech 100 0419 4304 300 43.63
00228648 @00002730 Waxie 74873060 Comm Ctr: Sanitation supplies 100 0419 4720 300 971.77
0 74880140 Lk Poway Rec Ctr: Sanitation Supplies 100 0419 4720 300 646.77
CD n Total for Check 00228648 1,618.54
CD
~00228649 23-0ct-14 @00006206 Weed Eliminator, Inc 2014-90 As-needed vegetation management services 100 0301 4918 100 1,100.00
CD 2014-91 As-needed vegetation management services 100 0301 4918 100 5,300.00 ....
1\) Total for Check 00228649 6,400.00
~00228650 23-0ct-14 @00010809 West Pacific Medical Laboratory 4684093014 Medical Exams 100 0501 4916 200 57.00
,. 00228651 @00002794 Western Mower and Engine 9493 Water Dist: Quart VP 50:1 Fuel Mixed 510 0404 4760 300 30.24
;:::; 9632 Blades, gatorline, stroke oil 100 0418 4308 300 176.98
CD Total for Check 00228651 207.22 3
:t:l:oo228652 23-0ct-14 -----Whittaker, Martyn R. 201 00600-28 Closing Balance Refund, 20100600-28 510 8120 50.00
t.J00228653 @00010637 Willis Americas Administration Inc. 788673 Willis Training Solutions-August 2014 100 0101 4908 100 20.00
00903215 20-0ct-14 @00010569 U.S. Dept. of the Treasury 102014 PE#21 Payroll W/H EFT for PE#21 100 8621 76,048.71
..a. Register of Demands Page 14 of 14
Q) Warrants From 1012012014-10/24/2014
9. Check
N CJINumber Date Payee/VemJ.or Invoice Comment Fund Orgn Acct Prog
c
CD
(')
CD
3
C"
CD ..,
N
N
0 ..a.
ol:ao
CD'
3
~
..a.
N
00903215 20-0ct-14 @00010569 U.S. Dept. of the Treasury 102014 PE#21
00903216 20-0ct-14 @00010570 Employment Development Department 102014 PE#21
00903217 @00010571 Garnishment Recipient 102014 PE#21
00903218 22-0ct-14 @00000248 Union Bank 3134G5KL8
3134G5KL8
3134G5KL8
Director of Administrati>e Services Appro"d ~
Date 1\/1 I
I
Payroll W/H EFT for PE#21 100 8624
Total for Check 00903215
Payroll W/H EFT for PE#21 100 8622
Payroll Garnishment 100 8620
Purchase Freddie Mac 10-20-17 Maturity 100 8225A
Purchase Freddie Mac 10-20-17 Maturity 100 8261
Purchase Freddie Mac 10-20-17 Maturity 100 8225
Total for Check 00903218
Register Total
CheckAmt
17,930.82
93,979.53
27,046.58
1,017.21
1,000.00
83.33
2,000,000.00
2,001 ,083.33
2,600,925.10
...a. The City of Poway Director of Administrative Services Submits the Following Register of Run Date: 31-0ct-14
....... Demands for the period 1012712014-1013112014 and Recommends its Ratification/Approval: Page: 1 of9 0 -N
(J'I
Check
Number Date Payee/Vendor Invoice Comment Fund Orgn Acct Prog CheckAmt
00228654 31-0ct-14 @00005371 A 0 Reed & Co 232355A City Hall: AHU controllers 100 0419 4302 300 3,227.00
00228655 @00004762 Abcana Industries 955055 Chemicals for Pool 100 0203 4502 400 344.30
00228656 @00000061 Agricultural Pest Control 344696 Various Parks: pest control 10/24/14 100 0418 4120 300 855.00
00228657 @00002106 Airgas USA, LLC 9032353874 Chemicals for Pool 100 0203 4502 400 389.50
9032457720 EMS supplies 100 0503 4750 200 88.51
Total for Check 00228657 478.01
00228658 31-0ct-14 @00000099 American Backflow Specialties Inc INV31620 3/4" RP Assy 100 0418 4770 300 225.95
00228659 @00004463 Anthem Blue Cross 000410833C Vision Insurance Premium-November 2014 100 87288 26.88
000410833C Vision Insurance Premium-November 2014 100 8728A 2,620.80
Total for Check 00228659 2,647.68
00228660 31-0ct-14 @00004463 Anthem Blue Cross 000314557E Medical Insurance Premium-November 2014 100 8720A 197,760.65
000314557E Medical Insurance Premium-November 2014 100 8720C 4,952.28
Total for Check 00228660 202,712.93
00228661 31-0ct-14 @00005011 Aqua-Metric Sales Co 0053643-IN Meters 510 0404 4899 300 6,861.34
00228662 @00005241 Aramark Uniform Services Inc 588-6895051 Towels and mats for Sta 2 100 0501 4928 200 19.09
588-6895052 Towels and mats for Sta 1 100 0501 4928 200 8.05
588-6899659 Mat Service -Lake 100 0202 4928 400 5.16
Total for Check 00228662 32.30
00228663 31-0ct-14 @00005241 Aramark Unifonm Services Inc 15935~36 Ranger Boots-Lake 100 0202 4928 400 156.05
00228664 @00010111 AT&T 5776458 858-679-4920 263 0421 2200 300 14.90
5819320 858-486-3210 OPP Porter House Phone-9/14 100 0205 3310 400 47.36
0 5819380 858-592-4791 Sta 2 modem 100 0501 3310 200 46.72
CD 5821283 858-748-6163 Sta 1 alarm 100 0501 3310 200 62.56 C')
CD 5821858 858-391-0248 OPP Train Depot Phone-9/14 100 0205 3310 400 46.41 3
C" Total for Check 00228664 217.95 CD ...
N00228665 31-0ct-14 @00000281 Seeds Embroidery 1279 K. Quinn -5 shirts 231 0412 4928 300 150.12
11.)00228666 @00010876 Blue Tarp Financial Inc. 31584944 Parks: Equipment Repair 100 0418 4308 300 17.11
...a. 31584944 Parks: Equipment Repair 100 8644 -17.11
~ 31584944 Parks: Equipment Repair 100 0418 4308 300 225.90
;:::;: Total for Check 00228666 225.90 CD
3
:f:t 00228667 31-0ct-14 @00003870 Bound Tree Medical, LLC 81571111 EMS supplies 100 0503 4740 200 2,124.84
....a.00228668 @00000322 Cable, Pipe, and Leak Detection 477661 Library: located utilities & sewer/drain lines 100 0419 4120 300 690.00
Noo228669 @00006901 California Commercial Asphalt, LLC 144575 1/2 Type Ill 211 0411 4520 300 273.75
..a. Register of Demands Page 2 of 9
CO Warrants From 10/2712014-1013112014
S, Check
1\) u.Number Date Payee/Vendor
00228670 31-0ct-14 @00000382 California Municipal Statistics Inc.
00228671 @00000398 Calolympic Glove & Safety Company Inc
00228672 @00005556 Cannon Pacific Services, Inc
00228673 @00007403 Capital One Commercial
00228674 31-0ct-14 @00010348 Chemtrade Chemicals US LLC
00228675 @00000539 City Treasurer
00228676 @00006221 Code Publishing Company
00228677 @00005872 Cole-Parmer Instrument Company, Inc.
00228678 @00002830 Costco Wholesale
00228679 @00003472 County of San Diego DEH
00228680 @00000813 Cox Communications
00228681
00228682
00228683
00228684 @00006614 CRA Payment Center
00228685 @00006176 Creswell Marketing
00228686 @00000949 Culligan Water Conditioning
00228687 @00004009 CWEA
00228688 Darmark Corp.
00228689
00228690 @0001 0127 Dave's Sport Sales & Screen printing
00228691 @00004897 Diamond Environmental Services
00228692 @00010744 Durbin, John
:l?oo228693
n
@00000752 E-W Truck & Equipment Company, Inc
CD
3
C"
~ 00228694
~1\) 00228695
1\)
0 ..a.
~
CD"
3
~
..a.
1\)
31-0ct-14 @00003453
@00000870
EMS Personnel Fund-Calif. EMS Authority
Esgil Corporation
Invoice
14102202
333507-1
999555
007363
007385
144297195211
90678543
1000116638
47937
9033235
0775510063804
128372 2014
6918601-10/14
62872701-10/14
67845201-10/14
62624301-10/14
200701
CM214316
90423391
340841 2014
8974-96
DR96-14
13532
288741
D3 EXAMFEE
336119
336391
P05768-2014
W/E 8/29/14
W/E 8/29/14
W/E 9/12/14
W/E 9/12/14
W/E 9/19/14
W/E 9/19/14
W/E 9/26/14
W/E 9/26/14
W/E 9/5/14
Comment Fund Orgn Acct Prog
6/30/14 Overlapping Debt Statement 100 0103 4924 100
Ear plugs 100 8189
Maintenance Services: Shelters 1242A 1000P 4120 600
Concession Supplies-PCPA 1 00 0204 4 799 400
Volunteer Meeting & Usher Potluck Supplies-P 100
Concession Supplies-PCPA 100
FY2014/2015Aium(dryton) 510
Dispatch Paging 7/1/14 to 9/30/14 100
Municipal code suppl. update #28 100
WTP KMn04: tubing, connectors 510
Teen Glow-in-the-Dark Dodgeball Supplies 100
Permit 128372 2014 renewal 611
Cable TV-Fire Station 1 -10/8/14-11/7/14 100
Halllnternet!Cable TV-10/22/14-11/21/1 100
Cable TV-Public Works Center 1 0/24-1 0/2 1 00
Cable TV-Public Works Treatment 10/24-11/23/ 100
Unit #665: Joints 611
PPE equipment 100
FY 2014/2015 50# bags salt, ordered as neede 510
Matt Thompson: CWEA mmbrshp ID 340841, 12 520
release of grading deposit 761
release of remaining landscape deposit 761
Reserve Park Ranger Uniforms 100
14656 Lake Poway-service 10/7/14 100
WOO D3 exam fee, test 9/20/14
Unit #929: 3 keys
Unit #28: Windshield washer fitting
510
611
611
Paramedic card renewal-Mitchell 100
building plan check/inspect services w/e 8-29-1 100
building plan check/inspect services w/e 8-29-1 100
building plan check/inspect services w/e 9-12-1 100
building plan check/inspect services w/e 9-12-1 100
building plan check/inspect services w/e 9-19-1 100
building plan check/inspect services w/e 9-19-1 100
building plan check/inspect services w/e 9-26-1 100
building plan check/inspect services w/e 9-26-1 100
building plan check/inspect services w/e 9-5-14 100
0204 4 760 400
0204 4 799 400
Total for Check 00228673
0402 4502 300
0501 4106 200
0011 4120 100
0402 4760 300
0208 4760 400
0413 5730 300
0106 2200 100
0106 2200 100
0106 2200 100
0106 2200 100
0413 4799 300
0501 4760 200
0402 4502 300
0405 4924 300
7221 5980 900
7063 5980 900
0205 4928 400
0418 4120 300
0404 4924 300
0413 4799 300
0413 4799 300
Total for Check 00228693
0503 4908 200
0303 1706 100
0303 1707 100
0303 1707 100
0303 1706 100
0303 1707 100
0303 1706 100
0303 1706 1 00
0303 1707 100
0303 1706 1 00
CheckAmt -425.00
88.78
1,400.86
86.76
98.59
345.78
531.13
3,274.11
29,406.00
193.05
65.87
163.43
1,421.00
87.07
174.08
67.25
67.25
201.33
217.08
502.74
156.00
5,900.00
277.40
466.13
27.00
100.00
81.65
6.16
87.81
200.00
14,559.86
466.89
622.52
10,455.25
3,800.29
17,748.18
11,808.49
1,428.62
17,173.30
...Jo.
Register of Demands Page 3 of 9
CD Warrants From 1012712014-10/31/2014
S, Check
N u.Number Date Payee/Vendor
0
CD
00228695 31-0ct-14 @00000870 Esgil Corporation
00228696 31-0ct-14 -----EVALS, LLC
00228697 @00006933 Fastenal Company
00228698 31-0ct-14 @00001144 Ferguson Waterworks
00228699 31-0ct-14 @00010264 Financial Credit Network
00228700 @00010652 Garda CL West Inc.
00228701 @00011159 GIS Planning Inc.
00228702 @00010003 Goldfarb & Lipman LLP
g 00228703 31-0ct-14 @00011 046
@00001207
Governor's Office of Emergency Services
Grainger Inc 3 00228704
0"
CD ..,
~
N
0
...Jo.
ollt>
Invoice
W/E 9/5/14
61525
CAPOW32237
CAPOW32242
CAPOW32243
CAPOW32243
CAPOW32244
CAPOW32280
CAPOW32323
0489464
0489464-1
0490483
0490485
0490487
0491784
0491785
SEPT. 2014
20025915
10042
113942
113943
DC-EMS CERT
9560844004
9562388661
9562578378
9563584078
9574605722
9574882131
Comment Fund Orgn Acct Prog
building plan check/inspect services w/e 9-5-14 100 0303 1707 1 00
Total for Check 00228695
records software 100 0501 4908 200
Squinchers 100 8189
Hex Screws 510 8189
Hex Screws, Mk Pt 510 8189
Hex Screws, Mk Pt 100 8189
Kit Strainers 100 8189
C Cell batteries 100 8189
Inverted striping paint (Standard) 100 8189
Total for Check 00228697
Curb Stops, Corp Stops, Meter Couplings 510 8189
Curb 510 8189
510 8189
510 8189
Meter 510 8189
copper tubing 510 8189
Angle Meter Valve 510 8189
Total for Check 00228698
Amount due FCNET from PWYGAR account 100 0502 7754 4000
Armored car service-off day route/excess items 100 0106 4120 100
50% Zoom Prospector Enterprise-Full Edition 100 0014 1799 100
As-Needed Legal Services 100 0309 1702B 100
As-Needed Legal Services 100 0309 1702B 100
Total for Check 00228702
Emer Management Specialist Certificate-Cawth 100 0500 4908 200
Beverage cooler 100 8189
FAKs, thread tape, cleaning tissues 100 8189
Plates 510 0410 4710 300
Soil Probes 100 8189
Batteries 100 8189
Cleanout Pluas 520 8189
CheckAmt
3,780.79
81,844.19
417.00
486.32
873.83
571.53
35.67
515.21
35.24
35.66
2,553.46
290.36
403.09
85.33
195.70
301.57
1,322.42
305.33
2,903.80
26.00
113.50
6,750.00
70.00
187.00
257.00
81.00
143.69
417.74
238.14
218.81
162.47
23.92
;:::; Total for Check 00228704 1 ,204.77
CD
3 00228705 31-0ct-14 -----Grant, Dennis 30607100-05 Overpayment on account-refund 30607100-05 510 8120 188.79
;t:00228706 @00010310 Hampton Inn & Suites-Poway 7/1/14-9/30/14 Reciprocal Easement Agreement-CAM Fees 720 0704 4120 100 1,555.00
~ 00228707 @00005130 Hanson Aggregates Pacific Southwest, Inc 1506605 Dump Fees 211 0411 2905 300 500.00
00228708 @00003690 Hawthorne Power Systems PS000735663 Mowing Excavator filters 231 0412 4308 300 80.02
t\)
Register of Demands Page 4 of 9
0 Warrants From 1012712014-1013112014
S, Check
t\) UINumber Date Payee/Vendor Invoice Comment Fund Orgn Acct Prog
0
(1)
(")
(1)
3
C"
(1)
~
t\)
t\)
0 ..a.
~
;-
3
~
..a.
t\)
00228709 31-0ct-14 @00001603 HD Supply Waterworks C979180 Covers for Street Lighting 275 0470 4327 300
D071420 Cone Boxes w/ sewer lids 520 8189
Total for Check 00228709
00228710 31-0ct-14 @00001447 Heaviland Enterprises Inc 11231 LMD 83-1A: Landscape Maintenance 266 0426 4116 300
11231 LMD 83-1A: Landscape Maintenance 269 0425 4116 300
11231 LMD 83-1A: Landscape Maintenance 263 0421 4116 300
11231 LMD 83-1A: Landscape Maintenance 262 0427 4116 300
11231 LMD 83-1A: Landscape Maintenance 271 0429 4116 300
11231 LMD 83-1A: Landscape Maintenance 264 0422 4116 300
11231 LMD 83-1A: Landscape Maintenance 268 0428 4116 300
11231 LMD 83-1A: Landscape Maintenance 267 0424 4116 300
11231 LMD 83-1A: Landscape Maintenance 265 0423 4116 300
11232 Landscape Maintenance: PCPA 100 0204 4116 400
11232 Landscape Maintenance: PCPA 100 0206 4116 400
11232 Landscape Maintenance: PCPA 100 0504 4116 200
11232 Landscape Maintenance: PCPA 100 0418 4116 300
11232 Landscape Maintenance: PCPA 100 0501 4116 200
11233 Landscape Maintenance: Poway Road Median 100 0418 4116 300
Total for Check 00228710
00228711 31-0ct-14 @00001645 Home Depot Commercial Account 2212847 Teen Glow-in-the-Dark Dodgeball Supplies 100 0208 4760 400
2220060 Gym Cleaning Supplies 100 0201 4760 400
2220060 Gym Cleaning Supplies 100 0201 4720 400
3220321 Dock Supplies 100 0202 4 760 400
3220322 Dock Supplies 100 0202 4 760 400
4212658 Fire tower supplies 100 0501 4304 200
4220156 Fire tower supplies 100 0501 4304 200
4220307 Saw blades 100 0419 4516 300
5212817 Lithium battery 100 0419 4516 300
5224837 Fire tower supplies 100 0501 4304 200
6212809 Operating Supplies 100 0202 4760 400
6220289 Replacement lens 100 0419 4760 300
6224785 Fire tower supplies 100 0501 4304 200
9212793 PS-3: PVC adapter, brass connector/elbow 510 0402 4760 300
9212860 lumber for concrete forms 211 0411 4760 300
9220274 PVC supplies 211 0411 4760 300
9220278 Lake Poway park -tools 100 0418 4516 300
9220345 Water Dist: couplings; adapters; 3/8 gravel 510 0404 4760 300
Total for Check 00228711
CheckAmt
181.44
378.21
559.65
1,112.94
17,039.56
4,390.81
1,396.81
280.42
7,439.44
631.41
681.68
485.59
502.37
755.86
380.77
297.35
1,711.92
3,946.73
41,053.66
10.75
85.54
49.54
58.74
23.44
9.17
14.53
31.74
106.92
39.90
11.60
125.53
19.04
55.41
139.11
53.30
229.41
69.82
1 '133.49
N Register of Demands Page 5 of 9
..a. Warrants From 10!2712014-10!3112014
0 Check -N a. Number Date PaJ:.ee!Vendor Invoice Comment Fund Orf!.n Acct Prof!. CheckAmt
00228712 31-0ct-14 @00003988 ICSC DUES 2014-DS Annual Membership -City Manager 100 0013 4924 100 100.00
DUES 2014-JV Annual Membership-Economic Dev. Manager 100 0014 4924 100 50.00
Total for Check 00228712 150.00
00228713 31-0ct-14 @00006476 Ingersoll-Rand Company 22817912 PS-3: compressor electronic drain valve 510 0402 4760 300 115.15
00228714 @00001328 Intermountain Radiator 22940 Unit #64: AIC compressor 611 0413 4312 300 923.69
00228715 @00010746 lntuBrite LLC 5638 Paramedic equipment 100 0503 4760 200 357.68
00228716 @00006821 Jenal Engineering Corp. 14-1990 Fuel Master Repairs 611 0413 4120 300 1,229.79
00228717 @00010467 Joints 100939 4" Clay Calder Couplings 520 8189 291.43
00228718 @00001306 JRC Printing LLC 33885 EMS forms 100 0503 4922 200 291.60
33894 Printing Program Flyers-Blue Sky 100 0207 4922 400 62.64
33896 Building Division Inspection Records 100 0303 4922 100 392.04
33904 Fire prevention forms 100 0502 4922 200 211.68
33905 Business Cards 100 0419 4710 300 34.56
33905 Business Cards 510 0410 4710 300 103.68
33910 Building Division Correction Notices 100 0303 4922 100 236.52
Total for Check 00228718 1,332.72
00228719 31-0ct-14 @00001317 Judicial Data Systems 4830 Parking activity for September 2014 100 0504 4919 200 100.00
00228720 @00010414 Kaiser Foundation Health Plan of the Mid-Atlantic Stat 201411-109379 Retired Medical Insurance Premium-November 100 8720C 847.00
00228721 @00006982 Lawson Products. Inc. 9302789648 striping paint -high solid 100 8189 66.36
00228722 @00001518 Liebert Cassidy Whitmore PUBLIC EMP RET Public Employee Retirement Training 100 0101 4908 100 55.00
00228723 @00001522 Lighthouse Incorporated. The 0085926 Shop stock 611 0413 4799 300 67.95
00228724 @00010440 Lowe's 975221 HPC Concrete 100 8189 463.05
977813 HPC Mortar, Quikcrete 100 8189 557.02
Total for Check 00228724 1,020.07
O 00228725 31-0ct-14 @00004808 Lynn Wolsey Designs PROGRESS-7/14 Poway Progress Layout-7/14 100 0205 4120 400 100.00
CD 00228726 @00004456 Maintex 361347 Janitorial supplies 100 0501 4720 200 498.39
n--------------~~--------~------------------------------------------------~~----------------------------------------------------
CD 00228727 @00005825 Neal Electric, Inc 61716 Replace (5) pedestals in various locations 269 0425 4120 300 979.43
3
C"
CD ..,
~N
N
0 ..a.
-11-
;:::;00228728 3 00228729
=It 00228730
...a.00228731
N
31-0ct-14 @00006932
@00005537
@00004716
@00000775
61716
61743
61743A
61813
Nexgen 082566
Ninyo & Moore 182884
North County Rebuilders 85419
Office Depot Business Services Division 734340941-001
735406182-001
Replace (5) pedestals in various locations 275 0470 4120 300 979.43
Pool lights 3500A 1000P 4120 600 3,833.00
As Needed Electrical Maintenance and 100 0419 4120 300 194.67
Pomerado (Sagecrest) Reservoir electrical work 510 0402 4120 300 4,987.00
Total for Check 00228727 10,973.53
Air Deodorizer, Hospital Disinfectant 100 8189 400.19
Inspection & Materials Testing Services 211 0411 4320B 300 9,577.50
Unit #598: fuel solenoid 611 0413 4799 300 128.52
Supplies for JPIA training (to be reimbursed) 100 0400 4760 300 116.81
Wall calendar 100 0418 4710 300 21.88
N Register of Demands Page 6 of 9
N Warrants From 10127/2014-/0/31/20/4
0 Check .....
N UINumber Date PaJ:.ee!Vendor Invoice Comment Fund Orf!.n Acct Pro G. CheckAmt
00228731 31-0ct-14 @00000775 Office Depot Business Services Division 735718167-001 Office Supplies CSD Front Office 100 0200 4710 400 118.52
735718167-001 Office Supplies CSD Front Office 100 0201 4710 400 49.34
735718216-001 Office Supplies for CSD Front Office 100 0200 4710 400 140.39
736063822-001 Office supplies 100 0013 4710 100 76.69
73641 0419-001 Office Supplies 100 0103 4710 100 258.98
73641 0419-002 Office Supplies 100 0107 4710 100 5.83
73641 0608-001 Office Supplies 100 0107 4710 100 9.67
737 467758-001 Offices Supplies -2nd Floor 100 0300 4710 100 67.19
Total for Check 00228731 865.30
00228732 31-0ct-14 @00002457 OneSource Distributors S4492311.001 WTP: Candela 939-Gem bulbs 510 0402 4760 300 17.49
00228733 @00005664 Paley, Blythe 7617.200-01.14 Instructor Payment Fall 2014 100 0208 4118 400 696.00
00228734 @00002099 Parkhouse Tire Inc 3010194498 Tires: #90, 23, 63, 723 & stock 611 0413 4799 300 1,545.87
00228735 @00002103 Parkway Business Centre 410-110CU 11/14 410-110-CU Assessment Fees 11/14 510 0410 5730 300 1,115.00
410-110CU 11/14 410-110-CU Assessment Fees 11/14 100 0418 5730 300 725.00
Total for Check 00228735 1,840.00
00228736 31-0ct-14 -----PK Smart Center, Inc. STI11-001 release of remaining deposit 763 0399 5980 900 1,701.00
00228737 @00002552 Postmaster 63298 Standard permit 1942 100 0013 3320 100 3,152.34
00228738 @00000173 Poway Center for the Performing Arts Foundation 10222014 Foundation ticket sales transfer-PCPA 100 8641 5,797.00
00228739 @00002712 Poway Irrigation Landscape Supply A-81789 Irrigation supplies 100 0418 4770 300 63.82
A-81868 OPP: irrigaiton supplies 100 0418 4770 300 50.78
Total for Check 00228739 114.60
00228740 31-0ct-14 @00002742 Poway Valley Senior Citizens Corporation 612 Reimburse phone/cable 10/15/14-11/14/14 100 0106 2200 100 77.93
612 Reimburse phone/cable 10/15/14-11/14/14 100 0106 3310 100 250.00
Total for Check 00228740 327.93
~00228741 31-0ct-14 @00005510 Progressive Technology Security Systems Inc 33602 Multipurpose room door 100 0106 4308 100 210.00
0 33603 City Hall: 2 power supplies 100 0106 4308 100 1 '137.24 CD
3 Total for Check 00228741 1,347.24
C"
~ 00228742 31-0ct-14 @00010911 R & B Pinto Properties LLC LKCONCOCT151914 Weekly Concession Payment (Oct. 15-19,2014 100 8647 2,550.97
_N00228743 @00011141 Rain Thanks & Greywater 175 Water Harvesting Workshops 1167A 1000P 4120 600 1,450.00
N00228744 @00006244 Rancho Bernardo Printing, Inc 41449 Water Drought Brochures 1167A 1000P 4922 600 345.60
...do.00228745 @00002163 Rayne Water Conditioning 830310/23-11/19 Pool Water Conditioning (11/23-11/19/14) 100 0203 4120 400 138.60
00228746 @00002867 ROO Equipment Company Inc P23657 Unit #770: Towing 611 0413 4312 300 250.00
;'00228747 @00002202 Regional Training Center 12273 Effective Time Management Training 100 0101 4908 100 137.00
3 00228748 12264 Excel2010 Introduction Training 100 0101 4908 100 548.00
:ft 00228749 @00002239 Rex Trophies 100814 Deputy and FF of the Year Plaques for 2014 100 0501 4904 200 172.00
...do,,-----------------=~----------------------------------------------------------~~--------------~----------------------------------------------
~00228750 -----Rodriguez, Francisco 2008918.001 Deposit Refund Permit#13760 100 0208 7471 400 300.00
00228751 @00002982 S K S Petroleum Distributors Inc CL64687 Fuel thru 10/15/14-All Fire Dept. 611 0413 3120 300 702.71
N
Register of Demands Page 7 of 9
W Warrants From 1012712014-1013112014
!a. Check
N U1Number Date Payee/Vendor Invoice Comment Fund Orgn Acct Prog
c
(I)
(")
(I)
3
C"
(I)
~
N
N
0
..I.
~
;-
3
=It
..I.
N
00228752 31-0ct-14 @00006542 Salgado, Ruben
00228753 @00002290 San Diego County Water Authority
00228754 31-0ct-14 @00002318 San Diego Gas & Electric
00228755 31-0ct-14 @00002312 San Diego Gas & Electric/Sundry
RS REIMB 10-14 Reimburse for purchase of uniform supplies 100
0914-11 SEPT 2014: Water deliveries and charges 510
0914-11 SEPT 2014: Water deliveries and charges 510
0914-11 SEPT 2014: Water deliveries and charges 510
487450894 10/14 13100 Poway Rd 9/15/14-10/14/14 100
512606474321014 Acct: 5126 064 743 2 (9/11-10/10/14) 264
5997168701.1014 14114 Midland Rd. Gas & Electric-OPP 100
701957299091014 Acct: 7019 572 990 9 (9/10-10/9/14) 267
71205215710/14 13221 Midland Rd A 9/15/14-10/14/14 100
824 759976 10/14 13306 1/2 Midland 9/15/14-10/14/14 100
838007961 10/14 141551/2 Pomerado 9/15/14-10/14/14 100
899222240 10/14 14038 Midland 915/14-10/14/14 100
932249213211014 Acct: 9322 492 132 1 (9/11-10/10/14) 269
932622414911014 Acct: 9326 224 149 1 (9/11-10/10/14) 275
049201334010/14 Utilities and Ops Ctr power: 9/11-10/10/14 520
049201334010/14 Utilities and Ops Ctr power: 9/11-10/10/14 520
049201334010/14 Utilities and Ops Ctr power: 9/11-10/10/14 510
049201334010/14 Utilities and Ops Ctr power: 9/11-10/10/14 510
049201334010/14 Utilities and Ops Ctr power: 9/11-10/10/14 510
049201334010/14 Utilities and Ops Ctr power: 9/11-10/10/14 520
049201334010/14 Utilities and Ops Ctr power: 9/11-10/10/14 520
049201334010/14 Utilities and Ops Ctr power: 9/11-10/10/14 510
049201334010/14 Utilities and Ops Ctr power: 9/11-10/10/14 520
049444400391014 Acct: 0494 444 003 9 275
049444400391014 Acct: 0494 444 003 9 265
049444400391014 Acct: 0494 444 003 9 100
049444400391014 Acct: 0494 444 003 9 275
049444400391014 Acct: 0494 444 003 9 263
049444400391014 Acct: 0494 444 003 9 271
049444400391014 Acct: 0494 444 003 9 268
049444400391014 Acct: 0494 444 003 9 266
049444400391014 Acct: 0494 444 003 9 267
049444400391014 Acct: 0494 444 003 9 264
049444400391014 Acct: 0494 444 003 9 269
522431678210/14 Monthly Gas-Pool-9/14 100
683160456-1 0/14 Comm Park Electric ( 13098 Bowron Rd) Oct 20 1 00
0501 4928 200
0402 2710A 300
0402 27108 300
0402 271 oc 300
Total for Check 00228753
0418 2110 300
0422 2110 300
0205 2110 400
0424 2110 300
0418 2110 300
0418 2110 300
0418 2110 300
0418 2110 300
0425 2110 300
0470 2120 300
Total for Check 00228754
0403 2140M 300
0403 21408 300
0402 2110 300
0410 2110 300
0406 2140S 300
0403 2140U 300
0403 21400 300
0402 2140 300
0403 2140H 300
0470 2120 300
0423 2110 300
0418 2110 300
0470 2130 300
0421 2110 300
0429 2110 300
0428 2110 300
0426 2110 300
0424 2110 300
0422 2110 300
0425 2110 300
0203 2110 400
0208 2110 400
CheckAmt
387.96
921,222.00
122,074.50
307,563.42
1,350,859.92
7.00
8.58
331.02
8.58
44.00
41.62
8.85
95.77
8.85
59.00
613.27
477.69
2,264.94
1,878.90
2,080.42
2,477.79
105.29
1,200.70
67,727.95
115.87
1,026.96
17.55
7.11
358.22
48.73
8.64
17.02
16.23
25.66
33.24
269.65
1,413.14
8,481.31
1\) Register of Demands Page 8 of 9
ol:lo Warrants From /0/27/2014-10/31/2014
0 Check ....
1\) u.Number Date PaJ:.ee!Vendor Invoice Comment Fund Orf!.n Acct Prof!. CheckAmt
Total for Check 00228755 90,053.01
00228756 31-0ct-14 @00005393 SCS Engineers 0241724 Environmental Services for Twin Peaks clean-u 5989H 5000P 1799 600 968.63
00228757 @00006465 So Cal Signs, Inc. 3519 Two new employee nameplates 100 0306 4710 100 40.00
00228758 @00010060 SoCo Group Inc. 0095571-IN Unleaded & Diesel del. 10/22/14 611 0413 3120 300 8,565.96
00228759 @00000464 Sonsray Machinery P01184-01 Keys-Units #748, 503 & 523 611 0413 4799 300 73.25
P01284-01 Unit #748: Resistor, blower, harness 611 0413 4799 300 526.07
Total for Check 00228759 599.32
00228760 31-0ct-14 @00003021 Sound Image 0508545-A Labor/Service for Speaker Removal/lnstaii-PCP 100 0204 4308 400 768.75
00228761 @00007183 South Coast Emergency Vehicle Service 473293 Unit #922: Ball Valve 611 0413 4799 300 49.83
473422 Unit #922: Bezel 611 0413 4799 300 63.26
Total for Check 00228761 113.09
00228762 31-0ct-14 @00007160 Specialty Electric Supply Co. 7148-526048 City Hall: lamps 100 0419 4760 300 105.90
7148-526058 Time switch 100 0419 4760 300 66.05
7148-526113 32 Watt bulbs 100 0419 4760 300 254.02
7148-526139 lights & combo kit 100 0419 4760 300 112.89
Total for Check 00228762 538.86
00228763 31-0ct-14 @00005200 SQS Video Communications 20141115 FY15 Telecasting City Council Regular Meeting 100 0106 4120 100 400.00
00228764 @00003143 Superior Ready Mix 665228 Pomerado & Casa Avenida 211 0411 4324 300 534.17
00228765 @00002305 Target Specialty Products 1705417 2nd Qtr -Annual Training Updates 100 0418 4120 300 500.00
00228766 @00002780 Thomson Reuters -West 830528846 CA Code V74-74B (3 Bks.) 100 0012 4924 100 152.31
00228767 @00002556 Tifco Industries 70993957 Fleet: stock-hardware, ind grease 611 0413 4760 300 460.46
00228768 @00010706 Toshiba Business Solutions 11351207 Copiers 9/25/14-10/24/14 100 0106 4308 100 1,427.48
00228769 @00010371 U.S. Bank Corporate Payment System 19140674 10/14 K O'Reilly Stmt of Acct: 9/22/14 CNG purchase 611 0413 3120 300 28.09
00228770 @00002473 Uniforms Plus 36914 Senior Park Ranger Uniform 100 0205 4928 400 92.93
;'oo228771 @00006522 United Site Services 114-2385211 Portable services for Open House 100 0502 4904 200 566.03
(') 114-2385297 Portable services for Fire Training Tower 100 0501 4908 200 139.05 CD
3 Total for Check 00228771 705.08
C"
~ 00228772 31-0ct-14 @00010115 UT Community Press 99333 Legal14-110 211 0411 4932 300 210.80
1\) 99334 Legal14-111 211 0411 4932 300 210.80
1\) Total for Check 00228772 421.60 0 ...
ol:looo228773 31-0ct-14 @00003270 Verizon Wireless 9733339691 Cell phones for Safety Services 100 0502 3311 200 59.89 -9733339691 Cell phones for Safety Services 100 0500 3311 200 -0.06
CD
3 9733339691 Cell phones for Safety Services 100 0504 3311 200 0.57
:f:l:: 9733339691 Cell phones for Safety Services 100 0503 2200 200 304.08 ... 9733339691 Cell phones for Safety Services 100 0502 2200 200 38.01
N 9733339691 Cell phones for Safety Services 100 0501 3311 200 83.46
N Register of Demands Page 9 of 9
Ul Warrants From 1012712014-1013112014
S. Check
N U'INumber Date Payee/Vendor Invoice Comment Fund Orgn Acct Prog
00228773 31-0ct-14 @00003270 Verizon Wireless 9733339691 Cell phones for Safety Services 100 0500 3311 200
00228774 31-0ct-14 @00003270 Verizon Wireless
00228775 @00002663 Village Lock and Key
00228776 @00002664 Village Nurseries
00228777 @00004427 Vining Wholesale Lighting Supply
00228778 @00002730 Waxie
00228779 31-0ct-14 @00005639 West Coast Arborists, Inc.
00228780 @00002794 Western Mower and Engine
00228781 31-0ct-14 @00003967 White Nelson Diehl Evans LLP
00228782 @0001 0896 WiMacTel Inc.
00903219 29-0ct-14 @00007257 CaiPERS
00903220 30-0ct-14 @00003518 Union Bank-San Diego
00903221 31-0ct-14 @00006266 Manufacturers & Traders Trust Co. Bank
00903222
00903223
00903224
C 00903225 @00003081 State Board of Equalization
CD n
CD
3
C"
9733339691 Cell phones for Safety Services 100 0500 2200 200
9733339691 Cell phones for Safety Services 100
9733678690 Ranger Cell Phone-10/14 100
8138 Meter Readers: duplicate keys; accessories 510
31808272 Memorial Tree 100
57361 Special Theatre Lighting-PCPA 100
74898754 Lk Poway Rec Ctr -Sanitation Supplies 100
74898755 Lk Poway Rec Ctr -Sanitation supplies 100
99755 Parks: Tree Trimming/Removal/Replacement 100
10116 Oil & Saw blades 231
9980 SE418: air filter, pump, muffler cover 611
9982 SE418: Hourmeter Main!. 611
2014GOVTXMANUA 2014 Government Tax Manual 100
000729832 City Pay Phones-Oct-Dec 2014 100
102914 PE#21 PERS EFT Debit for PE#21 100
PPE 10/26/14
457 PE 10/26/14
401A PE10/26/14
ROTH PE10/26/14
RHS PE 10/26/14
100565475-0914
100565475-0914
Transfer Net Payroll PPE 10/26/14 100
ICMA 457 deferred comp deductions PPE 10/2 100
401 a cmployee/er deductions for PPE 10/26/14 100
ROTH IRA-emolovee contributions for PPE 10/100
Retirement Health Savings Plan (Safety) PE10/ 100
Sales Tax 3rd Qtr Jui-Sep 2014 100
Sales Tax 3rd Qtr Jui-Sep 2014 100
0504 2200 200
Total for Check 00228773
0202 3311 400
0401 4760 300
0418 4770 300
0204 4760 400
0419 4720 300
0419 4720 300
Total for Check 00228778
0418 4120 300
0412 4760 300
0413 4799 300
0413 4799 300
Total for Check 00228780
0103 4924 100
0106 3310 100
8722 --
8003U --
8617 --
8618
8627
8717
8644
0103 5720 100
Total for Check 00903225
~ Director of Administrative Services Approved ~"" ~l!i
N
Register Total
N Date
0
~
.a::o.
;:::;
CD
3
:tt
~
N
CheckAmt -99.06
38.01
38.03
661.05
31.03
31.55
59.40
64.80
850.92
373.64
1,224.56
10,951.70
52.76
23.20
37.26
113.22
195.00
354.00
149,502.36
452,153.27
27,287.28
10,401.77
315.00
1,662.86
1,468.08
-0.08
1,468.00
2,574,887.18
DATE:
City of Poway
COUNCIL AGENDA REPORT
December 2, 2014
APPROVED D
APPROVED AS AMENDED 0
(SEE MINUTES)
DENIED D
REMOVED D
CONnNUED ________ __
Resolution No.
TO:
FROM:
Honorable Mayor and Members of the City Council
Daniel Singer, City Manager tf"I}J
INITIATED BY: Sheila Cobian, City Clerk(;£_,;
858-668-4535 scobian@poway.org
SUBJECT: Approval of Minutes
Summary:
· The Minutes of the October 21, 2014, Special and Regular Meetings of the Poway City Council
are attached for approval.
'. ·.
The Poway City Council sits as the Poway Planning Commission, the Poway Housing Authority,
the Public Financing Authority, and the Successor Agency to the Poway Redevelopment
Agency.
Recommended Action:
It is recommended that the City Council approve the Minutes of the October 21, 2014, Special
and Regular Meetings of the Poway City Council as submitted.
Fiscal Impact:
None.
Environmental Review:
Environmental review is not required according to CEQA guidelines.
:, Public Notification:
None.
Attachment:
A. October 21, 2014 City Council Special Meeting Minutes
B. October 21, 2014 City Council Regular Meeting Minutes
1 of 11 December 2, 2014 Item# 1.3
NOTE: These draft meeting minutes are not official until approved by the City Council at the next scheduled meeting.
CITY OF POWAY
CITY COUNCIL SPECIAL MEETING
MINUTES
October 21, 2014
City Council Chambers
13325 Civic Center Drive, Poway, California
(Per Government Code 54953)
(Meeting Called to Order as City Council/Poway Housing Authority/Planning Commission/Public Financing Authority and
Successor Agency to the Poway Red'evel'onnJeJ
CALL TO ORDER
Mayor Higginson called the Special Meeting to
ROLLCALL Cunningham, Vaus,
STAFF MEMBERS PRESENT
City Manager Daniel Singer;
Foley; Attorney Steven Boehmer;
rney Morgan
No. 2 in Closed Session
IFHE~re~;I, Councilmember Vaus
2.
Councilmember Vaus joi
6:14p.m.
Poway, etc. v. City of
GAL UNSEL-EXISTING LITIGATION
ion (d) of Section 54956.9)
y, etc. v. City of Poway, etc., eta/.
Court Case Number 37-2013-00067667-CU-TT-CTL
the Closed Session for discussion of the following item at
1. CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION
(Paragraph (1) of subdivision (d) of Section 54956.9)
Name of Case: City of Poway v. Suretec Insurance Company
San Diego County Superior Court Case Number 37-2014-00006186-CU-BC-CTL
City Council came out of Closed Session at 6:26p.m.
9980
2 of 11 Attachment A December 2, 2014 Item# 1.3
City of Poway-Minutes-October 21, 2014
City Attorney Foley announced that Council took the following actions:
2. CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION
(Paragraph (1) of subdivision (d) of Section 54956.9)
Name of Case: Preserve Poway, etc. v. City of Poway, etc., eta/.
San Diego County Superior Court Case Number 37-2013-00067667-CU-TT-CTL
Upon motion of Councilmember Cunningham, seconded by Mayor Higginson, the Poway
City Council approved an appeal from the judgment the case. Approved 4/0/1
(Councilmember Vaus disqualified from participation d ntial conflict of interest.)
1. CONFERENCE WITH LEGAL COUNSE
(Paragraph (1) of subdivision (d) of Sect
Name of Case: City of Poway v. S
San Diego County Superior Court
Upon motion by Councilmember Cunning
Poway City Council gave direction to the C
the dispute; the final terms and ns will
approved the final document.
ADJOURNMENT
ber Mullin, the
a resolution of
parties have
Sh . Cobian, CMC
3 of 11
City Clerk
ity of Poway, California
9981
December 2, 2014 Item# 1.3
NOTE: These draft meeting minutes are not official until approved by the City Council at the next scheduled meeting.
CITY OF POWAY
CITY COUNCIL REGULAR MEETING
MINUTES
October 21, 2014
City Council Chambers
13325 Civic Center Drive, Poway, California
(Per Government Code 54953)
(Meeting Called to Order as City Council/City of Poway Planning Commission/Poway Housing Authority/Public Financing
Authority and Successor Agency to the Poway Redevelopment Agency)
CALL TO ORDER
Mayor Higginson called the Regular Meeting to order at 7:00p.m.
ROLL CALL Cunningham, Vaus, Mullin, Grosch, Higginson
STAFF MEMBERS PRESENT
Daniel Singer, City Manager; Tina White, Assistant City Manager; Morgan L. Foley, City
Attorney; Sheila R. Cobian, City Clerk; Robin Bettin, Director of Community Services;
Bob Manis, Director of Development Services; Leah Browder, Director of Public Works;
Scott Edwards, Director of Administrative Services; Lieutenant J.T. Faulkner, Sheriff's
Department.
(Note: Hereinafter the titles Mayor, Deputy Mayor, Council member, City Manager, .Assistant City
Manager, City Attorney, City Clerk and Director of Administrative Services shall be used to
indicate Mayor/Chair, Deputy MayorNice Chair, Councilmember/Director, City
Manager/Executive Director, Assistant City Manager/Assistant Executive Director, City
Attorney/Counsel, City Clerk/Secretary and Director of Administrative Services/Finance Officer.)
PLEDGE OF ALLEGIANCE
Deputy Mayor Grosch introduced Candy Young, President of the Soroptomist
International of Poway, to lead the Pledge of Allegiance.
PRESENTATIONS
In recognition of Red Ribbon and Character Counts! Week, Mayor Higginson presented
Proclamations to linda Ellett, Poway Unified School District Student Support; Kimberly
Beatty, School Board Member; and, Cindy Hicks, Prevention Specialist.
4 of 11 Attachment B
9982
December 2, 2014 Item# 1.3
City of Poway-Minutes-October 21, 2014
PUBLIC ORAL COMMUNICATIONS
Tony Rubino provided an update on the Jack-0-Smash event scheduled for Sunday,
November 2, 2014. He also handed out umpire rule books to the City Manager and
Councilmembers for their use when serving as volunteer umpires during the Celebrity
Softball Game.
Bill Lennon requested assistance with navigating the City's planning and zoning
regulations.
1. CONSENT CALENDAR (Approved by Roll-Cal/ Vote)
Motion by Mayor Higginson, seconded by Deputy Mayor Grosch to approve
Consent Calendar Items 1.1 through Item 1.10. Motion carried by the following
roll-call vote:
Ayes:
Noes:
Absent:
Cunningham, Vaus, Mullin, Grosch, Higginson
None
None
1.1 Approval of Reading by Title only and Waiver of Reading in full of Ordinances on
Agenda.
1.2 Ratification/Approval of Warrant Registers for the periods of September 8 through
September 12, 2014 and September 15 through September 19, 2014.
1.3 Approval of the September 9, 2014, Special City Council Meeting Minutes and the
September 16, 2014, Regular City Council Meeting Minutes.
1.4 Approval of the Amendment and Biennial Review of the City's Conflict of Interest
Code.
1.5 Award of Bid to TA Jones Concrete Construction in the amount of $16,780.50 for
Repair of Two Midland Road Bus Shelters; RFB No. 15-004.
1.6 Acceptance of the FY 12/13 Reline/Replace Sewer Pipelines Project from
Southwest Pipeline & Trenchless Corp., as complete; Authorize the City Clerk to
file and record the Notice of Completion; Authorize the release of the retention in
the amount of $11,744.80, if unencumbered, 45 days after City Council
acceptance; Release the Bond for Material and Labor in the amount of
$204,881.00 and retain the Bond for Faithful Performance for a period of one year,
Bid No. 14-010.
1. 7 Approval of Agreement with RBF Consulting for Engineering Services for the
Espola Road Safety Improvements Project.
5 of 11
9983
December 2, 2014 Item# 1.3
City of Poway-Minutes-October 21, 2014
1.8 Award of Contract to Chaulk Mound Trout Farms, Inc., in the amount of $78,000
for Lake Poway Trout Stocking.
1.9 Outlook Trail to Blue Sky Ecological Reserve.
1.10 Approval of City Hall Holiday Closure Dates.
2. ORDINANCE (Ordinance(s) that do not require a Public Hearing)
2.1 None.
3. PUBLIC HEARING
3.1 Approval of Environmental Assessment and Minor Conditional Use Permit (MCUP)
14-001/Development Review (DR) 14-001; A request to construct a 223-space
automobile inventory storage lot on a two-parcel 1.17-acre vacant site located at
13946 Poway Road and 13917 Courier Way within the Automotive/General
Commercial (A/GC) Zone; Mark Abelkop/MLGP&L, LLC, Applicant.
City Planner Rich Whipple presented the report and reviewed a PowerPoint
presentation.
Speakers in Opposition: Eamon Kavanagh and Ron Selensky.
Councilmember Cunningham expressed concerns relating to the impacts of the
proposed lighting on adjacent homeowners. He suggested that alternative security
measures be considered to mitigate the lighting impacts.
In response to an inquiry from Councilmember Cunningham, Planner Whipple
explained that the proposed lighting features are intended to assist customers with
viewing cars until the close of business each night.
Councilmember Cunningham stated that the intent of the proposed project was
presented as a storage lot with minimum impacts rather than an active sales lot.
Councilmember Cunningham asked if the adjacent property owners would be
permitted to paint the side of the retaining wall facing their property once
constructed by the applicant.
Director of Development Services Bob Manis explained that the existing walls and
fences are on the homeowners' properties. He further explained that the wall
being built by the dealership would be on the applicant's property.
Councilmember Vaus asked if it is necessary to have 18 feet high lighting
standards.
6 of 11
9984
December 2, 2014 Item# 1.3
City of Poway-Minutes-October 21, 2014
Director Manis stated that typically automobile dealerships have lighting standards
15-18 feet high.
Councilmember Vaus spoke in favor of staff presenting additional lighting options
for consideration such as mounting the lighting on the surrounding walls. This
would allow the lighting to shine directly in the lot.
In response to Councilmember Mullin, City Planner Whipple explained that the
applicant's lighting study, based on the proposed project, indicated there would be
no lighting spillover into the neighboring homeowners' yards.
Councilmember Mullin commented that although he has some concerns about
lighting, the analysis performed as part of the application adequately addressed
potential lighting impacts through placement of the proposed lights and shielding
mechanisms.
Deputy Mayor Grosch expressed concerns relating to the impacts of the lot lighting
on adjacent homeowners.
In response to Deputy Mayor Grosch, City Planner Whipple explained that the
existing fire lane will be adjusted to accommodate the parking proposed as part of
the project.
Mayor Higginson stated that he would be in favor of approving the project with
exception of the proposed lighting. He suggested that the applicant continue to
work with staff to address the lighting concerns.
Councilmember Cunningham suggested that the item be continued to allow
additional time to address the adjacent homeowners' concerns relating to the
lighting impacts and construction of the retaining wall.
Councilmember Mullin commented that the applicant has already provided a study
indicating that there would be zero lighting spillover into adjacent homeowners'
properties.
Mike Stevens, Director of Sales for Poway Hyundai, came forward to address
Council on behalf of the Applicant Mark Abelkop. Mr. Stevens stated that the
intent of the project is for a storage lot; however, there may be occasions where it
will be necessary to show a customer a vehicle while it is parked in that lot.
Motion by Councilmember Cunningham, seconded by Mayor Higginson to
reopen the public hearing and continue the item to December 16, 2014.
Motion carried by a 4/1 Vote (Mullin-No).
7 of 11
9985
December 2, 2014 Item# 1.3
City of Poway-Minutes-October 21, 2014
3.2 Approval of Fiscal Year 2015-16 Community Development Block Grant Program.
Director of Development Services Bob Manis gave a brief overview of the agenda
report.
No speakers.
Motion by Mayor Higginson, seconded by Councilmember Cunningham to
close the Public Hearing; authorize staff to apply for FY 15-16 CDBG funding
through the County; authorize the reallocation of $20,752 in CDBG funds
from previous grant years to fund the proposed FY 15-16 CDBG progra~
upon approval by the County; and authorize the City Manager to execute
contracts with the County of San Diego. Motion carried unanimously.
4. STAFF REPORTS
4.1 First Quarter Budget Update for Fiscal Year 2014-15.
Director of Administrative Services Scott Edwards presented the Report.
No speakers.
Motion by Councilmember Cunningham, seconded by Councilmember Mullin
to receive the report and adopt Resolution No. 14-060 entitled "A Resolution
of the City Council, Housing Authority, and Successor Agency to the Poway
Redevelopment Agency of the City of Poway, California approving
amendments to the City's Financial Program for the first quarter Fiscal Year
2014-2015;" and, Resolution No. 14-061 entitled "A Resolution of the Housing
Authority of the City of Poway, California approving amendments to the
City's Financial Program for the first quarter Fiscal Year 2014-2015." Motion
carried unanimously.
5. WORKSHOP
5.1 Off-Leash Dog Access in Silverset Neighborhood Park.
Director of Community Services Robin Bettin gave an overview of the report and
provided a PowerPoint presentation. Director Bettin explained that staff identified
two options that would allow off-leash dogs at Silverset Park on a trial basis. The
options as presented were:
8 of 11
1. Offer designated off-leash dog access hours in all areas of Silverset Park
except the playground, basketball court and ball field.
2. No longer schedule the ball field for softball practice or other athletic use,
and designate it as an enclosed dog pen during all open-park hours.
9986
December 2, 2014 Item# 1.3
City of Poway-Minutes -October 21, 2014
Speakers in Opposition: Emma Hughes, Bart Castellitto, Carol Detamore, Eric
Davis, Doug Vick, David Narevsky, Joseph Calabrese, Vicki Gordon, Gail
Narevsky, Katie Detamore, Becca Berquist, David Kinman, Andre Garcia, Diane
Christian and Assi Friedman.
Submitted a Speaker Slip in Opposition but Did Not Speak: Kevin Gregg and
Abbey Skale.
Speakers in Support: Joan Schaefer, Stacey Forsey, Rich Forsey, Kim Conant,
Linda Nelson, Mark Claussen, Susan Busch, Joe Nalven, Margaret Briggerman,
Jim McKechnie.
Submitted a Speaker Slip in Support but Did Not Speak: Kim Wasung, Karen
Wasung, Janet DiPrinzio, Edward Oliva, Tania Lynch, Karen Hughson, Susan
Reeg, Joan Berger, Cheri Schenck, J. Brewster Schenck, Spicer Conant, Judy
Shriver, Richard Shriver, Richard Robbins, Carol Robbins, Tony Nay, Diane Nagle,
Shirley Schulz, Joanna Waits, Mari Hedtke, Jim Schindler, Scarlett Guice, Frank
Kenny, Debbie Sidley and Hannah Finley.
Deputy Mayor Grosch spoke in favor of allowing dogs off-leash in Silverset Park
between the hours of 6:00a.m. and 9:00a.m. for a 6-month trial period.
Councilmember Mullin spoke in favor of establishing a dedicated fenced-in area for
dogs to be off-leash in Silverset Park during designated hours.
In response to an inquiry from Councilmember Vaus, Director Bettin explained that
the City of San Carlos uses a shared use system that allows off-leash dogs on ball
fields during limited hours. She further explained that the Director of Community
Services in San Carlos is attempting to stop the shared use due to the impacts on
the availability of the limited number of ball fields. Conversely, the City of San
Mateo also has a shared use system that works well. However, San Mateo has
more ball fields and the shared use is spread across four fields.
Councilmember Vaus stated that he could support a trial period of allowing dogs
off-leash on the softball field in Silverset Park during limited hours.
Councilmember Cunningham asked if any discussions have taken place with the
proponents of allowing dogs off-leash in the park for funding any necessary repairs
to the ball field caused by the dogs. Director Bettin responded that the group has
offered to coordinate fundraising and assistance for minor repairs and upkeep of
the field.
Councilmember Cunningham stated that he would like additional environmental
and cost information relating to designating a fenced area for off-leash dog use in
Silverset Park.
Mayor Higginson spoke in support of evaluating the feasibility of constructing a
fenced area in the outer area of the softball field for off-leash dog use.
9 of 11
9987
December 2, 2014 Item# 1.3
City of Poway-Minutes-October 21, 2014
City Manager Singer summarized the direction provided by Council as follows:
• Staff to evaluate the environmental impacts of allowing dogs off-leash
during limited hours on the softball field.
• Staff to evaluate the costs and environmental impacts of constructing a
fenced area for off-leash dog use.
6. CITY MANAGER ITEMS
City Manager Singer announced that the November 4, 2014 Council Meeting had been
cancelled due to the General Election. He also announced that City offices would be
closed on Tuesday, November 11th in observation of Veterans Day.
7. CITY ATTORNEY ITEMS
City Attorney Foley announced that Council took the following actions during the Closed
Session meeting at 6:00p.m.:
CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION
(Paragraph (1) of subdivision (d) of Section 54956.9)
Name of Case: City of Poway v. Suretec Insurance Company
San Diego County Superior Court Case Number 37-2014-00006186-CU-BC-CTL
Upon motion by Councilmember Cunningham, seconded by Councilmember Mullin, the
Poway City Council gave direction to the City's legal counsel in negotiating a resolution
of the dispute; the final terms and conditions will be released once the other parties
have approved the final document. Approved 5/0.
CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION
(Paragraph (1) of subdivision (d) of Section 54956.9)
Name of Case: Preserve Poway, etc. v. City of Poway, etc., eta/.
San Diego County Superior Court Case Number 37-2013-00067667-CU-TT-CTL
Upon motion of Councilmember Cunningham, seconded by Mayor Higginson, ·the
Poway City Council approved an appeal from the judgment of the case. Approved 4/0/1
(Councilmember Vaus disqualified from participation due to potential conflict of interest)
8. MAYOR AND CITY COUNCIL-INITIATED ITEMS
Councilmember Cunningham invited members of the community to attend the Special
Olympics Host City kick-off event on Wednesday, October 22, 2014 at Old Poway Park.
Councilmember Cunningham also announced that he would be requesting a change to
the City's Sign Ordinance in the near future.
8.1 Metropolitan Transit Systems (MTS) Board Update-No Report.
10 of 11
9988
December 2, 2014 Item# 1.3
City of Poway-Minutes-October 21, 2014
8.2 "Hike, Bike and Ride across Poway" -(verbal report).
Councilmember Cunningham played a promotional video spotlighting the San Dieguito
Riverpark.
Councilmember Vaus
8.3 Water Saving Tips.
Councilmember Vaus encouraged residents to limit shower time to five minutes.
Councilmember Mullin
8.4 Metered Water Outlet Proposal
Councilmember Mullin requested Council concurrence for staff to evaluate the feasibility
of providing potable water to residents via a local, metered water source. He explained
that the current drought conditions have resulted in low ground water levels for
residents who rely on wells.
Councilmember Cunningham suggested that Councilmember Mullin meet with staff to
start a conversation regarding the feasibility of such a proposal.
Council concurred with Councilmember Cunningham's suggestion.
Deputy Mayor Grosch
Deputy Mayor Grosch thanked retiring Director of Public Works Leah Browder for her
years of service to the City of Poway.
Mayor Higginson
8.5 Consideration of Establishing City of Poway Hall of Fame.
Mayor Higginson suggested and Council concurred to direct staff to explore the concept
of establishing a "City of Poway Hall of Fame."
ADJOURNMENT
The meeting was adjourned at 11 :00 p.m.
11 of 11
Sheila R. Cobian, CMC
City Clerk
City of Poway, California
9989
December 2, 2014 Item# 1.3
City of Poway
COUNCIL AGENDA REPORT
APPROVED D
APPROVED AS AMENDED D
(SEE MINUTES)
DENIED D
REMOVED D
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
CONTINUED-----
RESOLUTION NO. ___ _
December 2, 2014
Honorable Mayor and Members of the City Council
Tina M. White, Assistant City Manager !>'f'l'-~
Sheila Cobian, City Clerk~
858-668-4535 or scobian@poway.org
Approval of Local Appointments List for 2015
The City Clerk has prepared the annual Local Appointments List required by
Government Code §54972 of all appointive terms that will expire during the next
calendar year.
Recommended Action:
It is recommended that the City Council approve the Local Appointments List for 2015
and authorize the City Clerk to post the list at City Hall and the Poway Library, in
compliance with Government Code §54972.
Discussion:
The Government Code requires that the City Council prepare and post a Local
Appointments List before December 31 51 of each year. The list includes all Board and
Committee terms scheduled to expire during the next calendar year. This information
allows any resident the opportunity to apply to serve on a Board or Committee. The
City of Poway has two Committees that fall under the provisions of this section. They
are the Budget Review Committee and Parks and Recreation Advisory Committee. In
2015, there will be three vacancies on the Parks and Recreation Committee and five
vacancies on the Budget Review Committee. Any other vacanci~s that occur during
2015 would be unscheduled and a notice would be posted.
The City Clerk will accept applications (available on the City's website and in the City
Clerk's office) from December 3, 2014 through January 5, 2015 from Poway residents
wishing to serve on the Budget Review Committee or the Parks and Recreation Advisory
Committee. The Poway City Council will review the applications and make appointments
to the Committees once the vacancy on the City Council has been filled. Staff
anticipates Committee appointments will take place in February, 2015.
Public Notification:
Once approved, the City Clerk will post the Local Appointments List at City Hall, the
Poway Library, and on the City's website. In addition, a Notice inviting Poway residents
to apply to serve on the Committees will be published in the Poway News Chieftain,
posted at City Hall, at the Poway Library and on the City's website.
Attachment:
A. Local Appointments List
1 of 2 December 2, 2014 Item# 1.4
CITY OF POWAY
LOCAL APPOINTMENTS LIST
In compliance with the requirements of the Maddy Act, Government Code 54972, the following appointment
list is posted on an annual basis by December 31 51 . The basic requirements in most cases are that
applicants be a resident of the City of Poway and a registered voter. A Committee/Commission member's
term coincides with the Councilmember who appointed them. Therefore, the City Clerk's Office submits the
following:
BUDGET ADVISORY COMMITTEE
Qualifications:
Purpose:
Expiring terms:
The committee consists of five (5) members who must be Poway residents.
The purpose of the Budget Review committee shall be to review the annual
Operating and Capital Improvement Budget as proposed by the City Manager, and
report its findings to the City Council.
Brett Ames
Mary Cross
Barry Leonard
Steven Stone
Peter Murray
Appointed By
John Mullin
Dave Grosch
Steve Vaus
Don Higginson
Jim Cunningham
Appointed
01/15/2013
01/15/2013
01/15/2013
03/18/2014
01/15/2013
Term Expires
01/2015
01/2015
01/2015
01/2015
01/2015
PARKS AND RECREATION COMMITTEE
Qualifications:
Purpose:
Expiring terms:
2 of2
The committee consists of five (5) members who must be Poway residents.
To advise the City Council on the parks and recreational needs of the City of Poway,
and to provide a means of encouraging community involvement as it pertains to park
development and recreational programming.
Appointed By Appointed Term Expires
Ginger Couvrette Jim Cunningham 01/20/2009 12/2012
Jim Cunningham 01/15/2013 01/2017
Sam Butler Dave Grosch 01/18/2011 12/2014
Susan Mallett Betty Rexford 06/16/2009 11/2010
John Mullin 01/18/2011 12/2014
Lori Simon Mickey Cafagna 01/05/1993 06/2009
Don Higginson 06/16/2009 11/2010
Don Higginson 01/18/2011 12/2014
Phil Spear Steve Vaus 01/15/2013 01/2017
Attachment A December 2, 2014 Item# 1.4
APPROVED D
APPROVED AS AMENDED D
(SEE MINUTES)
City of Poway
COU·NCIL AGENDA REPORT
DENIED D
REMOVED D
CONTINUED ________ __
..
RESOLUTION NO. _____ _
DATE:
TO:
FROM:
INITIATED BY:
Sl:JBJECT:
Summary:
December 2, 2014
Honorable Mayor and Members of the City Council
Daniel Singer, City Manager !ji'A~ .~
Jim Howell, Interim Director of Public Wor~ l \
Michael Obermiller, P.E., Assistant Direct~·;-;p Public Works~
Award of Agreement for As-Needed Landscape Architectural
Design Services, RFP 15-007
A notice inviting proposals for As-Needed Landscape Architectural Design Services was
duly advertised on October 2 and 9, 2014. Six proposals were received and opened on
October 23, 2014. RJM Design Group, Inc. was selected as the vendor best meeting
the evaluation criteria. The first term of the Agreement is three (3) years beginning
December 3, 2014 through December 2, 2017. The optionto renew may be by the
mutual agreement between the City and the selected Consultant. Award of the
Agreement and any extensions are subject ·to City Council appropriation of funds. The
Agreement may be extended through a total of two (2) separate one-year term
extensions. The maximum length of the Agreement would be up to five (5) years.
Recommended Action:
It is recommended that the City Council award the Agreement for As-Needed
Landscape Architectural Design Services, RFP 15-007, to RJM Design Group, Inc., and
authorize the City Manager to execute the necessary documents.
Background:
This Agreement is to cover as-needed landscape architectural design services for
projects that assist the City in its municipal activities.
Findings:
Six proposals were received and opened on· October 23, 2014. Staff determined that
RJM Design Group, Inc. best meets the City's requirements. Evaluation criteria for the
proposals included ability to perform, including, but not limited to, experience and
history of the firm, as well as upon the amount proposed.
The hourly rates in the table below are identified for the Principal Landscape Architect
for comparison between consultants.
1 of 4 December 2, 2014 Item# 15._
Award of Agreement for As-Needed Landscape Architectural Design Services , RFP 15-
007
December 2, 2014
Page2
Consultant Ftrrn
RJM Design Group, Inc.
JPBLA, Inc .
KTU&A
Delorenzo International
MIG
Estrada Land Planning
Hourly Rate for Pnnctpal
Landscape Arcllttect
$145-$165
$150
$175 . $175
$185-$195
$200
The length of the initial Agreement is three (3) years beginning December 3, 2014
through December 2, 2017 . The Agreement may be extended subject to Council
appropriation of funds through a total of two (2) separate one-year term extensions .
The maximum length of the Agreement would be up to five (5) years . This Agreement
may be terminated with or without cause by the City . Termination without cause shall
be effective only upon 60-day written notice to the Consultant. During the 60-day ··
period , the Consultant shall perform all consulting services in accordance with this
Agreement. This Agreement may be terminated by City for cause in the event of a
material breach of this Agreement, misrepresentation by the Consultant in connection
with the formation of this Agreement or the performance of services , or the failure to
perform services as directed by the City . Termination for cause shall be effected by
delivery of written notice of termination to the Consultant. Such termination shall be
effective upon delivery of said notice .
Fiscal Impact:
Funding for specific tasks assigned to the design firm under the terms of the agreement
would be funded on an as needed basis .
Environmental Review:
This action is not subject to CEQA review.
Public Notification:
A copy of this report has been sent to RJM Design Group, Inc .
Attachment:
A Fee Proposal. (The entire RFP is on file with the Office of the City Clerk.)
2 of4 December 2, 2014 Item# L.5_
I
I
I
I
I
I
I
I
!
J
City of Poway • As-Needed Landscape Architectural Design Services RFP #15-007 Commlllliry Inspired Spaces
Fee Proposal R~M DESIGN
GROUP
. -. -----
REIMBURSABLE EXPENSES (Estimated Allowance)
When incurred, the following project expenses will be billed at cost plus 15% administrative fee in addition
to the above fee proposal:
• Printing, plotting, copying, scanning, photography, graphic expenses
o Delivery and handling of documents, shipping
• Permits, plan check, and inspection fees
• City business license
o Soils testing
PAYMENTS
Payments are due and payable on a monthly basis following the completion of any substantial phase of work.
Carrying charges for overdue accounts beyond 30 days of billing date are charged at 1.5% of the amount due,
compounded monthly.
ADDITIONAL SERVICES
Professional services not specifically identified in the scope of work will be considered additional services
and may be performed at Client's request, reimbursable at consultant's standard hourly rates. Additional
services may include, but are not limited to:
o Additional meetings, presentations, or site visits beyond those identified in the scope of work.
o Exhibit preparation beyond that identified in the scope of work.
. • . R~visions to documents required as a result of changes in Client's direction andjor subsequent to
Client's approval, or changes in governmental regulations.
• Design of improvements beyond the designated project site, or due to changes in project phasing
schedule.
o Engagement of other consultants not specifically identified below.
CONSULTANTS' HOURLY RATES
Compensation for additional services will be billed hourly at our standard rates* below:
RIM DESIGN GROUP. INC.
Principal Landscape Architect
Associate Landscape Architect
Landscape Architect
Job Captain I Landscape Designer
Irrigation Designer
CADD Technician
Draftsperson '-"
Word Processor
MCE CONSULTANTS (dvil engineering)
Principal
Project Manager
Project Engineer
Project Surveyor
Design Engineer
Computer Draftsperson
Project Assistant
3-Man Survey Crew
2-Man Survey Crew
3 of4 ATTACHMENT A
$145 -$165 per hour
$130 -$140 per hour
$115-$125 per hour
$100 -$110 per hour
$ 95 -$105 per hour
$ 85 -$ 95 per hour
$ 70 -$ 80 per hour
$ 55 -$ 65 per hour
$160 per hour
$120 per hour
$100 per hour
$120 per hour
$90 per hour
$70 per hour
$50 per hour
$280 per hour
$230 per hour
SAN JUAN CAPISTRANO • SACRAMENTO
www.RJMdesigngroup.com • [949)493·2600
December 2, 2014 Item# L.!i.._
City of Poway · As-Needed Landscape Architectural Design Services RFP #15-007 community Inspired space~
-·~ • L·,·~.
Section Title .. RJM~~~
tklsc (electrical engineering)
Principal
Sr. Associate
Associate
Sr. project manger I Sr. Lighting Design I Sr. System Engineer
Project Manager I Lighting Designer I System Engineer
Engineer /Assistant Lighting Design I Assistant System Engineer
Designer
CAD I BIM Specialist
Clerical
ADS CONSULTING ENGINEERS (structural engineering)
Principal
Project Engineer
CADD Operator I Drafter
Technical Typing and Reproduction
Site Visit
JAMES MICKARTZ. ARCHITECT
Principal Architect
-Associate Architect
$210 per hour
$195 per hour
$185 per hour
$175 per hour
$150 per hour
$130 per hour
$110 per hour
$90 per hour
$75 per hour
$150 per hour
$135 per hour
$95 per hour
$85 per hour
$135 per hour
$135 per hour
$110 per hour
*charges for subconsultant services are billed at cost plus a 15% coordination fee.
Billings for all time and materials and contract extension work shall be in accordance with the level of work
performed based on the categories listed above.
Hourly rates will be escalated each August 1st in accordance with any· increase in the Consumer Price Index
or other mutually agreed upon cost index, beginning with August 1, 2015. Provisions for fee escalation
pertain to all contract extensions and additional work
SAN JUAN CAPISTRANO • SACRAMENTO 2
www.RJMdesigngroup.com • [949] 493-2600
4 of4 December 2, 2014 Item# 15_
APPROVED D
APPROVED AS AMENDED D
(SEE MINUTES)
C •t f p DENIED 1 y o oway REMOVED
D
D
COUNCIL AGENDA REPORT CONTINUED
. . ---. . ~ . . . .. . . . -... . -_ . .. _____ -----------· -RESOLUTION. NO ... """ ... ----"'===
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
December 2, 2014
Honorable. Mayor and Members of the City Council
Daniel Singer, City Manager ~J · 1\,
Jim Howell, Interim Director of Public WorkD ~\ \\
Michael Obermiller, P.E., Assistant Directo; otiPublic ..-"1t9_ rks~
Eric Heidemann, Public Works Operations Manager~
Rejection of Proposal for Trucking and Operator SeNices,
RFP 15-009
A notice inviting proposals for Trucking and Operator SeNices was duly advertised on
October 16 and 23, 2014. One proposal was received. from Kissinger & Herring, Inc.
dba Kissinger Trucking & EQ. The proposal was deemed non-responsive as the vendor
could only provide trucks older than 10 years, which didn't meet the requirements of the
proposal. At this time, staff is not selecting a vendor but instead recommending the
technical specifications be revised and the proposal re-advertised.
Recommended Action:
It is recommended that the City Council reject the proposal for Trucking and Operator
SeNices, RFP 15-009, and authorize staff to issue a new Proposal for Trucking and
Operator SeNices.
Background:
This Contract is to perform trucking seNices to include hauling asphalt grindings, dirt,
rock and other various materials to locations identified by the City to assist in Public
Works maintenance operation activities.
Findings:
On November 5, 2014, one proposal was received from Kissinger & Herring, Inc. dba
Kissinger Trucking & EQ., but was deemed non-responsive due to the age of the
trucking fleet available through the Company. Staff plans to re-evaluate the criteria in
the proposal and re-advertise for this seNice with modified specifications related to the
trucks, their age and condition.
Fiscal Impact:
Sufficient funds for an award of a Contract are budgeted in the 0411-4320A budget for
Fiscal Year 2014/2015 with a not to exceed $65,000 in each of the years in the first term
of the contract.
1 of 2 December 2, 2014 Item # \. (p
Rejection of Proposal for Trucking and Operator Services, RFP 15-009
December 2, 2014
Page 2
Environmental Review:
This action is not subject to CEQA review.
Public Notification:
A copy of this report has been sent to Kissinger & Herring, Inc. dba Kissinger Trucking
&EO.
2 of 2 December 2, 2014 Item # \. b
City of Poway
APPROVED 0
APPROVED AS AMENDED 0
(SEE MINUTES)
DENIED 0
REMOVED 0
CONTINUED ________ __
COUNCIL AGENDA REPORT RESOLUTION NO. __ _
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
December 2, 2014
Honorable Chairman and Members of the Housing Authority
Daniel Singer, Executive Director !}M-tJJ
Robert J. Manis, Director of Development Services pvl
Ashley Jones, Senior Management Analyst (tor{j
Exclusive Negotiating Rights Agreement between the Poway
Housing Authority and Habitat for Humanity
The Poway Housing Authority (Authority) owns a 2.15-acre property located on Twin Peaks
Road (APN 321-190-28) which was purchased to be developed as affordable housing. In
early 2014, Habitat for Humanity approached Poway with the concept of building affordable
for-sale housing for veterans on this site. In order to determine the project's feasibility and
negotiate the terms of a Disposition and Development Agreement (DDA), staff proposes to
enter into an Exclusive Negotiating Rights Agreement (ENRA) for a period of 180 days.
Recommended Action:
It is recommended that the Poway Housing Authority: 1) Approve the Exclusive Negotiating
Rights Agreement with Habitat for Humanity (Attachment A); and 2) Authorize the
Executive Director to execute the agreement.
Background:
On November 3, 2004, the former Poway Redevelopment Agency (Agency) purchased a
2.15-acre property located on Twin Peaks Road, next to Circle K, to be developed in the
future as affordable housing. A zoning and location map for the property is included as
Attachment B. On February 1, 2012, the Agency was dissolved, and pursuant to Health
and Safety Code Section 34176(b )(3) and 34177(g) all housing functions and assets of the
former Agency, including this site, were transferred to the Authority.
Earlier this year, Habitat for Humanity approached Poway with the concept of building a
for-sale affordable .housing development for veterans called Habitat for Heroes. As
currently proposed, the project would provide approximately 28 units for low-income
veteran households. If a development project can be successfully negotiated for this site,
the units would be applied to Poway's regional fair-share affordable housing allocation as
identified in the recently certified Housing Element.
1 of 15 December 2, 2014 Item # \ .1
Exclusive Negotiating Rights Agreement between the Poway Housing Authority
and Habitat for Heroes
December 2, 2014
Page 2
Findings:
In order to negotiate the terms of a DDA, staff proposes that the Authority enter into an
ENRA. The ENRA provides for a negotiating period of 180 days, which can be extended
for an additional180 days upon agreement of both parties. During the ENRA period, the
terms of the DDA will be established, which will include the design, financing, and schedule
of performance for the project. Additionally, the DDA will identify the requirements that
must be met by the developer prior to transfer of ownership of the Authority property. Once
the terms of the DDA have been negotiated, the DDA will be brought to the Authority for
final consideration.
Fiscal Impact:
Sufficient funds were appropriated with FY 2014-15 budget adoption (accounts 0309-
17028, 1799) to cover the costs associated with the approval of this agreement.
Environmental Review: This item is not subject to CEQA review.
Public Notification: A copy of this report was provided to Habitat for Humanity.
Attachments:
2 of 15
A.
B.
Exclusive Negotiating Rights Agreement
Zoning/Location Map
December 2, 20141tem # \ 7'1
EXCLUSIVE NEGOTIATING RIGHTS AGREEMENT
(TWIN PEAKS HOUSING DEVELOPMENT)
This Exclusive Negotiating Rights Agreement (this "Agreement") is entered into as of
this 2nd day of December, 2014 (the "Effective Date"), by and among the Poway Housing
Authority, a public body, corporate and politic (the "Authority") and San Diego Habitat for
Humanity, Inc., a California nonprofit public benefit corporation (the "Developer"), on the basis
of the following facts:
RECITALS
A. The City Council of the City of Poway (the "City Council") adopted the
Redevelopment Plan for the Paguay Redevelopment Project Area (the "Project Area") on
December 13, 1983 by Ordinance No. 117, as amended by Ordinance No. 415 on June 15, 1993,
Ordinance No. 439 on December 13, 1994, Ordinance No. 593 on December 2, 2003, Ordinance
No. 605 on August 3, 2004, Ordinance No. 611 on October 26, 2004, Ordinance No. 641 on July
18, 2006, and as further amended by Ordinance No. 657 on July 12, 2007 (as amended from time
to time, the "Redevelopment Plan"). The Redevelopment Plan affects and controls the
development and use of all real property located within the Paguay Redevelopment Project Area
within the City of Poway, California, (the "City") as more particularly described and set forth in
the Redevelopment Plan. The goals for the Redevelopment Plan include alleviation of blighting
conditions and the stimulation of economic development and affordable housing activities in the
Project Area and the community.
B. On January 17, 2012, and pursuant to Health and Safety Code Section 34173, the
City Council declared that the City would act as successor agency (the "Successor Agency") to
the former Poway Redevelopment Agency (the "Dissolved RDA") effective February 1, 2012,
but elected not to retain the housing assets and functions previously performed by the Dissolved
RDA and instead, pursuant to Health and Safety Code Section 34176(b)(3), selected the
Authority to retain the housing assets and functions previously performed by the Dissolved
RDA.
C. On February 1, 2012, pursuant to Health and Safety Code Section 34176(b)(3)
and 34177(g), the Successor Agency transferred to the Authority the housing functions and
assets of the Dissolved RDA.
D. The Authority, as housing successor, owns a specified site located within the
Project Area, as further described in the attached Exhibit A (the "Site"), on which the Authority
desires to cause the development of a twenty-eight (28) unit multi-family for-sale affordable
housing development targeted to U.S. veterans (the "Development").
E. The Authority and the Developer desire to enter into exclusive negotiations for
redevelopment of the Site and construction of the Development.
1
3 of 15 December 2, 20141tem # \.1
F. Completion of the Development in the Project Area will provide needed
affordable housing, and will assist in ameliorating blighting influences in the Project Area. The
Authority will be imposing occupancy and affordability restrictions on the Development in order
to utilize approximately twenty-eight (28) units to obtain affordable housing production credits
for the Authority pursuant to Section 33413(b)(2)(A)(i) of the Community Redevelopment Law
as housing units located in the Project Area and available at affordable housing cost to low-
income households.
G. The purpose of this Agreement is to establish procedures and standards for the
negotiation by the Authority and the Developer of a Disposition and Development Agreement (a
"DDA") pursuant to which, among other matters, if specified preconditions are satisfied, the
Authority would convey ownership of the Site to the Developer and the Developer would
construct the Development on the Site. As more fully set forth in Section 3.1, the Developer
acknowledges and agrees that this Agreement in itself does not obligate any party to acquire or
convey any property, does not grant the Developer the right to develop the Development, and
does not obligate the Developer to any activities or costs to develop the Development, except for
the preliminary analysis and negotiations contemplated by this Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the mutual covenants and promises contained
herein and for other valuable consideration, the receipt and sufficiency of which is hereby
acknowledged, the parties mutually agree as follows:
ARTICLE 1.
EXCLUSIVE NEGOTIATIONS RIGHT
Section 1.1 Good Faith Negotiations. The Authority and the Developer shall negotiate
diligently and in good faith, during the Negotiating Period described in Section 1.2, the terms of
a DDA for the conveyance of land and construction of the Development on the Site. During the
Negotiating Period, the parties shall use good faith efforts to accomplish the respective tasks
outlined in Article 2 to facilitate the negotiation of a mutually satisfactory DDA.
Among the issues to be addressed in the negotiations are: ( 1) the conveyance of the Site
by the Authority to the Developer; (2) the design and type of units to be constructed as part of
the Development; (3) the physical and land title conditions of the Site and remediation of any
adverse conditions; (4) the land use approvals necessary for the Development; (5) the
development schedule for the Development (including timing of entitlement applications and
governmental approvals); (6) financing of the Development; (7) marketing and management of
the Development; and (8) the level of housing affordability and the nature of affordability
controls.
Section 1.2 Negotiating Period. The negottatmg period (the "Negotiating Period")
under this Agreement shall be One-Hundred and Eighty (180) days, commencing on the
Effective Date, subject to extension by mutual agreement of the parties in writing. The
Negotiating Period may be extended on the Authority's behalf for up to an additional One-
2
4 of 15 December 2, 2014 Item # \ .1
Hundred and Eighty (180) days by the Executive Director if, in the Executive Director's
judgment, sufficient progress toward a mutually acceptable DDA has been made during the
initial One-Hundred and Eighty (180) day negotiating period to merit such extension.
If a DDA has not been executed by the Authority and the Developer by the expiration of
the Negotiating Period, including any extension that may be granted by the Executive Director
pursuant to the preceding paragraph, then this Agreement shall terminate and neither party shall
have any further rights or obligations under this Agreement. If a DDA is executed by the
Authority and the Developer then, upon such execution, this Agreement shall terminate, and all
rights and obligations of the parties shall be as set forth in the executed DDA.
Section 1.3 Exclusive Negotiations. During the Negotiating Period, including any
extension granted pursuant to Section 1.2, the Authority shall not negotiate with any entity, other
than the Developer, regarding development of the Site, or solicit or entertain bids or proposals to
do so.
Section 1.4 Identification of Developer's Representative. The Developer's
representative to negotiate the DDA with the Authority is Lori Holt Pfeiler, Executive Director.
The Developer's negotiating representative may be changed by written notice to the Authority.
Section 1.5 Identification of Authority Representatives. The Authority's
representatives to negotiate the DDA with the Developer are Tina White, Bob Manis, and Ashley
Jones; Tina White, as the Assistant Executive Director, has ultimate staff authority to make
decisions related to this Agreement that can be made at the staff level, and to make staff
recommendations to the Housing Authority Board (the "Authority Board") in connection with
decisions related to this Agreement to be made at the Authority Board level. The Authority's
negotiating representatives may be changed by written notice to the Developer.
Section 1.6 Good Faith Deposit Alternative. In lieu of and as an alternate to a good
faith deposit, and as consideration for the Authority's execution of this Agreement, the Developer
by this Agreement shall provide the Authority with copies of all reports, studies, analyses,
correspondence and similar documents prepared or commissioned by the Developer with respect
to this Agreement and the Development, all as more fully set forth in Section 2.8.
ARTICLE2.
NEGOTIATION TASKS
Section 2.1 Overview. To facilitate negotiation of the DDA, the parties shall use
reasonable good faith efforts to accomplish the tasks set forth in this Article 2 in a timeframe that
will support negotiation and execution of a mutually acceptable DDA prior to the expiration of
the Negotiating Period.
Section 2.2 Development Team. The Parties' acknowledge that the identity and
quality of the Developer's team that will oversee, monitor, and manage the day-to-day
construction of the Development is important to the completion of the tasks set forth in Article 2
below, and in seeking to negotiate a mutually acceptable DDA. Within Thirty Days (30) days
3
5 of 15 December 2, 2014 Item # \ .1
after the Effective Date, the Developer shall identify and seek Authority approval of an engineer,
architect, and legal counsel and any additional members to its proposed development team,
which approval shall not be unreasonably withheld, conditioned or delayed. The development
team members approved in accordance with this section shall comprise the "Development Team"
for the Development. The Developer may replace one or more members of the Development
Team upon receipt of Authority approval, which approval shall not be unreasonably withheld,
conditioned or delayed.
Section 2.3 Financing and Costs of Development. Within Ninety (90) days after the
Effective Date, the Developer shall provide the Authority with a detailed financial analysis for
the Development containing, among other matters, a development budget and operating
proforma, and housing affordability levels supported by the budget (the "Financing Proposal").
The financial analysis shall be refined by the parties during the Negotiating Period, as
appropriate, and will be used to evaluate the financial feasibility of the Development and to assist
in the negotiation of terms regarding payment of development costs.
Section 2.4 Conveyance of the Site. Concurrent with Developer's development of the
Financing Proposal, the Authority and the Developer shall seek to agree upon the conveyance of
the Site, and the nature, timing and cost of Authority assistance to the Development, if any. The
proposed conveyance shall be subject to confirmation and refinement pursuant to the formal
reuse appraisal and the noticed public hearing Authority Board and City Council finding process
to be conducted in accordance with Health and Safety Code Section 33433, as further described
in Section 2.11 below.
Section 2.5 Planning Approvals. The Developer acknowledges that the Development
may require City approval of various entitlements (the "Entitlements"). Within Ninety (90) days
after the Effective Date, the Developer shall submit conceptual site plans and preliminary
designs for the Development to the Authority and the appropriate City departments for their
informal review. The Authority and the Developer shall negotiate in good-faith a deadline for
the formal application for the Entitlements to the City, which deadline will be included in the
DDA.
Section 2.6 Schedule of Performance. Within 90 (days) days after the Effective Date,
the Developer shall provide the Authority with a proposed detailed schedule of performance for
the Development which shall be based on the preliminary schedule attached hereto as Exhibit B.
Section 2.7 Due Diligence. During the Negotiating Period, the Developer shall
conduct due diligence activities, including but not limited to planning, soils report, hazardous
materials report, financial feasibility and title adequacy.
(a) Physical Adequacy Determination. The Developer shall determine
whether the Site is suitable for development of the Development, taking into account the
geotechnical and soils conditions, the presence or absence of toxic or other hazardous materials,
the massing of the proposed Development improvements and the parking requirements imposed
on Developments of this type and the other environmental and regulatory factors that the
Developer deems relevant. If, in the Developer's judgment based on such investigations and
4
6 of 15 December 2, 20141tem # \.1
analyses, the Site is not suitable for the Development, the Developer may notify the Authority in
writing no later than Ninety (90) days after the Effective Date of its determination (an
"Unsuitability Notice"). Upon delivery of an Unsuitability Notice by the Developer within this
time period, this Agreement shall be terminated without further action of any party, and
thereafter no party shall have any further duties, obligations, rights, or liabilities under this
Agreement, except as set forth in Section 3.8. If the Developer does not deliver an Unsuitability
Notice during the first Ninety (90) days after the Effective Date, then the Site shall be deemed
physically suitable for development of the Development and any executed DDA shall not
provide for an additional opportunity for the Developer to determine the physical suitability of
the Site or for the Developer to terminate the DDA as a result of the purported physical
unsuitability of the Site (unless such unsuitability arises solely from an event (i) occurring
subsequent to the execution of the DDA, or (ii) that Developer, in its reasonable exercise of due
diligence, could not have discovered prior to the execution of the DDA).
(b) Title Adequacy Determination. Within Thirty (30) days following the
Effective Date, the Authority shall cause a reputable title company to issue a Preliminary Title
Report (the "Report") on the Site to the Developer. If the Developer objects to any exception
appearing on the Report or should any title exception arise after the date of the Report, the
Developer may object to such exception, provided such objection is made to the Authority in
writing on or before 5 o'clock P.M. on the thirtieth (30th) day following the date the Developer
receives the Report. If the Developer objects to any exception to title, the Authority, within
Thirty (30) days of receipt of Developer's objection shall notify Developer in writing whether
Authority elects to: (1) cause the exception to be removed of record; (2) obtain a commitment
from the title company for an appropriate endorsement to the policy of title insurance to be
issued to the Developer, insuring against the objectionable exception; or (3) terminate this
Agreement unless the Developer elects to take title subject to such exception. If any party elects
to terminate this Agreement pursuant to this Section 2.7(b), no party shall thereafter have any
obligations to or rights against the others hereunder, except as set forth in Section 3.8. If the
Developer fails to provide any notification to the Authority regarding this matter prior to
expiration of the time period set forth herein, the condition set forth in this Section 2.7(b) shall
be deemed satisfied, this Agreement shall continue in effect, and the condition of title at closing
under any executed DDA shall be as set forth in the Report.
Section 2.8 Reports. Unless otherwise waived by the Authority, the Developer shall
provide the Authority with copies of all reports, studies, analyses, correspondence and similar
documents prepared or commissioned by the Developer with respect to this Agreement and the
Development, promptly upon their completion.
The Authority shall provide the Developer with copies of all reports, studies, analyses,
correspondence and similar documents (collectively, "Documents"), exclusive of detailed
property appraisals, prepared or commissioned by the Authority with respect to this Agreement
and the Development, promptly following execution of this Agreement with respect to
Documents then in its possession or under its reasonable control, and promptly upon their
completion with respect to any subsequently prepared documents.
5
7 of 15 December 2, 2014 Item#\ .1
Section 2.9 Organizational Documents. The Developer shall provide the Authority
with copies of its organizational documents evidencing that the Developer exists and is in good
standing to perform its obligations under the DDA.
Section 2.10 Environmental Review. The Authority shall prepare or cause to be
prepared any and all environmental documentation, and in its sole discretion, make all findings
related to the approval of the DDA under the California Environmental Quality Act ("CEQA"),
pursuant to California Public Resources Code Sections 21000 et seq. and California Code of
Regulations Sections 15000 et seq; provided, that nothing in this Agreement shall be construed
to compel the Authority or the City to approve or make any particular findings with respect to
such CEQA documentation. The Developer shall provide such information about the
Development as may be required to enable the Authority to prepare or cause preparation and
consideration of any CEQA-required document, and shall otherwise generally cooperate with the
Authority to complete this task.
If the Authority, in its sole discretion, determines that the approval of the DDA requires non-
feasible mitigation measures, or fails to yield benefits that outweigh significant unavoidable
. impacts, or the Authority otherwise determines, in its sole discretion, not to make any finding
required by CEQA as a prerequisite to approval of the DDA, it may terminate the Agreement.
Upon such termination, neither party shall have any further rights or obligations under this
Agreement, except that any provision of this Agreement that is specified to survive termination
shall remain in effect and binding upon the Parties.
The parties intend this Agreement to reflect the basic understanding between them, but agree that
the transaction contemplated herein shall be subject to the execution of a mutually acceptable,
definitive, and final DDA to be negotiated, and subject to the approval of the Authority Board
and City Council. This Agreement does not constitute a legally binding commitment to a specific
project or the Development. Therefore, final CEQA review may be completed with entitlements
after execution of a final DDA.
Section 2.11 Section 33433 Report. The Authority shall prepare the necessary
documentation pursuant to Section 33433(a)(2)(B) of the California Health and Safety Code to
be submitted to the Authority Board and City Council in conjunction with the Authority's and the
City's consideration of any DDA that is prepared under this Agreement. The Section 33433
report shall contain the estimated value of the Site determined at its highest and best use under
the Redevelopment Plan and the estimated value of the Site determined at the use and with the
conditions, covenants and development costs required pursuant to the DDA.
Section 2.12 Progress Reports. From the Effective Date and every thirty (30) days
thereafter, the Developer shall make oral or written progress reports advising the Authority
representatives on studies being made and matters being evaluated by the Developer with respect
to this Agreement and the Development.
Section 2.13 Community Engagement. The Authority and the Developer shall confer
and seek agreement on an appropriate strategy to obtain input from community members
regarding the Development. At a minimum, the Developer shall take the lead in noticing and
6
8 of 15 December 2, 20141tem # l.l
conducting a community workshop (the "Community Workshop") to provide information and
solicit input regarding the proposed site plan and design of the Development within the time set
forth in the preliminary schedule attached hereto as Exhibit B. The Community Workshop shall
be noticed to all property owners and occupants in the vicinity of the Site.
ARTICLE3.
GENERAL PROVISIONS
Section 3.1 Limitation on Effect of Agreement. This Agreement shall not obligate
either the Authority or the Developer to enter into a DDA or to enter into any particular DDA.
By execution of this Agreement, the Authority is not committing itself to or agreeing to
undertake disposition, or exercise of control over the Site. Execution of this Agreement by the
Authority is merely an agreement to conduct a period of exclusive negotiations in accordance
with the terms hereof, reserving for subsequent Authority Board and City Council action the
final discretion and approval regarding the execution of a DDA and all proceedings and
decisions in connection therewith. Any DDA resulting from negotiations pursuant, to this
Agreement shall become effective only if and after such DDA has been considered and approved
by the Authority Board and, if required by law, the City Council, following conduct of all legally
required procedures, and executed by duly authorized representatives of the Authority and the
Developer. Until and unless a DDA is signed by the Developer, approved by the Authority
Board and City Council, and executed by the Authority, no agreement drafts, actions,
deliverables or communications arising from the performance of this Agreement shall impose
any legally binding obligation on either party to enter into or support entering into a DDA or be
used as evidence of any oral or implied agreement by either party to enter into any other legally
binding document.
Section 3.2 Notices. Formal notices, demands and communications between the
Authority and the Developer shall be sufficiently given if, and shall not be deemed given unless,
dispatched by certified mail, postage prepaid, return receipt requested, or sent by express
delivery or overnight courier service, to the office of the parties shown as follows, or such other
address as the parties may designate in writing from time to time:
Authority:
Developer:
Poway Housing Authority
13325 Civic Center Drive
Poway, CA 92064
Attn: Daniel Singer, Executive Director
San Diego Habitat for Humanity, Inc.
10222 San Diego Mission Road
San Diego, CA 92108
Attn: Lori Holt Pfeiler, Executive Director
Such written notices, demands and communications shall be effective on the date shown on the
delivery receipt as the date delivered or the date on which delivery was refused.
7
9 of 15 December 2, 2014 Item# \ .1
Section 3.3 Waiver of Lis Pendens. It is expressly understood and agreed by the
parties that no lis pendens shall be filed against any portion of the Site with respect to this
Agreement or any dispute or act arising from it.
Section 3.4 Right of Entry. The Authority hereby grants the Developer a right of entry
to enter the Site to perform the physical adequacy determination described in Section 2.7(a)
above. Developer shall indemnify, defend (with counsel reasonably acceptable to Authority and
the City) and hold harmless the Authority, the City, and their directors, council members,
officers, contractors, agents and employees against any claims made against them which arise
out of the activities Developer or its, contractors, subcontractors, agents, employees, licensees,
invitees or guests on or concerning the Site during the term of this Agreement. The foregoing
indemnity shall not extend to any claim arising solely from the Authority or City's gross
negligence or intentional acts.
Section 3.5 Insurance. The Developer shall at all times during the term of this
Agreement keep in full force and effect a policy or policies of commercial general liability
insurance against liability for bodily injury to or death of any person or property damage arising
out of or in any way related to the Developer's entry onto the Site. The insurance shall be written
on an occurrence basis and the limits of such insurance shall be not less than Two Million
Dollars ($2,000,000) combined single limit for bodily injury and property damage. The
Developer shall also carry or cause to be carried workers' compensation insurance, with statutory
limits as required by the California Labor Code, covering all persons employed by the
Developer, as applicable, in connection with the Development and entry onto the Site under this
Agreement, which shall provide for a waiver of subrogation against the Authority.
Section 3.6 Costs and Expenses. Each party shall be responsible for its owns costs
and expenses in connection with any activities and negotiations undertaken in connection with
this Agreement, and the performance of each party's obligations under this Agreement.
Section 3.7 No Commissions. Except as may otherwise be provided in any DDA
hereafter executed by the Authority, the Authority shall not be liable for any real estate
commissions or brokerage fees that may arise from this Agreement or any DDA resulting from
this Agreement. The Authority represents that it has engaged no broker, agent or finder in
connection with this transaction, and the Developer shall defend and hold the Authority harmless
from any claims by any broker, agent or finder retained by the Developer.
Section 3.8 Defaults and Remedies
(a) Default. Failure by any Party to negotiate in good faith as provided in this
Agreement shall constitute an event of default hereunder. The non-defaulting Party shall give
written notice of a default to the defaulting Party, specifying the nature of the default and the
required action to cure the default. If a default remains uncured thirty (30) days after receipt by
the defaulting Party of such notice, the non-defaulting Party may exercise the remedies set forth
in subsection (b).
8
10 of 15 December 2, 2014 Item# l .1
(b) Remedies. In the event of an uncured default by the Authority or the
Developer, the non-defaulting Party's sole remedy shall be to terminate this Agreement.
Following such termination, no Party shall have any further right, remedy or obligation under
this Agreement, except that the Developer's indemnification obligation pursuant to Section 3.4
shall survive such termination.
Except as expressly provided above, no Party shall have any liability to any other Party
for damages or otherwise for any default, nor shall any Party have any other claims with respect
to performance under this Agreement. Each Party specifically waives and releases any such
rights or claims it may otherwise have at law or in equity.
Section 3.9 Attorneys' Fees. The prevailing party in any action to enforce this
Agreement shall be entitled to recover attorneys' fees and costs from the other party.
Section 3.10 Governing Law. This Agreement shall be governed by and construed in
accordance with the laws of the State of California.
Section 3.11 Entire Agreement. This Agreement constitutes the entire agreement of the
parties regarding the subject matters of this Agreement.
Section 3.12 Counterparts. This Agreement may be executed in counterparts, each of
which shall be deemed an original but all of which together shall constitute one and the same
agreement.
Section 3.13 Assignment. The Developer may not transfer or assign any or all of their
rights or obligations hereunder except with the prior written consent of the Authority, which
consent shall be granted or withheld in the Authority's sole discretion, and any such attempted
transfer or assignment without the prior written consent of Authority shall be void.
Section 3.14 No Third Party Beneficiaries. This Agreement is made and entered into
solely for the benefit of the Authority and the Developer and no other person shall have any right
of action under or by reason of this Agreement.
Section 3.15 Actions by the Authority. Whenever this Agreement calls for or permits
the approval, consent, authorization or waiver of the Authority, the approval, consent,
authorization, or waiver of the Authority Executive Director shall constitute the approval,
consent, authorization or waiver of the Authority without further action of the Authority Board.
9
11 of 15 December 2, 2014 Item# \ .1
IN WITNESS WHEREOF, this Agreement has been executed by the parties on the
Effective Date.
ATTEST:
Sheila R. Cobian, CMC, City Clerk
APPROVED AS TO FORM:
Rafael Y aquian, Authority Special Counsel
12 of 15
DEVELOPER:
SAN DIEGO HABITAT FOR HUMANITY, Inc., a
California nonprofit public benefit corporation
By:
Lori Holt Pfeiler, Executive Director
AUTHORITY:
POWAY HOUSING AUTHORITY, a public body
corporate and politic
By:
Daniel Singer, Executive Director
10
December 2, 2014 Item# \ .1
EXHIBIT A
LEGAL DESCRIPTION OF THE SITE
(APN: 321-190-28)
PARCEL 1 OF PARCEL MAP NO. 1396, IN THE CITY OF POWAY, COUNTY OF SAN
DIEGO, STATE OF CALIFORNIA, FILED IN THE OFFICE OF THE COUNTY
RECORDER OF SAN DIEGO COUNTY, MARCH 19, 1973.
13 of 15 A-1 December 2, 2014 Item # \ .1
EXHIBIT B
PRELIMINARY SCHEDULE
ACTION FINAL DATE
1. Approval of ENRA by Authority December 2, 2014
2. Identification of Development Team January 2, 2015
3. Developer submission of Financing Proposal to March 2, 2015
Authority
4. Developer submission of conceptual site plans and March 2, 2015
preliminary design for the Development
5. Developer submission of detailed schedule of March 2, 20 15
performance for the Development
6. Developer receipt of financing commitments March 2, 2015
7. Community Workshop At least Sixty (60) days prior to DDA
consideration by City Council and
Authority Board
8. Authority and City Council consideration of DDA June 2015 or One-Hundred and Eighty
( 180) days from Effective Date, unless
extended pursuant to Section 1.2.
9. Execution ofDDA
r----· 10. Developer application for Entitlements
11. City Council consideration of Entitlements
12. Conveyance of Site to Develo_per
13. Commencement of Construction
14. Completion of Construction
15. 1 00% occupancy of Development
14 of 15 B-1 December 2, 20141tem # \ .1
CIY: I J/ ~l ~ . CARNI"!A::l ST I t:L DOLU__t:<_A WY "<
)---
r---r-
-r---1--
0:::
0 -L S N ETOS Av----
RS F-2 0::: -0
~ 0:::
t---
(/) -0 tn '"r-r-~ ~ ~ ~ 0
IQj :=r----ffi ~-u 1\Juu_c 1
5 w t---co I
pt' 1f=:=~~ I* PF
11 I = tdruvr I
TWIN PEAKS ROAD I I I I I I •
--
RS .. 4 ~CN lcOUNTI Y CREEK RD
A ~~ / 0
<{
~ ~ 0
'f.]WA VALLI:: ~OADI 0:::
::5
I""" 0
~~ ~ ~~ ) 85
t ;t'<_A _N LU ~~ ~L--1'-' ~ z
0 co RR-C <t:
0:::
0::: w
i=
~--.... '~ l -x ~~
N
$
0 125 250 500 r-..·-iFeet
15 of 15
Subje-ct _to_c_a!io n:
APN: 3/A90-28
PF
CITY OF POWAY
Zoning /location Map
~ ~
05-RM
ATTACHMENT B
December 2, 20141tem # \ .1
APPROVED D
APPROVED AS AMENDED D
City of Poway
COUNCIL AGENDA REPORT
(SEE MINUTES)
DENIED D
REMOVED D
CONTINUED ____ _
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
RESOLUTION NO. ___ _
December 2, 2014
Honorable Mayor and Members of the City Council
Daniel Singer, City Manager .!}M"-\))
Robin Bettin, Director of Community Services
Resolution Authorizing the Execution of the Agreement
for the Housing-Related Parks Program Grant, and
Appropriation of Funds to Capital Improvement
Project 1698B
The City of Poway has been awarded a Housing-Related Parks Program Grant from the
California Department of Housing and Community Development in the amount of
$82,550. The funds will be utilized for the resurfacing of the Hilleary Park playground.
The proposed Resolution authorizes the execution of the Standard Agreement.
Implementation of the project requires an appropriation of $82,550 from the
Unappropriated General Fund Balance to Capital Improvement Project (CIP) 1698B
Playground Renovation, which will be reimbursed by the grant. The project and
payment request must be completed by September 30, 2016.
Recommended Action:
It is recommended that the City Council approve the Resolution and appropriate
$82,550 from the Unappropriated General Fund balance to Capital Improvement Project
(CIP) 1698B, to be reimbursed by the Housing-Related Parks Program Grant.
Background:
The Housing-Related Parks Grant Program provides funding for local park
enhancements to jurisdictions that have recently approved housing for lower-income
households, and are in compliance with the State Housing Element law.
In September 2012, the City received a grant for $200,850 which was utilized for the
following improvements at Community Park: construction of a new gazebo and picnic
area, bocce court drainage improvements, renovation of the east and west ball fields,
painting of the Community Swim Center, and Poway Senior Center operable wall
replacement.
1 of 12 December 2, 2014 Item# .h1
Execution of the Agreement for the Housing-Related Parks Program Grant
December 2, 2014
Page 2
In January 2014, the City applied for the next round of grant funding. We received
notification in ·July that the City had been awarded a grant for $82,550 for the
resurfacing of the playground at Hilleary Park, located at 13500 Community Road.
Findings:
The Department of Housing and Community Development requests a resolution stating
the amount of the grant and authorizing the execution of the Standard Agreement. The
City is allowed to encumber funds against the grant award immediately upon execution
of the Standard Agreement. The term begins on the date the agreement is fully
executed and ends September 30, 2016.
To implement the project, it is necessary to advance funds from the Unappropriated
General Fund balance into a capital improvement project, to be reimbursed by the
Housing-Related Parks Program Grant. Capital Improvement Project (CIP) 1698 is an
existing project that provides funding for playground renovations at various City parks.
The funds will be appropriated to CIP 1698B specifically for the playground renovation
at Hilleary Park.
Fiscal Impact:
This action authorizes an appropriation of $82,550 from the Unappropriated General
Fund Balance (100-8912) to CIP account 1698B, to be reimbursed by the Housing-
Related Parks Grant.
Environmental Review:
This action is not subject to CEQA review.
Public Notification:
None.
Attachments:
A. Resolution of the City of Poway Authorizing the Execution of the Agreement
for the Housing-Related Parks Program Grant
B. State of California Standard Agreement
2 of 12 December 2, 2014 Item# L1
RESOLUTION NO. 14-
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF POWAY AUTHORIZING EXECUTION
OF STATE STANDARD AGREEMENT FOR HOUSING-
RELATED PARKS PROGRAM GRANT
WHEREAS, the State· of California, Department of Housing and Community
Development (the "Department") issued a Notice of Funding Availability (NOFA) dated
October 2, 2013, under its Housing-Related Parks (HRP) Program; and
WHEREAS, by Resolution No. 14-004, the City of Poway (the "Applicant") was
authorized to apply for an HRP 1 Program Grant and submitted the 2013 Designated
Program Year Application Package released by the Department for the HRP Program;
and
WHEREAS, the Department is authorized to approve funding allocations for the
HRP Program, subject to the terms and conditions of the NOFA, Program Guidelines,
Application Package, and Standard Agreement; and
3 of 12
WHEREAS, the Department awarded Applicant an HRP Program Grant in the
amount of Eighty-Two Thousand Five Hundred Fifty Dollars and No Cents ($82,550.00).
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway
as follows:
1. Applicant is hereby authorized and directed to enter into, execute, and deliver
a State of California Standard Agreement (Standard Agreement), for an HRP Program
Grant in the amount of Eighty-two Thousand Five Hundred Fifty Dollars and No Cents
($82,550.00), and any and all other documents required or deemed necessary or
appropriate to secure the HRP Program Grant from the Department, and all
amendments thereto (collectively, the "HRP Grant Documents").
2. Applicant shall be subject to the terms and conditions as specified in the
Standard Agreement. Funds are to be used for allowable capital asset project
expenditures to be identified in Exhibit A of the Standard Agreement. The application in
full is incorporated as part of the Standard Agreement. Any and all activities funded,
information provided, and timelines represented in the application are enforceable
through the Standard Agreement. Applicant hereby agrees to use the funds for eligible
capital asset(s) in the manner presented in the application as approved by the
Department and in accordance with the NOFA and Program Guidelines and Application
Package.
ATTACHMENT A December 2, 2014 Item# h1
Resolution No. 14-
Page 2
3. That the City Manager or,' in the absence of the City Manager, the Assistant
City Manager, is hereby authorized to execute the HRP Grant Documents as required
by the Department for participation in the HRP Program.
PASSED, ADOPTED, AND APPROVED by the City Council of the City of Poway
at a regular meeting this 2nd day of December, 2014.
ATTEST:
Sheila R. Cobian, CMC, City Clerk
STATE OF CALIFORNIA )
) ss
COUNTY OF SAN DIEGO )
Don Higginson, Mayor
I, Sheila R. Cobian, City Clerk, of the City of Poway, do hereby certify under penalty of
perjury that the foregoing Resolution No. 14-was duly adopted by the City Council at a
meeting of said City Council held on the 2nd day of December, and that it was so
adopted by the following vote:
AYES:
NOES:
ABSENT:
DISQUALIFIED:
4 of 12
Sheila R. Cobian, CMC, City Clerk
City of Poway
December 2, 2014 Item# 1.:1
STATE OF CALIFORNIA
STANDARD AGREEMENT ~-AGREEMENT NUMBER------------~
I ! 14-HRPP-9238
i
STD 213 (Rev 06/03)
i -:---··---····----------------------------------~---------~-----------------·~·--··-t·-REGisfRATfON·N-DMBER. ·---. __________ j
---~. This Agreement is -eniered irii(11Jet:We-ei;ihe-siaie-A.gei1;;)i-and-ilie contractor-rlame~Cbelow:
STATE AGENCY'S NAME
DEPARTMENT OF HOUSlNG AND COMMUNlTY DEVELOPMENT
·. · ..
City of Poway
2 ·The term of this
Agreement is: Upon HCD Approval through 09/30/2016
~~· 3· .-The n;a;(-iffi~ffi-~~o~-.,"t-;;t'-this _______ $8~~~~~00-------------------------------------------------------------------------------------------
Agreement is:
------;.:The-parties-agreetoco~ply-with-the terms ariCiconditions ·or the foiTowiniexhTbit5-which-areby this refe-re-nce-made_a_part-of __ _
the Agreemen_t_:_ ___________ ....... ____ _ _ _ _ ___ _ ___________________ _ ___________ _ ____ _ _ ___ __ ___ ___ _______________ _ _________________________________________________________________ _
Exhibit A-Authority, Purpose and Scope of Work
Exhibit B -Budget Detail and Payment Provisions
Exhibit C-State of California General Terms and Conditions*
Exhibit D-HRPP Terms and Conditions
Exhibit E-Special Terms and Conditions
Exhibit F -Additional Provisions
TOTAL NUMBER 9F PAGES ATTACHED:
2
2
GTC-610
2
0
7 pages
Items shown with an Asterisk ("'), are hereby inforporated by reference and made part of this agreement as if attached hereto. These
documents can be viewed at http://www.documents.dgs.ca.gov/ols/GTC-61 O.doc
IN WITNESS WHEREOF; this Agreement has been executed by the parties hereto.
CONTRACTOR
·cciNTRACTOR;S-NAME (ir"other tha-;;-;;individual,st;te whcth~~~ corpor;t~n;-p~--~~ship,etc) _____ _
City of Poway
------BY(Aii\i10i-Tied Signature) ------; DATE SIGNED (Do not type)--1
i . _ I
________ ]_ ________________________________ [
------rR.INTEDNAME AND TITLE OF PERSON SIGNING
ADDRESS
P.O. Box 789, Poway, CA 92074
---------STATE OF CALIFORNiA-·-....
··--·AaEi'lcv--iiiA:Mf----------·-----------.
Department of Housing and Community Development
BY (Authorized Signature)
-----------------------------..
PRINTED NAME AND TITLE OF PERSON SIGNING
Cathy Parr, Contracts Manager, Business & Contract Services Branch
ADDRESS
2020 W. El Camino Ave, Sacramento, CA 95833
Department of
General Ser-vice
Use Only
~~ Exe-mpt per: SCM 4.04.A.3 (DGS
'----' Memo dated 6/12/81)
5 of 12 ATTACHMENT B · December 2, 2014 Item # Lj
EXHIBIT A
AUTHORITY, PURPOSE AND SCOPE OF WORK
Housing-Related Parks (HRPl Program Grant
City of Poway
14-HRPP-9238
Page 1 of 2
1; Authority
Pursuant to Chapter 8 of Part 2 of Division 31 of the California Health and Safety Code,
commencing with Section 50700, as added by Section 1 of Chapter 641 of the Statutes of 2008,
the State of California Department of Housing and Community Development (herein referred to
as the "State" or the "Department") has established the Housing-Related Parks (HRP) Program
(the "Program"). This ~tandard Agreement (the "Agreement") is entered into under the authority
of, and in furtherance of the purposes of, the Program as set forth in Health and Safety Code
Section 50701. Pursuant to Health and Safety Code Sections 50702 and 50704.5, the State
has issued a Notice of Funding Availability, dated October 2, 2013 (NOFA) and Program
guidelines dated September 2013 (the "Guidelines") governing the Program.
2~ Purpose
In accordance with the authority cited above, the Contractor has applied to the State for
financial assistance (the "Application") in the form of a grant from the Program (the "Grant").
The State has agreed to make the Grant, as a financial incentive based on the issuance of
housing starts, for housing units affordable to very low-and low-income households by the
Contractor pursuant to the terms of the NOFA, the Guidelines and this Agreement. Based on
the representations made by the Contractor in its Application, which is hereby incorporated as if
set forth in full, the State shall provide a Grant iri the amount shown below for the purpose of
paying for capital improvement(s) related to the acquisition, rehabilitation, or construction of a
Park and Recreation Facility.
The State and the Contractor have agreed to enter into this Agreement in accordance with the
terms and conditions herein, subject to all the provisions of the applicable statutes, the NOFA,
the Guidelines and further subject to the State laws and requirements governing State
contracts. Capitalized terms herein shall have the meaning of the definitions set forth in the
Guidelines. ·
3.. Scope of Work
Removal and disposal of existing playground surface and installation of new recycled
playground surface at Hilleary Park.
HRP Program Grant-Round 3
NOFA Date: 10/02/13
Rev. Date: 8/15/14
Prep Date: 8/20/14
6 of 12 December 2, 2014 Item# .Ll
EXHIBIT A
City of Poway
14-HRPP-9238
Page 2 of 2
Grant Time lines
No work performed prior to the effective date of this Agreement or after June 30, 2016, shall be
funded. The effective date of this Agreement is the date it is executed by the State, after
execution by the Contractor. All funds must be requested from the Department no later than
April 30, 2016. For the purpose of this Agreement, no funds may be expended after June 30,
2016. It is the responsibility of the Contractor to monitor the project and timeliness of draws
within the specified dates.
4. Grant Amount
The total amount of this Grant is $ 82,550.00.
HRP Program Grant -Round 3
NOFA Date: 10/02/13
Rev. Date: 8/15/14
Prep Date: 8/20/14
7 of 12 December 2, 2014 Item # \. ~
EXHIBIT B
BUDGET DETAIL AND PAYMENT PROVISIONS
HRP Program Grant
City of Poway
14-HRPP-9238
Page 1 of 2
1. Allowable Uses of Grant Funds
A. Grant funds shall only be used for projects approved by the State that involve the
construction, rehabilitation, and/or acquisition of capital assets as defined by the
California Government Code, Section 16727(a) that benefit the community within the
Contractor's jurisdiction and as further set out in Section 108 of the Guidelines. Capital
assets include tangible physical property with an expected useful life of fifteen (15) years
or more, equipment with an expected useful life of two (2) years or more, or major
maintenance, reconstruction, or demolition for purposes of reconstruction and/or
retrofitting work.
B. Incidental expenses shall not be paid by Grant funps unless they are directly related to
the construction or acquisition of an eligible capital asset. Such expenses include costs
associated with planning, engineering, construction management, environmental impact
reports, appraisals, site acquisitions, or necessary easements.
C. Grant funds shall not be expended for the administrative costs of persons directly
employed by the Contractor or for other "soft" costs that are not directly related to the
construction, rehabilitation or acquisition of capital assets.
2. Perfonnance
Contractor shall take such actions, pay such expenses and do all things necessary to complete
the Work specified in Exhibit A in accordance with the schedule for.completion set forth therein
and within the terms and conditions of this Agreement.
3. Fiscal Administration
A. Term: The effective date of this Agreement is the date upon which it is executed by the
State (the date stamped in the lower right portion of the Standard Agreement (Std. 213)
through September 30, 2016. All funds must b~ requested by t!:Je Contractor by April 30,
2016 and expended by June 30, 2016. This Agreement shall'terminate September 30,
2016.
B. The Contractor shall make any and all request(s) for disbursement no earlier than ninety
(90) days from the anticipated need for the funds, using the forms provided by the State.
The forms will be made available at http://www.hcd.ca.gov/hpd/hrpp. The Contractor
shall expend the funds within 90 days from the date of receipt from the State, or by June
30, 2016, whichever occurs earlier and subsequent supporting documentation shall be
submitted to the Department.
C. Failure to expend contract funds in a timely manner may affect future funding.
HRP Program Grant-Round 3
NOFA Date: 10/02/13
Rev. Date: 8/15/14
Prep Date: 8/20/14
8 of 12 December 2, 2014 Item# 11.
EXHIBIT B
City of Poway
14-HRPP-9238
Page 2~of 2
D. A separate checking account for the Grant funds is not required. However, the
Contractor shall deposit Grant funds in an interest bearing checking or savings account,
or the State may require the Contractor to deposit all Grant funds !·into a segregated
account in an institution whose deposits are insured by the federal or state government.
All interest earned from the deposit of Grant funds shall be used for allowable, Program
purposes and accounted for to the State. All funds not expended within 90 days of
receipt, or by June 30, 2016, as applicable, shall be returned to the State with accrued
interest.
E. The Contractor shall make a good faith effort to minimize the number of disbursement
requests to the State by anticipating and requesting in advance the maximum amount of
funds that can be expended within the (ninety) 90 day time frame.
F. The Contractor shall inform the State within a reasonable amount of time in the event that
expenditures related to an authorized project(s) are less than the total Grant award. The
Contractor may expend the balance of Grant funds on additional capital assets projects,
upon written State approval. Contractor shall provide the State with a letter of request
that describes the additional project(s) to be funded.
G. The Contractor shall immediately inform the State, no later than December 31, 2015, if
the Contractor anticipates it will not be able to expend all Grant funds by June 30, 2016.
H. The Contractor is responsible for maintaining records which fully disclose the activities
funded by the Grant. Adequate documentation of each transaction shall be maintained to
permit the determination, through an audit if requested by the State, of the accuracy of
the records and the allowability of expenditures charged to Grant funds. If the allowability
of expenditure cannot be determined because records or documentation are inadequate,
the expenditure may be disallowed, and the State shall determine the reimbursement
method for the amount disallowed. The State's determination of the allowability of any
expense shall be final, absent fraud, mistake or'arbitrariness.
I. Any Grant funds remaining unexpended as of June 30, 2016, must be returned to the
State with accrued interest. Checks shall be made payable to the Department of Housing
and Community Development (HCD) and shall be mailed to the Department at the
address below, no later than July 31, 2016.
Department of Housing and Community Development
Accounting Division.
2020 W. El Camino Ave.
P.O. Box 952050
Sacramento, California 94252-2050
HRP Program Grant-Round 3
NOFA Date: 10/02/13
Rev. Date: 8/15/14
Prep Date: 8/20/14
9 of 12 December 2, 2014 Item # U
EXHIBIT D
HRP PROGRAM GENERAL TERMS AND CONDITIONS
HRP Program Grant
City of Poway
14-HRPP-9238
Page 1 of 2
1. Report Requirements
During the term of this Agreement, the Contractor shall submit the following reports by the
deadlines specified, or as otherwise required at the discretion of the State:
A. The Contractor shall submit annual reports to the State thirty (30) days after December
31 51 of each year ("Annual Report"), during the term of this Agreement for as long as the
.contractor has not expended all Grant funds. The Annual Report shall contain (1) the
progress the Contractor has made in completing the ~pproved projects partially or wholly
funded by. the Grant, including a description of the community benefit; (2) the amount of
Grant funds drawn down and expended to date by the Contractor; and (3) a description
of projects completed: The Cq~tractor sJ')CIII use the. forms provided by the State made
available at .hfib:/www:'hcd.ca:~dv/hpd/hro{t and, · ...
B. Upon complete expenditure of the Grant funds, the Contractor shall submit a final report
in a manner satisfactory to the State ("Final Report"). The Final Report shall be'
submitted to the State within 60 days of June 30, 2016, the date all funds must be
expended. The Final· Report shall contain (1) a description of the final capital assets
constructed or purchased with the Grant funds; and, (2) the number of certificates of
occupancy issued in relation to the number of building permits issued in the program
yee~r. The Contractor shall .u~e the forms provided by the State made available at
~ttp~//\\fW.W;hcd.ca,:gov/~'J;)d/htp'p\
2. State Contract Coordinator
The state contract coordinator of this Agreement for the Department is the HRP Program
Manager, Division of Housing Policy Development, or the Manager's designee ("State Contract
Coordinator"). Unless otherwise informed, any notice, report, or other communication required
by this Agreement shall be mailed first class to the State Contract Coordinator at the following
address:
Department of Housing and Community Development
Division of Housing PoliGY D~velopment
2020 W. El Camino Ave, P.O. Box 95250
Sacramento, California 94252-2050
Attention: HRP Program Manager
3. Audit/Retention and Inspection of: Records
Contractor agrees that the Department or its delegatee will have the right to review, obtain, and
copy all records pertaining to performance of this Agreement. Contractor agrees to provide the
Department or its delegatee with any relevant information requested and shall permit the
Department or its delegatee access to its premises; upon reasonable notice, during normal
HRP Program Grant-Round 3
NOFA Date: 10/02/13
Rev. Date: 8/15/14
Prep Date: 8/20/14
10 of 12 December 2, 2014 Item# .L1
EXHIBIT D
City of Poway
14-HRPP-9238
Page 2 of 2
· business ~ours for the purpose. of interviewing employees and inspecting. and copying such
books, records, accounts, and other material that may be relevant to a matter under
investigation for the purpose of determining compliance with the California Public Contract Code
Section 10115 et seq., the California Government Code Section 8546.7 and Title 2, California
Code of Regulations, Section 1896.60 et seq. Contractor further agrees to maintain such
records for a period of three (3) years after final payment under this Agreement. Contractor
shall comply with the caveats and be pware "of the penalties for violations of fraud and for
obstruction of investigation as set forth in the California Public.Contract Code Section 10115.10.
~ Spec~ICond~ons
5.
The State reserves the right to add any special conditions to this Agreement it deems necessary
to assure that the policy and goals of the Program are achieved.
Prevailing Wages
A. Where funds provided through this Agreement are used for construction work, or in
support of construction work, Contractor shall ensure that the requirements of Chapter I
(commencing with Section 1720) of Part 7 of the California Labor Code (pertaining to the
payment of prevailing wages and administered by the Californi9 Department of Industrial
Relations) are met.
B. For the purpose of this requirement "construction work" includes, but is not limited to
rehabilitation, alternation, demolition, installation or repair done under contract and paid
for, in whole or in part, through this Agreement. All construction work shall be done
through the use of a written contract, with the properly licensed building contractor
incorporating these requirements (the "construction contractor"). Where the construction
contract will be between the Coqtractor and a licensed building contractor the Contractor
shall serve as the "awarding body" as that term is defined in the California Labor Code.
Where the Contractor' will provide funds to a third party that will enter into the
construction contract with a licensed building contractor, the third party shall serve as the
"awarding body". Prior to any disbursement of funds, including but. not limited to release
of any final retention payment, the State may require a certification from the awarding
body that prevailing wages have been or will be paid.
HRP Program Grant-Round 3
NOFA Date: 10/02/13
Rev. Date: 8/15/14
Prep Date: 8/20/14
11 of 12 December 2, 2014 Item# 1}
EXHIBIT E
City of Poway
14-HRPP-9238
Page 1 of 1
HRP PROGRAM SPECIAL TERMS AND CONDITIONS
HRP Program Grant
The following Special Terms and Conditions are applicable to this Agreement and shall control
notwithstanding anything to the contrary herein:
1. No grant funds will be disbursed until the Department has been provided with and
approves an acceptable updated resolution authorizing the exact grant award amount
encumbered by this Standard Agreement.
HRP Program Grant,.., Round 3
NOFA Date: 10/02113
Rev. Date: S/15/.14
Prep Date:
12 of 12 December 2, 2014 Item# .hl
1 of 7
City of Poway
COUNCIL AGENDA REPORT
APPROVED D
APPROVED AS AMENDED 0
(SEE MINUTES)
DENIED 0
REMOVED D
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
CONTINUED-----
Resolution No.
December 2, 2014
Honorable Mayor and Members of the City Council
Honorable Chairman and Members of the Housing Authority
Honorable Chairman and Members of the Successor Agency
to the Poway Redevelopment Agency
Daniel Singer, City Manager/Executive Director~..d.
Scott Edwards, Director of Administrative Services~
Andrew White, Finance Manager t/1.,/
State Department of Finance Determination -Transfer of
Smith Judgment Fund
By this report, the City Council is asked to authorize a transfer of approximately $2.9
million from the Smith Judgment Fund (Smith Fund) to the Successor Agency Fund.
The State Department of Finance (DOF) has directed the Smith Fund to be used to pay
enforceable obligations of the former Redevelopment Agency. The City disagrees with
this determination and has initiated litigation, City of Poway, et al. v. Cohen, et al.,
Superior Court for the County of Sacramento Case No. 34-2013-80001923.
A transfer is requested at this time for cash flow purposes only. Since its determination,
the DOF has partially withheld Redevelopment Property Tax Trust Funds (RPTTF) from
the Successor Agency. The RPTTF would have been used to retire approved
enforceable obligations, and it is now necessary to use the Smith Fund to meet all
approved obligations on the Recognized Obligation Payment Schedule (ROPS) 14-15A,
as well as future ROPS. This action ensures sufficient funding is available to complete
the December 2014 debt service payment on the tax allocation bonds.
Recommended Action:
It is recommended the City Council authorize the transfer of the Smith Fund (Fund 429)
to the Successor Agency Fund (Fund 720) for the payment of enforceable obligations.
It is further recommended the transfer be authorized under protest of the State
Department of Finance' actions and determinations concerning the Smith Fund.
December 2, 2014 Item# \ ."\
2 of 7
State Department of Finance Determination -Transfer of Smith Judgment Fund
December 2, 2014
Page 2
Background:
The Smith Fund was created in 1995 after the Smith Judgment was entered by the San
Diego County Superior Court. The Judgment is related to an action challenging the 1993
amendment to the Redevelopment Plan for the Paguay Redevelopment Project Area, in
which the City and former Redevelopment Agency (RDA) were named as defendants.
The Smith Judgment required the RDA to allocate 2% of its gross tax increment funds
(beginning in fiscal year 2000-2001 and through the life of the redevelopment project) for
distribution to non-profit housing entities for specified housing uses including capacity
building, predevelopment costs, and affordable housing outreach and education.
In March 2011, the RDA transferred all rights, interests, and obligations under the Smith
Judgment (including the Smith Fund) to the City as part of an Amended and Restated
Cooperation Agreement. Since that time, the City has administered the Smith Fund
pursuant to its obligations as a defendant in the Smith Judgment. The City has also
fulfilled the RDA's obligations under the Smith Judgment as required by the Cooperation
Agreement.
In February 2012, the RDA was dissolved by operation of law. Prior to dissolution, the
City elected to be the Successor Agency to the Poway Redevelopment Agency
(Successor Agency), which is a legal entity existing separate and independent of the City.
At the same time, the Poway Housing Authority (Housing Authority) was designated as
the entity responsible for performing housing functions previously performed by the RDA.
As required by Assembly Bill No. 26 and Assembly Bill No. 1484 (collectively "Dissolution
Act"), the Successor Agency submitted two Due Diligence Reviews (DDR) to the DOF
that reported funds available for distribution to taxing entities as well as all RDA assets
transferred to the City between January 1, 2011 through June 30, 2012. This included
the Smith Fund, with a balance of $2,846,518 as of January 15, 2013. The DOF's initial
review of each DDR confirmed the Smith Fund is restricted by the terms of the Smith
Judgment and is not available for distribution to other taxing entities. The DOF's review
also directed the Smith Fund to be moved from the City to the Successor Agency for
administration. The City disagreed with the determination to move the Smith Fund to the
Successor Agency and sought to transfer the Smith Fund to the Housing Authority. The
transfer was approved by City Council resolution and confirmed by Oversight Board
resolution in August 2013.
Upon review of the Oversight Board's action in August 2013, the DOF reversed its prior
determination and directed the Smith Fund to be used to pay for approved ROPS
obligations. The City utilized the Meet and Confer process to discuss the DOF's
reversal and present its position. The City contended the Smith Judgment is an
enforceable obligation and, based upon the restricted uses (i.e., housing) of the Smith
Fund, it should be transferred to the Housing Authority for administration. The DOF
disagreed with the City's position and has directed the Smith Fund to be used to pay for
enforceable obligations, including the City's debt service on tax allocation bonds. The
attached letter from the DOF, dated April 7, 2014, includes this determination.
December 2, 2014 Item#\.~
3 of7
State Department of Finance Determination-Transfer of Smith Judgment Fund
December 2, 2014
Page 3
Findings
The City continues to disagree with the DOF's determination and has initiated litigation,
City of Poway, et al. v. Cohen, et al., Superior Court for the County of Sacramento Case
No. 34-2013-80001923. Unfortunately, resolution will not occur prior to the City needing
the Smith Fund for retiring enforceable obligations. Up until this point, the Successor
Agency has been able to pay all approved ROPS obligations without use of the Smith
Fund. Due to the DOF partially withholding RPTTF, the City anticipates the Smith Fund
must be used as early as December 2014 to cover debt service on the tax allocation
bonds. Accordingly, in order to pay all approved obligations listed on ROPS 14-15A as
well as future ROPS, the Smith Fund must be transferred to the Successor Agency at
this time. It is recommended the transfer be completed under protest of the DOF's
actions and determinations.
Fiscal Impact:
If approved, the Smith Fund (Fund 429) will be transferred to the Successor Agency
Fund (Fund 720) for the payment of enforceable obligations on the Recognized
Obligation Payment Schedule, as required by the State Department of Finance.
Environmental Review:
This item is not subject to environmental review.
Public Notification:
None.
Attachment:
A. State Department of Finance Letter, Dated April 7, 2014
December 2, 2014 Item # \. ~
4 of7
April 7, 2014
Mr. Andrew White, Finance Manager
City of Poway
13325 Civic Center Drive
Poway, CA 92064
Dear Mr. White:
Subject: Recognized Obligation Payment Schedule
Pursuant to Health and Safety Code (HSC) section 34177 (m), the City of Poway Successor
Agency (Agency) submitted a Recognized Obligation Payment Schedule (ROPS 14-15A) to the
California Department of Finance (Finance) on February 28, 2014 for the period of July through
December 2014. Finance has completed its review of your ROPS 14-15A, which may have
included obtaining clarification for various items.
HSC section 34171 (d) defines enforceable obligations. Based on a sample of line items
reviewed and application of the law, the following do not qualify as enforceable obligations for
the reasons specified:
• Item Nos. 42 and 247-Contracts for Legal Services totaling $20,000. Although
enforceable, the types of services requested totaling $20,000 are considered general
administrative costs and have been reclassified.
• Item No. 14-Judgment Case No. 667691 in the total amount of $13,804,600.
Previously, the Agency was required to set aside funds to be used on types of projects
listed within the judgment. The judgment states the Agency is to set aside the funds for
the life of the redevelopment project. However, with the passing of ABx1 26 and
AB 1484, the Agency is no longer allowed to enter into contracts pursuant to
HSC section 34177.3 (b). Since there are no current projects specified or in progress
that obligate the Agency, there is no enforceable obligation tied to this judgment.
Therefore, this item is not an enforceable obligation and not eligible for funding.
During our review, which may have included obtaining financial records, Finance determined the
Agency possesses funds that should be used prior to requesting Redevelopment Property Tax
Trust Funds (RPTTF). Pursuant to HSC section 34177 (I) ( 1) (E), RPTTF may be used as a
funding source, but only to the extent no other funding source is available or when payment
from property tax revenues is required by an enforceable obligation. The Agency provided
financial records that displayed unused funds in the amount of $2,246,712 that had been
retained in the All Other Funds and Accounts Due Diligence Review.
Attachment A December 2, 2014 Item#\."
5 of7
Mr. Andrew White
April 7, 2014
Page 2
Therefore, with the Agency's concurrence, the funding source for the following item has been
partially reclassified to Reserve Balances in the amount specified below:
Item No.2-2001 Tax Allocation Bonds in the amount of $2,246,712. The Agency requests
$2,838,282 of RPTTF; however Finance is reclassifying $2,246,712 to Reserve Balances.
This item is an enforceable obligation for the ROPS 14-15A period. However, the obligation
does not require payment from property tax revenues and the Agency has $2,246,712 in
available Reserve Balances. Therefore, Finance is approving RPTTF in the amount of
$591 ,570 and the use of Reserve Balances in the amount of $2,246,172 totaling
$2,838,282.
During the review of Oversight Board Resolution No. OSB 13-003 Finance identified $2,846,518
plus accrued interest in available funds that should be used to offset the need for RPTTF. In
Finance's December 5, 2013 letter, the Agency was directed to request these settlement funds
prior to requesting RPTTF on the ROPS.
Therefore, the funding source for the following items has been reclassified to Other Funds in the
amount specified below:
• Item No. 3-2003 Tax Allocation Bonds in the amount of $2,661,475. The Agency
requested $2,661,475 of RPTTF; however, Finance is reclassifying $2,661,475 to Other
Funds. This item is an enforceable obligation for the ROPS 14-15A period. However,
the obligation does not require payment from property tax revenues and the Agency has
$2,661,475 in available Other Funds. Therefore, Finance is approving the use of Other
Funds in the amount of $2,661,475.
• Item 4-2007 Tax Allocation Refunding Bonds in the amount of $185,043. The Agency
requested $603,079 of RPTTF; however, Finance is reclassifying $185,043 to Other
Funds. This item is an enforceableobligation for the ROPS 14-15A period. However,
the obligation does not require payment from property tax revenues and the Agency has
$185,043 ($2,846,518-$2,661 ,475) in available Other Funds. Therefore, Finance is
approving RPTTF in the amount of $418,036 and the use of Other Funds in the amount
of $185,043 totaling $603,079.
Any accrued interest earned on the settlement funds should be accounted for In the Agency's
ROPS 14-15B report of cash balances and used to fund obligations prior to requesting RPTTF.
Pursuant to HSC section 34186 (a), successor agencies were required to report on the
ROPS 14-15A form the estimated obligations and actual payments (prior period adjustments)
associated with the July through December 2013 period. HSC section 34186 (a) also specifies
prior period adjustments self-reported by successor agencies are subject to audit by the county
auditor-controller (CAC) and the State Controller. The amount of RPTTF approved in the table
below includes the prior period adjustment resulting from the CAC's audit of the Agency's self-
reported prior period adjustment.
The amount of RPTTF approved in the table on the next page includes excess prior period
adjustment (PPA) of$ 2,378,340. The current approved RPTTF is insufficient to allow for the
PPA of$ 3,973,978 to be fully expended during this ROPS period. The Agency should apply
the remaining funds prior to requesting RPTTF on future ROPS.
Attachment A December 2, 2014 Item# \.'1
6 of7
Mr; An'drew\iVnite:·:
April?, 2014
Page 3
E~c::ept for the items denied in,.whole or in part §iS enforceable obligations or for the items that
have bee,n reClassified, Finailc.e is not objecting to the.remaining it~ms listed on yow ROPS 14-
15A ·If ybu.:disagree with the,aetermination with respecrto any items on yoUr ROPS 1*1'5A,
yo~ may r:equest a Meet c:md Gpnfer within•fiye b~sjnes~ days of thE) date ofthis letter: The
Me.etand .Confer process and guidelines are available at Finance's website below:
http://www.dof.ca;gov/redeVelopment!meet and confer/
The Agericy'.s maximum appr6vea RPTTF distribUtion forthe reporting period is zero as
summariz.ecj below: ·
Approved RPTTF l)i~rib.ution
For the.:period of.Julythrough December 2014
Total RPTTF requested for non-administrative obligations 6;873.326.
Total RPTTF requested Jar administrative obligations 281 200 ,I., ,
Total RPTTF requested for obligations $ "1i154,'526'
Total RPTTF re.qllested for non-administrative obligations 6,873,326
Denied Item
Item No. 14 (423.;2!:)8)
Reclassified Items
Item No. 42 (10.000)
Item No. 247 (1.0,000)
(20;000)
Total RPTTF for•non-administrative obligations 6,430,068
Cash Balances ~ Item reclassified to other funding sources
ltemNo. 2 (2.246, 712)
Item No.3 (2,661,475)
ltem.No. 4 (185,043)
(5,093',230)
Total RPTTF•au~horized for non.adminlstrative obligations I $ 1,336,838
Total RPTTF requested for administrative obligations 281,200
Reclassified Items
ltemNo. 42 10;000
ltemNo. 247 10;000
20;000
Administrative costs in excess ofthe. cap (see Adrnin Cost Cap table below) (51,200)
Total RPTTF authorized for administrative obligations I $ 250,000
Total RPTTF authorized for obligations I $ 1,,586,838
ROPS 13-14A PPA (3,973..978)
Excess PPA 2;378,340
Total RPTTF approved for distrib,lltion I 0
Attachment A December 2, 2014 Item#\.~
Mr. Andrew White
April 7, 2014
Page 4
Administrative Cost Cap Calculation
Total RPTTFfornon-administrative obligations 6,430,068
Percent alloWed pursuant to HSC section 34171 (b) 3%
TotaiRPTTF allowable for administrative obligations $ 192;902
The greater of 3% or $250,000 L 250i000
Total RPTTF administrative obligations· after Financeadjustments 301,200
Administrative costs in excess ofthe cap j$ (5.1,200)
Please refer to the ROPS 14'-15A schedule that was used to calculate the approved RPTTF
amount:
http://www.dof.ca;gov/redevelopment!ROPS
Absent a Meet and Confer, this is Financ~'s final determination related to the enforceable
obligations reported onyour R0Ps for July 1. through D.ecember 31, 2014. This det~rmination
only applies to items where funding was requested for the six-month period. Finance:s
determination is effective for this time period only and should not be conclusively relied upon for
future periods. All items listed on a future ROPS are subjecttoa subsequent review and may
be denied even if it was or was not denied on this ROPS.ora preceding ROPS. The only
exception is for those items that have received a Final and Conclusive determination from
Finance pursuant to HSC section 34177.5 (i). Finance's review ofitems that have received a
Final and Conclusive determination is limited to confirming the scheduled payments as required
by the obligation.
The amountavailable from the RPTTF'is the same a·s the amount of'property tax increment that
was available prior to enactment of ABx1 26 and AB 1484. This amountis not and never-was
an unlimited funding source. Therefore, as a practical matter; the ability to· fund the items on the
ROPS with property tax is limited to the amount of funding available to the successor agency in
the RPTTF.
To the extent proceeds from bonds issued after December.31, 2010 exist and are not
encumbered by an enforceable obligation pursuant to HSC section 34171 (d),
HSC seCtion 34191.4 (c) (2)(B) requires these proceeds be used to detease the bonds or to
purchase those same outstanding bonds on the open marketfor car1eellation.
Please directinquides to Wendy Griffe, Supervisor or JennyDeAngelis, Lead Analyst at
(916) 445-1546.
Sincerely,
y~
/ ~U~TYN HOWARD
AssistantProgram Budget Manager
7 of7
cc: Ms~ Ashley Jones, Senior Management Analyst, City of Poway
Mr. Jon Baker, Senior Auditor and Controller Manager, San Diego County
California State Controller's Office
Attachment A December 2, 2014 Item# \. ~
APPROVED 0
APPROVED AS AMENDED 0
City of Poway
COUNCIL AGENDA REPORT
(SEE MINUTES)
DENIED 0-
REMOVED 0
CONTINUED-----
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
RESOLUTION NO.----
December 2, 2014
Honorable Mayor and Members of the City Council
Daniel Singer, City Manager !JW'-v)
Robert J. Manis, Director of Development Serviceslvt
Steve Crosby, City Engineer5G
Steven E. Strapac, Senior Civil Engineer
Approval of Parcel Map for Tentative Parcel Map 11-01;
Bill Yen, Applicant. APN: 273-820-20
The Parcel Map for Tentative Parcel Map (TPM) 11-01 is ready for approval. This map
creates two separate single-family residential parcels from one existing parcel located
at 17055 Rock Road (Attachment A).
Recommended Action:
It is recommended that the City Council approve the Parcel Map for TPM 11-01 and
direct its recordation.
Background:
The existing parcel is an infill property surrounded by existing single-family
development. TPM 11-01 is the subdivision of one existing parcel totaling 0.63 acres,
located at 17055 Rock Road, into two residential parcels (Attachment B). There is
currently one existing home on the property. TPM 11-01 was approved on October 4,
2011, by City Council Resolution No. P-11-25 (Attachment C). The Parcel Map is now
ready for approval.
Findings:
The site is developed with a single-family home. The existing residence would remain
on Parcel 1 of this two-lot subdivision. Development of a single-family home on Parcel
2 is not proposed at this time. When development is proposed on Parcel 2, it will be
subject to the processing and approval of a Minor Development Review Application
(MORA). The Parcel Map has been reviewed and found to be technically correct, in
compliance with State law and City ordinance, and in conformance with the approved
Tentative Parcel Map and the conditions of approval.
Fiscal Impact:
None from this action.
1 of 14 December 2, 2014 Item# \,\0
2 of 14
TPM 11-01
December 2, 2014
Page 2
Environmental Review:
The project is Categorically Exempt as a Class 15 Categorical Exemption from the
California Environmental Quality Act (CEQA) pursuant to Section 15315 of the 2014
CEQA Guidelines, in that the project involves a minor land division within an urbanized
area consistent with the General Plan and Zoning requirements.
Public Notification:
Yisroel & Devorah Goldstein, owners; and the project engineer, Bill Yen of Bill Yen and
Associates, were mailed a notice of the public meeting.
Attachments:
A. Location Map
B. Tentative Parcel Map 11-01
C. Resolution No. P-11-25
M:\engserv\Agenda Reports\ 14 Reports\Goldstein Map\report.docx
December 2, 2014 Item# \.\0
0 125 250 500
~~~---Feet
3 of 14
CITY OF POWAY
Location Map
Item: TPM 11-01
ol:loo
0 -~
ol:loo
)>
-i
-i
)>
()
::I: :s: m z
-i
OJ
0
CD n
CD
3
C"'
CD ..,
N
N
0
~
ol:loo
s-
3
~ -. -0
CITY OF POWAY TENTATIVE PARCEL MAP 11-01
§ ..:
a
i
----..;;;;-;;;r-1--
1Cia 0 !Ia lOCI :IDO <loOQ .. _______ ..... I I
( ..... )
SCJ.l.LIIHtH-1001'[!1'
11\ ... lf.OUJID
fl! (~ .r .:.:
~~;~
p.s~
·'i"C!
£} < .....
0 f.~
<:..
. ···.:J
-~:,;
·····:. .... -.:;,
-:..::..,..
r.·(/
~"~;·:~
"" .. ~ .. ;\-:t
.. ;:~~~
l~~~i
~r--~~
OET'Ail'A1 ......,,._
• COKCU'1UA fii.IIAIIQ 1W1 QUOIJG GtdJIN 111/tNC II Pal Mn;RDII:C O._Y
1111 aiWJIIICI lS NGPa5ED Rill nE TDRAIM IIMCEL ~.
~sa.:~u j 'i
(fll!rl
1CM.Ell••40nEI'
SHEET 1 OF 2
lEGAL OESCRIPTlON
l'llf&CEL 1 Of PMCD. 1111' lCD, Ml:ll,, Ill Cfh' Of' ,.,._,, CCIItHn' OF ~
DIEDQ, SJ'AJ"': Or CoiUf'D.IIIM, MZ:ai!CIICI 1U till> 1kERIEDI'" flLLD Itt 'IME
OFJa Dl' COIINI't IIECCIRDER Of SM CI[D) CQI.INJY ON OEZ:.E.IEEII. 24. 1raaa AS ru.r: Na.. ai-GOGZI1L
GENERAl. NOTES
GII053 MDI: IGU.U.11 fT. SQ. -'UI .ttA£5
filET -.-, 1$0,1Qa.l t fT SQ -Ul ACIE5
DI'S!NII~M-c PII:DI'OSm ZONMQ: M.-c:
I'O'M'f' ea.wYUitm' 11\NII OE:IIC:uf'lgM-RISIDOmiL. M.liW.
TDfAL fila. Of" PMCELS: t ~
ntDII: MR. ND SP£CW.. ~SI!IOd' ll;f PiiCX:Em1NC:S PROPOSED..
PARI( FED 'ft.L BE Nil) .C t4V OF' DIDICM'IO..
""' ... ....,.,
&.Mil US£ 5IW.L tooi4FOIIM ftl 111:11-c ZDHII'G.
_,INIIII1IJI PMCfl. 5111 IS I AII:IIC (fttl).
IIIIDflcmotl ft Tl"'f flJW. aa.3N.
THIS IS A SDL.M SUSJMSJCIN .:& tiaUUUl:l ft' ~0111 CII."' (NJ SVIDMSDI 01111...:::£.
bCH PMI:8.. HAS Af LOI$T 100 tlli'T. CF lM.aSfi.IABD) l«eiS To
'5UiftJCJHI' 0111 1M£ N.DML£ PORb:lll Of K fl.t.lltO..
Llf'IIII.£Sr. SDifJl.: CIT't fill' POWAT
tM.tm= arr ov f'01rM'
CAS 41: D.£CIRIC1 IAN D1U00 CAS • D.Et!RJ: tn..fPtiDIC(;: sac
N£ MO'tU:rJON: em OF ~~G~R
satOOUi:l fiiiDDI' wonm SCitOCIL E&n~rl'
AS!IESSOII'$ ~ IIUYBDl: 1)'.)-IID-ZQ
EARTHWORK
DCAYAnDN: o4QQ C..'Y.
DIINIDI:Wl)ll: 400 C:.T.
TOPOGRAPHY tNFORMATION
l'liPCCRIIPI(f ~ 8't MCIIOD lOW.. PHI21'0 "'IM.'rs Milt 1GtW. ltlaf'D GATED )-14-iiDtl.
EXISTING EAsEMENTS
Dllfl PUSUC un.trr IEASDIEXI' TQ SNt Q£1) Gl-s 8 nmRIC COIIPM"r
f'IEA rpc a-tune •o:. 4.1CG/liiA OHMGT •t PL01'Tib
1)01:2 DPOI SPACf. EllJEStAIM~ t'JUIIl 1'0 Cll't aF' l'mD:t POl
PM.r:tl. WIP 145'111 15 r/N 111-IOICZDI IEC. ri/M/111111.
~ ~ OfnR QF DCICAI'Iatf fOil ~'f TD OfT QF" PDWAT
I"£Jt PMCD. liN" 14MI AS r/tt Dl-6011201 liD:. tZ/.Zi/1881
DDf4 ~ UN.ft'IB. GPO! $IIIIICl. ~!Snllollt ND PEDES'IIIIWI liU.IL ta r.J.. 5CHWT ~ICC:. P£A F/N II~UD liD:.
'1'/18111
f"''''KISED asrw:am Aftt.A:. IUJI c
PREPARED FOR:
VISROEL l:lOUlSTEIN AND DEVORAH S. QOLOSTEIH
11d1.~ A.0aC ROAD
PfY'*AY.CJIVZDJ.I
I'HDfCt: (1t5.,.UJ.045S
fAX: C,IJI.fti7l-1Ct9
PRePAREO B"t':
S8b~<l::tc!,E!':.~!~~~~~~~ ~ tJIJII'OW .. 'I'"I"Q.I'C*AY.CA•,_....I• 0 tfJJtlJ ... I .. •J"'II:II~'"".IDU
iiliLWiii TDt. RCE .nno D.\ll:
W011C1
RESOLUTION NO. P-11-25
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF POWAY, CALIFORNIA,
APPROVING TENTATIVE PARCEL MAP 11-01
ASSESSOR'S PARCEL NUMBER 273-820-20
WHEREAS, a request for a Tentative Parcel Map (TPM 11-01) to subdivide a
2. 3-acre property located at 17055 Rock Road, in the Rural Residential C zone, into two
residential lots was submitted by Yisroel and Devorah Goldstein, Applicant; and
WHEREAS, on October 4, 2011, the City Council held a public hearing on the above-
referenced item; and
WHEREAS, the City Council has read and considered the agenda report for the
proposed project, and has considered other evidence presented at the public hearing.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway as
follows:
Section 1: The project is found to be Categorically Exempt from the California Quality Act
(CEQA), as a Class 15, to Section 15315 of the 2011 CEQA Guidelines, in that the project
involves a minor land division within an urbanized area consistent with the General Plan and
Zoning requirements.
Section 2: The findings, in accordance with the State Subdivision Map Act (Government
Code Section 66410 et. seq.) for Tentative Parcel Map 11-01, are made as follows:
A. The Tentative Parcel Map is consistent with the General Plan, in that it proposes to
create two residential lots at a density consistent with the General Plan and Poway
Municipal Code (PMC) Sections 17.08.160 and 17.08.170 designations.
B. The design and improvements required of the Tentative Parcel Map are consistent
with the General Plan, in that the approved lot sizes and configurations adhere to the
development standards of the General Plan and Poway Municipal Code.
C. The site is physically suitable for the type of development and the density proposed,
in that the site is large enough to provide two lots and is compatible and in character
with development in the vicinity.
D. The design of the Tentative Parcel Map is not likely to cause substantial
environmental damage and avoidable injury to humans and wildlife or their habitat, in
that the subdivision will not result in removal of habitat.
E. The approval is not likely to cause serious public health problems in that City water
service is available to the site.
F. The design of the Tentative Parcel Map will not conflict with any easement by the
public at large, now of record, for access through or use of the property within the
5 of 14 ATTACHMENT C December 2, 2014 Item# I.\ 0
Resolution No. P-11-25
Page 2
subdivision in that the development of a single-family residence on the proposed new
lot can be accommodated without obstructing or otherwise impacting existing
easements.
Section 3: The findings, in accordance with Government Code Section 66020 for the public
improvements, are made as follows:
A. The design and improvements of the proposed development are consistent with all
elements of the Poway General Plan, as well as City Ordinances, ·because all
necessary services and facilities will be available to serve the project. The
construction of public improvements is needed as a result of the proposed
development to protect the public health, safety, and welfare as identified below:
1. Water and sewer line improvements from the existing lines in Rock Road will
be constructed to serve the development.
2. Onsite drainage improvements will be constructed on Parcel 2 to handle the
surface water runoff.
3. Traffic mitigation fees will be paid.
4. Trail dedication and improvements will be completed along the segment of trail
on Parcels 1 and 2.
Section 4: The City Council hereby approves Tentative Parcel Map 11-01, to allow the
subdivision of a 2.3-acre property into two lots, as shown on the Tentative Parcel Map,
subject to the following conditions:
A. Approval of this request shall not waive compliance with any section of the Zoning
Ordinance or other applicable City Ordinance in effect at the time of Building Permit
issuance.
B.
C.
D.
E.
6 of 14
This approval is based on the existing site conditions represented on the Tentative
Parcel Map. If actual conditions vary from representations, the map must be
changed to reflect the actual conditions. Any substantial changes to the approved
Tentative Parcel Map, prior to Parcel Map approval, must be approved by the
Director of Development Services and may require approval of the City Council.
The developer is required to comply with the Poway Noise Ordinance (PMC Section
8.08) requirements that govern construction activity and noise levels.
Within 30 days of this approval, the applicant shall submit in writing that all conditions
of approval have been read and understood.
The applicant shall defend, indemnify, and hold harmless the City, its agents, officers,
and employees from any and all claims, actions, proceedings, damages, judgments,
December 2, 2014 Item#\ ,\0
Resolution No. P-11-25
Page 3
or costs, including attorney's fees, against the City or its agents, officers, or
employees, .relating to the issuance of this permit, including, but not limited to, any
action to attack, set aside, void, challenge, or annul this development approval and
any environmental document or decision. The City may elect to conduct its own
defense, participate in its own defense, or obtain independent legal counsel in
defense of any claim related to this indemnification. In the event of such election,
applicant shall pay all of the costs related thereto, including without limitation
reasonable attorney's fees and costs. In the event of a disagreement between the
City and applicant regarding litigation issues, the City shall have the authority to
control the litigation and make litigation-related decisions, including, but not limited to,
settlement or other disposition of the matter. However, the applicant shall not be
required to pay or perform any settlement unless such settlement is approved by
applicant.
F. A Minor Development Review Application shall be approved prior for a new house
and site design on Parcel 2; including, but not limited to, grading, site plan and
building elevations, incorporating all conditions of approval, through the Planning
Division.
G. Prior to Parcel Map approval, unless other timing is indicated, the following conditions
shall be complied with.
7 of 14
(Engineering)
1. Following project approval, the applicant shall schedule with the City Project
Planner and the City Project Engineer a post-approval meeting to discuss the
project conditions of approval, timing of design and construction, and
implementation of the project conditions. The meeting shall be scheduled
within thirty days of project approval and prior to any plan submittals. The
applicant should include their project design team, including project architect,
design engineer and landscape architect.
2.
3.
The applicant shall include provisions in the design contract with their design
consultants that, following acceptance by the City, all construction drawings or
technical reports accepted by the City, exclusive of architectural building
plans, shall become the property of the City. Once accepted, these plans may
be freely used, copied or distributed by the City to the public or other agencies
as the City may deem appropriate. An acknowledgement of this requirement
from the design consultant shall be included on all construction drawings at
the time of plan submittal.
A new/revised trail easement is to be dedicated to the City of Poway on the
Parcel Map to the satisfaction of the City Engineer. Trail improvements are to
be completed in accordance with the City of Poway Trail Standards and
Specifications to the satisfaction of the Public Works Department, as follows:
December 2, 2014 Item # 1.1 0
Resolution No. P-11-25
Page 4
1. The southerly portion of the trail shall be improved from the southwest
corner of the property, extending approximately 150 feet along the east
side of the existing driveway; at the 150 foot mark, the trail shall cross
over the driveway and re-connect to the existing improved northerly
portion of the trail as shown on the approved Tentative Parcel Map.
ii. Trail improvements shall be consistent with the following requirements:
• Approximately 150 feet of trail fencing is required, adjacent to the
existing driveway, matching the trail fencing located offsite to the
south.
• The existing native soil is sufficient for the improved trail surface,
with no import being required, with a 2% finished slope towards
the driveway.
4. Private utility service and access easements are to be reserved on the final
map.
5. The existing septic system for the developed lot is to be taken out of service
and connection to City sewer shall be completed. '
6. A deed covenant is to be recorded to ensure that the cost of maintaining
a private shared sewer pump station and force main is shared between the
two lots.
7. Applicant shall enter into a Standard Agreement to insure setting of
monuments. The applicant will be responsible for posting securities for
monumentation.
8. Applicant shall enter into a Private Street Maintenance Agreement for all
private roads that service the property. The form and content Shflll be in a
form satisfactory to the City Attorney.
9. A photo mylar copy of the map shall be provided to the City within 3 months of
its recordation or prior to Building Permit issuance, whichever comes first. A
cash deposit to the City, in an amount equivalent to $100.00 per sheet of the
parcel map, for the photo Mylar reproduction of the recorded tract map shall
be posted.
H. Prior to Grading Permit issuance, unless other timing is indicated, the following
conditions shall be complied with:
8 of 14
(Engineering)
1. Applicant shall incorporate Low Impact Development (LID) design features into
the site development. These shall be clearly shown and identified on the site
plan and be appropriately sized for the proposed level of development. Submit
a grading plan for the development of the lots, in accordance with the
December 2, 2014 Item# \.\0
9 of 14
Resolution No. P-11-25
Page 5
submittal and content requirements listed in the Poway Municipal Code.
Submittal shall be made to the Department of Development Services
Engineering Division for review and approval. The grading design shall be
100% complete at the time of submittal. Incomplete submittals will not be
accepted. All technical studies as required by the Municipal Code shall be
provided with the preliminary submittal.
2. The project shall comply with all requirements of the SUSMP chapter of the
Poway Municipal Code as applicable.
3. Grading securities in the form of a performance bond and a cash deposit, or a
letter of credit shall be posted with the City prior to grading plan approval. A
minimum cash security of $2,000 is required in all instances.
4. Construction staking is to be installed and inspected by the Engineering
Inspector prior to any clearing, grubbing or grading. As a minimum, all
protected areas as shown on the 'approved grading plans are to be staked
under the direction of a licensed land surveyor or licensed civil engineer and
delineated with lathe and ribbon. As applicable, provide two copies of a
written certification, signed and sealed in accordance with the Business and
Professions Code, by the engineer of record stating that all protected areas
have been staked in accordance with the approved plans.
5. Following approval of the grading plans, posting of securities and fees, and
receipt of three copies of the approved plans, the applicant shall attend a
pre-construction meeting at the Department of Development Services. The
scheduling request shall be submitted on a City standard form available from
the City's project engineer.
(Planning)
6. This approval does not include the development (grading and/or construction)
of a future single-family residence on Parcel 2. A Minor Development Review
Application (MORA) needs to be submitted and approved prior to issuance of
a Grading Permit for residential development on Parcel 2.
7. To avoid potential impacts to the California Gnatcatcher and Coastal Sage
Scrub (CSS), in accordance with Condition H of the Poway HCP Incidental
Take Permit, a take of active California Gnatcatchers nests, which includes
harassment of the bird due to grading noise and vibrations from February 15
through July 1, is not permitted. Therefore, grading during this time frame will
only be permitted subject to the following conditions having been met to the
satisfaction of the Director of Development Services:
a. If grading or clearing is to occur between February 15 and July 1, the
applicant shall provide to the Planning Division a letter from a qualified
biologist (retained by the applicant) that outlines a scope of work for a
December 2, 2014 Item# \. t 0
b.
c.
d.
e.
f.
10 of 14
Resolution No. P-11-25
Page 6
Gnatcatcher survey and a map for the area to be cleared and/or
graded, and CSS habitat areas within 500 feet of such area. The
biologist shall contact the USFWS to determine the appropriate
Gnatcatcher survey methodology. The purpose of the survey is to
determine if any active Gnatcatcher nests are located in the area to be
cleared or graded,· or in CSS habitat within 500 feet of such area. To
be considered qualified, the biologist must provide the City with a copy
of a valid Gnatcatcher Recovery Permit from the USFWS.
The scope of work shall explain the survey methodology for the
Gnatcatcher survey and the proposed Gnatcatcher nest monitoring
activities during the clearing/grading operation if a Gnatcatcher nest is
located within 500 feet of areas to be graded.
Should the report show, to the satisfaction of the Director of
Development Services, that Gnatcatcher nests are not present
within the area to be graded/ cleared, or within CSS ,habitat located
within 500 feet of said area, approval may be granted to commence
clearing/grading within the Gnatcatcher nesting season from
February 15 through July 1.
The applicant is hereby advised that, during grading, if active nests are
found within 500 feet of the grading, the grading activity shall be
stopped until such time as mitigation measures, to the satisfaction of
the City and the USFWS, are implemented. There is no guarantee that
grading will be allowed to resume.
The biologist must attend the City's pre-construction meeting for the
project and must be present onsite during all clearing/grading activities
to monitor that the clearing/grading activities stay within the designated
limits. If grading/clearing occurs between February 15 and July 1, the
biologist shall also monitor and survey the habitat within the area to be
cleared/graded, and any habitat within 500 feet of said area, on a
weekly basis for any evidence that a Gnatcatcher nest(s) exists or is
being built. Weekly monitoring summaries shall be submitted to the
Planning Division. Should evidence of a Gnatcatcher nest(s) be
discovered, the clearing/grading activities shall cease in that area and
be directed away from the Gnatcatcher nest(s) to a location greater
than 500 feet away from the nest(s). If clearing/grading is required to
stop due to the presence of active nests, the applicant shall provide
erosion control to the satisfaction of the City Engineer. This paragraph
must be included as a note on the cover sheet of the clearing/grading
plan.
Upon completion of the clearing/grading activities, the applicant's
biologist shall submit to the Director of Development Services a
December 2, 2014 Item#\ . \0
Resolution No. P-11-25
Page 7
biological monitoring report summarizing the daily observations of the
biologist, including whether any Gnatcatchers or evidence of active
Gnatcatcher nests were present during clearing and grading activities
within the area and any habitat within 500 feet of said area.
g. The biologist shall provide the City with written confirmation that the
limits of clearing/grading are in accordance with the project's Biological
Technical Report.
h. If the Survey reports that Gnatcatcher nests are present within the area
to be graded/cleared, or within CSS habitat located within 500 feet of
said area, no grading will be allowed during the Gnatcatcher nesting
season until such time as mitigation measures, to the satisfaction of the
City and the U.S. Fish and Wildlife Service, are implemented.
8. Pad elevations shall not increase by more than two feet in height from the
elevations shown on the approved tentative map, unless otherwise approved
by the City Council.
I. Prior to Building Permit issuance for the future development of a home on Parcel 2,
the applicant is required to comply with the following:
11 of 14
(Engineering)
1. The site shall be developed in accordance with the approved grading plans on
file in the Development Services Department and the conditions contained
herein. Grading of lots shall be in accordance with the Uniform Building Code,
the City Grading Ordinance, the approved grading plan, the approved soils
report, and grading practices acceptable to the City.
2. Erosion control, including, but not limited to, desiltation basins, shall be
installed and maintained by the developer from October 1 to April 30. The
developer shall maintain all erosion control devices throughout their intended
life.
3. Applicant shall obtain a Grading Permit and complete rough grading of the
site. The grading shall meet the approval of the Engineering Inspector and the
project's geotechnical engineer. Following completion of rough grading,
please submit the following:
4.
a. Three copies of certification of line and grade for the lot, prepared by
the engineer of work.
b. Three copies of a soil compaction report for the lot, prepared by the
project's geotechnical engineer.
The certification and report are subject to review and approval by the City.
Prior to start of any work within a City-held easement or right-of-way, a Right-
of-Way Permit shall be obtained from the Engineering Division. All appropriate
December 2, 2014 Item # \ • \O
fees shall be paid prior to permit issuance.
Resolution No. P-11-25
Page 8
5. An agreement for maintenance of the project's private sewer system shall be
recorded. The form and content of the agreement shall be to the satisfaction
of the City Attorney.
6. The applicant shall pay all applicable development impact fees in ·effect at time
of permit issuance. The following is a current list of the anticipated fees due
' for each lot:
Sewer (North Basin)
Indirect Benefit
.. Water (1" Meter)
"Traffic
.. Park
"Fire Apparatus
$6,470.00
$500.00
$3,026.00
$2,218.00
$4,562.00
$ 122.03
.. These fees are applicable to the undeveloped lot only.
The 1" meter is required for fire protection purposes only. Therefore, the water
meter fee and SDCWA fee are charged at the %" rate. The required fee to
the San Diego County Water Authority is $4,326 for a %" meter.
(Planning)
7. Applicable school fees in etfeet at the time of Building Permit issuance shall be
paid.
8. The developer is advised that, pursuant to PMC 17.26.100 through 17 .26.300,
single-family residential development shall provide that 15 percent of the units
created shall be affordable to low-income households. The developer of
for-sale housing may, in lieu of providing required inclusionary housing onsite
or otfsite, pay an Affordable Housing In-Lieu Fee to the City in accordance
with the provisions of the referenced Section prior to issuance of a Building
Permit for Parcel 2.
9. The applicant shall repair, to the satisfaction of the City Engineer, any and all
damages to the streets caused by construction activity from this project.
J. Prior to Issuance of a Certificate of Occupancy the applicant is required to comply
with the following:
(Engineering}
1. All existing and proposed utilities or extension of utilities required to serve the
12 of 14 December 2, 2014 Item # \.\0
Resolution No. P-11-25
Page 9
project shall be installed underground. No extension of overhead utilities shall
be permitted.
2. The drainage facilities, driveway, slope planting measures, and all utility
services shall be installed and completed by the property owner, and
inspected by the Engineering Inspector for approval. All new utility services
shall be placed underground.
3. An adequate drainage system around the new building pad capable of
handling and disposing all surface water shall be provided to the satisfaction of
the Engineering Inspector.
4. The applicant shall repair, to the satisfaction of the City Engineer, any and all
damages to the streets caused by construction activity from this project.
5. Trail improvements shall be reviewed and accepted by the City Public Works
Department. ·
6. Record drawings, signed by the engineer of work, shall be submitted to
Development Services prior to a request of occupancy, per Section
16.52.1308 of the Grading Ordinance. Record drawings shall be submitted in
a manner to allow the City adequate time for review and approval prior to
issuance of occupancy and release of grading securities. At least three weeks
priorto a request for occupancy is recommended.
Section 5: The approval of Tentative Parcel Map 11-01 shall expire on October 4, 2013,
at 5:00 p.m. The Parcel Map conforming to this conditionally approved Tentative Parcel
Map shall be filed with the City so that the City may approve the Parcel Map before this
approval expires, unless at least 90 days prior to the expiration of the Tentative Parcel Map,
a request for a time extension is submitted to the Development Services Department and a
time eXtension is subsequently granted by the City Council.
Section 6: Pursuant to Government Code Section 66020, the 90~day approval period in
which the applicant may protest the imposition of any fees, dedications, reservations, or
exactions imposed pursuant to this approval shall begin on October 4, 2011.
13 of 14 December 2, 2014 Item# \ .1 i)
Resolution No. P-11-25
Page 10
PASSED, ADOPTED AND APPROVED by the City Council of the City of Poway,
State of California, at a regular meeting this 4th day of October 2011.
ATIEST:
STATE OF CALIFORNIA )
) ss.
COUNTY OF SAN DIEGO )
I, Linda A. Troyan, MMC, City Clerk of the City of Poway, do hereby certify, under
penalty of perjury, that the foregoing Resolution No. P-11-25 was duly adopted by the City
Council at a meeting of said City Council held on the 4th day of October 2011 and that it
was so adopted by the following vote:
AYES: BOYACK, GROSCH, MULLIN, CUNNINGHAM, HIGGINSON
NOES: NONE
ABSENT: NONE
DISQUALIFIED: NONE
---
14 of 14 December 2, 2014 Item# \.10 ·
City of Poway
COUNCil AGENDA REPORT
APPROVED D
APPROVED AS AMENDED 0
(SEE MINUTES)
DENIED D
REMOVED D
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
CONTINUED ________ __
Resolution No.
December 2, 2014
Honorable Mayor and Members of the City Council
Tina White, Assistant City Manager~
Sheila R. Cobian, City Clerk 'j:JQ/
858-668-4535 or scobian@poway.org
Second Reading and Adoption of Ordinance No.772
entitled, "An Ordinance of the City of Poway, California,
Amending Sections 13.04.190 and 13.11.100 of the Poway
Municipal Code relating to Temporary Water and Sewer
Connections"
The introduction and first reading of the above-entitled Ordinance was approved at a
Regular City Council Meeting on November 18, 2014. All Councilmembers were present.
There were no public speakers.
The Ordinance is now presented for second reading and adoption by title only.
Vote at first reading:
Recommended Action:
Adopt Ordinance No. 772.
Fiscal Impact:
None.
Environmental Review:
AYES:
ABSENT:
Cunningham, Vaus, Mullin, Grosch, Higginson
None.
Environmental review is not required according to CEQA guidelines.
Public Notification:
Summary of Ordinance to be published in Poway News Chieftain on Thursday, November
27, 2014.
Attachment:
A. Ordinance No. 772
1 of7 December 2, 2014 Item# 1.11
ORDINANCE NO. 772
AN ORDINANCE OF THE CITY OF POWAY, CALIFORNIA,
AMENDING SECTIONS 13.04.190 AND 13.11.100
OF THE POWAY MUNICIPAL CODE RELATING TO
TEMPORARY WATER AND SEWER CONNECTIONS
WHEREAS, Sections 13.04.190 and 13.11.100 of the P,oway Municipal Code
(PMC) were adopted to serve the public health, safety and welfare, relating to the
installation of sewer laterals and water connections, respectively; and
WHEREAS, on August 19, 2014, the City Council directed staff to amend the
Municipal Code to allow administrative approval of temporary water connections; and
WHEREAS, the City has historically processed applications for temporary sewer
connections in the same manner as prescribed by the PMC for applications for
temporary water connections; and
WHEREAS, the proposed changes will allow for administrative approval of both
temporary water and sewer connections; and
WHEREAS, on November 18, 2014 the City Council held a duly advertised public
hearing to receive testimony from the public, both for and against, relative to this
ordinance.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF POWAY DOES
ORDAIN AS FOLLOWS:
Section 1: The City Council of the City of Poway finds that this project is
exempt from the provisions of the California Environmental Quality Act (CEQA)
pursuant to Section 15061 (b)(3) of the 2014 State CEQA Guidelines in that the proposal
pertains to minor changes to Title 13 of the PMC regarding the process for temporary
water and sewer connections and there is no possibility that this will have a significant
effect on the environment.
Section 2: Sections 13.04.190 and 13.11.100 of the Poway Municipal Code
are hereby repealed.
Section 3: Section 13.04.190 is hereby added to Title 13 of the Poway
Municipal Code to read as follows:
13.04.190 Construction of sewer lateral.
A. Obligation of Applicant. The expense of construction of the applicant's sewer line
and the City's lateral from the property line to the City main or collection system,
including, but not limited to, City permits, excavation, pipe, wyes, tees, backfill, surface
2 of7 Attachment A December 2, 2014 Item# 1.11.
Ordinance No. 772
Page 2
restoration and construction of No. 3 cleanout box and property line cleanout is the
responsibility of and shall be borne entirely by the applicant.
B. General Rule. Sewer laterals shall be installed on a main fronting the parcel to be
served. In the case of a parcel not fronting an existing main, the sewer lateral may be
installed on an existing main that does not front the parcel if the City Engineer
determines that the non-fronting main is the main from which the parcel should
ultimately receive regular service, and provided that all necessary easements have
been acquired.
C. Temporary Service. In the case of a parcel not fronting an existing main, where the
City Engineer has determined that the main from which the parcel should ultimately
receive regular service does not currently exist but could be built in the future, an
application for temporary service from an existing main not fronting the parcel may be
approved at the discretion of the Director of Development Services.
As a condition of receiving temporary service from a main not fronting the parcel, the
owner of the parcel, in addition to payment of all fees and charges applicable to regular
service, shall pay all fees associated with temporary service, and shall execute and
acknowledge a recorded agreement providing for:
3 of7
1. Installation and maintenance of a pipeline and other required facilities from the
temporary lateral connection to the owner's parcel and acquisition of any
required easements, all at owner's expense;
2. Discontinuance of temporary service and application for regular service at an
appropriate point closer to the owner's parcel upon installation of a main that the
City Engineer determines is the main from which the parcel should ultimately
receive regular service;
3. Payment by the owner of the entire cost of relocation and any applicable
connection charges, including a pro rata share of the cost of installation of such
main and any service area charge, the total of which shall not be less than the
City's then-established connection fee and service area charge to others for
such regular service; and
4. Such other matters as the City may reasonably require.
December 2, 2014 Item # 1.11
Ordinance No. 772
Page 3
Section 4: Section 13.11.100 is hereby added to Title 13 of the Poway
Municipal Code to read as follows:
13.11.100 Installation of service connections and meters.
A. General Rule. Services and meters shall be installed on a main fronting the parcel to.
be served. In the case of a parcel not fronting an existing main, the service and meter
may be installed on an existing main that does not front the parcel if the City Engineer
determines that the non-fronting main is the main from which the parcel should
ultimately receive regular service, and provided that all necessary easements have
been acquired.
B. Temporary Service. In the case of a parcel not fronting an existing main, where the
City Engineer has determined that the main from which the parcel should ultimately
receive regular service does not currently exist but could be built in the future, an
application for temporary service from an existing main not fronting the parcel may be
approved at the discretion of the Director of Development Services.
As a condition of receiving temporary service from a main not fronting the parcel, the
owner of the parcel, in addition to payment of all fees and charges applicable to regular
service, must execute and acknowledge a recorded agreement providing for:
1. Installation and maintenance of a pipeline and other required facilities from the
temporary meter to the owner's parcel and acquisition of any required
easements, all at owner's expense;
2. Discontinuance of temporary service and application for regular service at an
appropriate point closer to the owner's parcel upon installation of a main that the
City Engineer determines is the main from which the parcel should receive
regular service;
3. Payment by the owner of the entire cost of relocation and any applicable
connection charges, including a pro rata share of the cost of installation of such
main and any service area charge, the total of which shall not be less than the
City's then-established connection fee and service area charge to others for such
regular service; and
4. Such other matters as the City may reasonably require.
C. Location and Size. Upon receiving an application for any service connection, the City
will furnish or authorize installation of a service connection, the size and location of
which are within the City's sole discretion. The service connection will be installed from
the main to the curb line or property line of the parcel that abuts on a street or other
thoroughfare, or on a City right-of-way.
4 of7 December 2, 2014 Item# 1.11
Ordinance No. 772
Page 4
D. Separate Service Required. All separate parcels requiring City water service shall
have separate service.
E. Multiple Units.
1. Number of Services to Separate Premises. Separate premises will be supplied
through separate service connections except as otherwise authorized by the City.
2. Service to Multiple Units. Separate houses, buildings, living, or business
quarters on the same parcel or adjoining parcels, under single ownership, or
management and control, may be served at the option of the City by either of the
following methods:
a. Through separate service to each or any unit; provided, that the pipeline ·
system to each service is independent of the others, and it is not
interconnected.
b. Through a single service to the entire premises. In the event of the sale
or separation of management and control of a portion of property
subsequent to application for water service, the portion sold or separated
will no longer be considered as premises entitled to water from this service
connection.
F. Meters.
5 of 7
1. Water Service Required to Be Metered. All City water service is required to
pass through a meter. It shall be unlawful for any person to use City water in any
manner in which the water does not pass through a meter, or in circumstances
where the meter is not functioning properly due to tampering or alteration.
2. Change in Location of Meters or Service Connections. Meters or service
connections relocated for the convenience of the customer will be relocated at
the customer's expense. Meters or service connections relocated to protect the
City's property will be moved at City expense, except in the case of temporary
service connections.
3. Changes in Size of Meter.
a. Reductions. The City will approve a reduction in meter size only when
the customer's water demand does not exceed the capacity of the
reduced size meter. A reduction in meter size is subject to all applicable
fee payments and credits in effect at the time of the reduction.
December 2, 2014 Item# 1.11
Ordinance No. 772
Page 5
b. Increases. The City reserves the right and has the sole authority to
replace any undersized meter with a larger meter when the customer's
water demand exceeds the capacity of the existing meter, or based on a
change in the customer's type of water use. The City's determination
regarding appropriate meter size shall be based on American Water
Works Association standards. Replacement of an undersized meter shall
be at the customer's sole expense. Any increase in meter size shall be
subject to full payment of all applicable fees and charges, including City
capacity charges and San Diego County Water Authority connections
fees, if any. Credit shall be given for any capacity or connection fees and
charges previously paid.
EFFECTIVE DATE: This Ordinance shall take effect and be in force thirty (30)
days after the date of its passage; and before the expiration of fifteen (15) days after its
passage, it shall be published once with the names and members voting for and against
the same in the Poway News Chieftain, a newspaper of general circulation published in
the City of Poway.
Introduced and first read at a regular meeting of the City Council of the City of
Poway held the 18th day of November 2014, and thereafter PASSED AND ADOPTED
at a regular meeting of said City Council held the 2nd day of December 2014.
Don Higginson, Mayor
ATIEST:
Sheila R. Cobian, CMC, City Clerk
6 of? December 2, 2014 Item # 1.11
STATE OF CALIFORNIA )
) ss.
COUNTY OF SAN DIEGO)
Ordinance No. 772
Page 6
I, Sheila R. Cobian, CMC, City Clerk of the City of Poway, do hereby certify that
the foregoing Ordinance No. 772 was duly adopted by the City Council at a meeting of
said City Council held on the 2nd day of December 2014, and that it was so adopted by
the following vote:
AYES:
NOES:
ABSENT:
DISQUALIFIED:
7 of7
Sheila R. Cobian, CMC, City Clerk
City of Poway
December 2, 2014 Item# 1.11
1 of 54
APPROVED 0
APPROVED AS AMENDED 0
City of Poway
COUNCIL AGENDA REPORT
(SEE MINUTES)
DENIED 0
REMOVED 0
CONTINUED-----
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
RESOLUTION NO. ___ _
December 2, 2014
Honorable Mayor and Members of the City Council
Daniel Singer, City Manager~~ bAA
Robert J. Manis, Director of D~l91<ment Services rv \
Richard Whipple, City Planner~
Scott Nespor, Development Services Technician.S !ttJ
Environmental Assessment, Conditional Use Permit 14-005,
Minor Development Review Application 14-025, and
Variance 14-009; The Paw Pad
The applicant, Gunner Milo Inc., is requesting approval to establish an animal day care
and kennel business on a developed commercial site located at 12255 Poway Road.
The existing building would be used for an indoor kennel. New outdoor activity areas
are proposed. The project includes a request for a Variance to exceed City noise
standards. The site is located in the Community Business (CB) zone and the Poway
Road Specific Plan area.
Recommended Action:
It is recommended that the City Council adopt the Negative Declaration (Attachment A)
and approve Conditional Use Permit (CUP) 14-005, Minor Development Review
Application (MORA) 14-025, and Variance (VAR) 14-009 subject to the attached
Resolution (Attachment B).
Background:
The project site is currently developed with an approximate 5,400-square-foot building
and includes paved areas for parking and circulation. The site has been previously
occupied by a succession of vehicle sales and service businesses and other
automotive-related uses, the first of which predates City of Poway incorporation.
Currently no business is established on the site.
The site is situated on the south side of Poway Road, east of Oak Knoll Road, between
the Oak Knoll Plaza and the Poway Promenade. The eastern property line runs along a
creek. Easterly portions of the site are located within Federal Emergency Management
Agency (FEMA) designated floodway and floodplain. The location and zoning map is
included as Attachment C.
December 2, 2014 Item:# 3.1
2 of 54
Environmental Assessment, CUP 14-005, MORA 14-025, and VAR 14-009
December 2, 2014
Page 2
Findings:
The new business, which will be known as The Paw Pad, will operate a day care and an
overnight indoor kennel. Up to a total of 200 animals will be at the facility at any one
time. The facility will primarily be used for dogs; however, a portion will be dedicated to
cats. The day care proposes to operate between 6:30 am and 7:00 pm, Monday
through Friday. Crate or cage-free overnight boarding will take place within the building
for a maximum of 60 animals. The Paw Pad will also offer obedience training,
grooming, photography, and wellness programs. The largest component of the
business will be a dog day care facility. As such, the business will be busiest on
weekdays. In addition to the overnight boarding, the project proposes to have
promotional events on the weekends. The proposed day care hours, animal capacities,
and other detailed activities of the facility are outlined in the operational statement that
has been submitted with the CUP application and is included as Attachment D.
In addition to occupying the existing building, the project will establish two outdoor
activity areas: one in front of the building and the other in back of the building. These
areas will be enclosed by a ten-foot-high cedar fence and covered by a cloth canopy.
The fence will have two-foot-wide vertical lattice panels that will provide visual variation.
The canopies will be beige canvas material and will not extend above the roofline of the
building. The building's trim will be painted green. The existing paved surface within
the outdoor activity areas will be covered with artificial turf. The parking lot will provide
21 parking spaces. The proposed site plan is attached as Attachment E. The north
building elevation, which is along Poway Road, is included as Attachment F.
Parking
The Poway Municipal Code (PMC) does not have a parking requirement for animal day
care and kennel businesses. In determining the needed parking for this business, staff
considered the use of the PMC parking requirement for children's day care which would
have a similar parking demand. The PMC parking requirement for day care is one
space per 10 children plus provision of adequate drop areas. The site provides parking
in compliance with this standard (i.e. 200 animals at one space per 10 is 20 parking
spaces). Additionally The Paw Pad will provide a drop-off aisle in front of the facility by
making some minor site improvements that are necessary to accommodate adequate
drive aisle width.
Storm Water Runoff
The Paw Pad will provide Low Impact Development (LID) design features on the site
and implement business practices to minimize polluted storm water runoff. The LID
features and business practices are outlined in the operational statement. The
operational statement indicates that solid pet wastes will be picked up regularly and the
outdoor areas will be washed daily. The outdoor areas will be covered to minimize
rainfall contact with animal wastes. The existing paving within the outdoor activity areas
that will be surfaced with artificial turf will be perforated with bored holes to allow water
(either from wash down activity or rain) to infiltrate into the ground. Additionally, a five-
December 2, 2014 Item# 3.1
3 of 54
Environmental Assessment, CUP 14-005, MORA 14-025, and VAR 14-009
December 2, 2014
Page 3
foot swath of existing paving that runs roughly parallel to the easterly property line near
the creek will be removed. This depressed area will be covered with mulch and provide
another opportunity for storm water to infiltrate the ground instead of draining offsite.
Odor Control
The operational statement outlines the cleaning practices for the artificial turf in the
outdoor activity areas not only to minimize polluted storm water runoff but for odor
control. The turf areas will be sprayed daily alternatively with a water-based solution that
contains either an enzymatic solution to neutralize urine and bacteria or bleach to
control bacteria. Solid waste will be picked up frequently and put in bags. Trash pickup
will be scheduled on a weekly basis.
Floodway
A small portion of the existing secondary building lies within the floodway. Expansion of
the building area is not being proposed. Since building improvements will be interior,
the City's Floodplain Management ordinance requires that the value of the
improvements to the building cannot exceed 50% of the current value of the building.
The proposed project meets this requirement. The dog run fence in the rear will be
located outside of the floodway, but is allowed within the 1 00-Year Flood Plain.
Noise Variance
The CUP involves establishment of a dog kennel and day care business, which includes
two outdoor daytime activity areas. One outdoor activity area is in the front of the site
along Poway Road and one is located in the rear portion of the site. Some dogs will
only stay during the day, others will be kept overnight. Accordingly, there will be noise
associated with barking dogs both during the day and nighttime hours. A Noise Study
was prepared for the project by Investigative Science and Engineering Inc. The study
reports that noise during the nighttime hours, when up to 60 dogs could be kenneled
indoors, will be between 43 and 48 decibels (dBA), and that noise during daytime hours,
when up to 75 dogs will be using the outdoor activity areas, will be 65.1 dBA. The PMC
has two separate noise standards applicable to the project.
The noise standard contained in PMC 17.34.040 relates to the dog kennel use
specifically and relates to the existing, ambient noise levels in the area. The PMC
stipulates that noise associated with a kennel must be within the ambient noise levels
for the area. The study determined the ambient noise level in the front portion of the
site is between 44 and 82 dBA, and in the rear portion of the site to be between 44 to
68 dBA. Since the projected noise during the nighttime hours is between 43 to 48 dBA
and the projected noise level during the daytime is 65.1 dBA, which are both within the
ambient levels, the project complies with the ambient noise standard.
The PMC stipulates another noise standard applicable to the project which is based on
the project site's underlying Community Business (CB) zoning. The noise standard
contained in PMC 8.08.040 stipulates that noise generated from any use in the CB zone
December 2, 2014 Item# 3.1
4 of 54
Environmental Assessment, CUP 14-005, MORA 14-025, and VAR 14-009
December 2, 2014
Page 4
cannot be more than 55 dBA during nighttime hours and no more than 60 dBA during
daytime hours. The study reported that nighttime noise would be between 43 and 48
dBA. The project complies with the nighttime standard for the CB zone. The study
reported, however, that daytime noise associated with the outdoor activity areas would
be 65.1, which is slightly more than 5 dBA over the daytime standard for the CB zone.
PMC 8.08.220 contains a provision for variances to noise standards. The project
involves a request for a variance pertaining to the exceedance of the 60 dBA daytime
standard for the CB zone. The project site is located within a fully developed
commercial area along a major commercial corridor. The projected noise is within the
ambient levels in the area. It is also important to note that a similar dog kennel and day
care business has operated for many years in the immediate vicinity without complaints
and that there are minimal residential uses nearby that are more than 400 feet from the
project site. For these reasons staff recommends approval of the Variance.
Condition of Approval
A Condition of Approval is recommended that the business comply with all stipulations
included in the operational statement that was submitted with the CUP application.
Public Comment
As a result of the mailed public hearing notice conducted for the project, and as of the
writing of this report, the City has received one piece of correspondence. The
·correspondence is included as Attachment G and is from a residential property owner
located approximately 500 feet to the north of the project site. In the correspondence
concerns are expressed regarding noise associated with barking dogs. Noise is
discussed in detail in the section above.
Environmental Review:
As required under the California Environmental Quality Act (CEQA), an Environmental
Initial Study (EIS) was completed for the project. The EIS indicates the project would
have no, or a less than significant impact on the environment. It is recommended that
a Negative Declaration (NO) be approved. The EIS and NO are included in the
Resolution provided as Attachment A. Notice of the availability of the EIS and proposed
NO for public review and comment was provided pursuant to the requirements of
CEQA.
Fiscal Impact:
None.
Public Notification:
A public notice was published in the Poway News Chieftain and mailed to property
owners and occupants within a 500-foot radius of the site.
December 2, 2014 Item# 3.1
5 of 54
Environmental Assessment, CUP 14-005, MORA 14-025, and VAR 14-009
December 2, 2014
Page 5
Attachments:
A. Resolution Adopting the NO (including the EIS)
B. Resolution Approving CUP 14-005, MORA 14-025, and VAR 14-009
C. Zoning and Location Map
D. Operational Statement
E. Site Plan
F. Poway Road Elevations
G. Correspondence
December 2, 2014 Item# 3.1
RESOLUTION NO. P-14-
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF POWAY, CALIFORNIA
ADOPTING A NEGATIVE DECLARATION
FOR CONDITIONAL USE PERMIT 14-005,
MINOR DEVELOPMENT REVIEW APPLICATION 14-025,
AND VARIANCE 14-009
WHEREAS, the City Council considered Conditional Use Permit (CUP) 14-005,
Minor Development Review Application (MORA) 14-025, and Variance (VAR) 14-009; a
request to allow The Paw Pad to operate an animal day care and overnight kennel at
12255 Poway Road; and
WHEREAS, on December 2, 2014, the City Council held a duly advertised public
hearing to receive testimony from the public, both for and against, relative to this matter.
NOW, THEREFORE, BE IT RESOLVED by the City Council ofthe City of Poway
as follows:
Section 1: In accordance with the requirements of the California Environmental Quality
Act (CEQA) an Environmental Initial Study (EIS) and a proposed Negative Declaration
(NO) have been prepared for CUP 14-005, MORA 14-025, and VAR 14-009. The
City Council has considered the EIS and NO, and public comments received on the
EIS and ND. The subject EIS and NO documentation are fully incorporated herein
by this reference. The City Council finds, on the basis of the whole record before it,
that there is no substantial evidence the project will have a significant impact on the
environment. The City Council hereby adopts the ND attached to this· Resolution as
Exhibit A.
PASSED, ADOPTED AND APPROVED by the City Council of the City of Poway
at a regular meeting this 2nd day of December, 2014.
Don Higginson, Mayor
ATTEST:
Sheila R. Cobian, CMC, City Clerk
6 of 54 ATTACHMENT A December 2, 2014 Item# 3.1
7 of 54
STATE OF CALIFORNIA )
) ss
COUNTY OF SAN DIEGO )
Resolution No. P-14-
Page 2
I, Sheila R. Cobian, City Clerk, of the City of Poway, do hereby certify under penalty
of perjury that the foregoing Resolution No. P-14-was duly ·adopted by the
City Council at a meeting of said City Council held on the 2nd day of December 2014,
and that it was so adopted by the following vote:
AYES:
NOES:
ABSENT:
DISQUALIFIED:
Sheila R. Cobian, CMC, City Clerk
City of Poway
December 2, 2014 Item# 3.1
DON HIGGINSON, Mayor
DAVE GROSCH, Deputy Mayor
CITY OF POWAY
JIM CUNNINGHAM, Councilmember
JOHN MULLIN, Councilrnember
STEVE V AUS, Councilmember
Exhibit A
8 of 54
CITY OF POWAY
NEGATIVE DECLARATION
1. Name and Address of Applicant: Gunner Milo Inc.
PO Box 60506 San Diego, CA 92166
2. Project Name and Brief Description of Project: Environmental Assessment, Conditional Use
Permit (CUP) 14-005, Minor Development Review Application (MORA) 14-025, and Variance
(VAR) 14-009; Morningstar Real Estate Services, Applicant: A request for approval to
establish an animal kennel and day care business, which includes a request for a Variance to
, City noise standards, on a developed commer.ical site located at 12255 Poway Road, in the
Community Business zone.
3. In accordance with Resolution 83-084 of the City of Poway, implementing the California
Environmental Quality Act of 1970, the City of Poway City Council has found that the above
· project will not have a significant effect upon the environment and has approved a Negative
Declaration. An Environmental Impact Report will not be required.
4. This Negative Declaration is comprised of this form along with the Environmental Initial Study
that includes the Initial Study and Checklist for this project.
5. The decision of the City Council of the City of Poway is final.
Contact Person: Scott Nespor Phone: (858) 668-4656
Approved by: Date: December 2, 2014
Robert J. Manis
Director of Development Services
Attachments:
Environmental Initial Study
City Hall Located at 13325 Civic Center Drive
Mailing Address: P.O. Box 789, Poway, California 92074-0789
www.poway.org December 2, 2014 Item# 3.1
CITY OF POWAY
ENVIRONMENTAl INITIAl STUDY
AND CHECKLIST
A. INTRODUCTION
This Environmental Initial Study and Checklist, along with information contained in the public
record, comprise the environmental documentation for the proposed project as described below
pursuant to the requirements of the California Environmental Quality Act (CEQA). Based upon
the information contained herein and in the public record, the City of Poway has prepared a
Negative Declaration for the proposed project.
B. PROJECT INFORMATION
1. Project Title: Conditional Use Permit (CUP) 14-005, Minor Development Review Application
(MDRA) 14-025, and Variance (VAR) 14-009
2. Lead Agency Name and Address: ---=C=itv......,.o~f .:....P..:::.ow=ayLJ'-=D:::..;e::...:v"""e""'lo:..cp""'m:...:..;e::..:.n.:..:.t..:::S"""e;.:.,rv:::..:.ic=e=s=-------
13325 Civic Center Drive. Poway. CA 92064
3. Contact Person and Phone Number: Jason Martin. Senior Planner. (858) 668-4658
4. Project Location: ..:..1 =22=5=5:,_P=--o=-w:.:.a=.v.r....:..;R:.:::o.=.ad::::...,_ _________________ _
5. Project Sponsor's Name and Address: Gunner Milo Inc.
P .0. Box 60506, San Diego CA 92166
6. General Plan Designation: _C=o:.:.m:..:..:m~u::.:.n!!.:ity:..l-!:B:.!:u:.:::s::.:..in:.:::e:.:::.ss::::....J.:(C~B=-)'--------------
7. Description of Project: (Describe the whole action involved, including, but not limited to, later
phases of the project, and any secondary, support, or offsite features necessary for its
implementation. Attach additional sheets if necessary).
The project is a request to establish an animal kennel and day care business on a developed,
currently vacant commercial site. The site consists of an approximate 5,400-square-foot
building, landscape areas, vehicle parking and circulation areas, and other open paved surface
areas. The business would provide 24-hour kenneling, daytime dog day care, and ancillary
activities such as grooming, obedience training and wellness training for dogs. The project
includes the establishment of two separate outdoor dog activity areas that are enclosed within a
fence and include covers over these areas for shade, which total approximately 8,500 square
feet in area. The project also involves a request for a Variance to exceed the City noise
standard relating to barking dogs.
8. Surrounding Land Uses and Setting: The project site is located within an area that can be
characterized as urbanized. Poway Road, which is a major commercial corridor, is along the
north side of the site and developed commercial uses exist on the north side of Poway Road.
The site abuts developed commercial uses to the west. A creek, which is a United States
Geological Survey (USGS) mapped "blue line" creek and contains some flood control
improvements such as rip rap", abuts the site to the southeast and developed commercial uses
are beyond the creek.
9 of 54
1
December 2, 2014 Item # 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
9. Other agencies whose approval is required (e.g. permits, financing approval, or participation
agreement): _..:...;N=o.:..:.ne~---
Environmental Factors Potentially Affected: The environmental factors checked below would be
potentially affected by this project, involving at least one impact that is a "Potentially Significant
Impact" as indicated by the checklist on the following pages.
D Land Use and Planning D Transportationrrraffic D Public Services
D Population and Housing D Biological Resource D Utilities and Service
D Geology /Soils D Mineral Resources Systems
1Z1 Hydrology I Water Quality D Hazards/Hazardous Materials D Aesthetics
1Z1 Air Quality 1Z1 Noise D Cultural Resources
D Agricultural /Forestry 1Z1 Greenhouse Gas Emissions D Recreation
Resources
Determination (To be completed by the Lead Agency):
I
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the environment ~
and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the environment, 0
there will not be a significant effect in this case as revisions in the project have been made
by or agreed to by the project proponent and/or mitigation has been agreed to. A
MITIGATED NEGATIVE DECLARATION will be prepared. 1----1
I find that the proposed project MAY have a significant effect on the environment, and an D
ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed MAY have a "potentially significant impact" or "potentially 0
significant unless mitigated" impact on the environment, but at least one effect 1) has been
adequately analyzed in an earlier document pursuant to applicable legal standards, and 2)
has been addressed by mitigation measures based on the earlier analysis as described on
attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must
analyze only the effects that remain to be addressed.
I find that although the proposed project could have a significant effect on the environment, D
because all potentially significant effects (a) have been analyzed adequately in an earlier
EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been
avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including
revisions or mitigation measures that are imposed upon the proposed project, nothing
further is re u· ed.
City of Poway
10 of 54 2 December 2, 2014 Item# 3.1 ,
EIS and Checklist
CUP 14-005, MDRA 14-025, and VAR 14-009
C. EIS and Checklist
ISSUE
I. AESTHETICS . Would
the project
a . Have a substantia l
adverse effect on a
scenic vista?
b . Substantially damage
scenic resources,
including , but not
limited to, trees, rock
outcroppings, and
historic build ings with in
a state scenic
highway?
c. Substantially degrade
the existing visual
character or quality of
the site and its
surroundings?
d . Create a new source of
substantial light or
glare which would
adversely affect day or
nighttime views in the
area?
II. AGRICULTURAL AND
FORESTRY
RESOURCES .
In determining whether
impacts to agricultural
resources are significant
environmental effects, lead
agencies may refer to the
Cal ifornia Agricultural Land
Evaluation and Site
Assessment Model (1997)
prepared by the California
Department of
Conservation as an
optional model to use in
assessing impacts on
agriculture and farmland .
In determining whether
impacts to forest
resources , including
11 of 54
POTENTIALLY
SIGNIFICANT
IMPACT
3
POTENTIALLY
SIGNIFICANT
UNLESS
MITIGATION
INCORPORATED
LESS THAN
SIGNIFICANT NO IMPACT
IMPACT
X
X
X
X
December 2, 2014 Item # 3 .1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
POTENTIALLY
ISSUE POTENTIALLY SIGNIFICANT LESS THAN
SIGNIFICANT UNLESS SIGNIFICANT NO IMPACT
IMPACT MITIGATION IMPACT
INCORPORATED
timberland, are significant
environmental effects, lead
agencies may refer to
information compiled by
the California Department
of Forestry and Fire
Protection regarding the
state's inventory of forest
land, including the Forest
and Range Assessment
Project and the Forest
Legacy Assessment
project; and forest carbon
measurement
methodology provided in
Forest Protocols adopted
by the California Air
Resources Board. Would
the project:
a. Convert prime
farmland, unique
farmland, or farmland
of statewide
importance (farmland),
as shown on the maps
prepared pursuant to X
the Farmland Mapping
and Monitoring
Program of the
California Resources
Agency, to non-
agricultural use?
b. Conflict with existing
zoning for agricultural X use, or a Williamson
Act contract?
c. Conflict with existing
zoning for, or cause
rezoning of, forest land
(as defined in Public
Resources Code X section 12220(g)),
timberland (as defined
by Public Resources
Code section 4526), or
timberland zoned
12 of 54 4 December 2, 2014 Item# 3.1
EI S and C hecklist
CUP 14-005, MORA 14-025, and VAR 14-009
ISSUE
Timber land Production
(as defined by
Government Code
section 511
d . Result in t he loss of
forestland or
conve rsion of
forestland to non-forest
land?
e . Involve other changes
in the existing
environment that, due
to thei r location or
nature, could resu lt in
conversion of farm land
to non-agricultura l use
or conversion of
forestland to non -forest
use?
a. Conflict with or obstruct
implementation of the
applicab le air quality
n?
b. V iolate any air quality
standard or contribute
substantially to an
existing or p rojected air
ua violation?
c. Result in a cumulatively
conside rab le net
increase of any criteria
pollutant for which the
project region is non-
attainment under an
cable federal or
13 of 54
POTENTIALLY
SIGNIFICANT
IMPACT
5
POTENTIALLY
SIGNIFICANT
UNLESS
MITIGATION
IN CORPORATED
LESS THAN
SIGNIFICANT NO IMPACT
IMPACT
X
X
X
X
X
December 2, 2014 Item # 3 .1
EIS and Checklist
CU P 14-005, MORA 14-025, and VAR 14-009
POTENTIALLY
ISSUE POTENTIALLY SIGNIF IC ANT LESS THAN
SIGNIFICANT UNLESS SIGNIFICANT NO IMPACT
IMPACT MITIGATION IMPACT
INCORPORATED
state ambient air
quality standard
(including releasing
emissions that exceed
quantitative thresholds
for ozone precursors)?
d . Expose sensitive
receptors to substantial X pollutant
concentrations?
e . Create objectionable
odors affecting a X substantial number of
• • I ?
IV. BIOLOGICAL
' RESOURCES .
Would the project :
a. Have a substantial
adverse effect, either
directly or through
habitat modifications,
on any species
identified as a
candidate, sensitive, or
special status species X
in local or regional
plans , policies, or
regulations , or by the
California Department
of Fish and Game or
U.S. Fish and Wildlife
Service?
b. Have a substantial
adverse effect on any
riparian habitat or other
sensitive natural
community identified in
local or regional plans, X
policies, regulations , or
by the California
Department of Fish
and Game or U .S. Fish
and Wildlife Service?
c. Have a substantial
adverse effect on X
federally protected
14 of 54 6 December 2, 2014 Item# 3 .1
EIS and Checklist
CUP 14 -005, M ORA 14-025, and VAR 14-009
ISSUE
wetlands as defined by
Section 404 of the
Clean W ater Act
(including, but not
lim ited to, marsh,
vernal pool, coastal ,
etc.) through direct
removal, fi ling ,
hydrological
interruption, or other
means?
d. Interfere substantially
with the movement of
any native resident or
migratory fish or wildlife
species or with
established native
resident migratory
wildlife corridors , or
impede the use of
native wildlife nursery
sites?
e. Conflict with any local
policies or ordinances
protecting biological
resources, such as a
tree preservation policy
or ordinance?
f . Conflict with the
provisions of an
adopted Habitat
Conservation Plan ,
Natural Community
Conservation Plan, or
other approved local,
regional or state habitat
t I ? •
V. CULTURAL
RESOURCES.
Would the Project
a. Cause a substantial
adverse change in the
significance of a
h istorical resource as
defined in Section
15064.5?
15 of 54
POTENTIALLY
SIGNIFICANT
IMPACT
POTENTIALLY
SIGNIF ICANT LESS THAN
UNLESS SIGNIFI CANT NO IMPACT
MITIGATION IMPACT
INCORPORATED
X
X
X
X
7 December 2, 2014 Item # 3 .1
E IS and Checklist
CUP 14-005, MO RA 14-025, a nd VAR 14-009
POTENTIALLY
ISSUE POTENTIALLY SIGNIFI CANT LESS THAN
SIGNIFICANT UNLESS SIGNIFICANT NO IM PACT
IMPACT MITIGATION IMPACT
INCORPORATED
b. Cause a substantial
adverse cha nge in t he
significance of an X archaeological
resource pursuant to
Sectio n 15064.5?
c . Directly or indirectly
destroy a unique
paleontolog ica l X reso u rce or site or
unique geo logic
feature?
d. D ist urb any hu m an
rema ins, including X t hose interred outside
of fo rmal cemeteries?
VI. GEOLOGY AND
SOILS.
Would the proJect·
a . Expose people or
structures to potentia l
substantial adverse X effects, includi ng the
risk of loss , injury or
death involving:
i) Ruptu re of a known
earthquake fau lt, as
delineated on the most
recent Alquist-P riolo
Earthquake Fault
Zoning Map issued by
the State Geologist for X
the area or based on
other substantial
evide nce of a known
fault? Refer to Division
of M ines and Geology
Specia l Pu blication 42 .
ii) Strong se ismic X gro und shak in g?
iii) Seismic-related
gr ound failure, X
including liquefact ion?
iv) L andslides?
X
16 of 54 8 December 2 , 2014 Item # 3.1
E IS and C hecklist
CUP 14-005, M ORA 14-025, a nd VAR 14-009
POTENTIALLY
ISSUE POTENTIALLY SIGNIFICANT LESS THAN
SIGNIFICANT UNLESS SIGNIFICANT NO IMPACT
IMPACT MITIGATION IMPACT
INCORPORATED
b. Result in substant ia l
soil erosion or the loss X
of topsoil?
c . Be located on a
geolog ic unit or soi l that
is unstable , or that
would beco me unstable
as a result of the
project, and potentia ll y X
result in on-or offsite
la ndslide , lateral
spread ing, subsidence,
liquefaction or
co ll apse?
d. Be located on
expansive soil , as
defined in Table 18-1 -B
of t he Uniform Building X
Code (1994), c reat ing
substantial risk to life o r
prope rt y?
e. Have soils incapabl e of
adequately supporting
the use of septic tanks
or al ternative
wastewater disposa l X
syste m s whe re s ewers
are not avail able for the
disposal of
wastewater?
VII.GREENHOUSE GAS
EMISSIONS. Would
the project:
a. Generate greenhouse
gas e m issions, either
directly or indirectly , X t hat may have a
sig nificant impact on
t he environme nt?
b. Conflict with an
applicable plan , policy
or regulation adopted
for the pu rpose of X
reduci n g t he emissions
of greenhouse gases?
17 of 54 9 December 2, 2014 Item # 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
ISSUE
VIII.HAZARDS AND
HAZARDOUS
MATERIALS
Wou ld the project
a . Create a significant
hazard to the public or
the environment
through the routine
transport, use, or
disposal of hazardous
materials?
b. Create a significant
hazard to the public or
the environment
through reasonable
foreseeable upset and
accident conditions
involving the release of
hazardous materials
into the environment?
c . Emit hazardous
emissions or handle
hazardous or acutely
haza rdous materials,
substances or waste
within one-quarter mile
of an existing or
proposed school?
d . Be located on a site
which is included on a
list of haz ardous
materials sites
compiled pu rsuant to
Government Code
Section 65962.5 and ,
as a resu lt, would it
create a significant
hazard to the public or
the environment?
e. For a project located
within an airport land
use plan or, where
such a plan has not
been adopted, within
two miles of a public
airport or pub lic use
18 of 54
POT ENTIALLY
SIGNIF ICANT
IMP ACT
POTE NT IALL Y
SI G NIFICA NT
UNLESS
MITIG ATION
INCORP ORAT ED
10
LESS T H AN
S IG NI FI CANT NO IM PACT
IMPACT
X
X
X
X
X
Dece mber 2, 2014 Item# 3 .1
EI S and Checklist
CUP 14-005, M ORA 14-025, and VAR 14-009
POTENTIALLY
ISSUE POTENTIALLY SIGNIFICANT LESS THAN
SIGNIFICANT UNLESS SIGNIFICANT NO IMPA CT
IMPA CT MITIGATION IMPA CT
IN CORPORATED
airport, would the
project resu lt in a
safety haz ard for
people residing or
working w ith in the
project area
f . For a project in the
vicinity of a private
airstrip, would the
project resu lt in a X safety hazard for
people residing or
working in the project
area?
g . Impair implementation
of, or physically
interfere with , an
adopted emergency X
response plan or
emergency evacuation
plan?
h. Expose people or
structures to a
significant risk of loss,
injury or death involving
wildland fires , including
whe re wildland areas X
adjacent to urbanized
areas or where
residences are
intermixed with
w ildlands?
IX. HYDROLOGY AND
WATER QUALITY.
Would the project:
a. Violate any water
quality standards or X waste discharge
requirements?
b. Substantially deplete
groundwater s u pplies
or interfere
substantially with X
gro u ndwater recharge
such that there would
be a net deficit in
19 of 54 11 December 2 , 2014 Item# 3 .1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
POTENTIALLY
ISSUE POTENTIALLY SIGNIFICANT LESS THAN
SIGNIFICANT UNLESS SIGNIFICANT NO IMPACT
IMPACT MITIGATION IMPACT
INCORPORATED
aquifer volume or a
lowering of the local
groundwater table
lever (e.g., the
production rate of pre-
existing nearby wells
would drop to a level,
which would not
support existing land
uses or planned uses
for which permits have
been granted.
c. Substantially alter the
existing drainage
pattern of the site or
area, including through
the alteration of the X course of a stream or
river, in a manner
which would result in
substantial erosion or
siltation on-or offsite?
d. Substantially alter the
existing drainage
pattern of the site or
area, including through
the alteration of the
course of a stream or X river, or substantially
increase the rate or
amount of surface
runoff in a manner
which would result in
flooding on-or offsite?
e. Create or contribute
runoff water which
would exceed the
capacity of existing or
planned stormwater X
drainage systems or
provide substantial
additional sources of
pollute runoff?
f. Otherwise substantially
degrade water quality? X
20 of 54 12 December 2, 2014 Item# 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
POTENTIALL Y
ISSUE POTENTIALLY SIGNIF ICANT LESS THAN
SIGNIFICANT UNLESS SIGNIFICANT NO IMPACT
IMPACT MITIGATION IMPACT
INCORPORATED
g . Place housing within a
1 00-year flood
hazard a rea as
mapped on a Federal
Flood Hazard X
boundary or Flood
Insurance Rate Map or
other f lood haza rd
deli neation map?
h. Place wit hin a 1 00-yea r
flood hazard area
structures which would X
impede or redirect
flood flows?
i. Exposing people or
structures to a
significant risk of loss,
injury or death X involving flooding ,
including flooding
as a result of the failure
of a levee or dam?
j. Inundation by seiche, X tsunami, or mudflow?
X. LAND USE AND
PLANNING .
Would the proJect.
a . Ph ysica ll y d ivide a n
established X
community?
b. Conflict with app licable
land use plan , po licy ,
or regulation of an
agency with jurisdiction
over the project
(including , but not
limited to, the general X plan, specific plan ,
local coastal prog ram ,
or zoning ordinance)
adopted for the
purpose of avoiding or
mitigating an
envi ronmental effect?
c . Conflict wi t h any X a ppl icable habitat
21 of 54 13 December 2 , 2014 Item# 3 .1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
ISSUE
conservation plan or
natural community
conservation •lan.
XI . MINERAL
RESOURCES.
Would the project
a. Result in the loss of
availability of a known
mineral resource that
would be of future
value to the region and
the residents of the
State?
b. Result in the loss of
availabil ity of a locally
important mineral
resource recovery site
delineated on a local
general p lan , specific
plan or other land use
• I an?
XII.NOISE . Would the
proJect result m
a . Exposure of persons
to, or generation of,
noise levels in excess
of standards
established in the local
general plan or noise
ordinance, or
applicable standards of
other agencies?
b . Exposure of persons
to, or generation of,
excessive ground
borne vib ration or
ground borne noise
levels?
c. A substantial
permanent increase in
ambient noise levels in
the project vicinity
above levels existing
without the project?
d . A substantial temporary
or periodic increase in
22 of 54
POTENTIALLY
SIGNIFICANT
IMPACT
POTENTIALLY
SIGNIFICANT L ESS THAN
UN L ESS SIGN IFIC ANT NO IMPACT
MITIGATION IMPACT
INCORPORATED
X
X
X
X
X
X
14 Decembe r 2 , 2014 Item # 3 .1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
POTENTIALLY
ISSUE POTENTIALLY SIGNIFICANT LESS THAN
SIGNIFICANT UNLESS SIGNIFICANT NO IMPACT
IMPACT MITIGATION IMPACT
INCORPORATED
ambient noise levels in
the project vicinity
above levels existing
without the project?
e . For a project located
within an airport land
use plan or, where
such a plan has not
been adopted , within
two miles of a public
airport or public use X
airport, would the
project expose people
residing or working in
the project area to
excessive noise
levels?
f . For a project within the
vicinity of a private
airstrip, would the
project expose people X
resid ing or working in
the project area to
excessive noise levels?
XIII.POPULATION AND
HOUSING.
Would the proJect.
a. I nduce substantia l
growth in an area either
directly (for example,
by proposing new
homes and X businesses) or
indirectly (for example,
through extension of
roads or other
infrastructu re)?
b. Displace substantial
numbers of existing
housing, necessitating X the construction of
replacement housing
elsewhere?
c. Displace substantial
numbers of people , X
necessitating the
23 of 54 15 December 2, 2014 Item# 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
POTENTIALLY
ISSUE POTENTIALLY SIGNIFICANT LESS THAN
SIGNIFICANT UNLESS SIGNIFICANT NO IMPACT
IMPACT MITIGATION IMPACT
INCORPORATED
construction of
replacement housing
elsewhere?
XIV. PUBLIC SERVICES.
a. Would the project result
in substantial adverse
physical impacts
associated with the
provision of new or
physically altered
governmental facilities ,
need for new or
physically altered
governmental facilities, X the construction of
which could cause
significant
environmental impacts,
in order to maintain
acceptable service
ratios , response times
or other performance
object ives for any of
the public services.
i. Fire protection? X
ii. Police protection? X
iii. Schools? X
iv. Parks? X
v . Other public X facilities?
XV. RECREATION.
a . Would the project
increase the use of
existing neighborhood
and regional parks or
other recreational X facilities such that
substantial physical
deterioration of the
facility wou ld occur or
be accelerated?
b. Does the project
include recreational
facilities or require the X
construction or
expansion of
24 of 54 16 I December 2, 2014 Item# 3.1
EIS and Check list
CUP 14-005, M ORA 14-025, and VAR 14-009
POTENTIALLY
ISSUE POTENTIALLY SIGN IFICANT LESS THAN
SIGNIFICANT UNLESS SIGNIFIC ANT NO IMPACT
IMPACT MITIGATIO N IMPACT
IN CORPORATED
recreational facilities
which m ight have an
adverse physical effect
on the environment?
XVI. TRANSPORTATION
I TRAFFIC
Would the project.
a. Conflict with an
applicable plan,
ordinance or policy
establishing measures
of effectiveness for the
performance of the
circulation system ,
taking into account all
modes of
transportation,
including mass transit X and non-motorized
travel ,and relevant
components of the
circulation system,
including , but not
limited to,
intersections, streets,
highways and
freeways , pedestrian
and bicycle pat hs, and
mass transit?
b. Conflict with an
applica ble congestion
management program ,
incl uding , but not
limited to, level of
service standards and
travel demand X measures, or other
standards estab lished
by the county
congestion
management agency
for designated roads or
highways?
c. Result in a change in
air traffic patterns, X
including either an
25 of 54 17 Dec ember 2 , 2014 Item # 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
ISSUE POTENTIALL Y
SIGNIFICANT
IMPACT
increase in traffic levels
or a change in location
that results in
substantia l safety
risks?
d . Substantially increase
hazards due to a
design feature (e .g.,
sharp curves or
dangerous
inte rsections) or
incompatible uses
(e .g ., farm equipment)?
e. Result in inadequate
emergency access?
f. Conflict with adopted
policies, plans or
programs regarding
public transit, bicycle or
pedestrian faci li ties , or
otherwise decrease the
performa nce or safety
of such faci lities?
XVII. UTILITIES AND
SERVICE
SYSTEMS Would
the project.
a . Exceed wastewater
treatment requirements
of the applicab le
Regional Wate r Quality
Control Board?
b. Require or result in the
construction of new
water or wastewater
treatment facilities or
expansion of existing
facilities, t he
construction of which
could cause significant
envi r onmental effects?
c. Re q uire or res u lt in t he
const ruction of new
stormwater drainage
facilities or expansion
of existing facilities, the
26 of 54
POTENTIALLY
SIGN IFICANT
UNLESS
MITIGATION
INCORPORATED
18
LESS THAN
SIGNIFICANT NO IMPACT
IMPACT
X
X
X
X
X
X
I
December 2, 2014 Item # 3 .1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
ISSUE
construction of which
could cause significa nt
environmental effects?
d . Have sufficient water
supplies available to
serve the project from
existing entitlements
and reso urces, or are
new o r expanded
entitlements needed?
e. Result in the
determination by the
wastewater treatment
provider, which serves
or may serve the
p roject, that it has
adequate capacity to
serve the project's
projected demand in
add ition to t he
provider's existing
co mmitments?
f . Be served by a landfill
with sufficient permitted
capacity to
accommodate the
project's so lid waste
dispos al needs?
g. Comply with federal ,
state and local statutes
and regulations related
to solid waste?
XVIII. MANDATORY
FINDINGS OF
SIGNIFICANCE
a. Does the project have
the potential to degrade
the quality of the
environment,
substantially reduce the
habitat of a fish or
wil dl ife species, cause
a fish or wild life
popu lation to drop
below self-sustai n ing
leve ls , t hreaten t o
27 of 54
POTENTIALLY
SIGNIFICANT
IMPACT
POTENTIALLY
SIGNIFICANT LESS THAN
UNLESS SIGNIFICANT NO IMPACT
MITIGATION IMPACT
IN CORPORATED
X
X
X
X
X
19 December 2, 2014 Item·# 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
POTENTIALLY
ISSUE POTENTIALLY SIGNIFICANT LESS THAN
SIGNIFICANT UNLESS SIGNIFICANT NO IMPACT
IMPACT MITIGATION IMPACT
INCORPORATED
eliminate a plant or
animal community,
reduce the number or
restrict the range of a
rare or endangered
plant or animal, or
eliminate important
examples or the major
periods of California
history or prehistory?
b. Does the project have
impacts that are
individually limited, but
cumulatively
considerable?
("Cumulative
considerable" means
that the incremental
effects of a project are X
considerable when
viewed in connection
with the effects of past
projects, the effects of
other current projects,
and the effects of
probable future
projects.
c. Does the project have
environmental effects -
which will cause
substantial X
adverse effects on
human beings either
directly or indirectly?
D. DISCUSSION OF ENVIRONMENTAL EVALUATION
28 of 54
Please refer to the Environmental Initial Study Checklist Form above when reading the
following evaluation.
I. AESTHETICS:
a. No impact. The site is fully developed with a commercial building and paved areas
and is surrounded by developed commercial properties which are along a major
commercial corridor. Establishment of fenced areas with shade covers are in
keeping with the surrounding developed commercial areas. No impact will occur.
20 December 2, 2014 Item# 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
29 of 54
b. No impact. See response I.a.
c. No impact. See response I.a. .
d. No impact. Exterior lighting similar to that currently utilized in the surrounding
developed commercial area will be utilized. No impact will occur.
II. AGRICULTURAL AND FORESTRY RESOURCES:
a) No Impact. The project site is fully developed with a building and paved areas for
commercial use and is located within a developed commercial area with no farmland
uses in the vicinity. Thus, the project would not result in the conversion of Prime
Farmland, Unique Farmland or Farm-land of Statewide Importance to non-agricultural
uses. No impact would occur.
b) No Impact. The project site is not currently zoned for agricultural use and does not
contain Williamson Act contract land. No impact would occur.
c) No Impact. The project site does not contain, and is not zoned for, forest land,
timberland or timberland zoned Timberland Production. No impact would occur.
d) No Impact. As stated in response ll.c, the project site is not located in an area
containing forest land. Accordingly, the project would not convert any forest land to
non-forest use, and no impact would occur.
e) No Impact. The project would not directly impact agriculture or forest lands, nor
introduce new elements into the landscape that would contribute to future conversion
of agricultural use to non-agricultural use or forest land to non-forest use. No impact
would occur.
Ill. AIR QUALITY:
a. No impact. The City of Poway is part of the San Diego Air Basin and air quality in
the area is administered by the San Diego County Air Pollution Control District
(APCD). An Air Quality Management Plan (AQMP) describes air pollution control
strategies to be taken by a City, County or region classified as a non-attainment
area to meet the Clean Air Act (CAA) requirements. The main purpose of an AQMP
is to bring the area into compliance with the requirements of federal and state air
quality standards, and to coordinate regional and local governmental agencies to
achieve air quality improvement goals. A San Diego Regional Air Quality Strategies
Plan -1994 Uointly developed by the APCD and the San Diego Association of
Governments-SANDAG) exists for the San Diego area and provides strategies for
pollution control to improve air quality in the region. Land use plans and build out
projections of the General Plans of jurisdictions within the San Diego area were
considered in establishing the strategies of the Regional Air Quality Strategies Plan.
The Poway General Plan includes strategies that are directed toward reducing air
emissions through land use patterns, transportation planning, regional agency
cooperation, energy conservation, and construction. The project will not have a
significant adverse impact on air quality in the area. The zoning and General Plan
designation for the site envision potential establishment of dog kennels. The use,
therefore, will not have an impact and conflict with implementation the Regional Air
Quality Strategies Plan.
b. No impact. See response lll.a.
c. No impact. See response lll.a.
21 December 2, 2014 Item # 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
30 of 54
d. No impact. See response lll.a.
e. Less than significant impact. The project involves establishment of a dog kennel
and day care business and, therefore, dog wastes will be generated on the site with
the potential for odor. The business operations plan stipulates that dog solid waste
will be picked up frequently and disposed of in a waste collection area that will be
situated towards the interior of the site and more than 50 feet from any adjacent
commercial building and removed from the site regularly. Additionally, the outdoor
dog activity areas will be washed down daily. Impacts will be less than significant.
IV. BIOLOGICAL RESOURCES:
a. No impact. The site is fully developed with a building and paved areas. No
removal of natural vegetation will occur. No impact would occur.
b. No impact. The project site is located within an area that can be characterized as
urbanized. Poway Road, which is a major commercial corridor, is along the north
side of the site and developed commercial uses exist on the north side of Poway
Road. The site abuts developed commercial uses to the west. A creek, which is a
United States Geological Survey (USGS) mapped "blue line" creek and contains
some flood control improvements such as "rip rap", abuts the site to the southeast
and developed commercial uses are beyond the creek. The creek contains a high
degree of invasive type vegetation and is the subject of regular flood control
maintenance activity. The project will not result in the removal of vegetation in the
creek. The site will be developed with Low Impact Development (LID) features to
minimize polluted storm water run-off associated with pet wastes into the creek
(See discussion Hydrology and Water Quality). No impact will occur.
c. No impact. See responses IV.a and b.
d. No impact. See response IV.a and b.
e. No impact. No natural vegetation, or any onsite tree, is proposed to be removed.
No impact will occur.
f. No impact. See response IV.a and b.
V. CULTURAL RESOURCES:
a. No impact. According to the Prehistoric and Historic Resources Element of the
Poway General Plan, the project site is located in an area with a high probability
that archeological resources are present. The site was graded and developed over
25 years ago. Only minimal earth disturbing activities associated with digging holes
for new fence supports will occur No impact will occur.
b. No impact. See response V.a.
c. No impact. See response V.a.
d. No impact. See response V.a.
VI. GEOLOGY AND SOILS:
a.i No impact. The site is fully developed with a building and paved areas. Only
minimal earth disturbing activities will occur associated with digging holes for new
fence supports. Other activity involves perforating paving for drainage and removal
of a section of currently paved area to establish an LID feature to minimize polluted
storm water runoff from the site, which will have negligible if any effect on soil. No
impacts would occur.
a.ii No impact. Seeresponse Vl.a.i.
a.iii No impact. See response Vl.a.i.
22 December 2, 2014 Item# 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
31 of 54
a.iv No impact. See response Vl.a.i.
b. No impact. See response Vl.a.i.
c. No impact. See response Vl.a.i.
VII. GREENHOUSE GAS EMISSIONS:
a. Less than significant impact. Greenhouse gases allow solar radiation (sunlight)
into the Earth's atmosphere, but prevent radiative heat from escaping; thereby
warming the Earth's atmosphere. Greenhouse gases are emitted by both natural
processes and human activities. The accumulation of greenhouse gases in the
atmosphere affects the Earth's temperature. Emissions of greenhouse gases in
excess of natural ambient levels are thought to be responsible for the increase of
the "greenhouse" effect and contribute to what is called "global warming". The State
of California's Climate Change Scoping Plan aims to reduce state and local
greenhouse gas emissions by primarily targeting the largest emitters of greenhouse
gases-transportation, including emissions from vehicles, and energy sectors. Item
XVI.a below concludes that the project is not anticipated to result in a substantial
number of new vehicle trips on roads, particularly since the site has been developed
and used for commercial uses for over 25 years. Impacts would be less than
significant.
b. No impact. See response Vll.a.
VIII. HAZARDS AND HAZARDOUS MATERIALS:
a. No impact. The project involves the establishment of a dog kennel and day care
use on a developed site that will not involve the use of hazardous materials or
otherwise result in any public hazards. No impact will occur.
b. No impact. See response Vlll.a.
c. No impact. See response Vlll.a.
d. No impact. The site is not on the established lists of hazardous wastes sites. No
impact would occur.
e. No impact. The closest airport to the project site is the Marine Corps Air Station at
Miramar military base, which is approximately 7.5 miles away. The project does not
involve habitable structures that would result in exposure of people to safety
hazards. Therefore, the project would not result in a safety hazard for people
residing or working in the project area. No impact would occur.
f. No impact. See response Vlll.e. The project site is not within the vicinity of a
private airstrip. Therefore, the project would not result in a safety hazard for people
residing or working in the project area. No impact would occur.
g. No impact. See response Vlll.a.
h. No impact. According to the Very High Fire Hazard Severity Zones map for
Poway, the project site is not located within a Very High Fire Hazard designated
area. Additionally, the project site is within an urbanized and developed area, and
not located adjacent to any large expanse of wildlands. The project, therefore,
would not expose people or structures to a significant risk of loss, injury or death
involving wildland fires. No impact will occur.
IX. HYDROLOGY AND WATER QUALITY:
a. Less than significant. The project involves establishment of a dog kennel and day
care business on a developed commercial site which is adjacent to a creek and is
also otherwise served by the City-wide storm water conveyance system. The
23 December 2, 2014 Item# 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
32 of 54
project proposes two separate outdoor activity areas where dog waste will primarily
be generated. These outdoor areas will be on existing paved areas that will be
fenced, surfaced with artificial turf, and covered for shade. LID design features and
business operation procedures will be implemented with the project to minimize
polluted storm water runoff; and include keeping the dogs within a confined area,
covering the area to minimized rainfall (and runoff) from the areas, perforating the
pavement underneath the artificial turf to enable waste to infiltrate into the soil when
the areas are washed down on a daily basis, picking up solid waste frequently, and
the establishment of a depressed area in the ground along the rear property line.
This area is located above and adjacent to the creek that is located to the southeast
of the project site and will capture any runoff that results in the outdoor activity area
before reaching the creek. As a result, impacts will be less than significant.
b. No impact. The project involves establishment of a dog kennel and day care
business on a developed commercial site which will rely on the City potable water
system, not groundwater. No impact will occur.
c. No impact. . See response IX.b
d. No impact. The project would not alter the existing drainage pattern of the site or
area, including through the alteration of the course of a stream or river, in a manner
that would result in substantial erosion or siltation on or offsite. No impact would
occur.
e. No impact. The project would not alter the existing drainage pattern of the site or
area, including through . the alteration of the course of a stream or river, or
substantially increase the rate or amount of surface runoff in a manner which would
result in flooding on or offsite. No impact would occur.
f. Less than significant. See response IX.a
g. No impact. The project does not involve the placement of housing for humans on
the project site. No impact will occur.
h. No impact. A small southeasterly portion of the site is located within the
delineated Floodplain and a smaller portion in the Floodway. No improvements are
proposed within the Floodway. A portion of the outdoor activity area proposed in
the rear of the site is within the Floodplain. Accordingly, that improvement will
require the processing and approval of a Flood Plain Development Permit where
compliance with City requirements will be ensured. No impacts will occur.
i. No impact. The project would not result in exposing people or structures to a
significant risk of loss, injury or death involving flooding, including flooding as a
result of the failure of a levee or dam. See response IX.g. No impact would occur.
j. No impact. The project would not result in inundation by seiche, tsunami, or
mudflow. The project site is not located within or adjacent to any mapped dam
inundation areas. Ramona Dam is the closest dam to the project site. See
response IX.g. No impact would occur.
X. LAND USE AND PLANNING:
a. No impact. The project site is developed for commercial use, has been used for
commercial uses for over 25 years, is along a major commercial corridor, and in an
area that is developed with commercial uses. No impact will occur.
b. No impact. See response X,a ..
c. No impact. The Poway Subarea Habitat Conservation Plan (HCP) serves as the
planning document for the preservation and management of sensitive biological
habitat areas in the City of Poway. The HCP is consistent with the regional and
sub-regional planning efforts within San Diego County pursuant to the State of
California's Natural Community Conservation Plan act of 1991. The project is not
24 December 2, 2014 Item# 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
33 of 54
located within the HCP Mitigation Area. Additionally, no natural vegetation removal
will occur as a result of the project. No impact would occur.
XI. MINERAL RESOURCES:
a. No impact. According to the Poway General Plan, the only known valuable
mineral resource, as recognized by the California Department of Conservation,
Division of Mines and Geology, is construction quality sand and gravel located in
the South Poway area of the City. The project site is not in this area. No impact
would occur to mineral resources.
b. No impact. See response Xl.a.
XII. NOISE:
a. Less than significant impact. The project involves establishment of a dog kennel
and day care business, which includes two outdoor daytime activity areas. One
outdoor activity area is in the front of the site along Poway Road and one is located
in the rear portion of the site. Some dogs will only stay during the day, others will
be kept overnight. Accordingly, there will be noise associated with barking dogs
both during the day and nighttime hours. A Noise Study was prepared for the
project by Investigative Science and Engineering Inc. The study reports that noise
during the nighttime hours, when up to 60 dogs would be kenneled indoors, will be
between 43 and 48 decibels (dBA), and that noise during daytime hours, when up
to 75 dogs will be using the outdoor activity areas, will be 65.1 dBA. The Poway
Municipal Code (PMC) has two separate noise standards applicable to the project.
The noise standard contained in PMC 17.34.040 relates to the dog kennel use
specifically and relates to the existing, ambient noise levels in the area. The PMC
stipulates that noise associated with a kennel must be within the ambient noise
levels for the area. The study determined the ambient noise level in the front
portion of the site is between 44 and 82 dBA, and in the rear portion of the site to
be between 44 to 68 dBA. Since the projected noise during the nighttime hours is
between 43 to 48 dBA and the projected noise level during the daytime is 65.1
dBA, which are both within the ambient levels, the project complies with the
ambient noise standard.
The PMC stipulates another noise standard applicable to the project which is based
on the project site's underlying Community Business (CB) zoning classification.
The noise standard contained in PMC 8.08.04 stipulates that noise generated from
any use in the CB zone cannot be more than 55 dBA during nighttime hours and no
more than 60 dBA during daytime hours. The study reported that nighttime noise
would be between 43 and 48 dBA. The project complies with the nighttime
standard for the CB zone. The study reported however that daytime noise
associated with the outdoor activity areas would be 65.1, which is slightly more
than 5 dBA over the day time standard for the CB zone.
PMC 8.08.220 contains a provision for variances to noise standards. The project
involves a request for a variance pertaining to the exceedance of the 60 dBA
daytime standard for the CB zone. The project site is located within a fully
developed commercial area along a major commercial corridor. The projected
noise is within the ambient levels in the area. It is also important to note that a
similar dog kennel and day care business exists in the immediate vicinity and that
25 December 2, 2014 Item# 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
34 of 54
there are minimal residential uses nearby that are more than 400 feet from the
project site. Project noise impacts will be less than significant.
b. No impact. The project will not cause any ground vibrations. No impacts will
occur.
c. No impact. See response Xll.a on ambient noise discussion.
d. No impact. See response Xll.a on ambient noise discussion.
e. No impact. The closest airport to the project site is the Marine Corps Air Station at
Miramar military base, approximately 7.5 miles to the southwest. The project does
not involve, nor does it propose habitable structures that would result in exposure
of people to excessive noise levels. Therefore, the project would not result in
excessive noise levels for people residing or working in the project area and no
impact would occur.
f. No impact. The project site is not within the vicinity of a private airstrip. Therefore,
the project would not result in excessive noise levels for people residing or working
in the project area and no impact would occur.
XIII. POPULATION AND HOUSING:
a. No impact. The project involves the establishment of a dog kennel and day care
business on a developed commercial site. Therefore, the project would not induce
substantial direct or indirect population growth in the surrounding area. No impact
would occur.
b. No impact. See response XII I.a.
c. No impact. See response Xlll.a.
XIV. PUBLIC SERVICES:
a. No impact. The project involves the establishment of a dog kennel and day care
business on a developed commercial site. The site is adequately served by all
public services. No impact would occur.
a.i No impact. See response XIV.a.
a.ii. No impact. See response XIV.a.
a.iii.No impact. See response XIV.a.
a.iv.No impact. See response XIV.a.
a.v. No impact. See response XIV.a.
XV. RECREATION:
a. No impact. The project involves the establishment of a dog kennel and day
care business on a developed commercial site. The business will not result in a
demand for park or recreation services. No impact would occur.
b. No impact. See response XV.a.
XVI. TRANSPORTATION AND TRAFFIC:
a. No impact. The project involves establishment of dog kennel and day care
business on a developed commercial lot which is currently vacant. Where the
traffic generated by the new business will add traffic to the transportation system,
since it is currently vacant, the added traffic is consistent with that which was
previously generated by the prior business and the existing transportation system is
designed to accommodate such traffic. No impact will occur.
26 December 2, 2014 Item# 3.1
EIS and Checklist
CUP 14-005, MORA 14-025, and VAR 14-009
35 of 54
b. No impact. See response XVI.a.
c. No impact. The project does not involve air traffic. No impact will occur.
d. No impact. The project does not involve any alteration of existing transportation
design features, and is not located within an area with existing hazardous
transportation design features. No impact will occur.
e. No impact. The project involves establishment of dog kennel and day care
business on a developed commercial lot which is currently designed for adequate
emergency vehicle access. No impact will occur.
f. No impact. The project involves establishment of dog kennel and day care
business on a developed commercial lot and will not conflict with conflict with, or
otherwise impact transit, bicycle, or pedestrian systems. No impact will occur.
XVII. UTILITIES AND SERVICE SYSTEMS:
a. No impact. The project involves establishment of dog kennel and day care
business on a developed commercial lot which is adequately served by existing
utility and service systems. No impact will occur.
b. No impact. See response XVII.a.
c. No impact. See response XVI.a.
d. No impact. See response XVI.a.
e. No impact. See response XVI.a.
f. No impact. See response XVI.a.
g. No impact. See response XVI.a.
XVIII. MANDATORY FINDING OF SIGNIFICANCE:
a. No impact. See responses IV a and IV.b.
b. Less than significant impact. See responses II I.e, Vll.a, IX.a, and Xll.a.
c. Less than significant impact. See responses !ll.e and Vll.a
27 December 2, 2014 Item# 3.1
RESOLUTION NO. P-14-
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF POWAY, CALIFORNIA,
APPROVING CONDITIONAL USE PERMIT 14-005,
MINOR DEVELOPMENT REVIEW APPLICATION 14-025,
AND VARIANCE 14-009
ASSESSOR'S PARCEL NUMBER 317-151-60
WHEREAS, the Applicant, Gunner Milo Inc., requests approval of Conditional
Use Permit (CUP) 14-005, Minor Development Review Application (MORA) 14-025, and
Variance (VAR) 14-009 to establish an animal day care and kennel business, which
includes a request for a variance from City noise standards, on a developed commerical
site located at 12255 Poway Road, in the Community Business zone; and
WHEREAS, the proposed project involves an overnight kennel for up to 60 dogs/cats,
day care for up to 200 dogs/cats, other ancillary activities, and construction of two
covered and enclosed outdoor activity areas; and
WHEREAS, on December 2, 2014, the City Council held a duly advertised public
hearing to receive testimony from the public, both for and against, relative to this matter.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway
as follows:
Section 1: The findings, in accordance with Section 17.48.070 of the Poway
Municipal Code (PMC), for CUP 14-005 to establish an animal day care and kennel at
12255 Poway Road are made as follows:
A.
B.
C.
D.
The proposed location, size, design, and operating characteristics of the animal
day care and overnight kennel are in accord with the title and purpose of Chapter
17.48 PMC (Conditional Use Permit Regulations), the Poway General Plan, and
the development policies and standards of the City, in that animal boarding is
allowed with the approval of a Conditional Use Permit.
The location, size, design, and operating characteristics of the animal day care
and kennel will be compatible with, and will not adversely affect or be materially
detrimental to, adjacent uses, buildings, or structures in that the use will be
conducted within a building, except for outdoor activity areas that will be
screened from view from the street and neighboring properties by a fence.
That the harmony in scale, bulk, coverage and density of the animal day care
and kennel is consistent with adjacent uses.
There are adequate public facilities, services and utilities available at the subject
site to serve the animal day care and kennel. No new utilities are proposed.
~
36 of 54 December 2, 2014 Item # 3.1
Resolution No. P-14-
Page 2
E. There will not be a harmful effect upon the desirable surrounding property
characteristics in that the animal day care and kennel is located within an existing
building and the outdoor activity areas will be screened from view by fencing.
F. The generation of traffic will not adversely impact the capacity and physical
character of the surrounding streets and/or the Circulation Element of the
General Plan. The business would provide adequate off-street parking for cars.
G. The site is suitable for the type and intensity of the proposed development in that
the animal day care and kennel is in an area with other businesses and is
appropriate to the purpose of the CB zone, in which the site is located, with the
approval of a Conditional Use Permit.
H. There will not be significant harmful effects upon environmental quality and
natural resources in that the operator has provided a management plan for
regular cleaning of the outdoor activity areas and are providing Low Impact
Development (LID) design features that will provide a means for infiltration of
storm water into the ground.
I. There is no relevant negative impact associated with the operations of the animal
day care and kennel.
J. The potential impacts, as described in subsections A through I of this Section,
and the proposed location, size, design, and operating characteristics of the
animal day care and kennel, and the conditions under which it would be operated
or maintained, will not be detrimental to the public health, safety or welfare, or
materially injurious to properties or improvements in the vicinity, nor be contrary
to the adopted General Plan or the Poway Road Specific Plan, in that the
associated activities will be conducted indoors or behind a fence and will be
screened from view from neighboring development and the street.
K. The proposed animal day care and kennel will comply with the applicable
provisions of the Zoning Ordinance and the Poway Road Specific Plan, with the
exception of noise which is the subject of a variance.
Section 2: The findings for MORA 14-025, in accordance with PMC 17.52.010
Purpose of Development Review, are made as follows:
A.
B.
37 of 54
The project has been designed to be architecturally compatible with surrounding
commercial development, and conforms to City zoning and development
standards. Therefore, the project respects and recognizes the interdependence
of land values and aesthetics to the benefit of the City.
The project has been designed to minimize impacts on the surrounding
community by utilizing exterior building materials and an architectural design that
December 2, 2014 Item# 3.1
Resolution No. P-14-
Page 3
is consistent with surrounding development. Therefore, the proposed
development respects the public concerns for the aesthetics of development, and
encourages the orderly and harmonious appearance of structures and property
within the City.
C. The granting of the MORA would not be materially detrimental to the public
health, safety or welfare within the community since the proposed development
will complete improvements necessary for the new use.
D. The project has been designed to be compatible with development in the
surrounding area by utilizing exterior building materials and an architectural
design that is consistent with nearby development. Therefore, the proposed
development respects the public concerns for the aesthetics of development.
E. The project will not have an adverse effect on the aesthetics, health and safety,
or an architecturally-related impact upon adjoining properties, as the project has
been designed to be compatible with development in the surrounding community
by utilizing exterior building materials and an architectural design that is
consistent with nearby development.
F. The design and improvements of the proposed development are consistent with
all elements of the Poway General Plan, as well as the provisions of the Zoning
Code.
Section 3: The findings for VAR 14-009, in accordance with PMC 8.08.220 Variances
are made as follows:
A. The noise that will be generated by the project during daytime hours will be within
the range of existing ambient noise in the area.
B. During the nighttime animals will be kept indoors and therefore noise will comply
with all established City standards for nighttime noise levels.
C. Surrounding uses are developed commercial uses including a similar animal day
care and kennel business.
Section 4: The findings, pursuant to Government Code Section 66020, for the public
improvements for CUP 14-005, MORA 14-025, and VAR 14-009 are made as follows:
A.
B.
38 of 54
The design and improvements of the proposed development are consistent with
all elements of the Poway General Plan, as well as City Ordinances, because
all necessary facilities will be available to serve this project.
In accordance with the Poway General Plan, the project requires the payment of
applicable development impact fees, which are assessed on a pro-rata basis to
December 2, 2014 Item# 3.1
Resolution No. P-14-
Page 4
finance public infrastructure improvements, which promote a safe and healthy
environment for the residents of the City.
Section 5: The City Council hereby approves CUP 14-005, MORA 14-025, and VAR
14-009, as shown on the approved plans on file with the City, subject to the following
conditions:
A. The applicant shall defend, indemnify, and hold harmless the City, its agents,
officers, and employees from any and all claims, actions, proceedings, damages,
judgments, or costs, including attorney's fees, against the City or its agents,
officers, or employees, relating to the issuance of this permit, including, but not
limited to, any action to attack, set aside, void, challenge, or annul this
development approval and any environmental document or decision. The City
may elect to conduct its own defense, participate in its own defense, or obtain
independent legal counsel in defense of any claim related to this indemnification.
In the event of such election, applicant shall pay all of the costs related thereto,
including without limitation reasonable attorney's fees and costs. In the event of
a disagreement between the City and applicant regarding litigation issues, the
City shall have the authority to control the litigation and make litigation related
decisions, including, but not limited to, settlement or other disposition of the
matter. However, the applicant shall not be required to pay or perform any
settlement unless such settlement is approved by applicant.
B. Approval of this CUP, MORA, and VAR request shall apply only to the subject
project, and shall not waive compliance with all sections of the Zoning Ordinance
(except for noise standard pursuant to the approved variance) and all other
applicable City Ordinances in effect at the time of Building Permit issuance.
Additionally, the project shall comply with the stipulations contained in the
applicant's submitted operational statement on file with the City.
C. Within 60 days of the date of this approval, and before the issuance of any
permit: (1) the applicant shall submit in writing that all conditions of approval
have been read and understood; and (2) the property owner shall execute a
Covenant Regarding Real Property. In order for the City to prepare the
Covenant, the applicant must first submit a legal description of the subject site.
D. The use conditionally granted by this approval shall not be conducted in such a
manner as to interfere with the reasonable use and enjoyment of surrounding
uses.
E. The conditions of CUP 14-005, MORA 14-025, and VAR 14-009 shall remain in
effect for the life of the subject use and shall run with the land and be binding
upon future owners, successors, heirs, and transferees of the current property
owner.
39 of 54 December 2, 2014 Item# 3.1
Resolution No. P-14-
Page 5
F. CUP 14-005, MORA 14-025, and VAR 14-009 may be subject to annual review,
as determined by the Director of Development Services, for compliance with the
conditions of approval and to address unresolved operational concerns that may
have been raised during the prior year.
G. Proposed signage shall be in accordance with the Poway Sign Ordinance; the
necessary permits and approvals shall be obtained for any signage proposed
prior to installation.
H. The applicant shall obtain a Building Permit prior to construction. Prior to
issuance of a Building Permit, the applicant shall comply with the following:
40 of 54
(Planning)
1. The applicant shall comply with the latest adopted building and electric
codes, and all other applicable codes and ordinances in effect at the time
of Building Permit issuance.
2. The site shall be developed in accordance with the approved plans on file
in the Development Services Department and the conditions contained
herein. A final inspection from the appropriate City departments will be
required.
3. The applicant shall contact the Poway Unified School District [858
679-2570] to verify if school impact fees are required. If required, the
fees shall be paid at the rate established at the time of Building Permit
issuance.
4. All architectural details shown on the approved CUP/MDRANAR plans
shall also be shown on the building plan check submittal. Modifications to
the building or site design details on the approved CUP/MORA plans may
require an MORA revision and City Council approval.
5. If new roof-mounted equipment is proposed, the building plans shall
include elevations and cross sections that show all new roof
appurtenances, including air conditioning, architecturally integrated,
screened from view, and sound buffered from adjacent properties and
streets, to the satisfaction of the Director of Development Services.
(Engineering)
6. All spoil materials from footings and foundations shall be legally disposed
of offsite unless a Grading Permit for placement of the materials is
obtained from the Department of Development Services -Engineering
Division prior to placement or the applicant has received verification from
the Department in writing that no permit is required.
December 2, 2014 Item # 3.1
Resolution No. P-14-
Page 6
7. The applicant shall incorporate Low Impact Development (LID) design
features into the site development as applicable. These shall be clearly
shown and identified on the site plan that is included with the building
plan check submittal, and be appropriately sized for the proposed level
of development.
8. A minimum cash security for erosion control for $2,000 is required.
9. The applicant shall attend a pre-construction meeting at the Department of
Development Services. The scheduling request shall be submitted on a
City standard form available from the City's project engineer. The
applicant's action plan that identifies measures to be implemented during
construction to address erosion, sediment and pollution control will be
discussed. Compliance for sediment control shall be provided as directed
by the project inspector.
10. Erosion control shall be installed and maintained by the developer from
October 1 to April 30 annually. The developer shall maintain all erosion
control devices throughout their intended life.
11. Some of the proposed improvements are located within a regulated
floodplain. A Floodplain Development Permit shall be approved and
issued prior to Building Permit issuance. All applicable fees shall be paid
prior to floodplain permit issuance.
12. Prior to start of any work within a City-held right-of-way, a Right-of-Way
Permit shall be obtained from the Engineering Division of the
Development Services Department. , All appropriate fees shall be paid
prior to permit issuance.
I. The applicant shall comply with the following fire safety requirements, to the
satisfaction of the Fire Marshal:
1.
2.
3.
41 of 54
The applicant is required to meet all applicable PMC and California State
Fire and Building Codes for this project. The applicant is encouraged to
contact the Division of Fire Prevention at (858) 668-4470 to set up a
meeting prior to submitting building plans in order to review project
requirements.
Permanent access roadways for fire apparatus shall be designated as
"Fire Lanes" with appropriate signs and curb markings.
A 2A 1 OBC fire extinguisher(s) is required for office areas every 3,000
square feet and 75 feet of travel distance.
·December 2, 2014 Item'# 3.1
Resolution No. P-14-
Page 7
4. Roof covering of the existing building and the canopies in the activity
areas shall be fire retardant as per PMC 15.04.050, and City of Poway
Ordinance No. 64 and its amended Ordinance No. 526.
5. The building shall display the approved numbers and/or addresses in a
location plainly visible and legible from the street or roadway fronting the
property from either direction of approach. Said numbers shall contrast
with their background and be a size between six (6) inches (minimum) and
18-inches (maximum). The building address shall also be displayed on
the roof in a manner satisfactory to the Director of Safety Services, and
meeting Sheriff Department-ASTREA criteria.
J. Prior to issuance of the Certificate of Occupancy:
1. The site shall be developed in accordance with the approved plans on file
in the Development Services Department and the conditions contained
herein. A final inspection from appropriate City departments will be
required.
(Engineering)
2. Applicant shall provide signage and pavement markings for one-way
access at the westerly driveway entrance and for the proposed drive north
of the fenced enclosure and building.
3. The applicant shall repair, to the satisfaction of the City Engineer, any and
all damage to public improvements caused by construction activity from
this project.
K. Upon establishment of the dog day care and overnight boarding facility, pursuant
to CUP 14-005, MORA 14-025, and VAR 14-009 the following shall apply:
42 of 54
(Planning)
1. The dog activity areas shall be confined to the areas depicted on the
approved CUP/MDRAIVAR Site Plan. The canopies shall be pulled taut
and maintained in good condition.
2.
3.
The owner or operator of the animal day care and animal boarding facility
shall routinely and regularly inspect the site to ensure compliance with the
standards set forth in this permit and in accordance with the applicant's
operational statement on file with the City.
No loudspeaker sound amplification system shall be used to produce
sounds in violation of the Noise Ordinance, including telephone, electric
bell, or chime system.
December 2, 2014 Item# 3.1
Resolution No. P-14-
Page 8
4. A Sign Permit is required for a permanent wall sign and a temporary
wall banner sign. All signage shall comply with the PMC 17.08.040
Comprehensive Sign Regulations.
5. Within a year of the commencement of operations, an additional street
tree shall be planted in accordance with the requirement of the City of
Poway Landscape and Irrigation Design Manual at the location shown on
the approved site plan.
6. All landscaping onsite and within the adjacent public right-of-way shall
be adequately irrigated, and permanently and fully maintained by the
owner at all times in accordance with the requirements of the City of
Poway Landscape and Irrigation Design Manual. The trees shall be
encouraged and allowed to retain a natural form. Pruning should be
restricted to maintain the health of the trees and to protect the public
safety. Trees should be trimmed or pruned as needed to develop strong
and healthy trunk and branch systems. Tree maintenance and pruning
shall be in accordance with "American National Standard for Tree Care
Operations" latest edition (ANSI A300). Trees shall not be topped and
pruning shall not remove more than 25% of the trees' leaf surface.
7. The parking areas, driveways and landscape areas shall be well
maintained.
8. Weekend special events shall be contained within the building and/or the
fenced outdoor activity areas. Events conducted within the parking lot
shall require the processing and approval of a Temporary Use Permit. All
business parking needs shall be accommodated on-site in designated
parking spaces as shown on the site plan on file with the City. Should the
business need additional parking for special events the business operator
may enter into an agreement with adjoining or nearby properties for
shared use of parking in cases where that property has surplus (i.e. in
excess of City requirements) parking available.
Section 6: The approval of CUP 14-005, MORA 14-025, and VAR 14-009 shall expire
on December 2, 2016, at 5:00 p.m. unless, prior to that time, a Building Permit has been
issued and construction on the property in reliance on the CUP/MDRANAR approval
has commenced prior to its expiration.
Section 7: The parties are hereby informed that the time within which judicial
review of this decision must be sought is governed by Section 1094.6 of the California
Code of Civil Procedure.
43 of 54 December 2, 2014 Item# 3.1
Resolution No. P-14-
Page 9
PASSED, ADOPTED AND APPROVED by the City Council of the City of Poway
at a regular meeting this 2nd day of December, 2014.
ATTEST:
Sheila R. Cobian, CMC, City Clerk
STATE OF CALIFORNIA )
)SS
COUNTY OF SAN DIEGO)
Don Higginson, Mayor
I, Sheila R. Cobian, CMC, City Clerk of the City of Poway, do hereby certify
under penalty of perjury that the foregoing Resolution No. P-14-was duly adopted
by the City Council at a meeting of said City Council held on the 2nd day of December,
2014, and that it was so adopted by the following vote:
AYES:
NOES:
ABSENT:
DISQUALIFIED:
44 of 54
Sheila R. Cobian, CMC, City Clerk
City of Poway
December 2, 2014 Item# 3.1
\
N
$
0 125 250 500
~--9Feet
45 of 54
co
CITY OF POWAY
Zoning I Location Map
Item: The Paw Pad
CUP14-005
MDRA14-025
VAR14-009
RR-A
December 2, 2014 Item'·# 3.1
PetResoB1, Cage .. free Boarding· I WellnessCenler
OPERATIONAL STATEMENT
Operational flow starts at check-in kiosks (260st) conveniently located adjacent to 8+
parking stalls for primary business customers to drop off/pick up pets for boarding (day &
ovemight);average daily .. customer trips estimated at 30-40 vehicles per day with 5-.tO
minutes visit times. Peak "drop-oft" hours are between 6:30am...., 9:00am and peak "pick-
up" hours between'4:30pm ~ 7:00pm. A display and reception area (1,.631sf} includes two
ADA restrooms situated in main building for customer counseling and education; grooming
& food prep areas (84 7st) for pet wash/manicure services and pet food .preparation
separated by furniture is accessed by employed care keeperS only; separate warehouse
areas (2,852st) for cage free boarding kennels, training; therapy and temperament testing
accessed by trained care keepers only. Boarding ~ennel area will be equipped with 5'x5'
feeding cages for separate feeding or if a dog needs alone time; .also for ~crated boarding
op:qon': o!f~:r¢inadditig~. to "cage free". Existing facility already equipped wi~. ·
operational ,Systems ·[mechanical, :phrmbing; electrical). required for adequate lighting and
ventilation for excellent atmosphere and comfort to pets, keepers and customers;· including
reception/display area, management offices, grooming tubs; laundryappliances, small
kitchen appliances, restrooms, branded fixtures, furniture, and technical eqilipment to be
located in main building and kiosk offices as depicted in floor plan. Dog R,un Yards to be
situated in froiit~;019st) and back ( 4,524st) to have control fencing to ensure pet safety
per San Diego· C~Uhty Animal Control standards. The number' of employees'required to ..
start operations under 'The Paw Pad" standards are; l operational manager, 1 acJmissiongi.{';
keeper, 1 groomer, 1 tnrlner /therapist, 1 dog run keeper per yard utilized At full capacity·
(200 pets) the number of employees (4 -10) vary between 4-8 hour shifts per day onsite
at one time = 1 keeper/20 dogs depending on occupancy levels. Day care serVice hours
are between 6:30am-7:00pm Monday thru Friday and partial hours during weekends
With no more than 75 dogsallowed in the outdoor dog run areas at onetime. Overnight
boarding is a combination of "crated" and "cage free" with one overnight employee per 30
dogs not to exceed a 60 dog overnight boarding capacity. ·Dogs in open yard runs are
always supervised. All pets remain indoors between 7:00pm-6:30am With intermittent
supervised yard access only for pets to relieve themselves. After hours supervised yard
access is limited to 2 pets at one time.
RECEiVED
0Cl1 3 201~
46 of 54
"Serving our community with an unprecedented level of exceptional pet care" m~~if
12255 Poway Road, Poway, CA 92064
Contact: Barbara Armenti (732) 742-8542 Gil? ''e~
ATTACHMENT D December 2, 2014 Item#. 3.1
Facility
Pel Resori,·Cage-Free Boarding I Wellnm Center
OPERATIONAL STATEMENT
This project consists of minor buildinginiprovements·estimated.under $50,000 for interior
and exterior branding with no environmental impacts. The existing interior partition walls
will be modified to accommodate the primary service of "'pet day care" ~th ancillary
services provided to existing customers including; obedience training, grooming,
photography, wellness programs (I.E. yoga, massage, vaccination clinic;..non suigical). The
outdoor dog rwis are ~quipped with artificial turf installed over existing surface and
several control gates to ensure safety. The dog run is equipped with removable dog houses,
playgroimd apparatus, custom designed splash pond/waterfall and decorative sail
structure canopies secured inside a commercial grade solid wood fenced yard compliant
with commercial building standards. The sail structures are oriented to fence posts and
aligned with industrial metal posts approximately 10-12 feet high anchored with secured
cables to provide adequate shade, comfort and safety throughout the· dog run area All
operational services and any promotional or special events will be conducted within the
interior of building or enclosed yard spaces.
The removable splash pond placed near building to access a water source approximately
10'x11' on existing surfac~ above ground and water is 12inch" deep with custom waterfall
feature. Pond water is filtered and treated twice daily to ensure cleanliness and PH
balance .. The Paw Pad water quality controls and potential bacterial pollutants
management plan meets qty standards to determine equivocal exemptions under
California Environmental Quality Act and Standard Urban Storm Water Management Plan.
Water Quality Controls & Potential Bacterial Pollutants Management Plan contains, at
a minimum, the following elements: an exhibit identifying the outside dog activity areas,
and source. controls to ensure best management practices (BMP's) that will be employed to
minimize bacterial pollutants runoff. The premises shall adhere to this approved Plan for
the duration of Conditional Use Permit (CUP) issued by City of Poway. The Paw Pad project
reviewed by City win detail any requirements to comply with LID's and BMP's to minimize
. . . ·1 \ 1· . b~tterial pollutant containment or run-off as follows:
"Serving our community with an unprecedented level of exceptional pet care"
12255 Poway Road, Poway, CA 92064
Contact: Barbara Armenti (732) 742~8542
_. ·-
47 of 54 December 2, 2014 Item# 3.1
Pet 'Resort CZ!ge-Free Bearding 1 Wiliness CeBDter
OPERATIONAL STATEMENT
1.) Interior drain filters are "Groomers Best" for all utility sinks and grooming tubs:
2.) The outside synthetic lawn area will be sprayed nightly with a water fbleach
enzymatic.solution (Sol) in a concentration recommended by the manufacturer of
the product· This concentrate consists of3 oll.nces ofbleach per one gallon of water
and the Sol enzymatic solution consists of 2 ounces of product per one gallon of
water. The bleach solution kills any bacterialpollutants and the Sol enzymatic
solution is speclfically designed to neutralize tirlne arid bacteria 'the use of these
disinfectants will be alternated nightly. · ' '
3.) Any excess moisture left on the synthetic lawn is wetjdcy vacuumed. This prevents
any moistUre from draining into nearby storm drains and has the added benefit of
collecting loose materials and/ or dog fur to keep the grounds clean.
4.) "Rain Day'' Prm:edures -dog run closed and all activitieS moved indoors.
Artificial Turfis green on top, in the middle and even underneath. Beyond the color,
Artificial Turf goes a long way towards better enVironmental silstainability which makes it
truly "green." Artificial Turf backing is approximately 60'-70% green by weight The System
is an engineered component system which contributes to environmental sustainability. The
first component is the primary backing which helps extend the product life cycle by using
10% less material that is stronger and has superior dimensional stability coin pared to
traditional artificial grasses. Underlayment drainage channel allows for drainage under the
turf, but over the asphalt, ensures a clean and sanitary environment.
Solid waste is picked up immediately after any excretion and hermetically sealed in
biodegradable bags then placed in garbage dumpster for weekly service by EDCO.
"Serving our community with an unprecedented level of exceptional pet. care"
12255 Poway Road, Poway, CA 92064
Contact: Barbara Armenti (732) 742~8542
....... 48 of 54 December 2, 2014 Item# 3.1
49 of 54
Pel ResoRt Cage .. frteiOarding 1 WeiiUSsCear
OPERATIONAL',STATEMIENT
JrncKries5::;{/\SJtvlO"Wm)·. ·
FlOw{ASTM 041116)·
~xo~u~~gr~~ieot.= t
.. ''
"Serving our community with an unprecedented level of exceptional pet care~~
12255 Poway Road, Poway, CA 92064
Contact: Barbara Armenti (732) 742-8542
-.I •
December 2, 2014 Item.# 3.1
OPERATIONAL STATIEMIENT
Zeolite-base for synthetie lawn-
The installation techniques utilized to neutralize odors organically with natural zeolite
oystals. Used in many industries for purification, these crystals absorb and eliminate up to
80% of the odor caused by ammonia in pet waste. This material is 100 percent·natural
zeolite volcanic mineral with an ionic charge that attracts odors. Millions of micro-sized
pores in this natural mineral provide superior odor absorption -and -long-lasting results.
Zeolite regenerates by exposure to sun or dry environment for six ot more hours, this will
completely tethatge the mineral to work like new again.
Broad Spect:rum Germicidal Cleaner (Sol)
Sol-is a broad non":toxic enzymatic spectrum germicidal cleaner, deodorizer and
disinfectant formulated for animal care facilities. The concentrated formula knocks out
pathogens in o~e easy labor saving stept This very popular quaternary disinfe$Dt is.EPA
registered and kills the-broadest spe~ of pathogens in the industry~ Sol·is e{fective.
agaillstviru$es (including Canine Parvo~). bacteria, a.nd fimgi. Sol's pH neutrality at a
dilution of2 oz. per gallon of water (8 oz. per gallon for.canine parvovi~)providesfor the
highest level of ~afety for animals and humans with no rinsing necessary. It i~ non-
corr,osive and non-staining. Sol granules sprinkled regularly on top. of artificial lawn
gathers any liquid (Le. urine) located at the surface (sort of like kitty litter), then it is
washed away witlJ. a hose. This product is environmentally safe and naturally scented.
Rug Dr. Wide Track for Cleaning Lawn (as needed) .
Rug Dr. is a commercial grade carpet cleaner is used on the ~thetic lawn for regular
cleaning. Equipment is a water-based system, which forces steams water in and vacuums it
out leaving lawn clean and damp but not soaked. Chemicals are not used in the process -
since the Sol treatment disinfects and deodorizes. After use the Rug Dr. collected waste is
poured into the drain as it would with normal carpet ~leaning.
"Serving our community with an unprecedented level of exceptional pet care''
12255 Poway Road, Poway, CA 92064
Contact: Barbara Armenti (73-2) 742--8542
---
50 of 54 December 2, 2014 Item# 3.1
Pel Resort, Cage--Free Boarding 1r Wellness Center
OPERATIONAL STATEMENT
Noise Controls
The motivation behind why dogs bark typica1ly include dogs be1ng in a confined crate or
kennel for an extended period of time while their owners are away from home or at work
Dogs may bark because they are alone and seek attention from human beings or
companionship from other dogs, due to lack of exercise, and boredom. The Paw Pad is
designed specifically to combat all of these issues and is the precise reason why dog.
ownerS will seekout The Paw Pad facility. Dogs are free to fully explore their environment
without being confined, which takes away separation anxiety barking at The Paw Pad.
Dogs at The Paw Pad enjoy unlimited human and dog companionship, which fulfills any
attention seeking barking typically consistent with a "home alone environment". Dogs at
The Paw Pad enjoy hours of physical exercise and mental stimulation, thus setting the
standard of excellence to fulfill individual dog needs and keeping them content and quiet
Trainers will remain· onsite to address individual and group dog behavior to miliimize
barking at The Paw Pad facility. The Paw Pad is committed to the utmost eXtremes to keep
the dogs calm and serene for their own well-being. It's the only way a-business like this can
stay in operation and ensure the safety of the dogs in their care. The Paw Pad requires all
dogs to be temperament tested to ensure that they are socialized, even-,keeled, and .free of
behavioral problems. If a dog does not pass temperament test they are NOT allowed to stay
for "cage free" daycare or boarding services, but they would be able to be ;'crate boarded"
only which will be an option that The Paw Pad will offer in addition to cage-free. Training
services are offered to customers, so a barking dog or wining pet could easily be addressed
through proper behavioral training.
Please find The Paw Pad's site specific noise data compliance survey completed by
Investigative Science & Engineering Inc. (ISEI) dated 8/12/14. Ambient levels measured in
front & rear of property lines are above code threshold levels in CB zone With Poway Rd
over 75db. ISEI noise study to be updated indicating measured noise levels in front have
no impact with back yard exceeding code thresholds requiring a variance for project
Please reference institutional noise research papers regarding "barking dogs" completed by
California University, Davis (MS#: A9405R2 final dated 7 /24/02) and Massachusetts
Institute of Technologies "Behavioural Processes" study 81 (2009) 358-368 ''barking &
mobbing'' accepted 4/8/09.
51 of 54
"Serving our community with an unprecedented level of exceptional pet care"
12255 Poway Road, Poway, ·CA 92064
Contact: Barbara Armenti (732) 742-8542
December 2, 2014 Item# 3.1
52 of 54
53 of 54
I
i
I
I
•••
I I 1::\,
~
I
I
i
I
I I
• i
B
Gl ~~ r=
u :~ '»~ 1'1
--~
1<1:1 . I
H
M ll
I I H ~u
! :
~
,
I
8
.---.If.·
----· ---------~~,-ATFA ME -
I
I I
I·=
II
II
T
I~
i:
i0
~,,
r~
"' I I.
i
h z ~!
~ 1"1
--···~--··-····~·--·;'I
i ·.I
I
--c··---.. -------De ember-2-,-20-14--~ltem-# 3.1
54 of 54
November 22, 2014
To: The Mayor of Poway, City Council ofthe City of Poway, Staff Planner
From: The Residents of Poway Estates
Re: CUP14-005, MDRA 14-025, V AR14-009ffhe Paw Pad
We have received notification regarding the above referenced Conditional Use Permit
and are asking that you please deny approval of this requested variance from the City
noise standards.
Our homes are located such that the noise from this operation would directly carry up to
them. We already have the noise from the animals housed at the A.n}mal Keeper kennels
on Oak Knoll Road. When these animals start barking and howling their displeasure
about being left by their owners, the neighborhood dogs respond and it is quite annoying.
In view of this, you can imagine the noise situation with yet another kennel in our area -
in a location even closer to our homes than the Animal Keeper. Therefore, we ask for
your protection and assistance in trying to control the noise we contend with.
We sincerely appreciate your help in this situation. We will have representation at the
City Council meeting to provide any additional information you may need. For now, you
may contact Doug Eagle at 858-688-9600 or Deagle2@cox.net if you have any questions.
13043 Oak Knoll nve, Poway, CA 92064
ATTACHMENT G December 2, 2014 Item# 3.1
1 of 25
APPROVED 0
APPROVED AS AMENDED 0
City of Poway
COUNCIL AGENDA REPORT
(SEE MINUTES)
DENIED 0
REMOVED 0
CONTINUED-----
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
RESOLUTION NO.----
December 2, 2014
Honorable Mayor and Members of the City Council
Daniel Singer, City Manager~
Robert J. Manis, Director of Develo~ment Services /AA
Rich Whipple, City Planner~
City of Poway Habitat Acquisition Strategy
The Poway Subarea Habitat Conservation Plan (PSHCP) requires the City to use its
habitat in-lieu fees to purchase land to assist in meeting the PSHCP's habitat goal of
preserving 10,800 acres of land in Poway. Staff has developed an implementation
strategy to acquire properties for habitat preservation using funds from the City's habitat
in-lieu fee account.
Recommended Action:
It is recommended that the City Council receive and file this report.
Background:
The PSHCP was adopted by the Poway City Council in 1996 and covers the entire City.
The PSHCP is a "subarea" conservation plan in the region and was prepared to
facilitate private property development in coordination with the wildlife agencies and
also to create sustainable, interconnected habitat preserves for the .purpose of
maintaining biological resources in Poway. Approximately 13,300 acres of the 25,216
acres of land within the City's jurisdiction are included within the PSHCP "Mitigation
Area". The Mitigation Area includes all lands within the City where preservation or
management may contribute significantly to regional biological conservation. The
PSHCP requires a large portion (1 0,800 acres) of the Mitigation Area to be protected
and preserved in perpetuity. This area contains a significant amount of California
Gnatcatcher habitat vegetation (Coastal Sage Scrub) and serves as the City's regional
"fair share" of biological land preservation to protect the gnatcatcher and other
endangered species from extinction.
Findings:
As part of the PSHCP preservation requirements, habitat removal within the Mitigation
Area is limited to a maximum of two acres per parcel. A 2:1 mitigation ratio is typically
required to replace habitat lost to development when located within the Mitigation Area.
Due to the larger parcel sizes in the Mitigation Area, the mitigation habitat is commonly
preserved on site and protected through the placement of a biological conservation
open space easement over the mitigation land. Alternatively, a developer could
purchase the equivalent habitat elsewhere within the City or buy mitigation credits to
mitigate the habitat loss. In addition, a habitat in-lieu fee can be paid to mitigate the
December 2, 2014 Item#~ ·I
2 of 25
Habitat Acquisition Strategy
December 2, 2014
Page 2
loss within the Mitigation Area. The current habitat in-lieu fee is $17,000 per acre.
Through the placement of City land into Biological Conservation Easements (BCE),
dedication of private "mitigation" land associated with development, and the previous
purchase of property using habitat mitigation in-lieu fees, the City has preserved over
6,900 acres, or approximately 56% of its habitat preservation requirement. Although
over half of the preservation goal has been met, the City cannot meet the 10,800 acre
requirement with development dedications alone.
The PSHCP requires the City to use its habitat mitigation in-lieu fees to purchase
additional land for preservation purposes. The selection of mitigation parcels is up to
the City; however, the PSHCP provides criteria to assist staff in determining which
parcels to purchase. The criteria include, but are not limited to, high priority acquisition
areas (as defined in the PSHCP), biological significance, threat level from development,
important linkages that interconnect other open space parcels, land costs, parcel
location, and parcel availability. In the past year, staff has developed a proposed
strategy, using the criteria described in the PSHCP for habitat acquisition. This strategy
also includes a detailed list of potential parcels to target for acquisition, and provides a
thorough analysis of the priority areas as defined in the PSHCP. The acquisition
strategy is provided in the attachment to this report.
Since 1997, the City has acquired approximately 517 acres of land. The City has not
purchased any mitigation land since 2009. As a result, the current habitat in-lieu fee
account has grown and currently contains $1,366,881. In compliance with the PSHCP
and to demonstrate progress in implementing the PSHCP to the various "Wildlife
Agencies", staff will use the strategy to identify properties to be purchased based on
available funding. All proposed land purchases will be presented to City Council prior to
taking action.
Fiscal Impact:
The City's Habitat In-Lieu Fee Fund balance is currently $1,366,881. Based on criteria
in the acquisition strategy, staff will utilize funds from this account to acquire properties
as parcels and funding is available.
Environmental Review:
This action, which may result in acquisition of properties for the purposes of habitat
preservation, is Categorically Exempt as a Class 13 Categorical Exemption from the
California Environmental Quality Act (CEQA), pursuant to Section 15313(c) of the 2014
CEQA Guidelines, in that the action, may result in land acquisition intended to preserve
access to public lands where the purpose of the acquisition is to preserve the land in its
natural condition.
December 2, 2014 Item# '-t.l
Habitat Acquisition Strategy
December 2, 2014
Page 3
Public Notification:
None.
Attachment:
A. PSHCP Acquisition Strategy (Memorandum)
3 of 25 December 2, 2014 Item# '1.1
CITY OF POWAY
MEMORANDUM
TO: Daniel Singer, City Manager
FROM: Bob Manis, Director of Development Services
Rich Whipple, City Planner
DATE: December 2, 2014
SUBJECT: City of Poway Subarea Habitat Conservation Plan (PSHCP) Acquisition
Strategy
The City of Poway encompasses an area that has many natural resources, including
creeks, canyons, grassland areas, and mountains. Historically, the City has protected
its biological and natural resources through General Plan policies and requirements of
the Poway Municipal Code (PMC).
Subsequent to the adoption of the Poway General Plan, the California Gnatcatcher was
listed as a federally threatened species in March 1993. As a listed species, state and
federal laws prohibited the disturbance of the bird and/or the removal of its habitat
without permit authorization from the U.S. Fish and Wildlife Service (USFWS). As a
majority of the undeveloped land in Poway contains Gnatcatcher habitat, most new
development required review through a lengthy USFWS permit process. To facilitate
the permit and development process, the City worked with the USFWS and the
California Department of Fish and Wildlife (CDFW) in the preparation and
implementation of the citywide Poway Subarea Habitat Conservation Plan (PSHCP). A
key objective of the PSHCP is to create sustainable, interconnected habitat preserves
for the purpose of maintaining viable populations of biological resources.
Implementation of the PSHCP ensures compatibility between development and
conservation in the City, while meeting the mitigation requirements for private and
public development projects.
The PSHCP was adopted by the Poway City Council in 1996 and covers the entire City.
There are 25,216 acres within the borders of the City of Poway. Within that land area,
approximately 13,300 acres are identified as the PSHCP "Mitigation Area". The Wildlife
Agencies required, in the PSHCP, that 10,800 acres of the 13,300 acres be protected
and preserved in perpetuity. The 10,800 acres contain a large portion of the
Gnatcatcher habitat vegetation (Coastal Sage Scrub) and serves as the City's fair
share portion of preserved land, to protect the gnatcatcher and other endangered
species from extinction.
To date, through placement of City land into Biological Conservation Easements (BCE),
dedication of private "mitigation" land associated with development, the purchase of
property using funds generated from the City Habitat In-Lieu fee, and the initial
dedication of approximately 4,600 acres of preserved lands from "Cornerstone parcels"
4 of 25 December 2, 2014 Item# Y .l
such as Blue Sky/Mount Woodson and Iron Mountain, the City has preserved
approximately 56% of the preservation goal, or over 6,900 acres.
Habitat In-Lieu Fee
The purpose of the "in-lieu" fee is to provide an efficient and viable option for biological
resource impact mitigation. It is intended that the in-lieu fee serve as mitigation
compensation for direct, indirect, and cumulative impacts, where the direct purchase of
habitat lands by a project proponent or on-site preservation are determined by the City
to be infeasible. Over the last several years, the in-lieu fee typically has been used for
the removal of native habitat on private properties located outside the Mitigation Area
and for the purchase of open space parcels within the Mitigation Area. Per the PSHCP,
the Habitat In-Lieu Fee is to be assessed in accordance with a fee schedule adopted by
the City Council. The current fee is $17,000 per acre. The purpose of the Habitat In-
Lieu Fee is to provide the City the ability to acquire land within the Mitigation Area for
preservation and dedication.
Since the approval of the PSHCP, the City has collected over $1.8 million in Habitat In-
Lieu fees and has spent over $668,000 of that for the purchase of 517 acres containing
native habitat. In addition, approximately 1,860 acres has been dedicated to the
preserve in the form of mitigation land associated with development. Therefore, a total
of more than 2,377 acres have been added to the preserve's initial dedication of 4,600
acres.
Pursuant to the goals and policies of the PSHCP the selection and acquisition of habitat
parcels is entirely up to the City and is not subject to the further review or approval of
any other party of the PSHCP Implementing Agreement. Supplemental to the City's
efforts, staff may also consider input from SANDAG's Environmental Management
Program committee and the County's Quarterly Acquisition committee. Through these
committees the City may consider input on potential acquisition sites in Poway that
could be of regional significance and/or provide supplemental funding sources to assist
in the purchase of the mitigation parcels. The current in-lieu fee balance is $1,366,881
as of October 1, 2014. The City has subsequently been formulating a program for the
review and consideration of available lands for habitat acquisition. Despite the past
recession, land costs in Poway still remain high. As such, City staff is looking carefully
at potential sites that will offer the greatest amount of preservation acreage for the
dollars available.
Parcel Selection Process
The selection of mitigation parcels is entirely up to the City. There are a number of
tools, or criteria in the PSHCP, to assist staff in evaluating the appropriate parcels to
purchase. The criteria include, but are not limited to: Proposed Resource Protection
Area (PAPA) priorities, parcel location, quality of habitat, land cost, linkage
connections, and parcel availability. The following is a discussion of the parcel
acquisition process.
The main direction for parcel acquisition is from a priority acquisition list provided in the
PSHCP. Most of the properties included in the PAPA provided a connective link to
other preserved parcels or open space areas. These groups of parcels, or corridors,
were placed into PAPA. The PAPAs were delineated based on their value to the
preserve system and potential risks of loss to development. These factors were used to
rate PAPAs into three categories; high, medium, and low. (
5 of25
2
December 2, 2014 Item# Lf.J
• High is defined as areas that support concentrations of target species, large
contiguous blocks of sensitive vegetation communities, or essential habitat
linkages or wildlife movement corridors and within which development or other
impacts would irreparably damage preserve design (i.e. the unique aspects of
the Poway Subarea HCP including its core areas, linkages and buffers
compared to San Diego's regional conservation plan) and could not be
mitigated.
• Medium is defined as areas that support sensitive habitats, target species, or
habitat linkages that are important to preserve design, but their loss or partial
loss could be at least partially mitigated elsewhere in the preserve. Examples
include coastal sage scrub habitats peripheral to core areas, or habitat linkages
for which alternative linkages exist in the event the first is lost.
• Low is defined as areas that support sensitive resources of lesser importance to
preserve design than high or medium value PAPAs. Preservation of low value
PAPAs may add incrementally to total reserve size and resources, but loss of
these areas would not unduly damage overall preserve function. -
Additional Factors to Consider
In addition to the PAPA list there are additional economic and environmental conditions
to be taken into consideration in the parcel selection process. These conditions include:
6 of 25
• Linkages
Linkages are habitat connections that allow for wildlife movement, recruitment,
and colonization between preserved areas. Linkages are typically regional and
consist primarily of undeveloped corridors through urbanized areas that
interconnect preserved areas such as mitigation and/or open space parcels.
Linkages can be defined at a finer scale to include connections between habitat
patches through otherwise disturbed habitat areas. Linkages may also exist
between habitats in the Mitigation Area and habitats in adjoining jurisdictions.
Many of the high priority PAPAs contain important linkages.
• Location
The location of the parcel plays a significant role in its value to the overall
preserve system. Parcels located in the rural areas of the City may have a
higher biological value and a lower economic value. Conversely, parcels located
near or surrounded by urbanization may have a higher economic value as land
values will often be based on development potential vs. biological value. Equally
important is a parcel location to adjoining "Cornerstone Lands", mitigation
parcels or other lands designated for open space. Parcels that interconnect
open space parcels, preserve wildlife corridors, or protect sensitive plant or
animal species provide the greatest benefit to the Preserve.
• Biological Significance
The biological significance of a parcel is based on the type and quantity of
vegetation and the type and number of plant and animals species it supports. A
small parcel that contains quality vegetation may be considered biologically
significant. However, if that parcel is surrounded by development, it becomes
more of an island and less biologically valuable. Examples of this situation
consist of blocks of native vegetation located outside the PSHCP Mitigation
3
December 2, 2014 Item# L.f .1
Area. Large parcels located in the rural areas could contain habitat of lesser
quality, but through its sheer size are able to support a larger variety of plant and
animal species and, therefore, may be more biologically valuable. Careful
consideration must be given to a parcel's biological significance and what is best
for the Preserve when evaluating possible acquisition.
• Economic Significance
As discussed above, the economic significance of a parcel is based on its
location and quality of vegetation. Parcels that contain quality habitat, but
possess views of the City will typically demand a higher price as their value is
based on the residential unit potential. Conversely, parcels located far from
infrastructure improvements and possess high quality vegetation are of greater
biological value. As the goal is to select properties that provide maximum
benefit to the Preserve, careful consideration must be given to the dollar versus
biological value ratio.
• Development potential
Although a parcel may be located within the Mitigation Area, it still has
development potential. The PSHCP established a PAPA parcel acquisition
priority based on concentrations of target species, contiguous blocks of sensitive
vegetation communities, habitat linkages, and threat level from development. In
selecting a parcel for purchase, consideration must be given to the value of
biological preservation of the parcel versus damage to the preserve design that
cannot be mitigated if developed. Another option to consider is the percentage of
the native habitat on the parcel that can be preserved after development.
• Land Cost
The cost of land is often based upon many of the above criteria. Land adjacent
to development or with expansive views will likely have an inflated price as its
value will often be based on its residential unit potential. For the purposes of
acquisition of mitigation land, the price should be based on the value of the
habitat. Depending upon location, type and quantity of vegetation, the habitat
cost of Coastal Sage Scrub can range from $3,000 to $30,000 (2014 $) per acre
according to some industry experts. Careful consideration must be taken when
purchasing habitat parcels to insure that the price paid reflects a balance
between its value to the Preserve vs. its residential and/or habitat value.
Proposed Resource Protection Areas (PAPA)
The PSHCP identified six high priority, thirteen medium priority, and four low priority
PAPAs. The City is initially focusing on the location, availability and habitat condition of
the high priority parcels. Since the list of PAPA's was prepared over 18 years ago it is
recognized that some of those parcels have been developed and are no longer
available for acquisition. As such, the City is also examining lesser priority parcels and
other properties outside the PAPA's that contain significant biological value, such as
those in the Twin Peaks Mountain and Rattlesnake Canyon areas. Many of the parcels
within the Twin Peaks Mountain and Rattlesnake Canyon area have a medium priority,
with a medium to high preservation value.
4
December 2, 2014 Item# L.\ • f 7 of 25
PAPA List
Listed below are the high , medium and low priority PAPAs identified in the PSHCP and
all of the parcels within each PAPA. The list includes the status of individual parcels,
their size and condition. Parcels that are highlighted are considered "targef' parcels .
Parcels that are not highlighted are considered developed, or are already preserved .
Those identified as preserved were in the PSHCP as target parcels, but have since
been preserved. Exhibit A to this memorandum contains a description of each of the
PAPAs and a map showing their general locations .
The list below includes 19 target parcels in the high priority PAPA. The list includes
the individual parcels, their size and condition .
5
December 2, 2014 Item# L\ · f 8 of25
Listed below are the thirteen medium priority PAPAs identified in the PSHCP and the
target parcels within each PAPA. The list includes the individual parcels , their size and
condition.
9 of25
6 December 2, 2014 Item# 'i .1
3146503600 Medium T w in Peaks Mt. 1.84 Vacant
3140311000 Medium Twin Peaks Mt. 10.00 Vaca nt
3140311100 Medium Twin Peaks Mt. 10.00 Vacant
2754702800 Med1um Twm Peaks MI. 21.40 Preserved Hospital OS
10 of 25 7
December 2, 2014 Item# 4 .'
11 of 25
PRPA
14
PRPA
15
PRPA
17b
3212602200 Medium
3212602300 Medium
3212602400 Medium
3212602500 Medium
3212502800 Medium
3212502900 Medium
3212503000 Medium
3212503100 Medium
3212503200 Medium
3212503300 Medium
3212503400 Medium
3212503500 Medium
3212503600 Med ium
3212503700 Med iu m
3212503800 Med ium
3212503900 Med iu m
3212504000 Medium
3212602600 Medium
3212602700 Medium
3212602800 Medium
3212501500 Medium
3212601700 Medium
Rattlesnake Cyn. 1.69 Vacant
Rattlesnake Cyn. 2.02 Vacant
Rattlesnake Cyn. 2.02 Vacant
Rattlesnake Cyn. 2.02 Vacant
Rattles nake Cyn. 1.70 Vacant
Rattlesnake Cyn. 1.01 Vacant
Rattles nake Cyn. 1.01 Vacant
Rattles nake Cyn. 1.01 Vacant
Rattlesnake Cyn. 1.01 Vacant
Rattlesnake Cyn. 1.01 Vacant
Rattlesnake Cyn. 1.01 Vacant
Rattlesnake Cyn. 1.01 Vacant
Rattlesnake Cyn. 1.01 Vacant
Rattlesnake Cyn. 1.01 Vacant
Rattlesnake Cyn. 1.0 1 Vacant
Rattlesnake Cyn. 1.01 Vacant
Rattlesnake Cyn. 1.0 1 Vacant
Rattlesnake Cyn. 2.02 Vacant
Rattlesnake Cyn. 2 .02 Vacant
Rattlesnake Cyn. 2.02 Vacant
Rattlesnake Cyn. 1.86 Vacant City owned
Rattlesnake Cyn. 1.01 Vacant City owned
8
December 2, 2014 Item # 4 · l
Listed below are the four low priority PAPAs identified in the PSHCP and the target
parcels within each PAPA. The list includes the individual parcels, their size and
condition.
Private Properties
From time to time, the City is contacted by private property owners, conservation entities,
or brokers asking if the City is interested in acquiring properties for preservation. These
properties may or may not be on the PAPA List and may contain high biological value.
Staff will evaluate those parcels on a case-by-case basis against the criteria in this
strategy. However, it is not likely they will hold as high of a priority for acquisition as
those already on the list.
Tax Default Parcels
From time to time , the City becomes aware of tax default parcels located within Poway .
Many of these parcels are located within the Mitigation Area and contain biologically
significant habitat and may or may not be in the PAPA list as a target parcel. Staff will
12 of 25 9
December 2, 2014 Item# L{ ·l
seek to consider the tax default parcels in the list of potential acquisition sites, if they
meet the parcel selection requirements.
Summary
Section 7.6 Funding/Financing of the PSHCP states that implementation of the PSHCP
will be financed through in-lieu mitigation fees and state/federal grants. A major portion
of the in-lieu fees must be used by the City to purchase lands within the Mitigation
Area. The acquisitions shall be preferentially directed to lands within the PAPAs with
first priority given to habitat located in high priority PAPAs. The PSCHP encourages
annual acquisition of mitigation parcels to help reach the 10,800 preservation acres
required by the PSHCP.
The City Council has directed staff to develop a strategy to study and potentially
acquire parcels of land to implement future preservation efforts consistent with the
PSHCP. City staff is presently refining the list of PAPA parcels, noted above, to
determine availability and the best acquisition opportunities. The list includes priority
acquisition parcels within the PAPAs. Future acquisition efforts will target those parcels
that best meet the preservation goals of the PSHCP.
While the PSHCP encourages acquisitions from the high priority PAPA list, selection
from this list is not mandatory. Staff will use this acquisition strategy to make
recommendations to the City Council regarding parcels to acquire for open space
preservation based on the funds available in the City's Habitat In-Lieu account, parcel
availability, and consideration of the factors outlined in this memorandum.
13 of 25
10
December 2, 2014 Item# !1. \
Exhibit A
SUPPORTING SECTIONS FROM THE
POWAY SUBAREA HABITAT CONSERVATION PLAN (PSHCP)
Excerpt from Section 5.5 of the Poway Subarea Habitat Conservation Plan (PSHCP)
PROPOSED RESOURCE PROTECTION AREAS (PRPAs)
The following section discusses the attributes of each of the PRPAs and rates each for its
preservation value, the risk to this value under existing levels of protection, and its priority for
acquisition to enhance protection. Where PRPAs overlap the County Resource Conservation
Areas (RCAs), the RCAs are identified by number. Where appropriate, the results of the
region's Multiple Species Conservation Program (MSCP) California gnatcatcher and
composite habitat evaluation models are also presented (Ogden et al. 1995).
The California gnatcatcher habitat evaluation model developed for the MSCP is consistent with
the evaluation process developed by the Scientific Review Panel (SRP 1993) for determining
the long-term conservation value of land for the coastal sage scrub identified in the State's
Natural Community Conservation Plan (NCCP). The model rates habitats from no value to very
high value for long-term conservation of gnatcatchers based on patch size, vegetation
composition, connectivity, slope, elevation, and climatic zone. Much of the coastal sage scrub
habitat in Poway rates as very high value by this model, with higher and steeper elevation
areas varying down to moderate habitat value. Many of the PRPAs contain predominantly very
high quality habitat based on this model. In the following discussions, model results are
presented only for those PRPAs not rated as predominantly very high quality habitat by this
model.
The composite habitat evaluation model considers other sensitive habitats and target species in
addition to coastal sage scrub and gnatcatchers in rating areas for their regional importance in
the MSCP study area. Thus, such areas as wetland habitats, wildlife movement corridors, and
areas of clay soils may rate as high or very high habitat value using this model. Nearly all
PRPAs contain predominantly very high quality habitat based on this model. Again, only results
for PRPAs not rated as predominantly very high quality by this model are presented in the
following discussion.
PRPA 1
This area supports coastal sage scrub on relatively flat slopes adjacent to the San Dieguito
River Valley and the corresponding Mitigation Area for the San Dieguito River Park (SDRP). It
also contains oak riparian woodland. It is relatively undisturbed and known to support a number
of California gnatcatcher pairs. Flatter coastal sage areas are currently underrepresented in
protected areas, such as cornerstone lands and areas of 45 percent or greater slopes. PRPA 1
is immediately adjacent to coastal sage on non-developable 45 percent or greater slopes, and
includes scattered oak woodlands in County RCA 55. Protecting this area would add to the
value of this larger block of habitat and help ensure connectivity to the SDRP. Limited
development of rural residences may degrade the biological resources, but would probably not
sever the linkage.
11
14 of 25 December 2, 2014 Item# '1· \
PAPA2
PRPA 2 is also adjacent to the SDRP Mitigation Area, supports coastal sage on relatively flat
slopes, and is part of a much larger block of coastal sage scrub supporting California
gnatcatchers and other sensitive species. It is relatively undisturbed, is contiguous with
significant riparian oak vegetation, and forms part of an important linkage between the Poway
Subarea Mitigation Area and the SDRP Mitigation Area. PRPA 2 is included in County RCAs 56
and 69. It is at low to moderate risk of fragmentation by rural residential development.
PAPA3
PRPA 3 represents a large (approximately 360 acres), relatively flat area of coastal sage scrub
immediately north of the Old Coach Golf Estates Planned Community. Although partly
disturbed by a variety of dirt roads and trails, this area warrants further study as a potential
cornerstone. In addition to coastal sage scrub that is known to support orange-throated
whiptails, the area contains some oak woodlands and grasslands and is surrounded on most
sides by non-developable slopes of greater than 45 percent. The area could be fragmented by
rural residential development under current constraints.
PAPA4a
This area represents a constrained linkage through coastal sage scrub and riparian oak
woodland east of the Old Coach Golf Estates. Existing, scattered housing has fragmented the
coastal sage linkages in the vicinity. Protection of a few key parcels here might ensure that
further development, allowed under existing zoning, would not sever this already constrained
linkage. Remaining parcels in this area should be targeted for acquisition and restoration to
maintain the linkage.
PAPA 4b
This PRPA primarily represents the riparian vegetation and adjoining coastal sage scrub and
chaparral communities along Thompson Creek. Although it scores low as gnatcatcher habitat,
this area rates very high using the composite habitat evaluation model. Riparian vegetation is
off limits to development, but houses in adjacent chaparral could degrade habitat quality in the
area, which includes County RCA 57.
PAPA 5
This 37-acre parcel is immediately adjacent to the existing Lower Sycamore Creek Cornerstone
and the Old Coach Golf Estates open space areas. It supports coastal sage scrub, riparian
woodland, and a variety of sensitive species, but it is surrounded on three sides by existing
development and is therefore highly edge-affected. Under the special development
requirements (Section 7) this parcel could support one dwelling unit, or a maximum of 2 acres
of vegetation removal, which would degrade biological value slightly more. This area deserves
consideration for acquisition as a buffer for the existing cornerstone and open spaces only if it
is readily available and acquisition would not use resources better applied to higher priority
parcels.
PAPA 6
This PRPA, lying between the large avocado orchard and Old Coach Golf Estates, supports
oak riparian forest, coastal sage scrub, and disturbed and developed habitats. Its primary
benefit to the preserve system is in widening and buffering the habitat linkage and wildlife
12
December 2, 2014 Item # Lt ·l 15 of 25
movement corridor along Sycamore Creek through this already constrained area. PRPA
designation for this area encourages any future development on this property to be clustered in
areas not currently supporting native vegetation, such as .in the existing avocado orchard.
Restoration or enhancement in the remaining native habitat areas of PRPA 6 should be
considered.
PAPA 7
This area represents a constrained linkage and wildlife movement corridor. The large avocado
orchard in this vicinity funnels wildlife movements around it either to the west (along Sycamore
Creek) or the east, along a prominent ridge through PRPA 7. The ridge top may represent a
movement corridor for mountain lions, deer, and other animals. PRPA 7 also represents a
chaparral and coastal sage scrub habitat linkage between the Mount Beatrice Cornerstone and
the Blue Sky-Mount Woodson cornerstone. Although only rated as low quality habitat by the
regional habitat evaluation models, this PRPA deserves consideration for acquisition to
preserve this linkage if there is an increased risk of its disruption.
PAPA 8
One or more undeveloped parcels in this area are considered essential to preserving the
habitat linkage between Blue Sky Ecological Reserve and habitats to the north via Sycamore
Creek and the Old Coach Golf Estates open space areas. The Butcher property (see Section
5.1.1 0) was purchased by the City of Poway as mitigation to help preserve this highly
constrained linkage and movement corridor. Other parcels in PRPA 8, between the Butcher
property and Blue Sky Ecological Reserve, should be targeted for acquisition to ensure the
integrity of this connection.
PAPA 9
This area of approximately 60 acres lies between the Blue Sky-Mount Woodson
cornerstone and two biological open space easements south of Lake Poway. It is covered by
coastal sage scrub and supports some gnatcatchers. However, it is highly edge-affected by
surrounding development and has some disturbance onsite. As a result it is rated only as
moderate quality habitat by both regional habitat evaluation models. This area is therefore
low to medium priority for acquisition. Preserving it would add incrementally to protected
sage scrub habitat, would help buffer the large cornerstone, and would tie in existing open
spaces supporting coastal sage scrub. However, this PRPA should only be acquired if readily
available and so long as it does not take resources from higher priority PAPAs.
PAPA10
This is an area of relatively gentle, coastal sage and chaparral covered slopes in the southern
and western portions of Twin Peaks. It is contiguous with existing open space easements for
the Rancho Arbolitos Planned Community that also support coastal sage scrub. Together,
PRPA 10 and the existing open space area support approximately 17 gnatcatcher pairs
(Ogden, unpublished 1994 data). This PRPA overlays with the Twin Peaks RCA (County RCA
59). It was rated as moderate value gnatcatcher habitat and high value multiple species
habitat by the two regional habitat evaluation models. Under current zoning, PRPA 10 could
be fragmented by rural residential housing. Thus, this area deserves some consideration for
further protection to maintain the Twin Peaks gnatcatcher population. Other areas of
gnatcatcher habitat on Twin Peaks are steeper, and are less likely to be fragmented by
housing development than would PRPA 10.
16 of 25
13
December 2, 2014 Item # l-{ .1
PAPA 11
This PRPA north and west of Rattlesnake Canyon represents a relatively flat area of coastal
sage scrub that supports large numbers of gnatcatchers and other sensitive species. It is part of
the County-designated Rattlesnake Canyon Mitigation Area (County RCA 62) and was
identified as an important biological resource area in the Poway Detailed Biological Assessment
(ERCE 1991 ). Because the area mostly lies on slopes of less than 45 percent it could be
partially built out and moderately fragmented according to its zoning as RR-A. Relatively flat
coastal sage scrub areas are under-represented in current cornerstones and other protected
areas. This PRPA also represents the closest significant area of gnatcatcher habitat to Twin
Peaks and may support a source population for Twin Peaks.
PAPA12
This PRPA lies along the lower portions of Rattlesnake Creek. It consists primarily of steep
slopes supporting coastal sage scrub and chaparral, with oak riparian forest along the creek.
The area was zoned for residential development by the County of San Diego before the City
of Poway was incorporated, and is subdivided into many small parcels (average
approximately one acre). While the potential build out analysis based on zoning and parcel
size indicates that the area could be largely developed, existing constraints due to slopes and
sensitive vegetation types make this highly unlikely. Many of the parcels will probably not be
developed and may be available at reasonable cost as additional biological open space within
the Mitigation Area.
PAPA 13a
This high priority PRPA contains the central swath of coastal sage scrub habitat connecting
north to south through Poway. Protecting this important core and linkage area is essential to the
Poway Subarea HCP. Habitat in this PRPA is predominantly coastal sage scrub on relatively
gentle slopes. It is known to support gnatcatchers, and is part of a larger area of contiguous
sage scrub. The precise boundaries of PRPA 13a could be adjusted based upon further study,
so long as the contiguity of sage scrub habitat is kept substantially intact and free of
development between the Blue Sky-Mount Woodson Cornerstone and the Sanrex property.
Under existing and proposed constraints on development, this area could be moderately to
heavily fragmented by rural residential housing. Parcels in this area should be targeted for
acquisition to protect this essential core and linkage habitat.
PAPA 13b
PRPA 13b includes two areas of predominantly sage scrub on either side and immediately
adjacent to PRPA 13a. These areas support a number of target species, including healthy
populations of gnatcatchers. Under existing development constraints, these areas could be
moderately to heavily fragmented by rural residential housing. They are medium priority areas
for acquisition to minimize detrimental effects of this potential fragmentation. Adding parcels in
PRPA 13b to the preserve system would buffer the essential north-south sage scrub linkage
(PRPA 13a) and add valuable core habitat. The western portion of this PRPA also connects
with the Rattlesnake Canyon Cornerstone to the west.
14
December 2, 2014 Item#'-\. f 17 of 25
PRPA14
PRPA 14 lies east of State Highway 67 at the base of Iron Mountain and steep slopes north of
Iron Mountain. It provides a buffer to the Iron Mountain and Rock Haven Cornerstones, adds a
band of coastal sage scrub bordering along already protected chaparral vegetation, and
provides an alternative north-south linkage for gnatcatchers to that defined by PRPA 13a.
Effectively, designating this area as a PRPA helps focus attention on clustering development
close to Highway 67, and away from the already protected areas, on several large parcels
lining the east side of the highway. Otherwise, the sage scrub in this area could become
moderately fragmented by scattered residential housing in the foothills bordering the
cornerstones.
PRPA15
PRPA 15 lies between the east side of Highway 67 and the Iron Mountain Cornerstone. It
supports predominantly coastal sage scrub habitat occupied by gnatcatchers. San Diego
horned lizards and slender-pod jewelflower have also been observed there. This PRPA is at
relatively low risk of fragmentation under existing and proposed development requirements.
Similar areas north and south of this PRPA are already highly fragmented by housing
development and agriculture, increasing the importance of this area to maintaining the linkage
between the high elevation chaparral habitats to the east and the lower, sage-scrub dominated
landscape to the west. Parcels in this area should be considered for acquisition to maintain an
unfragmented connection.
PRPA16
This PRPA contains a constrained coastal sage scrub linkage connecting the large open space
areas in the eastern portion of the Mitigation Area with those surrounding the South Poway
Planned Community. A narrow band of coastal sage scrub, constricted by existing development
and habitat disturbance, links larger areas east and west of the Sanrex property. This coastal
sage scrub linkage supports at least one sensitive plant species, slender-pod jewelflower. A
variety of sensitive species are found in the broader areas it connects, including San Diego barrel
cactus, San Diego horned lizard, and California gnatcatcher. Further development or habitat
disturbance in the area could sever this important linkage and wildlife movement corridor. Under
current development restrictions this area could be moderately to highly fragmented by rural
residential housing.
PRPA 17a
This area adjoins the South Poway Planned Community Cornerstone in an area already
constrained by adjacent development. It supports coastal sage scrub known to be occupied by
gnatcatchers and San Diego barrel cactus. This PRPA is part of a partially fragmented habitat
linkage north of the planned community. Parcels within the PRPA are zoned for RR-C, and
could be largely developed under this designation, further degrading the linkage. Parcels in this
area should be targeted for acquisition and restoration to help buffer the cornerstone and
preserve the function of the coastal sage scrub linkage.
18 of 25 15
December 2, 2014 Item# 4 · \
PRPA 17b
This portion of PRPA 17 supports similar resources and similar risks as PRPA 17a, but is more
removed from the existing cornerstone, is not known to support as many sensitive resources,
and may be more edge affected. Acquiring parcels in this area would add incrementally to the
existing resources in the preserve and help buffer the South Poway Cornerstone. However, it is
of lower priority than PRPA 17a for the above reasons.
PRPA18
This highly constrained and disturbed area is nevertheless important to overall preserve
function and thus of high priority. It represents a "weak link" in the highly fragmented and
constrained regional habitat linkage and wildlife movement corridor connecting through the
South Poway Cornerstone to Van Dam Peak and Los Penasquitos Canyon Preserve, west of
Poway. The northern half of this PRPA is an island of coastal sage scrub and chaparral that is
contiguous with a portion of the Public Review Draft MSCP proposed preserve area in the City
of San Diego. It is considered a "stepping stone linkage" connecting sage scrub habitat in the
South Poway Cornerstone and Van Dam Peak. The southern half of the PRPA supports oak
riparian woodland in County RCA 64. This habitat is currently highly disturbed by human
activities and a portion of it is currently being restored to mitigate for impacts of the Scripps
Poway Parkway Extension on wetlands and oaks. A mobile home park currently exists under
the canopy of the mature oak trees in the floodplain of Beeler Creek. Other residences lie on
either side of the riparian woodland, which also supports a small city Park. This riparian strip
once functioned as an important wildlife movement corridor. Its current utility is marginal at
best for deer, mountain lions, or other target species, due to human impacts. The City of
Poway is planning to relocate the mobile home park out of the flood plain of Beeler Creek. This
area should be protected and restored as soon as feasible.
PRPA19
This area occupies the eastern and southern flanks of Van Dam Peak and is adjacent to the
existing Van Dam Cornerstone. It supports mostly high quality sage scrub habitat that supports
numerous gnatcatchers as well as other target species. The area is currently at low to
moderate risk of fragmentation, but given the already somewhat isolated nature of Van Dam
Peak, any further fragmentation could be highly detrimental to the function of this core
gnatcatcher population, as well as to the regional linkage in this area. Parcels in PRPA 19
should be considered for acquisition to add to the existing cornerstone and help maintain the
"stepping stone linkage" with the South Poway Cornerstone.
PRPA20
PRPA 20 comprises that portion of the Sanrex property lying within the City of Poway. It forms
part of the broad biological core area that remains largely intact from southeastern Poway to
Sycamore Canyon County Park. The Sanrex property supports a high quality mosaic of
coastal sage scrub and chaparral and a wide variety of sensitive species. The property is
currently at relatively low risk of development due to existing land use, constraints (steep
slopes) and its management as a land mitigation bank. However, this biologically valuable
property is not 100% protected until the land is purchased for habitat preservation. This would
add a valuable cornerstone to the regional preserve system. Because of the high biological
value and availability of property in the PRPA, public acquisition within the Sanrex property is
encouraged by the Subarea HCP.
19 of 25
16
December 2, 2014 Item# 4.\
PRPA Priority2
1 Medium
2 Medium
3 Medium
4a High
4b Medium
5 Low
6 Medium
7 Low
8 High
9 Low
20 of 25
Table S-4
ACQUISITION PRIORITY RANKINGS FOR
PROPOSED RESOURCE PROTECTION AREAS 1
Preservation
Value 3 Risk 4 Comments
Medium Medium Although development could impact
portions of the area, the linkage
should remain functional.
Medium Medium Relatively flat coastal sage scrub,
moderate risk of fragmentation.
Medium High Relatively flat coastal sage scrub,
high risk of fragmentation.
High High Constrained sage scrub linkage;
target parcel(s) for purchase.
Medium Medium
Thompson Creek riparian; probably
degradation from adjoining
development.
Edge affected sage scrub and
Medium Low riparian. May buffer existing open
space preserves.
Coastal sage scrub and oak riparian
Medium Medium forest fragmented by avocado
orchard. Effectively widens the
Sycamore Creek corridor.
Medium Low
Constrained linkage and
movement corridor through
chaparral. Consider acquisition if
risk increases.
Highly constrained linkage;
High High target parcel(s) for purchase.
Edge affected. Would connect
Low High small, isolated easements to
cornerstone. Consider acquisition if
available.
17
December 2, 2014-Item# '-l ·'
PRPA Priority2
10 Medium
11 Medium
12 Medium
13a High
13b Medium
14 Medium
15 Medium
16 High
17a High
17b Medium
21 of 25
Table S-4 (Continued)
ACQUISITION PRIORITY RANKINGS FOR
PROPOSED RESOURCE PROTECTION AREAS 1
Preservation
Value 3 Risk 4 Comments
Medium Medium Scenic value in addition to
gnatcatcher habitat.
High Medium Important gnatcatcher habitat. At
moderate risk of fragmentation.
Medium Medium Many small parcels may not be
developable; consider opportunistic
purchases.
High High Very important sage scrub core and
linkage at high risk of fragmentation.
Target for acquisition.
Important sage scrub habitat at
Medium High periphery of essential linkage (lla).
High risk of fragmentation.
Alternative sage scrub linkage and
Medium Medium buffer to cornerstones. Some risk of
fragmentation.
Valuable connection from sage scrub
Medium Medium to Iron Mountain. linkage may be
fragmented but functional after
buildout.
Important linkage; consider
High High purchase to allow restoration
following construction of
Scripps Poway Parkway
extension.
Target for acquisition to widen
High High coastal sage scrub linkage.
Edge affected. Consider for
Medium High acquisition as buffer.
18 December 2, 2014 Item# L.\ • \
PRPA Prioritl
18 High
19 Medium
20 Low
Table S-4 (Continued)
ACQUISITION PRIORITY RANKINGS FOR
PROPOSED RESOURCE PROTECTION AREAS 1
Preservation
Value3
Risk4
High High
High Medium
High Medium
Comments
Restoration needed; part of
regional linkage/corridor.
Consider acquisitions to add to
existing cornerstone, maintain
linkages.
Part of regional core and linkage;
currently managed as a
habitat mitigation bank but
not 100% protected
1 These priority rankings were developed based on available information and are subject to revision as
new information warrants.
2 Priority for acquisition: High= target parcels for acquisition as essential portions of preserve; Medium
=study for acquisition opportunities as important additions to preserve; Low = consider parcels for
acquisition as opportunities are presented, but not at the expense of protecting higher priority
parcels.
3 Preservation Value: High = biological resources, including linkages or corridors, whose loss would
irreparably damage preserve design and could not be mitigated; Medium = biological resources
onsite are important to preserve design, but their loss may be partially mitigable elsewhere in the
preserve; Low= loss of biological resources onsite would not disrupt overall preserve function.
4 Risk of loss of onsite resources: High = existing zoning, ordinances, and guidelines are insufficient to
protect the onsite biological resources; Medium = existing zoning, ordinances and guidelines offer
partial protection to onsite resource values; Low = existing zoning, ordinances and guidelines
sufficiently protect onsite resource values.
7.7 HABITAT MITIGATION COMPENSATION "IN-LIEU" FEE PROCESS AND SCHEDULE
7. 7.1 Purpose and Intent
The purpose of the "in-lieu" fee is to provide an efficient and viable option for biological resource
impact mitigation. This option will promote the interim protection, permanent acquisition, and
preservation of critical resources within the Mitigation Area. It is intended that the in-lieu fee serve as
mitigation compensation for direct, indirect, and cumulative impacts, where the direct purchase of
habitat lands by a project proponent is determined by the City to be infeasible, on a project-by-project
22 of 25 19 December 2, 2014 Item# '1.1
basis. The in-lieu fee will be administered by the City through the established Resource Conservation
Area Acquisition Fund Account. The fee will include adequate funds to cover the long-term operation,
maintenance, and management costs of the HCP preserve system.
7.7.2 Project Qualifications for the In-Lieu Fee Option
Section 7.2 of the Implementing AgreemenVManagement Authorization and Section 7.5 of this HCP
describe the Compensation Mitigation and Mitigation Ratios to be applied throughout the duration of the
incremental implementation of the Agreement and the HCP. As described therein, the in-lieu fee option
may be considered after onsite/offsite and in-kind/out-of-kind mitigation measures have been fully
considered, to the satisfaction of the City.
7. 7.3 In-Lieu Fee Process
1. The City will accept and deposit such fees in the established fund account. As determined
by the Parties of the Agreement, the fee will satisfy the mitigation compensation
requirements of both planned public and private development projects located within the
City's jurisdiction, and also for such projects located in other jurisdictions.
2. Funds accepted and deposited in the account established for such purpose will be expended
by the City as soon as possible following the approval of project mitigation measures, but no
later than one year from the date of such approval unless extension of this period is mutually
agreed to by the wildlife agencies and the City of Poway. The City will use such funds to
acquire habitat lands within the Mitigation Area, with first priority given to habitat located in
high priority PAPAs.
3. Pursuant to established City policy, the City will contract the professional services of an
independent third party certified appraiser in connection with its purchase of private land for
public purposes. Habitat land purchase will be based on the prevailing fair-market value.
4. The habitat land acquisition will be of the general type and approximate quantity approved
under the mitigation measures for the specific development project. The actual acquisition by
the City shall be within the Mitigation Area and directed preferentially in PAPAs. Acquisitions
shall not be subject to the further review or approval of any other party of the Agreement. In
conjunction with acquisition, the City will execute a biological open space easement upon the
acquired habitat land. The easement document will be drafted to identify the USFWS and
CDFW as co-beneficiaries of such easement in perpetuity. On an annual basis, the City will
initiate a General Plan Amendment/Zone Change to redesignate the land use and zoning of
recorded easements to the Open Space-Resource Management designation, in order to
permanently protect and preserve the habitat within such recorded easements
23 of 25 20 December 2, 2014 Item# Lf • f
7.7.4 In-Lieu Fee Schedule
1. The in-lieu fee will apply only to non-wetland habitats. Impacts to wetlands, such
as vernal pools and other habitats subject to the no net loss goal, shall first be avoided to the
greatest extent possible. Unavoidable wetland impact compensation mitigation will consist of
the creation of wetland habitats or restoration of disturbed wetland habitats.
2. In-lieu mitigation fees shall be assessed in accordance with a fee schedule adopted
by the City Council.
3. The City will re-evaluate the in-lieu fee every two years and may consider adjustments based
on market land value and comparable sales of habitat mitigation land.
4. The City will direct the purchase and preservation of land within the Mitigation Area through
the use of mitigation fees which will be used for the following purposes:
24 of 25
• To purchase and hold preserve lands -State law allows Poway to hold and receive
property, purchase and sell property, receive gifts of property, reduce or eliminate tax
burdens on lands, and limit liability.
• Operate mitigation banks -The City or a selected land conservancy shall assemble or
purchase land to be used as a mitigation bank and broker trades of land and
agreements for public or private entities to receive mitigation credit in exchange for
purchase of lands in a mitigation bank. The mitigation banks will exist within the
Mitigation Area and preferably within PAPAs.
21 December 2, 2014 Item # L.\ .t
Subarea Habitat Conservation Plan/NCCP
MAP 3: PRESERVE DESIGN
-COmtlltD•e Utili t9Sitlll I:Q .. fltJtM(I)
25 of 25
Cchrr Flltltt,er,.....,..,tlly
Olonecl 0:411 S;a
1&~10 I:Q .. IItlti'4C!I
44 .... Sk:pu II :0.. ~liM d)
Ootn~mO.I!lde rP~ 80Un1rt
-0!\tte S(lf~l PCMtt 1'\y ~{ll".,adtll PW!s
Cllllnt~ ..,, O."lliJid
~lUI
Pmpatdq .. A...,.
Prultdbn mu WRPAl s,.,.,~ 10 N.m:tn
CJ DrlltiiSCP ~"b->ilb!al
PU•nn~MI•
N l.ld:;ldt~~ A1~ .. IIIIIIJY
5¥1 OOS;IUIX! JPA
BO•I\W)
N !I:I:QCII Co•t and Lra•lll""• (ao.,l)
1\Jili Pesdrrrliii'Mllln
BCU.!!~ ""urwd)
HitlUI 1011101 RCA,
0Jalde6Q.~ ~~P-1\-ta
-......... ..
~~ .............. ,
N~-_....,.,. ,, .....
N ---
_.__ -~
December 2, 2014 Item#"\·'
1 of 15
APPROVED D
APPROVED AS AMENDED D
City of Poway
COUNCIL AGENDA REPORT
(SEE MINUTES)
DENIED D
REMOVED D
CONTINUED ________ __
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
RESOLUTION NO. _____ _
December 2, 2014
Honorable Mayor and Members of the City Council
Honorable Chairman and Members of the Successor Agency
to the Poway Redevelopment Agency
Daniel Singer, City Manager/Executive Director ..8 ..d.
Scott Edwards, Director of Administrative Services
Peter Moote, Assistant Director of Administrative Service~~
Andrew White, Finance Manager()~
Approval of Agreement for Financial Advisor Services
The City and Successor Agency engage the services of a financial advisor to assist with
management of the City and Successor Agency debt, and the development of financing
alternatives for a variety of projects. It is recommended that the City Council authorize
the attached agreement (Attachment 1) with KNN Public Finance to serve as the City's
financial advisor.
Recommended Action:
Authorize the City Manager to enter into an agreement with KNN Public Finance for
financial advisor services.
Background:
Since 2010, the City, former Redevelopment Agency, and Successor Agency have
utilized the services of Magis Advisors to provide financial advisor services. The City's
procurement policy limits the terms of engagements for professional services to five
years or less, where practical. In August 2014, the City solicited proposals for financial
advisor services from qualified firms.
December 2, 2014 Item #4.2
2 of 15
Financial Advisor Services
December 2, 2014
Page 2
Services to be provided include:
• As-needed financial advice regarding market conditions and trends, financial
products, credit and credit analysis, third-party alternative financing, and special
facility financing.
• Review of the City's long-range financing strategy, particularly with respect to its
capital improvement program.
o Assist the City with potential refundings and new money issues, including but not
limited to, analyses and evaluations of underwriter proposals, financing structure,
pricing, rating and insurance proposals, reserve fund (re)investment, assistance
with preparation and review of related documents, and coordination of financing
team and schedules.
• Development of a Debt Policy establishing the principles, controls, and guidelines
for issuance and management of City debt.
• Participate in rating agency presentations.
• Assist with the preparation of a Request for Proposals and serve on an evaluation
committee for selection of underwriting firms for the City's potential refundings and
new money issues.
Findings:
Six qualified firms responded to the City's request for proposals for financial advisor
services. Based upon the short-listed proposals, the maximum projected fees for
services assuming a three-year engagement and three potential financings are shown
in the following table.
Financial Advisor Services
Proposed Cost for Three-Year Agreement with Three Financings (Maximum Projected)
..
· ·,.· 'N0N-TRANS:t\C"'fiO~~:«L 'TRAN~A,GTIQN}\l TOTAL F!~l\/1 !
' '
KNN Public Finance $ 22,500 $ 155,000 $ 177,500
Fieldman-Rolapp $ 21,750 $ 158,000 $ 179,750
PFM Advisors $ 24,375 $ 158,000 $ 182,375
First Southwest $ 26,625 $ 215,000 $ 241,625
In addition to evaluating the firms' proposals, the evaluation team conducted in-depth
interviews with principal staff of the four short-listed firms. With the evaluation process
completed, it is recommended that KNN Public Finance (KNN) be engaged as the City's
financial advisor.
December 2, 2014 Item #4.2
3 of 15
Financial Advisor Services
December 2, 2014
Page 3
In support of this selection, the California Debt and Investment Advisory Commission
recently reported that, for the months of January through June 2013, KNN ranked 1st in
the total dollar value of bond deals completed and 3rd in the number of completed bond
deals. For the months of January through June 2014, KNN Public Finance ranked 3rd
in the total dollar value of bond deals completed and 5th in the number of completed
bond deals. KNN's consistent high rankings indicate they have the prerequisite
experience as a financial advisor on all sizes of bond issuances.
Mark Young and David Brodsly, Managing Directors, along with Assistant Vice
President Sujay Umashankar, would serve as the principal staff assigned to Poway.
Together, this group would bring extensive experience to the City's finance team,
particularly in the areas of expertise applicable to the City's financial program needs
over the immediate and near term.
The City anticipates using KNN's proposed fixed-fee schedule for most transactional
services, including new bond issues and refundings, as specified in Attachment 2 (from
the firm's proposal). Use of fixed-fee structures for the City's prior transactions has
proven to be cost-effective, and services are paid as part of the costs of issuance. Fees
for non-transactional work are to be quoted on a task-specific basis using the proposed
fee schedule, to include assistance with ongoing bond disclosure reporting and long-
term financial planning. KNN has agreed to include development of the City's debt
policy should the City proceed as anticipated with the refunding of eligible Successor
Agency debt in the first year of engagement.
Fiscal Impact:
Under the agreement, fees for transactional services are paid as part of the costs of
issuance. Non-transactional work and policy development will be funded on an as-
needed basis, using task-specific quotes.
Environmental Review:
This item is not subject to CEQA review.
Public Notification:
KNN Public Finance has been notified of this report.
Attachments:
1. Agreement with KNN Public Finance, Inc. for Financial Advisor Services
2. Fee Schedule from Proposal (full proposal available in the City Clerk's
Office)
December 2, 2014 Item #4.2
4 of 15
City of Poway
AGREEMENT FOR CONSULTANT
SERVICES
This Agreement, entered into this 3rd day of December, 2014 by and between the
CITY OF POWAY (hereinafter referred to as "City") and KNN Public Finance, Inc.
(hereinafter referred to as "Consultant").
RECITALS
WHEREAS, City desires to obtain the services of a private consultant to perform
Financial Advisor Services; and
WHEREAS, Consultant is a Financial Advisor and has represented that
Consultant possesses the necessary qualifications to provide such services; and
WHEREAS, City has authorized the preparation of an agreement to retain the
services of Consultant as hereinafter set forth.
NOW, THEREFORE, IT IS MUTUALLY AGREED THAT CITY DOES HEREBY
RETAIN CONSULTANT ON THE FOLLOWING TERMS AND CONDITIONS:
1. Scope of Services.
Consultant shall provide services as described in Exhibit "A" entitled
"Special Provisions" attached hereto and made a part hereof.
2. Compensation and Reimbursement.
City shall compensate and reimburse Consultant as provided in Exhibit "A"
entitled "Special Provisions" attached hereto and made a part hereof.
3. Term of Agreement.
The term of this Agreement shall be as described on Exhibit "A" entitled
"Special Provisions" attached hereto and made a part hereof.
4. Termination.
This Agreement may be terminated with or without cause by City.
Termination without cause shall be effective only upon 60-day written notice to
Consultant. During said 60-day period Consultant shall perform all consulting services
in accordance with this Agreement. This Agreement may be terminated by City for
cause in the event of a material breach of this Agreement, misrepresentation by
Consultant in connection with the formation of this Agreement or the performance of
services, or the failure to perform services as directed by City. Termination for cause
shall be effected by delivery of written notice of termination to Consultant. Such
termination shall be effective upon delivery of said notice.
Attachment 1 December 2, 2014 Item #4.2
5 of 15
Financial Advisor Services Agreement
Page 12
5. Confidential Relationship.
City may from time to time communicate to Consultant certain information
to enable Consultant to effectively perform the services. Consultant shall treat all such
information as confidential, whether or not so identified, and shall not disclose any part
thereof without the prior written consent of the City. Consultant shall limit the use and
circulation of such information, even within its own organization, to the extent necessary
to perform the services. The foregoing obligation of this Paragraph 5, however, shall
not apply to any part of the information that (i) has been disclosed in publicly available
sources of information; (ii) is, through no fault of Consultant, hereafter disclosed in
publicly available sources of information; (iii) is now in the possession of Consultant
without any obligation of confidentiality; or (iv) has been or is hereafter rightfully
disclosed to Consultant by a third party, but only to the extent that the use or disclosure
thereof has been or is rightfully authorized by that third party.
Consultant shall not disclose any reports, recommendations, conclusions
or other results of the services or the existence of the subject matter of this contract
without the prior written consent of the City. In its performance hereunder, Consultant
shall comply with all legal obligations it may now or hereafter have respecting the
information or other property of any other person, firm or corporation.
6. Office Space and Clerical Support.
Consultant shall provide its own office space and clerical support at its
sole cost and expense.
7. Covenant Against Contingent Fees.
Consultant declares that it has not employed or retained any company or
person, other than a bona fide employee working for Consultant, to solicit or secure this
Agreement, that it has not paid or agreed to pay any company or person, other than a
bona fide employee, any fee, commission, percentage, brokerage fee, gift or any other
consideration, contingent upon or resulting from the award or making of the Agreement.
For breach of violation of this warranty, City shall have the right to annul this Agreement
without liability, or, at its sole discretion, to deduct from the Agreement price or
consideration, or otherwise recover the full amount of such fee, commission,
percentage, brokerage fee, gift or contingent fee.
8. Ownership of Documents.
·All memoranda, reports, plans, specifications, maps and other documents
prepared or obtained under the terms of this Agreement shall be the property of City
and shall be delivered to City by Consultant upon demand.
Attachment 1 December 2, 2014 Item #4.2
6 of 15
Financial Advisor Services Agreement
Page 13
9. Conflict of Interest and Political Reform Act Obligations.
During the term of this Agreement Consultant shall not act as consultant
or perform services of any kind for any person or entity whose interests conflict in any
way with those of the City of Poway. Consultant shall at all times comply with the terms
of the Political Reform Act and the local conflict of interest ordinance. Consultant shall
immediately disqualify itself and shall not use its official position to influence in any way
any matter coming before the City in which the Consultant has a financial interest as
defined in Government Code Section 87103. Consultant represents that it has no
knowledge of any financial interests which would require it to disqualify itself from any
matter on which it might perform services for the City.
"Consultant" means an individual who, pursuant to a contract with a state
or local agency:
(A) Makes a governmental decision whether to:
1. Approve a rate, rule or regulation;
2. Adopt or enforce a law;
3. Issue, deny, suspend, or revoke any permit, license,
application, certificate, approval, order, or similar
authorization or entitlement;
4. Authorize the City to enter into, modify, or renew a contract
provided it is the type of contract that requires City approval;
5. Grant City approval to a contract that requires City approval
and to which the City is a party, or to the specifications for
such a contract;
6. Grant City approval to a plan, design, report, study, or similar
item;
7. Adopt, or grant City approval of, policies, standards, or
guidelines for the City, or for any subdivision thereof; or
(B) Serves in a staff capacity with the City and in that capacity participates in
making a governmental decision as defined in Regulation 18702.2 or
performs the same or substantially all the same duties for the City that
would otherwise be performed by an individual holding a position specified
in the City's Conflict of Interest Code.
Attachment 1 December 2, 2014 Item #4.2
7 of 15
Financial Advisor Services Agreement
Page 14
DISCLOSURE DETERMINATION:
D 1.
D 2.
ConsultanUContractor will not be "making a government decision"
or "serving in a staff capacity" as defined in Sections A and B
above.
No disclosure required.
ConsultanUContractor will be "making a government decision" or
"serving in a staff capacity" as defined in Sections A and B above.
As a result, ConsultanUContractor shall be required to file a
Statement of Economic Interest with the City Clerk of the City of
Poway in a timely manner as required by law.
DEPARTMENT DIRECTOR
10. No Assignments.
Neither any part nor all of this Agreement may be assigned or
subcontracted, except as otherwise specifically provided herein, or to which City, in its
sole discretion, consents to in advance thereof in writing. Any assignment or
subcontracting in violation of this provision shall be void.
11. Maintenance of Records.
Consultant shall maintain all books, documents, papers, employee time
sheets, accounting records, and other evidence pertaining to costs incurred and shall
make such materials available at its office at all reasonable times during the contract
period and for three (3) years from the date of final payment under this Agreement, for
inspection by City and copies thereof shall be furnished, if requested.
12. Independent Contractor.
At all times during the term of this Agreement, Consultant shall be an
independent contractor and shall not be an employee of the City of Poway. City shall
have the right to control Consultant only insofar as the results of Consultant's services
rendered pursuant to this Agreement; however, City shall not have the right to control
the means by which Consultant accomplishes such services.
13. Licenses, Permits, Etc.
Consultant represents and declares to City that it has all licenses, permits,
qualifications, and approvals of whatever nature that are legally required to practice its
profession. Consultant represents and warrants to City that Consultant shall, at its sole
cost and expense, keep in effect at all times during the term of this Agreement, any
license, permit, or approval which is legally required for Consultant to practice its
profession.
Attachment 1 December 2, 2014 Item #4.2
8 of 15
Financial Advisor Services Agreement
Page 15
14. Consultant's Insurance.
Consultant shall provide insurance as set forth in Exhibit "A" entitled
"Special Provisions" attached hereto and made a part hereof.
15. Liability.
Notwithstanding any other prov1s1on contained in this Agreement,
Consultant shall be responsible for all injuries to persons and for all damage to real or
personal property of City or others, caused by or resulting from the wrongful act or
negligent acts, errors, or omissions of itself, its employees, or its agents during the
progress of, or in connection with, the rendition of services hereunder. Consultant shall
hold harmless and indemnify City, and all officers and employees of City from ail costs
and claims for damages to real or personal property, or personal injury to any third
party, including reasonable attorney fees resulting from the negligent performance of
Consultant, its employees, or its agents, under this Agreement.
16. Consultant Not an Agent.
Except as City may specify in writing, Consultant shall have no authority,
expressed or implied, to act on behalf of City in any capacity whatsoever as an agent.
Consultant shall have no authority, expressed or implied, pursuant to this Agreement to
bind City to any obligation whatsoever.
17. Personnel.
Consultant shall assign qualified and certified personnel to perform
requested services. The City shall have the right to review and disapprove personnel
for assignment to Poway projects.
City shall have the unrestricted right to order the removal of any person(s)
assigned by Consultant by giving oral or written notice to Consultant to such effect.
Consultant's personnel shall at all times comply with City's drug and
alcohol policies then in effect.
18. Notices.
Notices shall be given as described on Exhibit "A" entitled "Special
Provisions" attached hereto and made a part hereof.
Attachment 1 December 2, 2014 Item #4.2
9 of 15
Financial Advisor Services Agreement
Page 16
19. Arbitration.
In the event of a dispute between City and Consultant concerning the
terms of this Agreement or its performance, the parties agree to submit such dispute to
arbitration before the American Arbitration Association or other mutually acceptable
arbitrator. In the event that the subject of such arbitration is compensation claimed by
Consultant in the event of termination, Consultant's damages shall be limited to
compensation for the 60-day period for which Consultant would have been entitled to
receive compensation if terminated without cause. In the event of arbitration, each
party shall bear its own attorneys' fees and costs incurred.
20. Gender.
Whether referred to in the masculine, feminine, or as "it," "Consultant"
shall mean the individual or corporate consultant and any and all employees of
consultant providing services hereunder.
21. Counterparts.
This Agreement (and any amendments) may be executed in multiple
counterparts, each of which shall be deemed an original, but all of which, together, shall
constitute one and the same instrument. Documents delivered by telephonic facsimile
transmission shall be valid and binding.
22. Entire Agreement.
This Agreement shall constitute the entire understanding between
Consultant and City relating to the terms and conditions of the services to be performed
by Consultant.
23. Pension Reform Act of 2013
At all times during the term of the Agreement with the City, no officer,
director, shareholder, member, partner, employee, or contractor, providing services to
the City, will be a "retired annuitant," under the City's retirement system, ineligible for
temporary employment under section 7522.56 of the California Government Code,
which was added as a part of the Pension Reform Act of 2013. For the purposes of this
statement a "retired annuitant" is a person retired from the California Public Employees'
Retirement System ("CaiPERS"). Any retired annuitant proposed to provide work on
behalf of the City must be eligible for appointment under the Pension Reform Act of
2013, and any other applicable laws, without any adverse financial impact to the City.
Attachment 1 December 2, 2014 Item #4.2
10 of 15
Financial Advisor Services Agreement
Page 17
IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement
on the date first above written.
City of Poway Consultant
Approved as to form: Company Name: KNN Public Finance, Inc.
Office of the City Attorney
Dated: Dated: --------------------------------------------
By: ____________________ _ By: ________________________ __
Its: Morgan Foley, City Attorney Its: ----------------------------
Dated: -------------------
By: ___________ _
Its: Daniel Singer, City Manager
Attachment 1 December 2, 2014 Item #4.2
Financial Advisor Services Agreement
Page 18
"SPECIAL PROVISIONS"
EXHIBIT "A"
A. Scope of Services.
Consultant agrees to perform consulting services as required by City, and
shall provide the necessary qualified personnel to perform the services as described in
Consultant's Proposal for Financial Advisor Services dated August 25, 2014, attached
to this agreement and made a part of herein.
B. Compensation and Reimbursement.
City shall pay Consultant as enumerated in Consultant's Proposal for
Financial Advisor Services dated August 25, 2014. Consultant's fee shall include and
Consultant shall be responsible for the payment of all federal, state, and local taxes of
any kind which are attributable to the compensation received.
In addition to said consulting fee, Consultant shall be reimbursed for all
reasonable expenses, including lodging, telephone, and travel (air, auto, rail)
necessarily incurred in performance of the services. Consultant shall bill City for such
expenses as incurred, referencing this Agreement. All expenses shall be itemized and
supported by receipts for amounts in excess of Twenty-Five Dollars ($25.00).
Statements for reimbursement of expenses shall be paid within ten (1 0) days of
approval by City. All air travel shall be billed at coach or special fare rates. Only
lodging outside San Diego County shall be reimbursable. Consultant shall receive prior
authorization for air travel and lodging expenses. All other expenses shall be
reimbursed in accordance with City's cash disbursement policies in effect at the time
incurred.
C. Term of Agreement.
This Agreement shall be effective from the period commencing December
3, 2014 and remain in effect until terminated as provided in the section of this
Agreement entitled "Termination." Upon expiration or termination of this Agreement,
Consultant shall return to City any and all equipment, documents or materials and all
copies made thereof which Consultant received from City or produced for City for the
purpo~es of this Agreement.
11 of 15 Attachment 1 December 2, 2014 Item #4.2
Financial Advisor Services Agreement
Page 19
D. Consultant's Insurance.
1 . Coverages:
Consultant shall obtain and maintain during the life of this Agreement all of
the following insurance coverages:
(a). Comprehensive General Liability, including premises-operations,
products/completed, broad form property damage, and blanket contractual liability with
the following coverages:
General Liability: $500,000 per person per occurrence/ .......... $1,000,000 aggregate
per occurrence/$500,000 property damage per occurrence
(b) Automobile Liability, including owned, hired, and non-owned vehicles with the
following insurance coverages:
Auto Liability: $ 500,000 per person per occurrence/ ............. $1,000,000 aggregate
per occurrence/$1 00,000 property damage per occurrence
(c) Consultant shall obtain and maintain, during the life of the Agreement, a policy
of Professional Errors and Omissions Liability Insurance with policy limits of not less
than $1,000,000.00 combined single limits, per claim and annual aggregate.
(d) Workers' Compensation insurance in statutory amount. All of the
endorsements which are required above shall be obtained for the policy of Workers'
Compensation insurance.
2. Endorsements:
Endorsements shall be obtained so that each policy contains the following three
provisions:
(a) Additional Insured. (Not required for Professional Errors and Omissions
Liability Insurance or Workers' Compensation.)
"City of Poway and its elected and appointed boards, officers, agents, and
employees are additional insureds with respect to this subject project and contract with
City."
(b) Notice.
"Said policy shall not terminate, nor shall it be canceled, until thirty (30) days after
written notice is given to City."
12 of 15 Attachment 1 December 2, 2014 Item #4.2
Financial Advisor Services Agreement
Page 110
(c) Primary Coverage.
"The policy provides primary coverage to City and its elected and appointed boards,
officers, agents, and employees. It is not secondary or in any way subordinate to any
other insurance or coverage maintained by City."
3. Insurance Certificates:
Consultant shall provide City certificates of insurance showing the insurance
coverages described in the paragraphs above, in a form and content approved by City,
prior to beginning work under this Agreement.
E. Notices.
All notices, billings and payments hereunder shall be in writing and sent to
the following addresses:
To City:
13 of 15
Scott Edwards
Director of Administrative Services
City of Poway
13325 Civic Center Drive
P.O. Box 789
Poway, CA 92074
To Consultant:
Mark Young
KNN Public Finance
5757 W. Century Blvd., Suite 700
Los Angeles, CA 90045
Attachment 1 December 2, 2014 Item #4.2
r 1
i !
:._ j
f 1
l j
r l
: I l J
n I ,
, I
L J
r 1
l J
! 1
L J
r,
l ~
I
l J
r:
L J
L j
r' . I
l J
~· 1
!
I J
l J
I .
I
I l j
, I
Ll
i .. .J
14 of 15
Neither KNN nor any members of the firm have been the subject of a SEC, FINRA, MSRB, federal,
state or local government inquiry or investigation associated with the sale, purchase, marketing or other
activities related to the securities industry.
Neither KNN nor any members of the firm are subject to any threatened or pending litigation or
sanctions, nor have they been during the past five years.
l(. Cost Proposal and Reimbursement for "Out-of-
Pocket" Expenses
Presmt a t"Ottcise list qf the scope ofsenlices and the nJ()rk products that your firm proposes to provide. Givm_yottr
proposed scope of.ren-ices and IJIOrk prod11cts, disam_your proposed fee atrangement based Otl ea.iJ ofthejollmving
alternatives:
a. Compensation on a jixed annual cost, payable month!J.
b. Cottpcnsatiotl on a time and expense basis, JJ'ith a list qfhour!y btJiin._e, rates for the proposed personnel and a'!)'
propo.·ed inmases in sNch rates during the term if the cotttract, and tbe rype.s of reitnb11rsable expenses u#h pmposed
charges.
c. Cotnpensation on ajilify contingent /JasiJfor specific financing isme.r.
Fees will be suiject to atfjttstment based f.fpon assignment by the Director if AdministratitJe Semicu of more than one
firm to a single project. Expenses Sitch as trave4 postage, reprod11ction and related costs tte.-essari!J incJtrred as
Financial Advisor are to be riflet:ted i11 item K 1 Cost Proposal STich e.:'<j;enses JJ'ill not be eligible for reimbursement
11nless othemJjse determined I?J the Director if Ad111inistrative S en.ices and approved bJ' the Ciry in adt'ant'e.
Atry t:osts incumd by Financial AdPi.ror which are not specificalfy provided for herein shall be the e:J<.jlense c!f
Financial Advisor. Af!Y 011tissions or ambi,gttities will he constmed ntost jai.'Orab/e to the Ci(JI·
A concise list of the scope of services and work products can be found in "Financial Advisory
Services Provided" within Section D starting on page 5.
a. Compensation on a fixed annual cost, payable monthly.
Because the specific needs of the City are not clear to us, it is difficult to propose a specific fixed cost
proposal. We recommend that you view any such proposal as indicative, and a starting point in
discussions. We are confident that, should the City desire a retainer-based program, that we would
reach a mutually agreeable arrangement.
If the City desired to pay a retainer for the issuance of one financing, financing planning, policy, and
other non-transaction services, we would recommend an annual fee of$70,000.
b. Compensation on a time and expense basis.
The following represent our standard hourly charges. We would be willing to negotiate not to exceed
limits on specific assignments. We would propose annual escalation of fees by 3% a year. Our
reimbursable expenses would be limited to third-party expenses such as conference call charges. We
Attachment 2 December 2, 2014 Item #4.2
f"1 ; .
t. J
ll
t ~
r 1 I j
n
I :
l J
11
! !
• I L J
r 1
' I i.. j
11 , I
LJ
r 1 ! .,
! 1
l j
r ·r
L J
l;
r'
i i
u
( .
l_j
i
i .J
15 of 15
would not anticipate being reimbursed for in-state travel We do charge a $550 per transaction expense
charge to reimburse us for Bloomberg and TM3 information services.
Hourly Rates
Title Hourly Fee
Managing Director $345
Vice President $300
AVP/Senior Associate $275
Associate $245
Analyst $200
We have flexibility in our fee schedule, and stand ready to negotiate whatever reasonable compensation
approach and amounts the Gty deems appropriate.
c. Compensation on a fully contingent basis for specific fmancing issues:
The specific fees would be negotiated based on the complexity of the transaction and the length of time
from initiation to dosing.
L.
Fixed Fees
Issuance Type Fixed Fee
General Obligation $40,000
Enterprise Revenue Bonds $45,000
Certificates of Participation/Lease Revenue $50,000
Bonds ·
Refunding Tax Allocation Bonds $60,000
Special Assessment Bonds $70,000
Mello-Roos Bonds $80,000
Potential Conflict of Interest
You sbo111d advise the Ciry ofat!Y potential conflict knon1t1 ~y_yottr firm and dimm bon', if sekcted,_Your jim; Jl'Ould
address Clf!Y conce-ms raised b_;• st1ch potential tmiflict.
We are aware of no conflicts of interests in representing the City of Poway as Financial Advisor. KNN
serves exclusively as a financial advisor, and neither it nor its parent would underwrite the City of
Poway's obligations. To monitor potential conflicts with new clients, we rely on an institutional
framework of strong governance and peer review practices. We have succeeded at creating a business
Attachment 2 December 2, 2014 Item #4.2
1 of 7
City of Poway
COUNCil AGENDA REPORT
APPROVED D
APPROVED AS AMENDED 0
(SEE MINUTES)
DENIED D
REMOVED D
DATE:
TO:
FROM:
INITIATED BY:
SUBJECT:
Summary:
CONTINUED ____ _
December 2, 2014 Resolution No.
Honorable Mayor and Members of the City Council
Daniel Singer, City Manager~lf)
Scott Edwards, Director of Administrative Services
Peter Moote, Assistant Director of Administrative Service~b\_
Recommendations for Water and Sewer Rate Adjustments
This report presents recommended changes to the City's water and sewer rates and charges
that would take effect in March 2015. Rate changes per Council's direction this evening would
be adopted under the provisions of Article XIIID Section 6 of the California Constitution,
commonly known as "Proposition 218". The proposed timeline for this process is as follows:
December 2, 2014
December 16, 2014
February 17, 2015
March 3, 2015
March 4, 2015
May 201
Rate Workshop
Prop 218 Public Hearing Notice sent to rate payers
Public Hearing on rates and first reading of the ordinance
Second reading of the ordinance
New rates in effect
First mailing of bills reflecting new rates
The proposed water rates would recover increases to the raw water rate and fixed charges
adopted by the San Diego County Water Authority in effect January 2015, as well as cover a
portion of the City's increased commitment to water capital improvement projects. The
proposed sewer rates would reduce the annual operating shortfall for sewer utilities operations.
Recommended Action:
In order to recover pass-through costs, continue proper maintenance of the water and sewer
systems, meet regulatory requirements, and fund necessary capital projects, it is
recommended the City Council authorize:
1. Increasing the water commodity rate by 7.75%, and increasing the fixed meter charge by
8.75%;
2. Increasing the sewer use rate by 7.50%, and increasing the fixed sewer service charge by
8.75%.
Combined, the proposed increases total $8.22 a month for a customer with median water use
(30 units) with tl)e most common residential meter size (3/4-inch), and assigned to the most
common sewer tier (2). With Council authorization, the City will proceed with the Prop 218
process to implement the recommended rate changes, effective in March 2015.
December 2, 2014 Item #5.1
2 of?
Recommendations for Changes to Water and Sewer Rates
December 2, 2014
Page 2
Water Rates
Background:
Due to limited local resources, the City buys nearly 100% of its water supply from the San
Diego County Water Authority (CWA). Rate increases adopted by the Metropolitan Water
District (MWD) are passed on to the CWA, and ultimately to CWA member agencies, including
Poway.
The last increase to the City's water rates was in January 2013, when both the service (fixed
meter) charge and volumetric commodity charges were increased by 3.5%. Increases to the
cost of water and CWA charges at that time were 7.2%, resulting in the City absorbing a
substantial portion of the higher pass-through costs. Since that time, the cost of raw water and
CWA charges were increased again by approximately 2.5% in January 2014, and CWA
increases taking effect January 2015 will result in an additional estimated increase of 7% for
Poway.
The single largest driver of the January 2015 CWA increase is the recovery of costs for the
Carlsbad desalination plant. The cost of improvements for this regional water resource (and its
ongoing operation) is projected to increase the region's overall water supply costs by 10%-
12%. The CWA's rate plan anticipates spreading recovery of the higher supply cost through
future rates.
The City's FY 2014-15 Adopted Budget for water supply, operations, maintenance and
administration is $22.98 million. Roughly 65% of this cost is made up of water supply
purchases and other pass-through charges from the CWA. The remaining 35% represents the
City's cost for operations, maintenance, and administration. Revenue collected by the City
from water fees and charges is used exclusively to operate, administer, maintain, and
rehabilitate the water system.
Cost reduction measures implemented by the City between 2007 and 2012, primarily in
response to the economic downturn, have resulted in reduced costs across all operations,
including water and sewer utilities. The most significant of these measures includes reduction
of the City workforce and the early application of pension reform.
Facts and recent trends for water consumption are as follows:
• The City's water customer base is comprised of 14,129 service connections;
single-family residential customers represent about 89% of the customer base.
• Despite moderate increases since 2011-12, overall consumption for FY 2013-14 is
still18% below peak use in 2007-08.
e Median household bimonthly use declined from 36 units in 2007-08 to 30 units in
2013-14.
o An average of 145 customers (residential) per bi-monthly billing period reached
the second rate block (200 units or more).
December 2, 2014 Item #5.1
3 of?
Recommendations for Changes to Water and Sewer Rates
December 2, 2014
Page 3
Further, the City declared a Level 2 Water Shortage Alert in August, restricting outdoor
watering. Anticipating that water supply challenges will continue, and that the region may
experience an allocation (reduced deliveries), the rates presented for Council consideration
assume a 6% decrease in consumption from 2013-2014.
Water Rates
Findings:
Based on the cost recovery of water purchases and operating costs, it is recommended that
the water commodity rate be increased by 7.75%. The City's water service charge is
recommended to increase by 8. 75%. The proposed rate increases would take effect in March
2015.
As discussed in the background section of this report, the City's current rates for service and
commodity reflect the City's absorption of increases in the cost of water in effect since January
2013. After taking into account all revenue used for recovery of operating expenditures and
contributions toward water system capital improvements in FY 2013-14, a $321,000 reduction
in the Water Operating Fund resulted.
Going forward, increases similar to those proposed for March 2015 may be necessary for 2016
and 2017 in order to maintain an appropriate level of Water Fund reserve, and to provide for
needed rehabilitation of the City's aging water system. Preliminary results of the updated
water master plan indicate that the annual contribution necessary to fund system rehabilitation
projects should be increased from the current $850,000 annual investment to approximately
$1.7 million for the foreseeable future. Staff will bring the final Water Master Plan to Council
upon its completion. It should be noted that staff continues to actively look for ways to reduce
the City's capital costs while still protecting infrastructure. ·
The Water Operating Fund balance at FY 2013-14 year end is $4.38 million. When combined
with the $294,119 balance in the Water Improvement Fund (AB 1600 Development Fees),
balances are in-line with the City's financial policy goal of maintaining 20% of annual operating
requirements in reserve.
The City's rate structure continues to support water conservation; acknowledging small water
users via our ratio of fixed (i.e., service charges) to variable (i.e., commodity charges) revenue.
The City currently receives approximately 13% of its water revenue through fixed charges. In
order to reduce rate volatility caused by unpredictable (due to weather) year-to-year
consumption while moving the City closer to full recovery of the fixed costs assessed by the
CWA, staff recommends that the City incrementally increase its revenue received from fixed
charges to 20% of total revenue. Doing so will require annual increases in service charges
that exceed annual cost-indexes as well as annual CWA fixed charge increases. While the
percentage of revenue received from fixed charges will increase to 20% over time, revenue
from variable charges will be adjusted to achieve overall revenue that is projected to meet, not
exceed, the amount necessary to recover operating and system maintenance costs.
Additionally, with fixed charges at 20% of total water revenue, the City's ratio would remain
well below the 30% industry-recommended standard for water conservation purposes.
December 2, 2014 Item #5.1
4of7
Recommendations for Changes to Water and Sewer Rates
December 2 , 2014
Page4
If adopted , the rate increases would be in effect March 2015 , and would be reflected on
customer bills beginning May 2015 , as shown in the following tables. The increase to water
rates and charges for a single-family residential customer with median water use (30 units bi-
monthly) and the most common res idential meter size (3/4-inch) would be $5.92 per month .
Current and Proposed Fixed Water Meter Charges
(All Customer Classes)
Meter S1ze
I
Current Ct1a1ge
I
Proposed C t1a1 ge
( blrllOilltlly) (blrllOtlthlyi
5/8", 3/4", 1" Fire $28.98 $31 .52
1" $48.30 $52 .53
1-1 /2" $96 .60 $105 .05
2" $154 .56 $168.08
3" $289.80 $315 .16
4" $483.00 $525.26
6 " $966 .00 $1 ,050.53
8" $1 ,545 .59 $1 ,680 .83
Current and Proposed Water Commodity Rates
(1 unit= 748 gallons)
I
Cu1rent
I
Proposed
81fllOilthly Rate per un1t Rate per un 1t consumpt1on
Single Family Block 1 0-199 un its $3 .96 $4 .27
------------------------------------------------------------------------------Residential Block 2 200+ units $5 .65 $6 .09
Multi Famil y & Uniform $4 .04 $4 .35 Non-Residential
In addition to recovering CWA pass-through costs , the proposed rate increases are necessary
to continue proper maintenance of our aging water system; meet all state and federal
regulations and requirements; fund necessary capital projects ; and continue to provide the
best quality service to our customers. The proposed rate changes are expected to result in
recovery of day-to-day operating costs . However, because of the need for increased capital
reinvestment , staff expects a $776 ,000 reduction in the Water Operating Fund balance at fLScal
yearend after allocating funds for system rehabilitation projects.
December 2, 2014 Item #5.1
5 of?
Recommendations for Changes to Water and Sewer Rates
December 2, 2014
Page 5
Sewer Rates
Background:
Wastewater generated in Poway is collected by the City's sewer system and conveyed to the
City of San Diego Metropolitan Wastewater System (Metro), where it is treated and ultimately
discharged to the Pacific Ocean. Approximately 54% of the City's costs for providing sewer
services are pass-through costs from Metro and other component systems relied on for
sewage transport, treatment and discharge.
The City's FY 2014-15 Adopted Budget for sewer treatment, operations, maintenance and
administration is $8.59 million. Revenue collected by the City from sewer fees and charges is
used exclusively to operate, administer, maintain, and rehabilitate the sewer system. Between
2011 and 2012, the City Council reduced sewer commodity charges by 20% followed by no
rate changes in 2013. A modest 2% increase to the sewer fixed service charges and
commodity charges was adopted for 2014 as the first step toward once again achieving full
recovery of sewer operating costs. Combined, these actions have resulted in a reduction in
the Sewer Fund balance over time, as reserves have supported operations and allowed
absorption of increased Metro pass-through charges.
As cited in the water rates background section of this report, cost reduction measures
implemented between 2007 and 2012 have resulted in reduced costs across all operations,
including sewer utilities. The most significant of these measures includes reduction of the City
workforce and the early application of pension reform.
Sewer Rates
Findings:
Sewer rates for single-family residential customers are based on a percentage of winter water
use. In the first full billing cycle after January of each year, residential customers are assigned
to one of seven bimonthly tiers based upon their lowest winter water consumption averaged
over the prior three years. Commercial and other non-residential customers pay sewer
charges based on their water consumption for that billing period. All customers also pay a
fixed bimonthly sewer service charge based on water meter size and customer classification to
recover the City's costs for system capacity, billing, and administrative overhead.
In order to continue the gradual climb to full recovery of sewer operating costs and increased
Metro pass-through costs, it is recommended that the sewer use (commodity) rate be
increased by 7.5%. It is also recommended that the City's sewer service charge increase by
8.75%. The proposed rate increases would take effect in March 2015.
The proposed increases, followed by similar increases through 2020, would result in the
continued use of Sewer Fund balance to cover a portion of operating costs. At that time, the
Sewer Fund balance is projected to remain sufficient, after absorbing the City's share of
increased capital and operating costs associated with the region's planned Pure Water/sewer
outflow reduction program.
December 2, 2014 Item #5.1
6 of7
Recommendations for Changes to Water and Sewer Rates
December 2 , 2014
Page6
If adopted , the rate increases would be in effect March 2015 , and would be reflected on
customer bills beginning May 2015 , as shown in the following tables.
Residential Bimonthly Sewer Rates
Current and Proposed
Non-Residential Sewer Rates
Current and Proposed
Use (Commodity) Charges
(Non-Res1dent1al by Customer Type)
Type of 01scharg~-~----Curre~~--f Proposed
• -. • -. -. •
•
• •
• .
Churches , Schools ,
Multi-family , Mobile
Home
$3.22 $3.46
$3.22 $3 .46
December 2, 2014 Item #5 .1
7 of7
Recommendations for Changes to Water and Sewer Rates
December 2 , 2014
Page?
In addition to recovering Metro pass-through costs , the proposed rate increases are necessary
to continue proper maintenance of our aging sewer system ; fund necessary capital projects ;
and continue to provide the best quality service to our customers .
Combined Water and Sewer Rates :
The combined proposed water and sewer rate increases for a single-family residential
customer with median water use (30 units), the most common residential meter size (3/4-inch),
and most common sewer tier (2), would be $8 .22 per month .
Single Family Residential Customer
Combined Water and Sewer Bill
(Median Use 30 Units, Most Common 3/4-inch Meter, Tier 2)
Fiscal Impact:
There is no fiscal impact from this workshop . If the proposed rates are adopted following a
Prop 218 hearing, water revenues are expected to be sufficient to meet operating
expenditures . However, after allocating for system rehabilitation projects , staff expects that the
City will need to use $776 ,000 of Water Fund balance for FY 2014-15. Sewer revenues are
expected to be supported by $331 ,000 from the Sewer Fund balance to meet operational and
system rehabilitation needs in FY 2014-15.
Environmental Review:
This item is not subject to CEQA review .
Public Notification:
None
December 2, 2014 Item #5.1
Item 6.1
Hike, Bike and Ride across Poway
Item 6.2
Water Saving Tips (verbal" report).