Loading...
Res 15-036RESOLUTION NO. 15 -036 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA, CONSIDERING THE FINAL MITIGATED NEGATIVE DECLARATION FOR THE APPLICATION OF COPPER -BASED ALGAECIDES AT FIVE RESERVOIRS IN SAN DIEGO COUNTY, ADOPTING THE MITIGATION MONITORING AND REPORTING PROGRAM, APPROVING THE APPLICATION OF COPPER -BASED ALGAECIDES AT LAKE POWAY AND AUTHORIZING THE FILING OF A NOTICE OF DETERMINATION WHEREAS, The City of Poway (City) intends to obtain permission from the State Water Resources Control Board to apply copper -based algaecides at Lake Poway under Water Quality Order No. 2013 - 0002 -DWQ (as amended by Order No. 2014 - 0078 -DWQ), Statewide General Permit for Residual Aquatic Pesticide Discharges to Waters of the United States from Algae and Aquatic Weed Control. The purpose is to control algae blooms, which can lead to degradation of drinking water quality through the presence of taste and odor compounds and production of algal toxins and can clog filters in water treatment plants; and WHEREAS, pursuant to the California Environmental Quality Act (CEQA), an Initial Study was prepared regarding the Application of Copper -Based Algaecides at Five Reservoirs in San Diego County (Project), including Lake Poway. On the basis of the Initial Study, which indicated that all potential environmental impacts from the Project would be less than significant with the incorporation of the mitigation measures in the Mitigation and Monitoring Reporting Program (MMRP), a Mitigated Negative Declaration (MND) was prepared; and WHEREAS, the Draft Initial Study /MND was made available for public review from March 12 to April 13, 2015, notice of the availability was published at least one time in a newspaper of general circulation, and copies were distributed to the Governor's Office of Planning and Research, State Clearing House, and to responsible and trustee agencies, as well as other interested agencies, organizations, and individuals; and WHEREAS, on March 26, 2015, the San Diego County Water Authority ( SDCWA), serving as the lead agency under CEQA, held a public hearing on the Final MND, consisting of any written comments and responses thereto and the revised Initial Study /MND. The SDCWA adopted the Final MND on May 28, 2015; and WHEREAS, pursuant to State CEQA Guidelines section 15096, 15381, and other provisions of CEQA, the City of Poway is a responsible agency for the Project and must therefore consider the Final MND prior to approving the application of copper -based algaecides at Lake Poway, which is a component of the Project; and WHEREAS, the City, as a responsible agency under CEQA, has heard, been presented with, reviewed and considered all of the information and data presented to it, including the Final MND and any other environmental documentation related to the Project; and Resolution No. 15 -036 Page 2 WHEREAS, in compliance with CEQA, the Final MND is sufficiently detailed so that all of the potentially significant effects of the application of copper -based algaecides at Lake Poway and measures necessary to avoid or substantially lessen such effects have been adequately evaluated; and WHEREAS, the City considered the proposed application of copper -based algaecides at Lake Poway at a public meeting on August 18, 2015. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway as follows: SECTION 1. The above recitals are incorporated herein by reference. SECTION 2. The City Council has reviewed and considered the Final MND, its appendices, and all other environmental documentation relating to the Project and has considered public comment and additional information presented at or prior to the August 18, 2015, City Council meeting. SECTION 3. The City Council determines that the City's jurisdiction to impose conditions on the Project is limited under State CEQA Guidelines section 15096 because application of copper -based algaecides at Lake Poway is just a component of the larger Project approved by SDCWA. A responsible agency has responsibility for mitigating or avoiding only the direct or indirect environmental effects of those parts on the project which it decides to carry out, finance, or approve. (State CEQA Guidelines, §15096(g)(1).) Based on the Final MND and the administrative record, including all written and oral evidence presented to the City Council, the City Council finds that all environmental impacts of applying copper -based algaecides at Lake Poway are less than significant with mitigation. The City Council further finds that there is no substantial evidence in the administrative record supporting a fair argument that application of copper -based algaecides at Lake Poway may result in significant environmental impacts. The City Council finds that the Final MND contains a complete, objective and accurate reporting of the environmental impacts associated with the application of copper -based algaecides at Lake Poway and reflects the independent judgement and analysis of the City Council. SECTION 4. Pursuant to State CEQA Guidelines sections 15162 and 15163, none of the conditions triggering subsequent or supplemental environmental review are present. There have been no changes in the Project approved by SDCWA, changes in circumstances, or new information since SDCWA adopted the Final MND on May 28, 2015. SECTION 5. The City Council adopts the MMRP prepared for the Project and attached to this Resolution as Exhibit A, as it applies to the City's application of copper - based algaecides at Lake Poway. SECTION 6. The City Council approves the application of copper -based algaecides at Lake Poway, as described in the Final MND, and authorizes staff to proceed with obtaining the exception from the State Water Resources Control Board. Resolution No. 15 -036 Page 3 SECTION 7. The City Council directs staff to have a Notice of Determination filed with the San Diego County Clerk and the Office of Planning and Research within five (5) working days of approval of the application of copper -based algaecides at Lake Poway. PASSED, ADOPTED AND APPROVED by the City Council of the City of Poway at a regular meeting this 18th day of August 2015. Steve Vaus, Mayor ATTEST: .• . W61 - STATE OF CALIFORNIA ) ) SS COUNTY OF SAN DIEGO ) I, Sheila R. Cobian, CMC, City Clerk, of the City of Poway, do hereby certify under penalty of perjury that the foregoing Resolution No. 15 -036 was duly adopted by the City Council at a meeting of said City Council held on the 18th day of August 2015, and that it was so adopted by the following vote: AYES: LEONARD, CUNNINGHAM, MULLIN, GROSCH, VAUS NOES: NONE ABSENT: NONE DISQUALIFIED: NONE Sheila . Cobian, CMC, City Clerk City of Poway ATTACHMENTS: Exhibit A Resolution No. 15 -036 Page 4 EXHIBIT A MITIGATION MONITORING AND REPORTING PROGRAM APLICATION OF COPPER -BASED ALGAECIDES AT FIVE RESERVOIRS SAN DIEGO COUNTY CALIFORNIA Prepared for: San Diego County Water Authority 4677 Overland Avenue San Diego, California 92123 Contact: Larry Purcell Sweetwater Authority 505 Garrett Avenue Chula Vista, California 91910 Contact: Scott McClelland Helix Water District 7811 University Avenue La Mesa, California 91942 Contact: Brian Olney City of Poway, Public Works Department 13325 Civic Center Drive Poway, California 92064 Contact: Tom Howard Prepared by: Santa Fe Irrigation District 5920 Linea del Cielo Rancho Santa Fe, California 92067 Contact: Tim Bailey AECOM 401 West A Street, Suite 1200 San Diego, California 92101 May 2015 Resolution No. 15 -036 Page 5 INTRODUCTION The California Environmental Quality Act (CEQA) requires that public agencies adopting a Mitigated Negative Declaration (MND) take affirmative steps to determine that approved mitigation measures and project design features are implemented subsequent to project approval. The lead or responsible agency must adopt a monitoring and reporting program for the mitigation measures incorporated into a project or included as conditions of approval. The program must be designed to ensure compliance with the MND during project implementation (Public Resources Code, Section 20181.6; CEQA Guidelines, Section 15074(d)). This Mitigation Monitoring and Reporting Program (MMRP) will be used by the San Diego County Water Authority (Water Authority) and four of its member agencies —Helix Water District (HWD), City of Poway (Poway), Santa Fe Irrigation District (SFID), and Sweetwater Authority (Sweetwater} —to ensure compliance with adopted mitigation measures associated with the application of copper -based algaecides to their respective surface water reservoirs to control algal blooms. This MMRP is divided into five sections that identify the project mitigation measures for each agency and its reservoir. The Water Authority is the lead agency on this project for CEQA administrative purposes, but only has discretionary authority over activities at Olivenhain Reservoir and does not have discretionary authority over project activities at the other agencies' reservoirs. The Water Authority, as CEQA lead agency, has determined that all the measures stated in this MMRP are appropriate to mitigate impacts identified in the MND, but the Water Authority only has the authority to implement the measures listed for Olivenhain Reservoir. The Water Authority has determined that the measures listed for HWD, Poway, SFID, and Sweetwater can and should be implemented at the agencies' respective reservoirs. The other four agencies' decision - making bodies, as Responsible Agencies under CEQA, will separately consider adopting this MMRP and will be responsible for implementing the mitigation measures identified specific to activities at their respective reservoirs. This MMRP contains the following sections, which correspond to the measures to be implemented by the agencies addressed in the MND: Section 1: San Diego County Water Authority Section 2: Helix Water District Section 3: City of Poway Section 4: Santa Fe Irrigation District Section 5: Sweetwater Authority Application of Copper -Based Algaecides at Five Reservoirs May 2015 San Diego County California —MMRP 1 Resolution No. 15 -036 Page 6 SECTION 1. MITIGATION MEASURES FOR IMPLEMENTATION BY SAN DIEGO COUNTY WATER AUTHORITY Section 1 consists of a checklist (Table 1) that lists the project mitigation measures to be carried out by the Water Authority, organized by environmental impact category discussed in the MND. The table identifies the mitigation monitoring and reporting requirements, including the timing of implementation (prior to, during, or after application) and the party responsible for implementing the measure. Space is provided for sign -off following completion/implementation of the mitigation measure. The Water Authority, as lead agency pursuant to CEQA and the agency responsible for activity at Olivenhain Reservoir, will ensure that all mitigation measures identified for the project at Olivenhain Reservoir are carried out in accordance with this section of the adopted MMRP. Application of Copper -Based Algaecides at Five Reservoirs May 2015 San Diego County California —MMRP 2 %1 0 5 Q FBI U o •� A � c cc Q VJ .r i0. G1 a I b O U O C v 0 C6 H Resolution No. 15 -036 Page 7 x Ix x Ix Ix -8 v Or o a a IP v on a u „ d �aaw„ yW.�sa R Ji ba $ v ° �❑ a q'3 a ° a a " o a'^ w q A b0 v❑ v v '� `� ^ y °� rt o A Q u o d �'S bO a a .� 3 p p ❑ (1, '� . f1A'. q v o q v a. v u� py °' bv p❑� 0 w O v a to W v .d , O cc o a y � W O p w 0 10 ❑ ❑ % 0v T , O ° E, �a 0 0 o . Y a oho N ° HE 0.� �a .0 ,��, rt u '[ ;, a v .� U ❑o p °' .q a s O " S� -o u rt a v s Q bD y p U a P, '00 N N 'b+ q b0 v r w a w ld v b0. v 'O v u p, r v v H H a'S.?w ° �[�- N Y a � 3 Cwt p�PL �.° �H °Hv a a5 �(1 M O N rt s PG a w v 00 I -a m PQ w° aU o P U a o ° 0 0 a v°Q 4� N Resolution No. 15 -036 Page 8 i .. 5 Mu sil y 7 I ii i III T.. LI i rc �i X14 s i NI i a I i I ^� 7 a -o h £. o ° - H go I i t III y a � o� to `� yri o q �A > w° p, po E, 114 U� ro u a s kn !, s N 'b r4 w a W A 09 I u p�p q C PQ W a� 0 U � o ° � o "A �a JR Resolution No. 15 -036 Page 9 SECTION 2. MITIGATION MEASURES FOR IMPLEMENTATION BY HELIX WATER DISTRICT Section 2 consists of a checklist (Table 2) that lists the project mitigation measures to be carved out by HWD, organized by environmental impact category discussed in the MND. The table identifies the mitigation monitoring and reporting requirements, including the timing of implementation (prior to, during, or after application) and the party responsible for implementing the measure. Space is provided for sign -off following completion/implementation of the mitigation measure. HWD, as a Responsible Agency pursuant to CEQA, will ensure that all mitigation measures identified for the prof ect at Lake Jennings are carried out in accordance with this section of the adopted MMRP. Application of Copper -Based Algaecides at Five Reservoirs May 2015 San Diego County California —MMRP 5 y� A s. a� x bD QI ta 0 b an 0 ire R N H (n �o x v ACA c. 0 V O O y.i V �R. "4 Resolution No. 15 -036 Page 10 0 N w P4 W rt row ao ro � � o u W O O O O 3 bAD �A Qa V) P. i A t ,' h�hw Ns!ax m i 0 G -V) pq a 4 a b V v „ 4. o ,�� a u °� Q v a Y W P Y a is o 'a 7! u a P4 M° .0 u �ro W =o W ssp O ° ° a v 3 m txO v t3 a w Oa g° Id ° c4 m pq ro. �. o � ok3 w o od.� �0 c, v via p3ro��a ab � k3 �roAa °ppaa�a " t7 i7 t7 th ri C7 0 0 N w P4 W rt row ao ro � � o u W O O O O 3 bAD �A Qa V) Resolution No. 15 -036 Page 11 SECTION 3. MITIGATION MEASURES FOR IMPLEMENTATION BY CITY OF POWAY Section 3 consists of a checklist (Table 3) that lists the project mitigation measures to be carried out by Poway, organized by environmental impact category discussed in the MND. The table identifies the mitigation monitoring and reporting requirements, including the timing of implementation (prior to, during, or after application) and the party responsible for implementing the measure. Space is provided for sign -ofd' following completion/implementation of the mitigation measure. Poway, as a Responsible Agency pursuant to CEQA, will ensure that all mitigation measures identified for the project at Lake Poway are carried out in accordance with this section of the adopted MMRP. Application of Copper -Based Algaeci des at Five Reservoirs May 2015 San Diego County California —MMU 7 C3 O O U a a� �a CD ^C y O � � C �U 4O •. Q y r••i CC H Resolution No. 15 -036 Page 12 t� � 31 X W M r s 11 A A ° A A A w° IN d v N .�.� �. 0. 0 a a b w Cp a' RPI° a .. 4° o Ys a: d v o to rt R ' 0 O bD ''� A `0 q q r� '� �+•, pq I' u q � aaiw R.0. � '� ��:' "'d � �w w � c .� .U61. '^ � °' o J, u v a❑ q a '� DD R, � 5 � � � W a � y❑ �a � u o 1 00 W .v rt " 0°�0 pq v o 4a u & ro A .a o rn a �oAo ° o a ap � °aa o � o r� ° pq ao�a ° '� 1-0 = v a " a� �0 pp P' .a 5p oa W ° p, w q .b o P C 93 0 :w J o .aPi 'tiII o o o Qw +� �2 cQ 0 N 9 y a v t 00 ai ww u� U o ° 0 0 R -�e) Resolution No. 15 -036 Page 13 SECTION 4. MITIGATION MEASURES FOR IMPLEMENTATION BY SANTA FE IRRIGATION DISTRICT Section 4 consists of a checklist (Table 4) that lists the project mitigation measures to be carried out by SFID, organized by environmental impact category discussed in the MND. The table identifies the mitigation monitoring and reporting requirements, including the timing of implementation (prior to, during, or after application) and the party responsible for implementing the measure. Space is provided for sign -off following completion/implementation of the mitigation measure. SFID, as a Responsible Agency pursuant to CEQA, will ensure that all mitigation measures identified for the project at San Dieguito Reservoir are carried out in accordance with this section of the adopted MMRP. Application of Copper -Based Algaecides at Five Reservoirs May 2015 San Diego County California —MMRP 9 V A en Pro a O iu i, C O ii O 67 C� .o a� A as a� F+'1 0. CL O V O O R. C. Resolution No. 15 -036 Page 14 o� 9 �i N N t to b wO aU 0 V a O O U 0 0 �A a �a � y I'I�g no .. 77,777 rr �°b °A (�u ii.bIDo NaS wo63 ONO pA 00�¢G^i¢gi -0 Q-4SpW NN p �4A M �a� �_u u'u o 'O �o u a 70a w .°. pH `. j `.a o o, o vc 4 8 . a 6 VN 0w-4 a 0 4 0. F_3 0-8 °E a o -90 o C 0 „ A ' u° y tg a a 40 u .° .a a o nW Q. 4 44 'O T,� ti o�°aW v w m Q ,SJ x a°+ C4,4 H w : M aQ. '(y R. 8 �b� � a g'� av�iw 0 o � c� oop a g ° "� a g d a o "acv x o u 0 9 H u v :0:1 - ; ma 3 nD ... u "v'� a a A a a a m C 3 o ° 0 a .°. 3.a � o � o o°�`d w' u in B 3 °c 9 a� A a 3. p can w o U W. V vi A Nl iy .I ;Q ' NE AN AM PT _ AN vi vi cri �r can �r Page 14 o� 9 �i N N t to b wO aU 0 V a O O U 0 0 �A a �a � Resolution No. 15 -036 Page 15 SECTION 5. MITIGATION MEASURES FOR IMPLEMENTATION BY SWEETWATER AUTHORITY Section 5 consists of a checklist (Table 5) that lists the project mitigation measures to be carried out by Sweetwater, organized by environmental impact category discussed in the MND. The table identifies the mitigation monitoring and reporting requirements, including the timing of implementation (prior to, during, or after application) and the party responsible for implementing the measure. Space is provided for sign -off following completion/implementation of the mitigation measure. Sweetwater, as a Responsible Agency pursuant to CEQA, will ensure that all mitigation measures identified for the project at Sweetwater Reservoir are carried out in accordance with this section of the adopted MMRP. Application of Copper -Based Algaecides at Five Reservoirs May 2015 San Diego County California —MMRP 11 i. Q r'rJ Rio � ao ,� o c�c b � C � C3+ U C O .a; CC Resolution No. 15 -036 Page 16 W3� i i �i � � A �i ilk 6i V I ,m ° b 00 ° ° -o o '00 .m g rt u m b -a o - ' a° o w o b �I Ihl cn °u 0 & ua a P� �C a . °•` v' is o � a� ,°, �° lily y O u a u `�-M acn u a.0 a b ' ti H.a u u " u .b oo T u ° Q. o °. o°. C w ua v o a rA p ixA�a N a °- a n a. on>. a a$ °° a tl ❑0. a m nS o " ��+ u p' o u �o a H a o o �s u w w a g v a o N o 40 op �. u o 0 w O En a Y p a p 0 o a. a {, w y 4� u� w� cn b a s o-a ull a a u a b o a a" .� a a °po °" o bD chi u y n`'i u_ aA a b aO �c o q°_, u 0° I) ( N o v u ab w b u p b a 0. u .° u u .s7 aw 3 .a w a `-' R. �, u :8 p v o a� V. o .-. ` ai'i pq .J w N u o �V u 3P♦ ,�uv❑aa° w °��°� N C ¢s i° o N o `� a� [� N w o $uuaN�A «YuWu'inwo p '�' q -l� is u� q� �qp, o .p w ^. aai 0 .p o u o .''a Go . -o `" p ,� m .�- o at c� o C to u a 3 H w w o cn ow o o v 3 o p a �a�u" cn on . V ��am q) Z A vi cn W Via° cn V) w .I m a x II 5° r r4 W lijry Wm W� W WN Ll VQ N O N F 9 u P4 u ba U b0 I 'O R u ❑ v� a O o V 0 0 rt � a� Resolution No. 15 -036 Page 17 FINAL MITIGATED NEGATIVE DECLARATION AND INITIAL STUDYIENVIRONMENTAL CHECKLIST APPLICATION OF COPPER -BASED ALGAECIDES AT FIVE RESERVOIRS SAN DIEGO COUNTY CALIFORNIA SCH No. 2015031045 Prepared fora San Diego County Water Authority 4677 Overland Avenue San Diego, California 92123 Contact: Larry Purcell Sweetwater Authority 505 Garrett Avenue Chula Vista, California 91910 Contact: Scott McClelland Helix Water District 7811 University Avenue La Mesa, California 91942 Contact: Brian Olney Prepared by: City of Poway, Public Works Department 13325 Civic Center Drive Poway, California 92064 Contact: Tom Howard Santa Fe Irrigation District 5920 Linea del Cielo Rancho Santa Fe, California 92067 Contact: Tim Bailey AECOM 401 West A Street, Suite 1200 San Diego, California 92101 Phone: (619) 610 -7600 Contact: Alex Hardy May 2015 Resolution No. 15 -036 Page 18 This page intentionally left blank. Resolution No. 15 -036 Page 19 TABLE OF CONTENTS Section pane SECTION 1.0 — INTRODUCTION ................................................................................ ..............................1 1.1 Project Background .............................................................................. ............................... l 1.2 Project Location and Environmental Setting ....................................... ............................... 2 III. 1.2.1 Olivenhain Reservoir ............................................................... ............................... 2 IV. 1.2.2 Lake Jennings ........................................................................... ..............................4 71 V. 1.2.3 Lake Poway ............................................................................... ..............................4 3.3.2 Hydrology and Water Quality ................................................ ............................... VI. 1.2.4 San Dieguito Reservoir ............................................................ ............................... 7 VII. 1.2.5 Sweetwater Reservoir .............................................................. ............................... 7 1.3 Project Description ..............................................................:............... .............................10 IX. 1.3.1 Olivenhain Reservoir ............................................................... .............................12 X. 1.3.2 Lake Jennings .......................................................................... .............................13 58 XI. 1.3.3 Lake Poway .............................................................................. .............................13 58 XII. 1.3.4 San Dieguito Reservoir ............................................................ .............................14 59 XIII. 1.3.5 Sweetwater Reservoir .............................................................. .............................15 SECTION 2.0 — INITIAL STUDY/ENVIRONMENTAL CHECKLIST FORM ......... .............................17 I. Aesthetics ............................................................................................. .............................19 3.1.1 Hazards and Hazardous Materials ......................................... ............................... II. Agriculture and Forestry Resources ................................................... ............................... 20 III. Air Quality ........................................................................................... .............................21 3.2.1 Hazards and Hazardous Materials ......................................... ............................... IV. Biological Resources ........................................................................... .............................23 71 V. Cultural Resources ............................................................................... .............................43 3.3.2 Hydrology and Water Quality ................................................ ............................... VI. Geology and Soils ................................................................................ .............................44 72 VII. Greenhouse Gas Emissions .................................................................. .............................46 3.4.2 Hydrology and Water Quality ................................................ ............................... VIII. Hazards and Hazardous Materials ....................................................... .............................46 IX. Hydrology and Water Quality .............................................................. .............................54 X. Land Use and Planning ...................................................................... ............................... 58 XI. Mineral Resources ............................................................................. ............................... 58 XII. Noise .................................................................................................. ............................... 59 XIII. Population and Housing ....................................................................... .............................61 XIV. Public Services ..................................................................................... .............................61 XV. Recreation ............................................................................................ .............................62 XVI. Transportation/ Circulation ................................................................... .............................63 XVII. Utilities and Service Systems ............................................................... .............................64 XVIII. Mandatory Findings of Significance .................................................. ............................... 66 SECTION 3.0 — DETERMINATION .......................................................................... ............................... 69 3.1 Olivenhain Reservoir Environmental Impacts and Mitigation .......... ............................... 69 3.1.1 Hazards and Hazardous Materials ......................................... ............................... 69 3.1.2 Hydrology and Water Quality ................................................ ............................... 70 3.2 Lake Jennings Environmental Impacts and Mitigation ...................... ............................... 70 3.2.1 Hazards and Hazardous Materials ......................................... ............................... 70 3.3 Lake Poway Environmental Impacts and Mitigation ......................... ............................... 71 3.3.1 Hazards and Hazardous Materials ......................................... ............................... 71 3.3.2 Hydrology and Water Quality ................................................ ............................... 71 3.4 San Dieguito Reservoir Environmental Impacts and Mitigation ....... ............................... 72 3.4.1 Hazards and Hazardous Materials ......................................... ............................... 72 3.4.2 Hydrology and Water Quality ................................................ ............................... 72 Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page i Resolution No. 15 -036 Page 20 3.5 Sweetwater Reservoir Environmental Impacts and Mitigation ......... ............................... 73 3.5.1 Hazards and Hazardous Materials ......................................... ............................... 73 3.5.2 Hydrology and Water Quality ................................................ ............................... 73 3.6 Authority To Prepare A Mitigated Negative Declaration .................. ............................... 74 3.7 Preparers of the Mitigated Negative Declaration ............................... ............................... 74 3.8 Results of Public Review (to be completed with Final MND) .......... ............................... 74 SECTION 4.0 — REFERENCES .................................................................................. ............................... 75 SECTION 5.0 — RESPONSE TO COMMENTS ON THE DRAFT MND ................. ............................... 77 APPENDICES Al Olivenhain Reservoir APAP A2 Lake Jennings APAP A3 Lake Poway APAP A4 San Dieguito Reservoir APAP A5 Sweetwater Reservoir APAP LIST OF FIGURES Figure Page 1 Regional Map ..................................................................................................... ..............................3 2 Olivenhain Reservoir ........................................................................................ ............................... 5 3 Lake Jennings ................................................................................................... ............................... 6 4 Lake Poway ........................................................................................................ ..............................8 5 San Dieguito Reservoir ...................................................................................... ..............................9 6 Sweetwater Reservoir ....................................................................................... .............................11 LIST OF TABLES Table Page 1 CNDDB Search Results at Olivenhain Reservoir ........................................... ............................... 24 2 CNDDB Search Results at Lake Jennings ...................................................... ............................... 27 3 CNDDB Search Results at Lake Poway ......................................................... ............................... 30 4 CNDDB Search Results at San Dieguito Reservoir ........................................ ............................... 31 5 CNDDB Search Results at Sweetwater Reservoir ............................................ .............................34 Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page ii SECTION 1.0 INTRODUCTION 1.1 PROJECT BACKGROUND Resolution No. 15 -036 Page 21 The San Diego County Water Authority (Water Authority) and four of its member agencies —Helix Water District (HWD), City of Poway (Poway), Santa Fe Irrigation District (SFID), and Sweetwater Authority (Sweetwater) —have identified the need to occasionally apply copper -based algaecides to their respective surface water reservoirs to control algae blooms. Algae blooms can lead to degradation of drinking water quality through presence of taste and odor compounds and production of algal toxins, and can clog filters in water treatment plants. The subject reservoirs are: • Olivenhain Reservoir (Water Authority) • Lake Jennings (HWD) • Lake Poway (Poway) • San Dieguito Reservoir (SFID) • Sweetwater Reservoir (Sweetwater) These five agencies plan to individually obtain permission from the State Water Resources Control Board (State Board) to apply copper -based algaecide at their reservoirs by qualifying for Water Quality Order No. 2013 - 0002 -DWQ (as amended by Order No. 2014 - 0078 -DWQ), Statewide General Permit for Residual Aquatic Pesticide Discharges to Waters of the U.S from Algae and Aquatic Weed Control (General Permit).' All five of the referenced agencies have prepared an Aquatic Pesticide Application Plan (APAP) and submitted a Notice of Intent to the State Board to initiate the permit process. To date, the Water Authority, HWD, Poway, and Sweetwater have received a Notice of Applicability from the State Board approving their APAP; SFID has responded to comments from the State Board and resubmitted their APAP for review. The General Permit identifies a maximum allowable concentration of certain aquatic pesticide constituents, including copper. Public water agencies may apply to the State Board to obtain a short-term or seasonal exception to the limitations on copper concentration established in the General Permit, pursuant to Section 5.3 of the Policy for Implementation of Toxics Standards forfnland Surface Waters, Enclosed Bays, andEstuariesin California (the State Implementation Plan, or SIP). Exceptions to the limitations are allowed if deemed necessary for drinking water sources to meet statutory requirements under the federal Safe Drinking Water Act or the California Health and Safety Code. Section 5.3 of the SIP states that to be considered for an exception, a water agency must provide the following information to the State Board: 1. A detailed description of the proposed action, including the proposed method of completing the action; 2. A time schedule; 1 A draft order further amending the General Permit was prepared in December 2014, and a public hearing for the order was held on March 3, 2015. The revision proposes to add calcium hypochlorite and sodium hypochlorite as active ingredients; add State Water Board delegation that allows the Executive Director to add (1) active ingredients to the General Permit and (2) agencies to the SIP exception list; add three agencies to the SIP exception list; and modify the SIP exception for the Department of Water Resources. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 1 Resolution No. 15 -036 Page 22 3. A discharge and receiving water quality monitoring plan (before project initiation, during the project, and after project completion, with the appropriate quality assurance and quality control procedures); 4. Cal ifornia Environmental Quality Act (CEQA) documentation; 5. Contingency plans; 6. Identification of alternate water supply (if needed); and 7. Residual waste disposal plans. Upon completion of an application, the agency is required provide certification by a qualified biologist that the receiving water beneficial uses have been restored. Under the current version of the General Permit, 28 agencies statewide are approved for the exception to the receiving water limitations established in the General Permit, as listed in Appendix G of the permit; the amendment proposed in December 2014 would increase that number to 31 agencies. As additional agencies are approved for the exception, the General Permit would be subsequently amended to add them to the list in Appendix G of the permit. The five water agencies listed above have indicated the current limitation on dissolved copper levels in the General Permit and the resultant allowable amount of the copper -based algaecide they are able to apply has the potential to constrain the effectiveness of algae control at their facilities and lead to diminished drinking water quality that is delivered to consumers. Therefore, the agencies will be submitting the required documentation to the State Board to be considered for approval of the General Permit exemption. This Mitigated Negative Declaration (MND) has been prepared for purposes of the agencies obtaining CEQA documentation compliance, as listed above. The CEQA "project" addressed in this MND is the application of copper -based algaecides at each of the five listed reservoirs, as implemented by the respective agencies, which may include periodic exceedances of the limitations stated in the General Permit. The Water Authority is the lead agency for CEQA administrative purposes, but does not have discretionary authority over project activities at the other reservoirs; the other four agencies' decision - making bodies, as Responsible Agencies under CEQA, will separately consider adopting the MND and implementing the project and the mitigation program identified specific to their activities. Aside from this combined MND, each participating agency will be individually responsible for complying with the terms and conditions specified in Section 5.3 of the SIP and in the General Permit as they seek coverage under the General Permit and State Board approval of the SIP limitation exceptions for copper. The State Board will be a responsible agency under CEQA for this MND, and will be using the document in its review process for considering the agencies' respective exceptions to the receiving -water limitations stated in the General Permit. 1.2 PROJECT LOCATION AND ENVIRONMENTAL SETTING The five subject reservoirs are located in the western portion of San Diego County, as shown in Figure 1. Specific discussions of the location of and environmental setting at each reservoir are provided below. 1.2.1 Olivenhain Reservoir Olivenhain Reservoir is a surface water storage reservoir owned by the Water Authority and located in northern unincorporated San Diego County, near the southwestern boundary of the City of Escondido, Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist page 2 Resolution No. 15 -036 Page 23 0 3,75 7,5 15 Miles Figure 1 TIWI 11 75 mil" Regional Map San Diego Reservoirs Copper -Based Algaecide MND 2015160334496 _SDCWA_TC201900.C4D- G1S1920 GM924 Ourgoing120150iO5 AECOM FigurgifFigl rmp.ai dbmdy U11115 Resolution No. 15 -036 Page 24 and the far northern reaches of the City of San Diego's incorporated boundaries. The City of Encinitas is approximately 2 miles to the west. Elfin Forest Road provides access to the reservoir and its operations facilities, which are located on the reservoir's southwestern end. Olivenhain Reservoir is approximately 1 mile west of the City of San Diego's Hodges Reservoir, also known as Lake Hodges, which is connected to Olivenhain Reservoir and provides some of the water stored in Olivenhain Reservoir. With storage of approximately 24,400 acre -feet, water in Olivenhain Reservoir is reserved for emergency use throughout the Water Authority's service area (San Diego County Water Authority 2014a). Water stored in Olivenhain Reservoir must be treated before distribution to consumers. Olivenhain Reservoir and the surrounding area are depicted in Figure 2. Olivenhain Reservoir is surrounded by undeveloped open space of the Elfin Forest Recreational Reserve (Reserve), a 784 -acre open space park and recreational area developed by the Water Authority and Olivenhain Municipal Water District (OMWD) in partnership with the U.S. Department of the Interior, Bureau of Land Management, as an element of the Olivenhain Water Storage Project and the Water Authority's Emergency Storage Project biological resources mitigation. The Reserve is owned by the Water Authority and managed by OMWD. A few rural residences are scattered southeast of the reservoir on Mount Israel, and additional residences are located farther east, on the western side of Lake Hodges. Denser residential development in the City of Escondido and unincorporated county begins at a radius of between 2 and 3 miles from the reservoir. Olivenhain Reservoir is not open for recreational use (San Diego County Water Authority 2014b). However, the Reserve features public picnic areas and approximately 11 miles of trails for hiking, mountain biking, and equestrian use. 1.2.2 Lake Jenninis Lake Jennings is a surface water storage reservoir owned by HWD and located in the unincorporated community of Lakeside, in the central portion of San Diego County, east of the City of Santee. Regional access to the reservoir is provided by Lake Jennings Park Road from Interstate 8. Lake Jennings serves as a short-term storage reservoir for HWD's R. M. Levy Water Treatment Plant, which is on the reservoir's southwest corner. Lake Jennings holds roughly 9,790 acre -feet of water, of which approximately 95% is untreated imported water purchased from the Water Authority. The remaining water comes from ephemeral, unnamed drainages (Helix Water District 2014a). The San Diego River is located approximately 2,000 feet north of Lake Jennings. The reservoir and surrounding area are shown in Figure 3. Lake Jennings is surrounded by a combination of open space and residential neighborhoods of varying densities, including the Lake Jennings Park Estates mobile home park located on the southern edge of the lake and other single - family residential developments in Lakeside on the west, north, south, and east of the reservoir. Open space is located directly adjacent to the reservoir on the north and east. Lake Jennings is open to the public year -round for fishing and boating. Swimming and other body contact uses are not allowed. HWD stocks the reservoir with catfish between May and September, and with trout during varying periods depending on water temperature. Stocking schedules are typically every 2 or 3 weeks (Helix Water District 2014b). 1.2.3 Lake Poway Lake Poway is a surface water storage reservoir owned by Poway and located in the northern portion of the incorporated area. Regional access to the reservoir is provided by Lake Poway Road. The facility is Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 4 Resolution No 15 -036 Page 25 Source SANGAG 2012 G 0 25 0 125 0 0.25 Miles Scale 1 15,840- 1 inch= 0.25 miles Figure 2 Olivenhain Reservoir San Diego Reservoirs Copper -Based Algaecide MND Pah Ilussdglfp00Lna.aeconmei omldatalpieyect5l20I5160 334496 SDCWA_7D201970.CALL GIS1920GISI922 MapslO&venham_=d, 111412015,pan5sann Resolution No 15 -036 Page 26 Source Esri, DigdalGlobe, GeoEye, i- cubed, USDA USGS, AEX Getrrapping Aerognd ION, IGP, svisstopo, and the GIS User Community, SANDAL 2012 025 0 125 0 0.25 Mlles Figure 3 Scale 1 15,840; 1 inch= 0.25 miles Lake Jennings San Diego Reservoirs Copper•BasedAlgaectde MND Pdh Ilumdgl,) p00/ .na.aecorme2comldatalprepecu120 15160334496 SDWA_ 70201900- CAIIGIS1920GIS1922 _MapsUemangs_mad, 2(24(2015,jms.vnn Resolution No. 15 -036 Page 27 maintained to hold approximately 3,150 acre -feet of water, with an approximately 60 -acre surface area. The majority of the water stored in the reservoir is untreated imported water purchased from the Water Authority, although seasonal runoff can also enter the lake through the Boulder Bay stream within Warren Canyon, located east of the reservoir. Water from the reservoir is treated at the Lester J. Berglund Water Treatment Plant, which is located west of the reservoir (City of Poway 2014a). Lake Poway and the surrounding area are depicted in Figure 4. The Blue Sky Ecological Reserve, a 700 -acre open space preserve owned by Poway, is located north and east of Lake Poway. The reservoir directly adjoins to Lake Poway Recreational Area to the east. High - density residential is located to the east of Lake Poway, with lower density housing to the south. Poway High School is located approximately 1 mile southwest of Lake Poway. Lake Poway is open year -round for fishing Wednesdays through Sundays, sunrise to sunset. Night fishing is available on select nights during the summer. The reservoir is stocked with rainbow trout weekly during the winter, and with channel catfish weekly during the summer. Public rental of rowboats, motorboats, sailboats, and paddle boats is available from a concessionaire, but private boats are not permitted. Swimming and other body contact is not allowed (City of Poway 2014b). 1.2.4 San Diepuito Reservoir San Dieguito Reservoir is a surface water storage reservoir owned by SFID and located in the northern part of the unincorporated community of Rancho Santa Fe, in the northern part of San Diego County. Access is provided by El Camino del Norte, which tuns along the northern side of the reservoir, and El Montevideo and Lago Lindo which runs along the south side of the reservoir. The City of Encinitas is located approximately 1 mile northwest of the reservoir. The facility is an 800 -acre -foot terminal reservoir that receives its water from Lake Hodges via the Cielo Pump Station, which is located on Del Dios Highway approximately 2 miles east of the reservoir. San Dieguito Reservoir water is pumped to the R.E. Badger Filtration Plant, which is jointly owned by SFID and the San Dieguito Water District and provides drinking water to both districts (Santa Fe Irrigation District 2014a). The surrounding areas are composed of rural residential development in the communities of Rancho Santa Fe and Fairbanks Ranch, many with associated agricultural uses. Figure 5 shows the reservoir and its surrounding area. The reservoir is not open to the public (Santa Fe Irrigation District 2014b). 1.2.5 Sweetwater Reservoir Sweetwater Reservoir is a surface water storage reservoir owned by Sweetwater and located along the Sweetwater River in southwestern San Diego County, near the unincorporated communities of La Presa to the north and Bonita to the west. The incorporated boundary of the City of Chula Vista is located to the south. The reservoir is directly east of the State Route 54 and State Route 125 interchange. Sweetwater Reservoir has a capacity of approximately 28,100 acre -feet and a maximum surface area of 1,027 acres (Sweetwater Authority 2013). Sweetwater Summit Regional Park abuts the reservoir's southern bank, and the U.S. Fish and Wildlife Service's (USFWS) 11,152 -acre San Diego National Wildlife Refuge is located immediately east of the reservoir. The Sweetwater Summit Regional Park offers trails, picnic areas, and a campground. Additional surrounding uses include single - family residential development to the north and west. The Bonita Golf Club's golf course and the County's Sweetwater Sports Complex are located southwest of the Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 7 Resolution No 15 -036 Page 28 Source: SANDAO 2012 025 0 125 0 0.25 Miles Scale 1 15,840; 1 inch= 0.25 miles Figure 4 Lake Poway San Diego Reservoirs Copper -Based Algaecide MND Path liumdglfp001, na. aacomnetcomldatalp ?gectsl2015160334496SDCWA_ 70201900- C4DG lb1920GIS1922_MapslPoway_mxd, 2R62015,jm2wn7j Resolution No 15 -036 Page 29 Source: SANGAG 2012 �0 25 0 125 0 1).25 Miles Figure 5 Scale 1 15,840, 1 inch= 0.25 miles San Dieeuito Reservoir San Diego Reservoirs Copper -Based Algaecide MND Pdh Ilumdgljp001. na .asconmetcomldatalpgects12015160 ?34496 SDCWA_ 71)2 01 9 0 0- CAIIGIS1920GIS1922 _MapslSanDfegutto_mzd, 212412015,jmassann Resolution No. 15 -036 Page 30 reservoir, across State Route 125. The Sweetwater Dam, the Robert A. Perdue Water Treatment Plant (PWTP), and Sweetwater's operations building are on the western side of the reservoir. The reservoir and surrounding area are shown in Figure 6. Sweetwater Reservoir is open to the public 3 days a week year -round for shoreline fishing from a limited area on the reservoir's southern end; no boats or body contact recreational activities are allowed. Sweetwater does not stock the reservoir with fish. A 5 -mile riding and hiking trail is also located on the southern border of the lake for pedestrians, bikes, and horses (Sweetwater Authority 2014). 1.3 PROJECT DESCRIPTION The project entails occasional application of copper -based algaecides at five surface water reservoirs in San Diego County to control and prevent degradation of water quality at those facilities resulting from algae blooms. The five reservoirs are Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, and Sweetwater Reservoir. Algae cause a multitude of water - quality concerns, including the potential to produce taste- and odor- causing compounds and toxins that are potent enough to poison animals and humans. Taste -and -odor compounds cause malodorous or unpalatable drinking water, resulting in increased treatment costs and consumer complaints. In addition, if great masses of algae enter the water treatment plant, the algae can cause operational problems by increasing the amount of suspended material that must be settled out of the water, and excessive algae can lead to water filter clogging. Filter clogging leads to shortened filter run times; this in turn leads to increased electricity and chemical use in the water treatment plant. The algaecides would be applied at the subject reservoirs pursuant to methods stated in the respective agencies' APAPs, which have been submitted to the State Board for approval of coverage under the General Permit. To date, the Water Authority, HWD, Poway, and Sweetwater have received a Notice of Applicability from the State Board approving their APAP; SFID has responded to comments from the State Board and resubmitted their APAP for review. Each of the five subject agencies has indicated that their periodic treatment of algae may require temporary exceedance of the permitted levels of dissolved copper stated in the General Permit, and the agencies are applying to the State Board for an exception from those copper levels. The project - related APAPs are included in this MND as Appendix Al through A5. The requirement to prepare APAPs is described in Section VIII.0 of the General Permit, which identifies the following mandatory information: 1. Description of the water system to which algaecides and aquatic herbicides are being applied; 2. Description of the treatment area in the water system; 3. Description of types of weed(s) and algae that are being controlled and why; 4. Algaecide and aquatic herbicide products to be used, the method in which they are applied, and the adjuvants and surfactants used; 5. Discussion of the factors influencing the decision to select algaecide and aquatic herbicide applications for algae and weed control; 6. Description of the control structure to be used to control the extent of receiving waters potentially affected by algaecide and aquatic herbicide application and the inspection schedule of the control structure to ensure that it is not leaking (if applicable); Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 10 Resolution No 15 -036 Page 31 Source: SANDAG 2012 �i► 0 5 025 0 0 5 Miles Scale 1 31 680, 1 inch= 0.5 miles Figure G Sweetwater Reservoir San Diego Reservoirs Copper -B ased A lgaeci de MND Pdh Ila. zsdgljp00l. na. aeco=,; tcomldatalpngects12015l603344A5 SDWA_ 70201970- CADGIS1920GIS1922 _MapslSweatwatermcd, 11142015,1anmenn Resolution No. 15 -036 Page 32 If the Discharger has been granted a short-term or seasonal exception under State Water Board Policy for Implementation of To dcs Standards for Inland Surface Waters, Enclosed Bays, * and Estuaries of California (Policy) section 5.3 from meeting acrolein and copper receiving water limitations, provide the beginning and ending dates of the exception period, and justification for the needed time for the exception. If algaecide and aquatic herbicide applications occur outside of the exception period, describe plans to ensure that receiving water criteria are not exceeded because the Dischargers must comply with the acrolein and copper receiving water limitations for all applications that occur outside of the exception period 8. Description of a monitoring program demonstrating compliance with the receiving water limitations, discharge specifications, and other requirements in the General Permit; 9. Description of procedures used to prevent sample contamination from persons, equipment, and vehicles associated with algaecide and aquatic herbicide application; 10. Description of the best management practices (BMPs) to be implemented. 11. Examination of possible alternatives to algaecide and aquatic herbicide use to reduce the need for applying algaecides and herbicides. The individual project descriptions for each subject reservoir provided below summarize the respective APAPs, augmented with additional information obtained from personal communications with representatives of the participating agencies, if needed. 1.3.1 Olivenhain Reservoir The Water Authority's APAP, provided as Appendix Al in this MND, proposes application of copper sulfate if necessary to control nuisance algae blooms. Since the reservoir became operational in 2003, it has not experienced significant algal growth and the Water Authority has not needed to apply chemicals to the reservoir to control algae. However, reservoir staff has started to recognize increased algal growth in recent years, which originates from Lake Hodges water transfers, and the Water Authority is seeking General Permit coverage for algaecide application in case the need arises. If nuisance algae blooms occur at Olivenhain Reservoir, in -situ treatment would be required to ensure the Water Authority's deliveries from the reservoir to its member agencies meet appropriate water quality specifications, primarily to prevent taste- and odor - causing compounds and algal toxins from reaching consumers. The Water Authority's primary response to algae blooms at Olivenhain Reservoir is to select a lower withdrawal elevation on the reservoir's outlet tower to avoid algae blooms that form on the surface. If that option is not available, then the secondary response would be isolating Olivenhain Reservoir from the Water Authority's system and transferring water to its member agencies from another storage point. If regional demands or operational constraints do not allow for the termination of flow from Olivenhain Reservoir, then the Water Authority would consider applying copper -based algaecide. Pursuant to their APAP, the Water Authority would apply a mixture of copper sulfate pentahydrate crystals and granular citric acid (for chelation purposes) at Olivenhain Reservoir from side hoppers attached to a powerboat. Applications are proposed to occur in the surface water on the reservoir's southwestern side. Application would be performed in a manner consistent with product labeling and would be the minimum amount necessary to be effective; the APAP proposes a rate of approximately 2 pounds of copper sulfate and 1 pound of citric acid per surface acre of treated area. The Water Authority estimates up to 80 pounds of the solid crystalline product would be delivered for a single application. Three monitoring locations are proposed in the Water Authority's APAP. Prior to an application event (24 hours in advance), background monitoring would be conducted near the application area. Event monitoring samples would be collected immediately after the application from two locations outside of Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 12 Resolution No. 15 -036 Page 33 the treatment area —one near the reservoir's nutlet tower and another near the Lake Hodges inlet/oudet structure. Post -event monitoring samples would be collected inside the treatment area within a week after application. This post - treatment monitoring would also include visual inspection of the treatment area for evidence of fish kills. The Water Authority will post a notification on its website andJor notify impacted member agencies by email, as appropriate, at least 7 days prior to the first algaecide application every calendar year. The notification will conform to the procedures described in Section VIII.B of the General Permit. 1.3.2 Lake Jennings HWD's APAP, provided as Appendix A2 in this MND, covers treatment of Lake Jennings for algae with the copper -based algaecide Cutine Plus, a liquid chelated copper product applied using a boat - mounted spray rig.'` Algaecide would be applied to the water in an area adjacent to Chet Harritt Dam and the intake tower to the water treatment plant. HWD normally prevents and controls algae blooms in Lake Jennings by conventional methods, using a mechanical system that aerates and circulates water. The aeration system consists of an air compressor located on the dam, an air diffuser grid that is located on the lake bottom adjacent to the dam, and an air line that connects the air compressor & diffuser grid. HWD places the aeration system in operation at the beginning of the season when algae blooms commonly occur (typically the summer) and operates the system throughout the season. Algaecide was used infrequently at Lake Jennings in the years before HWD installed and activated the aeration system but has not been used in the past 20 years due to the effectiveness of treatment through aeration. Because Lake Jennings is a water source for HWD's water treatment plant that produces potable water for its customers, HWD is seeking approval to use algaecide in case a severe algae bloom occurs that is beyond the capability of the aeration system to control. HWD would use algaecide consistent with the product label requirements and apply the minimum amount of product that is necessary to be effective- an estimated range of 2.75 to 11 gallons of the liquid product. The HWD APAP establishes two monitoring locations —one at an anchored buoy located within the algaecide application area near the dam, and another at an anchored buoy located outside of the treatment area where prevailing winds tend to push surface water at the reservoir. HWD's monitoring program includes background monitoring within 24 hours before an application event, event monitoring of samples just outside the treatment area immediately after the application event, and post -event monitoring of samples taken within the treatment area up to a week after the application. No public agencies need to be notified of algaecide application at Lake Jennings because HWD is both the discharger and the affected public agency. 1.3.3 Lake Poway Poxn•-ay's APAP, provided as Appendix A3 in this MND, covers treatment of Lake Poway for algae blooms to prevent development of nuisance conditions. Poway has used copper sulfate for algae control since the 1970s, with the frequency depending on when algae blooms occur, typically once per year, between April 1 and October 30. The copper sulfate product is ordered by the pallet and then used as needed. Copper sulfate is applied as needed to Lake Poway in the form of large crystals, which are typically applied by boat as a surface application, at various locations as necessary to prevent blooms from spreading. Citric acid is used in the application as a chelatin ag_ant. The need for treatment is based ' Thr HWD APAP also covers treatment of aquatic weeds such as tammix, cattails, and tubs by spraying hrrbiridcs alone the rdgrs of Lake Rmnings. However, this MND covrrs only the application of algarcido., as that is thr subject of thr rxerption from the permit limitations that HLiti D is srrking along with the other participating agrncirs. Mitigated Negative Declaration and San Diego Reservoirs Copper - lased Algaecide MND Initial Study /Enx ironmental Checklist Page 13 Resolution No. 15 -036 Page 34 on physical inspections, water quality monitoring, and potential and existing impacts on drinking water quality. Poway uses algaecide consistent with the product label requirements and applies the minimum amount of product that is necessary to be effective. During a single application process roughly five pounds of pesticide per acre foot of water is used, which averages about 300 pounds of solid crystalline product for each application. Poway does not implement any conventional, non - chemical algae treatment at Lake Poway; however, a Poway representative reported that nuisance algae blooms did not occur when they employed methods for controlling invasive quagga mussels and milfoil plants, which were treated by reducing the reservoir's water level and drying out the shoreline for 30 to 40 days (City of Poway 2014b). Because copper application within Lake Poway is not performed at any specific location within the reservoir, the copper- application monitoring locations will also vary depending on actual application sites. For each application, a treatment map will be developed shoving the application area, treatment area, and adjacent untreated area (if applicable) , which will be used throughout the monitoring period for each application. Post - application monitoring includes visual monitoring for fish kills. No agencies will be notified of Poway's algaecide application because no other public agencies are expected to be affected. 1.3.4 San Dieguito Reservoir SFID's APAP, provided as Appendix A4 in this MND, covers treatment of San Dieguito Reservoir for algae blooms that originate at Lake Hodges and that are transferred into the reservoir along with water deliveries via the Cielo Pump Station. SFID implements a Lake Management Program to control algae at San Dieguito Reservoir, with preferred methods being nonchemical solutions such as aeration, water level manipulation, nutrient control, and selective withdrawals from Lake Hodges's three outlets, pulling water from variable depths to minimize algae intake. These strategies are effective at minimizing algae blooms in the reservoir, but SFID often needs to apply algaecide to control major blooms and prevent adverse effects on water quality. The Cielo Pump Station is equipped with a closed -feed injection system that can release algaecides directly into the eater while being pumped from Lake Hodges to San Dieguito Reservoir as necessary. SFID applies a liquid non- chelated copper sulfate product through this method. The injection system allows for safe and effective application of precise amounts and minimizes the potential for worker exposure and spills. The rate of feed for any treatment event is limited to the recommendations on the product label to ensure effectiveness and minimize any unintended effects on non - targeted organisms. Chelated copper application is not necessary at San Dieguito Reservoir because SFID does not apply d rcctly to the reservoir, so the product does not need to remain suspended in reservoir water in order to effectively treat the tar ctg ed algae. The volume of liquid algaecide used for an application would depend on the severity of the algal bloom. SFID estimates between 100 to 500 gallons are used per application. The product is ordered in quantities large enough for roughly one year of application events, and is stored on site until it is used. At the end of a treatment event, the system is flushed with water to eliminate any algaecides remaining in the system. This protects the feed system from corrosion and leaks. The liquid copper sulfate containers are stored within a spill catchment that can capture 1001% of the chemical available for feed. The SFID APAP establishes two representative monitoring locations within San Dieguito Reservoir. One location, at the receiving water pipeline on the reservoir's eastern shore, is used for baseline monitoring, conducted within 24 hours before the treatment, and event monitoring, starting immediately after treatment begins. The second location is the San Dieguito Reservoir pump station inlet on the opposite side of the reservoir, which is used for past -event monitoring conducted within a week after treatment Mitigated Negative Declaration and San Diego Resen%oirs Copper -Based Algaecide MND Initial Study /Environmental Checklist Page 14 Resolution No. 15 -036 Page 35 begins. SFID does not notify other agencies of algaecide application at San Dieguito Reservoir because no other public agencies are expected to be affected by this activity. 1.3.5 Sweetwater Reservoir Sweetwater's APAP, provided as Appendix A5 in this MND, proposes application of copper sulfate when necessary to control nuisance algae blooms for control of taste and odor in their drinking water, and to prevent filter impairment at the PWTP. Sweetwater has been applying copper sulfate for algae control at least since 1986, averaging approximately one treatment per year during the summer, though the frequency and timing of application varies depending on the number of algae blooms per year, the length of the bloom, and the severity of the taste and odor problem that arises. The need for copper application at Sweetwater Reservoir has not arisen since 2009. Sweetwater prefers to initially handle algae blooms without the use of an algaecide. Alternative methods employed at Sweetwater Reservoir include obtaining water from different levels of the reservoir that are not inhibited by an algae bloom, adding powdered activated carbon to the water treatment process at PWTP, increasing the duration of free chlorine contact with treated water at PWTP, blending treated water with imported water, and waiting for a bloom to die off naturally. The decision to apply copper to the reservoir is made when nuisance algae indicators increase significantly over a short period of time and when other preferred mitigation strategies have not been successful. The Sweetwater APAP proposes application of a mixture of copper sulfate crystals and granular citric acid (for chelation purposes) at the reservoir from side hoppers attached to a powerboat. Applications are proposed to occur in an even manner throughout the surface of the western side of the reservoir, depending on the location of the bloom, though no more than one -half of the surface of the reservoir would be treated per application. If an additional treatment is necessary, a minimum of 2 weeks would elapse between applications. Application would be performed in a manner consistent with product labeling and would be the minimum amount necessary to be effective; the APAP proposes a rate of approximately 2 pounds of copper sulfate and 1 pound of citric acid per surface acre of treated area. In the past, the average amount of solid crystalline product used has been approximately 1,250 pounds per application. Monitoring before, during, and after a copper application is proposed to occur at three numbered buoys in the reservoir, to ensure consistency. Buoy #1 is located at the west end of the reservoir, near the Sweetwater Dam and PWTP; Buoy #2 is located in the center of the reservoir's minimum pool area, in the center of the potential application area; Buoy #7 is located near the opening to Gum Tree Cove on the reservoir's northern shore. Prior to an application event (up to 24 hours in advance), background monitoring would be conducted at Buoy #1 and Buoy #2. Event monitoring samples would be collected at Buoy #7 immediately after the application. Post -event monitoring samples would be collected at Buoy #1 and Buoy #2 within a week after application. Post - treatment monitoring would also include visual inspection of the treatment area by a qualified biologist to ensure beneficial uses have not been impacted. Every calendar year, at least 15 days prior to the first algaecide application (if any), Sweetwater will post a notification on its website and/or provide on -site signage (as appropriate) at the fishing program area. The notification will conform to the procedures described in Section VIII.B of the General Permit. No other agencies have rights to the water in the reservoir, and therefore no public agencies need to be notified. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 15 Resolution No. 15 -036 Page 36 This page intentionally left blank. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 16 Resolution No. 15 -036 Page 37 SECTION 2.0 INITIAL STUDY /ENVIRONMENTAL CHECKLIST FORM 1. Project Title: Application of Copper -Based Algaecides at Five Reservoirs, San Diego County 2. Lead Agency Name and Address: San Diego County Water Authority 4677 Overland Avenue San Diego, CA 92123 3. Contact Person and Phone Number 4. Project Location: 5. Project Sponsor's Name and Address 6. General Plan Designation 7. Zoning: 8. Description of Project: Larry Purcell Water Resources Manager (858) 522 -6752 Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir San Diego County Water Authority 4677 Overland Avenue San Diego, CA 92123 Sweetwater Authority 505 Garrett Avenue Chula Vista, California 91910 Helix Water District 7811 University Avenue La Mesa, California 91942 City of Poway, Public Works Department 13325 Civic Center Drive Poway, California 92064 Santa Fe Irrigation District 5920 Linea del Cielo Rancho Santa Fe, California 92067 NA NA Please refer to Section 1.3 for a detailed description of the proposed project at each of the subject reservoirs. 9. Surrounding Land Uses and Setting: Please refer to Section 1.2 for a detailed discussion of the project setting and surrounding land uses. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 17 Resolution No. 15-036 Page 38 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below will be potentially affected by this project, involving at least one impact that is "Less Than Significant with Mitigation Incorporated" or a "Potentially Significant Impact" as indicated by the checklist on the following pages. • Aesthetics • Agriculture and Forestry Resources • Air Quality © Biological Resources * Cultural Resources * Geology and Soils * Greenhouse Gas Emissions * Hazards and Hazardous Materials * Hydrology and Water Quality 111 W V 31 On the basis of this initial evaluation: • Land Use and Planning • Mineral Resources • Noise • Population and Housing • Public Services • Recreation • Transportation/Traffic • Utilities and Service System • Mandatory Findings of Significance 0 1 find that the proposed project COULD NOT have a significant effect on the environment, and a Categorical Exemption (Class 2, Section 15302) is the appropriate CEQA documentation. 0 1 find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. ■ I find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. 0 1 find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. 0 1 find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated impact" on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. 0 1 find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. Maec Ken Weinberg Date Director of Water Resources San Diego County Water Authority Mitigated Negative Declaration and San Diego Reservoirs Copper-Based Algaecide MND Initial Study/Environmental Checklist Page 18 Resolution No. 15 -036 Page 39 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact EVALUATION OF ENVIRONMENTAL UvIPACTS: I. Aesthetics I. AESTHETICS. Would the project: a Have a substantial adverse effect on a scenic vista? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir Visible components of the project include occasional operation of boats on existing reservoirs for infrequent algaecide application and monitoring. This activity would not have an aesthetic effect, and would not cause an impact at any scenic vistas that may exist at the subject reservoirs; therefore, no impact would occur. b) Substantially damage scenic resources, including, X but not limited to, trees, rock outcroppings, and historic X buildings within a state scenic highway? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See the response to I.a) None of the reservoirs are visible from a scenic highway. No impact would result from this project. c) Substantially degrade the existing visual character or X quality of the site and its surroundings? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See the response to I.a) The use of boats for infrequent application and/or monitoring would not lead to a significant divergence from normal views at the reservoirs, especially for those that allow recreational boating, and the visible components of this project would have no impact. The application of the algaecides would result in the reduction or removal of algae blooms, which typically occur below the water surface, so their removal generally would not be visible to reservoir users. Therefore, the project would have no impact. d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in X the area? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would not introduce any new source of light to the project area. Additionally, project activities would occur only during daylight hours and would not require any nighttime lighting in order to be carried out. Therefore, no impact would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 19 Resolution No. 15 -036 Page 40 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact II. AGRICULTURE AND FORESTRY RESOURCES. II. Agriculture and Forestry Resources Would the project: a) Convert Prime Farmland, Unique Farmland, or X Farmland of Statewide Importance (Farmland), as I I X shown on the maps prepared pursuant to the Farmland X Mapping and Monitoring Program of the Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project activities would not convert or alter Prime Farmland, Unique Farmland, or Farmland of Statewide Importance. All activities would occur within the reservoir and have no impact on agricultural resources. b) Conflict with existing zoning for agricultural use, or X a Williamson Act contract? I I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir No Williamson Act contract lands occur within the project area and no agricultural uses would be displaced as a result of the project. Therefore, no related impact would occur. c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code I I X section 12220(8)), timberland (as defined by Public X Resources Code section (4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir No forest land, timberland, or Timberland Production lands occur within the project area. Therefore, no related impact would occur. d) Result in the loss of forest land or conversion of forest land to non - forest use? I I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See Il.c) above. Because no forest land exists in the project area, no related impact would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 20 Resolution No. 15 -036 Page 41 Less Than Signilicant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact e) Involve other changes in the existing environment _F which, due to their location or nature, could result in X X conversion of Farmland, to non- agricultural use or conversion of forest land to non - forest use? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir Application of algaecides to the reservoirs would not lead to changes in the environment that would convert Farmland to non - agricultural use or forest -land to non - forest use. The algaecides would be applied directly to the water and would affect only the algae in the water. Therefore there is no impact. III. AIR QUALITY. III. Air Quality Would the project: a) Conflict with or obstruct implementation of the _F applicable air quality plan? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would involve the infrequent use of delivery trucks for transportation of algaecides to the subject reservoirs and the use of boats for application and monitoring. Applications would entail a single delivery truck trip to the respective reservoir's operations facility, and operation of a single boat to apply the product, except at San Dieguito Reservoir, where copper is applied through an in -line injection system, and operation of a single boat for pre- and post- application monitoring. The use of this equipment would be sporadic and last for a short duration of time. Any emissions release from the project equipment would be negligible. Therefore, project implementation would not conflict with or obstruct implementation of the applicable air quality plan. This impact is less than significant. b) Violate any air quality standard or contribute _F substantially to an existing or projected air quality X violation? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See III.a) above. Project activities would result in minimal vehicle emissions from trucks and boats for the transportation and application of the algaecide and monitoring in the reservoirs. Application events would not occur often, and would not result in long -term emissions. Therefore, this impact would be less than significant. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide NR TD Initial Study/Environmental Checklist Page 21 Resolution No. 15 -036 Page 42 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is I X non - attainment under an applicable federal or state X ambient air quality standard {including releasing emissions which exceed quantitative thresholds for ozone precursors)? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See III.a) and III.b) above. Project - related emissions would be negligible andwould not contribute considerably to a net increase for any criteria pollutants in the San Diego region. This impact is less than significant. d) Expose sensitive receptors to substantial pollutant concentrations? I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir Sensitive receptors include residences, schools, playgrounds, child care centers, athletic facilities, long- term health care facilities, rehabilitation centers, convalescent centers, and retirement homes. The nearest sensitive receptors to the proposed project are residential properties scattered around the reservoirs and park uses adjacent to certain reservoirs. The algaecides would be applied directly to the reservoirs in either a solid or liquid form, and would not contribute to air contaminants. Spray application at Lake Jennings are not conducted when winds exceed 10 miles per hour in order to ensure maximum control of the Cutrine Plus application and prevent any spray clouds from escaping the treatment zone. Minimal amounts of exhaust would be created by trucks and boats during the application and monitoring process at the reservoirs, but this would not create a substantial amount of pollutants in the area that would be received by these receptors. Therefore, no impact would occur. e) Create objectionable odors affecting a substantial number of people? I I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir Exhaust odors would be emitted by trucks and boats during algaecide application. However, the exhaust is highly diffusive and would be created only in minimal amounts in isolated incidents, so nearby receptors would not be significantly affected. Copper sulfate and citric acid are odorless substances. Furthermore, the algaecides are being applied to reduce or remove algae in the reservoirs, which would also reduce the objectionable odors created by nuisance algae. Therefore, no impact would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 22 Resolution No. 15 -036 Page 43 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact IV. BIOLOGICAL RESOURCES. Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in X local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? To assess the potential for the project to result in a significant impact on sensitive plant or wildlife species, AECOM first conducted a search of the California Department of Fish and Wildlife (CDFW) California Natural Diversity Database (CNDDB), generating a separate list for each subject reservoir and a surrounding 1 -mile radius around the edge of respective reservoir. Sensitive species identified in the database include species listed as endangered or threatened pursuant to the federal Endangered Species Act or California Endangered Species Act, rare plant species identified by the California Native Plant Society, and species listed as State Species of Special Concern by CDFW. AECOM reviewed the search results and then considered the potential for each of the identified species to be present within or adjacent to the reservoir such that they would be likely to come into contact with reservoir water, based on a review of SANDAG regional vegetation mapping to characterize the actual habitats present on -site. For those species that were considered to have potential to occur at the reservoirs based on habitat presence, AECOM considered the potential for these species to be significantly affected by copper application activities, including the temporary increase in copper concentrations in reservoir water. The analysis focused on species that would have the potential to reside or forage in the reservoirs or in wetland habitat on the edges of the reservoirs, because those would be the species that would have the most potential to come into contact with elevated copper levels during and after application. Upland species that are not known to be active in these wetland habitats or to forage in open water were removed from consideration because they would be unlikely to come into contact with elevated copper levels. The analysis concluded that while several special- status species may occur at or adjacent to the reservoirs, the project's impact would be less than significant because these species would not have the potential come into contact with harmful concentrations of copper. The results are summarized below for each subject reservoir. Copper treatments at the subject reservoirs would result in short-term increases in dissolved copper in the reservoir water. Copper would not be applied directly to land or at the edges of reservoirs. As stated in the General Permit, the registration process for pesticides in California includes evaluation of a product's chemical data by EPA and the California Department of Pesticide Regulation "to ensure that a product used according to label instructions will cause no harm or adverse impact on non - target organisms that cannot be reduced or mitigated with protective measures or use restrictions" The copper -based products discussed in this MND are algaecides with approved registration labels that explicitly allow direct application to water bodies. According to the U.S. Environmental Protection Agency's (EPA) "Copper Facts" sheet (EPA 2008), copper can be toxic in high concentrations, but it is also an important essential trace element for terrestrial animals, and many terrestrial animals have the ability to cope with some amount of excess copper exposure by storing it in the liver and bone marrow. The factsheet states that copper is highly toxic to most aquatic species, with the main cause of copper toxicity to fish and aquatic invertebrates being Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 23 Resolution No. 15 -036 Page 44 through rapid binding of copper to the gill membranes, which causes damage and interferes with osmoregulatory processes. However, the long -term biological impacts when copper is applied to reservoirs in the amounts needed to control algae are lessened, because the applied copper settles out of the water as it is taken up by the targeted algae and becomes bound to the bottom sediments, where it is biologically unavailable to organisms that are active within the reservoir water. Settlement rates for copper are dependent on several different factors, including water temperature, turbidity, pH, dissolved solids in the water, and oxidation reduction potential. The EPA states that copper strongly absorbs to organic matter, carbonates, and clay, thereby reducing the bioavailability of copper (EPA 2015). While copper has the ability to bioconcentrate in certain fish organs, the EPA considers this to have a low potential to occur in the quantities applied for algaecide purposes. Bioavailability of copper in bottom sediments is highly variable, and appears to be correlated with sediment characteristics, including pH, sediment particle size, cation exchange capacity, and other factors (Willis 2012). The three participating agencies that allow fishing at their reservoirs for recreational purposes —HWD, Poway, and Sweetwater —have not observed fish kill incidents after copper application and have no records that such fish kills have occurred in the past (Helix Water District 2015; City of Poway 2015; Sweetwater Authority 2015). Olivenhain Reservoir The CNDDB search conducted for Olivenhain Reservoir identified eight special- status plant species and 12 special- status wildlife species based on the species' regional distribution, as shown in Table 1. Table 1: CNDDB Search Results at Olivenhain Reservoir Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 24 ��t�s poi T!resent in Project Areap Spedes Habitath iliirrtatted Pree��ntin Dram F� 1'rojed Common Name Sdentifle Name Statas habitat ...Considei4flon Area PLANTS Low - growing chaparral dominated by chemise; in Encinitas baccharis Bacchans vanessae CLAPS -1, Encinitas region, grows X SE, Fr nearby Del Mar manzanita, Mojave yucca, and mission manzanita felt - leaved Monardella Chaparral understory, monardella hypoleuea ssp. CLAPS -1 beneath mature strands of X Janata Chamise in xerie conditions Vernally moist grasslands, Oreutt's brodiaea Brodiaea orcuthi CNPS -1 rrnma mound topography, X and periphery of vernal pools Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 24 Resolution No. 15 -036 Page 45 Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 25 Oln * �� Proaght �.+i iQr`uJeet Cozomom ]Name Scie"twe amc Status tiara'', Axea Openings in chaparral and Robinson's pepper- Lepidium sage scrub, away from coast virginiewn var. CLAPS -1 in foothill elevations; typical X grass robinsonii sites are relatively dry and exposed Coastal sage scrub, riparian scrub or woodland San Diego sagewort Artemisia palmen CNPS -A communities, and chaparral X below 1970 feet, also along drainages sea dahlia Leptosyne maritima CLAPS -2 coastal sage scrub, within X coastal bluffs summer holly Comarostaphylis diversifolia ssp. CNPS -1 Southern mixed chaparral, X diversi oha on mesic north-facing slopes wart- stemmed Ceanothus Coastal chaparral with ceanothus verrucosus CNPS -2 chamise and Mission X Manzaruta REPTILES Phrynosoma Lowlands along sandy coast horned lizard blainvillh CSSC washes with scattered low X bushes Coastal slope with coastal sage scrub, chaparral, coast patch -nosed Salvadora riparian, grasslands, and snake hexalepis virgultea CSSC agricultural fields, but with X open habitat with fiiable or sandy soils, but with some cover Deserts and semiarid habitats from sea -level to Aspidoscelis tigns 7000 feet, often associated coastal whiptail with dense vegetation like X stejnegeri chaparral and sage scrub around sandy washes and streambeds Coastal chaparral and orange - throated Aspidoscelis thomscrub, within washes, whiptail hyperythra CSSC streams, terraces, and other X sandy areas associated with some erent" plants Chaparral, coastal sage red - diamond Crotalus Tuber CSSC scrub, along creek banks, X rattlesnake and in granite rock outcrops or piles of debris Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 25 Resolution No. 15 -036 Page 46 FE = Fcderaiiy Listed as Endangered FT = Federally Listed as Threatened SE = State Listed as Endangered ST = State Listed as Threatened SCSC = State Lasted Species of Concern CNPS -1 = California Native Plant Society Listed Rare, Threatened, or Endangered in CA only CNPS -2 = California Native Plant Society Listed Rare, Threatened, or Endangered CNPS4 = California Native Plant Society Listed as Limited Distribution Of these species identified in the CNDDB search, AECOM concluded that none of the plant species has the potential to exist in or adjacent to the reservoir because these species are found in sage scrub and chaparral habitat, which would not be affected by copper application at Olivenhain Reservoir. Therefore, Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 26 llia�itat is not mt SpOOt 'omit t b:, , A lhemiwitn ifrom= Farther ` Piru,�+�ct +Conmmton Name Stientme NamUe Status Art,* Slow moving rivers, streams, and ponds with emergent marsh vegetation without western pond turtle Emys marmorata CSSC dense canopy, with X protruding rocks, vegetation mats, or submerged logs for sunning BIRDS Polioptila Diegan coastal sage scrub, coastal California californica FT CSSC dominated by California X gnatcatcher ealifornica sagebrush and flat -top buckwheat Grassy or rocky slopes with southern California Amophda rufceps open scrub at elevations rufous - crowned CSSC from sea level to 2000 feet; X sparrow canescens most populations occur in coastal sae scrub MANINIALS Chaetodapus Coastal sage scrub, Dulzurn pocket ca CSSC chaparral, woodlands, and X mouse oralieus femoral is grasslands, often at the scrub_ grassland interface northwestern San Chaetodipus fdlax Open habitats of coastal sage Diego pocket mouse fallax CSSC scrub, sage scrub /grassland X ecotones, Habitats with patches of San Diego desert Neotoma leplda CSSC prickly pear or cholla, or X woodrat interm edia with rock outcrops or low shrubs Eumops perotis Areas with caves, rock western mastiff bat caiifornicus CSSC crevices, or abandoned X buildings FE = Fcderaiiy Listed as Endangered FT = Federally Listed as Threatened SE = State Listed as Endangered ST = State Listed as Threatened SCSC = State Lasted Species of Concern CNPS -1 = California Native Plant Society Listed Rare, Threatened, or Endangered in CA only CNPS -2 = California Native Plant Society Listed Rare, Threatened, or Endangered CNPS4 = California Native Plant Society Listed as Limited Distribution Of these species identified in the CNDDB search, AECOM concluded that none of the plant species has the potential to exist in or adjacent to the reservoir because these species are found in sage scrub and chaparral habitat, which would not be affected by copper application at Olivenhain Reservoir. Therefore, Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 26 Resolution No. 15 -036 Page 47 the project would not have a significant impact on any of the special- status plant species identified for Olivenhain Reservoir. One of the 12 CNDDB wildlife species for Olivenhain Reservoir —the western mastiff bat (Ewnops perotis ca ifomicus) —was identified as having potential to use the reservoir as a drinking water source. Western mastiff bat is a CDFW State Species of Special Concern, though it is not a covered species under the Water Authority's Natural Communities Conservation Plan/Habitat Conservation Plan (NCCP/HCP). This bat species typically inhabits areas featuring caves, rock crevices, or even abandoned buildings, but is also known to forage over 15 miles from its roost sites and drink from large water impoundments. Western mastiff bat's preferred prey consists of terrestrial invertebrates, so this species is not likely to forage for food on Olivenhain Reservoir, but western mastiff bat has the potential to drink from Olivenhain Reservoir. However, this species is not likely to be affected by increased copper concentrations at Olivenhain Reservoir. If western mastiff bat drinks from the reservoir, it would do so from the reservoir's immediate surface, which would only experience high concentrations of copper immediately following an application, before the chemical would start sinking and mixing with subsurface water. Since algaecide applications at Olivenhain Reservoir would be performed during the day, when western mastiff bat is inactive, the species would not be present to experience an extended exposure to high concentrations of the chemical. Therefore, the western mastiff bat is not likely to ingest large concentrations of copper, and the project would not have a significant impact on this species. No other special- status species would have the potential to be affected by algaecide application at Olivenhain Reservoir. Therefore, the project would have a less than significant impact at Olivenhain Reservoir. Lake Jennings The CNDDB search conducted for Lake Jennings identified four special- status plant species and 16 special- status wildlife species based on the species' regional distribution, as shown in Table 2. Table 2: CNDDB Search Results at Lake Jennings Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 27 Ha0tatis not Presexit iin PrttJ Area; S'pt�eies 16UWnated rrbW Habitat is Awther Presexxt in Common Name SdenMeName Status "itast '' os>sitleratllin Pr ' ettArea PLANTS Abrams' spurge Chamaesyce CNPS 2 Creosote Bush Scrub, sandy X abramsiana flats and open areas Coastal Sage Scrub, decumbent goldenbush Isocoma menziesii CLAPS -1 intermixed with grassland, x var. decumbens wetland- riparian, more artial to clay soils Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 27 Resolution No. 15 -036 Page 48 Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 28 xaiitgrt�is riot Pru, Arm►; l�atcxi &fit Habit�t:ta�, Further l�reei�t =in' Common None Sdmtmc N=M Styx Habitat Considtratim . Pr; " e40CArta Periphery of oak woodlands and cismontane Chaparral delicate clarkia Clarha delicata CNPS -1 haunts, partially shaded by X tree canopy or large shrubs, and typically mesic situations Ramona horkelia Horkeha truncata CNPS -1 Chamise Chaparral, Foothill X Woodland REPTILES Phrynosoma Lowlands along sandy coast horned lizard blainvillii CSSC washes with scattered low X bushes Wide variety ranging from Plestiodon coastal sage, chaparral, oak Coronado Island skink sktltonianus CSSC woodlands, pinon - juniper, X interparietalis riparian woodlands, and pine forests, restricted to more mesic micro- habitats Coastal chaparfal and Aspidoscelis thormcrub, within washes, orange- throated whiptail hyperythra beldingi CSSC streams, terraces, and other X sandy areas associated with some perennial plants Dry rocky brushlands and and habitats, usually near rosy boa Charina trivirgata intermittent streams, also X needs vegetation or rock outcrops for shelter Veg communities include coastal dunes, chaparral, pine -oak woodland, and Anniella pulchra streamside growth of silvery legless lizard pulchra CSSC sycamores, cottonwoods, or X oaks, with loose, moist, warm soil for burrowing, underneath leaf litter for cover BIRDS Campylorhynchus Coastal sage scrub with coastal cactus wren brunneicapillus CSSC extensive stands of prickly X sandi ensrs ear or cholla cacti Pohoptila Diegan coastal sage scrub, coastal California calrfornica FT, dominated by California X gnatcatcher californica CSSC sagebrush and flat -top buckwheat Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 28 Resolution No. 15 -036 Page 49 FE = Federally Listed as Endangered FT = Federally Listed as Threatened SE = State Listed as Endangered ST = State Listed as Threatened SCSC = State Listed Species of Concern CNPS -1= California Native Plant Society Listed Rare, Threatened, or Endangered in CA only CNPS -2 = California Native Plant Society Listed Rare, Threatened, or Endangered CNPS -A = California Native Plant Society Listed as Limited Distribution Of the four plant species identified in the CNDDB search, AECOM concluded that none of the species have the potential to exist in or adjacent to the reservoir because these species are found in creosote scrub, sage scrub, woodlands, and chaparral habitat, which would not be affected by copper application at Lake Jennings. Therefore, the project would not have a significant impact on any of the special- status plant species identified for Lake Jennings. Of the 16 wildlife species identified in the CNDDB search for Lake Jennings, AECOM concluded that none of the species have potential to be present in or adjacent to the reservoir such that they could be exposed to elevated copper levels during or after algaecide application. Two State Species of Special Concern bat species —big free - tailed bat (Nyctinomops macrotis) and pallid bat (Antrozous pallidus)— Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 29 in Project Area; Spades Iliririnated frota Habitat is Further Presa t iu t com mvn warn Sclentilie Name Status kI bitat Consideration PrelectArea Grassy or rocky slopes with southern California Aimophila ruf ceps open scrub at elevations from rufous - crowned sparrow canescens CSSC sea level to 2000 feet; most X populations occur in coastal sage scrub yellow- breasted chat Icteria virens CSSC Riparian woodland with X dense undergrowth MAAD ALS Level and open areas in American badger Taxidea taxes CSSC grasslands, agricultural areas, X and open shrub habitats Pinyon- juniper and Douglas Myctinomops fir forests, chaparral and oak big free - tailed bat CSSC forests in the mountains and X macrons foothills where rocky cliffs and crevices are present Caves, mines, crevices, and pallid bat Antrozous pail idus CSSC abandoned buildings as roost X sites Typical habitats include early stages of chaparral, open San Diego black - tailed Lepus californicus CSSC coastal sage scrub, and X jackrabbit bennettii grasslands near the edges of brush; needs some open land with some shrubs for cover FE = Federally Listed as Endangered FT = Federally Listed as Threatened SE = State Listed as Endangered ST = State Listed as Threatened SCSC = State Listed Species of Concern CNPS -1= California Native Plant Society Listed Rare, Threatened, or Endangered in CA only CNPS -2 = California Native Plant Society Listed Rare, Threatened, or Endangered CNPS -A = California Native Plant Society Listed as Limited Distribution Of the four plant species identified in the CNDDB search, AECOM concluded that none of the species have the potential to exist in or adjacent to the reservoir because these species are found in creosote scrub, sage scrub, woodlands, and chaparral habitat, which would not be affected by copper application at Lake Jennings. Therefore, the project would not have a significant impact on any of the special- status plant species identified for Lake Jennings. Of the 16 wildlife species identified in the CNDDB search for Lake Jennings, AECOM concluded that none of the species have potential to be present in or adjacent to the reservoir such that they could be exposed to elevated copper levels during or after algaecide application. Two State Species of Special Concern bat species —big free - tailed bat (Nyctinomops macrotis) and pallid bat (Antrozous pallidus)— Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 29 Resolution No. 15 -036 Page 50 were identified in the CNDDB search, but unlike the western mastiff bat mentioned above in the Olivenhain Reservoir discussion, these species do not have high potential to use Lake Jennings as awater source, and they are not likely to forage on the reservoir. Therefore, the project would not result in a significant impact on sensitive species. No other special- status species would have the potential to be affected by algaecide application at Lake Jennings. Therefore, the project would have a less than significant impact at Lake Jennings. Lake Poway The CNDDB search conducted for Lake Poway identified three special- status plant species and three special- status wildlife species based on the species' regional distribution, as shown in Table 3. Table 3: CNDDB Search Results at Lake Poway FE = Federally Listed as Endangered Fr = Federally Listed as Threatened Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MID Initial Study/Environmental Checklist Page 30 tis not Preseist iti Pirojr:iatArca Ei%inated' Htitatis itror l�'nrtlur 'resent in Co nmon Nano Sd mtWeN.atne State . H boat tsnsiiierattea►:. Pra ect Area PLANTS Periphery of oak woodlands and cismontane Chaparral haunts, delicate clarkia Clarkia delicate CLAPS -1 partially shaded by tree canopy or X large shrubs, and typically mesie situations Lepiduun Openings in chaparral and sage Robinson's pepper- virginicum var. CLAPS -1 scrub, away from coast in foothill X grass robinsonu elevations; typical sites are relatively and exposed Coastal sage scrub, riparian scrub San Diego sagewort Artemisia palm en CLAPS -4 or woodland communities, and X chaparral below 2000 feet, also alonp drain es BIRDS coastal California Polioptila Diegan coastal sage scrub, gnatcatcher califomica FT, CSSC dominated by California sagebrush X tali omica and flat-top buckwheat southern California Grassy or rocky slopes with open crowned Aimophila CSSC scrub at elevations from sea level X ncf ceps canescens to 2000 feet; most populations s sparro sparrow occur in coastal sae scrub NL4AUdALS San Diego desert Neotoma lepida Habitats with patches of prickly woodrat intermedia CSSC pear or cholla, or with rock X outcrops or low shrubs FE = Federally Listed as Endangered Fr = Federally Listed as Threatened Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MID Initial Study/Environmental Checklist Page 30 Resolution No. 15 -036 Page 51 SE = State Listed as Endangered ST = State Listed as Threatened SCSC = State listed Species of Concern CNPS -1= California Native Plant Society Listed Rare, Threatened, or Endangered in CA only CNPS -2 = California Native Plant Society Listed Rare, Threatened, or Endangered CNPS -4 = California Native Plant Society Listed as Limited Distribution Of these species identified in the CNDDB search, AECOM concluded that none of the plant species has the potential to exist in or adjacent to the reservoir because these species are found in sage scrub and chaparral habitat and at the edges of oak woodland habitat, none of which would be affected by copper application at Lake Poway. Therefore, the project would not have a significant impact on any of the special- status plant species identified for Lake Poway. Similarly, none of the three wildlife species identified in the Lake Poway CNDDB search were considered to have potential to be present in or adjacent to the reservoir such that they could be exposed to elevated copper levels during or after algaecide application. Therefore, the project would not result in a significant impact on sensitive species. No other special- status species would have the potential to be affected by algaecide application at Lake Poway. Therefore, the project would have a less than significant impact at Lake Poway. San Dieguito Reservoir The CNDDB search conducted for San Dieguito Reservoir identified 11 special- status plant species and three special - status wildlife species based on the species' regional distribution, as shown in Table 4. Table 4: CNDDB Search Results at San Dieguito Reservoir Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 31 Habi�atis -�dt Present ibn Pro Ject Area ;'; Spedes F� ated from liaiiitat is Furfher Present in Commis Name ScientiiEe illam 't Status itat eration Prn Net Area PLANTS Within Diegan Sage scrub, California adolphia Adolphia cal:fornica CNPS -2 also peripheral of chaparral X habitats on hillsides near creeks Lowlands from sea level to Nuttall's scrub oak Quercus dumosa CNPS -1 1000 feet in open chaparral X and coastal sage scrub Vernally moist grasslands, Orcutt's brodiaea Brodiaea orcWhi CNPS -1 mama mound topography, X and periphery of vernal pools Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 31 Resolution No. 15 -036 Page 52 Ph = Federally Listed as Endangered FT = Federally Listed as Threatcned SE = State Listed as Endangered Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MI-41) Initial Study/Environmental Checklist Page 32 Present In Pro �t�l $Iatedll< OM der Pr tin Common Name SelentW1**Iamte mss' x` Cenddera&n o ear Coastal sage scrub and Orcutt's spineflower Chorizanthe CNPS -1 coastal chaparral openings X orcuttiana SE, FE and mesas in chamise, with loose sandy substrate clay soils and bums below Palmer's Harpagonella 3260 feet as well as open grapplinghook palmeri CNPS -4 grassy slopes or open X Die an Sage Scrub Valley grasslands coastal Bloomeria sage scrub, and chaparral, San Diego goldenstar clevelandii CNPS -1 near Mimamound X topography or vicinity of vernal pools Creeks or intermittent San Diego marsh- streambeds, open riparian elder Iva hayesiana CNPS -2 canopy to allow sunlight, X sandy alluvial embankments with cobbles Coastal sage scrub, riparian scrub or woodland San Diego sagewort Artemisia palm en CNPS -4 communities, and chaparral X below 2000 feet, also along drainages Shallow soils and cracks on sticky dudleya Dudleya viscida CNPS -1 vertical rock faces, steep X canyon slopes Comarostaphylis Southern mixed chaparral, summer holly divers:folia ssp. CNPS -1 on mesic north- facing slopes X Diversi olia wart - stemmed Ceanothus Coastal chaparral with ceanothus verrucosus CNPS -2 chamise and Mrssion X Manzanita BIRDS CampyIorhynchus Coastal sage scrub with coastal cactus wren brunneicapillus CSSC extensive stands of prickly X sandie ensis pear or cholla cacti Diegan coastal sage scrub, coastal California Polioptila californica FT CSSC donunated by California X gnatcatcher ealifomica sagebrush and flat -top buckwheat MAMMALS Chaetod:pus Coastal sage scrub, Dulzura pocket tali, fornicus CSSC chaparral, woodlands, and X mouse femoralis grasslands, often at the scrub-grassland interface Ph = Federally Listed as Endangered FT = Federally Listed as Threatcned SE = State Listed as Endangered Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MI-41) Initial Study/Environmental Checklist Page 32 Resolution No. 15 -036 Page 53 ST = State Listed as Threatened SCSC = State Listed Species of Concern CNPS -1 = California Native Plant Society Listed Rare, Threatened, or Endangered in CA only CNPS -2 = California Native Plant Society Listed Rare, 'Threatened, or Endangered CNPS -4 = California Native Plant Society Listed as Limited Distribution Of the 11 special- status plant species identified in the CNDDB search, AECOM concluded that two of the plant species —San Diego marsh -elder (Iva hayesiana) and San Diego sagewort (Artemisia pahwri)- have the potential to exist adjacent to the reservoir based on the presence of suitable wetland habitat, as mapped in the SANDAG regional vegetation data. San Diego marsh -elder is an evergreen herbaceous perennial shrub that occupies the margins of permanent alkaline streams and playas near the coast. San Diego sagewort is a perennial deciduous shrub that occupies drainages and riparian scrub from the foothills to the coast. Both of these plants are considered sensitive by the California Native Plant Society due to their limited distribution and threats from water channelization and coastal development. These plants are terrestrial species that may be found in or near drainages that lead into San Dieguito Reservoir. They are not found in open water, so they are unlikely to become inundated by copper- treated water that enters the reservoir after injection at the Cielo Pump Station. Furthermore, the EPA has determined that copper sulfate does not pose a risk to freshwater vascular plants or estuarine/marine plants (EPA 2008), so the potential exposure of these plants to copper as a result of the project would not create a significant impact. None of the three wildlife species identified in the San Dieguito Reservoir CNDDB search were considered to have potential to be present in or adjacent to the reservoir such that they could be exposed to elevated copper levels during or after algaecide application. Therefore, the project would not result in a significant impact on sensitive species. No other special- status species would have the potential to be affected by algaecide application at San Dieguito Reservoir. Therefore, the project would have a less than significant impact at San Dieguito Reservoir. Sweetwater Reservoir The CNDDB search conducted for Sweetwater Reservoir identified 23 special- status plant species and 28 special- status wildlife species based on the species' regional distribution, as shown in Table 5. In addition to the 28 wildlife species identified in the CNDDB search, AECOM considered two more species based on input from Sweetwater biologists regarding special- status species known to occur near the Sweetwater Reservoir. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 33 Resolution No. 15 -036 Page 54 Table 5: CNDDB Search Results at Sweetwater Reservoir Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 34 '::Eiabitat is nat Present in Project ,Area; Species Efl mkwte d Habit# b ffrom Frsrther Pyre 4it Common Name Selentific Name, Status tat Considratl Area PLANTS Within Diegan Sage scrub, also California adolphia Adolphia califomica CNPS -2 peripheral of chaparral habitats X on hillsides near creeks chaparral ragwort Senecio aphanactis CNP3 -2 Coastal sage scrub, cismontane X woodland and alkaline flats Open coastal sage scrub, Dean's milk -vetch Astragalus deanei CLAPS -1 chaparral, or southern oak X woodland on dry hillsides between 805 and 1126 feet Coastal Sage Scrub, intermixed decumbent Isocoma menzieni CLAPS 1 with grassland, wetland - X goldenbush var. decumbens riparian, more partial to clay soils desert bedstraw Galium pro[ifenun CLAPS -2 Creosote Bush Scrub Joshua X Tree Woodland felt - leaved Monardella Chaparral understory, beneath monardella hypoleuca ssp. CLAPS -1 mature strands of Chamise in X lanata xeric conditions Laguna Mountains 'ewelflower Streptanthus CLAPS -4 Chaparral, Yellow Pine Forest X bemardinus mudnama Nam stenocarpum CNPS -2 Muddy embankments of X ponds, lakes and rivers Munz's sage Salvia munm CNP3 -2 Coastal sage scrub below 1640 X feet in elevation Dry slopes in chaparral on Arctostaphylos metavolcanic peaks, shallow Otay manzanita CNPS -1 soils with exposed rock flake, X otayensis endemic to Otay mountain sites Otay Mountain Xeric chamisc chaparral, ceanothus Ceanothus otayensis CNPS -1 restricted to metavolcanic and X abbroic peaks Deinandra CLAPS -1, Fractured clay soils in Otay tarplant conjugens SE, FT grasslands or lightly vegetated X Die an sae scrub clay soils and bums below Palmer's Harpagoneiia CLAPS -4 3280 feet as well as open X grapplinghook p6nen grassy slopes or open Diegan Sae Scrub Low - growing chamise Parry's tetracoccus Tetracoccus dioicus CNPS -1 chaparral, with moderately X dense canopy cover Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 34 Resolution No. 15 -036 Page 55 Mitigated Negative Declaration and Initial Study/Environmental Checklist San Diego Reservoirs Copper -Based Algaecide MND Page 35 Habitat is pot Project Area; iidnbdtated Habitat is ivom*, Present in Cammnn111a w sdlent e,Nwnt St s Habitat. oa i&rati'on ProJect Pro Area Stemodia Riparian habitats, on wet sand purple stemodia durantifolia CLAPS -2 or rocks, drying streambeds X lower than 1300 feet Openings in chaparral and sage Robinson's pepper- Lepidium virgihicum CLAPS -1 scrub, away from coast in X grass var. robinsonii foothill elevations; typical sites are relatively and exposed Valleys or disturbed areas San Diego ambrosia Ambrosia pumila CLAPS -1, below 470 feet, usually creek X FE beds, seasonally dry drainages, and floodplains Diegan sage scrub hillsides; San Diego barrel Ferocactus CLAPS -2 crest of slopes and growing in X cactus viridescens cobbles, periphery of veinal pools, slopes below 4922 feet Valley grasslands coastal sage San Diego Bloomena CLAPS 1 scrub, and chaparral, near X goldenstar elevelandii Mima mound topography or vicinity of vernal pools Creeks or intermittent San Diego marsh- streambeds, open riparian elder Iva hayesiana CLAPS -2 canopy to allow sunlight, X sandy alluvial embankments with cobbles Grassy openings in chaparral San Diego thorn- Acanthomintha CLAPS -1, or sage scrub with friable or X mint dic{folia SE, FT broken clay soils, in clay depressions on mesas Veinal pools and veinal spreading navarretia Navarrena fossahs CNPS -1, swales, ditches and other X FT artificial depressions below 1475 feet Openings in sage scrub and variegated dudleya Dudleya variegata CLAPS -1 chaparral, isolated rocky X substrates in open grasslands, pro)dmity to veinal pools INVERTEBRATE Hermes copper Lycaena hermes Chaparral or coastal sage scrub X butterfly with redberry San Diego fairy Branchinecta Veinal pools on mesas and in shrimp sandiegonensis FE roadsides ditches and fire ruts X that are shallow Requires Tecate cypress (Cupressus forbesii) as a host Thorne's hairstreak Callophrys thornei plant for reproduction. Known X remaining populations are within the BLM Otay Mountain Wilderness. Mitigated Negative Declaration and Initial Study/Environmental Checklist San Diego Reservoirs Copper -Based Algaecide MND Page 35 Western beach tiger 1''i 1 " "` gnata beetle latesi latesi nata Western tidal -flat Cicindelagabbii tiger beetle AMPHIBIANS arroyo toad I Ancayrus californicus Western spadefoot Shea hammondii toad y areas associate wr REPTILES coast horned lizard Phrynosoma blainvillii orange - throated Aspidoscelis whiptail hyperythra Coastal habitats consisting of salt flats associated with estuaries. Salty coastal habitats including salt marsh, tidal flats, and beaches. Gravelly or sandy washes, FE stream and river banks, and CSSC arroyos; adults burrow in upland habitat near washes and streams Prefers sandy or gravelly soil in grasslands, open chaparral, CSSC and pine -oak woodlands. Breeds in vernal pools and CSSC with scattered low bushes - Coastal chaparral and thomscrub, within washes, CSSC streams, terraces, and other d 'th s—. d Resolution No. 15 -036 Page 56 X X ►./ ►1 X y areas associate wr X X some perennial plants X Occurs in a variety of habitats, Coastal whiptail Aspidoscelis tigns CSSA including chaparral, mixed stejnegeri chaparral, desert scrub, alkali scrub and annual grassland. Chaparral, coastal sage scrub, red - diamond Cratalus Tuber CSSC along creek banks, and in rattlesnake granite rock outcrops or piles of debris Rosy boa Charina trivirgata CSSA Sparsely distributed in desert and chaparral habitats. Most common in rocky areas San Diego Diadophis punctatus within valley - foothill, mixed ringnecked snake similis CSSA chaparral, and annual grassland habitats. Slow moving rivers, streams, and ponds with emergent Western pond turtle Emys marmorata CSSC marsh vegetation without dense canopy, with protruding rocks, vegetation mats, or submerged logs for sunning Resolution No. 15 -036 Page 56 X X ►./ ►1 i Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 36 X X X X X X i Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 36 Resolution No. 15 -036 Page 57 Mitigated Negative Declaration and San Diego Reservoirs C opper -Based Algaecide MND Initial Study/Environmental Checklist Page 37 Pruentin Specs" Eliminated HaWd Is from Fv rdterr Present in Cawmmon N% Sdientiillc Name Slatas i"Wit zctl Aran BIRDS Campylorhynchus Coastal sage scrub with coastal cactus wren brunneicapillus CSSC extensive stands of pri ckly X sandie ensra pear or cholla cacti Diegan coastal sage scrub, coastal California Polioptila californica FT, dominated by California gnatcatcher ealifornica CSSC sagebrush and flat -top X buckwheat Bell's sage sparrow Artemisiospiza bells Coastal sage scrub and open X belli chaparral habitats. Inhabits sandy ocean or bay California homed Eremophila alpestrzs CS C shores, grasslands, and open X lark actia scrublands and woodlands with low, sparse vegetation. CSWL Uncommon migrant and Cooper's hawk Accipiter coopers (nesting) winter visitor to woodlands, X arks, and residential areas. Found near fresh and saltwater Double- crested Phalacrocorax CSWL near coastline, inshore waters, X cormorant auntus beaches, inland rivers, and lakes. Summer resident of low riparian growth in the vicinity FE, SE, of water or in dry river Least Bell's vireo Vireo belliipusillus CSSC bottoms. Nests are placed X along the margins of bushes, usually Salrz, Baccharis, or Proso is. Southern California Aimophda ruficeps Uncommon to fairly common rufous- crowned CSWL localized resident of sage X sparrow canescens scrub on steep rocky slopes. Southwestern Empidonax traillii Typically nests in riparian willow flycatcher extimus FE, SE woodlands that are marshy or X at water's edge. In southern California, now mostly limited to spring and fall transient. Breeds and roosts in open stands of trees Swainson's hawk Buteo mainsoni ST in juniper -sage flats, riparian X areas, and in oak savannah. Forages in adjacent grasslands or suitable agricultural fields, or livestock pastures. SE, Localized resident; nests in CSSC large, dense colonies in Tricolored blackbird Agelams tricolor (nesting freshwater marsh; forages in X colony) agricultural areas, lakeshores and damp lawns. Mitigated Negative Declaration and San Diego Reservoirs C opper -Based Algaecide MND Initial Study/Environmental Checklist Page 37 Resolution No. 15 -036 Page 58 FT = Federally Listed as Threatened SE = State Listed as Endangered ST = State Listed as Threatened CSSC = State Listed Species of Concern CSWL = State Watch List CSSA = State Special Animal CNPS -1 = California Native Plant Society Listed Rare, Threatened, or Endangered in CA only CNPS -2 = California Native Plant Society Listed Rare, Threatened, or Endangered CLAPS -4 = California Native Plant Society Listed as Limited Distribution Of the 23 special- status plant species identified in the CNDDB search, AECOM concluded that three species are known to exist at the Sweetwater reservoir. These include San Diego marsh -elder (Iva hayesiana), decumbent goldenbush (Isocoma menziesii var. decumbens), and mud nama (Nama stenocarpum). One other species that appeared in the CNDDB search, San Diego ambrosia (Ambrosia pumila), has the potential to occur at the reservoir based on the presence of suitable wetland habitat, as mapped in the SANDAG regional vegetation data. San Diego marsh -elder is an evergreen herbaceous perennial shrub that occupies the margins of permanent alkaline streams and playas near the coast. Decumbent goldenbush is a low- growing perennial evergreen shrub that occupies chaparral and coastal Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 38 Resolution No. 15 -036 Page 59 scrub. Mud nama is a low- growing annual plant found in marshes, swamps, and lake margins. San Diego ambrosia is a low- growing evergreen rhizomatous perennial shrub that occurs most frequently on alluvial soils in valleys and floodplains that are seasonally dry. These plants are all terrestrial species that may be found in or near drainages that lead into Sweetwater Reservoir or, in the case of mud nama, on the reservoir's muddy embankments. They do not grow in open water, so they are unlikely to become inundated by copper - treated water in the reservoir. Furthermore, the EPA has determined that copper sulfate does not pose a risk to freshwater vascular plants or estuarine /marine plants (EPA 2008), so the potential exposure of these plants to copper as a result of the project would not create a significant impact. Fifteen of the 30 wildlife species identified in the Sweetwater Reservoir CNDDB search and identified by Sweetwater biologists were considered to have potential to be present in habitat immediately adjacent to the reservoir. Seven of these species are reptiles, including the following: coast horned lizard (Phrynosoma blainvilhi), orange - throated whiptail (Aspidoscelis hyperythra), red - diamond rattlesnake (Crotalus ruber), and western pond turtle (Emys marmorata) (all CDFW State Species of Special Concern), as well as coastal whiptail (Aspidoscelis tigris ste. jnegeri), rosy boa (Charina trivirgata), and San Diego ringnecked snake (Diadophis punctatus similis) (CDFW State Special Animals). With the exception of the western pond turtle and red - diamond rattlesnake, they are primarily terrestrial species that would typically not enter the reservoir water, and their target prey base consists of terrestrial invertebrates and rodents, so they are not likely to have any exposure to copper - treated water as a result of the project. While the western pond turtle would be expected to occasionally enter the reservoir, it spends the majority of the time in streams, secluded ponded areas, or in basking habitat along the edge of streams and is unlikely to occur in the open water areas that are treated with copper. The red - diamond rattlesnake has been documented swimming in open water, but this behavior is not a regular or common occurrence. The potential for this species to be swimming in the application area on the reservoir's western side is very limited, and it is unlikely this species would come into contact with copper- treated water. Additionally, the rosy boa and the coast horned lizard have also been documented in the upper riparian zone at Sweetwater Reservoir, but this habitat is distant from the areas of copper -based algaecide application and the potential for these species to come into contact with copper- treated water is very limited. Therefore, the project's impact on these special - status reptile species is less than significant. Two amphibian species with potential to occur in aquatic habitats adjacent to the reservoir are arroyo toad (Bufo californicus) and the western spadefoot toad (Spea hammondii). The arroyo toad is a species listed by USFWS as endangered pursuant to the federal Endangered Species Act, and is listed as a CDFW State Species of Special Concern. Outside of the arroyo toad's springtime breeding season, which is from March 1 through June 30, this species inhabits uplands areas with moist soils, typically in the interface between upland and riparian areas near streams. During the breeding season, arroyo toads enter slow - moving streams with adjacent sandbars, where quiet backwaters are available for egg laying. The species does not enter open water. Formerly occupied arroyo toad habitat is located upstream of the Sweetwater Reservoir along the Sweetwater River. The habitat is largely over -grown and arroyo toad has not been detected for many years. The western spadefoot toad is a CDFW State Species of Special Concern. This species occupies moist upland burrows for the majority of the year, only entering shallow rain -filled pools and ponds during the breeding season. Western spadefoot toad would not be expected to occur within the open water of the reservoir. Copper application at Sweetwater Reservoir would occur in open water, and high concentrations of copper would not migrate to formerly occupied arroyo toad or western spadefoot Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 39 Resolution No. 15 -036 Page 60 toad habitat upstream of the reservoir. Therefore, the project would not result in a significant impact on arroyo toad or western spadefoot toad. Thirteen special- status bird species are known to occur in the vicinity of the Sweetwater Reservoir, all of which have affinities for the various upland and/or wetland vegetation communities within the study area (Table 5, "BIRDS "). Six of those 13 bird species are terrestrial species that would not enter the reservoir water, and their target prey base consists of terrestrial invertebrates and rodents, so they are not likely to have any exposure to copper- treated water as a result of the project. These six birds are coastal cactus wren (Campylorhynchus brunneicapillus sandiegensis) (State Species of Concern), coastal California gnatcatcher (Polioptila ca[ifornica californica) (Federally- listed threatened, and a State Species of Concern), Bell's sage sparrow (Artemisiospiza Belli Belli) (State Watch List), California horned lark (Eremophila alpestris actia) (State Watch List), southern California rufous - crowned sparrow (Aimophila rueficeps canescens) (State Watch List), and Swainson's hawk (Buteo swainsoni) (State - listed threatened). Therefore, the project's impact on these special- status reptile species is less than significant. The other seven bird species are also terrestrial but are strongly associated with riparian and wetland vegetation communities associated with the Sweetwater reservoir. These are double - crested cormorant (Phalacrocorax auritus) (State Watch List), least Bell's vireo (Vireo belhi pusillus) (Federally and State - listed endangered, and a State Species of Concern), southwestern willow flycatcher (Empidonax traillii extimus) (Federally and State - listed endangered), tricolored blackbird (Agelaius tricolor) (State- listed endangered, and State Species of Concern), Cooper's hawk (Accipiter cooperii) (State Watch List), yellow warbler (Setophaga petechia) (State Species of Concern), and yellow - breasted chat (Icteria vixens) (State Species of Concern). With the exception of the double - crested cormorant, these bird species would not be expected to swim, wade, or forage in the reservoir. In the case of the double - crested cormorant, the proposed application locations would be located away from potential rookery sites. Rookeries are colonial nests, and the double - crested cormorant builds their nests from twigs and branches, on cliff ledges, in trees, or occasionally on the ground; as such, rookeries would typically be near but not on water. Additionally, the activities associated with the application of algaecide would be expected to flush the cormorant away from the treated area. Once applied, copper sulfate quickly hydrolyzes and moves down the water column, and the likelihood of direct contact with avian species would be minimized. Terrestrial wildlife species have mechanisms for sequestering and/or eliminating some excess copper levels (EPA 2008). In order to minimize ecological risk and to avoid exposing terrestrial wildlife to high concentrations of copper that could have adverse effects, the EPA requires strict labeling and application guidelines associated with copper pesticides and algaecides, including weather restrictions and steps to minimize spray drift (EPA 2008), which will be strictly adhered to by Sweetwater pursuant to their APAP. Therefore, the project would have a less than significant impact on avian species at Sweetwater Reservoir. Of the three special- status mammal species documented in the CNDDB query, only the pocketed free - tailed bat (N) ctinomops femorosaccus) would be expected to utilize the aquatic habitat of the Sweetwater Reservoir. The species is a State Species of Concern, and would be expected to fly over the reservoir during nighttime foraging, to skim the surface while drinking water. Since the application of algaecide would occur during daytime hours, the pocketed free - tailed bat would not be present when copper sulfate is being dispersed, or when the compound is at the surface of the reservoir. The other two mammal species identified in the CNDDB query are the American badger (Taxidea taxes) and San Diego black- Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide WM Initial Study/Environmental Checklist Page 40 Resolution No. 15 -036 Page 61 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact tailed jackrabbit (Lepus califomicus bennettii), which are both terrestrial species that would not be expected to enter the reservoir. Therefore, the application of copper sulfate is not expected to result in significant impacts to mammal species at the Sweetwater Reservoir site. b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the X X California Department of Fish and Game or U.S. Fish and Wildlife Service? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not entail vegetation clearing or other activities that could have an adverse effect on riparian habitats or other sensitive natural communities. Project - related application of algaecide would occur in open water at surface water reservoirs or, in the case of San Dieguito Reservoir, through direct injection at the Cielo Pump Station, which then pumps water into a surface water reservoir. Applied copper settles out of water as it is taken up by the targeted algae and becomes bound to bottom sediments. Therefore, significant amounts of copper would not migrate into wetland habitat that exists at the fringes of the subject reservoirs. Furthermore, the EPA has determined that copper sulfate does not pose a risk to freshwater vascular plants or estuarine/marine plants (EPA 2008), so the potential copper exposure to plants that form these wetland communities would not create a significant impact. Provision IX.4.b of the General Permit requires public entities who obtain an exception to the receiving water limitations on copper concentration to provide certification by a qualified biologist that beneficial uses of receiving waters have been restored upon completion of an algaecide application. This observation and certification process would be incorporated into the monitoring and reporting protocol for all five agencies addressed in this MND. If unforeseen situations arise in which the beneficial uses of receiving waters are adversely affected following an application, then provision IX.5.b of the General Permit requires the agency to implement corrective action by revising its application process and control measures to ensure that the situation is eliminated and will not be repeated in the future. c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, X vernal pool, coastal, etc.) through direct removal, filling, hydrological interru tion, or other means? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not propose direct removal, filling, hydrological interruption, or other disturbance of wetlands or jurisdictional waters. Therefore, no impact would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 41 Resolution No. 15 -036 Page 62 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or X with established native resident or migratory wildlife X corridors, or impede the use of native wildlife nursery sites? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not entail new construction or modification of existing features that could affect wildlife movement. Therefore, no impact would occur. e) Conflict with any local policies or ordinances protecting biological resources, such as a tree X preservation policy or ordinance? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir There are no local policies or ordinances pertaining to biological resources that would apply to algae treatment activity at the subject reservoirs. Therefore, no impact would occur. f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation X Plan, or other approved local, regional, or state habitat conservation plan? Olivenhain Reservoir The Water Authority conducts capital improvement projects and operations and maintenance (O &M) work within its system pursuant to the Water Authority NCCP/HCP, which was adopted in December 2010 (San Diego County Water Authority 2010). The Water Authority NCCP/HCP is a comprehensive program designed in conjunction with CDFW and USFWS to (1) facilitate conservation and management of plan- specified covered species and habitats associated with Water Authority activities, and (2) contribute to ongoing regional conservation efforts. Section 5.2.14 of the Water Authority NCCP/HCP identifies pest control, including pesticide application, as a covered activity, but does not specify aquatic pest control at Olivenhain Reservoir as part of this activity (nor does it preclude such activity). The project is limited to occasional O &M work at the reservoir that would not have any direct impact on habitat, nor would it result in take of any covered species. Therefore, the project would not rely on the permits for habitat impacts or species impacts obtained by the Water Authority as part of the NCCP/HCP process, and NCCP/HCP reporting is not required for project - related activities at Olivenhain Reservoir. The project would not conflict with provisions of the Water Authority NCCP/HCP, and there would be no impact. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 42 Resolution No. 15 -036 Page 63 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact Lake Jennings and Sweetwater Reservoir HWD and Sweetwater, along with Padre Dam Municipal Water District, formed the Joint Water Agencies (JWA) to prepare a combined NCCP and HCP for land management and conservation of natural habitats and species specific to the projects and O &M work related to these agencies' systems. However, preparation of the JWA NCCP was terminated in 2012. Therefore, no current habitat conservation plans pertain to activity at Lake Jennings and Sweetwater Reservoir, and there would be no impact. Lake Poway Poway adopted its HCP/NCCP in April 1996 (City of Poway 1996). The Poway HCP/NCCP identifies Lake Poway and immediately surrounding lands with the land use designation Open Space - Recreation as active recreation areas, with the lake allowing boating and fishing and the developed park space supporting picnic areas, ball fields, and land areas featuring active recreation that is generally not compatible with open space preservation. The Poway HCP/NCCP does not explicitly allow or prohibit pesticide application at Lake Poway. The project is limited to occasional O &M work at the reservoir that would not have any direct impact on habitat, nor would it result in take of any species covered by Poway's plan. Therefore, the project would not rely on the permits for habitat impacts or species impacts obtained by the Water Authority as part of the NCCP/HCP process, and NCCP/HCP reporting is not required for project - related activities at Lake Poway. The project would not conflict with provisions of the Water Authority NCCP/HCP, and there would be no impact. San Dieguito Reservoir SFID is preparing a subarea plan to the MSCP that will include San Dieguito Reservoir and its surrounding lands, but the plan is in draft form and has not yet been finalized, nor have permits been issued pursuant to the plan (Santa Fe Irrigation District 2012). Therefore, no current habitat conservation plans pertain to activity at San Dieguito Reservoir, and there would be no impact. V. CULTURAL RESOURCES. Would the project: V. Cultural Resources a) Cause a substantial adverse change in the significance of a historical resource as defined in X §15064.5? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not entail ground disturbance or any other activities that might adversely alter or disturb a historical resource. There would be no impact. b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to X §15064.5? Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 43 Resolution No. 15 -036 Page 64 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See V.a) above. No project activities would disturb or adversely affect the significance of an archaeological resource. There would be no impact. c) Directly or indirectly destroy a unique paleontological resource or site or unique geologic I X feature? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See V.a) above. No project activities would affect a unique paleontological resource or geologic feature. Project activities would be contained to the open water and therefore would have no impact. d) Disturb any human remains, including those interred outside of formal cemeteries? I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See V.a) above. There would be no impact. VI. GEOLOGY AND SOILS. Would the project: VI. Geology and Soils a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist- Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area X or based on other substantial evidence of known fault? Refer to Division of Mines and Geology Special Publication 42. Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir Project activities are limited to algaecide transportation, application, and water quality monitoring at the subject reservoirs. The project would not develop new structures or expose people to any risk of geologic hazards. There would be no impact. ii) Strong seismic ground shaking? I I I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See VI.a.- i) above. The project would not expose people or structures to seismic shaking and would not produce an increased risk of loss or injury due to ground shaking. There would be no impact. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 44 Resolution No. 15 -036 Page 65 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact iii) Seismic - related ground failure, including I I I X liquefaction? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See VI.a.- i) above. Project activities would occur only on the waters of the reservoirs and would not expose people or structures to ground failure. There would be no impact. iv) Landslides? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See VI.a.- i) above. The project would not involve any ground - disturbing activities and would not expose people or structures to related hazards. There would be no impact. b) Result in substantial soil erosion or loss of topsoil? I I I I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not entail ground disturbance and would not create conditions that could contribute to soil erosion and loss of topsoil. There would be no impact. c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, X and potentially result in on or off -site landslide, lateral spreading, subsidence, liquefaction or collapse? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir No project elements would be located on unstable geologic or soil units, and would not lead to a related hazard. Therefore, no impact would occur. d) Be located on expansive soil, as defined in Table 18 -1 -B of the Uniform Building Code (1994), creating X substantial risks to life or property? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See VI.c) above. No new structures would be built as a result of this project. No project activitieswould occur on expansive soil, so no impact would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 45 Resolution No. 15 -036 Page 66 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal X X X systems where sewers are not available for the disposal of waste water? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project involves the direct application of algaecide into reservoirs and would not involve the use of septic tanks or alternative waste water disposal systems. Therefore, no related impacts would occur. VII. GREENHOUSE GAS EMISSIONS. Would the project: VII. Greenhouse Gas Emissions a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the X X environment? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See Section III.a) above. A minimal amount of greenhouse gas (GHG) emissions would be generated by trucks during the transportation of the algaecides to the reservoirs, and by the boats used to apply the algaecides and to conduct water quality monitoring. These activities would occur minimally on an as- needed basis and would last for a short duration. These emissions would not elevate GHG emissions significantly above existing conditions. This impact is less than significant. b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emission of X X eenhouse gases? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See VII.a) above. The GHG emissions created by project activities would be negligible. Therefore, the project would not conflict with an applicable plan, policy, or regulation in the San Diego region. This impact is less than significant. VIII. HAZARDS AND HAZARDOUS MATERIALS. Would the project: VIII. Hazards and Hazardous Materials a) Create a significant hazard to the public or the environment through the routine transport, use, or X disposal of hazardous materials? Algaecide application at the subject reservoirs would entail transporting, handling, and using copper, which is a regulated hazardous material, but one that is commonly used in applications such as is proposed as part of the project. The EPA "Copper Facts" factsheet discusses the human health risks and Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 46 Resolution No. 15 -036 Page 67 environmental hazards related to copper -based pesticides and algaecides. According to the EPA's fact sheet, "There are no human health risks of concern for dietary (food and drinking water) exposures to the pesticidal uses of copper. However, some of the various copper compounds and formulations may cause some den-nal or eye irritation" Exposure or ingestion at very high levels can be harmful to human health, and the EPA regulates labeling of copper -based pesticide and algaecide products to prevent injury resulting from improper handling and application. The factsheet also indicates that copper is highly toxic to most aquatic species but is less of a concern for terrestrial species. In response to potential hazards of these materials, EPA publishes standards for application of copper -based algaecides that are incorporated into product labels. The potential for project- related impacts related to transport and handling of copper would be the result of spills or improper application, which could lead to worker or environmental exposure at toxic levels. Section VIII.0 of the General Permit requires a discharger to incorporate into their APAP the BMPs that will be employed in association with algaecide application so as to reduce the risk of worker or environmental exposure at hazardous levels, including measures to prevent spills and to ensure application at rates consistent with the product label, a plan for staff education on proper use of the products, and measures to prevent fish kills. Section V.B.1 of the General Permit states that dischargers pursuant to the permit must be licensed by the Department of Pesticide Regulation for applicable products; however, copper -based algaecide applications do not require such a license because copper is not a federal restricted use pesticide (R.UP) or a California restricted material. The impact discussion below assesses the potential hazards of copper application at each of the subject reservoirs and identifies the best management practices stated in the agencies' APAPs, which will be incorporated as mitigation measures to ensure the project's impact related to hazardous materials would be reduced to less- than- significant levels. Olivenhain Reservoir Algaecide application at Olivenhain Reservoir entails transporting and handling copper sulfate pentahydrate, which is a regulated hazardous material. The Water Authority estimates up to 80 pounds of the solid crystalline product would be delivered for a single application. The product would be purchased at the time of each application, and would not be stored at the Water Authority's facility. The Water Authority's APAP encloses a Material Safety Data Sheet (MSDS) describing copper sulfate's potential hazards and handling precautions. The MSDS describes copper sulfate pentahydrate as a blue crystalline or powdered, odorless solid that is harmful or potentially fatal if swallowed. The material may cause irritation to the eyes, respiratory system, and skin, and exposing the material to flames may produce irritating, corrosive, and/or toxic fumes. The Water Authority's algaecide application at Olivenhain Reservoir also entails transporting and handling citric acid in solid form, which is less of a concern than copper sulfate, but is identified in the MSDS provided in the Water Authority's APAP as a potential irritant to eyes and skin (San Diego County Water Authority 2014a). All empty containers will be disposed of in accordance with all manufacturer and regulatory requirements. Transport, handling, and use of copper sulfate and citric acid at Olivenhain Reservoir would create the potential for spills that could affect worker safety and the environment. The Water Authority operates with an Emergency Response Guide and Hazardous Materials Business Plan that would be followed in Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 47 Resolution No. 15 -036 Page 68 the event of a spill. The Water Authority's APAP incorporates measures to prevent hazards related to a potential spill from occurring. With the implementation of these mitigation measures, the project's hazardous materials impact at Olivenhaln Reservoir would be reduced to a less - than - significant level. OLIVENHAIN HAZ-1: The Water Authority will require training in copper sulfate and citric acid safety for all Water Authority employees participating in the application and handling of these chemicals. Response and containment procedures provided in the Water Authority's Emergency Response Guide, Hazardous Materials Business Plan and the product MSDS will be followed in the event of a spill. These procedures include isolation and containment of the spill while wearing the appropriate personal protective equipment. OLIVENHAIN HAZ-2: The Water Authority will avoid over - application by ensuring that employees involved with chemical application follow the specific product labels for the algaecides used in the program. Algaecide quantities required for each treatment will be precalculated and only sufficient material to carry out the treatment is transported for an application event. All label directions and California Department of Pesticide Regulation guidelines will be followed as to acceptable application methods as well as weather limitations for application. OLIVENHAIN HAZ-3: Water Authority staff members that may come into contact with the algaecide will be trained on its use and hazards by the safety department. Review of all applicable MSDSs will be included in the training to ensure that employees are up to date on the hazards associated with the chemicals) used. Personal protective equipment is supplied to any employee that will be working with the chemical(s). Goggles, face shield, chemically impervious gloves, and protective clothing to prevent skin contact are provided and used any time work is to be done with the algaecide. OLIVENHAIN HAZ-4: The Water Authority will ensure that application of algaecides is targeted at nuisance algae growths and that algaecides are applied in accordance with label instructions to minimize the application quantity and maximize efficacy. This includes avoiding uneven distribution and applying during favorable weather conditions, when feasible. Because nuisance algal growth affects the beneficial uses within the project area, application of algaecides will be proactive, which will minimize the quantity of decaying algae that results and may threaten oxygen levels. Lake Jennings Algaecide application at Lake Jennings entails transporting and handling Cutrine Plus, a liquid copper - based product that is a regulated hazardous material. HWD estimates using 2.75 to 11 gallons of liquid Cutrine Plus per application, and would order the specific amount at the time application is needed. HWD's APAP encloses an MSDS describing Cutrine Plus's potential hazards and handling precautions. The MSDS describes Cutrine Plus as a liquid product that can cause irritation to the eyes, respiratory system, and skin, and that is slightly toxic if swallowed (Helix Water District 2014a). Exposing the material to flames may produce irritating, corrosive, and/or toxic fumes. All empty containers would be disposed of pursuant to the instructions on the product label and applicable regulations. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 48 Resolution No. 15 -036 Page 69 Transport, handling, and use of Cutrine Plus at Lake Jennings would create the potential for spills that could affect worker safety and the environment. HWD's APAP incorporates measures to prevent these hazards from occurring. With the implementation of these mitigation measures, the project's hazardous materials impact at Lake Jennings would be reduced to a less - than- significant level. JENNINGS- HAZ-1: HWD will ensure that algaecide use rates will be per the U.S. Environmental Protection Agency (EPA) label and will be limited to ensure compliance with receiving water limitations. Treatments will be performed when no water is being discharged from the lake system. JENNINGS- HAZ-2: HWD will ensure that application personnel follow the storage, transport, and spill control procedures per EPA and California Department of Pesticide Regulation rules, regulations, and label instructions. JENNINGS- HAZ-3: HWD will ensure that algaecide quantities required for each treatment will be precalculated and only sufficient material to carry out the treatment will be transported for an application event. Application equipment will be routinely cleaned and maintained, and all label directions and Department of Pesticide Regulations guidelines will be followed as to acceptable application methods, including limitations due to weather conditions. Surface applications will not be made in winds above 10 miles per hour. Lake Poway Algaecide application at Lake Poway entails transporting and handling copper sulfate, which is a regulated hazardous material. Poway applies the solid copper sulfate at a rate of 5 pounds per acre foot of water, and estimates an average use of roughly 300 pounds per application. Copper sulfate is an odorless solid that is harmful or potentially fatal if swallowed. The material may cause irritation to the eyes, respiratory system, and skin, and exposing the material to flames may produce irritating, corrosive, and/or toxic fumes (San Diego County Water Authority 2014a). Copper sulfate is ordered by Poway by the pallet, and is used as needed. Post - application, the empty copper sulfate bags are disposed of by Poway. Transport, handling, and use of copper sulfate at Lake Poway would create the potential for spills that could affect worker safety and the environment. Poway's APAP incorporates measures to prevent these hazards from occurring. With the implementation of these mitigation measures, the project's hazardous materials impact at Lake Poway would be reduced to a less - than- significant level. POWAY- HAZ-1: Poway will ensure that algaecide use rates will be per the EPA label and will be limited to ensure compliance with receiving water limitations. Treatments will be performed when no water is being discharged from the lake system. POWAY-HAZ-2: Poway will ensure that application personnel follow the storage, transport, and spill control procedures per EPA and California Department of Pesticide Regulation rules, regulations, and label instructions. POWAY- HAZ-3: Poway will ensure that algaecide quantities required for each treatment will be precalculated and only sufficient material to carry out the treatment will be transported for an Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 49 Resolution No. 15 -036 Page 70 application event. Application equipment will be routinely cleaned and maintained, and all label directions and Department of Pesticide Regulation guidelines will be followed as to acceptable application methods, including limitations due to weather conditions. Surface applications will not be made in winds above 10 miles per hour. San Diegulto Reservoir Algaecide application at San Dieguito Reservoir entails transporting and handling a liquid form of copper sulfate pentahydrate, which is a regulated hazardous material. SFID's APAP encloses an MSDS describing copper sulfate's potential hazards and handling precautions. The MSDS describes copper sulfate pentahydrate as a clear blue, corrosive liquid with minimal odor. The substance is harmful if swallowed and may cause irritation to the eyes, respiratory system, and skin (Santa Fe Irrigation District 2014a). Exposing the material to flames may produce irritating, corrosive, and/or toxic fumes. Application of algaecides at San Dieguito Reservoir is conducted via a feed system in the Cielo Pump Station, as opposed to application on the reservoir from a boat, which allows for safe and effective application and minimizes exposure to workers and unintended targets. SFID estimates using 100 to 500 gallons of the liquid copper sulfate pentahydrate per application. Because applications at San Dieguito Reservoir are from a fixed feed system, the rate of application can be tightly controlled from the chemical metering portion of the system. Each feed system is contained within a spill catchment that is sized to capture 100% of the chemical available for feed. Transport, handling, and use of copper sulfate at San Dieguito Reservoir would create the potential for spills that could affect worker safety and the environment. SFID generally orders a year's supply of the product, and stores it on site to use as needed. After application the containers are triple rinsed and disposed of by SFID. SFID's APAP incorporates measures to prevent hazardous spills and exposure from occurring during and after application of copper sulfate. With the implementation of these mitigation measures, the project's hazardous materials impact at San Dieguito Reservoir would be reduced to a less - than- significant level. SAN DIEGUITO- HAZ-1: SFID will ensure the algaecide treatment system within the Cielo Pump Station is flushed with water at the end of each treatment event to eliminate having any copper sulfate remaining in the system, which will protect the feed system from corrosion and leaks and minimize the potential for worker exposure. SAN DIEGUITO- HAZ-2: SFID will ensure that a break in the algaecide application feed line, tanks, or pumps will be captured and treated as hazardous waste. SFID's safety department will employ a hazardous waste disposal company that will properly dispose of any material that has been contaminated by a spill. SAN DIEGUITO- HAZ-3: SFID staff will calculate maximum dosage rates and program them into the feed system to ensure correct concentration of the feed. The rate of feed for any treatment event will be limited to the recommendations on the product label and the MSDS to ensure effectiveness and minimize any unintended effects on nontargeted organisms. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MT-41) Initial Study/Environmental Checklist Page 50 Resolution No. 15 -036 Page 71 SAN DIEGUITO- HAZ-4: SFID will ensure that any staff members that may come into contact with copper sulfate are trained on its use and hazards by the SFID safety department. SFID will periodically review the product's MSDS to ensure employees are up to date on the hazards associated with the chemical. SFID will ensure personal protective equipment is supplied to any employee that will be working with copper sulfate. Goggles, face shield, chemically impervious gloves, and protective clothing to prevent skin contact will be provided by SFID and used any time work is to be done with the algaecide. Sweetwater Reservoir Algaecide application at Sweetwater Reservoir entails transporting and handling copper sulfate pentahydrate, which is a regulated hazardous material. Sweetwater generally stores enough copper sulfate product on site for two treatment applications. On average, an application at the Sweetwater Reservoir has required 1,250 pounds of solid copper sulfate crystals. This number varies based on water level and how much of the lake's surface area is being treated. The application rate of copper sulfate is approximately 2 pounds per surface acre. Sweetwater's APAP encloses an MSDS describing copper sulfate's potential hazards and handling precautions. The MSDS describes copper sulfate pentahydrate as a blue crystalline or powdered, odorless solid that is harmful or potentially fatal if swallowed. 'Me material may cause irritation to the eyes, respiratory system, and skin, and exposing the material to flames may produce irritating, corrosive, and/or toxic fumes. Sweetwater's algaecide application at Sweetwater Reservoir also entails transporting and handling citric acid in solid form, which is less of a concern than copper sulfate but is identified in the MSDS provided in Sweetwater's APAP as a potential irritant to eyes and skin (Sweetwater Authority 2013). After application, the empty 50 pound bags of copper sulfate are disposed of by Sweetwater in a sanitary landfill, as per the product label instructions. Transport, handling, and use of copper sulfate and citric acid at Sweetwater Reservoir would create the potential for spills that could affect worker safety and the environment. Sweetwater operates with a Chemical Hygiene Plan and Hazardous Response Plan that would be followed in the event of a spill. Sweetwater's APAP incorporates measures to prevent spill - related hazards from occurring. With the implementation of these mitigation measures, the project's hazardous materials impact at Sweetwater Reservoir would be reduced to a less - than- significant level. SWEETWATER HAZ-1: Sweetwater will apply copper sulfate and citric acid in accordance with the product label and shall comply with the recommendations provided on the MSDS applicable to the specific copper sulfate product to be used. Copper sulfate will be applied in an even, consistent manner over the surface area to be treated, thus minimizing the potential for higher than intended localized concentrations. SWEETWATER HAZ-2: Sweetwater will require training in copper sulfate and citric acid safety for all Sweetwater employees participating in the application and handling of copper sulfate. Sweetwater shall conduct additional refresher training, as deemed necessary, prior to each treatment event. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 51 Resolution No. 15 -036 Page 72 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact SWEETWATER HAZ-3: Sweetwater will follow all response and containment procedures provided in their Chemical Hygiene Plan, Hazardous Response Plan, and the product MSDS in the event of a spill. These procedures include isolation and containment of the spill while wearing the appropriate personal protective equipment. SWEETWATER HAZ-4: Sweetwater will require its employees participating in the application or handling of copper sulfate and citric acid to wear appropriate personal protective equipment recommended on the MSDS, including protective safety glasses with side shields (or goggles) per Occupational Safety and Health Administration (OSHA) 29 CFR 1910.133. Chemically impervious gloves made of any waterproof material, boots, and protective clothing will be worn to avoid skin contact (refer to OSHA 29 CFR 1910.138), as well as a respirator that meets OSHA 29 CFR 1910.134 requirements. b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and X X accident conditions involving the release of hazardous X materials into the environment? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See VIII.a) above. Implementation of the mitigation measures identified above will reduce this impact to a less - than- significant level at all of the subject reservoirs. c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste X within one - quarter mile of an existing or proposed X school? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir There are no schools within '/4 mile of any of the subject reservoirs. Therefore, no impact would occur. d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, X would it create a significant hazard to the public or the environment? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not entail any new development, earth disturbance, or other activities that could be affected by prior hazardous materials listing at any of the subject reservoirs. Therefore, no impact would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 52 Resolution No. 15 -036 Page 73 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two X miles of a public airport or public use airport, would the X project result in a safety hazard for people residing or working in the project area? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not entail any new development or activities that could be affected by air traffic. Therefore, no impact would occur. f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people X residing or working in the project area? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not entail any new development or activities that could be affected by air traffic. Therefore, no impact would occur. g) Impair implementation of or physically interfere with an adopted emergency response plan or X emergency evacuation plan? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not entail any new development or construction activities that could interfere with emergency response. Therefore, no impact would occur. h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including X where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not entail any new development or construction activities that could cause or be affected by wildland fire. Therefore, no impact would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 53 Resolution No. 15 -036 Page 74 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact IX. HYDROLOGY AND WATER QUALITY. Would the project: IX. HvdroloLyv and Water Quality a) Violate any water quality standards or waste X discharge requirements? As discussed in Section 1.1, the application of copper -based products for treatment of algae is permitted under the State Board's Water Quality Order No. 2013- 0002 -DWQ, Statewide General Permit for Residual Aquatic Pesticide Discharges to Waders of the U S from Algae and Aquatic Weed Control (General Permit), which regulates use of aquatic pesticides for the purpose of maintaining water quality statewide. The General Permit identifies a limitation on copper concentration in waters that receive permitted pesticide application, which is specified in Table 3 of the permit. The copper limitation is based on the California Toxics Rule (CTR) and varies depending on water hardness. Copper is more toxic to aquatic species when water is softer, as a lower concentration of minerals means a lower concentration of materials with which copper can bond, leading to a greater accumulation of copper in the water. However, the State Board's permitting process acknowledges that public water agencies and mutual water companies may need to periodically exceed this copper limitation when required to otherwise control water quality in their facilities that serve the public. Section 5.3 of the State Implementation Plan provides a Categorical Exemption to the toxics standards where the discharge is necessary to meet statutory requirements under the federal Safe Drinking Water Act or the California Health and Safety Code. The potential application of this Categorical Exception to the receiving -water copper limitation is identified in Table 3 of the General Permit, which points to Attachment G of the permit, a list of water agencies and mutual water companies that have been granted exemptions. The Categorical Exception is intended as a short-term or seasonal exception, not a permanent pass on meeting the limitations. As stated in the General Permit's Fact Sheet, Attachment D to the permit, "there is no discrete definition for short-term; but the intent is to allow the exception to apply during the treatment period. It is up to the Discharger to make this demonstration." The timeframe of when an agency expects they may exceed the receiving water limitations is identified in the agency's Notice of Intent. If the agency is granted the exception, the agency's APAP is revised to identify the approved seasonal exception. For these agencies that are granted the exception, the General Permit or SIP does not state additional limits on copper concentrations for those agencies who have been granted an exception. Instead, water quality monitoring is conducted before, during, and after an application event, and this information is reported to the State Board so they can observe application- related conditions and ensure there are no causes for water quality concern at the respective receiving water. As described above in Section 1.3, the purpose of algaecide application at the five subject reservoirs is to control serious algae blooms that could affect water quality at the subject reservoirs. This periodic treatment is necessary so the agencies can meet taste and odor standards in the drinking water they deliver to their respective consumers. Therefore, such discharges would qualify for the Categorical Exception to the CTR standards that are incorporated into the General Permit's receiving water limitations. The five subject water agencies plan to apply for coverage under the General Permit for use of copper sulfate and, as part of that application, seek the Categorical Exception to the receiving water limitations in case they identify the need to apply increased concentrations of copper during serious algae blooms. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 54 Resolution No. 15 -036 Page 75 The agencies' use of copper sulfate to control algae blooms would temporarily elevate copper concentrations in the subject reservoirs. If high concentrations of copper are needed or soft water conditions in the treated reservoirs elevate the copper toxicity, then these applications could result in excess of the thresholds set forth in the CTR and translated to the General Permit. Exceeding the thresholds in this instance would itself be necessary to prevent water quality impacts at the five reservoirs, but exceeding the thresholds would still be considered a significant impact. By seeking an exemption from the thresholds pursuant to the State Board's permit process, this potentially significant impact would be reduced to a less - than- significant level. Mitigation measures are stated below for each subject agency. Olivenhain Reservoir OLIVENHAIN WQ -1: The Water Authority will apply for coverage under the State Board's NPDES Permit for Discharges of Aquatic Pesticides and, as part of that application, seek a Categorical Exception pursuant to Section 5.3 of the State Board's Policy for Implementation of Toxics Standards for Inland Surface Waters, Enclosed Bays, and Estuaries of California. OLIVENHAIN WQ -2: The Water Authority will continue to monitor and report copper levels in Olivenhain Reservoir in accordance with State Board requirements. Lake Jennings JENNINGS -WQ- l: HWD will apply for coverage under the State Board's NPDES Permit for Discharges of Aquatic Pesticides and, as part of that application, seek a Categorical Exception pursuant to Section 5.3 of the State Board's Policy for Implementation of Toxics Standards for Inland Surface Waters, Enclosed Bays, and Estuaries of California. JENNINGS -WQ-2: HWD will continue to monitor and report copper levels in Lake Jennings in accordance with State Board requirements. Lake Poway POWAY -WQ -1: Poway will apply for coverage under the State Board's NPDES Permit for Discharges of Aquatic Pesticides and, as part of that application, seek a Categorical Exception pursuant to Section 5.3 of the State Board's Policy for Implementation of Toxics Standards for Inland Surface Waters, Enclosed Bays, and Estuaries of California. POWAY-WQ-2: Poway will continue to monitor and report copper levels in Lake Poway in accordance with State Board requirements. San Diegulto Reservoir SAN DIEGUITO -WQ-1: SFID will apply for coverage under the State Board's NPDES Permit for Discharges of Aquatic Pesticides and, as part of that application, seek a Categorical Exception pursuant to Section 5.3 of the State Board's Policy for Implementation of Toxics Standards for Inland Surface Waters, Enclosed Bays, and Estuaries of California. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 55 Resolution No. 15 -036 Page 76 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact SAN DIEGUITO -WQ-2: SFID will continue to monitor and report copper levels in San Dieguito Reservoir in accordance with State Board requirements. Sweetwater Reservoir SWEETWATER WQ -1: Sweetwater will apply for coverage under the State Board's NPDES Permit for Discharges of Aquatic Pesticides and, as part of that application, seek a Categorical Exception pursuant to Section 5.3 of the State Board's Policy for Implementation of Toxics Standards for Inland Surface Waters, Enclosed Bays, and Estuaries of California. SWEETWATER WQ -2: Sweetwater will continue to monitor and report copper levels in Sweetwater Reservoir in accordance with State Board requirements. b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such X that there would be a net deficit in aquifer volume or a X lowering of the local groundwater table level (e.g., the X production rate of pre - existing nearby wells would drop to a level which would not support existing land uses or Tanned uses for which permits have been granted)? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would not entail the use of groundwater and, thus, would not deplete groundwater supplies or interfere with groundwater recharge. Therefore, no related impacts would occur. c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the X course of a stream or river, in a manner which would X result in substantial erosion or siltation on- or oil site? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would not affect drainage patterns. Therefore, no impact would occur. d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the X rate or amount of surface runoff in a manner which would result in floodin ,g on or off site? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See IX.c) above. No impact would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 56 Resolution No. 15 -036 Page 77 Less Than e) Create or contribute runoff water which would Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See IX.c) above. The project would not create or contribute runoff water. No impact would occur. f) Otherwise substantially degrade water quality? I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See IX.a) above. All of the respective reservoirs are surface water impoundments within potable water systems, and none of them release considerable amounts of water to downstream water bodies. Therefore, temporarily increased copper levels at the reservoirs after application would have no impact outside the subject reservoirs. There are no other project components that would affect water quality that are not already discussed in IX.a). With the implementation of the mitigation measures stated above in IX.a), this impact would be reduced to a less than- significant level. g) Place housing within a 100 -year flood hazard area as e) Create or contribute runoff water which would I I X mapped on a federal Flood Hazard Boundary or Flood exceed the capacity of existing or planned stormwater X X drainage systems or provide substantial additional map? sources of polluted runoff? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See IX.c) above. The project would not create or contribute runoff water. No impact would occur. f) Otherwise substantially degrade water quality? I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See IX.a) above. All of the respective reservoirs are surface water impoundments within potable water systems, and none of them release considerable amounts of water to downstream water bodies. Therefore, temporarily increased copper levels at the reservoirs after application would have no impact outside the subject reservoirs. There are no other project components that would affect water quality that are not already discussed in IX.a). With the implementation of the mitigation measures stated above in IX.a), this impact would be reduced to a less than- significant level. g) Place housing within a 100 -year flood hazard area as I I X mapped on a federal Flood Hazard Boundary or Flood X Insurance Rate Map or other flood hazard delineation map? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would not place housing in floodplains. No related impacts would occur. h) Place structures within a 100 -year flood hazard area I I I X which would impede or redirect flood flows? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project would not place structures in flood hazard areas. No related impacts would occur. i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including X flooding as a result of the failure of a levee or dam? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project would not expose people or structures to potential flooding. Therefore, no related impacts would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 57 Resolution No. 15 -036 Page 78 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact j) Inundation by seiche, tsunami, or mudflow? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not propose development or other uses that could be affected by seiche, tsunami, or mudflow. Therefore, no impact would occur. X. LAND USE AND PLANNING. Would the project: X. Land Use and Planning a) Physically divide an established community? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would be implemented within existing reservoirs and does not entail building any new structures. Thus, the project would not physically divide an established community and no related impacts would occur. b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the X project (including, but not limited to the general plan, X specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project would not result in a change in land use, or create any new land uses, so it would not conflict with any applicable land use plan, policy, or regulation. Therefore, no related impacts would occur. c) Conflict with any applicable habitat conservation plan or natural community conservation plan? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See IV.f) above. The project would not conflict with any applicable habitat conservation or natural community conservation plans. Therefore, no impact would occur. XI. MINERAL RESOURCES. Would the project: XI. Mineral Resources a) Result in the loss of availability of a known mineral resource that would be of future value to the region and X the residents of the state? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 58 Resolution No. 15 -036 Page 79 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact Activities of the proposed project are limited to the application of algaecides into existing reservoirs in the San Diego region. No development or ground- disturbing activities would occur, and there would be no loss of availability of mineral resources. Therefore, no impacts to mineral resources would occur. b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local X general plan, specific plan or other land use plan? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XI.a) above. The project activitieswould not result in the loss of availability of a mineral resource recovery site. There would be no impact. XII. NOISE. XII. Noise Would the project result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general X plan or noise ordinance, or applicable standards of other agencies? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir Algaecide application involves limited use of delivery trucks and boats on the subject reservoirs. Trucks would be licensed for use on existing roadways, and any noise produced would not exceed thresholds. On the reservoirs that allow boating, noise from the boat motor would not create significant adverse conditions. On the reservoirs that restrict boating access, other uses are restricted as well, so no people in the surrounding area would be significantly affected by the noise of the motor. Additionally, noise from one power boat engine would not be enough to exceed the thresholds of a general plan or other applicable standards. Noise generation would be short in duration and occur sporadically, on an as- needed basis. There would be no impact. b) Exposure of persons to or generation of excessive oundborne vibration or groundbome noise levels? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XII.a) above. Any groundbome vibration from delivery trucks would be inconsequential due to the short duration and minimal use of the equipment. There would be no impact. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MI-41) Initial Study/Environmental Checklist Page 59 Resolution No. 15 -036 Page 80 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing X X without the project? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project does not entail installation or operation of new permanent sources of stationary noise. Therefore, no impact would occur. d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels X X existing without the project? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XII.a) above. Trucks and boats would generate noise at the project area, but this would not be a substantial increase in noise, especially for the reservoirs that allow use of the lake for recreational activities. For the reservoirs that do not allow public access, the project activity would not last long enough or create enough of a noise disturbance to be considered substantial. This is a less than significant impact. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two X miles of a public airport or public use airport, would the X project expose people residing or working in the project area to excessive noise levels? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir None of the subject reservoirs are located within an airport use plan or within 2 miles of a public airport. Therefore, no related impacts would occur. f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in X the project area to excessive noise levels? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir None of the subject reservoirs are in the vicinity of a private airstrip. Therefore, no impact would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study&nvironmental Checklist Page 60 Resolution No. 15 -036 Page 81 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact XIII. POPULATION AND HOUSING. Would the project: XIII. Population and Housing a) Induce substantial population growth in an area either directly (for example, by proposing new homes X and businesses) or indirectly (for example, through extension of roads or other infrastructure)? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project does not entail construction of homes, businesses, or new infrastructure. Therefore, no impact would occur. b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing X elsewhere? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project occurs within the boundaries of existing reservoirs, and would not impact or displace existing housing or necessitate construction of replacement housing in the area. Therefore, no related impacts would occur. c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XIII .b) above. There would be no impact. XIV. PUBLIC SERVICES. XIV. Public Services Would the proj ect result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: a Fire protection? I I I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project involves the application of algaecides into the waters of existing reservoirs. There would be no development or construction of new structures, and no alteration of existing government facilities or new government facilities would be necessary. According to the MSDS included in the project - related APAPs, the algaecide products that would be used pursuant to this project are not flammable; therefore, on -site storage and use in compliance with applicable requirements would not Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 61 Resolution No. 15 -036 Page 82 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact create a fire hazard. However, the products may decompose if exposed to the heat of a fire and produce corrosive and/or toxic fumes. The storage and use of hazardous materials for algaecide application could require the hazmat response services of local fire agencies in the event of an unforeseen accident. The potential for this to occur is limited and would be alleviated by proper storage and use of the products. Therefore, the project would not result in a significant impact on response times or service standards and the project's impact on fire protection services is less than significant. b) Police protection? I I I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XIV.a) above. There would be no impact to police protection. c Schools? I I I I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XIV.a) above. There would be no impact to school facilities. Parks? I I I I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XIV.a) above. There would be no impact to parks. e) Other public services? I I I F X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XIV.a) above. There would be no impact to other public services. XV. RECREATION. XV. Recreation a) Would the project increase the use of existing neighborhood and regional parks or other recreational X facilities such that substantial physical deterioration of the facility would occur or be accelerated? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir Application of algaecides at the subject reservoirs would not increase the use of existing recreational facilities. No impact would occur. In addition, the potential for impacts on existing water -based recreational uses at the subject reservoirs has been considered. There are no in -water recreational uses allowed at Olivenhain Reservoir, San Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 62 Resolution No. 15 -036 Page 83 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact Dieguito Reservoir, or Sweetwater Reservoir. HWD, Poway, and Sweetwater do not restrict recreational use of the reservoir following a copper application (Helix Water District 2015; City of Poway 2015; Sweetwater 2015). b) Does the project include recreational facilities or require the construction or expansion of recreational X facilities which might have an adverse physical erect X on the environment? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XV.a) above. The proposed project would not include recreational facilities or require the construction or expansion of recreational facilities. Therefore, no impact would occur. XVI. TRANSPORTATION /CIRCULATION. XVI. Transportation /Circulation Would the project: a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into X account all modes of transportation including mass X transit and non - motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project involves the use of light- to medium -duty trucks periodically for the delivery of the algaecide to the reservoir, and would not cause a substantial increase in traffic above existing conditions. Deliveries of the algaecide would occur infrequently and would not require an extensive number of trips to and from the project site. The use of boats for algaecide application would not have an impact on transportation at the project site or surrounding areas. There would be no impact. b) Conflict with an applicable congestion management program, including, but not limited to level of service standards and travel demand measures, or other X standards established by the county congestion management agency for designated roads or highways? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XVI.a) above. There would be no impact. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 63 Resolution No. 15 -036 Page 84 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would have no effect on air traffic. Therefore, no related impacts would occur. d) Substantially increase hazards due to a design c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? I I X X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would have no effect on air traffic. Therefore, no related impacts would occur. d) Substantially increase hazards due to a design I I I X feature (e.g., sharp curves or dangerous intersections) X or incompatible uses e.., farm equipment)? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project activities would be limited to the waters of existing reservoirs and existing roadways. No changes to roadways or increases in hazards due to equipment would occur. Therefore, no impact would occur. e Result in inadequate emergency access? I I I I X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would not restrict emergency access to the reservoirs. There would be no impact. f) Conflict with adopted policies, plans, or programs I I I X regarding public transit, bicycle, or pedestrian facilities, X or otherwise decrease the performance or safety of such facilities? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XVI.d and e) above. The proposed project would not result in effects on existing bus stops, bike lanes, or pedestrian facilities in the vicinity. Thus, the project would not result in conflicts with adopted policies, plans, or programs supporting alternative transportation. There would be no impact. XVII. UTILITIES AND SERVICE SYSTEMS. Would the project: XVII. Utilities and Service Systems a) Exceed wastewater treatment requirements of the I I I X applicable Regional Water Quality Control Board? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would be limited to the application of algaecides in existing bodies of water and would not generate any wastewater. No wastewater treatment requirements would be exceeded; therefore, no related impacts would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 64 Resolution No. 15 -036 Page 85 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing X facilities, the construction of which could cause X significant environmental effects? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would not generate any wastewater. No new or expanded water or wastewater treatment facilities would result or be required. Therefore, no related impacts would occur. c) Require or result in construction of new storm water drainage facilities or expansion of existing facilities, X the construction of which could cause significant X environmental effects? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would not require or include construction of new or expanded storm water facilities. Additionally, no new areas of impervious surface would be created that could increase the volume of storm water runoff associated with the project alignment. Therefore, no related impacts would occur. d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are X new or expanded entitlements needed? X Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would not require additional water supplies. No new or expanded facilities would be needed. Therefore, no related impacts would occur. e) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the X project's projected demand in addition to the provider's existing commitments? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The proposed project would not result in an increased demand on wastewater services. Therefore, no related impacts would occur. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 65 Resolution No. 15 -036 Page 86 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact f) Be served by a landfill with sufficient permitted I X capacity to accommodate the project's solid waste X disposal needs? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir No solid waste would be generated by the application of algaecides into the reservoirs aside from the bags and containers used to store the algaecides. This solid waste generation would be minimal, and no landfill would be needed for this project, and therefore no impact would occur. g) Comply with federal, state, and local statutes and I I X regulations related to solid waste? Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir See XVII.f) above. There would be no impact. XVIII. MANDATORY FINDINGS OF SIGNIFICANCE. XVIII. Mandatory Findims or Significance a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self - sustaining levels, X threaten to eliminate a plant or animal community, X reduce the number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or PrehistorY9 These topics have been addressed above, including issues of biological resources in Section IV and cultural resources in Section V. Section IV concluded that there would be no significant impact on biological resources. Section V concluded there would be no impacts on cultural resources, so the project would not eliminate examples of the major periods of California history or prehistory. b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection X with the effects of past projects, the effects of other current projects, and the effects of probable future projects.) Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 66 Resolution No. 15 -036 Page 87 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Environmental Impact Evaluation Impact Incorporated Impact Impact Olivenhain Reservoir, Lake Jennings, Lake Poway, San Dieguito Reservoir, Sweetwater Reservoir The project entails a very minimal amount of worker activity on an ongoing basis at each of the subject reservoirs, with work being confined to the reservoirs and their adjacent operations facilities. The subject reservoirs are contained by dams that do not release substantial amounts of water downstream, and there is no direct hydrologic connection between any of the reservoirs involved in the project. Therefore, algaecide- treated water in one reservoir would never drain into another reservoir. Application of aquatic pesticides at one reservoir could not lead to increased impacts at any of the others, as the pesticides could not travel between reservoirs and lead to a compounded level of copper. Accordingly, there would be no potential for a cumulative increase in copper levels at any of the reservoirs due to application at any of the other reservoirs. This means that no potential for cumulative water quality impacts would occur at any of the subject reservoirs as a result of this project. This also means there is no potential for a combined accumulation of copper levels at any of the reservoirs that would affect biological resources. This limited amount of activity and lack of connectivity between the reservoirs would not have the potential to substantially contribute to any cumulative impacts that may occur in the project areas. Therefore, no impact would occur. c) Does the project have environmental effects which will cause substantial adverse effects on human X beings, either directly or indirectly? The project's potential to result in impacts on human health have been addressed above, including air quality (Section III), hazards and hazardous materials (Section VIII), and noise (Section XII). As discussed in Sections III and XII, the project would not have air quality or noise effects that would cause substantial direct or indirect adverse effects on human beings. Section VIII identified potential health risks of exposure to copper -based products used in the proposed activity, and identified mitigation measures each of the subject agencies would employ to limit these risks and ensure impacts would be reduced to less - than- significant levels. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 67 Resolution No. 15 -036 Page 88 This page intentionally left blank. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 68 Resolution No. 15 -036 Page 89 SECTION 3.0 DETERNUNATION In conformance with the State CEQA Guidelines, the Water Authority, as lead agency, prepared an Initial Study (IS) and completed an Environmental Checklist Form (see Section 2.0) for the proposed project. During the analysis of the project's environmental impacts, the Water Authority determined that, unless certain mitigation was implemented, the proposed project could have a significant impact on the following environmental factors: hazards and hazardous materials, and hydrology and water quality. The significant impacts warranting mitigation were presented in the IS Checklist and are detailed below in Section 3.1 through 3.5. The project has been revised to include the specific measures listed below in Section 3.2, which would mitigate these impacts to below a level of significance. Analysis of all environmental issues is presented in the evaluation portion of the IS Checklist, provided in Section 2.0. 3.1 OLIVENHAIN RESERVOIR ENVIRONMENTAL IMPACTS AND MITIGATION 3.1.1 Hazards and Hazardous Materials Algaecide application at Olivenhain Reservoir entails transporting, handling, and using copper -based products that are regulated hazardous materials and, if handled or applied improperly, could be hazardous to human health and the environment. The following mitigation measures will be incorporated into the project to reduce this impact to a less - than- significant level: OLIVENHAIN HAZ-1: The Water Authority will require training in copper sulfate and citric acid safety for all Water Authority employees participating in the application and handling of these chemicals. Response and containment procedures provided in the Water Authority's Emergency Response Guide, Hazardous Materials Business Plan and the product MSDS will be followed in the event of a spill. These procedures include isolation and containment of the spill while wearing the appropriate personal protective equipment. OLIVENHAIN HAZ-2: The Water Authority will avoid over - application by ensuring that employees involved with chemical application follow the specific product labels for the algaecides used in the program. Algaecides quantities required for each treatment will be precalculated and only sufficient material to cant' out the treatment is transported for an application event. All label directions and California Department of Pesticide Regulation guidelines will be followed as to acceptable application methods as well as weather limitations for application. OLIVENHAIN HAZ-3: Water Authority staff members that may come into contact with the algaecide will be trained on its use and hazards by the safety department. Review of all applicable MSDSs will be included in the training to ensure that employees are up to date on the hazards associated with the chemical(s) used. Personal protective equipment is supplied to any employee that will be working with the chemical(s). Goggles, face shield, chemically impervious gloves, and protective clothing to prevent skin contact are provided and used any time work is to be done with the algaecide. OLIVENHAIN HAZ-4: The Water Authority will ensure that application of algaecides is targeted at nuisance algae growths and that algaecides are applied in accordance with label instructions to minimize the application quantity and maximize efficacy. This includes avoiding uneven distribution and applying during favorable weather conditions, when feasible. Because Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 69 Resolution No. 15 -036 Page 90 nuisance algal growth affects the beneficial uses within the project area, application of algaecides will be proactive, which will minimize the quantity of decaying algae that results and may threaten oxygen levels. 3.1.2 Hydroloey and Water Ouality The Water Authority's use of copper to control algae blooms at Olivenhain Reservoir may result in excess of receiving -water limitations established in the General Permit. Exceeding the thresholds would itself be necessary to prevent algae- related water quality impacts at Olivenhain Reservoir, but this would be considered a significant impact unless the Water Authority obtains an exception from the limitations by the State Water Resources Control Board. The following mitigation measures will be incorporated into the project to reduce this impact to a less - than- significant level: OLIVENHAIN WQ -1: The Water Authority will apply for coverage under the State Board's NPDES Permit for Discharges of Aquatic Pesticides and, as part of that application, seek a Categorical Exception pursuant to Section 5.3 of the State Board's Policy for Implementation of Toxics Standards for Inland Surface Waters, Enclosed Bays, and Estuaries of California. OLIVENHAIN WQ -2: The Water Authority will continue to monitor and report copper levels in Olivenhain Reservoir in accordance with State Board requirements. 3.2 LAKE JENNINGS ENVIRONMENTAL IMPACTS AND MITIGATION 3.2.1 Hazards and Hazardous Materials Algaecide application at Lake Jennings entails transporting, handling, and using copper -based products that are regulated hazardous materials and, if handled or applied improperly, could be hazardous to human health and the environment. The following mitigation measures will be incorporated into the project to reduce this impact to a less - than- significant level: JENNINGS -HAZ-1: HWD will ensure that algaecide use rates will be per the U.S. Environmental Protection Agency (EPA) label and will be limited to ensure compliance with receiving water limitations. Treatments will be performed when no water is being discharged from the lake system. JENNINGS -HAZ-2: HWD will ensure that application personnel follow the storage, transport, and spill control procedures per EPA and California Department of Pesticide Regulation rules, regulations, and label instructions. JENNINGS -HAZ-3: HWD will ensure that algaecide quantities required for each treatment will be precalculated and only sufficient material to carry out the treatment will be transported for an application event. Application equipment will be routinely cleaned and maintained, and all label directions and Department of Pesticide Regulations guidelines will be followed as to acceptable application methods, including limitations due to weather conditions. Surface applications will not be made in winds above 10 miles per hour. 3.2.2 Hydroloey and Water Ouality HWD's use of copper to control algae blooms at Lake Jennings may result in excess of receiving -water limitations established in the General Permit. Exceeding the thresholds would itself be necessary to prevent algae - related water quality impacts at Lake Jennings, but this would be considered a significant Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 70 Resolution No. 15 -036 Page 91 impact unless HWD obtains an exception from the limitations by the State Water Resources Control Board. The following mitigation measures will be incorporated into the project to reduce this impact to a less - than - significant level: JENNINGS-WQ-1: HWD will apply for coverage under the State Board's NPDES Permit for Discharges of Aquatic Pesticides and, as part of that application, seek a Categorical Exception pursuant to Section 5.3 of the State Board's Policy for Implementation of Toxics Standards for Inland Surface Waters, Enclosed Bays, and Estuaries of California. JENNINGS -WQ -2: HWD will continue to monitor and report copper levels in Lake Jennings in accordance with State Board requirements. 3.3 LAKE POWAY ENVIRONMENTAL IMPACTS AND MITIGATION 3.3.1 Hazards and Hazardous Materials Algaecide application at Lake Poway entails transporting, handling, and using copper -based products that are regulated hazardous materials and, if handled or applied improperly, could be hazardous to human health and the environment. The following mitigation measures will be incorporated into the project to reduce this impact to a less - than- significant level: POWAY- HAZ-1: Poway will ensure that aquatic algaecide use rates will be per the EPA label and will be limited to ensure compliance with receiving water limitations. Treatments will be performed when no water is being discharged from the lake system. POWAY- HAZ-2: Poway will ensure that application personnel follow the storage, transport, and spill control procedures per EPA and California Department of Pesticide Regulation rules, regulations, and label instructions. POWAY- HAZ-3: Poway will ensure that algaecide quantities required for each treatment will be precalculated and only sufficient material to carry out the treatment will be transported for an application event. Application equipment will be routinely cleaned and maintained, and all label directions and Department of Pesticide Regulation guidelines will be followed as to acceptable application methods, including limitations due to weather conditions. Surface applications will not be made in winds above 10 miles per hour. 3.3.2 Hydroloey and Water Ouality Poway's use of copper to control algae blooms at Lake Poway may result in excess of receiving -water limitations established in the General Permit. Exceeding the thresholds would itself be necessary to prevent algae - related water quality impacts at Lake Poway, but this would be considered a significant impact unless Poway obtains an exception from the limitations by the State Water Resources Control Board. The following mitigation measures will be incorporated into the project to reduce this impact to a less - than- significant level: POWAY-WQ-1: Powaywill apply for coverage under the State Board's NPDES Permit for Discharges of Aquatic Pesticides and, as part of that application, seek a Categorical Exception pursuant to Section 5.3 of the State Board's Policy for Implementation of Toxics Standards for Inland Surface Waters, Enclosed Bays, and Estuaries of California. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 71 Resolution No. 15 -036 Page 92 POWAY -WQ -2: Poway will continue to monitor and report copper levels in Lake Poway in accordance with State Board requirements. 3.4 SAN DIEGUITO RESERVOIR ENVIRONMENTAL IMPACTS AND MITIGATION 3.4.1 Hazards and Hazardous Materials Algaecide application at San Dieguito Reservoir entails transporting, handling, and using copper -based products that are regulated hazardous materials and, if handled or applied improperly, could be hazardous to human health and the environment. The following mitigation measures will be incorporated into the project to reduce this impact to a less- than- significant level: SAN DIEGUITO- HAZ-1: SFID will ensure the algaecide treatment system within the Cielo Pump Station is flushed with water at the end of each treatment event to eliminate having any copper sulfate remaining in the system, which will protect the feed system from corrosion and leaks and minimize the potential for worker exposure. SAN DIEGUITO-HAZ-2: SFID will ensure that a break in the algaecide application feed line, tanks, or pumps will be captured and treated as hazardous waste. SFID's safety department will employ a hazardous waste disposal company that will properly dispose of any material that has been contaminated by a spill. SAN DIEGUITO- HAZ-3: SFID staff will calculate maximum dosage rates and program them into the feed system to ensure correct concentration of the feed. The rate of feed for any treatment event will be limited to the recommendations on the product label and the MSDS to ensure effectiveness and minimize any unintended effects on nontargeted organisms. SAN DIEGUITO- HAZ-4: SFID will ensure that any staff members that may come into contact with copper sulfate are trained on its use and hazards by the SFID safety department. SFID will periodically review the product's MSDS to ensure employees are up to date on the hazards associated with the chemical. SFID will ensure personal protective equipment is supplied to any employee that will be working with copper sulfate. Goggles, face shield, chemically impervious gloves, and protective clothing to prevent skin contact will be provided by SFID and used any time work is to be done with the algaecide. 3.4.2 Hydroloey and Water Ouality SFID's use of copper to control algae blooms at San Dieguito Reservoir may result in excess of receiving - water limitations established in the General Permit. Exceeding the thresholds would itself be necessary to prevent algae - related water quality impacts at San Dieguito Reservoir, but this would be considered a significant impact unless SFID obtains an exception from the limitations by the State Water Resources Control Board. The following mitigation measures will be incorporated into the project to reduce this impact to a less -than- significant level: SAN DIEGUITO -W¢ 1: SFID will apply for coverage under the State Board's NPDES Permit for Discharges of Aquatic Pesticides and, as part of that application, seek a Categorical Exception pursuant to Section 5.3 of the State Board's Policy for Implementation of Toxics Standards for Inland Surface Waters, Enclosed Bays, and Estuaries of California. SAN DIEGUITO -WQ-2: SFID will continue to monitor and report copper levels in San Dieguito Reservoir in accordance with State Board requirements. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MM Initial Study/Environmental Checklist Page 72 Resolution No. 15 -036 Page 93 3.5 SWEETWATER RESERVOIR ENVIRONMENTAL IMPACTS AND MITIGATION 3.5.1 Hazards and Hazardous Materials Algaecide application at Sweetwater Reservoir entails transporting, handling, and using copper -based products that are regulated hazardous materials and, if handled or applied improperly, could be hazardous to human health and the environment. The following mitigation measures will be incorporated into the project to reduce this impact to a less - than- significant level: SWEETWATER HAZ-1: Sweetwater will apply copper sulfate and citric acid in accordance with the product label and shall comply with the recommendations provided on the MSDS applicable to the specific copper sulfate product to be used. Copper sulfate will be applied in an even, consistent manner over the surface area to be treated, thus minimizing the potential for higher than intended localized concentrations. SWEETWATER HAZ-2: Sweetwater will require training in copper sulfate and citric acid safety for all Sweetwater employees participating in the application and handling of copper sulfate. Sweetwater shall conduct additional refresher training, as deemed necessary, prior to each treatment event. SWEETWATER HAZ-3: Sweetwater will follow all response and containment procedures provided in their Chemical Hygiene Plan, Hazardous Response Plan, and the product MSDS in the event of a spill. These procedures include isolation and containment of the spill while wearing the appropriate personal protective equipment. SWEETWATER HAZ-4: Sweetwater will require its employees participating in the application or handling of copper sulfate and citric acid to wear appropriate personal protective equipment recommended on the MSDS, including protective safety glasses with side shields (or goggles) per Occupational Safety and Health Administration (OSHA) 29 CFR 1910.133. Chemically impervious gloves made of any waterproof material, boots, and protective clothing will be worn to avoid skin contact (refer to OSHA 29 CFR 1910.138), as well as a respirator that meets OSHA 29 CFR 1910.134 requirements. 3.5.2 Hydroloey and Water Ouality Sweetwater's use of copper to control algae blooms at the Sweetwater Reservoir may result in excess of receiving -water limitations established in the General Permit. Exceeding the thresholds would itself be necessary to prevent algae- related water quality impacts at Sweetwater Reservoir, but this would be considered a significant impact unless Sweetwater obtains an exception from the limitations by the State Water Resources Control Board. The following mitigation measures will be incorporated into the project to reduce this impact to a less - than- significant level: SWEETWATER WQ -1: Sweetwater will apply for coverage under the State Board's NPDES Permit for Discharges of Aquatic Pesticides and, as part of that application, seek a Categorical Exception pursuant to Section 5.3 of the State Board's Policy for Implementation of Toxics Standards for Inland Surface Waters, Enclosed Bays, and Estuaries of California. SWEETWATER WQ -2: Sweetwater will continue to monitor and report copper levels in Sweetwater Reservoir in accordance with State Board requirements. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 73 Resolution No. 15-036 Page 94 3.6 AUTHORITY TO PREPARE A MITIGATED NEGATIVE DECLARATION As provided in the State CEQA Guidelines Section 15070 (Title 14 - California Code of Regulations), an MND may be prepared for a project subject to CEQA when an IS has identified potentially significant effects on the environment but revisions to the project have been made so that clearly no significant effect on the environment will result from project implementation. The Water Authority is the lead agency for preparation of this MEND. Based on the findings of the IS/Environmental Checklist Form prepared for this project (Section 2.0 of this document), the Water Authority has determined that preparation of an MND is the appropriate method to present environmental review of the proposed project in compliance with CEQA. HWD, City of Poway, SFID, and Sweetwater have reviewed this IS and MND; their respective decision-making bodies will also consider adopting the MND before implementing any mitigation program identified specific to their activities, 3.7 PREPARERS OF THE MITIGATED NEGATIVE DECLARATION This MND was prepared by AECOM, 401 West A Street, Suite 1200, San Diego, CA 92101. The following AECOM professionals contributed to its preparation. Bill Graham — Principal in Charge Alex Hardy — Senior Project Manager Jessica Fernandes — Envirorimental Planner Meghan Haggblade — Environmental Planner Lyndon Quon — Senior Biologist Keoni Calantas — Project Biologist Nick Janssen — Geographic Information Systems Specialist Therese Tempereau — Technical Editor Marisa Fabrigas — Word Processor 3.8 RESULTS OF PUBLIC REVIEW (TO BE COMPLETED WITH FINAL MND) No comments were received during the public input period. Comments were received during the public input period, but they did not address the Draft Mitigated Negative Declaration findings or the accuracy or completeness of the Initial Study. No response is necessary. The letters are attached. (x) Comments addressing the findings of the Draft Mitigated Negative Declaration and/or accuracy or completeness of the Initial Study were received during the public input period. Signature Ken Weinberg Director of Water Resources SanUego County Water Authority Mitigated Negative Declaration and Initial Study/Environmental Checklist (A*rtS k () .2015 Date of Draft MND 2015 Date of Final MND San Diego Reservoirs Copper-Based Algaecide MND Page 74 Resolution No. 15 -036 Page 95 SECTION 4.0 REFERENCES City of Poway 1996. Poway Subarea Habitat Conservation Plan/Natural Community Conservation Plan. April. City of Poway. 2014a. Aquatic Pesticide Application Plan. March. City of Poway. 2014b. Personal communication; project questionnaire and emailed information provided to Alex Hardy, AECOM, by Kevin O'Reilly, Water Treatment Plant Supervisor. November — December. City of Poway. 2015. Personal communication; emailed information provided to Alex Hardy, AECOM, by Kevin O'Reilly, Water Treatment Plant Supervisor. January. Helix Water District. 2014a. Aquatic Pesticide Plan. Helix Water District. 2014b. Personal communication; project questionnaire and emailed information provided to Alex Hardy, AECOM, by Brian Olney. November — December. Helix Water District. 2015. Personal communication; emailed information provided to Alex Hardy, AECOM, by Brian Olney. January. San Diego County Water Authority. 2010. San Diego County Water Authority Subregional Natural Community Conservation Plan/Habitat Conservation Plan (NCCP/HCP). October. San Diego County Water Authority. 2014a. Aquatic Pesticide Application Plan. November 25. San Diego County Water Authority. 2014b. Personal communication; project questionnaire and emailed information provided to Alex Hardy, AECOM, by Jim Fisher, O &M Manager. November — December. Santa Fe Irrigation District 2012. Final Project Development and Feasibility Report for the San Dieguito Reservoir. Prepared by Dudek. May. Santa Fe Irrigation District. 2014a. Aquatic Pesticide Application Plan. October 16. Santa Fe Irrigation District. 2014b. Personal communication; project questionnaire and emailed information provided to Alex Hardy, AECOM, by Tim Bailey. November— December. Sweetwater Authority. 2013. State Water Resources Control Board Aquatic Pesticide Application Plan. October 28. Sweetwater Authority. 2014. Personal communication; project questionnaire and emailed information provided to Alex Hardy, AECOM, by Mark Hatcher, Water Quality Laboratory Supervisor. November — December. Sweetwater Authority. 2015. Personal communication; emailed information provided to Alex Hardy, AECOM, by Mark Hatcher, Water Quality Laboratory Supervisor. January. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 75 Resolution No. 15 -036 Page 96 U.S. Environmental Protection Agency (EPA). 2008. Copper Facts. Office of Pesticide Programs. June. U.S. Environmental Protection Agency (EPA). 2015. Ecological Toxicity Information. Website accessed February 5, 2015 (http: / /www.epa.gov/R5Super /ecology /toxprofiles.htm). Willis, B.E. 2012. Detecting Copper Resides in Sediments From Aquatic Copper -Based Pesticide Applications. A Thesis Presented to the Graduate School of Clemson University. December. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 76 Resolution No. 15 -036 Page 97 SECTION 5.0 RESPONSE TO COMMENTS ON THE DRAFT MND The Draft MND for the project was circulated for a 30 -day public review beginning March 12, 2015. A Notice of Intent (NOI) to Adopt an MND was published in the U -T San Diego newspaper on March 12, 2015, and was mailed to a list of potentially interested agencies and organizations compiled by the Water Authority and the four other agencies participating in preparation of the MND. Copies of the Draft MND and the supporting technical appendices were made available for review at the Water Authority and at the following libraries near the reservoirs and/or the participating agencies' service area: Bonita- Sunnyside Branch Library, Escondido Main Library, Lakeside Branch Library, National City Public Library, Poway Branch Library, Rancho San Diego Branch Library, Rancho Santa Fe Branch Library, and Spring Valley Branch Library. An electronic version of the Draft, MND and appendices were made available for review and download from the Water Authority's webpage, http: /Avww.sdcwa.org. A public hearing to take testimony on the adequacy of the Draft MND was held at the Water Authority's Board of Directors meeting on March 26, 2015. One comment letter was received in response to issuance of the Draft MND, from the California Department of Fish and Wildlife. No speakers offered testimony on the MND during the March 26, 2015, hearing. This Final MND has been prepared in accordance with the requirements of the California Environmental Quality Act (California Public Resources Code Section 21000, et seq., [revised December 1998] herein, CEQA) and the State of California CEQA Guidelines, as amended February 1999 (California Administrative Code, Title 14, Section 15000, et seq.). The purpose of the Final MND is to provide the decision - making body, in this case the San Diego County Water Authority, responsible agencies, and the public with environmental impact information relative to the proposed project. The Water Authority must consider the information contained in this Final MND, including comments received during the public review period, prior to approving the proposed project. The Final MND includes copies of the comment letter received regarding the Draft MND and the Water Authority's responses to the comments provided in the letter. The Final MND also includes the revised Draft MND and the appendices. Each issue raised in the comment letters has been assigned a number, as indicated with brackets in the margin of the comment letter page, and each response is numbered accordingly. The comment letter has been reproduced on the pages preceding the responses. The Final MND includes revisions to clarify and correct the Draft MND, where necessary. Those revisions are shown in strike - out/underline format, with strikeout text () signifying deletions and underline text text signifying additions. No new significant information is presented in the Final MND that would require recirculation of the Draft MND pursuant to Section 15073.5(a) of the CEQA Guidelines. DRAFT MND COMMENT LETTERS State Agencies California Department of Fish and Wildlife, dated April 13, 2015 (comment letter #1) Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 77 Resolution No. 15 -036 Page 98 COMMENT LETTER #1 California Department of Fish and Wildlife, dated April 13, 2015 (a typographic error on the letter shows the date as April 13, 2014) State of caiitornia - MOO Resources 6ggncy a aRO WN JR rLswmrr DEPARTY.. =NT OF FISH AND WILDLIFE CNARLrON N. SONMAM, DfrftW Sajth Coast Region 3883 Ruffs Road San Diego, CA 92123 (859) 467 -4201 www,wllxtiife.ce,gov April 13, 2014 Mr. Larry Purcell San Diego County Water Authority 4577 Overland Avenue San Diego, California 92125 LPurcellosdcwa.org Subject: Comments on the draft Mitigated Negstfvee Declarati Resolution No. 15-036 Page 99 Mr, Larry Purcell San Diego County Water Authority April 13, 2015 Page 2 of 3 species (e.g., fish). Increased residence time of copper In the water also increases the duration of algaecide exposure. However, the non-chelaited alpeoldes, (e.g., copper sulfate pentahydrate) generally tend to have a Shorter residence time and may be more toxic to non - target species than chetated formulations of algaecide (e.g,, CutrI40•Plus). Therefore the Department recommends the use of the lated algaecides whenever it is appropriate, Ala"ckle Sel"O The draft MND (Page 13) discusses the use of specific types of alpeddes. However, there is no mention of how the algoaddes were selected. The Department is not clear if studies were conducted to determine the appropriate form and concentration of copper that should be used to control the algae and cyanobacteria. Additionally. the Aquatic Pesticide Application Plans do not contain any information regarding how algaecides were selected. Therefore, the Department recommends that the final MND contain a section which explains the algaecide selection proms, Alaaecide_AncslicsrtlorgY Page 2 of the MND states "the application of copper-based algisecideis at each of the five listed reservoirs, as implemented by the respective agencies, which may include periodic exceeclances of the limitations stated in the Ger*raf Permit.* Higher concentrations of atgaecide, may cause increased toxicity to aquatic organisms. The Department recommends using multiple (2 or more) algaecide applications (it possible) to control algal growth and I of using field trials (or taboratoq Woossay) to determine the most efficient and effective chelated algaecide formulation before the five, water agencies resort to increasing copper concentrations to control problematic algae and cyanobacteds. We appreciate the opportunity to comment on the referenced MND. Questions regarding this letter and further coordination on these issues should be directed to Bryand Duke at (866) 637-5511 or Bryand.Dukeewildlife.ca.gov. Sincerely, 1, Oad K. Sevrens Environmental Program Manager South Coast Region ec: Lauren Kershak (U.S. Fish and Wildlife Service; lauren—kershekamsgov) Stott Morgan (State Clearinghouse) 70-1 Mitigated Negative Declaration and San Diego Reservoirs Copper-Based Algaecide MND Initial Study/Environmental Checklist Page 79 Mr Larry Purcell Son Diego County Water Authority April 1 -3, ,2016 Page 3 of 3 References Resolution No. 15 -036 Page 100 American Society for Testing and Materials (ASTM), 1903b. Standard guide for conducting acute toxtcily tests with fiches, macroinvertabrates, and amphibians, Applied Biochemists. 1007, Material safety data sheet, Laporte Water Technologies. ASTM Standards on aquatic toxicology and hazard evaluation, designation E -729• 88a.Americari Society for Testing and Materials, Philadelphia, PA. American Pubic Health Association (APHA), 19911. Standard Melh©ds for the Examination of Water and Wastewater, 19°5 ed. Washington, OC. Mastin, S. J,, and J. H Rodgers, Jr. 2000. Toxicity anal taoavadatwlity of copper tierbOdes Cleangate, Cutnne o -Plus, anti Copper Sulfate) to freshwater an(mahs. Arch. Enviran, Coraam. Toxiool. 39:445--451. Masuda K. and C. E. Boyd, 1991 Comparadve evaluation of the solubility and algal to )dcky of copper sulfate and cttelated copper, Aquac utture 117287-302, Murray - Guide, C. L., L E. Meatley, A, L. Schwartzman and J, H. Rodgers, Jr 2002Aigiodal effectiveness of Chearigate", Cutnne° -plus, and Copper Sulfate and margins of safety associated with their use. Archkes of Environmental Contamination and Toxicology. 4119-27. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist Page 80 Resolution No. 15 -036 Page 101 RESPONSE TO COMMENT LETTER #1 California Department of Fish and Wildlife 1. Four of the five agencies whose algaecide application programs are discussed in the MND propose to use either pre - chelated copper algaecide products or citric acid as a chelating agent, when copper - based algaecide is applied to their respective reservoirs. The Water Authority, Sweetwater Authority, and Poway use and/or propose to use citric acid as a chelating agent for their copper applications. HWD currently uses and proposes to continue using Cutrine Plus, a pre - chelated copper product. SFID uses and proposes to continue using a non - chelated copper algaecide product at San Dieguito Reservoir because it is more appropriate to SFID's method of application, which is a direct injection and mixing in the pipeline that delivers water to their reservoir. The algaecide application point for water transferred from Lake Hodges to San Dieguito Reservoir is in a pipeline approximately 1 mile from the reservoir, so the algaecide acts while water is in transit to the reservoir rather than while water is in the reservoir. Because SFID's water is treated in line, the product does not need to remain suspended in reservoir water in order to treat the targeted algae; therefore, the non- chelated product is the most effective and efficient means of algae control at San Dieguito Reservoir. Sections 1.3.2, 1.3.3, and 1.3.4 have been revised in the Final MND to clarify the products that each of the agencies proposes to use in their algae control programs. 2. As a requirement of APAP preparation, each agency addressed in this MND performed an examination of alternative, non - chemical treatment methods of algae control, and has described the alternate methods they considered and those they already employ in their respective APAPs. Based on this review of alternative treatment options, application of the respective copper products proposed at each subject reservoir has been determined to be the most practical and effective method to control nuisance algae blooms, while minimizing potential environmental impacts. Copper -based algaecides have a long history of effective treatment of algae blooms at reservoirs in the United States and around the world. This historic use has provided extensive field data that inform manufacturers' chemical formulation and recommended concentration specifications as listed on the products' EPA - regulated labels. With the exception of the Water Authority, which has not had to use algaecide at Olivenhain Reservoir in the past, the water agencies addressed in this MND have their own histories with copper -based algaecide application at their respective reservoirs, and as a result have extensive field data on application at their own reservoirs. This past experience and the monitoring required pursuant to the General Permit has enabled each agency to develop and optimize an efficient algae - control program that minimizes potential toxicity to non - target species. The Water Authority has relied on an ample amount of information available on various copper -based algaecides to select their product, and will follow all label requirements and industry - standard practices whenever they need to commence algaecide application at Olivenhain. All of the agency practices addressed in this MND will continue to conform to requirements stated in the General Permit, including pre- and post - application monitoring and reporting to the State Board to demonstrate permit compliance. 3. Application of algaecides at each of the reservoirs addressed in this MND will continue to be conducted in conformance with algaecide label instructions, including specifications governing product formulation, concentration, and application frequency. Large blooms of algae are most effectively controlled by repeated low dosage algaecide applications in conformance with label directions (and as recommended in this comment), rather than by merely increasing the amount of copper used in a single application. However, the infrequent exceedance of copper limitations allowed by the General Permit exception provisions may occur even though the agencies conform to label requirements and treat algal blooms with multiple low concentrations rather than a single higher concentration of algaecide product. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial StudyXnvironmental Checklist Page 81 Resolution No. 15 -036 Page 102 This page intentionally left blank. Mitigated Negative Declaration and San Diego Reservoirs Copper -Based Algaecide MND Initial Study/Environmental Checklist page 82