Loading...
Final Budget FY 2016-2017 and 2015-2016CITY OF POWAY CALIFORNIA CITY OF POWAY CALIFORNIA PROPOSED FINANCIAL PROGRAM FISCAL YEARS 2015-16 AND 2016-17PROPOSED FINANCIAL PROGRAM FISCAL YEARS 2015-16 AND 2016-17 ‘The Seeing’ by Jonny Bear Contreras CITY OF POWAY CITY COUNCIL STEVE VAUS, MAYOR JIM CUNNINGHAM DAVE GROSCH BARRY LEONARD JOHN MULLIN The City Council also sits as: Housing Authority Planning Commission Public Financing Authority Successor Agency to the Poway Redevelopment Agency CITY OF POWAY BUDGET REVIEW COMMITTEE GINGER COUVRETTE, CHAIR CHRIS OLPS, VICE CHAIR MARY BAKER BARRY CRONIN CAROL HARMAN Prepared by: Administrative Services Department Scott Edwards, Director Peter Moote, Assistant Director Andrew White, Finance Manager CITY OF POWAY DIRECTORY OF CITY OFFICIALS CITY MANAGER DAN SINGER ASSISTANT CITY MANAGER TINA WHITE CITY ATTORNEY MORGAN FOLEY DIRECTOR OF COMMUNITY SERVICES ROBIN BETTIN CITY CLERK SHEILA COBIAN DIRECTOR OF DEVELOPMENT SERVICES BOB MANIS DIRECTOR OF ADMINISTRATIVE SERVICES/TREASURER SCOTT EDWARDS DIRECTOR OF PUBLIC WORKS TROY BANKSTON DIRECTOR OF SAFETY SERVICES MARK SANCHEZ TABLE OF CONTENTS City Manager's Letter of Transmittal ...................................................................................................... i Budget Overview ........................................................................................................................................ v Fund Balances, Source, and Uses Statement of Fund Balances ............................................................................................................... 1-5 General Fund (100) ................................................................................................................................ 6 Economic Uncertainty Fund (101) .......................................................................................................... 7 Special Projects Fund (102) .................................................................................................................... 8 Pension Stabilization Fund (104) ............................................................................................................ 9 Stormwater Claim Fund (105) .............................................................................................................. 10 Capital Improvement Fund (106) .......................................................................................................... 11 Street Maintenance Fund (103) ............................................................................................................ 12 Streets Funds (211-226) ....................................................................................................................... 13 Drainage and Stormwater Funds (231-233) .......................................................................................... 14 Grant Funds (241-257, 282-284, 714) .................................................................................................. 15 Developer Contribution, Mitigation Funds (251-252, 258, 411, 422) .................................................. 16 Special Assessment District Funds (261 – 275) ................................................................................... 17 Other Assessment Funds (250, 280-281, 283) ...................................................................................... 18 Debt Service Funds (311-336) .............................................................................................................. 19 Water Utility Funds (510-511).............................................................................................................. 20 Sewer Utility Funds (520-521) ............................................................................................................. 21 Capital Replacement Funds (611, 617) ................................................................................................ 22 Trust Funds (254, 711-782) .................................................................................................................. 23 City Housing Funds (416-417, 429) ..................................................................................................... 24 Bond/Loan Interest and Redemption ......................................................................................................... 25 Transfers by Fund Group ..................................................................................................................... 26-27 Interfund Loans .......................................................................................................................................... 28 Revenues by Fund .............................................................................................................................. 29-32 Operating Expenditures Operating Expenditures/Budget by by Fund ....................................................................................... 33-40 Department Operating Budgets Legislative and Administrative. ...................................................................................................... 41-48 Department of Administrative Services .......................................................................................... 49-60 Department of Community Services ............................................................................................... 61-72 Department of Development Services ............................................................................................ 73-86 Department of Public Works ........................................................................................................ 87-104 Department of Safety Services.................................................................................................... 105-112 Capital Improvement Program .................................................................................................... 113-138 Additional Information ......................................................................................................................... 139 This page intentionally left blank L LL LLL This page intentionally left blank v Click on throughout the Budget for more information and detail BUDGET OVERVIEW The City’s operating budget is approximately $83 million in each year of the 2015-17 biennium (July-June). The operating budget covers the day-to-day costs of providing services for police and fire protection, parks and recreation services, streets, and water, sewer, drainage and stormwater utilities. The City uses a fund accounting system, which segregates revenues and expenditures by specific activity. Under this system, the funding source determines how the money can be spent. The General Fund is the City’s principal funding source for fire protection, law enforcement, parks and recreation, planning and engineering and other operations that are not paid by dedicated or restricted sources. Enterprise Funds are used to separately account for operations that are self-supporting. For these funds, costs are fully recovered from user charges, which may only be used to support that particular service, such as water or sewer. Special Revenue Funds are used to account for activities paid for by dedicated revenue sources with specific limitations, such as gas tax, which must be spent on street maintenance. Finally, other funds used by the City include Trust Funds, Reserve Funds, and Internal Service Funds. A description of each fund type is provided in the budget’s fund activity schedules (pages 1-20) which show each fund’s fiscal year beginning balance, projected revenues, budgeted expenditures, transfers to other funds, and projected year-end balance. For each year of the FY 2015-17 biennium, the General Fund makes up virtually half of the overall operating budget; $40 million for FY 2015-16, and $41.3 million for FY 2016- 17. Operating costs for fire protection and law enforcement together make up over half of all General Fund expenditures. An additional $1.4 million in non-departmental expenditures is used for debt service, capital facilities, and other costs. *Includes Park Maintenance from Public Works department FY 2015-16 General Fund Uses vi Understanding the Budget The operating budget is broken down into six departments: x Legislative and Administrative x Administrative Services x Community Services x Development Services x Public Works x Safety Services Departments are further broken down into divisions, such as Fire Suppression, or Park & Landscape Maintenance, and finally, by line- item, such as Gas & Electricity. For each department and its respective divisions, the budget reports proposed expenditures for FY 2015-16 & FY 2016-17, prior years’ estimated or actual expenditures, and the goals and objectives for the new fiscal year. vii City Staffing For fiscal year 2015-16, the budget authorizes 213 full-time and 35.29* part-time positions to staff the City. The number of positions is increased by one full-time and 0.48 part-time for FY 2016-17. The department operating budget pages show the positions assigned to each division. Salary and benefit costs account for roughly half of General Fund operating expenditures, not including contract costs for law enforcement provided by the San Diego County Sheriff’s Department. The City's employee classifications and salary ranges for each are shown in the Position Classifications schedule. 2015-2016 2016-2017 Proposed Proposed Department Full-Time Part-Time* Full-Time Part-Time* Legislative and Administrative 10 .96 10 .96 Administrative Services 21 .48 21 .48 Community Services 20 28.99 20 29.47 Development Services 22 .5 22 .5 Public Works 84 4.36 85 4.36 Safety Services 56 - 56 - Grand Total 213 35.29 214 35.77 *Figures represent full-time equivalent based on 2,080 hours/year Revenues and Other Sources for Operations Appendices The General Fund gets its money for operations primarily from sales tax, property tax, and fees. For fiscal year 2015-16, total General Fund sources are projected at $41.93 million. Over 70% of General Fund revenues are from sales tax, property tax, and the Redevelopment Property Tax Trust Fund. The City receives 1¢ of the 8¢ sales tax for every dollar spent in Poway. Most of the remainder goes to the State and County. viii About 21% of property taxes collected by the County Assessor are allocated to the City, or roughly $840 on a home valued at $400,000. The remainder of property taxes goes to schools, the County, and special districts. Utilities City provided water and sewer services are supported entirely by customer’s bills. Rates support necessary operational expenditures, the purchase and treatment of raw water, and capital improvements to ensure a safe and reliable system of plant, pipes, pump stations, and reservoirs. The budget and financial activity for each utility service is segregated into individual funds. Any unspent budget from a utility’s annual operations is placed in reserve and is used for capital projects and to moderate future rate increases. Due to the water supply challenges in the region, the City is paying over 50% more for its raw water supply than just three years ago. In addition, the cost of the planned reinvestment in the City’s aging water system is anticipated to average $1.8 million each year over the next ten years. Total Sources $25.2 Million Operating & Capital Expenditures $25.8 Million Water Utilities 2015-16 ix Similarly, charges for sewer service are used to support system operation, maintenance, and rehabilitation. Prior to 2011, sewer fees took into account the City’s share of costs for San Diego’s Metro system’s implementation of secondary wastewater treatment. In response to Metro’s deferral of this plan, Poway reduced its sewer commodity fees in 2011 and again in 2012. This resulted in the planned outcome where budgeted operating expenditures are projected to exceed revenue sources during the 2015-17 biennium. Substantial sewer fund reserves are available to provide the resources necessary to ensure continued reliable service to our customers, and to moderate any necessary sewer rate increases over the next few years. The cost of the planned reinvestment in the City’s aging sewer system is anticipated to average $1.5 million over the next four years. Capital Improvements In addition to funding day-to-day operations, the budget provides money for capital projects, or investments in the City’s infrastructure such as streets and parks. Unlike the operating budget which covers expenditures year-by-year, the capital improvement program (CIP) spans multiple-years. In total, there are over 50 active and proposed projects under the CIP, using $32.8 million from various sources. Pages 115-133 Sources $8.2 Million Operating & Capital Expenditures $8.6 Million* Sewer Utilities 2015-16 x More Information is Available Under direction of the City Manager, the Administrative Services Department prepares the City’s budget document. In addition to the published document, other budget resources are available on the City’s website. The City’s budget is reviewed by the Budget Review Committee (Committee), whose members are appointed by the City Council. The Committee also prepares recommendations for consideration by the City Council when the budget is adopted at a public hearing each June. The Committee’s recommendations are available for review on the City’s website with the budget document. Questions about the budget may be directed via email to the Administrative Services Department at adminservices@poway.org Fund Balances, Sources & Uses 1 2 Proposed Revenues and Expenditures FY 2015-2016CapitalBeginningProjects/ Loans/ InterestEndingFund BalanceProgram Transfers and Bond Net Fund Fund BalanceFund7/1/2015 Revenues Operations Costs In(Out) Redemption Activity 06/30/2016General Fund23,015,948 41,198,770 39,852,132 643,000(1,110,020)- (406,382) 22,609,566Economic Uncertainty3,100,000 --- --- 3,100,000Pension Stabilization Fund2,424,868 --- --- 2,424,868Capital Improvement Fund---- 450,000 - 450,000 450,000Street Maintenance Fund4,483,286 --- --- 4,483,286Streets Funds2,299,090 3,086,750 3,304,252 300,000 -- (517,502) 1,781,588Drainage & Stormwater Funds907,488 1,085,120 695,221 - 64,570 - 454,469 1,361,957Grant Funds (1)807,690 444,480 15,000 166,760 (100,000) - 162,720 970,410Developer Contribution/Mitigation Funds2,839,382 107,760 - 120,000 -- (12,240) 2,827,142Special Assessment Districts7,241,414 2,324,200 2,742,632 - 367,660 - (50,772) 7,190,642Other Assessment Funds (1)619,100 986,690 140,000 100,000 (625,000) - 121,690 740,790Debt Service Funds751,035 339,170 -- 752,400 1,816,020 (724,450) 26,585Water Utility Funds5,190,321 25,181,500 23,640,269 1,900,000 (230,890) 9,790 (599,449) 4,590,872Sewer Utility Funds13,441,537 8,190,890 8,372,676 300,000 75,470 - (406,316) 13,035,221Capital Replacement Funds12,840,315 2,941,320 4,045,247 1,971,600 566,950 - (2,508,577) 10,331,738Trust Funds4,215,855 28,840 - 25,000 (2,370) - 1,470 4,217,325City Housing Funds2,799,796 1,019,140 -- 47,730 - 1,066,870 3,866,666 (1) These expenditures are directly charged to these funds and are not included in the Budget by Fund allocation.Total86,977,126 86,934,630 82,807,429 5,526,360 256,500 1,825,810 (2,968,469) 84,008,657STATEMENT OF FUND BALANCES 3 This page intentionally left blank 4 Proposed Revenues and Expenditures FY 2016-2017CapitalBeginningProjects/ Loans/ InterestEndingFund BalanceProgram Transfers and Bond Net Fund Fund BalanceFund7/1/2016 Revenues Operations Costs In(Out) Redemption Activity 06/30/2017General Fund22,609,566 42,185,380 41,087,244 1,070,000 (1,070,020) - (1,041,884) 21,567,682Economic Uncertainty3,100,000 ------ 3,100,000Pension Stabilization Fund2,424,868 ------ 2,424,868Capital Improvement Fund450,000 --- 400,000 - 400,000 850,000Street Maintenance Fund4,483,286 ------ 4,483,286Streets Funds1,781,588 2,693,740 2,506,185 800,000 -- (612,445) 1,169,143Drainage & Stormwater Funds1,361,957 1,117,090 704,041 260,000 64,570 - 217,619 1,579,576Grant Funds (1)970,410 445,070 15,000 166,760 (100,000) - 163,310 1,133,720Developer Contribution/Mitigation Funds2,827,142 110,310 ---- 110,310 2,937,452Special Assessment Districts7,190,642 2,338,100 2,875,159 - 378,700 - (158,359) 7,032,283Other Assessment Funds (1)740,790 987,160 140,000 150,000 (625,000) - 72,160 812,950Debt Service Funds26,585 286,310 -- 1,369,600 1,656,485 (575) 26,010Water Utility Funds4,590,872 27,000,120 24,381,518 1,860,000 (230,600) - 528,002 5,118,874Sewer Utility Funds13,035,221 8,671,950 8,819,330 2,300,000 (124,350) - (2,571,730) 10,463,491Capital Replacement Funds10,331,738 2,993,900 2,473,602 - 566,950 - 1,087,248 11,418,986Trust Funds4,217,325 29,550 -- (2,480) - 27,070 4,244,395City Housing Funds3,866,666 1,021,310 -- 47,730 - 1,069,040 4,935,706 (1) These expenditures are directly charged to these funds and are not included in the Budget by Fund allocation.Total84,008,657 89,879,990 83,002,079 6,606,760 675,100 1,656,485 (710,234) 83,298,423STATEMENT OF FUND BALANCES 5 GENERAL FUND Activity Detail Fund 100 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 17,673,350 17,687,970 22,101,289 22,101,289 23,015,948 22,609,566 REVENUES Taxes & Franchises Sales Tax 11,564,533 11,564,533 12,387,930 12,589,833 13,093,430 13,486,230 Property Tax 20,095,254 18,301,031 15,887,800 16,446,884 17,246,490 17,726,050 Franchise Fees, TOT 2,709,013 2,829,913 2,799,930 3,011,532 2,968,340 2,960,680 Fees, Permits & Services 4,856,263 3,551,490 4,909,600 5,285,476 5,185,760 5,305,190 Use of Property, Grants, Other 4,097,970 5,746,851 2,766,980 2,669,672 2,704,750 2,707,230 Total General Fund Revenues 43,323,033 41,993,818 38,752,240 40,003,397 41,198,770 42,185,380 TOTAL FUNDS AVAILABLE 60,996,383 59,681,788 60,853,529 62,104,686 64,214,718 64,794,946 EXPENDITURES Operating Expenses Legislative and Admin. Services 794,889 827,424 1,080,190 1,016,600 1,259,770 1,231,129 Administrative Services 2,157,825 1,933,784 2,136,357 2,229,214 2,436,150 2,452,998 Community Services 4,733,922 4,912,545 5,156,270 5,252,480 5,569,150 5,699,750 Development Services 3,779,577 3,817,727 3,754,656 4,227,099 3,938,398 4,105,620 Public Works 3,954,035 4,069,404 4,317,252 4,170,786 4,864,014 4,917,267 Safety Services 19,422,840 20,303,104 21,398,360 21,250,334 21,972,210 22,876,580 Redevelopment Services ------ Allowance for Oper. Bgt. Savings - - - - (187,560) (196,100) Total Operating Expenses 34,843,089 35,863,988 37,843,085 38,146,513 39,852,132 41,087,244 Capital Projects (26,229)(13,316)187,000 219,500 643,000 1,070,000 Program Expenses (255,300) 246,769 25,000 124,694 - - Total Programs/Capital Projects (281,529) 233,453 212,000 344,194 643,000 1,070,000 TOTAL EXPENDITURES 34,561,560 36,097,441 38,055,085 38,490,707 40,495,132 42,157,244 TRANSFERS/LOANS Transnet Loan - - - - - - Pension Stabiliz. Fund Trans. In/(Out) - - - - - - Street Loan Repayment - - - - - - Park Fund Loan Repayment - - - - - - RDA Loan In/(Out) - - - - - - All Other Transfers In/(Out) (8,757,996) (1,485,747) (616,620) (598,031) (1,110,020) (1,070,020) Encumbrance Roll Forward - - (18,133) - - - Other Fund Balance Activity 11,144 2,689 - - - - TOTAL TRANSFERS/LOANS (8,746,852) (1,483,058) (634,753) (598,031) (1,110,020) (1,070,020) NET FUND ACTIVITY 14,621 4,413,319 62,402 914,659 (406,382) (1,041,884) ENDING FUND BALANCE 17,687,970 22,101,289 22,163,691 23,015,948 22,609,566 21,567,682 The General Fund is the City’s principal source for fire protection, law enforcement, parks and recreation, planning and engineering and other operations that are not funded by dedicated or restricted sources. The primary source of revenues for the General Fund are property taxes, sales tax, and fees for services. 6 ECONOMIC UNCERTAINTY FUND Activity Detail - Fund 101 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 3,100,000 3,100,000 3,100,000 3,100,000 3,100,000 3,100,000 REVENUES ------ TOTAL FUNDS AVAILABLE 3,100,000 3,100,000 3,100,000 3,100,000 3,100,000 3,100,000 EXPENDITURES Operating Expenses ------ Legislative and Admin. Services ------ Administrative Services ------ Community Services ------ Development Services ------ Public Works ------ Safety Services ------ Redevelopment Services ------ Indirect Cost Allocation ------ Total Operating Expenses ------ Capital Projects ------ Program Expenses ------ Total Programs/Capital Projects ------ TOTAL EXPENDITURES 0 0 0 0 0 0 TRANSFERS In/(Out) ------ LOANS In/(Out) - - - - - - ENCUMB. ROLL FORWARD ------ OTHER FUND BALANCE ACTIVITY - - - - - - TOTAL OTHER SOURCES/USES 0 0 0 0 0 0 NET FUND ACTIVITY 0 0 0 0 0 0 ENDING FUND BALANCE 3,100,000 3,100,000 3,100,000 3,100,000 3,100,000 3,100,000 This fund was created by transfers from the General Fund. It will be drawn upon as necessary to help mitigate actions by the State, possible reductions in State funding, or unforeseen effects of the economy. 7 SPECIAL PROJECTS FUND Activity Detail - Fund 102 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 641,250 641,250 ---- REVENUES ------ TOTAL FUNDS AVAILABLE 641,250 641,2500000 EXPENDITURES Operating Expenses ------ Legislative and Admin. Services ------ Administrative Services ------ Community Services ------ Development Services ------ Public Works ------ Safety Services ------ Redevelopment Services ------ Indirect Cost Allocation ------ Total Operating Expenses ------ Capital Projects ------ Program Expenses ------ Total Programs/Capital Projects ------ TOTAL EXPENDITURES 000000 TRANSFERS In/(Out) - (641,250)---- LOANS In/(Out)------ ENCUMB. ROLL FORWARD ------ OTHER FUND BALANCE ACTIVITY - - - - - - TOTAL OTHER SOURCES/USES 0 (641,250)0000 NET FUND ACTIVITY 0 (641,250)0000 ENDING FUND BALANCE 641,250 ----- This fund is used to account for the sources and uses of monies available through tax sharing agreements. There are no active agreements in effect for FY 2014-15. 8 PENSION STABILIZATION FUND Activity Detail - Fund 104 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 2,424,868 2,424,868 2,424,868 2,424,868 2,424,868 2,424,868 REVENUES ------ TOTAL FUNDS AVAILABLE 2,424,868 2,424,868 2,424,868 2,424,868 2,424,868 2,424,868 EXPENDITURES Operating Expenses ------ Legislative and Admin. Services ------ Administrative Services ------ Community Services ------ Development Services ------ Public Works ------ Safety Services ------ Redevelopment Services ------ Indirect Cost Allocation ------ Total Operating Expenses ------ Capital Projects ------ Program Expenses ------ Total Programs/Capital Projects ------ TOTAL EXPENDITURES 0 0 0 0 0 0 TRANSFERS In/(Out) - - - - - LOANS In/(Out) - - - - - - ENCUMB. ROLL FORWARD ------ OTHER FUND BALANCE ACTIVITY - - - - - - TOTAL OTHER SOURCES/USES 0 0 0 0 0 0 NET FUND ACTIVITY 0 0 0 0 0 0 ENDING FUND BALANCE 2,424,868 2,424,868 2,424,868 2,424,868 2,424,868 2,424,868 This fund was created by transfers from the General Fund to address potential future pension rate increases when impacted by volatile markets. 9 STORMWATER CLAIM FUND Activity Detail - Fund 105 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 ------ REVENUES ------ TOTAL FUNDS AVAILABLE 0 0 0 0 0 0 EXPENDITURES Operating Expenses ------ Legislative and Admin. Services ------ Administrative Services ------ Community Services ------ Development Services ------ Public Works ------ Safety Services ------ Redevelopment Services ------ Indirect Cost Allocation ------ Total Operating Expenses - - - - - - Capital Projects - - - - - - Program Expenses (323,259) - - - - - Total Programs/Capital Projects (323,259) - - - - - TOTAL EXPENDITURES (323,259)00000 TRANSFERS In/(Out) (323,259) - - - - - LOANS (In/(Out)------ ENCUMB. ROLL FORWARD ------ OTHER FUND BALANCE ACTIVITY - - - - - - TOTAL OTHER SOURCES/USES (323,259)00000 NET FUND ACTIVITY 000000 ENDING FUND BALANCE ------ This fund was created by a transfer from the General Fund to fund the stormwater claim process. 10 CAPITAL IMPROVEMENT FUND Activity Detail - Fund 106 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 - - - - - 450,000 REVENUES - - - - - - TOTAL FUNDS AVAILABLE 0 0 0 0 0 450,000 EXPENDITURES Operating Expenses - - - - - - Legislative and Admin. Services - - - - - - Administrative Services - - - - - - Community Services - - - - - - Development Services - - - - - - Public Works - - - - - - Safety Services - - - - - - Redevelopment Services - - - - - - Indirect Cost Allocation - - - - - - Total Operating Expenses - - - - - - Capital Projects 8,074,800 951,972 - - - - Program Expenses - - - - - - Total Programs/Capital Projects 8,074,800 951,972 - - - - TOTAL EXPENDITURES 8,074,800 951,972 0 0 0 0 TRANSFERS In/(Out)8,074,800 951,972 - - 450,000 400,000 LOANS (In/(Out)- - - - - - ENCUMB. ROLL FORWARD - - - - - - OTHER FUND BALANCE ACTIVITY - - - - - - TOTAL OTHER SOURCES/USES 8,074,800 951,972 0 0 450,000 400,000 NET FUND ACTIVITY 0 0 0 0 450,000 400,000 ENDING FUND BALANCE - - - - 450,000 850,000 This fund was created by a transfer from the General Fund to establish a funding source for various community reinvestment Capital Improvement Projects.The original source of funds was a distribution from the Redevelopment Property Tax Trust Fund,associated with dissolution of the Redevelopment Agency.Allocating these funds for community reinvestment purposes is intended to mitigate in part the loss of Redevelopment as a financing tool for the City's Capital Improvement Program. 11 STREET MAINTENANCE FUND Activity Detail Fund 103 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 4,483,286 4,483,286 4,483,286 4,483,286 4,483,286 4,483,286 REVENUES - ---- TOTAL FUNDS AVAILABLE 4,483,286 4,483,286 4,483,286 4,483,286 4,483,286 4,483,286 EXPENDITURES Operating Expenses Legislative and Admin. Services Administrative Services Community Services Development Services Public Works Safety Services Redevelopment Services Indirect Cost Allocation Total Operating Expenses ------ Capital Projects Program Expenses Total Programs/Capital Projects ------ TOTAL EXPENDITURES 000000 TRANSFERS In/(Out)------ LOANS In/(Out) ENCUMB. ROLL FORWARD OTHER FUND BAL. ACTIVITY TOTAL OTHER SOURCES/USES 000000 NET FUND ACTIVITY 000000 ENDING FUND BALANCE 4,483,286 4,483,286 4,483,286 4,483,286 4,483,286 4,483,286 The Street Maintenance Fund was established to provide an as-needed, supplemental source of funds for the City's Street Maintenance Program. Appropriations from this fund can be made at the discretion of the City Council to ensure that the City can continue its high standard for maintenance of streets. The source for the fund has been Council authorized transfers from prior years' General Fund operating surpluses. 12 STREETS FUNDS Activity Detail - Funds 211-226 2012-13 2012-13 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 1,344,275 1,869,896 2,648,488 2,648,488 2,299,090 1,781,588 REVENUES 3,564,371 3,853,739 3,088,160 2,673,731 3,086,750 2,693,740 TOTAL FUNDS AVAILABLE 4,908,646 5,723,635 5,736,648 5,322,219 5,385,840 4,475,328 EXPENDITURES Operating Expenses - - - - - - Legislative and Admin. Services - - - - - - Administrative Services - - - - - - Community Services - - - - - - Development Services 7,500 7,500 7,500 7,500 7,500 7,500 Public Works 3,027,229 2,455,259 3,296,038 2,865,629 3,296,752 2,498,685 Safety Services - - - - - - Redevelopment Services - - - - - - Indirect Cost Allocation - - - - - - Total Operating Expenses 3,034,729 2,462,759 3,303,538 2,873,129 3,304,252 2,506,185 Capital Projects - 601,722 150,000 150,000 300,000 800,000 Program Expenses - - - - - - Total Programs/Capital Projects - 601,722 150,000 150,000 300,000 800,000 TOTAL EXPENDITURES 3,034,729 3,064,481 3,453,538 3,023,129 3,604,252 3,306,185 TRANSFERS In/(Out)- - - - - - RDA LOANS In/(Out)- - - - - - LOANS - - - - - - ENCUMB. ROLL FORWARD - - (39,045) - - - OTHER FUND BALANCE ACTIVITY (4,022) (10,666) - - - - TOTAL OTHER SOURCES/USES (4,022) (10,666) (39,045) 0 0 0 NET FUND ACTIVITY 525,620 778,592 (404,423) (349,398) (517,502) (612,445) ENDING FUND BALANCE 1,869,896 2,648,488 2,244,064 2,299,090 1,781,588 1,169,143 These funds are used to finance the construction, repair and maintenance of City streets, to construct street projects financed by developer's fees, and to account for special sales taxes to be used for street and highway projects approved by the regional transportation group. Financial Activity in this fund group also includes proceeds from AB 2928, and State measure 1B bonds for traffic reduction and safety. 13 DRAINAGE AND STORMWATER FUNDS Activity Detail - Funds 231-233 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 (200,465) 288,859 646,167 646,167 907,488 1,361,957 REVENUES 1,003,843 1,065,789 1,024,750 1,053,286 1,085,120 1,117,090 TOTAL FUNDS AVAILABLE 803,378 1,354,648 1,670,917 1,699,453 1,992,608 2,479,047 EXPENDITURES Operating Expenses Legislative and Admin. Services 17,859 13,929 22,092 20,985 14,217 20,909 Administrative Services 33,300 33,485 44,972 47,428 37,739 45,372 Community Services - - - - - - Development Services 38,591 40,297 39,450 43,465 14,988 36,368 Public Works 517,350 566,332 566,213 544,657 628,277 601,392 Safety Services - - - - - - Redevelopment Services - - - - - - Indirect Cost Allocation - - - - - - Total Operating Expenses 607,100 654,043 672,727 656,535 695,221 704,041 Capital Projects (104,163) 50,000 200,000 200,000 - 260,000 Program Expenditures - - - - - - Total Programs/Capital Projects (104,163) 50,000 200,000 200,000 - 260,000 TOTAL EXPENDITURES 502,937 704,043 872,727 856,535 695,221 964,041 TRANSFERS In/(Out)- - - - - - RDA LOANS In/(Out)- - - 64,570 64,570 64,570 STREET FUND LOANS (In/Out)- - - - - - ENCUMB. ROLL FORWARD - - (1,558) - - - OTHER FUND BALANCE ACTIVITY (11,582) (4,438) - - - - TOTAL OTHER SOURCES/USES (11,582) (4,438) (1,558) 64,570 64,570 64,570 NET FUND ACTIVITY 489,324 357,308 150,465 261,321 454,469 217,619 ENDING FUND BALANCE 288,859 646,167 796,632 907,488 1,361,957 1,579,576 These funds are used to finance drainage maintenance activities, construction of flood control and drainage improvements, and for stormwater program activities. The primary sources of revenue are from property tax assessments and development impact fees. 14 GRANT FUNDS Activity Detail - Funds 241-257, 282-284, 714 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 512,359 498,773 469,511 469,511 807,690 970,410 REVENUES 805,245 517,613 436,840 724,736 444,480 445,070 TOTAL FUNDS AVAILABLE 1,317,604 1,016,386 906,351 1,194,247 1,252,170 1,415,480 EXPENDITURES Operating Expenses Legislative and Admin. Services ------ Administrative Services ------ Community Services 13,268 11,074 5,000 8,245 15,000 15,000 Development Services ------ Public Works ------ Safety Services ------ Redevelopment Services ------ Indirect Cost Allocation - - - - - - Total Operating Expenses 13,268 11,074 5,000 8,245 15,000 15,000 Capital Projects 375,283 299,285 51,208 160,693 45,030 45,030 Program Expenses 329,835 136,516 116,716 117,619 121,730 121,730 Total Programs/Capital Projects 705,118 435,801 167,924 278,312 166,760 166,760 TOTAL EXPENDITURES 718,386 446,875 172,924 286,557 181,760 181,760 TRANSFERS In/(Out) (100,445) (100,000) (100,000) (100,000) (100,000) (100,000) LOANS In/(Out) - - - - - - ENCUMB. ROLL FORWARD - - - - - - GRANTS OUTSTANDING 314,463 26,572 26,572 2,713 - - COMMITTED CAPITAL PROJECTS (314,463) (26,572) (26,572) (2,713) - - OTHER FUND BALANCE ACTIVITY - - - - - - TOTAL OTHER SOURCES/USES (100,445) (100,000) (100,000) (100,000) (100,000) (100,000) NET FUND ACTIVITY (13,586) (29,262) 163,916 338,179 162,720 163,310 ENDING FUND BALANCE 498,773 469,511 633,427 807,690 970,410 1,133,720 These funds are used to account for various grants that are received by the City. Grant programs available to the City include Federal Community Development Block Grants (CDBG), and various State grant programs for transportation improvements, recycling, law enforcement, and traffic safety. 15 DEVELOPER CONTRIBUTION/MITIGATION FUNDS Activity Detail - Funds 251-252, 258, 411, 422 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 2,468,078 2,598,954 2,649,563 2,649,563 2,839,382 2,827,142 REVENUES 123,333 100,609 86,520 192,219 107,760 110,310 TOTAL FUNDS AVAILABLE 2,591,411 2,699,563 2,736,083 2,841,782 2,947,142 2,937,452 EXPENDITURES Operating Expenses Legislative and Admin. Services - - - - - - Administrative Services - - - - - - Community Services - - - - - - Development Services - - - - - - Public Works - - - - - - Safety Services - - - - - - Redevelopment Services - - - - - - Indirect Cost Allocation - - - - - - Total Operating Expenses - - - - - - Capital Projects (7,543) 50,000 - 2,400 120,000 - Program Expenses - - - - - - Total Programs/Capital Projects (7,543) 50,000 - 2,400 120,000 - TOTAL EXPENDITURES (7,543) 50,000 0 2,400 120,000 0 TRANSFERS In/(Out)- - - - - - LOANS In/(Out)- - - - - - ENCUMB. ROLL FORWARD - - - - - - OTHER FUND BALANCE ACTIVITY - - - - - - TOTAL OTHER SOURCES/USES 000000 NET FUND ACTIVITY 130,876 50,609 86,520 189,819 (12,240) 110,310 ENDING FUND BALANCE 2,598,954 2,649,563 2,736,083 2,839,382 2,827,142 2,937,452 These funds are used for acquisition and preservation of habitat financed by developer's fees, for financing public improvements or services that benefit the properties against which the assessments are levied, and to support fire suppression operations. 16 SPECIAL ASSESSMENT DISTRICT FUNDS Activity Detail - Funds 261-275 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 6,733,071 7,055,088 7,290,908 7,290,908 7,241,414 7,190,642 REVENUES 2,339,548 2,320,930 2,266,450 2,309,849 2,324,200 2,338,100 TOTAL FUNDS AVAILABLE 9,072,619 9,376,018 9,557,358 9,600,757 9,565,614 9,528,742 EXPENDITURES Operating Expenses - - - - - - Legislative and Admin. Services 32,687 49,022 52,668 50,462 56,553 60,967 Administrative Services 100,262 94,320 89,650 96,010 100,395 104,526 Community Services - - - - - - Development Services - - - - - - Public Works 2,213,981 2,267,314 2,573,957 2,568,787 2,585,684 2,709,666 Safety Services - - - - - - Redevelopment Services - - - - - - Indirect Cost Allocation - - - - - - Total Operating Expenses 2,346,930 2,410,656 2,716,275 2,715,259 2,742,632 2,875,159 Capital Projects (9,398) - - - - - Program Expenditures - - - - - - Total Programs/Capital Projects (9,398) - - - - - TOTAL EXPENDITURES 2,337,532 2,410,656 2,716,275 2,715,259 2,742,632 2,875,159 TRANSFERS In/(Out)319,711 324,901 356,950 355,916 367,660 378,700 LOANS In/(Out)- - - - - - ENCUMB. ROLL FORWARD - - (75,685) - - - OTHER FUND BALANCE ACTIVITY 290 646 - - - - TOTAL OTHER SOURCES/USES 320,001 325,547 281,265 355,916 367,660 378,700 NET FUND ACTIVITY 322,017 235,821 (168,560) (49,494) (50,772) (158,359) ENDING FUND BALANCE 7,055,088 7,290,908 7,122,348 7,241,414 7,190,642 7,032,283 These funds are used to finance services and improvements that benefit the properties against which the assessments are levied. Individual funds are used to account for the City's nine landscape maintenance districts, and the lighting district (two zones). 17 OTHER ASSESSMENT FUNDS Activity Detail - Funds 250, 280-281, 283 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 134,940 162,799 393,275 393,275 619,100 740,790 REVENUES 981,660 993,706 984,330 994,839 986,690 987,160 TOTAL FUNDS AVAILABLE 1,116,600 1,156,505 1,377,605 1,388,114 1,605,790 1,727,950 EXPENDITURES Operating Expenses Legislative and Admin. Services ------ Administrative Services 113,872 130,721 136,120 136,000 140,000 140,000 Community Services ------ Development Services ------ Public Works ------ Safety Services ------ Redevelopment Services ------ Indirect Cost Allocation - - - - - - Total Operating Expenses 113,872 130,721 136,120 136,000 140,000 140,000 Capital Projects ------ Program Expenses 215,049 - 50,000 - 100,000 150,000 Total Programs/Capital Projects 215,049 - 50,000 - 100,000 150,000 TOTAL EXPENDITURES 328,921 130,721 186,120 136,000 240,000 290,000 TRANSFERS In/(Out) (624,880) (632,509) (625,000) (633,014) (625,000) (625,000) LOANS In/(Out) ------ ENCUMB. ROLL FORWARD - - - - - - DEBT SERVICE - - - - - - OTHER FUND BALANCE ACTIVITY - - - - - - TOTAL OTHER SOURCES/USES (624,880) (632,509) (625,000) (633,014) (625,000) (625,000) NET FUND ACTIVITY 27,859 230,476 173,210 225,825 121,690 72,160 ENDING FUND BALANCE 162,799 393,275 566,485 619,100 740,790 812,950 These funds are used to account for specific services supported by assessments and fees, including Fire Protection assessments, which are transferred to the General Fund for fire suppression and emergency operations, the 800 MHz regional emergency communications system, and the Household Hazardous Waste program, funded from fees on waste collection bills. 18 DEBT SERVICE FUNDS Activity Detail - Funds 311 - 336 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 5,516,458 5,033,565 4,436,733 4,436,733 751,035 26,585 REVENUES 18,346,681 3,706,614 386,460 428,563 339,170 286,310 TOTAL FUNDS AVAILABLE 23,863,139 8,740,179 4,823,193 4,865,296 1,090,205 312,895 EXPENDITURES Operating Expenses Legislative and Admin. Services ------ Administrative Services ------ Community Services ------ Development Services ------ Public Works ------ Safety Services ------ Redevelopment Services ------ Indirect Cost Allocation - - - - - - Total Operating Expenses ------ Capital Projects ------ Program Expenses ------ Total Programs/Capital Projects ------ TOTAL EXPENDITURES 0 0 0 0 0 0 TRANSFERS In/(Out) 451,310 471,475 485,540 485,540 952,400 1,369,600 LOANS In/(Out) (160,000) (170,000) (170,000) (170,000) (200,000) - ENCUMB. ROLL FORWARD ------ DEBT SERVICE (19,946,068) (4,623,136) (4,598,040) (4,618,228) (3,254,290) (1,739,280) OTHER FUND BALANCE ACTIVITY 825,184 18,215 - 188,427 1,438,270 82,795 TOTAL OTHER SOURCES/USES (18,829,574) (4,303,446) (4,282,500) (4,114,261) (1,063,620) (286,885) NET FUND ACTIVITY (482,893) (596,832) (3,896,040) (3,685,698) (724,450) (575) ENDING FUND BALANCE 5,033,565 4,436,733 540,693 751,035 26,585 26,010 These funds record the revenues and expenditures associated with the financing of the City's general debt, Community Facilities Districts, the High Valley Road Project, and the Old Coach Waterline Project bonds. 19 WATER UTILITY FUNDS Activity Detail - Funds 510-511 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 4,148,403 4,871,209 4,672,359 4,672,359 5,190,321 4,590,872 REVENUES 22,267,198 23,461,628 22,685,350 24,224,282 25,181,500 27,000,120 TOTAL FUNDS AVAILABLE 26,415,601 28,332,837 27,357,709 28,896,641 30,371,821 31,590,992 EXPENDITURES Operating Expenses Legislative and Admin. Services 591,759 575,919 685,242 655,920 751,083 773,087 Administrative Services 1,113,918 1,163,644 1,335,307 1,382,251 1,427,636 1,459,689 Community Services ------ Development Services 115,772 170,951 248,851 261,584 296,045 194,517 Public Works 17,997,948 19,781,391 19,861,486 20,004,313 21,215,875 22,005,685 Safety Services ------ Redevelopment Services ------ Allowance for Oper Bgt Savings - - - - (50,370) (51,460) Total Operating Expenses 19,819,396 21,691,905 22,130,886 22,304,068 23,640,269 24,381,518 Capital Projects 1,036,954 848,118 800,000 739,762 1,900,000 1,860,000 Program Expenses - - 50,000 160,238 - - Total Programs/Capital Projects 1,036,954 848,118 850,000 900,000 1,900,000 1,860,000 TOTAL EXPENDITURES 20,856,350 22,540,023 22,980,886 23,204,068 25,540,269 26,241,518 TRANSFERS In/(Out) (254,910) (280,507) (293,330) (305,642) (317,960) (317,670) RDA LOANS In/(Out) - - - 87,070 87,070 87,070 ENCUMB. ROLL FORWARD - - (10,393) - - - DEBT SERVICE (282,592) (273,414) (283,680) (283,680) (282,080) - OTHER FUND BAL. ACTIVITY (150,539) (566,534) - - 272,290 - TOTAL OTHER SOURCES/USES (688,041) (1,120,455) (587,403) (502,252) (240,680) (230,600) NET FUND ACTIVITY 722,807 (198,850) (882,939) 517,962 (599,449) 528,002 ENDING FUND BALANCE 4,871,209 4,672,359 3,789,420 5,190,321 4,590,872 5,118,874 Water Utility funds include the Water Utility Operating Fund, an enterprise fund that is self-supported by fees paid by users, and the Water Utilities Improvement Fund, which is used to account for development fees collected to fund improvements that increase the system's capacity. 20 SEWER UTILITY FUNDS Activity Detail - Funds 520-521 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 17,209,420 15,213,777 14,246,928 14,246,928 13,441,537 13,035,221 REVENUES 7,332,144 7,544,053 7,388,760 7,501,732 8,190,890 8,671,950 TOTAL FUNDS AVAILABLE 24,541,564 22,757,830 21,635,688 21,748,660 21,632,427 21,707,171 EXPENDITURES Operating Expenses Legislative and Admin. Services 452,696 372,460 368,610 353,422 373,750 442,894 Administrative Services 696,011 780,580 851,592 867,467 842,434 939,584 Community Services - - - - - - Development Services 154,361 161,189 146,303 162,302 99,598 245,121 Public Works 7,378,500 6,703,965 7,224,973 6,974,315 7,082,094 7,220,051 Safety Services - - - - - - Redevelopment Services - - - - - - Allowance for Oper. Bgt. Savings - - - - (25,200) (28,320) Total Operating Expenses 8,681,567 8,018,194 8,591,478 8,357,506 8,372,676 8,819,330 Capital Projects 643,938 500,000 - - 300,000 2,300,000 Program Expenses - - - - - - Total Programs/Capital Projects 643,938 500,000 - - 300,000 2,300,000 TOTAL EXPENDITURES 9,325,505 8,518,194 8,591,478 8,357,506 8,672,676 11,119,330 TRANSFERS In/(Out)(152,678) (161,218) (166,870) (158,917) (163,830) (163,650) RDA LOANS In/(Out)- - - 39,300 39,300 39,300 CFD #88-1/STREET LOANS In/(Out)160,000 170,000 170,000 170,000 200,000 - ENCUMB. ROLL FORWARD - - (11,494) - - - DEBT SERVICE - - - - - - OTHER FUND BAL. ACTIVITY (9,603) (1,490) - - - - TOTAL OTHER SOURCES/USES (2,281) 7,292 (8,364) 50,383 75,470 (124,350) NET FUND ACTIVITY (1,995,642) (966,849) (1,211,082) (805,391) (406,316) (2,571,730) ENDING FUND BALANCE 15,213,777 14,246,928 13,035,846 13,441,537 13,035,221 10,463,491 Sewer Utility funds include the Sewer Utility Operating Fund, an enterprise fund that is self-supported by fees paid by users, and the Sewer Utilities Improvement Fund, which is used to account for development fees collected to fund improvements that increase the system's capacity. 21 CAPITAL REPLACEMENT FUNDS Activity Detail - Funds 611, 617 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 10,277,521 11,336,226 13,137,068 13,137,068 12,840,315 10,331,738 REVENUES 2,599,870 3,409,935 2,849,500 2,905,817 2,941,320 2,993,900 TOTAL FUNDS AVAILABLE 12,877,391 14,746,161 15,986,568 16,042,885 15,781,635 13,325,638 EXPENDITURES Operating Expenses Legislative and Admin. Services 31,754 94,002 56,117 53,161 86,665 64,115 Administrative Services 1,397,477 1,524,914 1,259,242 1,780,429 2,679,827 1,104,970 Community Services - - - - - - Development Services - - 15,300 15,381 130,271 77,964 Public Works 1,042,461 1,097,676 1,085,652 1,075,874 1,148,484 1,226,553 Safety Services - - - - - - Redevelopment Services - - - - - - Indirect Cost Allocation - - - - - - Total Operating Expenses 2,471,692 2,716,592 2,416,311 2,924,845 4,045,247 2,473,602 Capital Projects - - 275,700 799,356 1,971,600 - Program Expenses - 9,780 - - - - Total Programs/Capital Projects - 9,780 275,700 799,356 1,971,600 - TOTAL EXPENDITURES 2,471,692 2,726,372 2,692,011 3,724,201 6,016,847 2,473,602 TRANSFERS In/(Out)927,985 1,115,441 521,700 521,631 566,950 566,950 LOANS In/(Out)- - - - - - ENCUMB. ROLL FORWARD - - (2,111) - - - OTHER FUND BAL. ACTIVITY 2,542 1,838 - - - - TOTAL OTHER SOURCES/USES 930,527 1,117,279 519,589 521,631 566,950 566,950 NET FUND ACTIVITY 1,058,705 1,800,842 677,078 (296,753) (2,508,577) 1,087,248 ENDING FUND BALANCE 11,336,226 13,137,068 13,814,146 12,840,315 10,331,738 11,418,986 The capital replacement funds are used to finance the replacement of City vehicles, major equipment and rehabilitation of public facilities. The revenue for this fund comes from rental fees charged to each of the divisions that have been assigned vehicles or equipment and the sale of surplus property and equipment. 22 TRUST FUNDS Activity Detail - Funds 254, 711-782 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 4,983,581 4,418,694 3,920,615 3,920,615 4,215,855 4,217,325 REVENUES 1,000,425 792,859 19,840 388,878 28,840 29,550 TOTAL FUNDS AVAILABLE 5,984,006 5,211,553 3,940,455 4,309,493 4,244,695 4,246,875 EXPENDITURES Operating Expenses Legislative and Admin. Services - - - - - - Administrative Services - - - - - - Community Services 40,570 42,271 - 50,000 - - Development Services 847,076 1,266,574 - - - - Public Works - - - - - - Safety Services - - - - - - Redevelopment Services - - - - - - Indirect Cost Allocation - - - - - - Total Operating Expenses 887,646 1,308,845 - 50,000 - - Capital Projects 653,748 (23,779) - - 25,000 - Program Expenses 20,000 2,450 - 42,825 - - Total Programs/Capital Projects 673,748 (21,329) - 42,825 25,000 - TOTAL EXPENDITURES 1,561,394 1,287,516 0 92,825 25,000 0 TRANSFERS In/(Out)(3,918) (3,422) (1,150) (813) (2,370) (2,480) DEVELOPER DEPOSITS - - - - - - ENCUMB. ROLL FORWARD - - - - - - OTHER FUND BALANCE ACTIVITY - - - - - - TOTAL OTHER SOURCES/USES (3,918) (3,422) (1,150) (813) (2,370) (2,480) NET FUND ACTIVITY (564,887) (498,079) 18,690 295,240 1,470 27,070 ENDING FUND BALANCE 4,418,694 3,920,615 3,939,305 4,215,855 4,217,325 4,244,395 Trust funds are used to account for proprietary trusts that have been donated to the City for specific, designated uses. This fund group includes 23 individual funds, which include the Library Endowment, Tree Trust, Sensitive Lands Acquisition, and various trusts for park improvements and law enforcement uses. 23 CITY HOUSING FUNDS Activity Detail Fund 416-417, 429 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Actual Actual Adopted Estimated Proposed Proposed FUNDS AVAILABLE Beginning Fund Balance- July 1 2,575,404 3,792,780 4,809,133 4,809,133 2,799,796 3,866,666 REVENUES 1,925,117 1,030,355 893,170 1,013,933 1,019,140 1,021,310 TOTAL FUNDS AVAILABLE 4,500,521 4,823,135 5,702,303 5,823,066 3,818,936 4,887,976 EXPENDITURES Operating Expenses Legislative and Admin. Services - - - - - - Administrative Services - - - - - - Community Services - - - - - - Development Services 7,741 16,202 - 63,000 - - Public Works - - - - - - Safety Services - - - - - - Redevelopment Services - - - - - - Indirect Cost Allocation - - - - - - Total Operating Expenses 7,741 16,202 - 63,000 - - Capital Projects - - - - - - Program Expenses 700,000 - - 58,000 - - Total Programs/Capital Projects 700,000 - - 58,000 - - TOTAL EXPENDITURES 707,741 16,202 0 121,000 0 0 TRANSFERS In/(Out)- - - (2,950,000) - - RDA LOANS In/(Out)- - - 47,730 47,730 47,730 ENCUMBRANCE ROLL FORWARD - - - - - - DEBT SERVICE - - - - - - OTHER FUND BALANCE ACTIVITY - 2,200 - - - - TOTAL OTHER SOURCES/USES 0 2,200 0 (2,902,270) 47,730 47,730 NET FUND ACTIVITY 1,217,376 1,016,353 893,170 (2,009,337) 1,066,870 1,069,040 ENDING FUND BALANCE 3,792,780 4,809,133 5,702,303 2,799,796 3,866,666 4,935,706 Housing Funds are used to increase the supply of housing for low and moderate income residents under the direction of the Poway Housing Authority. Effective February 1, 2012, redevelopment agencies were dissolved by State Legislative action. This action eliminated the 20% share of tax increment revenue set aside for housing. The source of funds for City Housing is now limited to Housing Special Programs (fund 429), proceeds from Tax Allocation Bonds (fund 417), and income produced by Housing Authority properties (fund 416). 24 This page intentionally left blank 25 TRANSFERS BY FUND GROUPFiscal Year 2015-16Transfers/Loans-OutTransfers/Loans-InGeneralFundGrantFundsOtherAssessmentFundsWaterFundSewerFundTrustFundsSucessorAgencyTotalGeneral Fund100,000 625,0002,370727,370Landscape & Lighting Funds367,660367,660Debt Service Funds 626,730192,140 115,70017,830 952,400Water Fund0Capital ReplacementFunds393,000125,820 48,130566,950Capital ImprovementFund450,000450,000Total1,837,390 100,000 625,000 317,960 163,830 2,370 17,830 3,064,380This schedule shows the inter-fund transfers for the City and Successor Agency to the Redevelopment Agency for FY 2015-16. Transfers aregenerally required to maintain proper separation of financial activity between funds while allowing revenues or expenditures to be reflectedwithin the appropriate department, division, or project. For example, the Landscape & Lighting Funds are receiving $367,660 from theGeneral Fund (column 1, row 1) to reimburse the districts for expenditures on services that benefit the City at large.26 TRANSFERS BY FUND GROUPFiscal Year 2016-17Transfers/Loans-OutTransfers/Loans-InGeneral FundGrant FundsOtherAssessment FundsWater FundSewer FundTrust FundsSucessorAgencyTotalGeneral Fund100,000 625,0002,480727,480Landscape & Lighting Funds378,700378,700Debt Service Funds 625,800191,850 115,520436,430 1,369,600Water Fund0Capital ReplacementFunds393,000125,820 48,130566,950Capital ImprovementFund400,000400,000Total 1,797,500 100,000 625,000 317,670 163,650 2,480 436,430 3,442,730This schedule shows the inter-fund transfers for the City and Successor Agency to the Redevelopment Agency for FY 2016-17. Transfers aregenerally required to maintain proper separation of financial activity between funds while allowing revenues or expenditures to be reflectedwithin the appropriate department, division, or project. For example, the Landscape & Lighting Funds are receiving $367,660 from theGeneral Fund (column 1, row 1) to reimburse the districts for expenditures on services that benefit the City at large. 27 INTERFUND LOANSNew Current New Current FundPrincipal Interest (1) Total Loans Interest (2) Payback Principal Interest (1) Total Loans Interest (2) Payback Principal Interest (1) TotalGeneral Fund to: Street Development (221)491,071 560,752 1,051,823 - 4,910 - 491,071 565,662 1,056,733 - 5,400 - 491,071 571,062 1,062,133 Park Improvement (411)307,228 350,822 658,050 - 3,070 - 307,228 353,892 661,120 - 3,380 - 307,228 357,272 664,500 Drainage AB 1600 Fund to: Street Development (221)17,576 3,714 21,290 - 180 - 17,576 3,894 21,470 - 190 - 17,576 4,084 21,660 Sewer Fund to: Street AB 1600 (222)214,500 167,038 381,538 - 2,150 - 214,500 169,188 383,688 - 2,360 - 214,500 171,548 386,048 CFD #88-1 (335)200,000- 200,000 - - 200,000 (3)- - - - - - - - - TOTAL1,230,375 1,082,326 2,312,701 0 10,310 200,000 1,030,375 1,092,636 2,123,011 0 11,330 0 1,030,375 1,103,966 2,134,341 1. For reference only-not accrued in either receivable or payable fund-estimated balance as of 7/01/15. 2. Interest rate for loans is the City's estimated average investment rate of return: FY 2015-2016 - 1.0% & FY 2016-17 - 1.1%. 3. Loan estimated to be paid off on 7/1/15.Ending Balance-6/30/2017Beginning Balance-7/1/15Fiscal Year 2015-2016Ending Balance-6/30/2016Fiscal Year 2016-201728 Revenues 29 30 REVENUES BY FUNDCITY OF POWAYFY 2012-13 FY 2013-14 FY 2014-15 FY 2014-15 FY 2015-16 FY 2016-17Actual Actual Approved Estimated Proposed ProposedGeneral Fund (100) $ 43,323,033 $ 41,993,818 $ 38,752,240 $ 40,003,397 $ 41,198,770 $ 42,185,380 Economic Uncertainty Fund (101) - - - - - - Special Projects Fund (102) - - - - - - Pension Stabilization Fund (104) - - - - - - Streets Funds (211-226) 3,564,371 3,853,739 3,088,160 2,673,731 3,086,750 2,693,740 Street Maintenance Fund (103) - - - - - - Drainage & Stormwater Funds (231-233) 1,003,843 1,065,789 1,024,750 1,053,286 1,085,120 1,117,090Grant Funds (241-257, 282-284, 714) 805,245 517,613 436,840 724,736 444,480 445,070 Developer Contrib. AB 1600 Funds (251-252, 258, 411, 422) 123,333 100,609 86,520 192,219 107,760 110,310 Special Assessment District Funds (261-275) 2,339,548 2,320,930 2,266,450 2,309,849 2,324,200 2,338,100 Other Assessment Funds (250, 280-281, 283) 981,660 993,706 984,330 994,839 986,690 987,160 Debt Service Funds (311 - 336) 18,346,681 3,706,614 386,460 428,563 339,170 286,310Water Utility Funds (510-511) 22,267,198 23,461,628 22,685,350 24,224,282 25,181,500 27,000,120 Sewer Utility Funds (520-521) 7,332,144 7,544,053 7,388,760 7,501,732 8,190,890 8,671,950 Capital Replacement and Facility Funds (611, 617) 2,599,870 3,409,935 2,849,500 2,905,817 2,941,320 2,993,900 Trust Funds (254, 711-782) 1,000,425 792,859 19,840 388,878 28,840 29,550City Housing Funds (416-417, 429) 1,925,117 1,030,355 893,170 1,013,933 1,019,140 1,021,310Revenue Grand Total $ 105,612,468 $ 90,791,648 $ 80,862,370 $ 84,415,262 $ 86,934,630 $ 89,879,990 31 This page intentionally left blank 32 Operating Expenditures 33 34 OPERATING EXPENDITURES 35 Operations and Capital Total Program Department Personnel Maintenance Outlay Expenditures Legislative & Administrative 1,808,040 725,040 8,960 2,542,040 Administrative Services 2,688,560 2,083,470 2,752,150 7,524,180 Community Services 3,190,020 2,119,970 259,160 5,569,150 Development Services 2,877,710 1,541,980 67,110 4,486,800 Public Works 8,969,950 30,849,680 1,001,550 40,821,180 Safety Services 9,078,430 12,263,740 630,040 21,972,210 Grand Total 28,612,710 49,583,880 4,718,970 82,915,560 CITY OF POWAY OPERATING EXPENDITURES Legislative & Administrative 3% Administrative Services 9% Community Services 7% Development Services 5% Public Works 49% Safety Services 27% Fiscal Year 2015-16 All Funds 36 BUDGET BY FUND GAS TAX/ CAPITAL SPECIAL FY 2015 - 2016 Proposed GENERAL WATER SEWER DRAINAGE PROP A REPLACE. DISTRICTS TOTAL Legislative and Administrative City Council 114,725 91,631 42,915 1,754 - 15,749 6,976 273,750 City Clerk 185,111 147,849 69,244 2,830 - 25,411 11,255 441,700 City Attorney 99,638 79,581 37,271 1,523 - 13,678 6,058 237,750 City Manager 522,376 432,022 224,321 8,111 - 31,827 32,264 1,250,920 Economic Development 337,920 ------ 337,920 Department Total 1,259,770 751,083 373,750 14,217 - 86,665 56,553 2,542,040 Administrative Services Director 428,667 159,258 134,093 284 - 8,358 1,130 731,790 Human Resources 406,015 113,000 58,385 11,081 - 17,166 6,683 612,330 Customer Services 89,966 224,091 205,806 199 -44 1,553 521,660 Finance 406,428 187,465 72,283 8,696 - 44,380 29,459 748,710 Information Technology 447,994 320,478 227,917 5,942 - 22,861 15,677 1,040,870 General Support Services 302,220 165,063 56,126 4,498 - 42,970 17,893 588,770 Risk Management 354,860 258,282 87,823 7,039 - 50,237 27,999 786,240 Equip. Replacement & Facilities ----- 2,493,810 - 2,493,810 Department Total 2,436,150 1,427,636 842,434 37,739 - 2,679,827 100,395 7,524,180 Community Services Director 939,140 ------ 939,140 Recreation 372,540 ------ 372,540 Lake Operations 878,610 ------ 878,610 Aquatics 807,970 ------ 807,970 Performing Arts Center 1,151,160 ------ 1,151,160 Old Poway Park 453,310 ------ 453,310 Library 59,350 ------ 59,350 Interpretive Services 109,030 ------ 109,030 Community Park 798,040 ------ 798,040 Department Total 5,569,150 ------ 5,569,150 Development Services Director 748,363 43,369 18,909 3,420 - 17,178 - 831,240 Current Planning 1,103,550 ------ 1,103,550 Building and Safety Inspection 838,220 ------ 838,220 Capital Projects Engineering 105,849 217,972 34,417 - 7,500 113,093 - 478,830 Land Development Engineering 541,720 ------ 541,720 Engineering Inspection 138,816 34,704 46,272 11,568 --- 231,360 Traffic Engineering 95,130 ------ 95,130 Stormwater Compliance 284,250 ------ 284,250 Housing Authority/Programs 39,500 ------ 39,500 Successor Agency Admin.43,000 ------ 43,000 Department Total 3,938,398 296,045 99,598 14,988 7,500 130,271 - 4,486,800 Public Works Director 249,996 424,483 170,408 29,164 - 37,652 41,476 953,180 Utility Systems Oper. & Maint.- 816,190 816,190 ---- 1,632,380 Water Supply,Treatment, Storage - 16,947,480 ----- 16,947,480 Wastewater Disposal -- 4,659,860 ---- 4,659,860 Water Transmission/Distribution - 1,406,100 ----- 1,406,100 Wastewater Collection Maint.-- 996,650 ---- 996,650 Reclaimed Water Supply - 821,048 205,262 ---- 1,026,310 Maintenance Operations 93,995 229,332 95,394 38,979 - 13,972 10,118 481,790 Street Maintenance 1,100,000 128,239 54,959 - 3,296,752 -- 4,579,950 Stormwater & Flood Control 440,316 -- 538,164 --- 978,480 Vehicle Maintenance ----- 1,047,320 - 1,047,320 Environmental Programs 50,534 123,294 51,286 20,956 - 7,512 5,439 259,020 Parks, Trails & Landscape Maint.2,054,305 223,195 ----- 2,277,500 Facilities Maintenance 874,868 96,514 32,084 1,014 - 42,029 2,321 1,048,830 Special Districts & Contract Svcs ------ 2,526,330 2,526,330 Department Total 4,864,014 21,215,875 7,082,094 628,277 3,296,752 1,148,484 2,585,685 40,821,180 Safety Services Director 741,750 ------ 741,750 Fire Suppression 9,265,960 ------ 9,265,960 Fire Prevention 608,900 ------ 608,900 Paramedics 394,280 ------ 394,280 Law Enforcement 10,961,320 ------ 10,961,320 Department Total 21,972,210 ------ 21,972,210 TOTAL EXPENDITURES 40,039,692 23,690,639 8,397,876 695,221 3,304,252 4,045,247 2,742,633 82,915,560 37 Operations and Capital Total Program Department Personnel Maintenance Outlay Expenditures Legislative & Administrative 1,909,260 676,280 7,560 2,593,100 Administrative Services 2,805,560 2,083,840 1,217,740 6,107,140 Community Services 3,351,620 2,132,740 215,390 5,699,750 Development Services 3,012,060 1,616,320 38,710 4,667,090 Public Works 9,443,860 30,856,830 878,610 41,179,300 Safety Services 9,482,130 12,811,400 583,050 22,876,580 Grand Total 30,004,490 50,177,410 2,941,060 83,122,960 CITY OF POWAY OPERATING EXPENDITURES Legislative & Administrative 3% Administrative Services 7% Community Services 7% Development Services 6% Public Works 50% Safety Services 27% Fiscal Year 2016-17 All Funds 38 BUDGET BY FUND GAS TAX/ CAPITAL SPECIAL FY 2016 - 2017 Proposed GENERAL WATER SEWER DRAINAGE PROP A REPLACE. DISTRICTS TOTAL Legislative and Administrative City Council 117,185 91,615 52,877 2,889 - 10,529 7,305 282,400 City Clerk 202,990 158,698 91,596 5,004 - 18,239 12,654 489,180 City Attorney 98,657 77,130 44,517 2,432 - 8,865 6,150 237,750 City Manager 545,328 445,643 253,904 10,585 - 26,482 34,859 1,316,800 Economic Development 266,970 ------ 266,970 Department Total 1,231,129 773,087 442,894 20,909 - 64,115 60,967 2,593,100 Administrative Services Director 445,732 158,621 147,526 1,496 - 5,201 1,204 759,780 Human Resources 346,198 96,429 54,130 10,106 - 13,468 5,869 526,200 Customer Services 94,137 232,238 213,282 208 -46 1,619 541,530 Finance 419,196 192,650 87,770 10,525 - 36,534 30,825 777,500 Information Technology 484,167 344,355 254,621 7,360 - 19,782 17,036 1,127,320 General Support Services 305,958 170,365 71,314 6,134 - 33,447 18,772 605,990 Risk Management 357,610 265,032 110,941 9,543 - 34,492 29,202 806,820 Equip. Replacement & Facilities - - - - -962,000 - 962,000 Department Total 2,452,998 1,459,689 939,584 45,372 - 1,104,970 104,526 6,107,140 Community Services Director 957,030 ------ 957,030 Recreation 411,560 ------ 411,560 Lake Operations 908,670 ------ 908,670 Aquatics 797,530 ------ 797,530 Performing Arts Center 1,171,730 ------ 1,171,730 Old Poway Park 456,700 ------ 456,700 Library 60,710 ------ 60,710 Interpretive Services 111,470 ------ 111,470 Community Park 824,350 ------ 824,350 Department Total 5,699,750 ------ 5,699,750 Development Services Director 780,281 29,989 38,124 6,274 - 10,191 - 864,860 Current Planning 1,145,710 ------ 1,145,710 Building and Safety Inspection 889,840 ------ 889,840 Capital Projects Engineering 124,156 127,873 158,123 17,875 7,500 67,773 - 503,300 Land Development Engineering 535,870 ------ 535,870 Engineering Inspection 146,622 36,656 48,874 12,219 --- 244,370 Traffic Engineering 96,390 ------ 96,390 Stormwater Compliance 304,250 ------ 304,250 Housing Authority/Programs 39,500 ------ 39,500 Successor Agency Admin.43,000 ------ 43,000 Department Total 4,105,620 194,517 245,121 36,368 7,500 77,964 - 4,667,090 Public Works Director 250,721 451,862 179,182 30,078 - 40,277 44,701 996,820 Utility Systems Oper. & Maint.- 815,275 815,275 ---- 1,630,550 Water Supply,Treatment, Storage - 17,719,250 ----- 17,719,250 Wastewater Disposal -- 4,712,450 ---- 4,712,450 Water Transmission/Distribution - 1,437,550 ----- 1,437,550 Wastewater Collection Maint.-- 1,087,810 ---- 1,087,810 Reclaimed Water Supply - 811,312 202,828 ---- 1,014,140 Maintenance Operations 86,281 210,511 87,566 35,780 - 12,825 9,287 442,250 Street Maintenance 1,100,000 104,962 44,984 - 2,498,685 -- 3,748,630 Stormwater & Flood Control 419,031 -- 512,149 --- 931,180 Vehicle Maintenance ----- 1,124,280 - 1,124,280 Environmental Programs 52,736 128,668 53,521 21,869 - 7,839 5,677 270,310 Parks, Trails & Landscape Maint.2,110,491 229,299 ----- 2,339,790 Facilities Maintenance 898,008 96,996 36,436 1,516 - 41,332 2,421 1,076,710 Special Districts & Contract Svcs ------ 2,647,580 2,647,580 Department Total 4,917,267 22,005,685 7,220,051 601,392 2,498,685 1,226,553 2,709,665 41,179,300 Safety Services Director 761,440 ------ 761,440 Fire Suppression 9,638,800 ------ 9,638,800 Fire Prevention 624,320 ------ 624,320 Paramedics 375,260 ------ 375,260 Law Enforcement 11,476,760 ------ 11,476,760 Department Total 22,876,580 ------ 22,876,580 TOTAL EXPENDITURES 41,283,344 24,432,979 8,847,651 704,041 2,506,185 2,473,603 2,875,158 83,122,960 39 This page intentionally left blank 40 LEGISLATIVE AND ADMINISTRATIVE DEPARTMENT Expense 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Classification Actual Actual Adopted Estimated Proposed Proposed Authorized Positions 7.9 8.7 9.0 9.0 11.0 11.0 Personnel Expense 1,474,040$ 1,390,326$ 1,556,100$ 1,519,157$ 1,808,040$ 1,909,260$ Operations and Maintenance 434,043 519,846 685,401 622,087 725,040 676,280 Capital Outlay 13,560 22,584 8,310 9,306 8,960 7,560 Total Department Budget 1,921,643$ 1,932,756$ 2,249,811$ 2,150,550$ 2,542,040$ 2,593,100$ Strategic Plan Goals and Implementation $0 $1 $1 $2 $2 $3 $3 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Millions Capital Outlay Operations and Maintenance Personnel Expense Plan for and prepare for succession, training, and recruitment. Lead City efforts to develop and implement a legislative platform. Secure Department of Finance approval of the Successor Agency's Long Range Property Management Plan for the property owned by the former Redevelopment Agency. Develop and implement a water conservation and management plan to reduce community water usage. Create an Economic Development Strategic Plan, which incorporates a Strengths, Weaknesses, Opportunities, and Threats (SWOT) analysis. Develop cost effective marketing materials to attract new businesses to the City. Consider creating a Community Outreach Coordinator position. 41 This page intentionally left blank 42 Residents of Poway 47,811 Residents* Mayor & City Council * 2010 Census Data ** Contracted Service City Manager Administrative Services Community Services Development Services Public Works Safety Services Economic Development City Clerk City Attorney · Human Resources · Customer Services · Finance · Information Technology · General Support Services · Risk Management · Capital Replacement · Recreation · Lake Operations · Aquatics · Performing Arts Center · Old Poway Park · Library · Interpretive Services · Community Park · Planning · Building & Safety Inspection · Capital Projects · Land Development Engineering · Engineering Inspection · Traffic Engineering · Stormwater Management · Field Operations · Street Maintenance · Water Transmission · Sewer Collection · Facilities Maintenance · Vehicle & Equipment Maintenance · Drainage Maintenance · Trails and Open Space · Parks & Landscape Maintenance · Special Landscape Districts · Fire Suppression · Fire Prevention · Paramedics · Law Enforcement FT = Full Time Equivalent PT = Part Time as Full Time Equivalent CT = Contract as Full Time Equivalent FY 2015-16 FY 2016-17 Total FT: 213 / PT: 35.4 / CT: 55.5 Total Exp. $82,915,560 Total FT: 214 / PT: 35.9 / CT: 55.5 Total Exp. $83,122,960 FY 2015-16 FT: 0 Exp: $273,750 FY 2016-17 FT: 0 Exp: $282,400 City of Poway FY 2015-16 FT: 1 Exp: $337,920 FY 2016-17 FT: 1 Exp: $266,970 FY 2015-16 FT: 3 / PT: .5 Exp: $441,700 FY 2016-17 FT: 3 / PT: .5 Exp: $489,180 FY 2015-16 FT: 6 / PT: .5 Exp: $1,250,920 FY 2016-17 FT: 6 / PT: .5 Exp: $1,316,800 FY 2015-16 FT: 0** Exp: $237,750 FY 2016-17 FT: 0** Exp: $237,750 FY 2015-16 FT: 21 / PT: .5 Exp: $7,524,180 FY 2016-17 FT: 21 / PT: .5 Exp: $6,107,140 FY 2015-16 FT: 22 / PT: .5 / CT: 3.5 Exp: $4,486,800 FY 2016-17 FT: 22 / PT: .5 / CT: 3.5 Exp: $4,667,090 FY 2015-16 FT: 56 / CT: 52 Exp: $21,972,210 FY 2016-17 FT: 56 / CT: 52 Exp: $22,876,580 FY 2015-16 FT: 20 / PT: 29 Exp: $5,569,150 FY 2016-17 FT: 20 / PT: 29.5 Exp: $5,699,750 FY 2015-16 FT: 84 / PT: 4.4 Exp: $40,821,180 FY 2016-17 FT: 85 / PT: 4.4 Exp: $41,179,300 43 CITY COUNCIL Legislative and Administrative Department Division No: 0010 Division Goals & Objectives » » 2013-14 2013-14 2014-15 2014-15 2015-16 2016-17 Division Operating Budget Actual Actual Adopted Estimated Proposed Proposed ◊Personnel Expenditure 154,974$ 158,408$ 171,580$ 194,200$ 181,620$ 187,360$ ◊Operations & Maintenance 143,715 182,161 182,161 186,410 90,500 93,410 ◊Capital Outlay 2,260 2,200 1,630 1,630 1,630 1,630 Division Total Operating Budget 300,949$ 342,769$ 355,371$ 382,240$ 273,750$ 282,400$ To provide legislative guidance and direction for the establishment and maintenance of City programs and services. To provide an open forum for direct public input and an avenue for resolving community issues. The City Council is comprised of five members (including the Mayor)elected at large by Poway residents to serve four-year overlapping terms.The Mayor is directly elected for a four-year term.The City Council selects a Councilmember to serve as Deputy Mayor annually. The City Council serves as the City's legislative and policy-making body, taking action on the adoption of all City ordinances, resolutions,contracts, and matters requiring policy decision and leadership.To reach policy decisions that meet the needs of the community,the Council listens to public comments and reviews proposals, while aiming to maintain desired service levels. The City Council appoints the City Manager and City Attorney,and establishes advisory committees to ensure broad-based input into City matters.The Council oversees the expenditure of City funds,initiates new programs and service enhancements, and determines funding for the proposed budget as submitted by the City Manager. $- $50 $100 $150 $200 $250 $300 $350 $400 Actual 2013-14 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 44 CITY CLERK Legislative and Administrative: Department Division No: 0011 Division Goals & Objectives » » » 2013-14 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Legal Ads & Public Hearing Notices 160 124 175 140 140 150 Documents Recorded 88 79 150 130 126 130 City/Planning/Housing/OSB Resolutions 38/24/0/5 48/17/5/3 70/30/1/10 70/30/1/5 50/34/3/10 60/35/3/10 Ordinances Processed 8 14 25 20 20 23 Minute Pages Prepared (CC/OSB)131/17 127 255/23 160 / 20 140 / 25 150 / 25 City & RDA Contracts/Agreements 61 74/3 100 120 120 120 Public Requests for Records 135 222 170 260 250 270 Fair Political Practices Commission Filing 150 151 180 150 160 165 Boxes Destroyed per Retention Schedule 180 108 200 200 200 200 Division Operating Budget Authorized Positions (FTE)2.9 3.3 3.0 3.0 3.5 3.5 ◊Personnel Expenditure 384,257$ 274,397$ 331,130$ 286,548$ 367,230$ 389,380$ ◊Operations & Maintenance 58,316 44,000 96,580 81,218 71,420 96,750 ◊Capital Outlay 3,400 16,764 3,300 4,296 3,050 3,050 Division Total Operating Budget 445,973$ 335,161$ 431,010$ 372,062$ 441,700$ 489,180$ The City Clerk's Office is the division of the City Manager's office that coordinates the legislative process, administers City elections and manages City records.The Clerk serves as Secretary to the City Council, Planning Commission,Poway Housing Authority, Public Financing Authority, and Poway Oversight Board to the Successor Agency of the Poway Redevelopment Agency,with duties as outlined in the City’s Municipal Code and California Government &Elections Codes.As the Elections Official,the Clerk plans, coordinates and administers municipal elections.The City Clerk serves as the Public Information Officer for the City of Poway,the editor of the quarterly Poway Today Publication, and coordinates the City's social media efforts. The Clerk's Office is responsible for preparing the City Council and Oversight Board meeting agendas and minutes. The Division also manages the Citywide Records Management Program including records storage, use,retention, disposition and scanning of records in accordance with applicable laws and regulations. The City Clerk responds to public records requests in accordance with California's Public Records Act,maintains the City's Municipal Code,meets legal noticing requirements, administers oaths, notarizes documents,serves as filing official for campaign and conflict of interest statements,and coordinates Boards and Commissions recruitment and selection process. Administer the Citywide Records Management Program for records storage, retrieval,retention and destruction;image vital,permanent City records;respond to public records requests,while complying with City, State and Federal regulations. Coordinate relocating Building Plans to Corodata for appropriate storage. Scan all City records into the document management system as they are retrived from storage and eliminate the paper as permissible.This will not only allow for ease in public retrieval,the elimination of the paper will reduce the amount of funding required for storage of records. Conduct a Citywide Electronic File Clean-up effort. Audit all department records for compliance with Council approved Records Retention Schedule. Develop a communications style guide for the City of Poway. $- $100 $200 $300 $400 $500 Actual 2013-14 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 45 CITY ATTORNEY Legislative and Administrative Department Division No: 0012 Division Goals & Objectives » » » » 2013-14 2013-14 2014-15 2014-15 2015-16 2016-17 Division Operating Budget Actual Actual Adopted Estimated Proposed Proposed ◊Operations & Maintenance 176,847$ 207,862$ 236,150$ 196,334$ 237,390$ 237,390$ ◊Capital Outlay 460 360 360 360 360 360 Division Total 177,307$ 208,222$ 236,510$ 196,694$ 237,750$ 237,750$ To prepare ordinances and resolutions necessary to implement City Council policies. To keep the Municipal Code up to date. To assist the City Council in developing policies based on sound legal principles,that enable the City to accomplish its goals and objectives. To keep the City Council and staff apprised of legislative and legal developments that may affect the City. The City Council appointed City Attorney provides legal advice regarding City operations and administration. The City Attorney keeps the City Council and staff informed of new legislative or legal developments that may affect the City. The City Attorney provides contractual legal counsel,attends meetings,and provides other specialized legal services.The City Attorney also drafts ordinances,prepares contracts,conducts legal negotiations,reviews legal documents,and may defend the City's position in court cases.The City Attorney serves as legal advisor to Council appointed committees and represents City officials and employees in legal matters relating to City business. $- $50 $100 $150 $200 Actual 2013-14 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance 46 CITY MANAGER Legislative and Administrative Department Division No: 0013 Division Goals & Objectives » » » 2013-14 2013-14 2014-15 2014-15 2015-16 2016-17 Division Operating Budget Actual Actual Adopted Esitmated Proposed Proposed Authorized Positions (FTE)5.0 4.6 5.0 5.0 6.5 6.5 ◊Personnel Expenditure 934,809$ 837,332$ 889,360$ 893,326$ 1,093,200$ 1,159,980$ ◊Operations & Maintenance 55,165 59,631 70,830 68,461 154,160 154,660 ◊Capital Outlay 7,440 2,820 2,660 2,660 3,560 2,160 Division Total 997,414$ 899,783$ 962,850$ 964,447$ 1,250,920$ 1,316,800$ Strengthen and maintain the City’s disaster preparedness systems and training. Ensure that municipal services are provided in the most efficient, effective, and responsive manner possible to meet the needs and desired service levels of the community. Continue emphasis on strong financial planning by maintaining a balanced budget, reducing the cost of City services, using precise cost allocation to City funds, and improving cost recovery user fees. The City Manager is appointed by the City Council to serve as the City's chief executive officer responsible for the overall planning, organization, and direction of municipal activities within the City. The City Manager is also responsible for the preparation,submittal to the City Council,and management of the annual budget,as well as the City’s Capital Improvement Program (CIP).In addition, the City Manager regularly advises the City Council on the financial condition and needs of the City. The City Manager advises the City Council on legislative and policy matters and provides recommendations to the Council to assist them in making effective and efficient policies to address the needs of the community.The City Manager is responsible for implementation and enforcement of all City ordinances,laws, and regulations.The City Manager provides direction to all City department directors and employees to ensure efficient and effective administration. $- $200 $400 $600 $800 $1,000 $1,200 $1,400 Actual 2013-14 Actual 2013-14 Adopted 2014-15 Esitmated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 47 ECONOMIC DEVELOPMENT Legislative and Administrative Department Division No: 0014 Division Goals & Objectives » » » » 2012-2013 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Number of business retention visits 38 40 40 45 50 50 Division Operating Budget Authorized Positions (FTE)- 0.8 1.0 1.0 1.0 1.0 ◊Personnel Expenditure -$ 120,189$ 164,030$ 145,083$ 165,990$ 172,540$ ◊Operations & Maintenance - 26,192 99,680 89,664 171,570 94,070 ◊Capital Outlay - 440 360 360 360 360 Division Total -$ 146,821$ 264,070$ 235,107$ 337,920$ 266,970$ The Economic Development Divison is also responsible for facilitating disposition of the former RDA properties. The Economic Development Division fosters a strong and diverse economic base, which supports jobs and tax revenues.The City partners with local business groups, private sector businesses and regional stakeholders to identify appropriate business and development opportunities,and disseminate business resource information,to enhance long-term economic vitality.Promoting Poway’s key industries,commercial corridors,the Poway Business Park, and recreational assets ensures diverse employment opportunities for Poway’s local workforce and a strong economic base to sustain a high quality of life for Poway residents. Develop and implement a citywide economic development strategic plan. Administer business assistance and retention activities through workshops,information dissemination,and networking. Manage disposition of former RDA properties under the Long Range Property Management Plan. Coordinate business attraction,growth,and expansion marketing efforts through advertising,web page development, business visitations, tours, and site selection assistance. $- $50 $100 $150 $200 $250 $300 $350 Actual 2012-2013 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 48 ADMINISTRATIVE SERVICES Department Code: 0100 Expense 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Classification Actual Actual Approved Estimated Proposed Proposed Authorized Positions 19.9 20.6 20.0 20.0 21.5 21.5 Personnel Expense $2,301,074 $2,309,480 $2,481,200 $2,422,106 $2,688,560 $2,805,560 Operations and Maintenance 2,234,624 2,165,797 1,810,070 2,025,966 2,083,470 2,083,840 Capital Outlay 963,096 1,242,828 1,766,850 1,954,725 2,752,150 1,217,740 Total Department Budget $5,498,794 $5,718,105 $6,058,120 $6,402,797 $7,524,180 $6,107,140 Strategic Plan: Goals and Implementation $0 $1 $2 $3 $4 $5 $6 $7 $8 Actual 2013-14 Approved 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Millions Capital Outlay Operations and Maintenance Personnel Expense Establish fiscal policies to regulate parameters for reserves. Explore alternative energy sources, such as solar power, to reduce operating costs. Develop and implement organization wide staff succession planning. Complete a classification and compensation study for the entire organization. Conduct a review of the City's management tools, systems, and resources. 49 This page intentionally left blank 50 Administrative Services Department Administrative Services Director Org: 0100 Human Resources Org: 0101 Customer Services Org: 0102 Finance Org: 0103 Information Technology Org: 0104 General Support Services Org: 0106 Risk Management Org: 0107 Capital Replacement Org: 0108 FT = Full Time Equivalent PT = Part Time as Full Time Equivalent FY 2015-16 FY 2016-17 Total FT: 21 / PT: .5 Total Exp. $7,524,180 Total FT: 21 / PT: .5 Total Exp. $6,107,140 FY 2015-16 FT: 4 Exp: $731,790 FY 2016-17 FT: 4 Exp: $759,780 FY 2015-16 FT: 3 Exp: $612,330 FY 2016-17 FT: 3 Exp: $526,200 FY 2015-16 FT: 4 / PT: .5 Exp: $521,660 FY 2016-17 FT: 4 / PT: .5 Exp: $541,530 FY 2015-16 FT: 5 Exp: $748,710 FY 2016-17 FT: 5 Exp: $777,500 FY 2015-16 FT: 5 Exp: $1,040,870 FY 2016-17 FT: 5 Exp: $1,127,320 FY 2015-16 FT: 0 Exp: $588,770 FY 2016-17 FT: 0 Exp: $605,990 FY 2015-16 FT: 0 Exp: $786,240 FY 2016-17 FT: 0 Exp: $806,820 FY 2015-16 FT: 0 Exp: $2,493,810 FY 2016-17 FT: 0 Exp: $962,000 51 DIRECTOR OF ADMINISTRATIVE SERVICES Administrative Services Department Division No: 0100 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Operating Budget Actual Actual Adopted Estimated Proposed Proposed Authorized Positions (FTE)3.9 3.7 4.0 3.5 4.0 4.0 ◊Personnel Expenditure 681,702$ 560,037$ 577,940$ 556,751$ 672,310$ 698,960$ ◊Operations & Maintenance 43,037 35,750 57,500 52,068 57,560 58,900 ◊Capital Outlay 2,740 2,400 1,920 1,920 1,920 1,920 Division Total 727,479$ 598,187$ 637,360$ 610,739$ 731,790$ 759,780$ Manage a Citywide Classification and Compensation Study The Office of the Director is responsible for the internal service operations of the City.The Administrative Services Director oversees the City's Human Resources,Customer Services, Finance,Information Technology, General Support Services,Risk Management, and Capital Replacement activities.Costs directly associated with the management of the Administrative Services Department and these activities are included in this Division. Complete Phase II of Enterprise Resource Planning (ERP)System replacement,to include using outside support to develop a request for proposals,identifying an ERP vendor,and developing an implementation plan. Complete the installation of a replacement city phone system,utilizing Voice-over-Internet-Protocol (VoIP) technology. Conduct a Citywide Fair Labor Standards Act (FLSA) Audit. $- $100 $200 $300 $400 $500 $600 $700 $800 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 52 HUMAN RESOURCES Administrative Services Department Division No: 0101 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Training/Info Sessions offered 5 6 14 44 44 45 Full & Part-Time Recruitments 23 44 45 49 44 46 Personnel Transactions 143 331 250 284 259 291 Employment Applications 2,708 5,132 3,600 4,899 5,016 5,016 Workers' Comp Claims Processed 29 24 37 19 22 22 Division Operating Budget Authorized Positions (FTE)1.7 2.5 2.0 3.0 3.0 3.0 ◊Personnel Expenditure 182,128$ 244,813$ 329,560$ 279,484$ 324,820$ 343,980$ ◊Operations & Maintenance 147,123 143,745 172,870 232,853 282,730 180,040 ◊Capital Outlay 3,840 2,180 2,680 2,680 4,780 2,180 Division Total 333,091$ 390,738$ 505,110$ 515,017$ 612,330$ 526,200$ The Human Resources Division is responsible for providing comprehensive,centralized,employment-related services to employees and departments.The Division is responsible for implementing and administering personnel policies,practices, and procedures; providing professional and technical assistance to departments in all areas of human resources and employee-relations issues;managing the City’s workers’compensation program;conducting comprehensive recruitment and selection activities; maintaining a Citywide classification and compensation system;overseeing the performance appraisal system;processing payroll changes and transactions;administering employee insurance benefits, leave,training, tuition reimbursement,and service award programs;and participating in labor negotiations. Provide various trainings and information sessions to all City employees concerning new or revised policies and procedures. Manage a Citywide Classification and Compensation Study Assist with the multiyear project to replace the City Enterprise Resource Planning (ERP)system,with an emphasis on the documentation of internal Human Resources processes. $- $100 $200 $300 $400 $500 $600 $700 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 53 CUSTOMER SERVICES Administrative Services Department Division No: 0102 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Past Due Water Bills Sent 8,070 6,992 7,800 9,000 8,500 8,500 Properties Tagged 2,008 1,712 1,800 2,650 2,700 2,700 Service Shutoffs 132 138 190 220 230 230 Service Starts/Stops 2,824 2,824 2,800 2,500 2,700 2,700 Active Business Cert./Renewals 1,418 2,572 2,800 2,750 2,800 2,825 Active Regulatory Lic./renewals 42 103 100 120 120 120 N/A 514 428 600 600 600 Division Operating Budget Authorized Positions (FTE)3.8 4.0 4.0 4.0 4.5 4.5 ◊Personnel Expenditure 308,557$ 329,140$ 335,480$ 341,310$ 369,960$ 386,580$ ◊Operations & Maintenance 119,862 139,271 132,680 130,454 141,790 145,040 ◊Capital Outlay 16,860 10,540 10,410 10,410 9,910 9,910 Division Total 445,279$ 478,951$ 478,570$ 482,174$ 521,660$ 541,530$ Home Occup. Permits/renewals The Customer Services Division is responsible for all aspects of water and sewer billing including:receiving and processing applications for water and sewer service,responding to customer inquiries and complaints,and processing water turn-on and turn-off requests.The Division also administers ambulance billing including receiving and processing run sheets,insurance billing,accepts payments and answers all billing inquiries.The Customer Services Division manages the City's cash handling systems and performs the accounts receivable function,which includes collecting,recording,and depositing all City revenues.Customer Services is also responsible for processing and issuing regulatory licenses, business certificates, and home occupation permits. Update ambulance bill program to ICD 10.HIPAA requires the Department of Health and Human Services to adopt national standard identifiers or ICD 10 to be used by all medical providers starting October 1, 2015. Identify, prioritize, and implement operational efficiencies resulting from the new Utility Billing System. Conduct a 2nd public awareness campaign to encourage customer use of the new on-line web portal,E-Care, to include on-line payment services, review of water use information, and account management. Complete a review of all regulatory licenses to ensure the applicable municipal code provisions and the City’s issuance and renewal processes are compliant with County and State requirements. $- $200 $400 $600 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 54 FINANCE Administrative Services Department Division No: 0103 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Investment Portfolio (average, in millions)$118.2 $111.8 $100.0 $100.0 $99.0 $98.0 Investment Earnings (in millions)$0.6 $1.0 $0.7 $0.9 $1.0 $1.1 Purchase Orders Processed 336 320 350 300 300 300 Vendor Warrants Processed 6,770 6,426 6,500 6,430 6,400 6,400 Payroll Warrants Processed 7,055 7,196 7,100 7,400 7,400 7,400 Division Operating Budget Authorized Positions (FTE)4.9 5.0 5.0 5.0 5.0 5.0 ◊Personnel Expenditure 551,562$ 591,197$ 592,940$ 604,086$ 633,960$ 659,290$ ◊Operations & Maintenance 80,070 86,046 114,540 150,304 112,950 116,410 ◊Capital Outlay 3,130 2,680 2,550 2,550 1,800 1,800 Division Total 634,762$ 679,923$ 710,030$ 756,940$ 748,710$ 777,500$ The Finance Division is responsible for managing the fiscal operations of the City.This division's main areas of responsibility include financial accounting, budgeting,internal controls,investments,payroll,accounts payable and debt administration.The Division manages the annual independent audit as well as ensures that various State and Federal reporting requirements are met on a timely basis. Assist with the multiyear project to replace the City Enterprise Resource Planning (ERP)System, with an emphasis on the Finance and Payroll processes, and the training of personnel in other departments on the use of the new system. Work with the Customer Services Division and other departments to update the City's Cash Handling Policy. Provide Successor Agency Administrative Support including on-going reporting requirements concerning Recognized Obligation Payment Schedule (ROPS) 15-16B, 16-17A &B and 17-18A. $- $100 $200 $300 $400 $500 $600 $700 $800 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 55 INFORMATION TECHNOLOGY Administrative Services Department Division No: 0104 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Major IT Projects n/a *n/a *6 8 9 3 IT Project Requests n/a *n/a *52 90 85 90 GIS Project Requests n/a *n/a *115 58 55 60 *Indicates new statistical areas created this fiscal year Division Operating Budget Authorized Positions (FTE)5.6 5.4 5.0 4.5 5.0 5.0 ◊Personnel Expenditure 577,125$ 584,293$ 645,280$ 640,475$ 687,510$ 716,750$ ◊Operations & Maintenance 126,258 158,024 186,470 181,775 181,690 238,900 ◊Capital Outlay 109,451 129,690 127,700 128,200 171,670 171,670 Division Total 812,834$ 872,007$ 959,450$ 950,450$ 1,040,870$ 1,127,320$ The Information Technology Division is responsible for the overall management of the City’s information and telecommunications systems.Functions directly performed by the division include the purchase,installation, administration and maintenance of City servers,network infrastructure,personal computers,printers,and telephone system and coordination of the Internet/Intranet and citywide Geographic Information System (GIS) database.The Division serves as a help desk for staff providing hardware and software support.The Division also provides citywide technology training.The Division uses contractual services for specialized technical support and new software development. Continue multiyear project to replace the City Enterprise Resource Planning (ERP)System.The objective for this year is to utilize the outside consultant to develop and release a Request for Proposal (RFP).ERP vendor selection would be expected in the second half of the year. Perform a major upgrade to the Public Works Cartegraph Work order system.The new web based system will provide for improved efficiency in the office and further deployment of mobile computing for field crews. Completion is expected in the second half of the year. Work with Community Services to implement a replacement Point-of-Sale system Work with Development Services to implement online permitting including the ability to apply for and review building permits through the City website. Additionally, implement the CRW System's GIS module to improve the permit/project work flow process and provide for enhanced query and reporting capabilities. $- $200 $400 $600 $800 $1,000 $1,200 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 56 GENERAL SUPPORT SERVICES Administrative Services Department Division No: 0106 Division Goals & Objectives » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Operating Budget Actual Actual Adopted Estimated Proposed Proposed ◊Operations & Maintenance 352,174 394,937 412,680 558,200 520,510 537,730 ◊Capital Outlay 89,788 65,060 125,270 140,363 68,260 68,260 Division Total 441,962$ 459,997$ 537,950$ 698,563$ 588,770$ 605,990$ The General Support Services Division houses projects and funding for activities that do not fit clearly into any other particular department/division or are spread amongst several departments.Funding for City Hall utilities, alarms and maintenance,office machine and communications system operating costs,intergovernmental fees and agreements, and general supply purchases are included in this Division. Work with the City Attorney to complete an update of the City’s various contract,procurement,and request for proposal documents. Complete the integration of the financial and inventory components of the City's fixed asset management system. 0 100 200 300 400 500 600 700 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance 57 RISK MANAGEMENT Administrative Services Department Division No: 0107 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Tort Liability Claims Processed 13 17 N/A 19 N/A N/A Division Operating Budget ◊Operations & Maintenance 799,313$ 641,237$ 733,330$ 720,312$ 786,240$ 806,820$ ◊Capital Outlay - - - - - - Division Total 799,313$ 641,237$ 733,330$ 720,312$ 786,240$ 806,820$ The Risk Management Division is responsible for managing the City's various insurance policies, administering the City's safety programs and processing tort liability claims.The Risk Management Division aims to minimize liability exposure and loss to the City through education,risk transference,risk avoidance, contract management, and by managing City contractors'insurance liability coverage.This Division also funds membership in a pooled California Joint Powers Insurance Authority (CJPIA),coordinates a Citywide safety program,participates in the City's monthly Safety Committee meetings,and oversees liability claim contingencies and training opportunities on risk management topics. Work with the Finance Division to complete the annual Underwriters Report for submittal to the CJPIA. Ensure CJPIA best risk management practices are in place through implementation of the Loss Control Action Plan (LossCAP) recommendations. Implement centralized tracking and reporting of Cal-OSHA compliance certifications and various department trainings. $- $200 $400 $600 $800 $1,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance 58 CAPITAL EQUIPMENT REPLACEMENT Administrative Services Department Division No: 0108 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Operating Budget Actual Actual Adopted Estimated Proposed Proposed ◊Operations & Maintenance.*566,787$ 566,787$ -$ -$ -$ -$ ◊Capital Outlay 737,287 1,030,278 1,496,320 1,668,602 2,493,810 962,000 Division Total 1,304,074$ 1,597,065$ 1,496,320$ 1,668,602$ 2,493,810$ 962,000$ Ensure the City maintains sufficient capital funds available for the regularly scheduled replacement of vehicles and equipment and for major improvements and restoration of City facilities. Establish equipment rental rates at a level that provides an adequate fund balance with minimal impact on operating departments. Maintain current vehicle and equipment replacement schedules and prioritize facility improvements and restorations. The Capital Replacement Division cost center contains funding for the replacement of equipment and vehicles, funded through annual allocations and rental rates charged to divisions for assigned equipment and vehicles.This allows the City to maintain a regular improvement/replacement cycle for these assets. *Beginning in 2014-15, Operations & Maintenance costs (for Facilities Renovation) are included in Public Works Department, Facilities Maintenance (0419), or in Capital Improvement Projects, project series #3500. Prior to 2014-15, Operations & Maintenance costs (for Facilities renovation) were included in Division 0105. $- $500 $1,000 $1,500 $2,000 $2,500 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance.* 59 This page intentionally left blank 60 COMMUNITY SERVICES Department Code: 0200 Expense 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Classification Actual Actual Adopted Estimated Proposed Proposed Authorized Positions 44 45.0 46.3 46.3 49.0 49.5 Personnel Expense 2,874,081 $2,860,804 $3,001,140 $2,924,603 $3,190,020 $3,351,620 Operations and Maintenance 1,720,529 1,905,104 1,947,410 2,106,107 2,119,970 2,132,740 Capital Outlay 139,313 175,758 199,420 221,770 259,160 215,390 Total Department Budget $4,733,922 $4,941,665 $5,147,970 $5,252,480 $5,569,150 $5,699,750 Strategic Plan: Goals and Implementation $0 $1 $2 $3 $4 $5 $6 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Millions Capital Outlay Operations and Maintenance Personnel Expense Review costs of providing services and adjust fees as prudent. Fully assess operations and fees at the Poway Center for the Performing Arts. Implement a Point of Sale (POS) system to improve accuracy in collecting fees, tracking trends, and financial reporting. Extend operation of the Lake Poway entry station from nine to twelve months to increase revenue by 30%. Host an annual employee/volunteer emergency preparedness care and shelter training. Engage community interest in the proposed Mickey Cafagna Community Center. Launch the inflatable packages and sessions at the Swim Center. 61 This page intentionally left blank 62 Community Services Department Community Services Director Org: 0200 Recreation Org: 0201 Lake Operations Org: 0202 Aquatics Org: 0203 Performing Arts Center Org: 0204 Old Poway Park Org: 0205 Interpretive Services Org: 0207 Community Park Org: 0208 Library Org: 0206 FT = Full Time Equivalent PT = Part Time as Full Time Equivalent FY 2015-16 FY 2016-17 Total FT: 20 / PT: 29 Total Exp. $5,569,150 Total FT: 20 / PT: 29.5 Total Exp. $5,699,750 FY 2015-16 FT: 4 Exp: $939,140 FY 2016-17 FT: 4 Exp: $957,030 FY 2015-16 FT: 2 / PT: 2.1 Exp: $372,540 FY 2016-17 FT: 2 / PT: 2.6 Exp: $411,560 FY 2015-16 FT: 4 / PT: 6.1 Exp: $878,610 FY 2016-17 FT: 4 / PT: 6.1 Exp: $908,670 FY 2015-16 FT: 2 / PT: 9.6 Exp: $807,970 FY 2016-17 FT: 2 / PT: 9.6 Exp: $797,530 FY 2015-16 FT: 3 / PT: 4.9 Exp: $1,151,160 FY 2016-17 FT: 3 / PT: 4.9 Exp: $1,171,730 FY 2015-16 FT: 2 / PT: 2.5 Exp: $453,310 FY 2016-17 FT: 2 / PT: 2.5 Exp: $456,700 FY 2015-16 FT: 0 Exp: $59,350 FY 2016-17 FT: 0 Exp: $60,710 FY 2015-16 FT: 1 Exp: $109,030 FY 2016-17 FT: 1 Exp: $111,470 FY 2015-16 FT: 2 / PT: 3.8 Exp: $789,040 FY 2016-17 FT: 2 / PT: 3.8 Exp: $824,350 63 DIRECTOR OF COMMUNITY SERVICES Community Services Department Division No: 0200 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Operating Budget Actual Actual Adopted Estimated Proposed Proposed Authorized Positions (FTE)4.0 4.0 4.0 4.0 4.0 4.0 ◊Personnel Expenditure 581,854$ 607,129$ 616,980$ 600,149$ 654,080$ 679,930$ ◊Operations & Maintenance 246,608 270,410 267,980 280,497 282,780 274,820 ◊Capital Outlay 16,780 5,378 2,530 2,530 2,280 2,280 Division Total 845,242$ 882,917$ 887,490$ 883,176$ 939,140$ 957,030$ The quality of recreational opportunities,cultural programming,and environmental stewardship reflects a vibrant and strong community.The Office of the Director is responsible for the eight divisions that work to fulfill those needs: Recreation, Aquatics,Lake Poway Recreation Area,the Poway Center for the Performing Arts,Old Poway Park,the Poway Community Library,Interpretive Services, and Community Park. Staff members within the Director's Division oversee the City's animal control operating agreement and the youth recreation scholarship program.This Division also provides administrative coordination with the Metropolitan Transit System and private foundations. Identify and implement an efficient and effective way to elicit feedback on events,programs,activities,and services to enhance enjoyment and fulfill the needs of the community.Ensure that the opportunity is available to the public by June 2016. Establish a policy granting the City Manager authority to establish fees for new programs and activities,and bring forth to the City Council for approval by February 2016. Create a centralized,bi-annual Poway's Partners sponsorship campaign to offset event and program costs by $33,800 cash and $6,150 in-kind donations. $- $100 $200 $300 $400 $500 $600 $700 $800 $900 $1,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 64 RECREATION Community Services Department Division No: 0201 Division Goals & Objectives » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Total Sports Field Participants 110,000 110,000 110,000 110,000 110,000 110,000 Total Sports Field Hours Used 13,700 18,390 17,000 18,500 18,500 18,500 Open Play Participants-Meadowbrook 24,230 4,321 4,400 4,500 4,500 4,500 Open Play Participants-Twin Peaks 29,600 6,132 6,200 6,200 6,200 6,200 Division Operating Budget Authorized Positions (FTE)4.9 3.6 3.6 3.6 4.1 4.6 ◊Personnel Expenditure 332,570$ 231,684$ 232,230$ 217,000$ 248,160$ 286,190$ ◊Operations & Maintenance 52,630 74,848 75,070 89,269 105,070 107,060 ◊Capital Outlay 11,930 13,210 14,560 15,898 19,310 18,310 Division Total 397,130$ 319,742$ 321,860$ 322,167$ 372,540$ 411,560$ The Recreation Division provides customer service support for all divisions, hosts recreation opportunities at Meadowbrook and Twin Peaks Gymnasiums in partnership with the Poway Unified School District,and works closely with youth and adult sports leagues to coordinate use of City and joint use facilities.The Recreation Division administers Citywide facility and field rentals, class registrations,and the recreation section of Poway Today.The Division is responsible for the administration of the Poway Leisure Assistance for Youth (P.L.A.Y.) scholarship program. As identified below, meet or exceed Division Activity Statistics for FY 2015-16. Implement a Point of Sale system to improve accuracy in collecting fees, tracking trends, and financial reporting. $- $50 $100 $150 $200 $250 $300 $350 $400 $450 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 65 LAKE POWAY RECREATION AREA Community Services Department Division No: 0202 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Fishing Permits 27,123 24,350 25,000 25,000 22,600 22,600 Boat Rentals 9,927 8,600 9,000 9,000 9,200 9,200 Facility Rental Reservations 544 343 350 350 355 355 Parking Permits 21,362 19,000 30,000 30,000 39,000 39,000 Day Camp/Counselor in Training 576 584 684 684 684 684 Division Operating Budget Authorized Positions (FTE)9.3 9.2 10.1 10.1 10.1 10.1 ◊Personnel Expenditure 469,965$ 472,547$ 553,840$ 546,856$ 560,800$ 586,790$ ◊Operations & Maintenance 233,216 238,314 249,640 257,592 274,420 278,500 ◊Capital Outlay 20,340 28,990 31,990 31,990 43,390 43,380 Division Total 723,521$ 739,851$ 835,470$ 836,438$ 878,610$ 908,670$ The Lake Poway Recreation Area provides year-round boating, fishing,and outdoor recreational opportunities that promote healthier lifestyles.Staff provides oversight for lease of the concession,which sells fishing and boating permits,and grill and tackle items.Staff coordinates with other departments to ensure a safe and secure water resource and trails system,and provides support to nonprofits, groups,and private rentals for fundraising activities, celebrations, and community gatherings. As identified below, meet or exceed Division Activity Statistics for FY 2015-16. Ensure minimized interruption to operations while coordinating directly with the Public Works and Development Services departments to complete Capital Improvement Projects. Implement the Point of Sale system to improve accuracy in collecting fees, tracking trends, and financial reporting. Extend operation of the Lake Poway entry station from nine to twelve months to increase revenue by 30%. $- $100 $200 $300 $400 $500 $600 $700 $800 $900 $1,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 66 AQUATICS Community Services Department Division No: 0203 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Swim Classes/Private lessons 510 650 500 625 650 650 Swim Lesson Participants 1,650 1,827 1,800 1,800 1,800 1,800 Total Daily attendance 32,052 32,052 33,000 33,000 34,000 34,000 Event Attendance 250 300 600 900 900 900 Swim Meet Attendance 7,500 7,500 7,500 7,500 7,500 7,500 Division Operating Budget Authorized Positions (FTE)10.9 10.4 10.9 10.9 11.6 11.6 ◊Personnel Expenditure 464,070$ 451,892$ 464,780$ 467,300$ 510,590$ 530,270$ ◊Operations & Maintenance 200,977 207,456 225,770 227,805 234,640 240,820 ◊Capital Outlay 17,060 18,250 19,840 40,840 62,740 26,440 Division Total 682,107$ 677,598$ 710,390$ 735,945$ 807,970$ 797,530$ The Aquatics Division is dedicated to providing a diverse range of high-quality aquatic programs and activities that are accessible to all members of the community.Aquatic programs support and promote safety, fitness,education,and youth sports.The Aquatics Division coordinates with the Poway Unified School District and youth sports organizations to provide programming that is reflective of community needs. As indicated below, meet or exceed Division Activity Statistics for FY 2015-16. Ensure minimized interruption to operations while coordinating directly with the Public Works and Development Services departments to complete Capital Improvement Projects. Implement the Point of Sale system to improve accuracy in collecting fees, tracking trends, and financial reporting. Launch the inflatable packages and sessions to provide experienced-based parties, drive daily attendance, enhance existing Kid/Teen Night Out activities, and bolster Swim Center revenue. $- $100 $200 $300 $400 $500 $600 $700 $800 $900 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 67 POWAY CENTER FOR THE PERFORMING ARTS Community Services Department Division No: 0204 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Total Performances 161 156 160 156 161 161 Total Rehearsals 87 87 85 82 84 84 Total Attendance 58,740 55,652 60,500 58,300 58,313 58,313 Average Attendance per Show 365 357 378 375 389 389 Total Hours Facility Used 1,574 1,497 1,587 1,450 1,600 1,600 Division Operating Budget Authorized Positions (FTE)6.6 7.5 7.5 7.5 7.9 7.9 ◊Personnel Expenditure 410,551$ 511,271$ 524,960$ 493,394$ 533,030$ 553,480$ ◊Operations & Maintenance 446,807 480,515 497,550 535,930 526,280 527,360 ◊Capital Outlay 42,673 78,050 88,320 88,320 91,850 90,890 Division Total 900,031$ 1,069,836$ 1,110,830$ 1,117,644$ 1,151,160$ 1,171,730$ The Performing Arts Center Division is responsible for the efficient and effective operation and maintenance of the Poway Center for the Performing Arts. Performing Arts Center staff partners with the Poway Performing Arts Center Foundation, the Poway Unified School District,and community-based arts organizations to provide leisure and cultural activities that entertain,enlighten,and enrich lives.Staff ensures professional technical,box office, and front-of-house services.The volunteer usher program provides critical operational support. The lobby features juried rotating art exhibits. As identified below, meet or exceed Division Activity Statistics for FY 2015-16. Ensure minimized interruption to operations while coordinating directly with the Public Works and Development Services departments to complete Capital Improvement Projects. Fully assess operations and fees, bring adjustment recommendations forward to City Council, and implement as directed. $- $200 $400 $600 $800 $1,000 $1,200 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 68 OLD POWAY PARK Community Services Department Division No: 0205 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Community Events 7 6 10 11 11 11 Event Participants 18,000 21,000 26,000 26,500 27,000 27,500 Poway Midland Railroad Ridership 46,000 59,800 56,000 61,000 61,500 62,000 Museum/Nelson House Attendance 5,000 13,500 11,600 15,000 15,250 15,450 Facility Reservations 450 257 275 350 390 390 Historical Tour Participants 1,700 1,950 1,500 1,500 1,500 1,500 Annual Farmers Market Vendors 85 110 110 110 110 110 Division Operating Budget Authorized Positions (FTE)3.0 3.5 3.4 3.4 4.5 4.5 ◊Personnel Expenditure 232,557$ 209,053$ 228,370$ 221,896$ 278,470$ 292,810$ ◊Operations & Maintenance 132,353 158,556 153,110 189,741 160,430 154,980 ◊Capital Outlay 10,820 7,390 17,750 17,762 14,410 8,910 Division Total 375,730$ 374,999$ 399,230$ 429,399$ 453,310$ 456,700$ As identified below, meet or exceed Division Activity Statistics for FY 2015-16. Coordinate with the Old Poway Park Action Committee to implement two to three volunteer-driven activities, which meet the park theme and community needs and interests. Ensure minimized interruption to operations while coordinating directly with the Public Works and Development Services departments to complete Capital Improvement Projects. The Old Poway Park Division is dedicated to bringing history to life through community group partnerships. Interpretive tours,and themed programs and events ensure visitors experience Poway's history,and facilitate celebration and community spirit.The Reserve Park Ranger Program helps provide a safe and family-friendly park and trail system.Staff administers agreements for operation of the Farmers Market, Poway Midland Railroad, Hamburger Factory Restaurant, Poway Museum, and Blacksmith Shoppe. $- $50 $100 $150 $200 $250 $300 $350 $400 $450 $500 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 69 LIBRARY Community Services Department Division No: 0206 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Patron Count 289,263 290,000 310,000 315,000 315,000 320,000 Circulation 782,288 730,000 800,000 810,000 815,000 815,000 Programs/Attendance 608/23,389 650/27,000 675/30,000 700/25,000 710/27,000 715/30,000 Internet Sessions 43,021 43,000 45,000 47,000 48,000 50,000 Division Operating Budget ◊Operations & Maintenance 55,768$ 54,786$ 60,240$ 58,180$ 59,350$ 60,710$ ◊Capital Outlay - - - - - - Division Total 55,768$ 54,786$ 60,240$ 58,180$ 59,350$ 60,710$ The Library Division is a cost center that ensures the City supports Library building maintenance operations, custodial service, landscape maintenance, and security.City staff is the liaison to County Library staff, fostering a strong working relationship and responding to special building maintenance requests, as needed. Coordinate with Public Works, Development Services, and the County of San Diego during the Poway Library Remodel Project. Administer the Library Endowment Fund in accordance with Council policy. Promote positive relations and effective operations by coordinating interaction between County Library staff and all City departments. $51 $52 $53 $54 $55 $56 $57 $58 $59 $60 $61 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance 70 INTERPRETIVE SERVICES Community Services Department Division No: 0207 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Volunteer Hrs. - Blue Sky & Kumeyaay 4,073 3,378 4,000 3,800 4,000 4,000 Blue Sky: Public, School, Scout Tours 80 60 80 75 75 75 Public Programs 12 10 13 12 12 12 Outreach/Tour Participants 516 832 521 380 500 500 Kumeyaay: School Tours 51 41 45 45 47 47 School Tour Participants 1,355 1,052 1,000 1,300 1,300 1,300 1,181 489 600 500 500 500 Division Operating Budget Authorized Positions (FTE)1.0 1.0 1.0 1.0 1.0 1.0 ◊Personnel Expenditure 79,999$ 80,218$ 82,970$ 81,324$ 85,170$ 86,810$ ◊Operations & Maintenance 17,054 16,390 23,200 23,128 20,740 21,540 ◊Capital Outlay 1,900 3,120 3,120 3,120 3,120 3,120 Division Total 98,953$ 99,728$ 109,290$ 107,572$ 109,030$ 111,470$ Public, Scout Tour Participants The Interpretive Services Division is dedicated to the preservation and protection of the Blue Sky Ecological Reserve and the Kumeyaay-Ipai Interpretive Center at Pauwai.The goal is to carefully manage these valuable resources for future generations. Staff provides interpretive cultural and natural resource programs to foster stewardship,and recreational activities that promote healthier lifestyles.Staff coordinates and partners with a team of volunteers to create opportunities for the public, schools,and community-based groups to connect with nature and history. As identified below, meet or exceed Division Activity Statistics for FY 2015-16. Bring forward recommendations to create efficiencies in volunteer recruitment and management, and implement as approved. Effectively balance high demand with staff/volunteer capacities. Identify and implement new procedures for hosting the annual Hiking for Fitness program. $- $20 $40 $60 $80 $100 $120 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 71 COMMUNITY PARK Community Services Department Division No: 0208 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 15 25 27 23 23 23 930 1,872 1,850 1,900 1,950 2,000 486 549 515 555 565 565 Contract Class and Camp Participants 3,591 4,299 4,500 4,350 4,450 4,450 Special Event Attendance 3,750 10,082 10,100 10,600 11,100 11,600 726 405 420 425 435 435 Division Operating Budget Authorized Positions (FTE)3.8 5.3 5.8 5.8 5.8 5.8 ◊Personnel Expenditure 302,515$ 267,888$ 297,010$ 296,684$ 319,720$ 335,340$ ◊Operations & Maintenance 335,116 403,829 394,850 443,965 456,260 466,950 ◊Capital Outlay 17,810 21,370 21,310 21,310 22,060 22,060 Division Total 655,441$ 693,087$ 713,170$ 761,959$ 798,040$ 824,350$ The Community Park Division is dedicated to providing classes,programs,and services that bring the Poway community together, and expand recreational opportunities for people of all ages. Staff develops and hosts events and activities that promote health and wellness, and are accessible to families at all income levels. Staff coordinates with the Poway Senior Center and local nonprofit groups to provide programming reflective of the community's needs and interests. As identified below, meet or exceed Division Activity Statistics for FY 2015-16. Provide Poway's teen population the opportunity to grow their leadership abilities. Increase the number of teen volunteers from 65 to 130. Ensure minimized interruption to operations while coordinating directly with the Public Works and Development Services departments to complete Capital Improvement Projects. Facility Reservations Youth and Teen Programs Contract Classes and Camps Youth and Teen Program Participants $- $200 $400 $600 $800 $1,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 72 DEVELOPMENT SERVICES Department Code: 0300 Expense 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Classification Actual Actual Adopted Estimated Proposed Proposed Total Positions 22.9 23.5 24.8 22.5 22.5 22.5 Personnel Expense $ 2,682,967 $ 2,773,263 $ 2,808,251 $ 2,801,224 $ 2,877,710 $ 3,012,060 Operations and Maintenance 1,373,937 1,402,677 1,366,921 1,879,216 1,541,980 1,616,320 Capital Outlay 68,620 37,920 36,890 36,890 67,110 38,710 Total Dept. Operating Budge $ 4,125,524 $ 4,213,860 $ 4,212,062 $ 4,717,330 $ 4,486,800 $ 4,667,090 Strategic Plan: Goals and Implementation $0 $1 $2 $3 $4 $5 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Millions Capital Outlay Operations and Maintenance Personnel Expense Explore alternative energy sources, such as solar power, to reduce costs. Conduct a nexus fee study to determine actual cost of service delivery for planning, building and engineering; and determine an appropriate cost recovery model for Development Services. Coordinate with regional, State and Federal agencies to identify and secure new grants as they become available. Install sidewalks and street lighting on Midland Road. Implement safety improvements on Espola Road. Maintain a Pavement Condition Index rating of 70 or greater. Utilize an online permitting tool to streamline the application process for development and code compliance issues. Lead implementation of the Poway Road Specific Plan, and coordinate with other departments and the Ad Hoc Committee. Support development, design and future construction of the Mickey Cafagna Community Center. Continue to support the development of affordable housing projects in the City via partnerships with housing providers. Revise the landscape manual for Zone B vegetation management requirements. 73 This page intentionally left blank 74 Development Services Department Development Services Director Org: 0300 Traffic Engineering Org: 0307 Land Development Engineering Org: 0305 Planning Org: 0301 Building and Safety Inspection Org: 0303 Housing Org: 0309 Capital Projects Engineering Org: 0304 Engineering Inspection Org: 0306 Stormwater Management Org: 0308 Engineering Planning Successor Agency Administration Org: 0310 FT = Full Time Equivalent PT = Part Time as Full Time Equivalent CT = Contract as Full Time Equivalent FY 2015-16 FY 2016-17 Total FT: 22 / PT: .5 / CT: 3.5 Total Exp. $4,486,800 Total FT: 22 / PT: .5 / CT: 3.5 Total Exp. $4,667,090 FY 2015-16 FT: 6 / PT: .5 Exp: $831,240 FY 2016-17 FT: 6 / PT: .5 Exp: $864,860 FY 2015-16 FT: 7 Exp: $1,103,550 FY 2016-17 FT: 7 Exp: $1,145,710 FY 2015-16 CT: 3.5 Exp: $838,220 FY 2016-17 CT: 3.5 Exp: $889,840 FY 2015-16 FT: 0 Exp: $43,000 FY 2016-17 FT: 0 Exp: $43,000 FY 2015-16 FT: 0 Exp: $39,500 FY 2016-17 FT: 0 Exp: $39,500 FY 2015-16 FT: 2 Exp: $478,830 FY 2016-17 FT: 2 Exp: $503,300 FY 2015-16 FT: 4 Exp: $541,720 FY 2016-17 FT: 4 Exp: $535,870 FY 2015-16 FT: 3 Exp: $231,360 FY 2016-17 FT: 3 Exp: $244,370 FY 2015-16 FT: 0 Exp: $95,130 FY 2016-17 FT: 0 Exp: $96,390 FY 2015-16 FT: 0 Exp: $284,250 FY 2016-17 FT: 0 Exp: $304,250 75 DIRECTOR OF DEVELOPMENT SERVICES Development Services Department Division No: 0300 Division Goals & Objectives » » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Operating Budget Actual Actual Adopted Estimated Proposed Proposed Authorized Positions (FTE)6.9 7.6 7.0 7.0 6.5 6.5 ◊Personnel Expenditure 680,683$ 757,742$ 788,870$ 795,888$ 784,270$ 818,150$ ◊Operations & Maintenance 33,722 31,936 36,020 36,020 41,970 43,110 ◊Capital Outlay 10,360 5,160 4,350 4,350 5,000 3,600 Division Total 724,765$ 794,838$ 829,240$ 836,258$ 831,240$ 864,860$ Program Budgets Total 5110 – North County Winter Shelter $72,555 $22,250 $94,805 5961 – Home Share & Community Connections 787,981 159,790 947,771 Total Program Budgets $860,536 $182,040 $1,042,576 The Office of the Director is responsible for the overall administration of the department.The Director is responsible for managing the operation of the department and ensuring that all department goals are achieved in an efficient manner. Continue work on the Poway Road Corridor Study. Oversee City Capital Improvement Program. Oversee purchase of open space in accordance with the Habitat Acquisition Strategy. Added for 2015-17 Complete updates to the Municipal Code. Oversee design of the Mikey Cafagna Community Center. Approp. Thru May 2015 $- $100 $200 $300 $400 $500 $600 $700 $800 $900 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 76 PLANNING Development Services Department Division No: 0301 Division Goals & Objectives » » » » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Development Review Applications 63 48 70 45 62 66 Conditional Use Permit Applications 22 11 23 25 22 26 Sign Permit Applications 160 131 186 120 145 163 Variance Applications 7 5 8 8 7 8 Temporary Use Permit Applications 65 56 65 60 62 67 Vegetation Abatements 944 876 925 885 895 890 Division Operating Budget Authorized Positions (FTE)7.0 7.2 7.0 7.0 7.0 7.0 ◊Personnel Expenditure 803,335$ 851,297$ 856,960$ 875,456$ 915,260$ 957,360$ ◊Operations & Maintenance 194,649 158,403 173,060 182,530 178,950 179,010 ◊Capital Outlay 12,600 8,940 9,340 9,340 9,340 9,340 Division Total 1,010,584$ 1,018,640$ 1,039,360$ 1,067,326$ 1,103,550$ 1,145,710$ The Planning Division assists the development community and homeowners with processing land use applications and ensuring compliance with zoning and conditions of approval through plan reviews and field inspections. It is the City’s goal to process all land use applications in a timely manner. Code Compliance is conducted within the Planning Division and enforces City regulations on signs, graffiti, businesses, noise, housing, vegetation management, Stormwater pollution, vehicle abatement, and other topics. Continue work on the Poway Road Corridor Study. Complete zoning amendments to the Poway Municipal Code. Complete design of the Mickey Cafagna Community Center. Pursue purchase of open space in accordance with the Habitat Acquisition Strategy. Provide accurate information to the public in a timely manner. Apply Affordable Housing Overlay Zones to sites identified in the Housing Element. Follow adopted code compliance procedures and work with property owners to gain compliance. $- $200 $400 $600 $800 $1,000 $1,200 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 77 BUILDING AND SAFETY INSPECTION Development Services Department Division No: 0303 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Plan Checks 705 896 715 805 842 889 Building Permits 2,099 2,682 2,278 2,410 2,531 2,695 Inspections 6,112 8,221 6,740 7,895 8,040 8,089 Division Operating Budget ◊Operations & Maintenance 701,323$ 856,811$ 756,500$ 907,241$ 836,420$ 888,040$ ◊Capital Outlay 2,280 1,800 2,410 2,410 1,800 1,800 Division Total 703,603$ 858,611$ 758,910$ 909,651$ 838,220$ 889,840$ The Building and Safety Inspection Division provides assistance and information on construction code requirements to developers and residents through telephone/counter contacts, plan check review, and structural, electrical,plumbing,and mechanical inspections.The City's Building and Safety Inspection services are provided through a contract with Esgil Corporation. Provide accurate information and plan check and inspection services to developers and residents. Monitor and implement changes in laws, codes, and techniques that affect the building industry. Maintain and update the Access database record of all stored plans. $- $100 $200 $300 $400 $500 $600 $700 $800 $900 $1,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance 78 CAPITAL PROJECTS ENGINEERING Development Services Department Division No: 0304 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Projects in Design 18 17 17 19 20 20 Projects Under Construction 10 14 12 12 16 16 Division Operating Budget Authorized Positions (FTE)2.0 1.8 2.0 2.0 2.0 2.0 ◊Personnel Expenditure*455,976$ 487,111$ 435,480$ 437,809$ 464,340$ 488,420$ ◊Operations & Maintenance 7,950 8,429 12,400 12,400 13,350 13,740 ◊Capital Outlay 9,980 4,640 1,140 1,140 1,140 1,140 Division Total 473,906$ 500,180$ 449,020$ 451,349$ 478,830$ 503,300$ *Includes allocated cost of shared positions The Capital Projects Engineering Division is responsible for surveys, design, construction administration,and inspection services for capital improvement projects.This Division also performs special studies and provides engineering support for projects in other departments such as Community Services and Public Works. Complete Capital Improvement Projects (CIP) in accordance with the approved CIP Program, including the design and construction of Blue Crystal, Welton, Buehler, and Sagecrest Reservoir rehabilitation projects, Community Park Swim Center renovations, Old Poway Park general construction and repairs, Poway Center for the Performing Arts (PCPA) cooling tower repair and boiler replacement, Lake Poway parking lot expansion, Espola Road safety improvements, and preparation of the City Facilities Maintenance Assessment. Expand overall TRAKiT database by inputting data associated with CIP projects into LandTrak. Explore opportunities for future water conserving CIP projects. $400 $420 $440 $460 $480 $500 $520 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure* 79 LAND DEVELOPMENT ENGINEERING Development Services Department Division No: 0305 Division Goals & Objectives » » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Grading Permit Applications 17 18 16 16 16 16 Improvement Plan Applications 8 7 8 4 8 8 Other Engineering Reviews 81 43 74 52 52 52 Right-of-Way Permit Applications 236 291 300 228 250 250 Division Operating Budget Authorized Positions (FTE)3.0 3.0 3.0 3.5 4.0 4.0 ◊Personnel Expenditure*392,464$ 419,123$ 435,671$ 409,513$ 487,150$ 508,490$ ◊Operations & Maintenance 12,643 31,151 23,500 108,437 23,990 23,800 ◊Capital Outlay 11,840 3,700 3,700 3,700 30,580 3,580 Division Total 416,947$ 453,974$ 462,871$ 521,650$ 541,720$ 535,870$ *Portion of costs allocated for shared positions The Land Development Engineering Division assists the private development community and homeowners with processing grading permits,improvement plans,and addressing other engineering matters in a timely manner while ensuring compliance with City standards and specific conditions of approval. Complete initial reviews of all grading and improvement plans within four weeks of submittal. Undertake public outreach effort to improve understanding and awareness of land development engineering requirements. Update the Floodplain Development Permit Regulations in the Municipal Code. Update the City's utility undergrounding policies and procedures. Provide accurate information to the public in a timely manner. $- $100 $200 $300 $400 $500 $600 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure* 80 ENGINEERING INSPECTION Development Services Department Division No: 0306 Division Goals & Objectives » » » 2011-12 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Grading Projects Inspected 30 26 36 38 38 38 MDRAs Inspected 24 40 32 36 36 36 Capital Improvement Projects Inspected 13 15 12 12 16 16 Right-of-Way Permits Inspected 180 291 300 228 250 250 Division Operating Budget Authorized Positions (FTE)3.0 3.0 3.0 3.0 3.0 3.0 ◊Personnel Expenditure*200,274$ 197,401$ 207,210$ 198,498$ 194,500$ 206,190$ ◊Operations & Maintenance 23,759 30,533 26,531 112,463 24,640 25,960 ◊Capital Outlay 16,440 11,820 11,820 11,820 12,220 12,220 Division Total 240,473$ 239,754$ 245,561$ 322,781$ 231,360$ 244,370$ *Portion of costs allocated for shared positions The Engineering Inspection Division is responsible for ensuring that all public and private construction projects comply with the City-approved plans and specifications and meet State requirements to prevent stormwater pollution. Respond to inspection needs or requests on public and private projects. Oversee right-of-way permits according to established procedures from review of plans to final project inspection. Train all Engineering Inspectors annually on National Pollutant Discharge Elimination System (NPDES) requirements and other technical inspection issues. $- $50 $100 $150 $200 $250 $300 $350 Actual 2011-12 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure* 81 TRAFFIC ENGINEERING Development Services Department Division No: 0307 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Traffic Counts 53 25 90 25 20 20 Traffic Safety Committee Items 2 4 4 3 3 3 Traffic Control Plan Reviews 236 291 300 228 250 250 Division Operating Budget Authorized Positions (FTE)0.8 0.3 1.0 - - - ◊Personnel Expenditure*130,030$ 60,589$ 84,060$ 84,060$ 32,190$ 33,450$ ◊Operations & Maintenance 174,100 37,031 59,310 79,310 55,910 55,910 ◊Capital Outlay 5,120 1,860 4,130 4,130 7,030 7,030 Division Total 309,250$ 99,480$ 147,500$ 167,500$ 95,130$ 96,390$ Program Budgets Approp. Through May 2015 Added for 2015-17 Total 1188 - Motorist Aid Services $0 $175,344 Total Program Budgets $0 $175,344 *Allocated cost of shared positions beginning in 2014-15 $175,344 $175,344 The Traffic Engineering Division is responsible for resolving the City’s traffic engineering and transportation planning issues.Staff oversees the operation and maintenance of the City’s computerized traffic signal system and reviews all work area traffic control designs and traffic impact reports for land development projects. Collect traffic data for SANDAG and review its Congestion Management Program. Maintain current speed surveys in accordance with the California Vehicle Code. Review development projects according to established timelines. Respond to all inquiries regarding traffic related issues. $- $50 $100 $150 $200 $250 $300 $350 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure* 82 STORMWATER MANAGEMENT Development Services Department Division No: 0308 Division Goals & Objectives » » » 2011-12 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Municipal inspections 30 30 30 30 30 30 Educational materials distributed 57,000 30,000 30,000 200 200 200 Dry weather sites monitored 50 50 50 50 50 50 Division Operating Budget Authorized Positions (FTE)- - - - - - ◊Personnel Expenditure -$ -$ -$ -$ -$ -$ ◊Operations & Maintenance 175,263 192,122 233,550 260,315 284,250 304,250 ◊Capital Outlay - - - - - - Division Total 175,263$ 192,122$ 233,550$ 260,315$ 284,250$ 304,250$ The Stormwater Management Division is responsible for preserving, protecting,and improving the waters of the U.S.within the City boundaries.Staff maintains compliance with the National Pollutant Discharge Elimination System Permit by reducing or preventing the discharge of pollutants to the storm drain system and performing required inspections, monitoring and annual reporting. Reorganize the City's stormwater program, including the City's Municipal Code, to satisfy the requirements of the new storm water permit. Implement bacteria Total Maximum Daily Load (TMDL) requirements as necessary, and sediment TMDL requirements once approved by Regional Water Quality Control Board. Inspect industrial/commercial/municipal facilities, construction sites, treatment best management practices, and other items. $- $50 $100 $150 $200 $250 $300 $350 Actual 2011-12 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 83 HOUSING AUTHORITY & PROGRAMS Division No: 0309 Division Goals & Objectives » » » » 2011-12 2013-14 2014-15 2014-15 2015-16 2016-17 Division Operating Budget Actual Actual Adopted Estimated Proposed Proposed Authorized Positions (FTE)0.2 - - - - - ◊Personnel Expenditure 20,205$ -$ -$ -$ -$ -$ ◊Operations & Maintenance 14,359 20,092 23,050 85,500 39,500 39,500 ◊Capital Outlay - - - - - - Division Total 34,564$ 20,092$ 23,050$ 85,500$ 39,500$ 39,500$ Coordinate with County of San Diego to disseminate fair housing information. Work with non-profit developers to implement Exclusive Negotiating Rights Agreements and negotiate the terms of Disposition and Development Agreements for future affordable housing developments. Monitor each of Poway's affordable housing developments to ensure continued compliance with regulatory agreements requirements. Development Services Department Programs The Housing Authority and Programs Division supports Poway's Housing Authority.Staff works to provide the community with a variety of housing options, including high quality, multi-family and single-family homes affordable to low-and moderate-income households.This Division manages existing assets and facilities affordable housing development with care and attention to resident and community needs.Additionally,staff work with non-profit housing developers to build new quality affordable housing developments for the community. Administer the SHOP and BEGIN loan programs including monitoring of existing program loans, and reissuance of loans related to participating household resales. $- $10 $20 $30 $40 $50 $60 $70 $80 $90 Actual 2011-12 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 84 HOUSING PROGRAMS Development Services Department Housing Assistance Programs Total 1135 - Supporting Home Ownership in Poway (SHOP) Program 2,137,514$ -$ 2,137,514$ 1173A- Building Equity and Growth in Neighborhoods (BEGIN) Program 1,545,000 - Housing Developments Programs 5925 - Oak Knoll/Pomerado Rd Affordable Housing 2,129,427$ -$ 5948 - Orange Gardens 9,036,000 - 5976 - Monte Vista 1,863,019 - 5989 – Twin Peaks Affordable Housing 970,000 - Other Programs 5983 – Housing Special Programs Fund 4,468,307$ 4,468,307$ Total Housing Programs 22,149,267$ -$ 22,149,267$ 9,036,000 1,863,019 970,000 2,129,427$ 1,545,000 Appropriations Appropriation for May 2015 FY 2015-17 85 REDEVELOPMENT SUCCESSOR AGENCY ADMINISTRATION Development Services Department Division No: 0310 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Operating Budget Actual Actual Adopted Estimated Proposed Proposed Authorized Positions (FTE)- 0.70 1.88 - - - ◊Personnel Expenditure -$ -$ -$ -$ -$ -$ ◊Operations & Maintenance 36,169 36,169 23,000 95,000 43,000 43,000 ◊Capital Outlay - - - - - - Division Total 36,169$ 36,169$ 23,000$ 95,000$ 43,000$ 43,000$ This Division is the administrative cost center for the Successor Agency to the former Poway Redevelopment Agency, dissolved effective February 1, 2012 by State Legislative action. 86 PUBLIC WORKS Department Code: 0400 Expense 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Classification Actual Actual Adopted Estimated Proposed Proposed Authorized Positions 76.6 77.7 83.4 86.4 88.4 89.4 Personnel Expense $ 7,704,265 $ 7,750,429 $ 8,516,130 $ 8,007,984 $ 8,969,950 $ 9,443,860 Operations and Maintenance 27,637,299 28,288,905 29,540,780 29,344,362 30,849,680 30,856,830 Capital Outlay 789,937 902,008 868,660 852,015 1,001,550 878,610 Total Department Budget $36,131,501 $36,941,342 $38,925,570 $38,204,361 $40,821,180 $41,179,300 Strategic Plan: Goals and Implementation $- $5 $10 $15 $20 $25 $30 $35 $40 $45 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Millions Capital Outlay Operations and Maintenance Personnel Expense Explore alternative energy sources such as solar power to reduce costs. Seek and apply for grants to fund infrastructure improvements including water, sewer, and roadways. Develop and implement a comprehensive risk management plan. Update the Poway Trail Guide. Initiate study to expand Recycled Water distribution beyond the Business Park. Explore alternative Water Treatment Facility possibilities. 87 This page intentionally left blank 88 Public Works Department Public Works Director Org: 0400 Facilities Maintenance Org: 0419 Parks, Trails and Landscape Maint. Org: 0418 Water Supply Treatment & Storage Org: 0402 Water Transmission and Distribution Org: 0404 Wastewater Disposal and Contract Admin. Org: 0403 Streets Maintenance Org: 0411 Stormwater and Flood Control Org: 0412 Vehicle and Equipment Maintenance Org: 0413 Special Districts and Contract Services Org: 0420 Wastewater Collection Maintenance Org: 0405 Reclaimed Water Supply and Storage Org: 0406 Environmental Programs Org: 0417 Maintenance Operations Org: 0410 FT = Full Time Equivalent PT = Part Time as Full Time Equivalent FY 2015-16 FT: 7 Exp: $953,179 FY 2016-17 FT: 7 Exp: $996,820 FY 2016-17 FT: 3 Exp: $442,250 FY 2015-16 FT: 3 Exp: $481,790 FY 2016-17 FT: 2 / PT: 0.5 Exp: $270,310 FY 2015-16 FT: 2 / PT: 0.5 Exp: $259,020 Total FT: 84 / PT: 4.4 Total Exp. $40,821,180 Total FT: 85 / PT: 4.4 Total Exp. $41,179,300 FY 2016-17 FT: 14 / PT: 1 Exp: $2,339,790 FY 2015-16 FT: 14 / PT: 1 Exp: $2,277,500 FY 2016-17 FT: 3 Exp: $1,076,710 FY 2015-16 FT: 3 Exp: $1,048,830 FY 2016-17 FT: 1 Exp: $2,647,580 FY 2015-16 FT: 1 Exp: $2,526,330 FY 2016-17 FT: 4 Exp: $1,124,280 FY 2015-16 FT: 3 Exp: $1,047,320 FY 2016-17 FT: 9 / PT: 1.9 Exp: $3,748,630 FY 2015-16 FT: 9 / PT: 1.9 Exp: $4,579,950 FY 2016-17 FT: 6 Exp: $931,180 FY 2015-16 FT: 6 Exp: $978,480 FY 2016-17 FT: 0 Exp: $4,712,450 FY 2015-16 FT: 0 Exp: $4,659,860 FY 2016-17 FT: 7 Exp: $1,087,810 FY 2015-16 FT: 7 Exp: $996,650 FY 2016-17 FT: 8 Exp: $17,719,250 FY 2015-16 FT: 8 Exp: $16,947,480 FY 2016-17 FT: 9 Exp: $1,437,550 FY 2015-16 FT: 9 Exp: $1,406,100 FY 2016-17 FT: 1 Exp: $1,014,140 FY 2015-16 FT: 1 Exp: $1,026,310 Utility Systems Operations & Maintenance Org: 0401 FY 2015-16 FT: 11 / PT: 1 Exp: $1,632,380 FY 2016-17 FT: 11 / PT: 1 Exp: $1,630,550 FY 2015-16 FY 2016-17 89 DIRECTOR OF PUBLIC WORKS Public Works Department Division No: 0400 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 6,682 5,400 8,050 8,800 8,250 8,450 356 390 400 510 510 510 67%66%66%66%67%68% Division Operating Budget Authorized Positions (FTE)4.0 3.8 5.0 5.0 7.0 7.0 ◊Personnel Expenditure 568,656$ 595,964$ 746,330$ 654,403$ 908,030$ 950,110$ ◊Operations & Maintenance 20,518 21,844 25,900 28,241 35,170 36,730 ◊Capital Outlay 4,500 7,740 10,630 10,630 9,980 9,980 Division Total 593,674$ 625,548$ 782,860$ 693,274$ 953,180$ 996,820$ The Office of the Director oversees and coordinates 14 functional areas to ensure reliable operation and maintenance of public infrastructure to protect public health and safety.The Department is responsible for compliance with State and Federal regulations for water treatment,water distribution,wastewater, reclaimed water,stormwater,flood control,solid waste and household hazardous waste, and fleet operations. Additional functions include maintenance of streets, medians, sidewalks and signage;parks,trails and open space;urban forestry; traffic signals and street lights;resource conservation,and administration of special districts.The Director's Office ensures Department preparedness for emergency events, including fire and severe weather. Ensure all operations meet or exceed regulatory requirements. Meet or exceed the state mandated solid waste diversion rate of 50%. Ensure timely, effective response to service requests. Percent of Total Waste Stream Diverted from Landfills Work Orders Online Service Requests $- $200 $400 $600 $800 $1,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 90 UTILITY SYSTEMS OPERATIONS AND MAINTENANCE Public Works Department Division No: 0401 Division Goals & Objectives » » »Complete Geographic Information System (GIS) mapping of utilities systems to support efficiency of field work. 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 10.16 10.66 8.65 10.37 8.85 8.85 2.86 2.73 3.63 2.53 2.29 2.29 84,474 85,229 85,700 85,700 85,700 85,700 Division Operating Budget Authorized Positions (FTE)11.4 11.5 11.0 13.0 12.0 12.0 ◊Personnel Expenditure 1,259,831$ 1,286,912$ 1,271,590$ 1,253,355$ 1,329,440$ 1,386,310$ ◊Operations & Maintenance 113,267 105,366 176,281 118,565 248,040 192,340 ◊Capital Outlay 7,344 55,914 56,200 50,925 54,900 51,900 Division Total 1,380,442$ 1,448,192$ 1,504,071$ 1,422,845$ 1,632,380$ 1,630,550$ This Division plans work and directs activities to ensure delivery of water to residents and businesses and transportation of wastewater to the City of San Diego's wastewater treatment system for production of reclaimed water or discharge through the Point Loma Treatment Plant.Raw water purchased from the San Diego County Water Authority is piped to Poway's Water Treatment Plant,which is currently delivering over 10 million gallons per day of treated water to 19 reservoirs for domestic and commercial use, landscape irrigation,and fire protection. Central to the delivery of high quality potable water, reclaimed water, and the disposal of wastewater is a complex piping and pumping system that is operated and maintained by this Division.This Division is also responsible for providing field customer service related to water service,including meter reading and repair and turning water service on and off. Operate and maintain all potable and reclaimed pumping and storage facilities. Operate and maintain system to transport wastewater for treatment. Water Meters Read Average daily potable water (Million Gallons per Day) Average daily wastewater pumped and gravity fed (Million Gallons per D) $- $500 $1,000 $1,500 $2,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 91 WATER SUPPLY, TREATMENT AND STORAGE Public Works Department Division No: 0402 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 10.79 11.77 9.81 10.84 10.56 10.56 10.16 10.66 8.65 10.37 8.85 8.85 41,900 41,900 41,900 41,900 41,900 41,900 100%100%100%100%100%100% Division Operating Budget Authorized Positions (FTE)6.2 6.1 7.0 7.0 8.0 8.0 ◊Personnel Expenditure 814,670$ 832,372$ 919,340$ 905,983$ 975,160$ 1,023,290$ ◊Operations & Maintenance 13,811,377 15,446,470 15,112,669 15,531,069 15,810,380 16,565,820 ◊Capital Outlay 104,461 172,195 229,130 207,666 161,940 130,140 Division Total 14,730,508$ 16,451,037$ 16,261,139$ 16,644,718$ 16,947,480$ 17,719,250$ Program Budgets Total 1167 Water Conservation 436,558$ -$ 436,558$ Total Program Budgets 436,558$ -$ 436,558$ * Measured in Million Gallons per Day This Division plans for and acquires water supplies,maximizes the water storage capabilities of Lake Poway and the City's reservoir system,treats raw water to ensure potable water quality that meets or exceeds regulatory requirements, and ensures the availability of high-quality water during normal and high-demand times.The Division must meet comprehensive regulatory reporting requirements for State, Federal, and local agencies. Provide water quality that meets or exceeds regulatory requirements. Maximize utilization of Lake Poway storage. Maintain compliance with Cal-OSHA regulations. Treated water delivered* Annual water quality samples Percentage of test results Raw water purchased* Approp. Through May 2015 Added for 2015-2017 $- $2,000 $4,000 $6,000 $8,000 $10,000 $12,000 $14,000 $16,000 $18,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 92 WASTEWATER DISPOSAL AND CONTRACT ADMINISTRATION Public Works Department Division No: 0403 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 0.534 0.546 0.521 0.472 0.500 0.500 2.86 2.73 3.63 2.80 3.29 3.29 Division Operating Budget ◊Operations & Maintenance 5,375,290 4,602,096 4,932,190 4,899,737 4,636,560 4,676,550 ◊Capital Outlay 2,972 24,201 26,800 34,736 23,300 35,900 Division Total 5,378,262$ 4,626,297$ 4,958,990$ 4,934,473$ 4,659,860$ 4,712,450$ *Measured in Million Gallons per Day This Division’s costs include power to operate the City’s five sewage lift stations that pump an average of 244 million gallons of wastewater annually,and contract costs for the transmission, treatment,and disposal of Poway’s over one billion gallons of wastewater by the City of San Diego.The City of Poway participates in the San Diego Metro Wastewater Joint Powers Authority with 12 other cities and special districts in San Diego County for wastewater treatment and shared use of the City of San Diego’s regional wastewater infrastructure. Coordination with the City of San Diego, Poway's wastewater treatment provider, to ensure cost effective service and to manage technical elements associated with wastewater transportation and treatment. Maintain Poway's collection system lift stations and pumps according to recommended standards. Implement new technology to improve operations throughout the collection system. Wastewater flow* Wastewater pumped* 4,200 4,400 4,600 4,800 5,000 5,200 5,400 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance 93 WATER TRANSMISSION AND DISTRIBUTION Public Works Department Division No: 0404 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 693 467 900 767 780 730 100%100%100%100%100%100% 1,973 1,862 2,340 283 125 2,250 760 730 1,120 43 25 760 46 46 38 42 49 51 Division Operating Budget Authorized Positions (FTE)8.7 7.9 9.0 9.0 9.0 9.0 ◊Personnel Expenditure 831,832$ 764,349$ 854,520$ 768,910$ 873,610$ 913,430$ ◊Operations & Maintenance 362,293 390,394 443,011 459,668 437,150 439,540 ◊Capital Outlay 83,705 87,629 77,440 59,000 95,340 84,580 Division Total 1,277,830$ 1,242,372$ 1,374,971$ 1,287,578$ 1,406,100$ 1,437,550$ Residential meters replaced Percentage of backflows tested Valves exercised Fire hydrants inspected Emergency responses Perform 940 utility mark-outs annually. The Water Transmission and Distribution Division ensures reliable delivery of high quality water.The Division is responsible for the maintenance and repair of the water mains,pipes and appurtenances that deliver water to Poway’s water customers.This system consists of 291 miles of water system piping, 1,662 air-release and blow- off assemblies,2,830 fire hydrants, 6,967 valves, and over 13,500 water meters.The City also has a proactive Cross-Connection Program to identify potential contamination points, ensure backflow protection and ensure all backflow devices (almost 1,900) in the potable water system meet testing requirements annually. Maintain safe and reliable water distribution system. Perform system-wide distribution maintenance to ensure distribution valves are exercised and system flushing occurs to ensure water quality. Ensure all potable water backflow devices are tested annually. $- $500 $1,000 $1,500 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 94 WASTEWATER COLLECTION MAINTENANCE Public Works Department Division No: 0405 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 0 2 0 2 0 0 9 15 12 6 0 0 167,720/ 17%167,745/ 17%243,152/ 25%124,921/ 16%173,992/ 18%193,000/ 20% 307,353 /31%246,022/ 26%307,320/ 31%180,421/ 18%182,000/ 19%200,000/ 20% 74 10 40 20 20 20 Division Operating Budget Authorized Positions (FTE)6.0 6.1 7.0 7.0 7.0 7.0 ◊Personnel Expenditure 528,076$ 532,471$ 616,140$ 538,629$ 652,230$ 681,610$ ◊Operations & Maintenance 210,280 154,311 240,010 166,562 256,780 258,560 ◊Capital Outlay 66,365 141,186 95,040 103,526 87,640 147,640 Division Total 804,721$ 827,968$ 951,190$ 808,717$ 996,650$ 1,087,810$ Private Property Lateral Spills System pipe videotaped (ft.) / % System pipe cleaned (ft.) / % FOG Permits issued Public Sewage Spills The City of Poway provides sewer (wastewater)collection services through 185 miles of collection pipelines, 12,115 sewer laterals,five sewage lift stations,and 4,072 manholes.This Division provides ongoing preventive cleaning, maintenance, and repair of the sewage collection system in accordance with the City's Sewer System Management Plan (SSMP)which ensures the City meets strict regulations set by the State of California.This includes emergency removal of sewer line blockages, repair and replacement of sewer laterals in the public right- of-way,and maintenance of the structural integrity of sewer mains and manholes in the collection system.The Division also administers the Fat,Oil,and Grease (FOG)Program responsible for the permitting and compliance monitoring of food establishments to minimize the discharge of grease into the sewer system. Zero spills of the public sewage system. Maintain the City's 185-mile wastewater system pipe by videotaping (20%), and cleaning (33%) annually. Ensure access to wastewater collection system through an easement maintenance program. $- $200 $400 $600 $800 $1,000 $1,200 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 95 RECLAIMED WATER SUPPLY AND STORAGE Public Works Department Division No: 0406 Division Goals & Objectives » » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 37 40 34 34 34 35 174 165 175 171 171 170 25 19 20 25 20 20 Division Operating Budget Authorized Positions (FTE)1.0 1.0 1.0 1.0 1.0 1.0 ◊Personnel Expenditure 98,472$ 104,647$ 106,370$ 106,654$ 112,920$ 117,480$ ◊Operations & Maintenance 367,814 391,038 414,670 379,590 908,080 891,350 ◊Capital Outlay 5,440 4,129 4,040 4,040 5,310 5,310 Division Total 471,726$ 499,814$ 525,080$ 490,284$ 1,026,310$ 1,014,140$ Site violations issued Shutdown tests Site inspections The Reclaimed Water Supply and Storage Division is responsible for the delivery of reclaimed (recycled) water that is used for commercial landscape irrigation in the South Poway Business Park. Poway receives its reclaimed water supply from the City of San Diego’s North City Reclamation Plant.The system is comprised of 13 miles of system piping, one pumping station,one reservoir,and over 205 metered connections.The Division monitors,operates, and maintains Poway’s two recycled water distribution system zones, including all regulatory monitoring and compliance required by the State of California. Meet demand for reclaimed water in the Poway Business Park. Perform required four-year regulatory shutdown tests annually. Perform required one-year regulatory site inspections annually. Continue to provide prompt, direct contact with City customers and to assist them in achieving regulatory compliance. Abide by strict regulations associated with use of recycled water set by the State of California. $- $200 $400 $600 $800 $1,000 $1,200 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 96 MAINTENANCE OPERATIONS Public Works Department Division No: 0410 Division Goals & Objectives » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed NA NA 4,700 4,450 4,500 4,500 1,470 1,375 3,300 3,650 3,500 3,500 10,337 4,625 5,000 4,546 4,800 4,800 173 168 250 209 250 250 Division Operating Budget Authorized Positions (FTE)3.7 3.3 3.0 3.5 3.0 3.0 ◊Personnel Expenditure 327,003$ 325,068$ 331,710$ 333,054$ 355,030$ 371,330$ ◊Operations & Maintenance 116,909 120,114 49,540 53,299 54,700 59,830 ◊Capital Outlay 9,755 4,407 4,340 4,340 72,060 11,090 Division Total 453,667$ 449,589$ 385,590$ 390,693$ 481,790$ 442,250$ Graffiti Removed Sq. Ft. ** Reflects Incorporation of All Operations Functions Due to Process Upgrade * Prior to FY14-15, Statistics Reflect Only Streets and Drainage This Division plans,oversees, and administers the work of street maintenance,stormwater and flood control, and vehicle and equipment maintenance to protect public health and safety and to ensure regulatory compliance, responsiveness, efficiency and effectiveness during normal and emergency operations. Ensure regulatory compliance with State and Federal environmental agencies. Ensure timely response to service requests in assigned operational areas. Requests and Work Orders Completed* Development Plans Reviewed Requests and Work Orders Received $- $100 $200 $300 $400 $500 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 97 STREETS MAINTENANCE Public Works Department Division No: 0411 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 257,756 257,756 319,550 300,000 300,000 300,000 644 164 400 300 300 300 39%100%90%100%100%100% 97%95%97%96%95%95% 489 437 400 450 400 400 Division Operating Budget Authorized Positions (FTE)8.8 9.8 10.9 10.5 10.9 10.9 ◊Personnel Expenditure 751,791$ 711,504$ 869,090$ 784,924$ 833,710$ 874,240$ ◊Operations & Maintenance 3,332,381 2,778,419 3,493,230 3,131,677 3,615,730 2,749,880 ◊Capital Outlay 116,400 114,955 112,720 110,095 130,510 124,510 Division Total 4,200,572$ 3,604,878$ 4,475,040$ 4,026,696$ 4,579,950$ 3,748,630$ This Division preserves and maintains the public roadway infrastructure to ensure the safe and efficient movement of pedestrians,traffic,goods and emergency services at all times,including special events and emergency situations such as storm,flood and fire.The Division is responsible for the maintenance and repair of the City's 165 miles of roads and right-of-ways,sidewalks, regulatory signs,street trees, and removing graffiti from areas visible from the right-of-way. Preserve and maintain the public roadway infrastructure. Respond to roadway emergencies. Remove graffiti in areas visible from the right-of-way. Sidewalk Grinds Completed Percentage of Pothole Work Orders Responded to Within 1 Working Day Percentage of Sign Repairs Completed Within 10 Working Days Square Feet of Asphalt Repaired Number of Potholes Repaired $- $500 $1,000 $1,500 $2,000 $2,500 $3,000 $3,500 $4,000 $4,500 $5,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 98 STORMWATER AND FLOOD CONTROL Public Works Department Division No: 0412 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 100%/10%100%/19%100%/15%100%/10%100%/10%100%/10% 100%/70%100%/86%100%/100%100%/90%100%/100%100%/100% 77%75%73%80%80%80% 21,986 35,255 18,139 30,000 30,000 30,000 1 1 7 7 6 8 Division Operating Budget Authorized Positions (FTE)6.0 5.8 6.0 6.0 6.0 6.0 ◊Personnel Expenditure 519,361$ 530,382$ 561,071$ 541,814$ 562,620$ 585,430$ ◊Operations & Maintenance 250,338 291,216 257,919 255,274 273,300 252,000 ◊Capital Outlay 53,500 67,771 70,360 65,360 142,560 93,750 Division Total 823,199$ 889,369$ 889,350$ 862,448$ 978,480$ 931,180$ This Division is responsible for inspecting and maintaining the public drainage and stormwater collection and conveyance systems to reduce risk of death,injury and property damage due to flooding.This Division performs annual inspections and maintains over 1,400 stormwater drain inlets,26 channel mowing sections,12 detention basins, 44 under road box culverts and 64 miles of pipeline to verify proper operation of all municipal structural treatment controls designed to reduce pollutant discharges and comply with the National Pollutant Discharge Elimination Systems (NPDES) permit. Inspect and maintain catch basins, stormwater drain inlets, concrete and open earthen channels. Complete annual channel cleaning, mowing and invasive/exotic plant removal. Repair or replace failed corrugated metal pipe (CMP). Percentage of 4.8 Miles (25.1 acres) of Earthen Channels Mowed Square Feet of Invasive Plants Removed Corrugated Metal Pipe (CMP) Repairs Percentage of 1,453 Drop Inlets Inspected and Required Cleaning Percentage of 6.3 Miles of Concrete Channels Inspected and Cleaned $- $200 $400 $600 $800 $1,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 99 VEHICLE AND EQUIPMENT MAINTENANCE Public Works Department Division No: 0413 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Total Street-Legal Vehicle Inventory 120 119 126 126 120 120 46% / 54%51 /49 51 /49 71 /29 60 /40 65 /35 100%100%100%100%100%100% Division Operating Budget Authorized Positions (FTE)3.0 3.0 3.0 3.0 3.0 4.0 ◊Personnel Expenditure 318,503$ 334,936$ 342,370$ 343,659$ 366,460$ 453,750$ ◊Operations & Maintenance 609,809 625,468 628,900 619,517 638,610 634,280 ◊Capital Outlay 39,520 60,754 31,700 37,572 42,250 36,250 Division Total 967,832$ 1,021,158$ 1,002,970$ 1,000,748$ 1,047,320$ 1,124,280$ This Division ensures safe and reliable vehicles and equipment for City departments while meeting regulatory requirements,inspections and certifications.The City's fleet and equipment inventory includes sedans, law enforcement vehicles,fire apparatus, sewer and water equipment, heavy-duty trucks,tractors,trailers,off-road and industrial equipment,generators, and small landscape equipment.Essential vehicle services include acquisition and disposal, preventive maintenance, repairs, regulatory compliance,provision of close to 100,000 gallons of fuel and oil supplies, and collection and disposal of hazardous waste generated by City departments. Maintenance strategies that ensure a constant state of readiness. Proactive and preventive maintenance to extend and maximize service life. Meet or exceed local, State, and Federal regulatory requirements. Percentage of Regulatory Compliance Achieved (over 88 i) Percentage of Time Spent on Scheduled Maintenance Compared to Unscheduled Repairs $- $200 $400 $600 $800 $1,000 $1,200 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 100 ENVIRONMENTAL PROGRAMS Public Works Department Division No: 0417 Division Goals & Objectives » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 2,140 2,005 2,500 2,260 2,300 2,350 Contracts/Projects Managed 34 / N/A 66/85 55/75 55/75 65/80 65/80 Division Operating Budget Authorized Positions (FTE)2.0 2.8 2.5 2.5 2.5 2.5 ◊Personnel Expenditure 164,853$ 226,658$ 230,550$ 178,670$ 232,670$ 245,390$ ◊Operations & Maintenance 15,574 12,184 12,150 11,599 21,090 22,060 ◊Capital Outlay 3,000 3,747 3,440 3,440 5,260 2,860 Division Total 183,427$ 242,589$ 246,140$ 193,709$ 259,020$ 270,310$ Program Budgets Approp. Through May 2015 Added for 2015-17 Total 1110-Container Recycling 24,000$ 235,493$ 1260-Used Oil Recycling 27,420$ 267,744$ 1697-Household Hzrd Waste 250,000$ 3,487,374$ Total Program Budgets 301,420$ 3,990,610$ 240,324$ 3,237,374$ 3,689,190$ The Division plans,oversees, and administers the work of parks,trails and open space maintenance,facility maintenance, special districts,and contract services to protect public health and safety and to ensure compliance,responsiveness,efficiency, and effectiveness during normal and emergency operations.The Division is also responsible for energy conservation efforts. Manage and monitor critical peak pricing tariff and energy conservation events to maximize energy savings. Ensure timely response to service requests in assigned operational areas. Work Orders Completed in Parks, Facilities and Special Districts 211,493$ $- $50 $100 $150 $200 $250 $300 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 101 PARKS, TRAILS AND LANDSCAPE MAINTENANCE Public Works Department Division No: 0418 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Acres Maintained 232 232 232 232 232 232 Sport Courts and Fields Maintained 26 26 26 26 26 26 Miles of Trails 55 56 56 56 56 56 Eagle/Girl Scout Projects Supported 22 22 15 15 15 15 Special Events Supported 24 24 24 24 24 24 37 35 36 36 36 36 Division Operating Budget Authorized Positions (FTE)13.5 14.3 15.0 15.0 15.0 15.0 ◊Personnel Expenditure 1,113,998$ 1,105,126$ 1,198,060$ 1,159,249$ 1,276,050$ 1,331,920$ ◊Operations & Maintenance 622,324 703,661 737,080 731,560 880,940 910,410 ◊Capital Outlay 102,170 94,578 93,940 102,440 120,510 97,460 Division Total 1,838,492$ 1,903,365$ 2,029,080$ 1,993,249$ 2,277,500$ 2,339,790$ This Division provides safe, clean,well-maintained, inviting,useable public parks,trails and green spaces to support quality programming and enhance the enjoyment of all residents and visitors.The Division provides full- service maintenance for parks and public restrooms,certain vacant City properties, sports courts and fields, trails, and open space.The Division also performs mandated playground inspections and supports landscape maintenance at City Hall. Maintain developed parks. Maintain and expand trails system. Reduce water consumption by converting to low volume irrigation and increase water monitoring capabilities in landscaped areas to achieve maximum water efficiency. Successor Agency/Housing Authority Properties Maintained $- $500 $1,000 $1,500 $2,000 $2,500 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 102 FACILITIES MAINTENANCE Public Works Department Division No: 0419 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 45%/55%0%/100%10%/90%2%/98%10%/90%15%/85% Division Operating Budget Authorized Positions (FTE)1.8 1.7 2.0 3.0 3.0 3.0 ◊Personnel Expenditure*156,287$ 160,574$ 237,340$ 208,100$ 245,970$ 253,630$ ◊Operations & Maintenance 690,987 711,486 760,040 705,372 788,130 811,350 ◊Capital Outlay 10,340 18,220 18,420 18,120 14,730 11,730 Division Total 857,614$ 890,280$ 1,015,800$ 931,592$ 1,048,830$ 1,076,710$ *Portion of costs allocated for shared positions The Division provides contract and in-house repair, maintenance, and janitorial functions for all City buildings and structures including 75 buildings ranging in size from 200 to 60,000 square feet, appurtenances such as electronic gates,fire extinguishers,fire sprinkler systems,exterior parking lot lights,and security and fire monitoring systems. Undertake regular preventive maintenance activities. Complete service requests. Implement and administer prioritized reinvestment plan to maximize and protect City assets. Percent of time preventive maintenance compared to unscheduled repair Explore opportunities to engineer water conservation solutions. $- $200 $400 $600 $800 $1,000 $1,200 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure* 103 SPECIAL DISTRICTS AND CONTRACT SERVICES Public Works Department Division No: 0420 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed Customer inquiries and service requests 2,823 2,464 2,500 1,680 2,500 2,500 Street light outages 865 776 600 850 850 850 89%92%95%93%95%95% Traffic signal calls 314 208 280 270 270 270 Emergency traffic signal repairs 28 38 28 40 40 40 Division Operating Budget Authorized Positions (FTE)0.6 0.7 1.0 1.0 1.0 1.0 ◊Personnel Expenditure*250,932$ 239,466$ 231,650$ 230,580$ 246,050$ 255,940$ ◊Operations & Maintenance 1,738,140 1,934,839 2,257,190 2,252,632 2,245,020 2,356,130 ◊Capital Outlay 180,465 44,582 34,460 40,125 35,260 35,510 Division Total 2,169,537$ 2,218,887$ 2,523,300$ 2,523,337$ 2,526,330$ 2,647,580$ *Includes allocated cost of shared positions Percentage of street lights repaired within 10 days This Division is responsible for the maintenance,operation and contract administration of 188 acres of landscape, 42 acres of open space,over 3,000 street lights,traffic signals at 57 intersections, lighted street signs and 25 flashing beacons within the boundaries of the Special Districts.The Division administers ten Special Districts and provides engineering services, contract inspection and supervision of contractual work,administrative support, coordination of in-house repairs as needed, and staff assistance to property owners, developers,civic associations, and the general public in matters relating to the Special Districts. Enhance public safety by providing traffic signals, street lights, illuminated street name signs and safety lighting. Enhance the quality of life of residents by providing safe, attractive and well-maintained landscaping. To achieve maximum water efficiency, monitor water use and retrofit irrigation in landscaped areas as feasible. Implement multi-year capital reinvestment projects to improve traffic signal safety and reliability. $- $500 $1,000 $1,500 $2,000 $2,500 $3,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure* 104 SAFETY SERVICES Department Code: 0500 Expense 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Classification Actual Actual Adopted Estimated Proposed Proposed Authorized Positions 51.9 52.5 54.0 54.5 56.0 56.0 Personnel Expense $ 8,214,490 $ 8,383,555 $ 8,885,650 $ 8,683,227 $ 9,078,430 $ 9,482,130 Operations and Maintenance 10,748,130 11,365,708 11,880,700 11,964,864 12,263,740 12,811,400 Capital Outlay 460,220 553,840 607,010 602,243 630,040 583,050 Total Department Budget $19,422,840 $20,303,103 $21,373,360 $21,250,334 $21,972,210 $22,876,580 Strategic Plan: Goals and Implementation $- $5 $10 $15 $20 $25 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Millions Capital Outlay Operations and Maintenance Personnel Expense Seek local, regional, and federal grant opportunities for law enforcement and/or fire suppression training, equipment, services and/or programs. Implement the tactical medic program, and increase the capability of its first responders to provide immediate medical care. Encourage community participation in residential emergency-readiness programs such as the Community Emergency Response Team (CERT) and Poway Neighborhood Emergency Corps (PNEC). Continue to provide CERT classes, training drills, and community education through community events such as the annual Open House, the Kids Safety House, and street fairs. Establish Sheriff's quarterly meetings with the community advisory group to discuss issues. Update the Emergency Operations Plan (EOP) and develop and implement a Continuity of Operations Plan (COOP). 105 106 Safety Services Department Safety Services Director Org: 0500 Fire Suppression Org: 0501 Fire Prevention Org: 0502 Paramedics Org: 0503 Law Enforcement Org: 0504 FT = Full Time Equivalent CT = Contract as Full Time Equivalent FY 2015-16 FY 2016-17 Total FT: 56 / CT: 52 Total Exp. $21,972,210 Total FT: 56 / CT: 52 Total Exp. $22,876,580 FY 2015-16 FT: 4 Exp: $741,750 FY 2016-17 FT: 4 Exp: $761,440 FY 2015-16 FT: 49 Exp: $9,265,960 FY 2016-17 FT: 49 Exp: $9,638,800 FY 2015-16 FT: 3 / CT: 1 Exp: $608,900 FY 2016-17 FT: 3 / CT: 1 Exp: $624,320 FY 2015-16 FT: 0 Exp: $394,280 FY 2016-17 FT: 0 Exp: $375,260 FY 2015-16 CT: 51 Exp: $10,961,320 FY 2016-17 CT: 51 Exp: $11,476,760 107 DIRECTOR OF SAFETY SERVICES Safety Services Department Division No: 0500 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 52 52 52 52 52 52 8 8 8 8 8 8 Division Operating Budget Authorized Positions (FTE)3.0 3.1 3.0 3.0 4.0 4.0 ◊Personnel Expenditure 426,451$ 492,893$ 509,530$ 488,709$ 644,760$ 670,170$ ◊Operations & Maintenance 37,856 42,581 54,000 50,475 71,350 65,630 ◊Capital Outlay 25,260 36,930 36,810 36,810 25,640 25,640 Division Total 489,567$ 572,404$ 600,340$ 575,994$ 741,750$ 761,440$ Program Budgets Approp. Through May 2015 Added for 2015-16 Total 1161-Emergency Preparedness -$ 1,515,600$ 1187-CERT Program Funds $7,500 - 7,500$ Total Program Budgets 7,500$ -$ 1,523,100$ 1,515,600$ The Director of Safety Services Division is responsible for providing overall administration,direction, planning, and management for the Fire Department and contract law enforcement services including budget development and management,personnel recruitment, citywide emergency planning,disaster preparedness, and incident management. Maintain a high level of professional competencies during the delivery of effective emergency response. Remain one of the safest communities in San Diego County. Continue community-based partnerships focused on emergency planning and disaster preparedness. CERT training sessions & drills Law enforcement activity reports $- $100 $200 $300 $400 $500 $600 $700 $800 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 108 FIRE SUPPRESSION Safety Services Department Division No: 0501 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 3,800 4,102 4,000 4,100 4,100 4,200 175 188 200 200 220 220 15,500 12,768 15,000 11,520 11,520 11,600 Division Operating Budget Authorized Positions (FTE)47.3 47.4 49.0 49.0 49.0 49.0 ◊Personnel Expenditure 7,470,126$ 7,599,493$ 7,973,560$ 7,791,485$ 7,993,410$ 8,354,230$ ◊Operations & Maintenance 659,196 762,316 873,180 929,191 876,000 894,520 ◊Capital Outlay 264,456 343,054 376,600 379,872 396,550 390,050 Division Total 8,393,778$ 8,704,863$ 9,223,340$ 9,100,548$ 9,265,960$ 9,638,800$ Program Budgets Approp. Through May 2015 Added for 2015-16 Total 1166- Fire Equip. Trust Fund 71,412$ -$ 71,412$ Total Program Budgets 71,412$ -$ 71,412$ The Fire Suppression Division is responsible for the delivery of emergency and nonemergency services including fire suppression,rescue, emergency medical,hazardous materials responses,and public assistance.The Division deploys 16 firefighters each day from three fire stations that staff three fire engines,one ladder truck,and two ambulances.This Division is responsible for the coordination of facility,apparatus, and equipment repair and maintenance. Personnel training, team response drills, and incident management are also part of this Division. Training and manipulative skill hours Incident responses Facility and apparatus work orders Manage Division resources to ensure effective response to all requests for emergency service and nonemergency assistance. Ensure that a high state of readiness is maintained by actively managing fire apparatus, equipment and facility resources. Through a vibrant and ongoing effort, assure that a highly trained and well-prepared workforce is maintained. $- $2,000 $4,000 $6,000 $8,000 $10,000 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 109 FIRE PREVENTION Safety Services Department Division No: 0502 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 1,800 2,192 2,000 2,100 2,100 2,100 Operational permits issued 600 578 600 580 580 580 900 842 1,000 1,000 1,000 1,000 Division Operating Budget Authorized Positions (FTE)1.5 1.9 2.0 2.5 3.0 3.0 ◊Personnel Expenditure 317,913$ 291,169$ 402,560$ 403,033$ 440,260$ 457,730$ ◊Operations & Maintenance 166,343 177,429 140,380 138,995 145,380 145,830 ◊Capital Outlay 7,560 43,626 18,270 18,270 23,260 20,760 Division Total 491,816$ 512,224$ 561,210$ 560,298$ 608,900$ 624,320$ The Fire Prevention Division is responsible for the delivery of fire and life safety inspection and education services to existing businesses,apartments, educational,institutional,and permitted facilities.This Division provides plan review and new construction inspections to ensure compliance with State and local fire and life safety regulations. Coordination of fire investigations and incident management are also part of this Division. Manage the fire company inspection program (FCIP) and business self-inspection program. Conduct annual inspections and issue fire department operational permits. Perform plan reviews and new construction inspections. Plan reviews completed FCIP and business self inspections $- $100 $200 $300 $400 $500 $600 $700 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance Personnel Expenditure 110 PARAMEDICS Safety Services Department Division No: 0503 Division Goals & Objectives » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 18 18 18 18 18 18 18 18 18 18 18 18 1,760 1,984 2,000 2,000 2,000 2,000 Division Operating Budget ◊Operations & Maintenance 210,985$ 253,765$ 186,090$ 215,408$ 212,490$ 231,460$ ◊Capital Outlay 135,444 117,274 172,680 164,641 181,790 143,800 Division Total 346,429$ 371,039$ 358,770$ 380,049$ 394,280$ 375,260$ EMS Transports EMS in-service training Field care audit sessions The Paramedic Division is a budget cost center that supports Fire Suppression,Division 0501.It specifies the financial outlay and activity for emergency medical services (EMS).This Division captures equipment and training costs associated with supporting Safety Services'pre-hospital EMS delivery system,but contains no direct personnel costs. Evaluate new technology while maintaining current technology that enhances patient treatment data collection and improved billing processing. Identify emerging EMS treatment improvements and deliver in-service training and field care audits to ensure maintenance of licenses and certifications of personnel. Maintain active involvement in EMS groups and associations and communicate changes in EMS treatment protocols to personnel. $- $50 $100 $150 $200 $250 $300 $350 $400 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance 111 Division Goals & Objectives » » » » 2012-13 2013-14 2014-15 2014-15 2015-16 2016-17 Division Activity Statistics Actual Actual Adopted Estimated Proposed Proposed 14,197 13,145 13,200 13,852 13,283 13,103 226 278 275 240 240 275 12 13 12 12 12 12 256 188 195 176 160 147 Division Operating Budget ◊Operations & Maintenance 9,673,751$ 10,129,618$ 10,627,050$ 10,630,795$ 10,958,520$ 11,473,960$ ◊Capital Outlay 27,500 12,956 2,650 2,650 2,800 2,800 Division Total 9,701,251$ 10,142,574$ 10,629,700$ 10,633,445$ 10,961,320$ 11,476,760$ Program Budgets Approp. Through May 2015 Added for 2015-2017 Total 105,393$ -$ 105,393$ 46,764 - 46,764$ Total Program Budgets 152,157$ -$ 152,157$ 1152- Law Enforcement Equip. 1160- Sr. Volunteer Patrol Fund Maximize the use of Community Oriented Policing Programs (COPPS) resources and strategies. Continue aggressive gang-related policing, documentation, and prosecution. Utilize crime analysis to monitor real-time crime trends occurring within the community. Number of Calls for Service Traffic Accident Reports Start Smart Education Classes Narcotic Arrests LAW ENFORCEMENT Safety Services Department Division No: 0504 The Law Enforcement Division is a budget cost center that supports comprehensive contract law enforcement services provided by the San Diego County Sheriff's Department. These services include emergency response, crime prevention,traffic enforcement,collision reduction,investigative services,drug prevention and education,and community policing. Reduce youth access to drugs and alcohol through education, prevention, and enforcement. $8,500 $9,000 $9,500 $10,000 $10,500 $11,000 $11,500 Actual 2012-13 Actual 2013-14 Adopted 2014-15 Estimated 2014-15 Proposed 2015-16 Proposed 2016-17Thousands Capital Outlay Operations & Maintenance 112 Capital Improvement Programs 113 114 Funding Sources Source Total Prior Appropriations Proposed Appropriations Total Project Appropriations Funding Spent to Date Available Balance General Fund (100)1,728,537 $1,713,000 $3,441,537 965,499 $2,476,038 Street Develop. (222-226)650,000 1,100,000 1,750,000 392,960 1,357,040 Drainage Fund (231/232)2,971,456 260,000 3,231,456 2,637,240 594,216 CDBG Fund (241)836,673 90,060 926,733 834,653 92,080 Fed/State Grants (242/253)82,550 -82,550 82,550 - Park Improv. Fund (411)75,000 120,000 195,000 50,000 145,000 Successor Agency (720)----- Housing (416/472)----- Water Fund (510/511)4,311,701 3,760,000 8,071,701 1,554,223 6,517,478 Sewer Fund (520/521)2,080,000 2,600,000 4,680,000 1,226,508 3,453,492 Capital Facilities (106/617) 8,401,792 1,971,600 10,373,392 500,402 9,872,990 Trusts (7xx)-25,000 25,000 -25,000 Total Budget $21,137,709 $11,639,660 $32,777,369 $8,244,036 $24,533,333 Funding Uses Project Type Total Prior Appropriations Proposed Appropriations Total Project Appropriations Funding Spent to Date Available Balance Streets & Highways $3,050,000 $1,100,000 $4,150,000 $563,420 $3,586,580 Drainage 2,971,456 260,000 3,231,456 2,637,240 594,216 Govern. Buildings 8,354,065 2,286,660 10,640,725 1,921,918 8,718,807 Parks and Open Space 370,487 1,633,000 2,003,487 340,726 1,662,761 Water Utilities 4,311,701 3,760,000 8,071,701 1,554,223 6,517,478 Sewer Utilities 2,080,000 2,600,000 4,680,000 1,226,508 3,453,492 Total Budget $21,137,709 $11,639,660 $32,777,369 $8,244,036 $24,533,333 * "Total Prior Appropriations" column reflects previously appropriated prior year funding for all currently active CIP projects. ** "Total Project Appropriations" column includes previously appropriated prior year funding and newly appropriated current year funding for all currently active CIP projects. This figure represents the total amount of funding which is appropriated for all active CIP projects. CITY OF POWAY CAPITAL IMPROVEMENT PROGRAM OVERVIEW Streets & Highways 17% Drainage 14% Govern. Buildings 9% Parks and Open Space 8% Water Utilities 33% Sewer Utilities 19% Total Project Appropriations by Project Type Water 33% Sewer 19% Drainage 14% General 14% Capital Facilities 8% Grants/ Other 12% Total Project Appropriations by Funding Source 115 CITY OF POWAYCAPITAL IMPROVEMENT PROGRAM SUMMARYProject TitleProject No. Funding Source Total Prior Appropriations FY 2015-17 Appropriation Total Project Appropriation Expenditures (thru May 2015) Available Balance Streets & Highways Projects Midland Road Improvements12008 222 300,000$ 300,000$ 600,000$ 42,960$ 557,040$Poway Road Corridor Study12009 223A 350,000 - 350,000 350,000 -Espola Rd. Improvements12010 106 2,400,000 - 2,400,000 170,460 2,229,540Poway Road Pedestrian/Bicycle12012 223 - 800,000 800,000 - 800,000Total Streets & Highways 3,050,000$ 1,100,000$ 4,150,000$ 563,420$ 3,586,580$ Drainage Projects Corrugated Metal Pipe Replacement1437231/232 2,146,456$ 60,000$ 2,206,456$ 2,066,605$ 139,851$Rattlesnake Creek Bank Stblzn1443 231/232 575,000 - 575,000 570,229 4,771Natural Channel Silt Study1445 231 50,000 200,000 250,000 - 250,000Concrete Channel Repair Project1446 231 200,000 - 200,000 407 199,593Total Drainage2,971,456$ 260,000$ 3,231,456$ 2,637,240$ 594,216$ Government Buildings Projects Emergency Preparedness1161 100 1,515,600$-$ 1,515,600$ 757,323$ 758,277$Public Facilities Renovation3500617 385,020 1,756,600 2,141,620 319,026 1,822,594ADA Barrier Removal1548241 836,673 90,060 926,733 834,653 92,080Capital Facilities Reinvestment1561106 5,251,772- 5,251,772 10,705 5,241,067City Hall HVAC 3500N106 365,000 15,000 380,000211 379,789City Hall Breakroom Renovation3501617- 150,000 150,000- 150,000Fiber Optic Connections Project 3502617- 50,000 50,000- 50,000PCPA Fall Protection Project1562100- 225,000 225,000- 225,000Total Govt. Buildings8,354,065$2,286,660$10,640,725$1,921,918$8,718,807$116 Project TitleProject No. Funding Source Total Prior Appropriations FY 2015-17 Appropriation Total Project Appropriation Expenditures (thru May 2015) Available Balance Parks & Open Space Projects Mickey Cafagna Community Center1502 411 75,000 - 75,000 50,000 25,000Lake Poway Parking Project1561 411 - 165,000 165,000 - 165,000Swim Center Mechanical Systems Repair1632100- 220,000 220,000- 220,000Swim Center Deck, Plaster and Dive Platform Project1633100- 690,000 690,000- 690,000Playground Renovation1698 100/242 295,487- 295,487 290,726 4,761Lake Poway Boat Dock Replacement1634100- 305,000 305,000- 305,000Blue Sky Amphitheater Shade Structure 1635100- 30,000 30,000- 30,000Community Park Playground Renovation1636100- 148,000 148,000- 148,000Starridge Park Playground Renovation1637100- 75,000 75,000- 75,000Total Parks&Open Space370,487$1,633,000$2,003,487$340,726$1,662,761$117 CITY OF POWAYCAPITAL IMPROVEMENT PROGRAM SUMMARYProject TitleProject No.Funding Source Total Prior Appropriations FY 2015-17 Appropriation Total Project Appropriation Expenditures (thru May 2015) Available Balance Water Utilities Projects Water System Repair/Rehab.1756 510 2,361,701 - 2,361,701 1,117,424 1,244,277Clearwell Redundant Pipeline1757 510/511 670,000 - 670,000 436,799 233,201Alta Mira Reservoir Rehabilitation1763 510 780,000 - 780,000 - 780,000Water Distribution System/Treatment Plant Rehab Project1764 510 500,000 - 500,000 - 500,000Arc Flash Compliance Study1765 510 - 300,000 300,000 - 300,000Water Valve Replacement Project 1766 510 - 150,000 150,000 - 150,000Blue Crystal Reservoir Rehabilitation1767 510 - 425,000 425,000 - 425,000Welton Reservoir Rehabilitation1768 510 - 1,000,000 1,000,000 - 1,000,000PS1 Electrical Equipment Replacement1769 510 - 25,000 25,000 - 25,000Buehler Reservoir Rehabilitation1770 510 - 1,000,000 1,000,000 - 1,000,000Sagecrest (Pomerado) Reservoir Rehabilitation1771 510 - 480,000 480,000 - 480,000Poway Dam Maintenance and Security1772 510/511 - 380,000 380,000 - 380,000Total Water Utilities4,311,701$ 3,760,000$ 8,071,701$ 1,554,223$ 6,517,478$ Sewer Utilities Projects Annual Manhole Rehabilitation1824 520 - 300,000 300,000 - 300,000Annual Sewer Line Repair / Replace1829 520 2,030,000 - 2,030,000 1,226,508 803,492Martincoit Road Sewer Upsize1833 520/521 - 2,300,000 2,300,000 - 2,300,000Sewer Odor Study0000 520 50,000 - 50,000 - 50,000Total Sewer Utilities2,080,000$ 2,600,000$ 4,680,000$ 1,226,508$ 3,453,492$Grand Total Capital Projects21,137,709$ 11,639,660$ 32,777,369$ 8,244,036$ 24,533,333$118 Capital Projects Funded through Departmental Operating BudgetsFY14/15 Street Maint. Slurry Seal100/2232,320,000$FY14/15 Street Overlay100/2231,380,000FY14/15 Street Striping100500,000Total Capital Projects Funded through Departmental Operating Budget4,200,000$Funding Source Definitions:100 - General Fund231/232 - Drainage Funds 510/511 - Water Funds222 - Street Development Fund241 - CDBG Fund520/521 - Sewer Funds223 - Transnet242 - State Grant Fund617 - Capital Facilities224 - Traffic Congestion Fund253 - Federal Grant Fund119 Midland Road Improvements - CIP # 12008 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: February 2014 Estimated Completion:November 2015 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Streets (222) 300,000 - 300,000 42,960 257,040 Strs Prop A (223A) - 300,000 300,000 - 300,000 Total Budget 300,000$ 300,000$ 600,000$ 42,960$ 557,040$ Estimated Annual Operating Budget Impact: $0 Poway Road Corridor Study - CIP # 12009 Project Manager:Rich Whipple Responsible Department:Development Services Start Date: September 2014 Estimated Completion:November 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Streets Prop A (223A) 350,000 - 350,000 350,000 - Total Budget 350,000$ -$ 350,000$ 350,000$ -$ Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Streets and Highways) Description This project will include the design and construction of sidewalk improvements to Midland Road from Hillary Place to just north of Scots Way. The proposed work will include sidewalks, along with the necessary drainage and ADA improvements associated with the sidewalk construction. The 2015 RTIP amendment added $300,000 in Transnet funding to the project to add street lighting to the project scope. The project will also include the acquisition of necessary Right-of- Way. This work is identified in the Transportation Element of the City’s General Plan, and will provide a safe route to Midland Elementary School. City of Poway - Capital Improvement Program (Streets and Highways) Description In September 2014, the City hired MIG Inc., a planning and transportation consulting firm, to assist the City in planning for Poway Road’s future. The project, known as the Poway Road Corridor Study (PRCS), will provide recommendations on land use, transportation, design/aesthetics, and economic development for Poway Road, the City’s main commercial corridor. The study will be based on an evaluation of existing land use and transportation conditions along Poway Road. The transportation and land use analysis will result in recommendations and an implementation strategy regarding the appropriate transportation improvements and mix of uses along the project corridor. These may include proposed changes to regulatory and policy documents such as the Poway Municipal Code (PMC) and the City’s General Plan. The study is expected to take approximately 18 months to complete. 120 Espola Road Safety Improvements – Design and EIR CIP # 12010 Project Manager:Steve Crosby Responsible Department:Development Services Start Date: November 2013 Estimated Completion:December 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Capital Facilities (106) 2,400,000 - 2,400,000 170,460 2,229,540 Total Budget 2,400,000$ -$ 2,400,000$ 170,460$ 2,229,540$ Estimated Annual Operating Budget Impact: $0 FY 15/16 & 16/17 Street Maintenance - Slurry Seal-Div. 0411 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: July , annually Estimated Completion:November, annually Funding Source FY 2015-16 Appropriation FY 2016-17 Appropriation General (100)722,280$ 709,150$ Transnet (223B)437,720 450,850 Total Budget 1,160,000$ 1,160,000$ Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Streets and Highways) Description In 2013, the City finalized the Espola Road Improvement Project Environmental Impact Report (EIR) based on a project scope that included improving Espola Road between Twin Peaks Road and Titan Way to a three-lane roadway with curb, gutter and sidewalks, and signalizing the intersection of Espola Road and Durhullen Street/Golden Sunset Road. The EIR was certified by the City Council in June of 2013, however the City Council did not support the construction of the full project scope identified in the EIR. In October 2013, the City Council directed staff to pursue a pedestrian safety project consisting of a multipurpose trail on the west side of Espola Road from Mountain Road to Willow Ranch Road. The project also includes the undergrounding of approximately 2000 linear feet of existing overhead utility lines using the City’s available 20A funds. Project improvement plans are currently being prepared. The preliminary undergrounding design has been completed by SGD&E and will be finalized after the completion of the improvement plans. City of Poway - Capital Improvement Program (Streets and Highways) Description The street maintenance project is a continuation of the annual Citywide street maintenance program. The program is an eight-year rotation through eight street maintenance zones providing deep patching, skin patching, crack sealing, slurry sealing, and raising utility lids to grade as-needed. In fiscal year 2015-16 the program will address zone 6, generally the Green Valley area, and in fiscal year 2016-17 zone 7, the business park area. 121 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: July, annually Estimated Completion:November, annually Funding Source FY 2015-16 Appropriation FY 2016-17 Appropriation Transnet (223A)1,120,000 260,000 Total Budget 1,120,000$ 260,000$ Estimated Annual Operating Budget Impact: $0 FY 15/16 & 16/17 Street Striping - Div. 0411 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: July, annually Estimated Completion:June annually Funding Source FY 2015-16 Appropriation FY 2016-17 Appropriation General (100)250,000$ 250,000$ Total Budget 250,000$ 250,000$ Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Streets and Highways) Description This annual project provides restriping of the streets within the zone that receives slurry seal in the annual street maintenance project. When the street maintenance zone is an odd numbered zone, this project also refreshes striping in the other three odd numbered zones, and when the street maintenance zone is an even numbered zone, the project refreshes the striping in the other three even numbered zones. Under this rotation, all public street striping in the City is refreshed or replaced every two years. The restriping of slurry sealed zones will include the adding of buffer zones to bike lanes, and the replacing of traditional crosswalk striping with "continental" striping. FY 15/16 & 16/17 Street Overlay Project - Div. 0411 City of Poway - Capital Improvement Program (Streets and Highways) Description The City annually overlays or reconstructs portions of public streets that have deteriorated to a level that requires more than patching and slurry seal. In fiscal year 2015-16, work will be completed on portions of Garden Road, Adah Lane and Stowe Drive. In fiscal year 2016-17, overlay work will done in the Poway Road/Pomerado Road intersection area. 122 Poway Road Pedestrian/Bicycle - CIP #12012 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: July 2016 Estimated Completion:June 2017 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Transnet (223A) - 800,000 800,000 - 800,000 Total Budget -$ 800,000$ 800,000$ -$ 800,000$ Estimated Annual Operating Budget Impact: $0 Corrugated Metal Pipe Annual Repair/Replace - CIP # 1437 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: Annual Estimated Completion: Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Drainage (231) 2,118,606 60,000 2,178,606 2,066,605 112,001 Drainage Imp. (232) 27,850 - 27,850 - 27,850 Total Budget 2,146,456$ 60,000$ 2,206,456$ 2,066,605$ 139,851$ Estimated Annual Operating Budget Impact: $0 Description This fund is used to replace or repair failing corrugated metal drainage pipes citywide. This project has been coordinated to coincide with the City’s annual Street Maintenance project. The fiscal year 2015-16 project will replace or repair failing corrugated metal pipe in Street Maintenance Zone 7, generally the business park area. The fiscal year 2016-17 project will replace or repair failing corrugated metal pipe in Street Maintenance Zone 8, generally the west of Pomerado Road and the Oak Knoll Road area. City of Poway - Capital Improvement Program (Flood/Drainage Control) City of Poway - Capital Improvement Program (Streets and Highways) Description This project will construct pedestrian/bicycle improvements to improve the connections between nodes identified as priorities in the Poway Road Corridor Study. 123 Rattlesnake Creek Streambank Stabilization CIP # 1443 Project Manager:John Tolliver Responsible Department:Development Services Start Date: September 2010 Completion Date:November 2013 Estimated Monitoring Period Completion:March 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Drainage (231)219,000 -219,000 211,282 7,718 Drainage (232)356,000 -356,000 358,947 (2,947) Total Budget 575,000$ -$ 575,000$ 570,229$ 4,771$ Natural Channel Silt Removal - CIP # 1445 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: June 2016 Estimated Completion:June 2017 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Drainage (231)50,000 200,000 250,000 - 250,000 Total Budget 50,000$ 200,000$ 250,000$ -$ 250,000$ Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Flood/Drainage Control) Description Two areas of the tributary to Rattlesnake Creek, from Kentfield Drive to Norwalk Street, were eroded by the rains between December 7, 2009, and January 27, 2010. These areas experienced bank failures that required immediate repair. The City of Poway’s Public Works Department obtained approval from the Army Corps of Engineers for temporary restoration measures. The approval letter required long-term bioengineering solutions for the two areas, in the context of the larger basin. This project included all the necessary studies and design coordination with the regulatory agencies to address the long-term solution, and construction of the permanent solution. Construction has been completed. This project is currently in the plant establishment monitoring period, which will last a minimum of two non-drought years. Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Flood/Drainage Control) Description Phase I of this project will study silt levels in natural channels throughout the City, and will provide prioritized recommendations for silt removal. Phase II will remove silt to restore full channel flow capacity at priority locations citywide. The scope will also include removal of sediment from culvert crossings located within natural channels. 124 Concrete Channel Repair Project - CIP # 1446 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: May 2015 Estimated Completion:September 2015 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Drainage (231)200,000 200,000 407 199,593 Total Budget 200,000$ -$ 200,000$ 407$ 199,593$ Emergency Preparedness - CIP #1161 Project Manager:Steve Crosby Responsible Department:Development Services Start Date: As-Needed Estimated Completion:As-Needed Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance General (100)1,515,600 -1,515,600 757,323 758,277 Total Budget 1,515,600$ -$ 1,515,600$ 757,323$ 758,277$ Estimated Annual Operating Budget Impact: $0 Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Flood/Drainage Control) Description This project will repair or replace approximately 10,000 SF of deteriorated sections of Garden Road concrete drainage channel. This project was designed in-house, with start of construction anticipated in June 2015. City of Poway - Capital Improvement Program (Emergency Preparedness) Description This fund is used to improve the City’s emergency response capabilities as needs are identified. Use of funds is subject to City Council approval. 125 Public Facilities Renovation - CIP #3500 Series Project Manager:Michael Obermiller/Jeff Beers Responsible Department:Public Works/Development Services Start Date: Ongoing Project Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Painting: 212,500 212,500 - 212,500 Roofing: 315,100 315,100 - 315,100 Flooring: 286,000 286,000 - 286,000 HVAC: 10,000 10,000 - 10,000 Specialized projects 7,000 7,000 7,000 General Maintenance: 147,000 147,000 - 147,000 Old Poway Park General Construction and Repairs 135,000 135,000 - 135,000 PCPA Dressing Room Renovation 46,000 46,000 - 46,000 PCPA Stage Floor Replacement 56,000 56,000 - 56,000 City Facilities Maintenance Assessment 300,000 300,000 - 300,000 Lake Poway/Iron Mountain Wayfaring Signage 20,000 20,000 - 20,000 Old Poway Park Concrete Repairs 62,000 62,000 - 62,000 PCPA Boiler and Cooling Tower 160,000 160,000 - 160,000 Total Budget 385,020$ 1,756,600$ 2,141,620$ 319,026$ 1,822,594$ Estimated Annual Operating Budget Impact: $0 ADA Barrier Removal - CIP # 1548 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: December, annually Estimated Completion:June, annually Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance CDBG (241)836,673 90,060 926,733 834,653 92,080 Total Budget 836,673$ 90,060$ 926,733$ 834,653$ 92,080$ Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Government Buildings) Description This project provides funding for major repairs and renovation of aging public facilities, including Community Services buildings, fire stations, and administrative offices. Funding is from the Capital Facilities Fund (617), which is made up of annual contributions from the City's various operating funds, including General, Water, and Sewer. Individual tasks may be assigned to Public Works staff or to Development Services CIP staff for completion. Description This is an annual Community Development Block Grant (CDBG) funded program to remove Americans with Disabilities Act (ADA) barriers and improve access to various public facilities. The FY 15-16 project will reconstruct the Porter House Kitchen to meet current ADA standards and the City's ADA compliance plan. Reconstruction will consist of removing the existing non-compliant kitchen cabinetry and replacing it with new compliant cabinetry and fixtures. The scope of the 16/17 project is yet to be determined. City of Poway - Capital Improvement Program (Government Buildings) 126 Capital Facilities Reinvestment - CIP #1561 Responsible Department:Development Services Start Date: Ongoing Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Cap. Facilities (0106) 5,251,772 - 5,251,772 10,705 5,241,067 Total Budget 5,251,772$ -$ 5,251,772$ 10,705$ 5,241,067$ Estimated Annual Operating Budget Impact: Variable City Hall HVAC - CIP #3500N Project Manager:Jeff Beers Responsible Department:Development Services Start Date: January 2015 Estimated Completion:December 2015 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Capital Facilities (617) 365,000 15,000 380,000 211 379,789 Total Budget 365,000$ 15,000$ 380,000$ 211$ 379,789 Estimated Annual Operating Budget Impact: $0 City Hall Break Room Renovation - CIP #3501 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: October 2015 Estimated Completion:March 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Capital Facilities (617) - 150,000 150,000 - 150,000 Total Budget -$ 150,000$ 150,000$ -$ 150,000$ Estimated Annual Operating Budget Impact: $0 Description This project account provides funding for new public facilities and renovation, including park facilities, and Community Services buildings. Funding is from the Capital Facilities Projects Fund (0106), which is made up of one-time funds associated with dissolution of the Redevelopment Agency and annual contributions from uncommitted General Fund operating sources. City of Poway - Capital Improvement Program (Government Buildings) Description This project will provide rehabilitation and upgrade of the existing HVAC system in City Hall, including a new digital control system, and a retro-commissioning of the HVAC's electrical system. Description This project will expand the size of the City Hall break room by pushing the existing exterior wall out into the covered patio area. This will increase the usefulness of the room by providing space for employee gatherings. City of Poway - Capital Improvement Program (Government Buildings) City of Poway - Capital Improvement Program (Government Buildings) 127 Fiber Optic Connections Project - CIP #3502 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: October 2015 Estimated Completion:February 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Capital Facilities (617) - 50,000 50,000 - 50,000 Total Budget -$ 50,000$ 50,000$ -$ 50,000$ Estimated Annual Operating Budget Impact: $0 PCPA Fall Protection Project - CIP #1562 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: Jan 2016 Estimated Completion:Aug 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance General Fund (100) - 225,000 225,000 - 225,000 Total Budget -$ 225,000$ 225,000$ -$ 225,000$ Estimated Annual Operating Budget Impact: $0 Mickey Cafagna Community Center - CIP # 1502 Project Manager:Bob Manis Responsible Department:Development Services Start Date: April 2014 Estimated Completion:October 2015 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Park Improv. (411)75,000 -75,000 50,000 25,000 Total Budget 75,000$ -$ 75,000$ 50,000$ 25,000$ City of Poway - Capital Improvement Program (Parks and Open Space) Description This project will include the completion of the schematic design for a new Community Center building located in Community Park. The original appropriation was for $50,000 for a consultant to prepare a schematic design. The work was completed but the City Council rejected the design. An additional appropriation of $25,000 was approved on March 17, 2015 to amend the contract to provide alternative designs that will ultimately result in a single schematic design for the building. The alternative designs will be presented to the City Council in the summer of 2015 and the final schematic design will be completed in the fall. City of Poway - Capital Improvement Program (Public Facilities) Description This project will connect Fire Station 1, Fire Station 3, and Old Poway Park to the City Hall server via existing traffic signal system high speed fiber. The resulting connection will operate at a much higher speed than the current connections. In addition, the City will no longer pay a monthly fee for internet service for these facilities. City of Poway - Capital Improvement Program (Public Facilities) Description This project will enhance the safety systems within the staff only areas of the Poway Center for the Performing Arts through the design and construction of fall protection devices. This project has been identified in the City's Fall Protection Safety Plan. The project will include six areas within the PCPA: high gird, catwalk system, follow spot crow's nest, balcony, auditorium side box booms, and low roof above the box office. 128 Lake Poway Parking Project - CIP #1561B Project Manager:Jeff Beers Responsible Department:Development Services Start Date: March 2015 Estimated Completion:December 2015 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance General Fund (100) - 45,000 45,000 - 45,000 Park Improv. (411)- 120,000 120,000 - 120,000 Total Budget -$ 165,000$ 165,000$ -$ 165,000$ Swim Center Mechanical Systems Repair/Replace - CIP #1632 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: July 2015 Estimated Completion:January 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance General Fund (100) - 220,000 220,000 - 220,000 Total Budget -$ 220,000$ 220,000$ -$ 220,000$ Estimated Annual Operating Budget Impact: $0 Swim Center Deck, Plaster and Dive Platform Project - CIP #1633 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: September 2016 Estimated Completion:March 2017 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance General Fund (100)- 690,000 690,000 - 690,000 Total Budget -$ 690,000$ 690,000$ -$ 690,000$ Estimated Annual Operating Budget Impact: $0 Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Park & Open Space) City of Poway - Capital Improvement Program (Parks & Open Space) Description This project will expand the parking capacity at Poway Lake by designing and constructing an additional 64 parking spaces. In addition to the parking lot expansion, the project includes the construction of a turnaround at the entry booth. This project is scheduled to begin construction in October of 2015. Description This project is phase one of a two year renovation of the Community Park Swim Center. This project will replace the existing pool heaters with high efficiency heaters, install pool circulation pump variable speed controls, rehabilitate the existing filter system, and will modify the existing acid storage system. City of Poway - Capital Improvement Program (Park & Open Space) Description This project is phase two of the two year renovation of the Community Park Swim Center. This project will replace the deteriorated concrete pool deck, re-plaster the pool, repair the pool gutters, and will replace the aging three meter dive platform. 129 Playground Renovation - CIP #1698 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: November 2014 Estimated Completion:May 2015 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance General (100)212,937 212,937 208,176 4,761 State Grant (242)82,550 82,550 82,550 - Total Budget 295,487$ -$ 295,487$ 290,726$ 4,761$ Estimated Annual Operating Budget Impact: $0 Lake Poway Boat Dock Replacement - CIP #1634 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: July 2016 Estimated Completion:December 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance General (100)- 305,000 305,000 - 305,000 Total Budget -$ 305,000$ 305,000$ -$ 305,000$ Project Manager:Jeff Beers Responsible Department:Development Services Start Date: November 2015 Estimated Completion August 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance General (100)-5,000 5,000 - 5,000 Blue Sky Trust (783)- 25,000 25,000 - 25,000 Total Budget -$ 30,000$ 30,000$ -$ 30,000$ Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Parks & Open Space) Blue Sky Amphitheater Improvements - CIP #1635 Description This project will design and construct improvements for the Blue Sky Amphitheater, to include an outlook trail, and subject to available funding, a shade structure comprised of re-purposed telephones poles and PVC coated mini-mesh chain link, designed to compliment the existing site architecture. City of Poway - Capital Improvement Program (Parks & Open Space) Description This project will replace the existing wooden boat dock at Lake Poway with a new aluminum dock. The current boat dock is deteriorating and requires extensive maintenance. The aluminum dock will have a longer useful life than a wood dock, and will have lower annual maintenance costs. Estimated Annual Operating Budget Impact: $0 Description This project includes the replacement of the existing playground surfacing at Hilleary Park as well as replacing the existing playground equipment at Sycamore Creek Park West and Starridge Park. The project is under construction and is schedule for completion in May 2015. City of Poway - Capital Improvement Program (Parks & Open Space) 130 Community Park Playground Renovation - CIP #1636 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: July 2015 Estimated Completion:December 2015 ` Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance General (100)- 148,000 148,000 - 148,000 Total Budget -$ 148,000$ 148,000$ -$ 148,000$ Estimated Annual Operating Budget Impact: $0 Starridge Park Playground Renovation - CIP #1637 Project Manager:Jeff Beers Responsible Department:Development Services Start Date: July 2016 Estimated Completion:December 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance General (100)- 75,000 75,000 - 75,000 Total Budget -$ 75,000$ 75,000$ -$ 75,000$ Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Park & Open Space) Description This project will replace aging playground equipment and play surfacing at Starridge Park. The existing surfacing will be replaced with Play Matta surfacing. City of Poway - Capital Improvement Program (Parks & Open Space) Description The existing poured in place playground surfacing has reached the end of its useful lifespan. This project will replace the surface with a combination of Play Matta surface and ADA compliant wood fiber mulch. 131 Annual Water System Repair/Replacement CIP # 1756 Project Manager:Taryn Kjolsing Responsible Department:Development Services Estimated Completion:Ongoing Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)2,361,701 -2,361,701 1,117,424 1,244,277 Total Budget 2,361,701$ -$ 2,361,701$ 1,117,424$ 1,244,277 Estimated Annual Operating Budget Impact: $0 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: November 2009 Estimated Completion December 2015 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)349,383 -349,383 349,383 - Water Imp. Fnd (511)320,617 -320,617 87,417 233,201 Total Budget 670,000$ -$ 670,000$ 436,799$ 233,201$ Alta Mira Reservoir Rehabilitation - CIP # 1763 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: April 2015 Estimated Completion:May 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)780,000 -780,000 - 780,000 Total Budget 780,000$ -$ 780,000$ -$ 780,000$ Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Water Utilities) Description Each year the City funds maintenance and rehabilitation of the City’s aging water infrastructure. In fiscal years 15-16 and 16-17, these funds will be used to perform maintenance and rehabilitation of the City’s water treatment plant and distribution system, which will be managed as separate CIP project accounts. City of Poway - Capital Improvement Program (Water Utilities) Clearwell Redundant Pipeline - CIP # 1757 Estimated Annual Operating Budget Impact: $0 Description This project will address corrosion issues and will rehab mechanical system issues due to age at Alta Mira Reservoir, in order to extend the useful life of the facility. This one-million gallon reservoir was originally constructed in 1981 and has never undergone a full rehabilitation. The project will also include seismic evaluation. City of Poway - Capital Improvement Program (Water Utilities) Description This project originally consisted of the design of a new redundant feed pipeline from the Poway water treatment plant clearwell to the distribution system, and approximately 1,000 linear feet of 24” transmission main and approximately 1,500 linear feet of 36” piping. The scope has been revised to include design and construction of high line connections for temporary emergency water supply in the event the clearwell pipeline is taken out of service due to damage or for maintenance. Design of this project is complete and the project is scheduled to bid for construction in summer of 2015. 132 Water Distribution System/Treatment Plant Rehab Project - CIP # 1764 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: April 2015 Estimated Completion:April 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)500,000 -500,000 - 500,000 Total Budget 500,000$ -$ 500,000$ -$ 500,000$ Estimated Annual Operating Budget Impact: $0 Arc Flash Compliance Study - CIP # 1765 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: July 2015 Estimated Completion:Feb 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510) - 300,000 300,000 - 300,000 Total Budget -$ 300,000$ 300,000$ -$ 300,000$ Estimated Annual Operating Budget Impact: $0 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: October 2015 Estimated Completion:June 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)- 150,000 150,000 - 150,000 Total Budget -$ 150,000$ 150,000$ -$ 150,000$ Estimated Annual Operating Budget Impact: $0 Description The results of the recently completed Water Treatment Plant and the water distribution system assessment studies were used to prioritize necessary water system repair and maintenance into a ten year list of projects. This project addresses needs at the Water Treatment Plant identified by the assessment study, including chlorine scrubber replacement, electrical conduit replacement, concrete repair in the wash-water recovery vault and basin, wash-water tank upgrades, and wash- water pump station upgrades. City of Poway - Capital Improvement Program (Water Utilities) City of Poway - Capital Improvement Program (Water Utilities) Description This study will address arc flash safety at all existing water system pump stations, and will provide recommendations to ensure employee safety, as well as to ensure compliance with all applicable outside agency requirements. City of Poway - Capital Improvement Program (Water Utilities) Water Valve Replacement Project - CIP #1766 Description This project will replace approximately 23 water valves ranging in size from 6" to 12". 133 Blue Crystal Reservoir Rehabilitation - CIP #1767 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: January 2016 Estimated Completion:April 2017 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)- 425,000 425,000 - 425,000 Total Budget -$ 425,000$ 425,000$ -$ 425,000$ Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: April 2016 Estimated Completion:July 2017 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)- 1,000,000 1,000,000 - 1,000,000 Total Budget -$ 1,000,000$ 1,000,000$ -$ 1,000,000$ City of Poway - Capital Improvement Program (Water Utilities) Description Blue Crystal Reservoir was constructed in 1981 and consists of a 700,000 gallon steel tank. The condition assessment found this facility to be in fair-to-poor condition. Significant rehabilitation is required to extend the useful life of the reservoir. The reservoir rehabilitation scope includes: recoat tank interior, seismic evaluation and anchoring, add overflow pipe air gap, add flexible pipe couplings, add bollards around tank inlet/outlet piping, modify ladder rail at top of tank, repave and seal driveway pavement, replace telemetry equipment, and evaluate CP system for maintenance. Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Water Utilities) Welton Reservoir Rehabilitation - CIP #1768 Description Welton Reservoir is a 2.0 mg steel tank constructed in 1980. The condition assessment found this facility to be in fair-to- poor condition. Significant rehabilitation is required to extend the useful life of the reservoir. The rehabilitation scope includes: recoat tank exterior, recoat tank interior, seismic evaluation and anchoring, repair voids at tank footing perimeter, epoxy injection repair of ring footing cracks, add overflow pipe air gap, add flexible pipe couplings, add bollards around tank inlet/outlet piping, modify ladder rail at top of tank, replace electrical service entrance equipment, replace telemetry equipment, evaluate CP system for maintenance, and replace staff gauge. Estimated Annual Operating Budget Impact: $0 134 PS1 Electrical Equipment Replacement - CIP #1769 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: July 2015 Estimated Completion:June 2016 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)- 25,000 25,000 - 25,000 Total Budget -$ 25,000$ 25,000$ -$ 25,000$ Buehler Reservoir Rehabilitation - CIP #1770 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: January 2017 Estimated Completion:April 2018 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)- 1,000,000 1,000,000 - 1,000,000 Total Budget -$ 1,000,000$ 1,000,000$ -$ 1,000,000$ Estimated Annual Operating Budget Impact: $0 Description Raw Water Pump Station No. 1 (PS-1) was constructed in 1964 with two pumps, each with a capacity of 4,200 gallons per minute (gpm). One pump was added in 1970 and later two additional 4,200 gpm pumps were added. This project will replace the electrical service equipment and main switch which were originally installed in 1972 and require replacement. Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Water Utilities) Description Buehler Reservoir is a 2.5 mg steel tank constructed in 1990. Cathodic protection was added in 1999 and telemetry was replaced in 2010. The condition assessment found the facility to be in fair-to-poor condition. Significant rehabilitation is required to extend the useful life of the reservoir. The rehabilitation scope will include: recoat exterior tank, recoat tank interior, seismic evaluation and anchoring, add overflow pipe air gap, add flexible pipe couplings, add bollards around tank inlet/outlet piping, modify ladder rail at top of tank, repair subgrade, repave and seal driveway, replace electrical service entrance equipment, and replace staff gauge. City of Poway - Capital Improvement Program (Water Utilities) 135 Sagecrest (Pomerado) Reservoir Rehabilitation - CIP #1771 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date:April 2017 Estimated Completion:July 2018 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)- 480,000 480,000 - 480,000 Total Budget -$ 480,000$ 480,000$ -$ 480,000$ Estimated Annual Operating Budget Impact: $0 Poway Dam Maintenance and Security - CIP #1772 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: July 2016 Estimated Completion:August 2017 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Water Fund (510)- 380,000 380,000 -380,000 Total Budget -$ 380,000$ 380,000$ -$ 380,000 Estimated Annual Operating Budget Impact: $0 Description Pomerado Reservoir is a 1.5 mg steel tank constructed in 1955. The interior and exterior were recoated in 1977, the exterior was recoated and cathodic protection was added in 2000. Telemetry and electrical service were replaced in 1995 and 2010. The condition assessment found this facility to be in fair-to-good condition. Rehabilitation is required to extend the useful life of the reservoir. The rehabilitation scope will include: recoat exterior tank, seismic evaluation and anchoring, add protective coating on concrete footing, add flexible pipe couplings, add bollards around tank inlet/outlet piping, modify ladder rail at top of tank, and install new drain line. City of Poway - Capital Improvement Program (Water Utilities) Description This project will replace the piezometer manifold located in a vault at the toe of the dam. The current condition of equipment is generally poor and three of the piezometers are nonfunctioning. This project will also install surveillance equipment to monitor security of the dam. Monitoring systems are critical to the safety of the structure and must be kept in good working condition to protect the significant investment that Poway dam represents. City of Poway - Capital Improvement Program (Water Utilities) 136 Annual Manhole Rehabilitation - CIP # 1824 Project Manager:Michael Obermiller Responsible Department:Public Works Start Date: July 2015 Estimated Completion:June 2017 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Sewer Fund (520) - 300,000 300,000 - 300,000 Total Budget -$ 300,000$ 300,000$ -$ 300,000$ Estimated Annual Operating Budget Impact: $0 Annual Sewer Line Repair and Replace CIP # 1829 Project Manager:Taryn Kjolsing Responsible Department:Development Services Estimated Completion:Ongoing Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Sewer Fund (520)2,030,000 -2,030,000 1,226,508 803,492 Total Budget 2,030,000$ -$ 2,030,000$ 1,226,508$ 803,492$ Estimated Annual Operating Budget Impact: $0 Martincoit Road Sewer Upsize - CIP #1833 Project Manager:Taryn Kjolsing Responsible Department:Development Services Start Date: July 2016 Estimated Completion:July 2017 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Sewer Fund (520) - 1,552,000 1,552,000 - 1,552,000 Sewer Imp. Fund (521) - 748,000 748,000 - 748,000 Total Budget -$ 2,300,000$ 2,300,000$ -$ 2,300,000$ Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Sewer Utilities) Description This project continues the City's annual manhole rehabilitation program. This rehabilitation is intended to eliminate infiltration into the manholes and extend their useful life,and involves coating the interior of the manholes with an impervious corrosion resistant lining. City of Poway - Capital Improvement Program (Sewer Utilities) Description This project replaces surcharging pipes along Martincoit Road, between Espola Road and Camino del Valle. The 8, 10, and 12-inch pipelines are more than 50 percent full under existing peak dry weather conditions. The pipelines are surcharged under existing peak wet weather conditions for both the 5-year and 25-year modeled storm events. Approximately 1,870 feet of 8-inch diameter pipe will be replaced with 15-inch diameter pipe and 2,970 feet of 10 and 12- inch pipeline will be replaced with 15-inch diameter pipe. City of Poway - Capital Improvement Program (Sewer Utilities) Description This project is part of an ongoing semi-annual program to maintain the City’s sewer system. Portions of the sewer system are prioritized annually for repair, replacement, or lining. Design is underway for the fiscal year 2014/15 project, which will include reconstruction of failing sewer in Pomerado Road at Stone Canyon Road. 137 Sewer Odor Study - CIP #0000 Project Manager:Steve Crosby Responsible Department:Development Services Start Date: March 2015 Estimated Completion:July 2015 Funding Source Total Prior Approp. FY 2015-17 Appropriation Total Approp. Life-to-Date Expended May 2015 Available Balance Sewer Fund (520) 50,000 50,000 - 50,000 Total Budget 50,000$ -$ 50,000$ -$ 50,000$ Estimated Annual Operating Budget Impact: $0 City of Poway - Capital Improvement Program (Sewer Utilities) Description A natural phenomenon within any wastewater collection system is the production of, and the subsequent release of odorous gases. Through analysis of odor complaints received, the City has identified six priority areas on which to focus. These areas will be targeted for detailed testing and analysis based on the location of the odor complaints as well as the physical characteristics of the sewers including: pipe slope, junction structures, and proximity to pressure systems. This project will identify permanent, long term solutions for each of these six areas. 138 ADDITIONAL INFORMATION Available at www.poway.org Resolution Adopting City Financial Program Chart of Expense Accounts and Definitions Chart of Revenue Accounts and Definitions Position Classifications