Item 1.11 - Award of Contract for Martincoit Road Sewer Upsize; Blue Pacific Engineering, Bid No. 19-015OF PpW �r City of Poway COUNCIL AGENDA REPORT Cary IN THE C'J DATE: May 21, 2019 TO: Honorable Mayor and Members of the City Council FROM: Robert Manis, Director of Development Services 04 CONTACT: Brian Banzuelo, Associate Civil Engineer - (858) 668-4623 or bbanzuelo@poway.org SUBJECT: Summary: APPROVED ❑ APPROVED AS AMENDED ❑ (SEE MINUTES) $2,931,106.00 DENIED ❑ REMOVED ❑ CONTINUED RESOLUTION NO. Award of Contract to Blue Pacific Engineering & Construction for the Martincoit Road Sewer Upsize Project; Bid No. 19-015 This project involves the upsizing of existing sewer mains along Martincoit Road and within an equestrian trail and sewer easement, between Camino del Valle and Espola Road. Approximately 3,360 lineal feet of existing 8 -inch, 10 -inch, and 12 -inch vitrified clay pipes (VCP) are to be upsized to 12 -inch and 15 -inch polyvinylchloride (PVC) pipe, and 16 -inch high-density polyethylene (HDPE) pipe, respectively. In addition, approximately 350 lineal feet of sewer adjacent to Green Valley Creek is to be upsized using pipe bursting and other trenchless methods. The project will also involve sewer bypassing, dewatering, tree removal, fencing, and traffic control. Recommended Action: It is recommended that the City Council: (1) Appropriate $275,000.00 from the unappropriated Sewer Fund balance (5200) to the Martincoit Road Sewer Upsize project account (SWR0004); and (2) Award the contract for the Martincoit Road Sewer Upsize Project to Blue Pacific Engineering & Construction, the lowest responsible and responsive bidder, in the amount of $2,414,880.00. Discussion: The contract time for this project is 200 working days with an Engineer's estimate of $2,300,000.00. Bids were opened on May 1, 2019. The following four bids were received: Company Bid Amount Blue Pacific Engineering & Construction $2,414,880.00 Burtech Pipeline, Inc. $2,931,106.00 Wier Construction $3,059,724.00 Bonadiman Water, Inc. $3,424,130.00 Due to the depth of the sewer installation and project's proximity to an existing creek, additional funding is needed for soil/materials testing, and environmental monitoring. Additional funding is also needed to allow for 10% contingency during construction. Sufficient funds exist in the unappropriated Sewer Fund balance (F5200-89010) for the additional funding. 1 of 2 May 21, 2019, Item #1.11 Environmental Review: A Notice of Exemption for this project was filed with the San Diego County Clerk on February 15, 2018. The proposed sewer replacement upsizing project is a Class 2 Categorical Exemption, pursuant to Section 15302(c) of the 2016 CEQA Guidelines, in that the project consists of replacement or reconstruction of existing utility systems and/or facilities where the new utilities/facilities will be located in the same area as the replaced systems/facilities and will have substantially the same purpose and involve negligible or no expansion of capacity. Fiscal Impact: Approval of staff recommendation authorizes the appropriation of $275,000.00 from the unappropriated Sewer Fund balance (F5200-89010) to the Martincoit Road Sewer Upsize project account (SWR0004), bringing the total funds available for this project to $2,797,420.17. Public Notification: Blue Pacific Engineering & Construction, 7330 Opportunity Road, Suite A, San Diego, CA 92111 Attachments: None. Reviewed/Approved By: W ne dy aserman Assistant City Manager Reviewed By: Alan Fenstermacher City Attorney Approved By: CRS -Ra, -Wine City Manager 2 of 2 May 21, 2019, Item #1.11