Item 4.1 Visual slideshow presented by Staff at MeetingPurpose:
The goal of the Capital Improvement Program (CIP)is
to plan and implement projects that maintain and
improve the City’s Infrastructure and enhance public
facilities based upon community needs.
Capital Improvement Program
Streets
Drainage
Public Facilities
Sewer
Water
Capital Improvement Project Types
Streets
2018-2019 Street Overlay
2019-2020 Street Maintenance
Poway Road Turn Pocket Extension
Espola Road Safety Improvements
2019-2020 Street Striping
LED Street & Safety Lighting Conversion
Espola Road Bike Lanes
Neighborhood Sidewalks (Powers & Garden Areas)
Traffic Signal Controller Upgrades
2019-2020 Street Overlay
Pavement Management
Street Maintenance
•8 Zones –1 Maintained Each Year
Citywide Striping
•Half of City each year -Same Zone
as Street Maintenance plus either
odd or even zones
Overlay
•Citywide, not confined to Street
Maintenance Zone
Drainage
Rattlesnake Creek Integrity Study
2019 CMP Repairs
Sebago Avenue Channel Repair
Annual Trash Capture Program
Public Facilities
PCPA Smoke Hatch Winch Replacement
Mickey Cafagna Community Center
FY 18/19 ADA Barrier Removal –Lake Poway Pathways
Valle Verde Park Playground Renovation
Ground Mounted Photovoltaic System -Fire Station 3
Public Facilities Renovation Project
Blue Sky Amphitheater Shade Structure
Water
Water Treatment Plant Washwater Tank Upgrades
Poway Dam Security Upgrades
Buehler Reservoir Rehabilitation
36-inch Steel Water Main Assessment
Chemical Building and Tank Farm Upgrades
Boulder Mountain Reservoir I & II Rehabilitation
Annual Valve Replacement
Clearwell Upgrades
Water Treatment Plant Clearwell Distribution Flow Meters
Power to Blue Crystal Reservoir
Camera
Locations
Sewer
Sewer Line Repair/Replace 14/15 (Pomerado/Stone Canyon)
Martincoit Road Sewer Upsize
Exposed Sewer East of Martincoit
Annual Manhole Rehabilitation
Butterfield Trail Sewer Upsize