Loading...
Item 3.1 - SPA 19-001 & DR 19-003; request to amend South Poway Specific Plan & construct a self-storage buildingCity of Poway COUNCIL AGENDA REPORT DATE: January 7, 2020 TO: Honorable Mayor and Members of the City Council FROM: Robert Manis, Director of Development Services CONTACT: Austin Silva, Senior Planner 858-668-4658/asilva@poway.org SUBJECT: Summary: Specific Plan Amendment 19-001 and Development Review 19-003; a request to amend the South Poway Specific Plan and construct a self -storage building This action is a Specific Plan Amendment (SPA) request to amend the South Poway Specific Plan (SPSP) to allow self -storage buildings to contain a maximum of three -stories within the existing maximum height limits and a Development Review (DR) request to construct and operate a 99,895 square -foot self -storage building with three stories meeting the maximum allowable height and two levels of underground basements on a 1.6 -acre lot located at 12183 Kirkham Road in the Light Industrial (LI) land use district of the SPSP. Recommended Action: It is recommended that the City Council take public input, close the public hearing, adopt the resolution and introduce the Ordinance for first reading by title only, waive further reading, and schedule the adoption for January 21, 2020. Discussion: This project is initiated by Brian Caster (Applicant) and is a request for a SPA and DR. The SPA is a request to amend the SPSP to allow self -storage buildings to contain a maximum of three stories where a maximum of two stories is currently allowed. The three-story allowance would still require compliance with the existing maximum height limits. The DR is a request to construct and operate a 99,895 square -foot self -storage facility with three stories meeting the maximum allowable height and two levels of underground basements on a 1.6 -acre lot located at 12183 Kirkham Road (Attachment C) in the (LI) land use district of the SPSP (Attachment D). Approximately 638 storage units are proposed as a part of the project. The 1.6 -acre project site is undeveloped and surrounded by an industrial building to the north containing a light manufacturing business, an industrial building to the south containing multiple businesses, Kohl's department store upslope to the east and a Sysco distribution facility to the west. The site will be graded and excavated to accommodate the two levels of basements in the proposed building. The rear portion of the building will be built into an existing slope on the east with the building wall serving as a retaining wall. The SPSP was originally approved in 1985 and has been amended periodically in response to evolving real estate trends and business needs. With the anticipated increase in multi -family 1 of 21 January 7, 2020, Item #3.1 housing units regionally, self -storage facilities are in high demand. Historically, SPSP amendments have been related to both development standards and land use designation changes. Over the past ten years the City Council has approved one property owner request for changes in development standards. In 2001, the City Council also approved a request to allow three stories within the existing height limit for hotels and motels. Pursuant to Section 17.47.020 of the Poway Municipal Code (PMC), it is required that proposed Specific Plan Amendments be considered by the City Council at a public hearing. The proposed SPA would allow for self -storage buildings to contain a maximum of three stories within the existing allowable height. The existing height limit is 35 feet maximum within two stories, except that industrial buildings up to 45 feet in height within two stories may be allowed when it can be demonstrated that the additional height is necessary for the particular use anticipated for reasons such as automated warehousing, inventory retrieval or bridge cranes. Since this is not an industrial building, the 45 -foot height limit is not applicable. Related to the DR, a public storage use is a permitted use within the (LI) land use district. The storage building requires a total of 45 parking spaces and the project proposes 46 parking spaces (Attachment E). The proposed project is consistent with all development standards including setbacks, lot coverage and driveway width. The project will also be required to adhere to the City's Landscape and Irrigation Design Manual including new trees and landscape along the property's street frontage in the public right-of-way. Approval of a final landscape plan is required prior to issuance of building permits. The project will be also constructing a driveway meeting accessibility standards. The building is consistent with the architectural standards of the SPSP (Attachment F). The building utilizes a beige split -face masonry block as the base material with a gray vertical siding made of metal on most of the upper portion of the building. Gray horizontal -metal panels and glass are used to create an architectural feature around the entrance to the office on the first above -ground floor. Windows with architectural vents underneath that are surrounded with burgundy metal panels are used to create visual interest on elevations that are seen from Kirkham Road. The proposed building is compatible with the architecture and colors of the concrete tilt - up buildings in the surrounding area which utilize white and earth tone colors and similar materials. Environmental Review: An Environmental Impact Report (EIR) was prepared pursuant to the California Environmental Quality Act (CEQA) in conjunction with the adoption of the SPSP, and was certified on July 30, 1985, and the Final Subsequent EIR was certified on July 26, 1988. The SPSP EIR analyzed the potential impacts of the proposed build -out of the SPSP area in the manner permitted by the Specific Plan. The proposed SPA is consistent with the SPSP and conforms with the requirements, development standards and guidelines therein, and, therefore, as set forth in Chapter 10, Section VIII of the SPSP, no further environmental analysis is required because the project's impacts have already been adequately analyzed and are fully covered by the previously certified EIR. The increase in the allowed number of stories from two to three within the existing maximum height requirements for self -storage buildings does not impact the aesthetics because the allowed building heights will remain the same. Additionally, there are no significant changes proposed that would require subsequent or supplemental environmental review pursuant to Public Resources Code section 21166 and CEQA Guidelines sections 15162 and 15163. Fiscal Impact: None. 2 of 21 January 7, 2020, Item #3.1 Public Notification: A Notice of Public Hearing was published in the Poway News Chieftain on Thursday, December 26, 2019. A public notice was mailed to property owners and occupants located inside of the SPSP boundary and within 500 feet of the project SPSP boundary. Attachments: A. Resolution B. Ordinance C. Zoning and Location Map D. South Poway Specific Plan Map E. Site Plan F. Building Elevations Reviewed/Approved By: Reviewed By: Approved By: Wendaserman Alan Fenstermacher Assistant City Manager City Attorney Chris Ha City Manager 3 of 21 January 7, 2020, Item #3.1 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA, APPROVING DEVELOPMENT REVIEW 19-003 FOR THE CONSTRUCTION OF A 99,895 SQUARE -FOOT SELF -STORAGE BUILDING CONTAINING THREE STORIES AND TWO LEVELS OF UNDERGROUND BASEMENTS ON PROPERTY LOCATED AT 12183 KIRKHAM ROAD WITH A LAND USE DESIGNATION OF LIGHT INDUSTRIAL IN THE SOUTH POWAY SPECIFIC PLAN AREA. ASSESSOR PARCEL NUMBER: 317-270-23 WHEREAS, the City Council considered Development Review (DR) 19-003; a proposed self -storage building containing three stories and two levels of underground basements with related public improvements (Project) on property located at 12183 Kirkham Road with a land use designation of Light Industrial (LI) in the South Poway Specific Plan (SPSP) area; WHEREAS, on January 7, 2020, the City Council held a duly advertised public hearing to solicit comments from the public, both for and against, relative to DR19-003 and associated Specific Plan Amendment (SPA) 19-001; and WHEREAS, the City Council has read and considered the agenda report for the proposed Project, including the attachments, and has considered all other evidence presented at the public hearing. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway as follows: SECTION 1: An Environmental Impact Report (EIR) was prepared pursuant to the California Environmental Quality Act (CEQA) in conjunction with the SPSP, and was certified on July 30, 1985, and the Final Subsequent EIR was certified on July 26, 1988. The SPSP EIR analyzed the potential impacts of the proposed build out of the SPSP area in the manner permitted by the Specific Plan. The proposed DR is consistent with the SPSP and conforms with the requirements, development standards and guidelines therein, and, therefore, as set forth in Chapter 10, Section VIII of the SPSP, no further environmental analysis is required because the Project's impacts have already been analyzed, and are fully covered by the previously certified EIR. There are no significant changes proposed that would require subsequent or supplemental environmental review pursuant to Public Resources Code section 21166 and CEQA Guidelines sections 15162 and 15163. SECTION 2: The City Council finds the proposed Project is consistent with the SPSP generally, including the (LI) land use designation. SECTION 3: The findings for DR19-003, in accordance with the PMC 17.52.010 Purpose of Development Review, are made as follows: A. The Project is consistent with the SPSP and the Poway General Plan in that the proposed Project has been designed to comply with all City site development standards. B. The approved Project will not have an adverse aesthetic, health, safety, or architecturally - related impact upon adjoining properties, in that the design of the building for the intended purpose conforms to the criteria of the SPSP Development Standards, and will be 4 of 21 ATTACHMENT A January 7, 2020, Item #3.1 Resolution No. Page 5 compatible with current and future buildings in the vicinity. C. The approved Project encourages the orderly and harmonious appearance of structures and property within the City in that the Project, as conditioned, is consistent with the general design standards in the SPSP. SECTION 4: The findings, in accordance with Government Code Section 66020 for the public improvements needed as a result of the proposed development to protect the public health, safety and welfare, are made as follows: A. The design and improvements of the proposed development are consistent with all elements of the Poway General Plan, as well as City Ordinances, because all necessary facilities will be available to serve this Project. B. The construction of public improvements is needed as a result of the proposed development to protect the public health, safety and welfare as further described in the conditions of approval. C. In accordance with the Poway General Plan, the Project requires the payment of development impact fees, which are assessed on a pro -rata basis to finance public infrastructure improvements, which promote a safe and healthy environment for the residents of the City. SECTION 5: The City Council hereby approves DR19-003, in association with SPA19- 001, as shown on the approved plans incorporated by reference herein as "Exhibit A", except as noted and subject to the following conditions: A. The applicant shall defend, indemnify, and hold harmless the City, its agents, officers, and employees from any and all claims, actions, proceedings, damages, judgments, or costs, including reasonable attorney's fees, collectively the "Claims" against the City or its agents, officers, or employees, relating to the issuance of any aspect of the Project approval set for in this resolution, including, but not limited to, any action to attack, set aside, void, challenge, or annul this development approval (including but not limited to DR19-003) and any environmental document or decision made pursuant to CEQA. The City may elect to conduct its own defense, participate in its own defense, or obtain independent legal counsel in defense of any claim related to this indemnification. In the event of such election, applicant shall pay all of the costs related thereto, including without limitation reasonable attorney's fees and costs. In the event of a disagreement between the City and applicant regarding litigation issues, the City shall have the authority to control the litigation and make litigation -related decisions, including, but not limited to, settlement or other disposition of the matter. However, the applicant shall not be required to pay or perform any settlement unless such settlement is approved by applicant. Notwithstanding the foregoing, no indemnity shall be required for claims resulting from the exclusive gross negligence or willful misconduct of the City. B. This approval is based on the existing site conditions and proposed Project details represented on the approved plans ("Exhibit A"). If actual conditions and details vary from representations, the approved plans must be changed to reflect the existing site conditions and proposed Project details. Any substantial changes to the approved plans must be approved by the Director of Development Services and may require approval of the City 5 of 21 January 7, 2020, Item #3.1 Resolution No. Page 6 Council if the Director of Development Services finds that the proposed changes do not substantially conform to approved plans. C. The developer is required to comply with the Poway Noise Ordinance (Chapter 8.08 PMC) requirements that govern construction activity and noise levels. D. Prior to issuance of any permit, the applicant shall (1) submit in writing that all conditions of approval have been read and understood; and (2) the property owner shall execute a Covenant Regarding Real Property notarizing and recording said document. In order for the City to prepare the Covenant the applicant must first submit a legal description of the subject site. E. The conditions for the Project shall remain in effect for the life of the subject property, and shall run with the land and be binding upon future owners, successors, heirs, and transferees of the current property owner. F. The approval of DR19-003 does not become effective until the ordinance approving SPA19-001 is effective. G. Prior to issuance of a Building Permit, the applicant shall obtain approval of a Grading Permit. Compliance with the following conditions is required prior to issuance of the Grading Permit: (Engineering) 1. Submit a precise grading plan for the development of the lot prepared on a City of Poway standard sheet at a scale of 1" = 20', unless otherwise approved by the City Project engineer. Submittal shall be made to the Department of Development Services Engineering Division for review and approval. The grading design shall be 100 percent complete at the time of submittal, ready for approval and issuance of permit. Incomplete submittals will not be accepted. All technical studies as required by Chapter 16 of the Poway Municipal Code (PMC) shall be submitted. 2. Applicant shall incorporate Low Impact Development (LID) design features into the site development. These shall be clearly shown and identified on the grading plan and be appropriately sized for the proposed level of development. 3. The grading plans shall reflect a minimum two percent grade away from the building in the all areas including the loading dock. 4. A drainage study addressing the impacts of the 100 -year storm event prepared by a licensed Civil Engineer is to be submitted and approved. The study shall evaluate existing and proposed hydrologic and hydraulic conditions to the satisfaction of the City Project Engineer. 5. Water Quality Control — Design and Construction The Project shall comply with the City and Regional Water Quality Control Board stormwater requirements. The Project is considered a Priority Development Project and will be subject to all City and State requirements. A Final Storm Water Quality 6 of 21 January 7, 2020, Item #3.1 Resolution No. Page 7 Management Plan (SWQMP) prepared by a registered Civil Engineer is to be submitted and approved. a. Provide two copies of an Operation & Maintenance (O&M) plan in accordance with Chapter 16.104 of the PMC, and a signed PDF version. b. Property owner shall execute an approved Storm Water Management Facilities Maintenance Agreement accepting responsibility for all structural BMP maintenance, repair and replacement as outlined in the Operations and Maintenance plan. The operation and maintenance requirements shall be binding on the land throughout the life of the Project as outlined in Chapter 16.104 of the PMC. c. Construction Storm Water Management Compliance: The Project proposes to disturb an area greater than one acre. Proof of coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity (Construction General Permit, 2009-0009-DWQ, as amended by order 2010-0014) shall be provided to the City along with a copy of the Storm Water Pollution Prevention Plan (SWPPP). 6. Grading securities shall be posted with the City prior to grading plan approval per section 16.46.080 of the PMC. A minimum cash security of $2,000 is required in all instances. 7. Erosion control shall be installed and maintained by the developer from October 1 to April 30 annually. The developer shall maintain all erosion control devices throughout their intended life. 8. The applicant shall pay the storm water pollution inspection fee according to the latest adopted master fee schedule. 9. All applicable easement dedications are to be recorded. 10. Any existing and proposed public easements shall be depicted on the grading plans. The proposed public easement dedications shall be submitted prior to grading permit issuance. 11. Any private improvements within any publicly held easement or right-of-way may require an encroachment agreement as determined necessary by the City Engineer. All necessary encroachment agreements shall be approved and executed prior to grading permit issuance. 12. All existing and proposed utilities are required to be installed underground. 13. Following approval of the grading plans, posting of securities and fees, and receipt of five copies of the approved plans, the applicant shall attend a pre -construction meeting at the Department of Development Services. The scheduling request shall be submitted on a City standard form available from the City's Project Engineer. The applicant's action plan that identifies measures to be implemented during construction to address erosion, sediment and pollution control will be discussed. Compliance for sediment control shall be provided as directed by the Project Inspector. 7 of 21 January 7, 2020, Item #3.1 Resolution No. Page 8 14. Prior to start of any work within a City -held easement or right-of-way, a Right -of -Way Permit shall be obtained from the Engineering Division of the Development Services Department. All appropriate fees shall be paid prior to permit issuance. 15. Construction staking is to be inspected by the Engineering Inspector prior to any clearing, grubbing or grading. At a minimum, all protected areas as shown on the approved grading plans are to be staked under the direction of a licensed land surveyor or licensed civil engineer and delineated with lathe and ribbon. As applicable, provide two copies of a written certification, signed and sealed in accordance with the Business and Professions Code, by the engineer of record stating that all protected areas have been staked in accordance with the approved plans. (Planning) 16. A Tree Removal Permit shall be obtained prior to the removal of all existing trees. A separate permit is required for trees within the public right-of-way and trees located on private property. The removal of both public and private trees shall conform to Chapter 12.32 (Urban Forestry) Articles II and III of the PMC. If the trees are proposed to be removed during the recognized nesting season for birds (February 15 through August 15), a nesting bird survey shall be conducted by a qualified biologist and report the findings in writing to the City. Between February 15 and August 15, removal of trees containing nests shall be delayed until such time as the nest(s) have been abandoned unless the removal can be completed in accordance with California State codes and the Federal Migratory Bird Treaty Act of 1918. 17. Landscape and irrigation on-site and within the right-of-way fronting the property shall be provided in accordance with the SPSP and the Poway Landscape and Irrigation Design Manual. Plans shall be submitted and a minimum of one staff review shall be completed prior to issuance of a grading permit. The landscape and irrigation plans shall demonstrate compliance with the City of Poway Landscape and Irrigation Design Manual, Chapter 17.41 PMC, and all other applicable standards in effect at the time of landscape and irrigation plan check submittal. The landscape and irrigation plan submittal is a separate submittal from other Project plan check submittals, and is made directly to the Planning Division. Contact the Planning Division for copies of applicable City standards, the landscape and irrigation plan submittal checklist and the plan review fee worksheet. Landscape and irrigation plan review fees are required and are the responsibility of the applicant. Any landscaped areas within the adjacent public right-of-way shall be permanently and fully maintained by the owner. All existing irrigation and landscaping within any designated Landscape Maintenance District (LMD) and Land Development Association (LDA) areas shall be protected to the greatest extent possible. Any LMD and LDA areas to be disturbed shall be shown on the landscape plans. These disturbed areas shall be restored per the previously approved landscape plans or proposed revisions shall be part of this landscape plan review. 18. Use of recycled water will be required for on-site landscape and irrigation. Each site shall have a designated user supervisor who has attended the San Diego County Water Authority's user supervisor class. The County of San Diego Department of 8 of 21 January 7, 2020, Item #3.1 Environmental Health will assess fees for the following activities: a. Site Plan Check b. Shut Down Test ** c. Title 22 Inspection $400 avg. costs* $320 avg. costs* $ 80 avg. costs* Resolution No. Page 9 * Based on full cost recovery, actual fee amount may vary. ** Shut down test is required at initial installation and at least every four (4) years intervals on sites with both recycled and potable water. (Public Works) 19. Applicant shall provide detailed plans associated with deep shoring process to include mitigation of ground water into storm drain system and horizonal boring to pin shoring planks. H. Prior to building permit issuance, unless other timing is indicated, the following conditions shall be complied with: (Engineering) 1. The site shall be developed in accordance with the approved grading plans on file in the Development Services Department and the conditions contained herein. Grading shall be in accordance with the Uniform Building Code, the City Grading Ordinance, the approved grading plan, the approved soils report, and grading practices acceptable to the City. 2. Applicant shall obtain a Grading Permit and complete rough grading of the site. The grading shall meet the approval of the Engineering Inspector and the Project's Geotechnical Engineer. Following completion of rough grading, please submit the following: a) Three copies of certification of line and grade for the lot, prepared by the civil engineer of work. b) Three copies of a soil compaction report for the lot, prepared by the Project's Geotechnical Engineer. The certification and report are subject to review and approval by the City. 3. The applicant shall attend a pre -construction meeting at the Department of Development Services. The scheduling request shall be submitted on a City standard form available from the City's Project Engineer. The applicant's action plan that identifies measures to be implemented during construction to address erosion, sediment and pollution control will be discussed. Compliance for sediment control shall be provided as directed by the Project Inspector. 4. The applicant shall pay all applicable development impact fees in effect at time of permit issuance. 9 of 21 January 7, 2020, Item #3.1 Resolution No. Page 10 (Planning) 5. Trash receptacles shall be enclosed by a six -foot -high masonry wall, with view - obstructing gates, and shall provide an area for recyclable materials. Enhanced exterior treatments to the trash enclosure shall be provided, and shall be architecturally compatible with the buildings. Locations and exterior treatments shall be subject to approval by the Planning Division. 6. All roof appurtenances, including air conditioners, shall be architecturally integrated, screened from view, and sound -buffered from adjacent properties and streets as required by the Planning Division. 7. 8. 9. The applicant shall comply with the latest adopted construction related codes, and all other applicable codes and ordinances in effect at the time of Building Permit issuance. The colors and materials on the building shall be consistent with the approved colors on file in the Planning Division. All two-way traffic aisles shall be a minimum of 25 -feet wide. 10. All parking spaces shall be double striped. The minimum dimensions for standard - sized parking stalls shall be eight -foot six -inches x 18 -foot six -inches per the SPSP. The parking lot design shall comply with the Americans with Disabilities Act for accessible spaces, with one van -accessible space. 11. Parking lot lights, wall mounted lights and landscape accent lights shall be required and shielded per the SPSP and PMC standards. Wall -mounted security lights shall only be used on the rear or interior sides of buildings. 12. All parking stalls shall observe a minimum 25 -foot setback from the right-of-way. 13. Signs shall be proposed and approved under separate permits. 14. The landscape and irrigation plans on-site and property shall be approved in conformance with Design Manual. I. Compliance with the following conditions is required securities: (Engineering) within the right-of-way fronting the the City's Landscape and Irrigation prior to occupancy and release of 1. All existing and proposed utilities or extension of utilities required to serve the Project shall be installed underground. No extension of overhead utilities shall be permitted. 2. The stormwater facilities shall be complete and operational prior to occupancy. 3. The drainage facilities, driveway, slope planting measures, and all utility services shall be installed and completed by the property owner and inspected and approved by the Engineering Inspector. All new utility services shall be placed underground. 10 of 21 January 7, 2020, Item #3.1 Resolution No. Page 11 4. An adequate drainage system shall be provided around the new building pad capable of handling and disposing all surface water to the satisfaction of the Engineering Inspector. 5. The applicant shall repair, to the satisfaction of the City Engineer, any and all damage to public improvements caused by construction activity from this Project. 6. After completion of all work, record drawings, signed by the engineer of work, shall be submitted to Development Services for review prior to a request of occupancy, per PMC Section 16.52.130(B) of the Grading Ordinance. Approval of record drawings is required prior to issuance of occupancy and release of grading securities. Initial submittal of record drawings at least three weeks prior to a request for occupancy is recommended. (Planning) 7. Approval of this request shall not waive compliance with all sections of the Zoning Ordinance and all other applicable City Ordinances in effect at the time of Building Permit issuance. 8. Landscaping and irrigation on-site and within the right-of-way fronting the property shall be installed per the approved landscape plans. 9. Prior to any use of the Project site, or business activity being commenced thereof, all conditions of approval contained herein shall be completed to the satisfaction of the Director of Development Services. (Public Works) 10. The existing recycled irrigation at the rear slope must be properly altered, repaired or abandoned with approval of association responsible for irrigation system. A cross - connection test must be performed and passed prior to occupancy. Applicant will incur all costs associated with cross -connection testing. New irrigation system shall be highlined with potable water until cross -connection tests are complete and the site is approved to operate recycled water for irrigation. J. Upon occupancy the following conditions shall apply: 1. All landscaped areas on-site and within the right-of-way fronting the property shall be maintained in a healthy and thriving condition, free from weeds, trash and debris. The trees shall be encouraged and allowed to retain a natural form. Pruning should be restricted to maintain the health of the trees and to protect the public safety. Unnatural or excessive pruning, including topping, is not permitted. 2. Any fences, walls or signs proposed for this development shall be designed and approved in conformance with the SPSP and to the satisfaction of the Director of Development Services. 3. Uses established on the subject property shall comply with all zoning/SPSP standards applicable to the property for the life of the Project. 11 of 21 January 7, 2020, Item #3.1 Resolution No. Page 12 K. The following conditions shall be complied with to the satisfaction of the Director of Safety Services: 1. Fire Department access for use of firefighting equipment shall be provided to the immediate job construction site at the start of construction and maintained at all times until construction is completed. 2. Permanent access roadways for fire apparatus shall be designated as "Fire Lanes" with appropriate signs and curb markings. 3. Fire apparatus access roads shall have an unobstructed, improved width of not less than 20 feet. In most cases, the City of Poway construction standards for streets (Chapter 12.20 PMC) will be more restrictive. The more restrictive standard shall apply. Vertical overhead clearance shall be a minimum of 13 feet 6 inches. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus not less than 75,000 -pounds with an approved paved surface as to provide all-weather driving capabilities. The turning radius of a fire apparatus access road shall be a minimum of 28 feet as measured to the inside edge of the improvement width or as approved by the fire code official. 4. The angle of departure and the angle of approach of a fire access roadway shall not exceed seven degrees (12 percent) or as approved by the fire code official. 5. The building shall display the approved numbers and/or addresses in a location plainly visible and legible from the street or roadway fronting the property from either direction of approach. Said numbers shall contrast with their background and a size approved by the City. Each building address shall also be displayed on the roof in a manner satisfactory to the Director of Safety Services, and meeting Sheriff Department- ASTREA criteria. 6. The building is required to be equipped with an approved fire sprinkler system according to PMC requirements. The fire sprinkler system shall be designed to meet minimum design density at the roof per NFPA 13 requirements. The system is required to be monitored by a central monitoring company. Backflow valve assemblies with tamper switches shall be monitored. The City Fire Marshal shall locate these fire protection devices prior to installation. Two separate plan submittals to the Fire Department will be required, one for the fire service underground and a second for fire sprinkler design. A water analysis is required. 7. The building is required to be equipped with an approved Class 1 automatic wet fire protection system according to PMC requirements. The standpipe system shall be installed according to NFPA 14. A plan submittal to the Fire Department is required. 8. Fire sprinkler riser(s) shall be located within ten feet of an exterior exit man door or shall be located inside an enclosed closet with an exterior access man door. Door shall be labeled with a sign indicating "Fire Sprinkler Riser." When the closet method is chosen, applicant shall provide 36 inches of clearance from the standpipe or attached additional risers, accessible by a three-foot man door. 9. A metal sign with raised letters at least one inch (25mm) in size shall be mounted on all Fire Department connections serving automatic sprinklers, standpipes or fire pump 12 of 21 January 7, 2020, Item #3.1 Resolution No. Page 13 connections. Such signs shall read: AUTOMATIC SPRINKLERS or STANDPIPES or TEST CONNECTION or a combination thereof as applicable. Where the Fire Department connection does not serve the entire building, a sign shall be provided indicating the portions of the building served. 10. A properly licensed contractor shall install an automatic fire alarm system to approved standards according to the PMC. The system shall be installed according to NFPA 72. Duct detectors shall be tied into system over 2,000 cfm total. The system shall be completely monitored by a UL listed central station alarm company or proprietary remote station. A plan submittal to the Fire Department is required. 11. A `Knox' Security Key Box shall be required for the building at locations determined by the City Fire Marshal. 12. A 2A10BC fire extinguisher(s) are required for office areas every 3,000 square feet and 75 feet of travel distance. 13. At least one elevator shall be sized at a minimum to accommodate a normal hospital gurney. Minimum dimensions for the inside car platform shall meet the "Medical" size standards per the California Building Code. 14. All automatic gates across fire access roadways and driveways shall be equipped with approved, emergency, key -operated switches overriding all command functions and opening gates. Dual -keyed or dual switches shall be provided to facilitate access by law enforcement. SECTION 6: The approval of DR19-003 shall expire January 7, 2021, at 5:00 p.m., unless prior to that time a Building Permit has been issued and construction has commenced on the property unless prior to the expiration, a request for a time extension is submitted to the Development Services Department and a time extension is subsequently granted by the City Council. SECTION 7: The parties are hereby informed that the time within which judicial review of this decision must be sought is governed by Section 1094.6 of the California Code of Civil Procedure. 13 of 21 January 7, 2020, Item #3.1 Resolution No. Page 14 PASSED, ADOPTED AND APPROVED at a Regular Meeting of the City Council of the City of Poway, California on the 7th day of January, 2020 by the following vote, to wit: AYES: NOES: ABSENT: DISQUALIFIED: Steve Vaus, Mayor ATTEST: Faviola Medina, CMC, City Clerk 14 of 21 January 7, 2020, Item #3.1 ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA, APPROVING SPECIFIC PLAN AMENDMENT 19-001 TO THE SOUTH POWAY SPECIFIC PLAN TO ALLOW SELF -STORAGE BUILDINGS TO CONTAIN A MAXIMUM OF THREE STORIES WITHIN THE EXISTING HEIGHT ALLOWANCE WHEREAS, Chapter 17.47 (Specific Plan Regulations) of Title 17 (Zoning Development Code) of the Poway Municipal Code provides the requirements for the initiation, preparation, and adoption of Specific Plans in accordance with Section 65450, et seq. of the California Government Code (Article 8, Specific Plan); WHEREAS, Specific Plan Amendment (SPA) 19-001, in association with Development Review (DR) 19-003, is proposed to allow self -storage buildings to contain a maximum of three stories within the existing height allowance; WHEREAS, on January 7, 2020, the City Council held a duly advertised public hearing to solicit comments from the public, both in favor and against SPA19-001; and WHEREAS, the City Council has read and considered the agenda report for the proposed project and has considered other evidence presented at the public hearing. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF POWAY DOES ORDAIN AS FOLLOWS: SECTION 1: The above recitations are true and correct. SECTION 2: An Environmental Impact Report (EIR) was prepared pursuant to the California Environmental Quality Act (CEQA) in conjunction with the South Poway Specific Plan (SPSP), and was certified on July 30, 1985, and the Final Subsequent EIR was certified on July 26, 1988. The SPSP EIR analyzed the potential impacts of the proposed build out of the SPSP area in the manner permitted by the SPSP. The proposed SPA is consistent with the SPSP and conforms with the requirements, development standards and guidelines therein, and, therefore, as set forth in Chapter 10, Section VIII of the SPSP, no further environmental analysis is required because the project's impacts have already been analyzed and are fully covered by the previously certified EIR. The increase in the allowed number of stories from two to three within the existing maximum height requirements for self -storage buildings does not impact the aesthetics because the allowed building heights will remain the same. Additionally, there are no significant changes proposed that would require subsequent or supplemental environmental review pursuant to Public Resources Code section 21166 and CEQA Guidelines sections 15162 and 15163. SECTION 3: The City Council hereby approves this Ordinance (SPA19-001), in association with DR19-003, and amends certain sections of the SPSP as specified below. Removals are indicated with strikethroughs and additions are indicated with underline. SECTION 4: Chapter 3, Section IV, Subsection A, Item 3(f) of the SPSP Volume 2 shall be amended as follows: 3. Height [Excerpt only] 15 of 21 ATTACHMENT B January 7, 2020, Item #3.1 Ordinance No. Page 2 f. The maximum height of a public storage structure shall not exceed 35 feet. No more than three stories shall be contained within the 35 -foot height limit. SECTION 5: Severability. If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this Ordinance or its application to any person or circumstance, is for any reason held to be invalid or unenforceable by a court of competent jurisdiction, such invalidity or unenforceability shall not affect the validity or enforceability of the remaining sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases of this Ordinance, or its application to any other person or circumstance. The City Council declares that it would have adopted each section subsection, subdivision, paragraph, sentence, clause or phrase hereof, irrespective of the fact of any one or more sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases hereof be declared invalid or unenforceable. SECTION 6: This Ordinance shall be codified. SECTION 7: All references to the Government Code are inclusive of any amendments that may occur following adoption of this Ordinance. EFFECTIVE DATE: This Ordinance shall take effect and be in force thirty (30) days after its adoption. CERTIFICATION/PUBLICATION: The City Clerk shall certify the adoption of this Ordinance and cause it or a summary of it, to be published with the names of the City Council members voting for and against the same in the Poway News Chieftain, a newspaper of general circulation in the City of Poway within fifteen (15) days after its adoption and shall post a certified copy of this Ordinance in the Office of the City Clerk in accordance with Government Code § 36933. INTRODUCED AND FIRST READ at a Regular Meeting of the City Council of the City of Poway, California, held the 7th day of January, 2020, and thereafter PASSED AND ADOPTED at a Regular Meeting of said City Council held the 21st day of January, 2020, by the following vote, to wit: AYES: NOES: ABSENT: DISQUALIFIED: Steve Vaus, Mayor ATTEST: Faviola Medina, CMC, City Clerk 16 of 21 January 7, 2020, Item #3.1 17 of 21 ATTACHMENT C January 7, 2020, Item #3.1 - , LI - - . : .. =i ,* ., LI Subject APN 317-270-23 - % IP Location: SPC // IP Nom, CITY OF POWAY Zoning / Location Map Item: SPA19-001/DR19-003 OF Pow, :F IN Tris Gp�L 0 55 110 220 —�—�� Feet 17 of 21 ATTACHMENT C January 7, 2020, Item #3.1 0 IN2WHJVIIV 4'£# wain `OZOZ 'L I Jenue RR -C-1 Creek Road Enclave Specific Plan Industrial Park Light Industrial LI Appendix C - South Poway Land Use Plan LI -S Light Industrial/Outside Storage MRE Mineral Resource Extraction OS Open Space OS -RM Open Space Resource Management OS -1 DU Open Space/1 Dwelling Unit RA Residential Apartment RS -2 SPC SC Residential Single Family 2 South Poway Commercial Sports Complex Not to Scale Updated 01/2019 3 1N3WHOVllV January 7, 2020, Item #3.1 a NOTE: ENCLOSURE ALLCWS FOR 1 - 4'x6' - 3 YARD TRASH BIN 1 - 4'x6' - 3 YARD RECYCLE BIN PAIR OF 18 GA. , 1 1/2" GALV DECKING W/ HEAVY DUTY HINGES TRASH PLAN SCALE: 1/4" = 1'-0" BUILDING AREAS FLOOR LEVEL 2" HIGH x 24" WIDE 8" SPLIT -FACE ROUNDED CONC. MASONRY BERM THIRD FLOOR 23,492 SF \ \ 6' CURB 6" CURB II 1"". 1 RECYCLE BIN 11 TRASH BIN 1 1 ?% MAX 1 R•'=` "= ) L-- -J L- __J '''''':\:'; r.- 6' CURB TOTAL 99,895 SF NOTE: ENCLOSURE ALLCWS FOR 1 - 4'x6' - 3 YARD TRASH BIN 1 - 4'x6' - 3 YARD RECYCLE BIN PAIR OF 18 GA. , 1 1/2" GALV DECKING W/ HEAVY DUTY HINGES TRASH PLAN SCALE: 1/4" = 1'-0" BUILDING AREAS FLOOR LEVEL AREA THIRD FLOOR 23,492 SF SECOND FLOOR 22,413 SF FIRST FLOOR 22,286 SF BASEMENT 15,852 SF SUB -BASEMENT 15,852 SF TOTAL 99,895 SF FIRE DEPARTMENT NOTES: PARNELL COURT 1. FIRE DEPARTMENT ACCESS FOR USE OF FIREFIGHTING EQUIPMENT SHALL BE PROVIDED TO THE IMMEDIATE JOB CONSTRUCTION SITE AT THE START OF CONSTRUCTION AND MAINTAINED AT ALL TIMES UNTIL CONSTRUCTION IS COMPLETED. 2. PERMANENT ACCESS ROADWAYS FOR THE APPARATUS SHALL BE DESIGNATED AS "FIRE LANES" WITH APPROPRIATE SIGNS AND CURB MARKINGS. 3. FIRE APPARATUS ACCESS ROADS SHALL HAVE AN UNOBSTRUCTED, IMPROVED WIDTH OF NOT LESS THAN 20 FEET. IN MOST CASES, THE CITY OF POWAY CONSTRUCTION STANDARDS FOR STREETS (CHPA. 12.20 PMC) WILL BE MORE RESTRICTIVE. THE MORE RESTRICTIVE STANDARD SHALL APPLY. VERTICAL OVERHEAD CLEARANCE SHALL BE A A MINIMUM OF 13 -FEET 6 -INCHES. FIRE APPARATUS ACCESS ROADS SHALL BE DESIGNED AND MAINTAINED TO SUPPORT THE IMPOSED LOADS OF THE FIRE APPARATUS NOT LESS THAN 75,000 POUNDS WITH AN APPROVED PAVED SURFACE AS TO PROVIDE ALL-WEATHER DRIVING CAPABILITIES. THE TURNING RADIUS OF A FIRE APPARATUS ACCESS ROAD SHALL BE A MINIMUM OF 28 FEET AS MEASURED TO THE INSIDE EDGE OF THE IMPROVEMENT WIDTH OR AS APPROVED BY THE FIRE CODE OFFICIAL, 4. THE ANGLE OF DEPARTURE AND THE ANGLE OF APPROACH OF A FRE ACCESS ROADWAY SHALL NOT EXCEED 7 DEGREES (12 %) OR AS APPROVED BY THE FIRE CODE OFFICIAL. 5. THE BUILDING SHALL DISPLAY THE APPROVED NUMBERS AND/OR ADDRESSES IN A LOCATION PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROADWAY FRONTING THE PROPERTY FROM EITHER DIRECTION OF APPROACH. SAID NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND AND SIZE APPROVED BY THE CITY. EACH BUILDING ADDRESS SHALL ALSO BE DISPLAYED ON THE ROOF IN A MANNER SATISFACTORY TO THE DIRECTOR OF SAFETY SERVICES, AND MEETING SHERIFF DEPARTMENT - ASTREA CRITERIA. 6. THE BUILDING IS REQUIRED TO BE EQUIPPED WITH AN APPROVED FIRE SPRINKLER SYSTEM ACCORDING TO POWAY MUNICIPAL CODE REQUIREMENTS. THE FIRE SPRINKLER SYSTEM SHALL BE DESIGNED TO MEET MINIMUM DESIGN DENSITY AT THE ROOF PER NFPA 13 REQUIREMENTS. THE SYSTEM IS REQUIRED TO BE MONITORED BY A CENTRAL MONITORING COMPANY. BACKFLOW VALVE ASSEMBLIES WITH TAMPER SWITCHES SHALL BE MONITORED. THE CITY FIRE MARSHALL SHALL LOCATE THESE FIRE PROTECTION DEVICES PRIOR TO INSTALLATION. TWO SEPARATE PLAN SUBMITTALS TO THE FIRE DEPARTMENT WILL BE REQUIRED, ONE FOR THE FIRE SERVICE UNDERGROUND AND A SECOND FOR THE FIRE SPRINKLER DESIGN. A WATER ANALYSIS IS REQUIRED. 7. THE BUILDING IS REQUIRED TO BE EQUIPPED WITH AN APPROVED CLASS 1 AUTOMATIC WET FIRE PROTECTION SYSTEM ACCORDING TO POWAY MUNICAPAL CODE REQUIREMENTS. THE STAND PIPE SYSTEM SHALL BE INSTALLED ACCORDING TO NFPA 14. A PLAN SUBMITTAL TO THE FIRE DEPARTMENT IS REQUIRED. .I 65'-0" • 85'-0" 32'-6" FREE STANDINQ SIGN 6' HIGH MAX & 43 SF (SEE NOTE#2 0V THIS SHEET) EXISTING 10'JTILITY EASEMENT I 0 0 z 40'-0" 22+43.60 359.59' C . w ;1 0' 0" 50' RAD. rte; - • • +111-4+++ _+_.+ + + •. + ++ C 29 L C13-0" L6 L1 OFFICE L2 (31 9'-6" CONCRETE DRIVEWAY SPECS: 6" NOMINAL PCC CONCRETE W/ #3 REBAR EACH DIRECTION @ 18" 0/C OVER BASE AS SPECIFIED BY THE SOILS ENGINEER. EXTERIOR SLABS TO BE THICKENED TO 12' FOR 12" HORIZONTAL WHERE ADJACENT TO LANDSCAPE AREAS. PARKING AREA TO BE PROVIDED WITH 1/2" DEEP SAW -CUTS AT 10' 0/C IN BOTH DIRECTIONS. WHERE CONCRETE SLABS ABUT THE STRUCTURE, PROVIDE MINIMUM 1/2" THICK EXPANSION JOINT MATERIAL. CONCRETE COMPRESSION STRENGTH TO BE MIN. 2,500 psi. SUB -GRADE MATERIAL TO BE COMPACTED TO 95%. DENOTES CAR OVERHANG OF LANDSCAPE AREA SPLIT FACE, 8' HIGH MASONRY TRASH /7...------ & RECYCLE ENCLOSURE W/ STANDING I SEAM METAL ROOF & HEAVY DUTY MTL. GATES. COLORS TO MATCH BUILDING. (SEE ENLARGED PLAN ON THIS SHEET) BIKE RACKS L4 11 L5 \4 L3 16'-6" I 25'-0" I, 18'-6" L7 15 i� C ic" 0 C'j PROPOSED A-1 SELF STORAGE FACILITY 99,985 GSF / / SEE NOTE #1 REGARDING THIS SPACE ELEVATORS (SEE MIN. "MEDICAL" SIZE CAR PLATFORMS ON FLOOR PLANS) 126'-10' LINE OF BASEMENTS c 168-'4" (@ 2nd & 3rd floor) 126'-10" 41'-6" ST, 2ND, & 3RD FLOORS ED U 8. FIRE SPRINKLER RISERS SHALL BE LOCATED WITHIN 10 FEET OF AN EXTERIOR EXIT MAN DOOR OR SHALL BE LOCATED INSIDE AN ENCLOSED CLOSET WITH AN EXTERIOR ACCESS MAN DOOR. THE DOOR SHALL BE LABELED WITH AN SIGN INDICATIONG "FIRE SPRINKLER RISER'. WHEN THE CLOSET METHOD IS CHOSEN, APPLICANT SAHLL PROVIDE 36 INCHES OF CLEARANCE FROM THE STANDPIPE OR ATTACHED ADDITIONAL RISERS, ACCESSIBLE BY A 3'-0" MAN DOOR. 9. A METAL SIGN WITH RAISED LETTERS AT LEAST ONE INCH IN SIZE SHALL BE MOUNTED ON ALL FIRE DEPARTMENT CONNECTIONS SERVING AUTOMATIC SPRINKLERS, STANDPIPES OR FIRE PUMP CONNECTIONS. SUCH SIGNS SHALL READ: AUTOMATIC SPRINKLERS OR STANDPIPES OR TEST CONNECTION OR A COMBINATION THEREOF AS APPLICABLE. WHERE THE FIRE DEPARTMENT CONNECTION DOES NOT SERVE THE ENTIRE BUILDING, A SIGN SHALL BE PROVIDED INDICATING THE PORTIONS OF THE BUILDING. 10. A PROPERLY LICENSED CONTRACTOR SHALL INSTALL AN AUTOMATIC FIRE ALARM SYSTEM TO APPROVED STANDARDS ACCORDING TO THE POWAY MUNICIPAL CODE. THE SYSTEM SHALL BE INSTALLED ACCORDING TO NFPA 72. DUCT DETECTORS SHALL BE TIED INTO SYSTEM OVER 2000 SFM TOTAL. THE SYSTEM SHALL BE COMPLETELY MONITORED BY A UL LISTED CENTRAL STATION ALARM COMPANY OR PROPRIETARY REMOTE STATION. A PLAN SUBMITTAL TO THE FIRE DEPARTMENT IS REQUIRED. 11. A 'KNOX SECURITY KEY BOX SHALL BE REQUIRED FOR THE BUILDING AT LOCATIONS DETERMINED BY THE CITY FIRE MARSHAL. 12. A 2A1 OBC FIRE EXTINGUISHER(S) ARE REQUIRED FOR OFFICE AREAS EVERY 3000 SF AND 75 FT OF TRAVEL DISTANCE. 13. AT LEAST ONE ELEVATOR SHALL BE SIZED AT A MINIMUM TO ACCOMMODATE A NORMAL HOSPITAL GURNEY. MINIMUM DIMENSIONS FOR THE INSIDE CAR PLATFORM SHALL MEET THE "MEDICAL" SIZE STANDARDS PER THE CALIFORNIA BUILDING CODE. NOTE: ELEVATORS PROPOSED MEET THE MIN. SIZE 80"X54" INSIDE REQUIREMENTS OF CBC SECT. 3002 L EXISTING SLOPE 356.23' 6' MAX. HIGH SPLIT FACE MASONRY RETAINING WALL. COLOR TO MATCH BUILDING. SEE COLOR SPECS ON SHEET 8. O T 1003 NOTES: 1 EXISTING SLOPE . EXISTING SLOPE EXISTING SLOPE SITE DATA PARKING REQUIRED: 1/ 1,000 SF FOR 1ST 20,000 SF = 1/ 2,000 SF FOR 2ND 20,000 SF = 1/ 4,000 SF FOR OVER 40,000 SF = EMPLOYEE SPACES = 20 SPACES 10 SPACES 15 SPACES 1 SPACES 46 SPACES THEREFORE...46 SPACES WILL SUPPORT 100,000 SF STANDARD SPACES: 8.5' X 18.5' COMPACT SPACES: 8' X 15' (20% MAX ALLOWED = 8 SPACES MAX.) ACTUAL PROVIDED: STANDARD SPACES: 31 ACCESSIBLE SPACES: 2 COMPACT SPACES: 8 LOADING SPACES: 5 TOTAL 46 LANDSCAPING: ENTIRE LOT: SITE AREA: 69,792.8 S.F. % LOT AREA LANDSCAPED: PARKING AREA: PARKING AREA: 14,385 S.F. REQUIRED 10% LANDSCAPING: PROVIDED LANDSCAPING: 51% (35,685 S.F.) 1,439 S.F. 1,790 S.F. #1. A SIGN IS REQUIRED THAT WILL NOTIFY MOTORISTS THAT PARKING WILL NOT BE ALLOWED IN THIS SPACE DURING EDCOREFUSE PICK UP TIMES. #2. THE FREE STANDING SIGN WILL ONLY BE APPROVED AS PART OF A SEPARATE SIGN PERMIT. #3. UTILITY SERVICE FOR PROPOSED STRUCTURE IS REQUIRED TO BE INSTALLED UNDERGROUND NO OVERHEAD SERVICE WILL BE PERMITTED. 0 2 (1) 0 Z SITE PLAN SCALE : 0 10 20 1"=20'-0" 40 5 15 30 BAR SCALE 60 a REVISION • DATE: 11.6.19 SCALE: ARCHITECTURE• PLANNING• INTERIOR DESIGN 8330 UNIVERSITY AVENUE (61 9) 465-2011 LA MESA, CA 91941 FAX: (619) 465-2833 CONTACT: RICK MARRS (619) 465-2011 X-103 RICK@RMI-ARCHITECTS.COM JOB NO: 2 ❑o 1V123N 4 DEL j aN Z /4-04rof OWNER CONTRACTOR CASTER PROPERTIES, INC OWNER Caster Properties 4607 MISSION GORGE PLACE SAN DIEGO, CA 92120 (619) 287-8873 Q (1) Kirkl NA 1 PROJECT • DATE: 11.6.19 SCALE: DRAWN: JOB NO: 2 � 1N3WHOVllV `OZOZ `L fuenuer 7n 8 1'-4" Factory Installed Mastic (When Specified) MasterLine 16 Panel Profile 11-0" 6' 6" FW -120-1 Panel Profile PANEL PROFILES iv 24'-0" CASTER ORANGE CASTER BLUE 9 HEIGHT LIMIT 768.50' DENOTES LINE OF STAN ING SEAM ROOF BEYOND O VERTICAL SIDING EX IST/NATURAL GRADE 3RD FLOOR 738.90' 733.50' CALCULATED AVERAGE HEIGHT LIMIT DETERMINATION A -i self Stoage INDIVIDUAL BACK LIT LETTERS 2ND FLOOR 729.57 1ST FLOOR 719.20 EXTERIOR SIGNAGE HEIGHT LIMIT 768.50' 733.50' CALCULATED AVERAGE HEIGHT LIMIT DETERMINATION EXTERIOR FINISH SCHEDULE ®RCP SPLIT -FACE MASONRY PAINTED: "TRAVERTINE" DEC 738R1/4" 0RCP PRECISION MASONRY PAINTED: "TRAVERTINE" DEC 738 METAL WALL PANELS: O EXTERIOR HORIZ.. PATTERN METAL SIDING MBCI PANEL "MASTERLINE 16" COLOR: "SLATE GRAY ® METAL WALL PANELS: EXTERIOR VERT. PATTERN METAL SIDING MBCI PANEL "MASTERLINE 16" COLOR: "ASH GRAY" O METAL WALL PANELS: EXTERIOR VERT. PATTERN METAL SIDING MBCI PANEL "FW -120-1", 24 GA. SIDING COLOR: "RUSTIC RED" ® METAL FASCIA PANELS KINGSPAN INSULATED PANELS COLOR: "SILVERSMITH" NOTE: ALL PAINT, DUNN EDWARDS PAINTS. DATE: 11.6.19 ®METAL ROOF: MBCI ULTRA-DEK STANDING SEAM ROOF; IN 12" SLOPE; 24 GA. METAL; COLOR: "GALVALUME" SIGNATURE 200 O ROLL -UP DOORS: JANUS OR EQUAL COLOR: "DESERT TAN" 6 STOREFRONT & WINDOW FRAMES: CPOLOR: DUNN-EDWARDS FINIS WARDS COLOR: "MIL FINISH" ® MAN DOORS & FRAMES: COLOR: MATCH MBCI "TRAVERTINE" DEC 738 e VISION GLASS: 1/4" SINGLE PANE ( CLEAR) SPANDREL GLASS: 0' 1/4" SINGLE PANE REFLECTIVE "AZURITE" 11 GUTTERS & DOWNSPOUTS: COLOR: PAINT TO MATCH ADJOINING SURFACE. MECHANICAL LOUVER VENTS @ STOREFRONT COLOR: PAINT TO MATCH ADJOINING MULLIONS ( MIL FINISH. / 0 METAL CANOPIES \ COLOR: MATCH "RUSTIC RED" OF SIDING. e14 LOUVER VENTS IN MASINRY OR SIDING COLOR: MATCH THE ADJOINING SURFACE evil »4'4, nN • � `b48 5 tx i trtioK METAL TO HAVE A KYNAR FINISH. 84 OWNER 1 HEIGHT LIMIT 1 HORIZONTAL SIDING v SPANDREL GLASS oe. ARCHITECTURAL VENT 12 1 tt 11. VERTICAL SIDING 0 VERTICAL SIDING 0 r ++ --l— ---!------1�__----!!___—. ------------ — --------l-----------l----- �_.� I_ 1— SPLIT FACE MASONRY 1A —1=1 --i--- R WM - -1 - ----- -------- == === -- MI — ------- -,--.--tom --,� • l----------- ----------- --r---�1= .-- 1-1 ==.= �1 EM =— 1 1 -- I -----------lr------ m----------w.nor mow -- i— ®—ter----- ------- ====1Z====.• — --- ----- --- — ---- --.w -- o—== HMI 22'-7" -0. 14'-71 4'-0" HEIGHT LIMIT 733.50' 1 PI "KINGSPAN" METAL PPANELS VISION GLASS ARCHITECTURAL VENT 12 -_J —® ROLL -UP DOORS EXIT DOOR FROM STAIR L 12 ARCHITECTUFRAL VENT VERTICAL SIDING S• PLIT FACE MASONRY €e —k) GRADE WITHIN 20' OF BUUILDING LINE = 722.5' - 9 SPLIT FACE MASONRY 1A ELECTRONIC SLIDING ENTRANCE DOORS J NORTH ELEVATION -ViSION GLASS oe. 34'-0" 4'-0" 26-0" 4'- Al Self. 7 API "KINGSPAN" METAL® PANELS SPANDREL GLASS e ARCHITECTURAL VENT 12 HORIZONTAL TIDING O 0 BASEMENT SUB -BASEMENT 20'-0" VERTICAL SIDING SOUTH P.L. 3RD FLOOR 2ND FLOOR 722.5 1ST FLOOR (719.20) HEIGHT LIMIT 768.50 _ .1 wwr w.w� --N !—!—!—l-------- 1.0 mIN---mi..—wr•IIIM IIM =MI MI= —r1 -- =MI —l—l—l----- —wr11...-1..11..1—.= 1Vim M=11 1' =MI .= iimmi=immimm S: ----'v—1--l—\\ ■-- — 1-- -- l— ! -- —r — l —1-1- • IMP= RIM miww.1=I = = == s.1=1•1 .w.. tE I I I PLANNING DIVISION NOTES: #4. ALL EXTERIOR SIGNS SHALL BE APPROVED ONLY UNDER A SEPARATE PERMIT. #6. ALL LIGHT FIXTURES PROPOSED ARE BUILDING MOUNTED. THEY SHALL BE SHIELDED WITH WELL DEFINED CUT-OFF LIMITS TO CONFINE ILLUMINATIONTO THE SITE AREAS ONLY. ALL LIGHTING TO BE CONSISTENT WITH ALL OTHER REQUIREMENTS CONTAINED IN CHAPTERS 17.10 AND 17.42 OF THE POWAY MUNICIPAL CODE. -n IL MMUDEENUMEMINEME---- - -.1 r. -■11r.- vWI VISION GLASS oe. 1 -- SPLIT FACE 1A MASONRY • _.-r1...----- ----1 ---- .--- ■11 IN 1 l II ` I:II i 1 MEM .. • 3rd FLOOR 738.90 2nd FLOOR 729.57 733.50' o) —==—. ind lir=..:41•1111 KEW IMMENNOIMMIMEMILIF 1 LrT- I ITIS - - 11. I i "'r — 1._-I-- -- _ — I =— —-- — -- 1 -- - —— - I_I II wlw. ` 7 . SPLIT FACE MASONRY 719.20 1st FLOOR STAIR EiCIT DOOR® ELECTRONIC SLIDING ENTRANCE DOORS WEST ELEVATION AVERAGE GRADE FOR DETERMINATION OF BUILDING HEIGHT LOWEST FINISHED GRADE WITHIN 20' OF BUILDING PERIMETER = 717.00' HIGHEST FINISHED GRADE WITHIN 20' OF BUILDING PERIMETER = 750.00' 1,467 / 2 = 733.5' H BASEMENT v r SUB -BASEMENT EXTERIOR ELEVATIONS SCALE: 3/32" = 1'-0" REVISI❑N BY IA RAil ARCH1TECTS ARCHITECTURE • PLANNING • INTERIOR DESIGN 8330 UNIVERSITY AVENUE (61 9) 465-2011 LA MESA, CA 91 941 FAX: (619) 465-2833 CONTACT: RICK MARRS (619) 465-2011 X-103 RICK@RMI-ARCHITECTS.COM a DATE: 11.6.19 r_d___I evil »4'4, nN • � `b48 5 ` 2Wp K 84 OWNER C O N T R A C T O R CASTER PROPERTIES, INC OWNER Caster Properties 4607 MISS ON GORGE PLACE SAN DIEGO, CA 92120 (619) 287-8873 JOB NO: • O i Kirkl T J = 1o a 1 PROJECT I 4 4 a DATE: 11.6.19 SCALE: DRAWN: JOB NO: • 8 i January 7, 2020, Item #3.1 733.50' HEIGHT LIMIT 768.50 CALCULATED AVERAGE HEIGHT LIMIT DETERMINATION 11 VERTICAL SIDING 111��Ti�1�T�T�r�rr�r�rr�r� 1rJ_J 1 SPANDREL GLASS 0 ARCHITECTURAL VENT 12 /7.--------------- HORIZONTAL SIDING n VERTICAL S DINGO NsrruTirrmlTiTim irm-i�TiilatTh �TirWINTmTiffiara-m- _mm- 1 1 I I MN MINIIIMMIIMPIMIIM 1 ■rrrrrr MOIIIIMMENNIMMIIMIN MMMMMMMMMM NIMMOIMIN=MONEN r•_rMMr•_r_MM•SrFEMEMIlMMinlin•MrrMMrrMMrr__rr_r_rEMEMrrr MONNE I__EN /A, =rMERr .MEN=IlNIMIIMEMININAMMENIMIIIIMMINININIMMENNEMEMENNEMEME=MMAIMMENEM=MMEMMIENIMMINEIMMENENNEMENNEMEDEMENEMB=MMEM=MENN=REN-1--1MN I==MMI MI w=mow ww=== =NNMw� =MIw w�Mw MI=N MM wrwwiiwrrwlitwNiwwwwiw=MIwMir�iINwMIr�rINwNrr�wuwwwSwwr- rM=r= ==================— — ---------- --r — -- L.-1 L L EXISTING AND FINISH GRADE Air , EXTERIOR FINISH SCHEDULE , RCP SPLIT -FACE MASONRY 1A PAINTED: "TRAVERTINE" DEC 738 1B RCP PRECISION MASONRY PAINTED: "TRAVERTINE" DEC 738 METAL WALL PANELS: ®EXTERIOR HORIZ.. PATTERN METAL SIDING MBCI PANEL"MASTERLINE 16" COLOR: "SLATE GRAY" OMETAL WALL PANELS: EXTERIOR VERT. PATTERN METAL SIDING MBCI PANEL "MASTERLINE 16" COLOR: "ASH GRAY" O METAL WALL PANELS: EXTERIOR VERT. PATTERN METAL SIDING MBCI PANEL "FW -120-1", 24 GA. SIDING11 COLOR: "RUSTIC RED" ® METAL FASCIA PANELS KINGSPAN INSULATED PANELS COLOR: "SILVERSMITH" NOTE: ALL PAINT, DUNN EDWARDS PAINTS. \ / n \ / O /-) `' / e 0' 12 13 DRAWN: METAL ROOF: MBCI ULTRA-DEK STANDING SEAM ROOF; 1/4" IN 12" SLOPE; 24 GA. METAL; COLOR: "GALVALUME" SIGNATURE 200 ROLL -UP DOORS: JANUS OR EQUAL COLOR: "DESERT TAN" STOREFRONT & WINDOW FRAMES: PAINTED: NNHIT ARDS WHITEE" COLOR: "BONE WH MAN DOORS & FRAMES: COLOR: MATCH MBCI "TRAVERTINE" DEC 738 VISION GLASS: 1/4" SINGLE PANE ( CLEAR) SPANDREL GLASS: 1/4" SINGLE PANE REFLECTIVE "AZURITE GUTTERS & DOWNSPOUTS: COLOR: PAINT TO MATCH ADJOINING SURFACE. MECHANICAL LOUVER VENTS COLOR: PAINT TO MATCH ADJOINING MULLIONS ( BONE WHITE) . METAL CANOPIES COLOR: MATCH "RUSTIC RED" OF SIDING. 4 EXTERIOR METAL TO HAVE A KYNAR FINISH. t: • 9 r 1 SPLIT FACE MASONRY 1A L FINISH GRADE • -► I SPLIT FACE 1A MASONRY L 20'-0" SOUTH ELEVATION J C� -VERTICAL S DINU 0 0 20-0" 3rd FLOOR 2nd FLOOR 1st FLOOR 719.20 BASEMENT SUB -BASEMENT SOUTH PROPERTY LINE 1 - 011 ...VI.C.)I.1I1l IVIt11....J1 NDI 1v1 1 /A-1 /1, r - TO MATCH VERTICAL SIDING EAST (REAR) ELEVATION 3rd FLOOR 733.50' 2nd FLOOR 729.57' NORTH PROPERTY LINE EXISTING SLOPE BANK wzr 1st FLOOR 719.20' 1 Q HEIGHT LIMIT 768.50' CALCULATED AVERAGE 733.50' HEIGHT LIMIT DETERMINATION ! 1" EXTERIOR ELEVATIONS SCALE: 3/32" = 1'-0" REVISI❑N • BY D A • s "M ARCHITECTURE •PLANNII1IG •INTERIDR DESIGN 8330 UNIVERSITY AVENUE (61 9) 465-2011 LA MESA, CA 91 941 FAX: (61 9) 465-2833 CONTACT: RICK MARRS (619) 465-2011 X-103 RICK@RMI-ARCHITECTS. C❑M SCALE: DRAWN: JOB NO: • 9 r ri- 11-' No. - 287 py 6/ /21 1 OWNER ■ CONTRACTOR CASTER PROPERTI ESLI NC OWNER Caster Properties 4607 MISSION GORGE PLACE SAN DIEGO, OA 92120 (619) 287-8873 OIL Kirkl PROJECT s DATE: 11.6.19 SCALE: DRAWN: JOB NO: • 9 r