Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Item 7 Visual Slideshow provided by Staff at Meeting
Streets & Highways –9 Projects Drainage –4 Projects Public Facilities –8 Projects Water –12 Projects Sewer –6 Projects 39 Projects –Total Funding $53.86 MIL Capital Improvement Program Completed Projects FY 19/20 Street Overlay Rattlesnake Creek Integrity Study Valle Verde Playground Renovation Streets Espola Road Safety Improvements Espola Road Bike Lanes Traffic Signal Controller Upgrades LED Street & Safety Lighting Conversion Neighborhood Sidewalks (Powers & Garden Areas) FY 20/21 Street Maintenance FY 20/21 Street Striping FY 20/21 Street Overlay 20A 20B Drainage 2019-20 Corrugated Metal Pipe Annual Repair/Replace Sebago Avenue Channel Repair Annual Trash Capture Program Public Facilities Mickey Cafagna Community Center Swim Center Valve and Strainer Replacement (Community Services) Swim Center Deck Coating (Community Services) Public Facilities Renovation Project ◦City Monument Welcome Sign Replacement Blue Sky Amphitheater Improvements FY 19/20 ADA Barrier Removal –Lake Poway FY 20/21 ADA Barrier Removal –Lake Poway June 11, 2020 July 17, 2020 October 19, 2020 September 24, 2020 October 9, 2020 Water Annual Valve Replacement Boulder Mountain Reservoirs 1 and 2 Rehabilitation 36-inch Steel Water Main Assessment WTP Chemical Building and Tank Farm Upgrades WTP Clearwell Distribution Flow Meters Power to Blue Crystal Reservoir PRV Station Access Assessment WTP Electrical System Assessment Clearwell Upgrades (Public Works) Clearwell Bypass (Public Works) SDCWA Treated Water Connection (Public Works) Clearwell Overflow Structure Modifications (Public Works) Sewer Martincoit Road Sewer Upsize Sewer Line Repair/Replace 14/15 (Pomerado/Stone Canyon) Exposed Sewer East of Martincoit Bowron Road Sewer Upsize Annual Manhole Rehabilitation (Public Works) Butterfield Trail Sewer Upsize Photo 1 Photo 2 Questions?