Ord 638
ORDINANCE NO. 638
AN ORDINANCE OF THE CITY OF POWAY, CALIFORNIA,
AMENDING THE DEVELOPMENT SERVICES
DEPARTMENT BUILDING DIVISION FEE SCHEDULE
AND RESCINDING ORDINANCE NO. 545
WHEREAS, the City of Poway provides Building Permit services to the citizens of
Poway; and
WHEREAS, the processing of such permits requires staff time to investigate the
circumstances surrounding the application and perform other related tasks; and
WHEREAS, California Government Code Section 66016, et seq., establishes
procedures for the adoption of fees for services provided by local government; and
WHEREAS, the last comprehensive revision to the permit fee schedule for
building services was last amended by the City Council on April 6, 1993, by Resolution
No. 93-049; and
WHEREAS, the City Council finds that it is appropriate to amend the fee
schedule to more accurately reflect the cost of the services provided; and
WHEREAS, before enacting this Ordinance, the City Council held a public
hearing on June 20, 2006, at which oral or written presentations could be made as part
of a regularly scheduled meeting; and
*
WHEREAS, after receiving the evidence presented at the public hearing,
including the staff report and the oral or written presentations from the public, if any, the
City Council found and determined that the amounts of the fees established by this
Ordinance do not exceed the estimated reasonable cost of providing the service for
which the fees are charged.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF POWAY DOES
ORDAIN AS FOLLOWS:
SECTION 1: The City Council hereby finds that this amendment is statutorily
exempt from the California Environmental Quality Act, pursuant to Section 15273(a)(1)
of the CEQA Guidelines, because it entails only the modification of a charge for the
purpose of meeting operating expenses for building services.
SECTION 2: The City Council hereby adopts the Development Services
Department Building Division Fee Schedule as set forth in the attached Exhibit A.
SECTION 3: The City Council hereby adopts the 2005 valuation table created by
the San Diego Area Chapter of the International Code Council as set forth in the
attached Exhibit B, and it shall become effective one year from the effective date of this
ordinance.
Ordinance No. 638
Page 2
SECTION 4: The revised fee schedule contained in Exhibits A and B shall not
apply to any project for which a substantially completed application, as determined by
the Director of Development Services, for Building Permit, Development Review,
Conditional Use Permit, Variance, or Minor Development Review Application has been
submitted prior to the effective date of this ordinance. However, if the applicant does
not obtain approval of the application within one year of submittal, or if the approval of
the application expires and no Building Permit is obtained prior to its expiration, then
any re-submittal of the application or submittal of a new application would be subject to
the Building Permit fees in effect at the time of Building Permit application.
Section 5: Ordinance 545 is hereby rescinded.
EFFECTIVE DATE: This Ordinance shall take effect and be in force sixty (60)
days after the date of its passage; and before the expiration of fifteen (15) days after its
passage, it shall be published once with the names of members voting for and against
the same in the Poway News Chieftain, a newspaper of general circulation published in
the City of Poway.
Introduced and first read at a Regular Meeting of the City Council of the City of
Poway held the 20th day of June, 2006, and thereafter PASSED AND ADOPTED at a
regular meeting of said City Council held the 18th day of July, 2006, by the following roll
call vote:
AYES:
BOYACK, EMERY, HIGGINSON, REXFORD, CAFAGNA
NOES:
NONE
ABSENT:
NONE
DISQUALIFIED:
NONE
ATTEST:
~'"~"~
r
Ordinance No. 638
Page 3
EXHIBIT A
CITY OF POWAY
DEVELOPMENT SERVICES DEPARTMENT
BUILDING DIVISION
BUILDING PERMIT FEES
$1.00 to $500.00
$501.00 to $2,000.00
FEE
$24.00
TOTAL VALUATION
$2,001.00 to $25,000.00
$24.00 for the first $500.00 plus $3.00 for each
additional $100.00 or fraction thereof, to and
including $2,000.00.
$69.00 for the first $2,000.00 plus $13.20 for
each additional $1,000.00 or fraction thereof, to
and including $25,000.00.
$25,001.00 to $50,000.00
$372.60 for the first $25,000.00 plus $9.00 for
each additional $1,000.00 or fraction thereof, to
and including $50,000.00.
$50,001.00 to $100,000.00
$597.60 for the first $50,000.00 plus $6.60 for
each additional $1,000.00 or fraction thereof, to
and including $100,000.00.
$100,001.00 to $500,000.00
$927.60 for the first $100,000.00 plus $5.10 for
each additional $1,000.00 or fraction thereof, to
and including $500,000.00.
$500,001.00 to $1,000,000.00
$2,968.50 for the first $500,000.00 plus $4.20
for each additional $1,000.00 or fraction
thereof, to and including $1,000,000.00.
$1,000,000.00 and up
$5,067.60 for the first $1 ,000,000.00 plus
$2.70 for each additional $1,000.00 or fraction
thereof.
Ordinance No. 638
Page 4
OTHER INSPECTIONS AND FEES:
1. Inspections outside of normal business $60.00 per hour
hours (minimum charge one hour).
2. Re-inspection fees assessed under $60.00 each
provisions of Section 305(g).
3. Inspection for which no fee is specifically $60.00 per hour
indicated (minimum charge one hour)
4. Additional plan review required by changes, $60.00 per hour
additions or revisions to approved plans
(minimum charge one hour)
5. Permit History Survey $60.00
6. Demolition Permit Fee $72.00
7. Investigation Fee. The fee shall be equal to, and in addition to, the permit fee for
the work, whether or not a permit is issued.
8. Plan Review Fee. When a plan or other data is required to be submitted for plan
review, a plan review fee shall be paid at the time of submitting plans and
specifications for review. Said plan review fee shall be 65% of the building
permit fee as established after disabled access inspection fees and energy code
inspection fees have been added to the building permit fee. (Residential sub-
division or tract development projects may have production units that are
duplicates of the model units reduced to 30% of the permit fee).
9. Permit Issuance Fee (non-refundable) $36.00
10. Disabled Access Inspection Fee (applies 10% of Building Permit Fee
to all projects required by State law
to be accessible to the physically disabled)
11. Energy Code Inspection Fee 15% of Building Permit Fee
(applies to all projects required by State law
to comply with the energy conservation
standards of the California Energy
Commission)
Ordinance No. 638
Page 5
ELECTRICAL PERMIT FEES
For issuance of each Permit (non-refundable)
$36.00
In addition, either one of the following:
(a) New permanent service, including fixtures and outlets. Fees are based on
carrying capacity of each set of service entrance conductors.
o to 40 amperes $28.80
41 to 60 amperes $31.20
61 to 70 amperes $36.00
71 to 100 amperes $43.20
101 to 150 amperes $50.40
151 to 200 amperes $64.80
201 to 300 amperes $72.00
301 to 400 amperes $86.40
Over 400 amperes $86.40
Plus $18.00 for each 100 amperes or fraction thereof over 400 amperes.
(b) Temporary service, including fixtures and outlets:
$24.00
$24.00
$24.00
$24.00
(c) Miscellaneous additional wiring, outlets, fixtures, or similar work with no change
in service
Entrance - conductors $30.00
Neon sian $12.00
Sian - other than Neon $12.00
Overhead service to underground service (no change in $24.00
capacity)
Other Fee: When the project requires a plan check of the electrical plan, a plan check
fee, equal to 25% of the calculated electrical permit fee, shall be paid.
The total permit fee for solar energy system installation shall be reduced by 25%.
Ordinance No. 638
Page 6
PLUMBING PERMIT FEES
Plumbinq Issuance Fee $36.00 each
Bathtub $ 4.20 each
Dental Unit/Cuspidor $ 4.20 each
Floor Drain $ 4.20 each
Gas Piping System of 1 to 5 Outlets $12.00 each
Gas Outlets Each (over 5) $ 1.20 each
Building Sewer $14.40 each
Interceptors/Pump $ 3.60 each
Lavatorv $ 7.20 each
Lavatorv (more than one) $ 4.20 each
Laundrv Tubs $ 4.20 each
Backflow Preventer $ 4.80 each
Receptor and Floor Sink $ 4.20 each
Shower Drain $ 4.20 each
Sink - Kitchen $ 4.20 each
Sink - Other $ 4.20 each
Urinal $ 4.20 each
Washinq Machine Drain $ 4.20 each
Water Closet $ 7.20 each
Water Closet (more than one) $ 4.20 each
Water Heater $ 7.20 each
Water Heater (more than one) $ 4.20 each
Water Pipe Repair/Replacement $ 7.20 each
Water Softener $ 4.20 each
Drain-Vent Repair/Alter $ 7.20 each
Hose Bibb $ 4.20 each
Drinkinq Fountain $ 4.20 each
6.
Ordinance No. 638
Page 7
OTHER INSPECTIONS AND FEES
When the project requires a plan check of the plumbing plan, a plan check fee, equal to
25% of the calculated plumbing permit fee, shall be paid.
1.
Inspections outside of normal business hours
(minimum charge one hour)
$60.00/hour
2.
Re-inspection Fee
$60.00 each
3.
Inspections for which no fee is specifically indicated
(minimum charge one hour)
$60.00/hour
MECHANICAL PERMIT FEES
1.
For the issuance of each permit
$36.00
$12.00
2.
For issuing each supplemental permit
Unit Fee Schedule
1.
For the installation or relocation of each forced air
or gravity type furnace or burner, including ducts
and vents attached to such appliance, up to and
including 100,000 Btu/h.
$14.40
2.
For the installation or relocation of each forced air
or gravity type furnace or burner, including ducts
and vents attached to such appliance, over
100,000 Btu/h.
$18.00
3.
For the installation or relocation of each floor furnace,
including vent.
$14.40
4.
For the installation or relocation of each suspended
heater, recessed wall heater, or floor-mounted unit
heater.
$14.40
5.
For the installation, relocation, or replacement of each
appliance vent installed and not included in an
appliance permit.
$ 7.80
For the repair of, alteration of, or addition to each
heating appliance, refrigeration unit, cooling unit,
absorption unit, or each heating, cooling, absorption,
or evaporative cooling system, includin9 installation
of controls regulated by this code.
$14.40
Ordinance No. 638
Page 8
7. For the installation or relocation of each boiler or $14.40
compressor to and including three horsepower, or each
absorption system to and including 100,000 Btu/h.
8. For the installation or relocation of each boiler or $30.00
compressor over three horsepower to and including
15 horsepower, or each absorption system over
100,000 Btu/h and including 500,000 Btu/h.
9. For the installation or relocation of each boiler or $38.40
compressor over 15 horsepower to and including
30 horsepower, or each absorption system over
500,000 Btu/h and including 1,000,000 Bt/h.
10. For the installation or relocation of each boiler or $56.40
compressor over 30 horsepower to and including
50 horsepower, or for each absorption system
over 1,000,000 Btu/h to and including
1,750,000 Btu/h.
11. For the installation or relocation of each boiler or $93.60
refrigeration compressor over 50 horsepower, or
each absorption system over 1,750,000 Btu/h.
12. For each air-handling unit to and including 10,000 $10.80
cubic feet per minute, including ducts attached thereto.
Note: This fee shall not apply to an air-handling unit
which is a portion of a factory-assembled appliance,
cooling unit, evaporative cooler or absorption unit for
which a permit is required elsewhere in this code.
13. For each air-handling unit over 10,000 cfm. $18.00
14. For each evaporative cooler other than portable type. $10.80
15. For each ventilation fan connected to a single duct. $ 7.20
16. For each ventilation system which is not a portion of any $10.80
heating or air-conditioning system authorized by a permit.
17. For the installation of each hood which is served by $24.00
mechanical exhaust, including the ducts for such hood.
18. For the installation or relocation of each domestic-type $18.00
incinerator.
19. For the installation or relocation of each commercial or
industrial-type incinerator.
20. For each appliance or piece of equipment regulated by
this code, but not classed in other appliance categories,
or for which no other fee is listed in this code.
Ordinance No. 638
Page 9
$72.00
$12.00
21. When Chapter 12 is applicable (see Section 103), permit fees for fuel-gas
piping shall be as follows:
a.
For each gas-piping system of one to four outlets.
b.
For each gas-piping system of five or more
outlets per outlet.
OTHER INSPECTIONS AND FEES:
1.
Inspections outside of normal business hours
(minimum charge one hour).
2.
Re-inspection fee assessed under provisions of Section
305(f).
3.
Inspections for which no fee is specifically indicated
(minimum charge one hour).
4.
Additional plan review required by changes, additions or
revisions to approved plans (minimum charge one hour).
$12.00
$ 1.20
$60.00/hour
$60.00 each
$60.00/hour
$60.00/hour
5. When the project requires a plan check of the mechanical plan, a plan check fee,
equal to 25% of the calculated mechanical permit fee, shall be paid.
Occupancy
Apartment Houses
Apartment Houses
Apartmentl:iouses
Apartment Houses
Banks
Banks
Banks
Banks
Ban ks
Banks
Banks
Car Washes
Car Washes
Car Washes
Car Washes
Churches
Churches
Churches
Churches
Churches
Churches
Churches
Convalescent Hospitals
Convalescent Hospitals
. Convalescent_Hospitals
Convalescent Hospitals
Dwellings ***
Dwellings "''''*
Dwellings "''''*
Dwellings ***
Dwellings ...
Dwellings ***
Dwellings. ***
Fire Stations
Fire Stations
Fire Stations
Fire Stations
Fire Stations
Fire Stations
Fire Stations
Fitness Centers
Hospitals
Hospitals
Hospitals
Hotels & Motels
Hotels & Motels
Hotels & Motels
Hotels & Motels
Hotels & Motels
Industrial Plants
Exhibit B: Valuation Schedule
Type af Canstruction
i*Typel_orll~F.R. _n_ $
ITYPEl.Vor III (iV18_sonry) $
iType V Wood Frame - _n, $
i-ryjie I Basement Garage-- $
*Type I or Tf::F.R- $
,TXl'eIl1-Hour j$__
,1)peJl:-N i $$- -
TypelllJ.:f:I()ur
Type III:N j $
T}i!'eV 1-Hour__ 1$
Txpe V-N. --T$
l"}ipe 1I11-Hou..r. i $
.i
jT}i!'El.III-N ,$
,Type V 1-Hour T:j;
IT}ipe V-N . $
Type I or II-FR. . $
Type 1I1:l:iour $
l)!,eU-N n __ . $
Type 11I1-Hour . $
Typelll:N ; $
TY!l.e_\l1-Hour t' $
.IType V-N~=~ .~ 1$ __-.~__.
~::elll{~~~ft_-~ $
Type 11I_1-H()ur --~iC__
T}i!'.e.V.1:Hour ,1.__
I~~~~~~~~;~a~~___ ..1 ;$$
j Basemer't~Jsemi-finish..e.dl_ .
Additions - Wood Frame ' $
Solariums . -.$
.C:8bf1na - '=.ooD:louse (Type V) _ -- $
Txpel or II-F,R. _ ... $
Type II 1-Hour $
Type II-N _.. $
. Typelll1.-l:iour $
Type III-N . $
i+t~~{~Hour~jr
ISame valu_esas Office Buildings i
I;Type I or II-F.R $
- . t-Type 1l11-tiol.ir~_~ . _ _~$
I Type.'V..1-Hour . ...._~$ _ .
*T }ipe I orll:F.R. $
Type 11I1-Hour . $
,Typelll-N - -1$-
1-----------,--------
-tl"ype V 1 :Hour_ L $
TyP.El..V-N_ . $
Tel or II-F.R. $
Ordinance No. 638
Page 10
Valuatian
120.83
98.66
90.90
----------
42.13
164.07
120.83
117.51
-----------
133.03
128.59
------------
120.83
116.40
77.60
74.27
66.51
62.08
109.75
83.14
78.71
89.79
85.36
84.25
-----------
78.71
154.09
107.53
109.75
103.10
---..---
135.24
---------
107.53
- -------------
101.99
25.50
121.94
103.10
95.34
126.38
83.14
78.71
90.90
87.58
85.36
80.92
180.69
149.65
143.00
-------------
111.96
97.55
92.01
-------------
84.25
83.14
63.19
Occupancy
Industrial Plants
Industrial Plants
Industrial Plants
Industrial Plants
Industrial Plants
Industrial Plants
Industriai Piants
Medical Offices
Medical Offices
Medical Offices
Medical Offices
Medical Offices
Medical Offices
Medical Offices
Offices
Offices
Offices
Offices
Offices
Offices
Offices
Private Garages
Private Ga~alles
Private Garages
Private Garages
Publ~c Buildings
Public Buildings
Public Buildings
Public Buildings
Public Buildings
Public Buildings
Public Buildings
Public Gara(les
Public Garages
Public Garages
Public Garages
Public Garages
Public Garages
Restaurants
Restaurants
Restaurants
Restaurants
Schools
Schools
Schools
Schools
Schools
Schools
Service Stations
Service Stations
Exhibit B: Valuation Schedule
Type of Construction
Type II 1-Hour
.TYlleU~_(Stock)
!-Type 11I1-Hour
'Type III-N
lf~}~~1~~our
: Type \/-N___
*Type I or II-F.~.
Type II 1-Hour
Typeli=i\i-
IType 1I11-Hour -
Typell~f\J___
Type V 1-Hour ,
Type V-f\J
*Type I or II-F.R.
IY!'ElII 1-Hour
Type II-N
!type-Ijli-Hour
IType III-N
tType V 1-Hour
,Type V-N
jlwoolfFrame - Finished'
WOOd_F!all1_e- UnfinishEld
! Masonry _
,_OEenCarports_ _
__*Type I or II-F,~._
iType 1I1-Hour
I'Type II-N
TypeI1l1~t:iolJr
'Type III-N
_ Type V 1-Hour_ ,
Type V:f\J ____
,*Type I or II-F.R.
i -typelor II Open, Parking
t "'--
I Ty!,ell:N
,Type 11I1-Hour
[Type III-N '"
I Type\! 1=Hour
Type 1I11-Hour
Type III-N
TYflEl\/_1:Hour
TYlle V-N__
!Typelor II-F.R.
;TY!'ElII 1-Hour
Typell11-Hour
T ypIJIII:f'.l
,Type V1:liour
~Type V-N
I Typel!:lIl_
T e 11I1-Hour
$
I$-~~ -
j ~
:$
- -" - -----
i$
----------..---
$
$
---1 $
$
$
$
$
$
$
$
$
$
,$
:$
$
$
$
. $--
$
1--- ---
, $
-~-H
1$
,
$
$
----~$
- I -
I t__
L$
, $
1$
j---
1$
ul$
$
$
$
,$
$
"f
$
$
l---
! $-
,$
$
$
Ordinance No. 638
Page 11
Valuation
44.34
41.02
48.78
45.45
33.26
-- --------..-
45.45
-----------
42.13
133.03
-------.-----..-
101.99
97.55
110.86
103.10
99.77
96.44
118.62
79.82
75.38
85.36
82.03
79.82
75.38
26.61
26.61
31.04
18.85
136.35
---- ------...-
110.86
106.42
115.29
110.86
105.31
101.99
54.32
_n______
41.02
- ----- ---..-
31.04
41.02
36.58
37.69
108.64
104.20
98.66
95.34
123.05
84.25
89.79
86.47
-----------
84.25
80.92
74.27
77.60
Exhibit B: Valuation Schedule
Occupancy
Service Stations
Service Stations
Stores
Stores
Stores
Stores
Stores
Stores
Stores
Stores
Theatres
Theatres
Theatres
Theatres
Theatres
Warehouses **
Warehouses **
Warehouses **
Warehouses **
Warehouses **
Warehouses **
Warehouses **
MISCELLANEOUS
Agricultural Building.
Aluminum Siding.
Antennas
Antennas
Awning or Canopy
(supported bybuilding)
Awning or Canopy
(supported by building)
Balcony
Decks (wood)
Demolition of Building
Fence or Freestanding Wall
Fence or Freestanding Wall
Fence or Freestanding Wall
Fence or Freestanding Wall
Fence or Freestanding Wall
Foundation Only (25% of value of whole
building). Remainder of building will be I'
valued at 75% of the building
Greenhouse
Manufactured Housing (25% of
value of "site buill" house)
Mobile Home
Patio
Patio
Patio
Patio
Type of Construction
Type V 1-Hour $
Canopies i $
j*Type.lor II-F,R. . $
'Typell 1-Hour , $
lype II-f\! -. i$--
;Type 1I11-Hour ' $
iType III-N $
. TypeVJ:Hour., .j $
ITypeV:N" '" ,,$
rRet;JjIGardEln. CenteUType.II:N)~$
Type I or II-FR. I $
IType 1I11-Hour " $
Type III-N . $
TypeV 1-Hour $
Type V-N ; $
j TypeJ orll--F.Ft +$
iType 1I1-Hour $
IType II-N $
iType-jIl1:Hour $
Type III-N $
"- -+-
;T, YP,',e V 1:f:lour J,~,,'
ITypeV-N 1$
$
,$
1$ -
+$
'I Radio over 30 ft. high
D~sh, 10 ftdia.w/decoder
IAluminLJm
i
, Canvas
$
$
$
H
..-.1
$
1$
j]
1$
- '$
$
I
i
Wood or Chain Link
I -----
IWOOd Fr<l.me with Stucco
,Wire
: Mas~nry
Wrought Iron
$
J$
1$
$
1 $
i.
$
$
i
,
I
'Wood Frame with Cover
------- -----
Metal Frame with Cover
JWoodFrame-Cover &I,\ialls'-
I Metal Frame Cover & Walls
Ordinance No. 638
Page 12
Valuation
66.51
31.04
90.90
55.43
54.32
67.62
64.30
57.64
53.21
44.10
121.94
88.68
84.25
83.14
78.71
54.32
32.15
31.04
36.58
35.47
32.15
31.04
18.85
5.54
3,569.54
4,339.98
21.06
8.87
14.41
14.41
4.43
2.22
5.54
2.22
8.87
5.54
5.54
24.39
24.39
8.87
11.09
12.19
14.41
.. rCast:in-pl~ce c.9.ncrete pITes_
... 'Ste~IFile.s._m
Alterations to Existing Structures
(with no additional Floor Area or Roof Cover!. .
Interior Partition 1 $ 53.21
Install Windows orSlidin\l. Glass Doo~sll 16.63
Close E)(teri~rh~~~~~;i~g~ .m __t8~D,b_oicomPlele~~52
"Deduct 11 percent for mini-warElhouses. u. . _ _ m
***For subdivisions with 1 0 o~more single:famii}'dwel~ngsll'o'hichJ1i3vefJl,m check 8rld building pe.r
groups of 10 or more, the valuation of the plan check and building permit fees may be decreased b
-. -- -------- ---T---
Exhibit B: Valuation Schedule
Occupancy I Type of Construction I
Patio Screen or Plastic Walls , $
Plastering Inside . i $
Plastering ! OLJts.ide __ __ -t $
Retaining Wall IConcre~or M.asonry. $
Reroofing (1 square = 100square feel!. Built:up _ _u. -I~, $$.
Reroofing (1 square = 100 square feet) I Composition Sllingle_s
Reroofing (1 square = 10o.square feet) .j'AFiSbbeergstlaoss..scSehmi.r1.e9.nlteSsh-I'-ngleS -tL'......$$...
Reroofing (1 square = 100_squarefeetL
Reroofing (1 square = 10o.squar~ fee!L 'Wood Shingles (Class C min) $
Reroofing (1 square = 100squi3re fee.t),^,o()d~hakes-(CI<3js Crn:ir1)ml $__
Reroofing (1 square =.!.OO square f.eet) IAluminum Shingl~___, L
Reroofing (1 square = 100 square fElet) 'ICc--oI8nYcTr.e.il.tee.. TI'le- ___I, $$_
Reroofing (1 square = 100sguare_feet)
Roof Structure Replacement' 'I L
Saunas(Steam) , $
Spa or Hot Tub ("Jacuzzi@") $
Stairs j $
Stone and Brick Veneer I I $
Storage Racks 'per CF'$
Swimming Pool (per sf surface area) Vinyl-lined , $
~::~~:~~ ~~~: f~:; :H~~:6~:;:~l .1 ~i~:~I~SS_ _ --I ~.-
Medical offices, restaurants,
Tenant Improvements Ihazardous. 'h'.c>cGupa_ncies__ ! $
Tenant Improvements_ _JOthersuch.~s stores &_offices +$
General Additions and Modifiers
Fire Sprinkler System _
Air Conditioning-Comm.e.rcial
Air ConditioninJj-Rellidenti;cl1
FirepI8ce-Concre.te or masonry
Fireplace-prefabricated metal
Pile Foundations
Pile Foundations
--I
,
1$-
$
f$
-$
$
I -
$
$
I
,
Avera e Increase
Ordinance No. 638
Page 13
Valuation
3.33
3.33
3.33
17.74
135.24
126.38
126.38
300.42
300.42
300.42
453.40
--- --
380.23
-- --
321 .48
14.41
--- --
. 8,909.c44
u 7,309.80.
14.41
8.87
1.11
34.37
37.69
41.02
46.56
34.37
2.88
4.66
3.88
3,569,54
2,426.62
-. -
23.28
57.64