Upcoming Agenda Deadlines
Council Meeting Staff Reports Due Agenda Posted
August 17 August 2 August 10
September 7 August 23 August 31
September 21 September 2 September 14
Public Records Requests
Name Subject of Request Date Closed
PRR 2021-099
Cohen, Brittany
Requesting any and all documents and complaints pertaining
to Isabella Parkinson and residence 16619 Orchard Bend Rd
Poway CA 92064 between dates 5/20/2021-5/28/2021
7/14/21
2021-113
Friedman, Assi
1) All email communications with email Ms. Cynthia Elizondo at
email Cynthia@cynthiaelizondo.com. This request includes all
and any city staff, city council, and mayor. 2) Any email
communications in which Ms. Cynthia Elizondo is mentioned,
i.e. internal emails/memos. 3) Responsive materials should be
in the date range of 1 April 2021 to 30 June 2021.
Extension
notice sent
7/21/21
2021-115
Partner Engineering
and Science Inc.
13500 Danielson Street
Fire Record of ´” Notice of Violation or Notice to Comply” against
the property. A history of the property inspections by the fire
department. Any other records related to the following for the
property.
Building Record of “Notice of Violation or Notice to Comply”
against the property. A history of the property inspects by the
building department. A copy of the original core/shell Certificate
of Occupancy and it’s issued date. Any open building department
permits.
Zoning A record the current zoning designation for the property
and that it’s compliant with the current designation. A record of
“Notice of Violation or Notice to Comply” against the property.
Any record of “Activity and Use Limitations (AUL)” related to
environmentally hazardous conditions” associated with the
property.
7/21/21
City Clerk’s Office Page 2 of 4
Public Records Requests continued
Name Subject of Request Date Closed
2021-116
Mandell, Mike
Application for permit and subsequent permits related to
15362 Skyridge dating back to 2009; building/property
inspections requested/ performed back to 2009 and
findings/code violations; and blueprints on file for new house
built on 15362 Skyridge following Witch Creek Fire.
7/14/21
2021-117
DI Drafting & Design
Structure permits for 14321 Twin Peaks Rd., 14305 Twin Peaks
Rd., and 14437 Ortez Pl. 7/14/21
2021-118
Greer, Natasha
Environmental/Soil Reports for Poway Commons, Outpost,
Fairfield, Lots 13010, 13020 and 13036. 7/20/21
2021-119
DRN Definite
Solutions
Any open permit, open code / building violations, code
enforcement lien on 13110 SUDAN RD POWAY CA 92064, Lori
Cota.
7/21/21
2021-120
American
Geotechnical
Review/obtain copies of any geotechnical reports, grading
plans & reports, and foundation plans for the residential
address: 14123 Ticia Street, Poway.
7/22/21
2021-121
Center for Contract
Compliance
2021-2022 Citywide Striping, Contract #21013
Information on contractor, subcontractors, original bid
advertisement and proof of publication, DIR Project ID.
7/22/21
2021-122
MADesign &
Drafting Services
Any and all files related to APN 320-020—2700, Original MDRA
04-007, Address: 11545 Creek Road, Poway, CA. This site was
originally approved and constructed via a MDRA and Flood
Plane Development. I would like to review all documents that
were submitted, reviewed or approved during the plan review
process. Homeowner & requested will be in attendance once
documents are available to review.
7/21/21
2021-123
Center for Contract
Compliance
Landscape Maintenance Services – Various Locations
Information on contractor, subcontractors, original bid
advertisement and proof of publication, DIR Project ID.
7/20/21
2021-124
Center for Contract
Compliance
FY 2019-20 Corrugated Metal Pipe Annual Repair, Contract
20012. Landscape Maintenance Services – Various Locations
Information on contractor, subcontractors, original bid
advertisement and proof of publication, DIR Project ID.
7/21/21
2021-125
Friedman, Assi
All emails from Councilmember Dave Grosch's email account
dgrosch@cox.net relating to Poway City business from the year
2021. A copy of the City of Poway document retention policy
demonstrating private email accounts, phones, etc. are
maintained consistenly with state law. Evidence from Cox
cable Councilmember Dave Grosch has not destroyed public
record.
Extension
notice sent
7/21/21
2021-126
Scott, Jeffrey
Copy of a list of the top 100 water users in the City of Poway for
the years 2019 and 2020. Names only is fine. Not requesting
billing information or contact information, just a list of the
entities themselves.
7/21/21
2021-127
Sandoval, Kevin
Precise Grading Plans and Building Permit for the lot at 13609
Twin Peaks Road, APN 3141927200. Design Review Plans; City
of Poway Approved Plot Plan #P71-40W, CUP 87.03 and
Development Review 87-05.
City Clerk’s Office Page 3 of 4
Public Records Requests continued
Name Subject of Request Date Closed
2021-128
Partner Engineering
and Science Inc.
Properties: 12425 Oak Knoll Road, Poway and 0 Pomerado
Road, Poway, Parcels: 3175502000 and 3175551900.
Requesting information on any open zoning code violations;
open building code violations; copies of available certificates of
occupancy (and if not on file, is this a code violation?), copy of
approved site plan on file, if available, information on any open
fire code violations and information on any roadwork or
construction that may impact the property.
2021-129
WEXCO International
Any and all building permits, inspection records, code
enforcement/violations (new and old), certificates of
occupancy and Plsn for review for 13475 Poway Road, Poway.
2021-130
GG Homes
OPEN and CLOSED Residential Code Violations between June
16, 2021 and July 23, 2021
2021-131
SmartProcure
All purchasing records from Jun 30, 2018 12:00 AM to current.
The request is limited to readily available records without
physically copying, scanning or printing paper documents.
Any editable electronic document is acceptable.
The specific information requested from your record keeping
system is:
1. Purchase order number. If purchase orders are not used a
comparable substitute is acceptable, i.e., invoice,
encumbrance, or check number
2. Purchase date
3. Line item details (Detailed description of the purchase)
4. Line item quantity
5. Line item price
6. Vendor ID number, name, address, contact person and
their email address
2021-132
Do, Jonathan
Copies of permit or structural plan for suite D4/D5 at 15525
Pomerado Road. APN 2754606521 and 2754606525.
2021-133
Olps, Chris
Copy of Letter from Mayor Vaus mentioned at 7/20/21 City
Council meeting.
2021-134
Olps, Chris
Communications from all current council members from their
first day in office including past council member Cunningham
back to 2012 re. Clearwell upgrades etc…Water treatment
upgrades etc. Water system upgrade etc.
2021-135
Olps, Chris
Any communications with the city regarding the Skate Park
including communications with any staff or council from any
non city connected person from 2010 to now, preferably from
2003.
2021-136
Olps, Chris
All communications and records between Bob McKeon and
the City (staff) and between Dave Grosch and Steve Vaus from
2018 to present.
City Clerk’s Office Page 4 of 4
Public Records Requests continued
Name Subject of Request Date Closed
2021-137
Murbach Geotech
Review of geotechnical reports, specifically Geotechnical
Investigation reports and/or As-Graded Geotechnical reports
for properties at the south end of Adah Lane. Parcels at or near
APNs 323-262-33 through 36; APN 323-290-1700.I do not need
copies of all the documents. Review the documents, take notes
and possibly copy a few pages.
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Wendy Kaserman, Assistant City Manager
DATE: July 28, 2021
SUBJECT: Community Services Department Bi-Weekly Report
Upcoming Date Time Location
Night Fishing
(shoreline only)
July 30 & 31 6:00pm-11:30pm Lake Poway
Family Campout July 31-Aug 1 6:00am-9:00am Lake Poway
Summer Concert Series:
Highland Way
Aug 1 5:30pm-7:00pm Old Poway Park
Fall Class Registration Aug 3 7:00am Online or In-Person
Night Fishing
(shoreline only)
Aug 6 & 7 6:00pm-11:30pm Lake Poway
Summer Movies in the Park
Series:
Raya and the Last Dragon
Aug 7 6:00pm-9:45pm Community Park
Summer Concert Series:
Pop Vinyl
Aug 8 5:30pm-7:00pm Lake Poway
Night Fishing
(shoreline only)
Aug 13 & 14 6:00pm-11:30pm Lake Poway
Summer Concert Series:
Benedetti Trio
Aug 15 5:30pm-7:00pm Old Poway Park
It may be hot and sticky outside, but we are prepped and ready to go for fall! The Fall Community
Services Guide is published and uploaded to our website: Fall Poway Community Services Guide.
Fall class registration begins next week on August 3.
A little bit of rain didn’t put a damper on attendance at the movie or concert this past weekend. 300
moviegoers enjoyed Onward on the big screen at Community Park, while 1,000 concertgoers danced
the night away at Lake Poway to classic hits performed by the Blue Breeze Band.
With both the start of summer and COVID requirements dropping at the same time, the Swim Center
has experienced a 200% increase in attendance. In the past five weeks, there have been 18,482
entries. Additionally, we’ve hosted 592 group swim lessons with 536 unique participants, 137 private
lessons, and over 188 hours of aquatic youth sports reservations (swim, dive, and water polo) with
190 athletes.
In anticipation of reopening in September, PCPA staff is working to re-launch several business
processes. In the last two weeks, staff attended several software trainings related to box office
ticketing, client management, and website content management. Additionally, interviews for all
performance support positions (box office, front of house, and stage technician) are in-progress.
CSD Bi-Weekly Report
July 28, 2021
Page 2
Night Fishing from the shoreline continues to be a big hit every Friday and Saturday at Lake Poway.
Anglers have until September 5 to reel in the big one. A total of 6,200 pounds of catfish will be
stocked throughout the season.
Park staff is hosting the annual thank you dinner for Old Poway Park Action Committee (OPPAC)
presidents this Sunday during the Summer Concert. OPPAC volunteers contribute close to 15,000
hours yearly to park operations and events, and the presidents coordinate volunteer involvement.
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Bob Manis, Director of Development Services
DATE: July 28, 2021
SUBJECT: Director’s Notes
HOUSING
Monte Vista Housing Site
For round two of the solicitation for an affordable housing development, all three invited respondents
submitted a proposal. The Review Committee met July 13th to discuss and review the final
proposals. In conjunction with staff review, a consultant evaluated the financial component of the
submittals for completeness and initial financial feasibility of the project. Staff met with the consultant
on July 15th and discussed their findings. Presentations and interviews with respondents are
scheduled to be held August 10th. If a respondent is selected, staff will seek Housing Authority
approval to enter into an Exclusive Negotiating Rights Agreement in September.
PLANNING
New Single-Family Residence at 0 Misty Meadow Road
On July 15th, a Minor Development Review Application was submitted to construct a 4,175 square-
foot (sf) single-family residence with a 1,195-sf garage on a vacant 40-acre property in the Rural
Residential A zone.
Building Plan Check Submittal for Mixed-Use Development by Fairfield
On July 19th, Fairfield Poway, LLC submitted building plans for the plan check of a five building,
mixed-use development at 12845-12941 Poway Road (Carriage Center and Poway Fun Bowl sites),
with 212 residential units and 11,364 square feet of commercial space.
New Single-Family Residence at 13510 Willow Run Road
On July 21st, a Minor Development Review Application was submitted to demolish an existing single-
family residence and construct a new 2,503 sf single-family residence with an attached 663 sf garage
on a one-acre property located in the Rural Residential C zone.
New Accessory Dwelling Unit (ADU) at 14299 Hacienda Ln.
On July 8th, a building permit was issued for a 1200-sf detached ADU and a 183-sf patio cover.
New ADU at 12343 Spyglass Ter.
On July 6th, a building permit was issued for a 539-sf remodel of a portion of the existing dwelling
into a two-bedroom ADU.
New Single-Family Residence and ADU at 12893 Glen Circle Dr.
On July 20th, a building permit was issued for a 6,235-sf single-family residence, an attached 895
ADU, a 900-sf patio cover, and a 1,135-sf garage.
Director’s Notes
July 28, 2021
Page 2
Tenant Improvements at 13125 and 13225 Danielson St. (Thysenrupp Bilstein of America)
On July 21st and 22nd, building permits were issued for an 8,080-sf and a 3,680-sf tenant
improvement for Thysenrupp Bilstein of America. The company manufactures motor vehicle parts
and accessories.
CAPITAL IMPROVEMENTS
City Hall HVAC Controls Replacement Project
The contractor has completed the cutover of the chiller and boiler to the new control system. They
will be presenting the final graphics for the new interface to Public Works for approval prior to turning
the system over to the City.
2020-21 Street Overlay Project
The contractor has completed all contractual work including the reconstruction of the accessway
around Reservoir 8.
Public Works Fleet Maintenance Equipment Lift Project
The foundations and slab that the lift will be placed upon were placed on July 26th. The contractor
took concrete cylinders to test to determine the earliest possible time the lift equipment could be
placed on the new slab.
Lake Poway CDBG ADA Pathways Project
The contractor mobilized on site and completed survey work last week. Clearing, grubbing and
grading will commence this week. This project will address ADA issues with the ADA parking stalls
and accessible path of travel in the volleyball courts area at Lake Poway Park.
Bowron Road Sewer Upsize
The contractor has requested and been approved to work extended hours until the end of July to
complete the work fronting Valley Elementary before school starts on August 2nd. Additionally, the
contractor has submitted a request to move a manhole currently proposed in front of the school north
of the driveways in order to expedite construction fronting the school and reduce bypass/construction
equipment obstructions.
Clearwell Distribution Flow Meter Project
The contractor completed startup, testing, and calibration of the new flowmeter on July 20th. The
concrete repairs to the vault walls shown below have been completed and conduit and piping have
been installed. The project will be considered complete after successful operation of the meter over
a 7-day period and proceed to Council for acceptance.
Director’s Notes
July 28, 2021
Page 3
Boulder Mountain No. 1 & 2 Reservoir Rehabilitation
The contractor completed coating both tanks July 16th and are installing the remaining tank
appurtenances this week. Staff is coordinating with Public Works to have them install valves for the
sampling ports on July 27th. The contractor is tentatively scheduled to wash and disinfect the tanks
on August 2nd and 3rd.
LAND DEVELOPMENT
Poway Commons (G20-0007)
City staff received and approved the precise grading package for the proposed residential and mixed-
use development on parcels on the south side of Poway Road near Quate Court and Civic Center
Drive/Tarascan Drive. The applicant has been directed to submit mylars.
Scheinblum Residence (G21-0008)
City staff received the first submittal for the grading associated with the development of a new single-
family residence and ADU on Heritage Drive.
Heritage Drive (WI21-001)
City staff received the first submittal for the improvement plans associated with the proposed fire
hydrant in support of a new single-family residence and ADU on Heritage Drive.
Nathanson Residence (G20-0011)
City staff has received a request for a 2nd construction change to the grading plans for the relocation
of the bio-filtration basin and creation of an additional pad area on the lot for the proposed single-
family residence at the end of Del Poniente Road.
Director’s Notes
July 28, 2021
Page 4
Buswell Residence (FLD21-0002)
City staff issued a floodplain development permit for the construction of a pool in the floodplain at a
residence at 16505 Orchard Bend Road.
Dixon Residence (FLD21-0003)
City staff issued a floodplain development permit for the construction of a pool in the floodplain at a
residence at 16831 Orchard Bend Road.
Norris Residence (G20-0019)
City staff approved the 2nd construction change to the grading plans for the relocation of the
guardrails on a proposed single-family residence on St. Andrews Drive.
Nguyen Property (ESMT20-017)
The applicant has submitted a revised legal and plat for 2nd review of a proposed water easement
for the extension of the water main and addition of a fire hydrant along Oak Canyon Road.
Fairfield Grading Plans (G21-0007)
City staff returned comments on the 1st submittal of the onsite grading plans for the Fairfield mixed-
use redevelopment project.
Garden Road (FLD21-0004)
City staff issued a floodplain development permit for the temporary material storage area within a
parcel on Garden Road. The temporary material storage area is associated with the Bowron Road
sewer upsize project.
STORMWATER
Los Penasquitos Water Quality Improvement Plan (WQIP) Annual Report
City staff has received the review comment letter from the Regional Water Quality Control Board for
the Los Penasquitos WQIP Annual Report submitted in January of 2021 with the other Copermittees
in the watershed. Staff is in the process of reviewing the letter, along with the other Copermittees
and preparing responses to the questions, comments and requests for information from the Board.
Construction General Permit
A revised draft of the State Water Board Construction General Permit (CGP) has been released for
public review and comment. A key goal of the proposed permit reissuance is to incorporate
Wasteload Allocations (WLAs) from adopted Total Maximum Daily Loads (TMDLs) that identify
construction as a source. These pollutants include sediment, metals, pesticides, bacteria,
temperature, nutrients, chloride and salts. Additional goals of the revised permit include revisions to
monitoring and reporting requirements, including the definition of storm events that need to be
sampled, increasing the information required with termination to expedite the approval process and
incorporating the trash provisions.
On August 4th, the State Water Board will hold a public hearing to hear oral comments regarding the
CGP permit reissuance. Written comments are due August 13th by noon. An adoption hearing has
not yet been scheduled. The California Stormwater Quality Association (CASQA) is preparing
comments and testimony.
Director’s Notes
July 28, 2021
Page 5
INSPECTION
General Atomics Addition A 42 Thunder
Kirkham Way (DR20-006) - The contractor completed the concrete for the revised loading dock and
water tanks. Construction of the overhead canopy for the water tank is ongoing. Last week the
contractor began placing structural steel and waterproofing for the canopy.
StoneRidge Country Club Demolition
Espola Road (RW20-0160) - Work continues to take place demolishing the tennis courts. The City
has received complaints that a resident had thought that explosives were being used. No explosives
have been used. The resident was contacted, and the method of demolition was explained. Another
resident had complained that the demolition damaged his property. Inspection met with the resident
and explained the method that the contractor was using to break the concrete. The inspector
provided the resident with the contractor’s contact information for any possible claim action.
Poway Commons
Poway Road (G19-0011) (STI20-002) - With the concrete cross gutter at Poway Road and Tarascan
Drive complete the contractor ground down two-inches of asphalt, removing and replacing 2/3 of
Tarascan Drive. This work covered the entire area affected by underground construction. Both
coats of striping have been placed and the new curbs have been painted. The contractor also began
asphalt restoration for the utility trenches along Poway Road. That work was not completed and is
expected to resume this week. The retaining wall at the north and west property lines on the northern
parcel, north of the Poway Commons affordable housing project, are being installed. Reinforcing
steel and concrete footing placement were completed, and the contractor is now working on block
placement. The contractor has requested occupancy for the homes along Civic Center Drive. This
week the inspector met with the owner and contractor and created a punch list for occupancy
approval of phase 1 (along Civic Center Drive).
Advani Residence
Riparian Road (MDRA19-012) - A list was generated and given to the owner to aid in the close-out
portion of the project. Last week the inspector performed the final inspection and confirmed all items
are complete. The occupancy form has been signed and the project file will be delivered to the
project manager for final close out.
Director’s Notes
July 28, 2021
Page 6
Creekside Plaza / The Habit Burger Grill
Poway Road (G19-0013) - Construction is nearing completion. Punch list work continues, the
contractor has completed all paving, slurry seal, and striping. The project inspector still needs to
conduct the punch list inspection for all surface and underground storm drain system improvements.
Outpost
Poway Road (STI18-001) (G18-0002) - This week the contractor removed all equipment and
construction debris from the existing sidewalk. The construction fence was relocated to behind the
existing sidewalk. The contractor removed damaged sidewalk areas and placed concrete for the
temporary sidewalk along Poway Road. The sidewalk is now re-open.
SDG&E 16” Gas Line Installation
Pomerado Road (RW20-0036) - Work along Pomerado Road continues with two crews working in
separate locations. The southern crew is now working north of Ted Williams Parkway. They will be
working south of Ted Williams Parkway for a portion of this week to bring the fiber optic cables to the
side of the roadway (into a vault). Additional pipe has been installed to the middle of Colony Way.
The pipeline has been welded and is expected to be backfilled this week. SDG&E has informed the
contractor that they no longer want the contractor paving on Fridays. The paving typically runs late,
and they do not want the contractor working late on Fridays. As the pipeline goes past Colony Way,
the pipeline will cross Pomerado Road and then continue north in the southbound lanes.
The northern crew is working to cross Pomerado Road just south of Monte Vista Road. The
contractor was not allowed to work in this area on the City’s dark Friday as they would be excavating
around the City’s wet utilities, which is not allowed during dark Fridays. The contractor was able to
continue to work on the southbound lanes but short of the intersection so traffic lights would not need
to be switched to 4-way flash.
AT&T Small Cell Pole Replacement
Various locations (STI19-002) - After several months of lead time the approved wire was received
and installed. All punch list items were completed and inspected. The project file has been delivered
to the project manager for close out.
Pedestrian Traffic Signal
Kirkham Way (STI20-003) - Last week the contractor started potholing the existing utilities along the
proposed bore path and pole locations. Several conflicts were discovered when underground utilities
and unidentified slurry was found. The first conflict was the pole on the south side of Kirkham Way.
This was alleviated by moving the pole slightly to the west. The second conflict was at the pole on
the north side of Kirkham Way. This will take more effort to correct, and several ideas were submitted
for consideration. Last week the conduit for the project was installed, which crosses Kirkham Way.
St. Bartholomew’s Church
Pomerado Road (G21-0004) - A preconstruction meeting is scheduled for this week. Work includes
demolition of the existing parish hall and columbarium access walkway, and construction work
includes expansion of the existing parking lot, a new columbarium access walkway, and expansion
of the existing playground.
Agamirzoyan Residence
Bryce Point (MDRA18-030) - A request for occupancy was received. A final job walk/punch list
inspection was performed, and only minor issues were noted. A re-inspection was performed later
in the week and all items had been addressed. The occupancy request has been signed by the
inspector and delivered to the project engineer for final close out.
Director’s Notes
July 28, 2021
Page 7
Norris Residence
St. Andrews Drive (G20-0019) - The site walls have been excavated, inspected, and approved by
the geotechnical representative and the special inspector. City inspection was not able to perform
an inspection as the proposed walls had been changed and the construction change plans are under
review by the project engineer.
SCHEDULED ROAD/LANE CLOSURES
Sidewalk closure south side of Poway Road between 13301 and 13245. Work is related to
the Outpost project.
Possible lane closure on Espola Road between Twin Peaks Road and Titan Way in both
directions for the undergrounding and removal of overhead utilities associated with the
Espola Road Safety Improvements project.
Possible lane closure on Poway Road between Tarascan Drive and Carriage Road, and
Tarascan Drive between Wanesta Drive and Poway Road both directions for work related to
the Poway Commons project.
Possible lane closure Pomerado Road from Leone Way to 200 feet north of Stone Canyon
Road both directions for work related to the SDG&E gas main installation project.
Possible lane shift or lane closure Espola Road from Twin Peaks Road to Mountain Road
northbound lane for work related to an SDG&E undergrounding electric.
Possible lane closure on Kirkham Way between General Atomics Way and Stowe Drive both
directions for work related to the General Atomics traffic signal/crosswalk project.
Lane closure on Twin Peaks Road eastbound #2 lane between Pomerado Road and Ted
Williams Parkway for tree work for the Regency Center.
1 of 2
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Aaron Beanan, Director of Finance
DATE: July 28, 2021
SUBJECT: Finance Department Director’s Notes
Finance
• Deadline for FY21 invoices to be entered and approved is 12:00 p.m. on August 24
Information Technology
• PCs Replacements
o PCs continue to roll out by Division
o IT is looking to hire another volunteer intern
• EnerGov – On schedule for November deployment
o Department staff continue testing/modifying configuration through July
o Tyler Cashiering implementation will begin in August
General Support Services
Requests for Proposals:
RFP Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded RFP Awarded Vendor Council Award Date
RFP 21-029 Grove Management & Maintenance Services TBD N/A $106,243 TBD TBD TBD
RFP 21-031 Generator & Switchgear Maintenance Services 6/21/21 2:00 p.m. N/A $104,106 $50,401.45 Bay City Electric 8/3/21
RFP 21-032 Design Services for the Clearwell Replacement Project
7/7/21 4:00 p.m. N/A $298,780 TBD TBD 8/17/21
2 of 2
RFP Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded RFP Awarded Vendor Council Award Date
RFP-22-001 Fire Suppression Equipment Services 7/19/21 2:00 p.m. (PW Admin)
N/A $12,776 TBD Fire Service Corp. 8/17/2021
RFP 22-002 As-Needed Legal Services for Poway Housing Authority
8/23/21 (City Hall) N/A $13,833 TBD TBD 9/21/2021
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Jon Canavan, Fire Chief
DATE: July 28, 2021
SUBJECT: Fire Department Management Staff Notes
ADMINISTRATION
FIRE PREVENTION
EMS / TECHNOLOGY
Activity # Activity #
Administrative Remedy Letters (ARLs) 0 Meetings Attended (DRC, Mgmt., Council) 1
Business License Reviews 12 Permit to Operate Inspections 25
Businesses invoiced (Permit to Operate – ex.
Cutting and Welding, Places of Assembly, etc.)
0 Plan Reviews (FSS, MCUP, CUP, DR, Grading,
Landscape, MDRA, Street Improvement)
13
Customer Consultations (Phone, email,
Counter, Field)
51 Site Visits 1
EOC Sessions Attended 0 Temporary Use Permit 6
Fire Inspections - Fire & Life Safety,
Construction, New Business
48
• Administrative staff completed relocation of offices to City Hall on 7/16.
• Chief Canavan attended monthly meeting of the SD Operation Area - Metro Zone Chiefs.
• Updated the Memorandum of Agreement (MOA) with General Atomics Aeronautical Systems, Inc and
provided them with a copy.
• Chief Canavan has assumed Fire Marshal duties while Chief Post is away on leave.
• Submitted medical supply pricing to Customer Services for the current fee study.
• Submitted 2021Q2 NFIRS data to state. The Fire Department sends quarterly response reports to
the State of California for data collection.
• Attended Base Station Physician Committee and Prehospital Audit Committee meetings.
• Attended San Diego County Fire Chiefs Association EMS Section meeting in San Marcos.
FD Management Staff Notes
Page 2
• Between Monday, July 12th and Sunday, July 25th, personnel completed 304 hours of training
and activities. Topics included 150 hours of Company Training, 56 hours of Officer Training, and
43 hours of Facility Training.
OPERATIONS
TRAINING / SAFETY
TRAINING &
PROFESSIONAL
DEVELOPMENT
HOURS
• Between Monday, July 12th and Sunday, July 25th, the Fire Department
responded to 169 incidents.
• Engine OES421 is assigned to the Dixie Fire in Northern California. The Fire Station 2 crew is
part of a County strike team.
• Brush 3763 returned from BitPros where the engine had some repair work completed for the fire
pump.
• Water Tender 3751 is out of service for a water leak at the pump. Fleet Services is working on it.
• Completed work on Truck 3773 due to failing cab lift mechanism.
FD Management Staff Notes
Page 3
TRAINING / SAFETY - CONTINUED
DISASTER PREPAREDNESS
• Coordinated and conducted a meeting with all Captains to review the updates on the Probationary
Firefighter Manual.
• Reviewed the Paramedic Mentorship Program with all Captains.
• Crews trained with probationary firefighters on first quarter hose lays to prepare for upcoming
testing.
• Crews trained on dynamic rope rescue pick off. This is a skill utilized to access a patient when
there are challenges with terrain or elevation. A rope rescue system is used in conjunction with
our ladder truck arial ladder to perform a rescue.
July 12-July 25
7/12 –Participated in County Office of Emergency Services (OES) Recovery call
7/13 –Participated in Poway Neighborhood Emergency Corps (PNEC) planning meeting for the
upcoming (August 14th) Emergency Safety Fair
7/13 –Participated in County Office of Emergency Services Hazard Mitigation working group to
discuss Dam failure
7/14 –Meeting with Andrea Thomas to discuss Request for Information needs on the Rattlesnake
Creek Hazard Mitigation Grant submission
7/14 –Participated in a meeting with San Diego Office of Emergency Services to discuss Urban
Area Security Initiative (UASI) grants
7/15 –Participated in SDGE working group to discuss Public Safety Power Shutoff (PSPS) plan for
the Operational Area
7/15 –Call with CalOES to discuss the Rattlesnake Creek grant application
7/16 –Move offices to City Hall
7/22 –Meeting with Andrea Thomas to review Request for Information needs on the Rattlesnake
Creek Hazard Mitigation Grant submission
7/22 –One on One meeting with Chief Canavan
7/22 –Meeting with County OES to review CA Resilience Challenge working group
COVID 19 Support
(Daily)
•Manage EOC Briefings
•Monitor WebEOC
•Monitor County/State Briefings
•City Liason with County of San Diego Office of Emergency Services and CalOES
•Prepare FEMA reimbursement documents
FD Management Staff Notes
Page 4
PHOTO HIGHLIGHTS
Vehicle rescue on the Poway grade on 7/25/21. One patient
was trapped and successfully extricated by 3779 and 3711,
treated for minor injuries, and transported by 3791.
FD Management Staff Notes
Page 5
A resident’s pool pump caught fire on
7/21/21. Brush engine 3761 extinguished
the fire.
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Jodene Dunphy, Director of Human Resources & Risk Management
DATE: July 28, 2021
SUBJECT: Human Resources & Risk Management Department Director’s Notes
HUMAN RESOURCES
Promotion
Name Position/Title Department Start Date
Jesse Gonzales Construction Maintenance Supervisor Public Works 8/2
Current Active/In Progress Recruitments
No. Dept. Title Type
Opened Closed/Close
1 CS Box Office Attendant Part-Time Temporary 6/30 9/19
2 CS Front of House Assistant Part-Time Temporary 6/30 9/19
3 CS Director of Community Services Full-Time Regular 6/8 Continuous
4 CS Lifeguard Part-Time Temporary 7/14 10/17
5 CS Recreation Leader I Seasonal 3/25 Continuous
6 CS Stage Technician Part-Time Temporary 5/25 8/22
7 DS Associate Civil Engineer Full-Time Regular 6/1 7/18
8 FIRE Firefighter/Paramedic Full-Time Regular 5/26 Continuous
9 LS City Clerk Full-Time Regular 6/18 Continuous
10 LS Records Technician Full-Time Regular 6/2 6/20
11 PW Administrative Assistant III Full-Time Regular 6/21 7/5
12 PW Facilities Maintenance & Special
Districts Supervisor
Full-Time Regular 6/2 7/5
13 PW Sr. Facilities Maintenance Technician Full-Time Regular 6/16 7/18
14 PW Stormwater Maintenance &
Construction Worker I/II
Full-Time Regular 6/4 7/11
15 PW Utility Systems Mechanic/Sr. Utility
Systems Mechanic
Full-Time Regular 7/27 8/22
16 PW Water Treatment Plant Operator Full-Time Regular 5/11 6/30
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Eric Heidemann, Director of Public Works
DATE: July 28, 2021
SUBJECT: Public Works Department Bi-Weekly Report
(July 12, 2021 – July 25, 2021)
Work/Description Units Location/Description
OPERATIONS
Street Maintenance
Asphalt Repairs (sq. ft.) 81021 Zone #4 Crack Sealing Program – Complete
(81,000 linear feet). Repaired a water utility trench
on Poway Road. Repaired potholes at various
locations.
Debris Removal 6 Removed wood and plastic debris from along the
roadside on the Poway Grade. Removed an
illegally dumped bed from Bowron Road and an
illegally dumped refrigerator from Scots Way.
Picked up drywall from Pomerado and Nazas
Roads and cleaned up glass from Espola Road.
Concrete Repairs (sq. ft.) 45 Performed concrete grinds at various locations
(approximately 45 sq. ft.), Removed and replaced
sidewalk panels on Pomerado Road, Scripps
Poway Parkway, and Aubrey Street. Replaced the
sidewalk and a driveway approach for a
Wastewater clean out repair.
Signs 11 Removed unauthorized “STOP” sign and legend
from Crossrock Road, repaired a sign on Scripps
Poway Parkway, installed eight new parking
restriction signs on Midland Road and repaired a
sign on Pomerado Road.
Vegetation 9 Removed a tree branch blocking the sidewalk on
Palisades Drive, trimmed branches blocking a
lane of traffic on Old Pomerado Road, removed a
tree branch blocking the bike lane and sidewalk
on Twin Peaks Road, removed a fallen branch
blocking the road on Woodland Parkway, trimmed
low hanging branches on Midland Road.
Performed weed abatements on Standish Road,
Garden Road, Espola Road, and Twin Peaks
Road.
Graffiti - No incidents
Public Works Department Report – July 28, 2021 Page 2
Work/Description Units Location/Description
Miscellaneous 6 Removed trash from the right of way under
Sycamore Canyon bridge, removed trash along
Espola Road and from Scripps Poway Parkway.
Repainted fire lane at Lake Poway parking lot
(approximately 1,800 linear feet) and at the Water
Treatment Plant (approximately 60 linear feet).
Placed two asphalt berms around the grease
enclosure at the Hamburger Factory.
Special Events - None
Stormwater & Flood Control
Annual Concrete Channel Cleaning
Program
6 Crews completed work on Adah Lane and the
Pomerado Channel from Pomerado Hospital to
Amso Street
Vactor Request 3 Carlson Court
Cross Bar Install 1 Cloudcroft Court
Stencil/Medallion Install 28 Installed “No Dumping” medallions at inlets
throughout Poway. The medallions serve as a
JURMP component complying with public
education and outreach regarding our MS4.
Fence Repair 1 Floral Ave
Vehicle & Equipment Maintenance
Work Orders 29
Scheduled/Unscheduled 20/9
Red Fleet Work Orders 6
Red Fleet Scheduled/Unscheduled 5/1
Underground Storage Tank - APCD Vapor Recovery Test Completed
Facilities Maintenance
Electrical & Lighting ½ Lighting
Plumbing/HVAC 9/1 Mostly Plumbing
Miscellaneous 15/8 Doors, cosmetically finishes, moving furniture
Total Facilities Work Orders
Completed / In Progress
25/11
Contract Inspections Attended an M drive clean up meeting with Izzy,
a grid trim meeting with Marc LeDrew and
Michael DeVenere, and an LMD maintenance
and tree meeting. Sent out a backflow RFP to
Palomar Backflow, Certified Backflow, San
Diego Backflow Testing. Picked up debris that
was generated by two days of work from
volunteers on Espola Road. Performed tree/fuel
removal in LMD 83-1A. Responded to requests
for repair of an irrigation leak and an irrigation
main break.
Oversaw the contractors who were fumigating
the Sheriff’s Station. Attended the traffic signals
upgrade pre-construction meeting; the HVAC
Public Works Department Report – July 28, 2021 Page 3
Work/Description Units Location/Description
water treatment inspection and Community
Center kitchen walk-thru with janitorial staff.
Customer Inquiries 10
Streetlight Issues I Starridge Park
Traffic Signal / Emergency Community and Olive Grove; Poway at
Treadwell, Pomerado and Creek; Community at
Twin Peaks; Hilleary at Community Road and
Colony Drive.
USA Mark Outs 5 Port Marnock Way and St Andrews Drive; St
Andrews Drive and Burning Hills Drive; St
Andrews Drive and Tining Way; Olive Meadows
Drive; Lake Poway Road.
Service Requests/Work Orders 1 Investigated damaged loop after road work along
Espola and Twin Peaks Roads.
Work Orders Completed / In
Progress
4 Siemens investigated noisy HVAC cover at
Public Works Administration. Priced out
additional day of cleaning at park restrooms. Ag
Pest Control investigated wasp infiltration at the
Library; Siemens investigated duct detectors at
City Hall.
Parks, Trails & Landscape Maintenance
Arbolitos Sports Park - Trimmed the trees, shrubs, and hedge along
entry.
Aubrey Park - Trimmed trees, shrubs, and vines along the
northern boundary. Performed gopher abatement.
Performed irrigation repairs replacing three
valves.
Bette Bendixen Park - Painted both picnic tables.
City Hall - Trimmed shrubs, cleaned planters, removed
debris. Treated facility with herbicide; along
walkways, planters, trails, and mulched areas.
City Owned Properties - Removed pepper tree trunk suckers along
Midland Road across from Old Poway Park.
Community Park - Supported daily activities and camps. Trimmed
trees and shrubs. Applied herbicide along
walkways and fence lines, planters, and the trail
from Dog Park to City Hall.
Garden Road Park - Performed weed abatement before herbicide
application. Applied herbicide along the trail,
mulched areas, picnic areas and fence lines.
Hilleary Park - Replace tennis court nets. Trimmed trees,
hedges, and shrubs, and remove suckers.
Repaired and adjusted the irrigation.
Lake Poway Park - Cleaned red curb areas for Streets division to re-
paint. Adjusted/repaired several turf irrigation
heads. Supported the campout Saturday evening
– Sunday afternoon.
Public Works Department Report – July 28, 2021 Page 4
Work/Description Units Location/Description
Old Poway Park - Performed multiple irrigation repairs. Provided
support for activities and events. Trimmed trees
and shrubs. Performed gopher abatement.
Poway Oaks Park - Repaired a metal park bench next to the
basketball court.
Silverset Park - Removed eucalyptus tree stump suckers along
the field view fence line. Applied herbicide along
the walking path, fence lines and hardscapes.
Starridge Park - Repaired the trail fence.
Valle Verde Park - Performed gopher abatement along the front of
the park. Replaced several turf irrigations heads,
ran a new 20-foot drip line in the planter near the
backflow. Added 10 medium sized rocks to the
planter in front of the restroom building.
Replaced home plate on the ballfield.
Miscellaneous Parks - Performed Crosthwaite Materials Handling Yard
duties this month.
Miscellaneous Trails - Attended and memorialized Trails Committee
meeting. Installed a new signpost at the end of
Old Wine Master Way. Applied herbicide along
Justin’s Trail.
Emergency Response
Emergency Response Callouts 8 Opened the gate at Lake Poway to allow a patron
to leave after-hours. Removed an LMD tree
branch from the street. Repaired a valve in a
meter box that was full and leaking on the City’s
side (resident to have plumber repair leak on their
side) cleaned out the meter box and left open for
the resident to have repair made on their side.
Re-seated a toilet valve in the men’s toilet at
Arbolitos Park, performed repair and turned water
back on. Responded to smart cover alarm on
Bowron Road, could be due to construction in the
area. Water running into the street from LMD
sprinkler, turned off backflow to sprinkler.
Stopped a small leak on a fire hydrant on Bowron
Road. Resident sewer was backing up on Halper
Road, no city clean outs, resident to contact a
plumber.
UTILITIES
Water Distribution System Operations
Mark-Outs 70
Distribution Maintenance 81
Water System Shutdown 2 Avenida Florencia, Crosthwaite Circle
Main valve replacement 1 Avenida Florencia
Cleaned Fire Tower cistern and
interceptors
1 Crosthwaite Circle
Customer Service Repairs: 3 Pomerado Road, Whitewater Drive, Poway Road
Public Works Department Report – July 28, 2021 Page 5
Work/Description Units Location/Description
Leaks, AMS updates, non-ops.
Annual Test Reports 302
Backflows Tested 14
Large Meter Tests 0
Water Treatment Plant and Utility Systems Operations
Lake Poway Rainfall (inches) 0
Lake Poway and Poway Dam (FSL) 930.5
Water Treatment Plant 264.5
82
Average flow: 10.61 MGD.
Collection System Maintenance
Sewer Mainlines Rodded (Vactor)
Routine Mainline Rodding (l/ft.) 8,935
Monthly High Frequency Rodding (l/ft.) 0
Quarterly High Frequency Rodding
(l/ft.)
0
Special Mainline Rodding (l/ft.) 140
Total Mainline Rodded (l/ft.) 9,075
Sewer Mainlines Inspected (CCTV)
Routine Mainline Inspection (l/ft.) 0
Special Mainline Inspection (l/ft.) 0
Total Mainlines Inspected (l/ft.) 0
Utility Crew Task Count
Annual Lateral Assessments 16
Bi-Annual Lateral Assessments 0
Laterals Inspected 17
Laterals Rodded 13
Laterals Repaired 1
Lateral Blockage Mitigation 0
SSO Spill Volume Estimation 0
Manholes Located 0
Manholes Raised 0
Manholes Inspected 0
Easement Maintenance 0
Customer Service 1
Total of Division Tasks Completed 48
Recycled Water System
Recycled Site Inspections 2
Four-Year, Four-Hour Potable Cross-
Connection Tests
5
Four Year, 24 Hour Recycled Irrigation
Test
5
Annual Recycled Site Inspection 0
Customer Service 1
DRC Plans Reviewed 0
Total Completed Tasks 13
Fats, Oils, Grease (FOG) Program
Business License Review 13
Public Works Department Report – July 28, 2021 Page 6
Site Inspection 3
FOG Permit Issued 3
Customer Service 0
Total of Completed Tasks 19
Water Infrastructure Improvement Program
Staff is finalizing a contract with GSE for the construction of the clearwell bypass with an
anticipated notice to proceed mid-August. The RFP for the design of the Clearwell closed on July
7. Four proposals were received, an evaluation team reviewed the proposals, and IEC was
selected as the most responsive. A contract with IEC will be on the City Council agenda for
consideration on August 17, 2021.
July 20, 2021
TO:Chris Hazeltine, City Manager
City of Poway
FROM:Michael Knobbe, Lieutenant
Poway Station
WEEKLY ACTIVITY REPORT FOR 7/9/2021 - 7/15/2021
San Diego County Sheriff's Department
Post Office Box 939062 - San Diego, CA 92193-9062
William D. Gore, Sheriff
Arrested Name Violations Arrest Location
07/10/2021 RONQUILLO, UNIQUE OW-F ZZ - FELONY OTHER AGENCY'S
WARRANT
Scripps Poway
Parkway & Stowe
Drive, Poway
07/11/2021 GLENN, THOMAS 11364 HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M); 11377 (A) HS -
POSSESS CONTROLLED SUBSTANCE (M)
Poway Road &
Hidden Knoll Road,
Poway
07/13/2021 RODRIGUEZ, BRANDON 488 PC - PETTY THEFT(All Other Larceny) (M)13589 Poway Rd,
Poway
07/13/2021 FREEMAN, KEVIN 647 (F) PC - DRUNK IN PUBLIC: ALCOHOL,
DRUGS, COMBO OR TOLUENE (M)
12425 Oak Knoll Rd,
Poway
07/14/2021 CONNELLY, RANDALL 11364 HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M); 466 PC - POSS
BURGLARY TOOLS (M)
Community Rd @
Gregg Ct., Poway
07/14/2021 HILL, CLARK 647 (F) PC - DRUNK IN PUBLIC: ALCOHOL,
DRUGS, COMBO OR TOLUENE (M)
14168 Poway Road,
Poway
Category Arrests
DUI 1
Felony 1
Misdemeanor 5
Total 7
Category Cases
Felony 7
Misdemeanor 8
Total 15
Keeping the Peace Since 1850
Michael Knobbe, Lieutenant
Poway Station
Captain David M. Schaller, Poway Station
Keeping the Peace Since 1850
July 26, 2021
TO:Chris Hazeltine, City Manager
City of Poway
FROM:Michael Knobbe, Lieutenant
Poway Station
WEEKLY ACTIVITY REPORT FOR 7/16/2021 - 7/22/2021
San Diego County Sheriff's Department
Post Office Box 939062 - San Diego, CA 92193-9062
William D. Gore, Sheriff
Arrested Name Violations Arrest Location
07/17/2021 HORETH, TERRANCE 11364 HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M); 14601.2 (A) VC -
DRIV W/LIC SUSP/REV W/PRIOR DUI
CONV (M)
13301 Poway Rd,
Poway
07/17/2021 SEAY, JORDAN 594 (B)(1) PC - VANDALISM ($400 OR
MORE) (F); 236 PC - FALSE
IMPRISONMENT (M); 243 (E)(1) PC -
BATTERY:SPOUSE/EX SPOUSE/DATE/ETC
(M)
13508 Pomerado Rd,
Poway
07/18/2021 SNODGRASS, JAMES 245 (A)(1) PC - ASSAULT W/DEADLY
WEAPON:NOT F/ARM (F); 25850 (C)(6) PC -
CARRY LOADED HANDGUN:NOT
REGISTERED OWNER (F); 22350 VC -
UNSAFE SPEED (BASIC SPEED LAW) (I);
2800.1 (A) VC - EVADING PEACE OFFICER
(M)
18000 Old Coach Dr,
Poway
07/18/2021 WILLEMSE, WALDEMAR 243 (E)(1) PC - BATTERY:SPOUSE/EX
SPOUSE/DATE/ETC (M)
12815 Stone Canyon,
Poway
07/19/2021 MILLANES, JESUS BW-F ZZ - FELONY BENCH WARRANT
(OUR AGENCY); 11364 HS - POSS
CONTROLLED SUBS PARAPHERNALIA
(M); 11377 (A) HS - POSSESS CONTROLLED
SUBSTANCE (M); 14601.1 (A) VC - DRVG
WHILE LIC SUSP OR REVOKED:OTHER
REASONS (M)
Poway Road &
Millards Road, Poway
07/19/2021 CORNELIUS, MICHAEL OW-F ZZ - FELONY OTHER AGENCY'S
WARRANT; 148.9 (A) PC - FALSE IDENT TO
PEACE OFCR (M)
13536 Poway Road,
Poway
07/19/2021 BIAS, MICHAEL 243 (E)(1) PC - BATTERY:SPOUSE/EX
SPOUSE/DATE/ETC (M); 591.5 PC -
OBSTRUCT USE OF ANY WIRELESS
COMMUNICATION DEVICE (M)
12825 Claire Dr.,
Poway
Keeping the Peace Since 1850
07/20/2021 CORNELIUS, MICHAEL 529 (A) PC - FALSE PERSONATION OF
ANOTHER:SPEC CIRC (F)
13100 Bowron Rd,
Poway
07/20/2021 GUZMAN, WILLIAM 11377 (A) HS - POSSESS CONTROLLED
SUBSTANCE (M); 647 (F) PC - DRUNK IN
PUBLIC: ALCOHOL, DRUGS, COMBO OR
TOLUENE (M)
13030 Morene Street,
Poway
07/22/2021 MARTINEZ, ALEX 11364 HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M)
Pomerado Rd @ 9th
Street, Poway
Category Arrests
Felony 5
Misdemeanor 5
Total 10
Category Cases
Felony 5
Misdemeanor 4
Total 9
Michael Knobbe, Lieutenant
Poway Station
Captain David M. Schaller, Poway Station