Loading...
Directors' Notes 07-28-21City Clerk’s Office Page 1 of 4 DATE: July 28, 2021 TO: Chris Hazeltine, City Manager FROM: Deborah Harrington, Interim City Clerk CONTACT: (858) 668 – 4535 or dharrington@poway.org SUBJECT: City Clerk: Weekly Notes (July 14 - July 27, 2021) Upcoming Agenda Deadlines Council Meeting Staff Reports Due Agenda Posted August 17 August 2 August 10 September 7 August 23 August 31 September 21 September 2 September 14 Public Records Requests Name Subject of Request Date Closed PRR 2021-099 Cohen, Brittany Requesting any and all documents and complaints pertaining to Isabella Parkinson and residence 16619 Orchard Bend Rd Poway CA 92064 between dates 5/20/2021-5/28/2021 7/14/21 2021-113 Friedman, Assi 1) All email communications with email Ms. Cynthia Elizondo at email Cynthia@cynthiaelizondo.com. This request includes all and any city staff, city council, and mayor. 2) Any email communications in which Ms. Cynthia Elizondo is mentioned, i.e. internal emails/memos. 3) Responsive materials should be in the date range of 1 April 2021 to 30 June 2021. Extension notice sent 7/21/21 2021-115 Partner Engineering and Science Inc. 13500 Danielson Street Fire Record of ´” Notice of Violation or Notice to Comply” against the property. A history of the property inspections by the fire department. Any other records related to the following for the property. Building Record of “Notice of Violation or Notice to Comply” against the property. A history of the property inspects by the building department. A copy of the original core/shell Certificate of Occupancy and it’s issued date. Any open building department permits. Zoning A record the current zoning designation for the property and that it’s compliant with the current designation. A record of “Notice of Violation or Notice to Comply” against the property. Any record of “Activity and Use Limitations (AUL)” related to environmentally hazardous conditions” associated with the property. 7/21/21 City Clerk’s Office Page 2 of 4 Public Records Requests continued Name Subject of Request Date Closed 2021-116 Mandell, Mike Application for permit and subsequent permits related to 15362 Skyridge dating back to 2009; building/property inspections requested/ performed back to 2009 and findings/code violations; and blueprints on file for new house built on 15362 Skyridge following Witch Creek Fire. 7/14/21 2021-117 DI Drafting & Design Structure permits for 14321 Twin Peaks Rd., 14305 Twin Peaks Rd., and 14437 Ortez Pl. 7/14/21 2021-118 Greer, Natasha Environmental/Soil Reports for Poway Commons, Outpost, Fairfield, Lots 13010, 13020 and 13036. 7/20/21 2021-119 DRN Definite Solutions Any open permit, open code / building violations, code enforcement lien on 13110 SUDAN RD POWAY CA 92064, Lori Cota. 7/21/21 2021-120 American Geotechnical Review/obtain copies of any geotechnical reports, grading plans & reports, and foundation plans for the residential address: 14123 Ticia Street, Poway. 7/22/21 2021-121 Center for Contract Compliance 2021-2022 Citywide Striping, Contract #21013 Information on contractor, subcontractors, original bid advertisement and proof of publication, DIR Project ID. 7/22/21 2021-122 MADesign & Drafting Services Any and all files related to APN 320-020—2700, Original MDRA 04-007, Address: 11545 Creek Road, Poway, CA. This site was originally approved and constructed via a MDRA and Flood Plane Development. I would like to review all documents that were submitted, reviewed or approved during the plan review process. Homeowner & requested will be in attendance once documents are available to review. 7/21/21 2021-123 Center for Contract Compliance Landscape Maintenance Services – Various Locations Information on contractor, subcontractors, original bid advertisement and proof of publication, DIR Project ID. 7/20/21 2021-124 Center for Contract Compliance FY 2019-20 Corrugated Metal Pipe Annual Repair, Contract 20012. Landscape Maintenance Services – Various Locations Information on contractor, subcontractors, original bid advertisement and proof of publication, DIR Project ID. 7/21/21 2021-125 Friedman, Assi All emails from Councilmember Dave Grosch's email account dgrosch@cox.net relating to Poway City business from the year 2021. A copy of the City of Poway document retention policy demonstrating private email accounts, phones, etc. are maintained consistenly with state law. Evidence from Cox cable Councilmember Dave Grosch has not destroyed public record. Extension notice sent 7/21/21 2021-126 Scott, Jeffrey Copy of a list of the top 100 water users in the City of Poway for the years 2019 and 2020. Names only is fine. Not requesting billing information or contact information, just a list of the entities themselves. 7/21/21 2021-127 Sandoval, Kevin Precise Grading Plans and Building Permit for the lot at 13609 Twin Peaks Road, APN 3141927200. Design Review Plans; City of Poway Approved Plot Plan #P71-40W, CUP 87.03 and Development Review 87-05. City Clerk’s Office Page 3 of 4 Public Records Requests continued Name Subject of Request Date Closed 2021-128 Partner Engineering and Science Inc. Properties: 12425 Oak Knoll Road, Poway and 0 Pomerado Road, Poway, Parcels: 3175502000 and 3175551900. Requesting information on any open zoning code violations; open building code violations; copies of available certificates of occupancy (and if not on file, is this a code violation?), copy of approved site plan on file, if available, information on any open fire code violations and information on any roadwork or construction that may impact the property. 2021-129 WEXCO International Any and all building permits, inspection records, code enforcement/violations (new and old), certificates of occupancy and Plsn for review for 13475 Poway Road, Poway. 2021-130 GG Homes OPEN and CLOSED Residential Code Violations between June 16, 2021 and July 23, 2021 2021-131 SmartProcure All purchasing records from Jun 30, 2018 12:00 AM to current. The request is limited to readily available records without physically copying, scanning or printing paper documents. Any editable electronic document is acceptable. The specific information requested from your record keeping system is: 1. Purchase order number. If purchase orders are not used a comparable substitute is acceptable, i.e., invoice, encumbrance, or check number 2. Purchase date 3. Line item details (Detailed description of the purchase) 4. Line item quantity 5. Line item price 6. Vendor ID number, name, address, contact person and their email address 2021-132 Do, Jonathan Copies of permit or structural plan for suite D4/D5 at 15525 Pomerado Road. APN 2754606521 and 2754606525. 2021-133 Olps, Chris Copy of Letter from Mayor Vaus mentioned at 7/20/21 City Council meeting. 2021-134 Olps, Chris Communications from all current council members from their first day in office including past council member Cunningham back to 2012 re. Clearwell upgrades etc…Water treatment upgrades etc. Water system upgrade etc. 2021-135 Olps, Chris Any communications with the city regarding the Skate Park including communications with any staff or council from any non city connected person from 2010 to now, preferably from 2003. 2021-136 Olps, Chris All communications and records between Bob McKeon and the City (staff) and between Dave Grosch and Steve Vaus from 2018 to present. City Clerk’s Office Page 4 of 4 Public Records Requests continued Name Subject of Request Date Closed 2021-137 Murbach Geotech Review of geotechnical reports, specifically Geotechnical Investigation reports and/or As-Graded Geotechnical reports for properties at the south end of Adah Lane. Parcels at or near APNs 323-262-33 through 36; APN 323-290-1700.I do not need copies of all the documents. Review the documents, take notes and possibly copy a few pages. CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Wendy Kaserman, Assistant City Manager DATE: July 28, 2021 SUBJECT: Community Services Department Bi-Weekly Report Upcoming Date Time Location Night Fishing (shoreline only) July 30 & 31 6:00pm-11:30pm Lake Poway Family Campout July 31-Aug 1 6:00am-9:00am Lake Poway Summer Concert Series: Highland Way Aug 1 5:30pm-7:00pm Old Poway Park Fall Class Registration Aug 3 7:00am Online or In-Person Night Fishing (shoreline only) Aug 6 & 7 6:00pm-11:30pm Lake Poway Summer Movies in the Park Series: Raya and the Last Dragon Aug 7 6:00pm-9:45pm Community Park Summer Concert Series: Pop Vinyl Aug 8 5:30pm-7:00pm Lake Poway Night Fishing (shoreline only) Aug 13 & 14 6:00pm-11:30pm Lake Poway Summer Concert Series: Benedetti Trio Aug 15 5:30pm-7:00pm Old Poway Park It may be hot and sticky outside, but we are prepped and ready to go for fall! The Fall Community Services Guide is published and uploaded to our website: Fall Poway Community Services Guide. Fall class registration begins next week on August 3. A little bit of rain didn’t put a damper on attendance at the movie or concert this past weekend. 300 moviegoers enjoyed Onward on the big screen at Community Park, while 1,000 concertgoers danced the night away at Lake Poway to classic hits performed by the Blue Breeze Band. With both the start of summer and COVID requirements dropping at the same time, the Swim Center has experienced a 200% increase in attendance. In the past five weeks, there have been 18,482 entries. Additionally, we’ve hosted 592 group swim lessons with 536 unique participants, 137 private lessons, and over 188 hours of aquatic youth sports reservations (swim, dive, and water polo) with 190 athletes. In anticipation of reopening in September, PCPA staff is working to re-launch several business processes. In the last two weeks, staff attended several software trainings related to box office ticketing, client management, and website content management. Additionally, interviews for all performance support positions (box office, front of house, and stage technician) are in-progress. CSD Bi-Weekly Report July 28, 2021 Page 2 Night Fishing from the shoreline continues to be a big hit every Friday and Saturday at Lake Poway. Anglers have until September 5 to reel in the big one. A total of 6,200 pounds of catfish will be stocked throughout the season. Park staff is hosting the annual thank you dinner for Old Poway Park Action Committee (OPPAC) presidents this Sunday during the Summer Concert. OPPAC volunteers contribute close to 15,000 hours yearly to park operations and events, and the presidents coordinate volunteer involvement. CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Bob Manis, Director of Development Services DATE: July 28, 2021 SUBJECT: Director’s Notes HOUSING Monte Vista Housing Site For round two of the solicitation for an affordable housing development, all three invited respondents submitted a proposal. The Review Committee met July 13th to discuss and review the final proposals. In conjunction with staff review, a consultant evaluated the financial component of the submittals for completeness and initial financial feasibility of the project. Staff met with the consultant on July 15th and discussed their findings. Presentations and interviews with respondents are scheduled to be held August 10th. If a respondent is selected, staff will seek Housing Authority approval to enter into an Exclusive Negotiating Rights Agreement in September. PLANNING New Single-Family Residence at 0 Misty Meadow Road On July 15th, a Minor Development Review Application was submitted to construct a 4,175 square- foot (sf) single-family residence with a 1,195-sf garage on a vacant 40-acre property in the Rural Residential A zone. Building Plan Check Submittal for Mixed-Use Development by Fairfield On July 19th, Fairfield Poway, LLC submitted building plans for the plan check of a five building, mixed-use development at 12845-12941 Poway Road (Carriage Center and Poway Fun Bowl sites), with 212 residential units and 11,364 square feet of commercial space. New Single-Family Residence at 13510 Willow Run Road On July 21st, a Minor Development Review Application was submitted to demolish an existing single- family residence and construct a new 2,503 sf single-family residence with an attached 663 sf garage on a one-acre property located in the Rural Residential C zone. New Accessory Dwelling Unit (ADU) at 14299 Hacienda Ln. On July 8th, a building permit was issued for a 1200-sf detached ADU and a 183-sf patio cover. New ADU at 12343 Spyglass Ter. On July 6th, a building permit was issued for a 539-sf remodel of a portion of the existing dwelling into a two-bedroom ADU. New Single-Family Residence and ADU at 12893 Glen Circle Dr. On July 20th, a building permit was issued for a 6,235-sf single-family residence, an attached 895 ADU, a 900-sf patio cover, and a 1,135-sf garage. Director’s Notes July 28, 2021 Page 2 Tenant Improvements at 13125 and 13225 Danielson St. (Thysenrupp Bilstein of America) On July 21st and 22nd, building permits were issued for an 8,080-sf and a 3,680-sf tenant improvement for Thysenrupp Bilstein of America. The company manufactures motor vehicle parts and accessories. CAPITAL IMPROVEMENTS City Hall HVAC Controls Replacement Project The contractor has completed the cutover of the chiller and boiler to the new control system. They will be presenting the final graphics for the new interface to Public Works for approval prior to turning the system over to the City. 2020-21 Street Overlay Project The contractor has completed all contractual work including the reconstruction of the accessway around Reservoir 8. Public Works Fleet Maintenance Equipment Lift Project The foundations and slab that the lift will be placed upon were placed on July 26th. The contractor took concrete cylinders to test to determine the earliest possible time the lift equipment could be placed on the new slab. Lake Poway CDBG ADA Pathways Project The contractor mobilized on site and completed survey work last week. Clearing, grubbing and grading will commence this week. This project will address ADA issues with the ADA parking stalls and accessible path of travel in the volleyball courts area at Lake Poway Park. Bowron Road Sewer Upsize The contractor has requested and been approved to work extended hours until the end of July to complete the work fronting Valley Elementary before school starts on August 2nd. Additionally, the contractor has submitted a request to move a manhole currently proposed in front of the school north of the driveways in order to expedite construction fronting the school and reduce bypass/construction equipment obstructions. Clearwell Distribution Flow Meter Project The contractor completed startup, testing, and calibration of the new flowmeter on July 20th. The concrete repairs to the vault walls shown below have been completed and conduit and piping have been installed. The project will be considered complete after successful operation of the meter over a 7-day period and proceed to Council for acceptance. Director’s Notes July 28, 2021 Page 3 Boulder Mountain No. 1 & 2 Reservoir Rehabilitation The contractor completed coating both tanks July 16th and are installing the remaining tank appurtenances this week. Staff is coordinating with Public Works to have them install valves for the sampling ports on July 27th. The contractor is tentatively scheduled to wash and disinfect the tanks on August 2nd and 3rd. LAND DEVELOPMENT Poway Commons (G20-0007) City staff received and approved the precise grading package for the proposed residential and mixed- use development on parcels on the south side of Poway Road near Quate Court and Civic Center Drive/Tarascan Drive. The applicant has been directed to submit mylars. Scheinblum Residence (G21-0008) City staff received the first submittal for the grading associated with the development of a new single- family residence and ADU on Heritage Drive. Heritage Drive (WI21-001) City staff received the first submittal for the improvement plans associated with the proposed fire hydrant in support of a new single-family residence and ADU on Heritage Drive. Nathanson Residence (G20-0011) City staff has received a request for a 2nd construction change to the grading plans for the relocation of the bio-filtration basin and creation of an additional pad area on the lot for the proposed single- family residence at the end of Del Poniente Road. Director’s Notes July 28, 2021 Page 4 Buswell Residence (FLD21-0002) City staff issued a floodplain development permit for the construction of a pool in the floodplain at a residence at 16505 Orchard Bend Road. Dixon Residence (FLD21-0003) City staff issued a floodplain development permit for the construction of a pool in the floodplain at a residence at 16831 Orchard Bend Road. Norris Residence (G20-0019) City staff approved the 2nd construction change to the grading plans for the relocation of the guardrails on a proposed single-family residence on St. Andrews Drive.  Nguyen Property (ESMT20-017) The applicant has submitted a revised legal and plat for 2nd review of a proposed water easement for the extension of the water main and addition of a fire hydrant along Oak Canyon Road. Fairfield Grading Plans (G21-0007)  City staff returned comments on the 1st submittal of the onsite grading plans for the Fairfield mixed- use redevelopment project. Garden Road (FLD21-0004) City staff issued a floodplain development permit for the temporary material storage area within a parcel on Garden Road. The temporary material storage area is associated with the Bowron Road sewer upsize project. STORMWATER Los Penasquitos Water Quality Improvement Plan (WQIP) Annual Report City staff has received the review comment letter from the Regional Water Quality Control Board for the Los Penasquitos WQIP Annual Report submitted in January of 2021 with the other Copermittees in the watershed. Staff is in the process of reviewing the letter, along with the other Copermittees and preparing responses to the questions, comments and requests for information from the Board. Construction General Permit A revised draft of the State Water Board Construction General Permit (CGP) has been released for public review and comment. A key goal of the proposed permit reissuance is to incorporate Wasteload Allocations (WLAs) from adopted Total Maximum Daily Loads (TMDLs) that identify construction as a source. These pollutants include sediment, metals, pesticides, bacteria, temperature, nutrients, chloride and salts. Additional goals of the revised permit include revisions to monitoring and reporting requirements, including the definition of storm events that need to be sampled, increasing the information required with termination to expedite the approval process and incorporating the trash provisions. On August 4th, the State Water Board will hold a public hearing to hear oral comments regarding the CGP permit reissuance. Written comments are due August 13th by noon. An adoption hearing has not yet been scheduled. The California Stormwater Quality Association (CASQA) is preparing comments and testimony. Director’s Notes July 28, 2021 Page 5 INSPECTION General Atomics Addition A 42 Thunder Kirkham Way (DR20-006) - The contractor completed the concrete for the revised loading dock and water tanks. Construction of the overhead canopy for the water tank is ongoing. Last week the contractor began placing structural steel and waterproofing for the canopy. StoneRidge Country Club Demolition Espola Road (RW20-0160) - Work continues to take place demolishing the tennis courts. The City has received complaints that a resident had thought that explosives were being used. No explosives have been used. The resident was contacted, and the method of demolition was explained. Another resident had complained that the demolition damaged his property. Inspection met with the resident and explained the method that the contractor was using to break the concrete. The inspector provided the resident with the contractor’s contact information for any possible claim action. Poway Commons Poway Road (G19-0011) (STI20-002) - With the concrete cross gutter at Poway Road and Tarascan Drive complete the contractor ground down two-inches of asphalt, removing and replacing 2/3 of Tarascan Drive. This work covered the entire area affected by underground construction. Both coats of striping have been placed and the new curbs have been painted. The contractor also began asphalt restoration for the utility trenches along Poway Road. That work was not completed and is expected to resume this week. The retaining wall at the north and west property lines on the northern parcel, north of the Poway Commons affordable housing project, are being installed. Reinforcing steel and concrete footing placement were completed, and the contractor is now working on block placement. The contractor has requested occupancy for the homes along Civic Center Drive. This week the inspector met with the owner and contractor and created a punch list for occupancy approval of phase 1 (along Civic Center Drive). Advani Residence Riparian Road (MDRA19-012) - A list was generated and given to the owner to aid in the close-out portion of the project. Last week the inspector performed the final inspection and confirmed all items are complete. The occupancy form has been signed and the project file will be delivered to the project manager for final close out. Director’s Notes July 28, 2021 Page 6 Creekside Plaza / The Habit Burger Grill Poway Road (G19-0013) - Construction is nearing completion. Punch list work continues, the contractor has completed all paving, slurry seal, and striping. The project inspector still needs to conduct the punch list inspection for all surface and underground storm drain system improvements. Outpost Poway Road (STI18-001) (G18-0002) - This week the contractor removed all equipment and construction debris from the existing sidewalk. The construction fence was relocated to behind the existing sidewalk. The contractor removed damaged sidewalk areas and placed concrete for the temporary sidewalk along Poway Road. The sidewalk is now re-open. SDG&E 16” Gas Line Installation Pomerado Road (RW20-0036) - Work along Pomerado Road continues with two crews working in separate locations. The southern crew is now working north of Ted Williams Parkway. They will be working south of Ted Williams Parkway for a portion of this week to bring the fiber optic cables to the side of the roadway (into a vault). Additional pipe has been installed to the middle of Colony Way. The pipeline has been welded and is expected to be backfilled this week. SDG&E has informed the contractor that they no longer want the contractor paving on Fridays. The paving typically runs late, and they do not want the contractor working late on Fridays. As the pipeline goes past Colony Way, the pipeline will cross Pomerado Road and then continue north in the southbound lanes. The northern crew is working to cross Pomerado Road just south of Monte Vista Road. The contractor was not allowed to work in this area on the City’s dark Friday as they would be excavating around the City’s wet utilities, which is not allowed during dark Fridays. The contractor was able to continue to work on the southbound lanes but short of the intersection so traffic lights would not need to be switched to 4-way flash. AT&T Small Cell Pole Replacement Various locations (STI19-002) - After several months of lead time the approved wire was received and installed. All punch list items were completed and inspected. The project file has been delivered to the project manager for close out. Pedestrian Traffic Signal Kirkham Way (STI20-003) - Last week the contractor started potholing the existing utilities along the proposed bore path and pole locations. Several conflicts were discovered when underground utilities and unidentified slurry was found. The first conflict was the pole on the south side of Kirkham Way. This was alleviated by moving the pole slightly to the west. The second conflict was at the pole on the north side of Kirkham Way. This will take more effort to correct, and several ideas were submitted for consideration. Last week the conduit for the project was installed, which crosses Kirkham Way. St. Bartholomew’s Church Pomerado Road (G21-0004) - A preconstruction meeting is scheduled for this week. Work includes demolition of the existing parish hall and columbarium access walkway, and construction work includes expansion of the existing parking lot, a new columbarium access walkway, and expansion of the existing playground. Agamirzoyan Residence Bryce Point (MDRA18-030) - A request for occupancy was received. A final job walk/punch list inspection was performed, and only minor issues were noted. A re-inspection was performed later in the week and all items had been addressed. The occupancy request has been signed by the inspector and delivered to the project engineer for final close out. Director’s Notes July 28, 2021 Page 7 Norris Residence St. Andrews Drive (G20-0019) - The site walls have been excavated, inspected, and approved by the geotechnical representative and the special inspector. City inspection was not able to perform an inspection as the proposed walls had been changed and the construction change plans are under review by the project engineer. SCHEDULED ROAD/LANE CLOSURES  Sidewalk closure south side of Poway Road between 13301 and 13245. Work is related to the Outpost project.  Possible lane closure on Espola Road between Twin Peaks Road and Titan Way in both directions for the undergrounding and removal of overhead utilities associated with the Espola Road Safety Improvements project.  Possible lane closure on Poway Road between Tarascan Drive and Carriage Road, and Tarascan Drive between Wanesta Drive and Poway Road both directions for work related to the Poway Commons project.  Possible lane closure Pomerado Road from Leone Way to 200 feet north of Stone Canyon Road both directions for work related to the SDG&E gas main installation project.  Possible lane shift or lane closure Espola Road from Twin Peaks Road to Mountain Road northbound lane for work related to an SDG&E undergrounding electric.  Possible lane closure on Kirkham Way between General Atomics Way and Stowe Drive both directions for work related to the General Atomics traffic signal/crosswalk project.  Lane closure on Twin Peaks Road eastbound #2 lane between Pomerado Road and Ted Williams Parkway for tree work for the Regency Center. 1 of 2 CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Aaron Beanan, Director of Finance DATE: July 28, 2021 SUBJECT: Finance Department Director’s Notes Finance • Deadline for FY21 invoices to be entered and approved is 12:00 p.m. on August 24 Information Technology • PCs Replacements o PCs continue to roll out by Division o IT is looking to hire another volunteer intern • EnerGov – On schedule for November deployment o Department staff continue testing/modifying configuration through July o Tyler Cashiering implementation will begin in August General Support Services Requests for Proposals: RFP Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded RFP Awarded Vendor Council Award Date RFP 21-029 Grove Management & Maintenance Services TBD N/A $106,243 TBD TBD TBD RFP 21-031 Generator & Switchgear Maintenance Services 6/21/21 2:00 p.m. N/A $104,106 $50,401.45 Bay City Electric 8/3/21 RFP 21-032 Design Services for the Clearwell Replacement Project 7/7/21 4:00 p.m. N/A $298,780 TBD TBD 8/17/21 2 of 2 RFP Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded RFP Awarded Vendor Council Award Date RFP-22-001 Fire Suppression Equipment Services 7/19/21 2:00 p.m. (PW Admin) N/A $12,776 TBD Fire Service Corp. 8/17/2021 RFP 22-002 As-Needed Legal Services for Poway Housing Authority 8/23/21 (City Hall) N/A $13,833 TBD TBD 9/21/2021 CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Jon Canavan, Fire Chief DATE: July 28, 2021 SUBJECT: Fire Department Management Staff Notes ADMINISTRATION FIRE PREVENTION EMS / TECHNOLOGY Activity # Activity # Administrative Remedy Letters (ARLs) 0 Meetings Attended (DRC, Mgmt., Council) 1 Business License Reviews 12 Permit to Operate Inspections 25 Businesses invoiced (Permit to Operate – ex. Cutting and Welding, Places of Assembly, etc.) 0 Plan Reviews (FSS, MCUP, CUP, DR, Grading, Landscape, MDRA, Street Improvement) 13 Customer Consultations (Phone, email, Counter, Field) 51 Site Visits 1 EOC Sessions Attended 0 Temporary Use Permit 6 Fire Inspections - Fire & Life Safety, Construction, New Business 48 • Administrative staff completed relocation of offices to City Hall on 7/16. • Chief Canavan attended monthly meeting of the SD Operation Area - Metro Zone Chiefs. • Updated the Memorandum of Agreement (MOA) with General Atomics Aeronautical Systems, Inc and provided them with a copy. • Chief Canavan has assumed Fire Marshal duties while Chief Post is away on leave. • Submitted medical supply pricing to Customer Services for the current fee study. • Submitted 2021Q2 NFIRS data to state. The Fire Department sends quarterly response reports to the State of California for data collection. • Attended Base Station Physician Committee and Prehospital Audit Committee meetings. • Attended San Diego County Fire Chiefs Association EMS Section meeting in San Marcos. FD Management Staff Notes Page 2 • Between Monday, July 12th and Sunday, July 25th, personnel completed 304 hours of training and activities. Topics included 150 hours of Company Training, 56 hours of Officer Training, and 43 hours of Facility Training. OPERATIONS TRAINING / SAFETY TRAINING & PROFESSIONAL DEVELOPMENT HOURS • Between Monday, July 12th and Sunday, July 25th, the Fire Department responded to 169 incidents. • Engine OES421 is assigned to the Dixie Fire in Northern California. The Fire Station 2 crew is part of a County strike team. • Brush 3763 returned from BitPros where the engine had some repair work completed for the fire pump. • Water Tender 3751 is out of service for a water leak at the pump. Fleet Services is working on it. • Completed work on Truck 3773 due to failing cab lift mechanism. FD Management Staff Notes Page 3 TRAINING / SAFETY - CONTINUED DISASTER PREPAREDNESS • Coordinated and conducted a meeting with all Captains to review the updates on the Probationary Firefighter Manual. • Reviewed the Paramedic Mentorship Program with all Captains. • Crews trained with probationary firefighters on first quarter hose lays to prepare for upcoming testing. • Crews trained on dynamic rope rescue pick off. This is a skill utilized to access a patient when there are challenges with terrain or elevation. A rope rescue system is used in conjunction with our ladder truck arial ladder to perform a rescue. July 12-July 25 7/12 –Participated in County Office of Emergency Services (OES) Recovery call 7/13 –Participated in Poway Neighborhood Emergency Corps (PNEC) planning meeting for the upcoming (August 14th) Emergency Safety Fair 7/13 –Participated in County Office of Emergency Services Hazard Mitigation working group to discuss Dam failure 7/14 –Meeting with Andrea Thomas to discuss Request for Information needs on the Rattlesnake Creek Hazard Mitigation Grant submission 7/14 –Participated in a meeting with San Diego Office of Emergency Services to discuss Urban Area Security Initiative (UASI) grants 7/15 –Participated in SDGE working group to discuss Public Safety Power Shutoff (PSPS) plan for the Operational Area 7/15 –Call with CalOES to discuss the Rattlesnake Creek grant application 7/16 –Move offices to City Hall 7/22 –Meeting with Andrea Thomas to review Request for Information needs on the Rattlesnake Creek Hazard Mitigation Grant submission 7/22 –One on One meeting with Chief Canavan 7/22 –Meeting with County OES to review CA Resilience Challenge working group COVID 19 Support (Daily) •Manage EOC Briefings •Monitor WebEOC •Monitor County/State Briefings •City Liason with County of San Diego Office of Emergency Services and CalOES •Prepare FEMA reimbursement documents FD Management Staff Notes Page 4 PHOTO HIGHLIGHTS Vehicle rescue on the Poway grade on 7/25/21. One patient was trapped and successfully extricated by 3779 and 3711, treated for minor injuries, and transported by 3791. FD Management Staff Notes Page 5 A resident’s pool pump caught fire on 7/21/21. Brush engine 3761 extinguished the fire. CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Jodene Dunphy, Director of Human Resources & Risk Management DATE: July 28, 2021 SUBJECT: Human Resources & Risk Management Department Director’s Notes HUMAN RESOURCES Promotion Name Position/Title Department Start Date Jesse Gonzales Construction Maintenance Supervisor Public Works 8/2 Current Active/In Progress Recruitments No. Dept. Title Type Opened Closed/Close 1 CS Box Office Attendant Part-Time Temporary 6/30 9/19 2 CS Front of House Assistant Part-Time Temporary 6/30 9/19 3 CS Director of Community Services Full-Time Regular 6/8 Continuous 4 CS Lifeguard Part-Time Temporary 7/14 10/17 5 CS Recreation Leader I Seasonal 3/25 Continuous 6 CS Stage Technician Part-Time Temporary 5/25 8/22 7 DS Associate Civil Engineer Full-Time Regular 6/1 7/18 8 FIRE Firefighter/Paramedic Full-Time Regular 5/26 Continuous 9 LS City Clerk Full-Time Regular 6/18 Continuous 10 LS Records Technician Full-Time Regular 6/2 6/20 11 PW Administrative Assistant III Full-Time Regular 6/21 7/5 12 PW Facilities Maintenance & Special Districts Supervisor Full-Time Regular 6/2 7/5 13 PW Sr. Facilities Maintenance Technician Full-Time Regular 6/16 7/18 14 PW Stormwater Maintenance & Construction Worker I/II Full-Time Regular 6/4 7/11 15 PW Utility Systems Mechanic/Sr. Utility Systems Mechanic Full-Time Regular 7/27 8/22 16 PW Water Treatment Plant Operator Full-Time Regular 5/11 6/30 CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Eric Heidemann, Director of Public Works DATE: July 28, 2021 SUBJECT: Public Works Department Bi-Weekly Report (July 12, 2021 – July 25, 2021) Work/Description Units Location/Description OPERATIONS Street Maintenance Asphalt Repairs (sq. ft.) 81021 Zone #4 Crack Sealing Program – Complete (81,000 linear feet). Repaired a water utility trench on Poway Road. Repaired potholes at various locations. Debris Removal 6 Removed wood and plastic debris from along the roadside on the Poway Grade. Removed an illegally dumped bed from Bowron Road and an illegally dumped refrigerator from Scots Way. Picked up drywall from Pomerado and Nazas Roads and cleaned up glass from Espola Road. Concrete Repairs (sq. ft.) 45 Performed concrete grinds at various locations (approximately 45 sq. ft.), Removed and replaced sidewalk panels on Pomerado Road, Scripps Poway Parkway, and Aubrey Street. Replaced the sidewalk and a driveway approach for a Wastewater clean out repair. Signs 11 Removed unauthorized “STOP” sign and legend from Crossrock Road, repaired a sign on Scripps Poway Parkway, installed eight new parking restriction signs on Midland Road and repaired a sign on Pomerado Road. Vegetation 9 Removed a tree branch blocking the sidewalk on Palisades Drive, trimmed branches blocking a lane of traffic on Old Pomerado Road, removed a tree branch blocking the bike lane and sidewalk on Twin Peaks Road, removed a fallen branch blocking the road on Woodland Parkway, trimmed low hanging branches on Midland Road. Performed weed abatements on Standish Road, Garden Road, Espola Road, and Twin Peaks Road. Graffiti - No incidents Public Works Department Report – July 28, 2021 Page 2 Work/Description Units Location/Description Miscellaneous 6 Removed trash from the right of way under Sycamore Canyon bridge, removed trash along Espola Road and from Scripps Poway Parkway. Repainted fire lane at Lake Poway parking lot (approximately 1,800 linear feet) and at the Water Treatment Plant (approximately 60 linear feet). Placed two asphalt berms around the grease enclosure at the Hamburger Factory. Special Events - None Stormwater & Flood Control Annual Concrete Channel Cleaning Program 6 Crews completed work on Adah Lane and the Pomerado Channel from Pomerado Hospital to Amso Street Vactor Request 3 Carlson Court Cross Bar Install 1 Cloudcroft Court Stencil/Medallion Install 28 Installed “No Dumping” medallions at inlets throughout Poway. The medallions serve as a JURMP component complying with public education and outreach regarding our MS4. Fence Repair 1 Floral Ave Vehicle & Equipment Maintenance Work Orders 29 Scheduled/Unscheduled 20/9 Red Fleet Work Orders 6 Red Fleet Scheduled/Unscheduled 5/1 Underground Storage Tank - APCD Vapor Recovery Test Completed Facilities Maintenance Electrical & Lighting ½ Lighting Plumbing/HVAC 9/1 Mostly Plumbing Miscellaneous 15/8 Doors, cosmetically finishes, moving furniture Total Facilities Work Orders Completed / In Progress 25/11 Contract Inspections Attended an M drive clean up meeting with Izzy, a grid trim meeting with Marc LeDrew and Michael DeVenere, and an LMD maintenance and tree meeting. Sent out a backflow RFP to Palomar Backflow, Certified Backflow, San Diego Backflow Testing. Picked up debris that was generated by two days of work from volunteers on Espola Road. Performed tree/fuel removal in LMD 83-1A. Responded to requests for repair of an irrigation leak and an irrigation main break. Oversaw the contractors who were fumigating the Sheriff’s Station. Attended the traffic signals upgrade pre-construction meeting; the HVAC Public Works Department Report – July 28, 2021 Page 3 Work/Description Units Location/Description water treatment inspection and Community Center kitchen walk-thru with janitorial staff. Customer Inquiries 10 Streetlight Issues I Starridge Park Traffic Signal / Emergency Community and Olive Grove; Poway at Treadwell, Pomerado and Creek; Community at Twin Peaks; Hilleary at Community Road and Colony Drive. USA Mark Outs 5 Port Marnock Way and St Andrews Drive; St Andrews Drive and Burning Hills Drive; St Andrews Drive and Tining Way; Olive Meadows Drive; Lake Poway Road. Service Requests/Work Orders 1 Investigated damaged loop after road work along Espola and Twin Peaks Roads. Work Orders Completed / In Progress 4 Siemens investigated noisy HVAC cover at Public Works Administration. Priced out additional day of cleaning at park restrooms. Ag Pest Control investigated wasp infiltration at the Library; Siemens investigated duct detectors at City Hall. Parks, Trails & Landscape Maintenance Arbolitos Sports Park - Trimmed the trees, shrubs, and hedge along entry. Aubrey Park - Trimmed trees, shrubs, and vines along the northern boundary. Performed gopher abatement. Performed irrigation repairs replacing three valves. Bette Bendixen Park - Painted both picnic tables. City Hall - Trimmed shrubs, cleaned planters, removed debris. Treated facility with herbicide; along walkways, planters, trails, and mulched areas. City Owned Properties - Removed pepper tree trunk suckers along Midland Road across from Old Poway Park. Community Park - Supported daily activities and camps. Trimmed trees and shrubs. Applied herbicide along walkways and fence lines, planters, and the trail from Dog Park to City Hall. Garden Road Park - Performed weed abatement before herbicide application. Applied herbicide along the trail, mulched areas, picnic areas and fence lines. Hilleary Park - Replace tennis court nets. Trimmed trees, hedges, and shrubs, and remove suckers. Repaired and adjusted the irrigation. Lake Poway Park - Cleaned red curb areas for Streets division to re- paint. Adjusted/repaired several turf irrigation heads. Supported the campout Saturday evening – Sunday afternoon. Public Works Department Report – July 28, 2021 Page 4 Work/Description Units Location/Description Old Poway Park - Performed multiple irrigation repairs. Provided support for activities and events. Trimmed trees and shrubs. Performed gopher abatement. Poway Oaks Park - Repaired a metal park bench next to the basketball court. Silverset Park - Removed eucalyptus tree stump suckers along the field view fence line. Applied herbicide along the walking path, fence lines and hardscapes. Starridge Park - Repaired the trail fence. Valle Verde Park - Performed gopher abatement along the front of the park. Replaced several turf irrigations heads, ran a new 20-foot drip line in the planter near the backflow. Added 10 medium sized rocks to the planter in front of the restroom building. Replaced home plate on the ballfield. Miscellaneous Parks - Performed Crosthwaite Materials Handling Yard duties this month. Miscellaneous Trails - Attended and memorialized Trails Committee meeting. Installed a new signpost at the end of Old Wine Master Way. Applied herbicide along Justin’s Trail. Emergency Response Emergency Response Callouts 8 Opened the gate at Lake Poway to allow a patron to leave after-hours. Removed an LMD tree branch from the street. Repaired a valve in a meter box that was full and leaking on the City’s side (resident to have plumber repair leak on their side) cleaned out the meter box and left open for the resident to have repair made on their side. Re-seated a toilet valve in the men’s toilet at Arbolitos Park, performed repair and turned water back on. Responded to smart cover alarm on Bowron Road, could be due to construction in the area. Water running into the street from LMD sprinkler, turned off backflow to sprinkler. Stopped a small leak on a fire hydrant on Bowron Road. Resident sewer was backing up on Halper Road, no city clean outs, resident to contact a plumber. UTILITIES Water Distribution System Operations Mark-Outs 70 Distribution Maintenance 81 Water System Shutdown 2 Avenida Florencia, Crosthwaite Circle Main valve replacement 1 Avenida Florencia Cleaned Fire Tower cistern and interceptors 1 Crosthwaite Circle Customer Service Repairs: 3 Pomerado Road, Whitewater Drive, Poway Road Public Works Department Report – July 28, 2021 Page 5 Work/Description Units Location/Description Leaks, AMS updates, non-ops. Annual Test Reports 302 Backflows Tested 14 Large Meter Tests 0 Water Treatment Plant and Utility Systems Operations Lake Poway Rainfall (inches) 0 Lake Poway and Poway Dam (FSL) 930.5 Water Treatment Plant 264.5 82 Average flow: 10.61 MGD. Collection System Maintenance Sewer Mainlines Rodded (Vactor) Routine Mainline Rodding (l/ft.) 8,935 Monthly High Frequency Rodding (l/ft.) 0 Quarterly High Frequency Rodding (l/ft.) 0 Special Mainline Rodding (l/ft.) 140 Total Mainline Rodded (l/ft.) 9,075 Sewer Mainlines Inspected (CCTV) Routine Mainline Inspection (l/ft.) 0 Special Mainline Inspection (l/ft.) 0 Total Mainlines Inspected (l/ft.) 0 Utility Crew Task Count Annual Lateral Assessments 16 Bi-Annual Lateral Assessments 0 Laterals Inspected 17 Laterals Rodded 13 Laterals Repaired 1 Lateral Blockage Mitigation 0 SSO Spill Volume Estimation 0 Manholes Located 0 Manholes Raised 0 Manholes Inspected 0 Easement Maintenance 0 Customer Service 1 Total of Division Tasks Completed 48 Recycled Water System Recycled Site Inspections 2 Four-Year, Four-Hour Potable Cross- Connection Tests 5 Four Year, 24 Hour Recycled Irrigation Test 5 Annual Recycled Site Inspection 0 Customer Service 1 DRC Plans Reviewed 0 Total Completed Tasks 13 Fats, Oils, Grease (FOG) Program Business License Review 13 Public Works Department Report – July 28, 2021 Page 6 Site Inspection 3 FOG Permit Issued 3 Customer Service 0 Total of Completed Tasks 19 Water Infrastructure Improvement Program Staff is finalizing a contract with GSE for the construction of the clearwell bypass with an anticipated notice to proceed mid-August. The RFP for the design of the Clearwell closed on July 7. Four proposals were received, an evaluation team reviewed the proposals, and IEC was selected as the most responsive. A contract with IEC will be on the City Council agenda for consideration on August 17, 2021. July 20, 2021 TO:Chris Hazeltine, City Manager City of Poway FROM:Michael Knobbe, Lieutenant Poway Station WEEKLY ACTIVITY REPORT FOR 7/9/2021 - 7/15/2021 San Diego County Sheriff's Department Post Office Box 939062 - San Diego, CA 92193-9062 William D. Gore, Sheriff Arrested Name Violations Arrest Location 07/10/2021 RONQUILLO, UNIQUE OW-F ZZ - FELONY OTHER AGENCY'S WARRANT Scripps Poway Parkway & Stowe Drive, Poway 07/11/2021 GLENN, THOMAS 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M); 11377 (A) HS - POSSESS CONTROLLED SUBSTANCE (M) Poway Road & Hidden Knoll Road, Poway 07/13/2021 RODRIGUEZ, BRANDON 488 PC - PETTY THEFT(All Other Larceny) (M)13589 Poway Rd, Poway 07/13/2021 FREEMAN, KEVIN 647 (F) PC - DRUNK IN PUBLIC: ALCOHOL, DRUGS, COMBO OR TOLUENE (M) 12425 Oak Knoll Rd, Poway 07/14/2021 CONNELLY, RANDALL 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M); 466 PC - POSS BURGLARY TOOLS (M) Community Rd @ Gregg Ct., Poway 07/14/2021 HILL, CLARK 647 (F) PC - DRUNK IN PUBLIC: ALCOHOL, DRUGS, COMBO OR TOLUENE (M) 14168 Poway Road, Poway Category Arrests DUI 1 Felony 1 Misdemeanor 5 Total 7 Category Cases Felony 7 Misdemeanor 8 Total 15 Keeping the Peace Since 1850 Michael Knobbe, Lieutenant Poway Station Captain David M. Schaller, Poway Station Keeping the Peace Since 1850 July 26, 2021 TO:Chris Hazeltine, City Manager City of Poway FROM:Michael Knobbe, Lieutenant Poway Station WEEKLY ACTIVITY REPORT FOR 7/16/2021 - 7/22/2021 San Diego County Sheriff's Department Post Office Box 939062 - San Diego, CA 92193-9062 William D. Gore, Sheriff Arrested Name Violations Arrest Location 07/17/2021 HORETH, TERRANCE 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M); 14601.2 (A) VC - DRIV W/LIC SUSP/REV W/PRIOR DUI CONV (M) 13301 Poway Rd, Poway 07/17/2021 SEAY, JORDAN 594 (B)(1) PC - VANDALISM ($400 OR MORE) (F); 236 PC - FALSE IMPRISONMENT (M); 243 (E)(1) PC - BATTERY:SPOUSE/EX SPOUSE/DATE/ETC (M) 13508 Pomerado Rd, Poway 07/18/2021 SNODGRASS, JAMES 245 (A)(1) PC - ASSAULT W/DEADLY WEAPON:NOT F/ARM (F); 25850 (C)(6) PC - CARRY LOADED HANDGUN:NOT REGISTERED OWNER (F); 22350 VC - UNSAFE SPEED (BASIC SPEED LAW) (I); 2800.1 (A) VC - EVADING PEACE OFFICER (M) 18000 Old Coach Dr, Poway 07/18/2021 WILLEMSE, WALDEMAR 243 (E)(1) PC - BATTERY:SPOUSE/EX SPOUSE/DATE/ETC (M) 12815 Stone Canyon, Poway 07/19/2021 MILLANES, JESUS BW-F ZZ - FELONY BENCH WARRANT (OUR AGENCY); 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M); 11377 (A) HS - POSSESS CONTROLLED SUBSTANCE (M); 14601.1 (A) VC - DRVG WHILE LIC SUSP OR REVOKED:OTHER REASONS (M) Poway Road & Millards Road, Poway 07/19/2021 CORNELIUS, MICHAEL OW-F ZZ - FELONY OTHER AGENCY'S WARRANT; 148.9 (A) PC - FALSE IDENT TO PEACE OFCR (M) 13536 Poway Road, Poway 07/19/2021 BIAS, MICHAEL 243 (E)(1) PC - BATTERY:SPOUSE/EX SPOUSE/DATE/ETC (M); 591.5 PC - OBSTRUCT USE OF ANY WIRELESS COMMUNICATION DEVICE (M) 12825 Claire Dr., Poway Keeping the Peace Since 1850 07/20/2021 CORNELIUS, MICHAEL 529 (A) PC - FALSE PERSONATION OF ANOTHER:SPEC CIRC (F) 13100 Bowron Rd, Poway 07/20/2021 GUZMAN, WILLIAM 11377 (A) HS - POSSESS CONTROLLED SUBSTANCE (M); 647 (F) PC - DRUNK IN PUBLIC: ALCOHOL, DRUGS, COMBO OR TOLUENE (M) 13030 Morene Street, Poway 07/22/2021 MARTINEZ, ALEX 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M) Pomerado Rd @ 9th Street, Poway Category Arrests Felony 5 Misdemeanor 5 Total 10 Category Cases Felony 5 Misdemeanor 4 Total 9 Michael Knobbe, Lieutenant Poway Station Captain David M. Schaller, Poway Station Keeping the Peace Since 1850