Loading...
Directors' Notes 08-11-21City Clerk’s Office Page 1 of 4 DATE: August 11, 2021 TO: Chris Hazeltine, City Manager FROM: Deborah Harrington, Interim City Clerk CONTACT: (858) 668 – 4535 or dharrington@poway.org SUBJECT: City Clerk: Weekly Notes (July 28 – August 10, 2021) Upcoming Agenda Deadlines Council Meeting Staff Reports Due Agenda Posted September 7 August 23 August 31 September 21 September 2 September 14 October 5 September 20 September 28 Legal Notices Order No. Project Title Publishing Date(s) Dept. 21-053 Fire Suppression Equipment Services, RFP No. 22-004 8/12 & 8/19 PW 21-054 SPA19-002/CUP19-002 Kirkham Wireless Facility 8/12 DSD Public Records Requests Name Subject of Request Date Closed 2021-113 Friedman, Assi 1) All email communications with email Ms. Cynthia Elizondo at email Cynthia@cynthiaelizondo.com. This request includes all and any city staff, city council, and mayor. 2) Any email communications in which Ms. Cynthia Elizondo is mentioned, i.e. internal emails/memos. 3) Responsive materials should be in the date range of 1 April 2021 to 30 June 2021. Extension notice sent 7/21/21 2021-125 Friedman, Assi All emails from Councilmember Dave Grosch's email account dgrosch@cox.net relating to Poway City business from the year 2021. A copy of the City of Poway document retention policy demonstrating private email accounts, phones, etc. are maintained consistently with state law. Evidence from Cox cable Councilmember Dave Grosch has not destroyed public record. Extension notice sent 7/27/21 City Clerk’s Office Page 2 of 4 Public Records Requests continued Name Subject of Request Date Closed 2021-127 Sandoval, Kevin Precise Grading Plans and Building Permit for the lot at 13609 Twin Peaks Road, APN 3141927200. Design Review Plans; City of Poway Approved Plot Plan #P71-40W, CUP 87.03 and Development Review 87-05. Extension notice sent 7/30/21 2021-128 Partner Engineering and Science Inc. Properties: 12425 Oak Knoll Road, Poway and 0 Pomerado Road, Poway, Parcels: 3175502000 and 3175551900. Requesting information on any open zoning code violations; open building code violations; copies of available certificates of occupancy (and if not on file, is this a code violation?), copy of approved site plan on file, if available, information on any open fire code violations and information on any roadwork or construction that may impact the property. Extension notice sent 7/30/21 2021-129 WEXCO International Any and all building permits, inspection records, code enforcement/violations (new and old), certificates of occupancy and Plsn for review for 13475 Poway Road, Poway. 7/28/21 2021-130 GG Homes OPEN and CLOSED Residential Code Violations between June 16, 2021 and July 23, 2021 7/28/21 2021-131 SmartProcure All purchasing records from Jun 30, 2018 12:00 AM to current. The request is limited to readily available records without physically copying, scanning or printing paper documents. Any editable electronic document is acceptable. The specific information requested from your record keeping system is: 1. Purchase order number. If purchase orders are not used a comparable substitute is acceptable, i.e., invoice, encumbrance, or check number 2. Purchase date 3. Line item details (Detailed description of the purchase) 4. Line item quantity 5. Line item price 6. Vendor ID number, name, address, contact person and their email address 8/03/21 2021-132 Do, Jonathan Copies of permit or structural plan for suite D4/D5 at 15525 Pomerado Road. APN 2754606521 and 2754606525. 8/03/21 2021-133 Olps, Chris Copy of Letter from Mayor Vaus mentioned at 7/20/21 City Council meeting. 2021-134 Olps, Chris Communications from all current council members from their first day in office including past council member Cunningham back to 2012 re. Clearwell upgrades etc…Water treatment upgrades etc. Water system upgrade etc. Extension notice sent 8/05/21 2021-135 Olps, Chris Any communications with the city regarding the Skate Park including communications with any staff or council from any non-city connected person from 2010 to now, preferably from 2003. Extension notice sent 8/05/21 2021-136 Olps, Chris All communications and records between Bob McKeon and the City (staff) and between Dave Grosch and Steve Vaus from 2018 to present. City Clerk’s Office Page 3 of 4 Public Records Requests continued \ Name Subject of Request Date Closed 2021-137 Murbach Geotech Review of geotechnical reports, specifically Geotechnical Investigation reports and/or As-Graded Geotechnical reports for properties at the south end of Adah Lane. Parcels at or near APNs 323-262-33 through 36; APN 323-290-1700.I do not need copies of all the documents. Review the documents, take notes and possibly copy a few pages. 7/29/21 2021-138 TSCA Engineering As-builts for Water/Sewer/Storm utilities at 13732 Rostrata Rd, Poway 7/29/21 2021-139 SD County Taxpayers Association Government Funding Homelessness Services 7/28/21 2021-140 Olps, Chris All correspondence to and from the San Diego County Water Authority and the City of Poway from August 1, 2019 through November 1, 2019. Also any record of any meetings held (same period) if available. Withdrawn by requestor 2021-141 Powers, Torrey Copies of 700 Forms for Steve Vaus from 2010 - Present. 8/14/21 2021-142 Ohm Analytics Data regarding Issue Residential and Commercial Solar (photovoltaic - PV) permits from 7/1/21 to 7/31/21 in CSV or excel format. 8/10/21 2021-143 Brorokhov, Michael All public records, all plans, and all permits, and all inspections regarding the 15065 Garden Road, Poway, CA 92064 property. I am the current owner. 2021-144 Christensen Building Design 12306 Teri Drive, Poway CA 92064, Copies of past building permits. Existing condominium subdivision called Pacific Homes. I'm in need of a site plan copy for the entire subdivision, if available? Or subdivision map? 2021-145 Filtrous Inc. Find the owner of the property that the Costco and Home Depot both occupy on Scripps Poway Pkwy. 2021-146 Olps, Chris Would like to speak with Jessica Parks or find records, documentation, or communications between her and the SDCWA regarding a treated water connection. 2021-147 Dean Runyan Associates TOT form I need filled out and sent back to me. Basically, rates and totals from FY 2019-2020 8/10/21 2021-148 TSAC Engineering AS-BUILT’s for Water/Sewer/Storm utilities. Our project is about relocating power poles and we need to design the location and not interfere with any wet utilities pipes. The area include the following APNS and Right-of-Way. APNS: 27508203, 27571102, 27571104 and would also need have the utilities in the right of way of 27571102 and 27571104. A nearby address that may help can be 13732 Rostrata Rd, Poway, CA 92064. CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Wendy Kaserman, Assistant City Manager DATE: August 11, 2021 SUBJECT: Community Services Department Bi-Weekly Report Upcoming Date Time Location Night Fishing (shoreline only) Aug 13 & 14 6:00pm-11:30pm Lake Poway Summer Concert Series: Benedetti Trio Aug 15 5:30pm-7:00pm Old Poway Park Night Fishing (shoreline only) Aug 20 & 21 6:00pm-11:30pm Lake Poway Summer Movies in the Park: The Jungle Book Aug 21 6:30pm- 9:45pm Old Poway Park Night Fishing (shoreline only) Aug 27 & 28 6:00pm-11:30pm Lake Poway Kid’s Night Out Sept 3 4:30pm – 9:00pm Community Park Night Fishing (shoreline only) Sept 3 & 4 6:00pm-11:30pm Lake Poway Fall recreation programs got off to a great start, with first-day registrations up 3%. First-day revenues were up 11% over the last year of full programming (2019). This past Sunday, Lake Poway hosted the final Summer Concert of the Summer. Pop Vinyl entertained a crowd of over 2,000 people of all ages with today’s pop hits. The entry station generated $3,330 in parking revenue. Old Poway Park brings history to life daily with assistance from a dedicated corps of volunteers. In the month of July, close to 1,000 hours were donated by the Old Poway Park Action Committee groups. These various organizations provide unique support services, for example the Poway Valley Garden Club maintains the multiple beautiful gardens at the park. We are thrilled to announce that the 1907 Baldwin Steam Engine is back on the track for the first and third weekends of each month. Poway Midland Railroad volunteers have been working hard retraining on the operation of the Steam Engine and are enthusiastic about offering this iconic ride. Preparations for rotating Art Exhibits at the PCPA are in full swing. We’re in contact with several local artists and look forward to welcoming a diverse lineup of fine art, mixed media, and even a dazzling display of quilts. Over 450 moviegoers enjoyed Raya and the Last Dragon on the big screen at Community Park last Saturday. The final movie of the summer (The 1967 version of Jungle Book) will take place at Old Poway Park on August 21. CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Bob Manis, Director of Development Services DATE: August 11, 2021 SUBJECT: Director’s Notes PLANNING Community Park Assessment Public Survey The City is conducting an updated needs assessment to determine future amenities and offerings at Community Park. This is an action plan to provide a prioritized list of programs, facilities, and amenities currently offered at Community Park or that might be considered in the future. The outreach and assessment was prepared by PROS Consulting, Inc. A public community survey regarding the offerings at the park was released on August 12th and will be available in Spanish and English at plancommunitypark.com. New Five-Story Self Storage Commercial Building at 12183 Kirkham Road On August 4th, a building permit was issued for a new 99,057 square-foot five-story self-storage commercial building, including 838 square feet of office space. Public Review and Comment Period for Environmental Determination of Kirkham Wireless Facility On August 12th, a Negative Declaration was released for a 20-day public review and comment regarding Specific Plan Amendment (SPA) 19-002 and Conditional Use Permit (CUP) 19-002 to amend the South Poway Specific Plan (SPSP) to allow freestanding wireless communication facilities to have a maximum height of 90 feet with a conditional use permit and to allow a wireless communication facility consisting of an 85.5-foot-tall monopole and a ground mount equipment cabinet on a 5.37 acre-lot at 13875 Kirkham Way in the Light Industrial – Storage (LI-S) land use district of the SPSP. Neighborhood Meeting for Private Recreational Facility at 14100 Biscayne Place (Heritage) On August 5th, a hybrid in-person/virtual neighborhood meeting was held for Conditional Use Permit (CUP) 21-001 to allow for a private recreation facility (indoor basketball court) at 14100 Biscayne Place. The private recreation facility would be constructed as part of a single-family residence that is proposed with a Minor Development Review Application (MDRA) 21-001. There were approximately 15 people in attendance, including the applicant’s team and City staff. Attendees expressed concerns regarding: 1) the amount of people that would be using the facility at any given time; 2) how early the facility would be used; 3) the noise generated by the facility (music); 4) the design of the facility not compatible with the surrounding neighborhood; 5) the design of the facility not looking like a single-family residence; 6) additional vehicle trips and parking in the neighborhood; 7) memberships and/or classes provided at the facility, if applicable; and 8) enforcement after the facility is built. Based on the comments received from the community, the applicant is going to consider some design changes and reach out to the community for additional feedback. New Accessory Dwelling Unit at 13620 Holly Oak Way On July 27th, a building permit was issued for a one-bedroom 785 square foot ADU with an office. Director’s Notes August 11, 2021 Page 2 CAPITAL IMPROVEMENTS Poway Center for the Performing Arts Rehabilitation Project The request for proposals (RFP) for the design of this project was posted on July 29th. This project is a multi-year major rehabilitation of the mechanical, electrical, plumbing, interior finishes, ADA upgrades and roof rehabilitation. The consultant team that staff is looking for is one that has extensive Department of State Architect as well as performing arts center experience. A mandatory pre-proposal site visit is scheduled for August 13th. 2021-22 Street Maintenance Project The first week of the project started with chip sealing six streets. Slurry seal started last Tuesday. The project will continue for the next four weeks with approximately 120 sections of residential and collector streets being sealed Monday through Thursday. Twin Peaks Road, Community Road and Camino Del Norte will be sealed on Sunday mornings. Boulder Mountain No. 1 & 2 Reservoir Rehabilitation The contractor completed installation of all the tank appurtenances at the end of July and washed and disinfected the tanks before Public Works filled up the tanks last week. Public Works staff will collect samples and test the water before putting the tanks back on the distribution system. The duck bill for the overflow was delayed. Once that part is installed, a final punch list walkthrough will be performed to close out the project. Lake Poway CDBG ADA Pathways Project The contractor continues to make progress on the project. Clearing and grubbing, and rough grading were completed last week. By the end of this week the placement of the concrete pathways will be nearing completion. Bowron Road Sewer Upsize With the extra working day given to the contractor last Saturday, they were able to complete work fronting the school’s northernmost driveway prior to school starting on August 2nd. The contractor is now working near the intersection of Bowron Road and Civic Center Drive. Until they are north of Civic Center Drive, they will not be allowed to work during school drop-off and pickup times. Exposed Sewer East of Martincoit The contractor has excavated the first 80 feet of trench and boring pits. One unmarked lateral was discovered during operations and relocated. Boring activity and setup will begin next week pending submittal approval by the consultant. Director’s Notes August 11, 2021 Page 3 LAND DEVELOPMENT The Farm City staff has issued comments on the second submittal of the rough grading plans, street improvement plans, and final maps (Units 1 & 2) for the subdivision taking place at the Stoneridge Golf Course property. Lara Residence Minor comments were issued on the resubmittal of the stormwater quality management plan for the residence proposed on Golden Way. Nguyen Residence City staff has approved and prepared the final easement document granting a water easement along Oak Canyon Road for a proposed fire hydrant. Staff has routed the document to the owner for signatures. Sage Highlands The surveyor of record has submitted a Certificate of Correction (C of C) after realizing that a monument at the southwest boundary corner was replaced but not included on the C of C that was previously recorded in January 2019. City staff is currently reviewing the submittal. Fitzner Properties City staff received the final signed merger document back for two adjacent properties along Beeler Creek Trail. Staff is awaiting the recording fee to send the document for recordation. FEMA – CRS Program   FEMA Community Rating System The National Flood Insurance Program (NFIP) provides federally backed flood insurance within communities that enact and enforce floodplain regulations.  To be covered by a flood insurance policy, a property must be in a community that participates in the NFIP. To qualify for the NFIP, a community adopts and enforces a floodplain management ordinance to regulate development in flood hazard areas.  Additionally, there is the Community Rating System (CRS) which is a national program developed by FEMA.  Under the CRS program, communities can be rewarded for doing more than simply regulating construction of new buildings to the minimum national standards.   The City participates in the CRS program for several reasons, one of which is the discounted flood insurance premiums it provides for the City’s residents and businesses.  In order to participate in the CRS program, City staff must implement activities to reduce flood damage to existing buildings, manage development in areas not mapped by the NFIP, protect new buildings beyond the minimum NFIP protection level, preserve and/or restore natural functions of floodplains, help insurance agents obtain flood data, and help people obtain flood insurance.  Each year, the City must recertify that it is continuing to implement the activities for which it has earned credit and meets the requirements for its level of participation.  City staff just completed and submitted the recertification package to FEMA for review.    STORMWATER Best Management Practices Manual The Municipal Separate Storm Sewer Systems (MS4 Permit) that covers this region includes requirements for new developments and redevelopments. As required by the MS4 Permit, the Copermittees collaboratively prepared a Model Best Management Practices (BMP) Design Manual to address on-site post-construction stormwater requirements and provide updated procedures for planning, preliminary design, selection and design of permanent stormwater BMPs based on the requirements presented in the MS4 Permit. The manual is intended to be used as the Director’s Notes August 11, 2021 Page 4 basis for jurisdiction-specific BMP Design Manuals for local implementation. There are areas in the manual where a jurisdiction can add and/or clarify jurisdiction specific requirements or information. From time to time the Copermittees update the Model BMP Manual based on new information or clarification from the Regional Water Quality Control Board. City staff just updated the Poway BMP Manual based on the latest Model BMP Manual and uploaded the document to the City website. INSPECTION Creekside Plaza / The Habit Burger Grill Poway Road (G19-0013) - Construction is nearing completion. Punch list work continues, and the contractor has completed all paving, slurry seal, and striping. The project inspector conducted the punch list inspection for all surface and underground storm drain system improvements, several items were noted. Irrigation, landscape, and storm drain punch list items are ongoing. Pedestrian Traffic Signal Kirkham Way (STI20-003) - After numerous utility conflicts were discovered, several re-route alternate ideas were submitted for consideration. The City reviewed these alternates and chose relocating the crosswalk pushbutton pole to meet ADA requirements and still miss conflicts. Stone Ridge Country Club Demolition Espola Road (RW20-0160) - All buildings have been demolished, along with the pool and all nine tennis courts. The pile of rubble was crushed and made into a pile of miscellaneous base material that can now be used for future backfill. Poway Commons Poway Road (G19-0011) (STI20-002) - The contractor performed asphalt restoration for several of the utility trenches along Poway Road. That work was not completed and is expected to resume soon. Some of the restoration that was completed was found to be non-conforming, those areas were marked out for removal. Work on the retaining walls on the northern parcel continues, north of the Poway Commons affordable housing project. The pre-grout inspection was conducted and grout placement is tentatively scheduled for this week. The contractor has requested occupancy for the homes along Civic Center Drive. Last week the contractor worked on landscape and irrigation installation as well as punch list items. St. Bartholomew’s Church Pomerado Road (G21-0004) - A preconstruction meeting has been held. A haul route permit has been issued and work has begun. The new playground, the expansion of the existing parking lot with Director’s Notes August 11, 2021 Page 5 various retaining walls, and an ADA path of travel up a slope are being constructed. Grading is ongoing and this week the first keyway inspection is scheduled. SDG&E 16” Gas Line Installation Project North Pomerado Road (RW20-0366) - Advanced warning signs have been placed along Pomerado Road at both ends of work. The contractor has now excavated, installed 16” pipe, backfilled with 2-sack sand slurry, and base paved the trench from Ted Williams Parkway to Colony Drive. The crew has crossed Pomerado Road from the northbound lanes to the southbound lanes (just north of Colony). The second crew adjacent to the hospital is expected to install pipe crossing Pomerado Road from northbound lanes to southbound lanes. This work is currently south of Monte Vista Road. SDG&E 16” Gas Line Installation Project South Pomerado Road (RW21-0126) - This portion of the 16” steel gas main installation is between Ted Williams Parkway and Scripps Poway Parkway. The preconstruction meeting has been held. The contractor performing work for SDG&E (Hinkle McCoy) will be using both the construction laydown yard on Oak Knoll Road and one on Stonebridge Parkway within the City of San Diego. Hinkle McCoy is scheduled to begin potholing to locate and identify existing utilities along Pomerado Road this week. Lamie Residence Heritage Drive (G20-0023) - Last week the footings for the upper masonry walls around what will be the tennis court were placed. Concrete footings and slab for the new home and ADU have been placed. Work on the structure is scheduled to begin. SCHEDULED ROAD/LANE CLOSURES  Possible lane closure on Espola Road between Twin Peaks Road and Titan Way in both directions for the undergrounding and removal of overhead utilities associated with the Espola Road Safety Improvements Project.  Possible lane closure on Poway Road between Tarascan Drive and Carriage Road, and Tarascan Drive between Wanesta Drive and Poway Road in both directions for work related to the Poway Commons project.  Possible lane closure on Pomerado Road from Stone Canyon Road in both directions to Scripps Poway Parkway for work related to the SDG&E gas main installation project.  Possible lane shift or lane closure Espola Road from Twin Peaks Road to Mountain Road northbound lane for work related to an SDG&E undergrounding electric project.  Possible lane closure on Kirkham Way between General Atomics Way and Stowe Drive in both directions for work related to the General Atomics traffic signal/crosswalk project. 1 of 3 CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Aaron Beanan, Director of Finance DATE: August 11, 2021 SUBJECT: Finance Department Director’s Notes Finance • Deadline for FY21 invoices to be entered and approved is 12:00 p.m. on August 24 Information Technology • PCs Replacements o PCs continue to roll out by Division - deployments citywide are 60% completed • EnerGov – On schedule for November deployment o Department staff continue testing/modifying configuration through end of August o First pass of data conversion from TRAKiT is expected in a few weeks o Tyler Cashiering implementation started last week • Tokay Backflow Software o Upgrade of the Tokay backflow software to a SQL database and implementation of website for submitting testing online. We have had two meetings and started on data conversion. • Storage Hardware Replacement o RFP is almost completed and will be released in a few weeks o This project will replace data storage and backup hardware at both City Hall and Public Works • Northstar o Working with Customer Services to implement Payment Arrangements within NorthStar o Completing upgrade of NorthStar and Customer Connect o Testing credit card transaction fees (moving from set amount to percentage) 2 of 3 Customer Services Business Registration Customer Services completed updates to the City’s business registration process for home occupation permits and business certificates to waive fees for local Poway businesses starting the first week of August 2021. The Poway Business Registration Fee Waiver Program is part of the City’s ongoing efforts to accelerate the economic recovery of local businesses and address both the near and long-term negative impacts of the COVID-19 pandemic. Utility Billing Late fees were assessed for utility accounts with a past due balance starting July 1. Customer Services continues the use of automated phone and email notifications to customers to provide a courtesy reminder of past due balances before late fees are assessed. Business Registration July 2021 Business Certificates 142 Home Occupation Permits 14 Regulatory Licenses 1 Utility Billing Start Service 108 Close Service 93 Cycle Bills Processed 6534 Past Due Notices Sent 551 General Support Services Requests for Proposals: RFP Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded RFP Awarded Vendor Council Award Date RFP 21-029 Grove Management & Maintenance Services TBD N/A $106,243 TBD TBD TBD RFP 21-032 Design Services for the Clearwell Replacement Project 7/7/21 4:00 p.m. N/A $298,780 TBD TBD 8/17/21 RFP 22-002 As-Needed Legal Services for Poway Housing Authority 8/23/21 (City Hall) N/A $13,833 TBD TBD 9/21/2021 3 of 3 RFP Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded RFP Awarded Vendor Council Award Date RFP 22-003 PCPA Architectural and Engineering Design Services 8/27/21 N/A $500,000 TBD TBD TBD RFP 22-004 Fire Suppression Equipment Services 8/25/21 N/A $23,776 TBD TBD 9/17/2021 RFP 22-005 Storage Area Network (SAN) System 9/22/21 N/A Over $50,000 TBD TBD TBD October 2021 CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Jon Canavan, Fire Chief DATE: August 11, 2021 SUBJECT: Fire Department Management Staff Notes ADMINISTRATION FIRE PREVENTION Activity # Activity # Administrative Remedy Letters (ARLs) 0 Permit to Operate Inspections 36 Business License Reviews 11 Permits to Operate sent out to respective businesses 42 Businesses invoiced (Permit to Operate – ex. Cutting and Welding, Places of Assembly, etc.) 17 Plan Reviews (FSS, MCUP, CUP, DR, Grading, Landscape, MDRA, Street Improvement) 17 1. Chief Canavan attended the monthly meeting of the San Diego County Fire Chiefs Association. 2. Staff met with representatives of the Poway Firefighters Association to address staffing challenges and develop workable solutions. 3. Chief Canavan’s last day is August 13th; Scott Post will become the Interim Fire Chief. [Deputy Fire Chief Scott Post] 1. Met with SDG&E to discuss the Pomerado Road gas pipeline construction project impacts to Fire Station 3. 2. Conditions of approval submitted for the drive thru coffee shop (CUP20-008) in the Poway Town Center. 3. Conditions of approval submitted for a single-family residence on Oak Canyon (MDRA18-010). [Senior Fire Inspector Andy Loperena] 4. Completed a final fire alarm and fire sprinkler inspection at Poway Commons Building #5. 5. Completed a final fire alarm inspection at the Palisades Apartments and final fire sprinkler inspection at the Blanchard ADU on Iris Lane. 6. Completed State 850 Fire Clearance plan review and inspection at two large family day care facilities. 7. Continued to perform EnerGov configuration training. [Fire Inspector Matt Powell] 8. Completed the California State Fire Marshal Plans Examiner 1A course. 9. Performed various fire code enforcement activities at Hotbodies Racing, Tek84, Midas, and Transform Partners. FD Management Staff Notes Page 2 EMS / TECHNOLOGY OPERATIONS Activity # Activity # Customer Consultations (Phone, email, Counter, Field) 56 Site Visits 1 EOC Sessions Attended 0 State License Review and Inspection 2 Fire Inspections - Fire & Life Safety(22), Construction(9), New Business(7) 38 Temporary Use Permit 2 Meetings Attended (DRC, Mgmt., Council) 1 Between Monday, July 26th and Sunday, August 8th, the Fire Department responded to 185 incidents. 1. C Division 1st quarter probationary testing completed. 2. Gathered data for upcoming ambulance fee study meeting. 3. Started preparing and organizing data for upcoming controlled substance audit. 1. Truck 3773 returned from Bit Pros with repairs completed. 2. Fire Training Tower fire pumps removed from service. Public Works cleaned out the cistern and found a leaking pipe from the jockey pump. Repairs will be coordinated next week. 3. OES 421 responded on a mutual aid strike team to the Dixie Fire. Crews encountered extreme fire behavior, especially in the town of Greenville. Rotation of the OES crew occurred on August 4th, including BC Ortiz as the Strike Team Leader trainee. 4. Crews attended National Night Out at the SDSO substation FD Management Staff Notes Page 3 Between Monday, July 26th and Sunday, August 8th, personnel completed 249 hours of training and activities. Topics included 140 hours of Company Training, 71 hours of Officer Training, and 19 hours of Facility Training. TRAINING / SAFETY DISASTER PREPAREDNESS TRAINING & PROFESSIONAL DEVELOPMENT HOURS 1. Truck 3773 performed Tiller Operator certification training with personnel working to obtain the required training to work on the ladder truck. 2. Probationary Firefighter/Paramedic training occurred to prepare for Hoselay and manipulative skills testing. 3. Forcible entry, Hoselay and ladder training occurred. 07/26/21 -08/08/21 •[July 26] Hazard Mitigation Grant Review with Andrea Thomas •[July 27] •Participated in San Diego County's Table Top Exercise •Participated in Poway Neighborhood Emergency Corps Board Meeting •[July 28] Participated in planning workshop for the Continuity of Operations Plan (COOP) •[July 29] Participated in a meeting for the Tree Mitigation Project for the Hazard Mitigation Grant •[July 30] •Participated in SDGE's community workshop regarding Public Safety Poway Shutoffs (PSPS) •Participated in Public Works meeting for America's Water Infrastructure Act: Emergency Response Plan •[August 2] Facilitated a Zoom call to interview a CERT member for a leadership role •[August 3] Participated in National Night Out at the Sheriff's Department COVID 19 Support (Daily) •Manage EOC Briefings •Monitor WebEOC •Monitor County/State Briefings •City Liason with County of San Diego Office of Emergency Services and CalOES •Prepare FEMA reimbursement documents FD Management Staff Notes Page 4 Poway Engine (OES 421) Provides Mutual Aid to the DIXIE FIRE Yahoo News captured Poway Fire Engineer Ben Schmid in the town of Greenville, CA. FD Management Staff Notes Page 5 Poway Firefighter Jonathan Wadley in the town of Greenville, CA. CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Jodene Dunphy, Director of Human Resources & Risk Management DATE: August 11, 2021 SUBJECT: Human Resources & Risk Management Department Director’s Notes HUMAN RESOURCES Current Active/In Progress Recruitments No. Dept. Title Type Opened Closed/Close 1 CS Box Office Attendant Part-Time Temporary 6/30 9/19 2 CS Front of House Assistant Part-Time Temporary 6/30 9/19 3 CS Director of Community Services Full-Time Regular 6/8 Continuous 4 CS Lifeguard Part-Time Temporary 7/14 10/17 5 CS Stage Technician Part-Time Temporary 5/25 8/22 6 DS Associate Civil Engineer Full-Time Regular 6/1 7/18 7 FIRE Firefighter/Paramedic Full-Time Regular 5/26 Continuous 8 LS Records Technician Full-Time Regular 6/2 6/20 9 PW Administrative Assistant III Full-Time Regular 6/21 7/5 10 PW Construction Maintenance Crew Leader – Streets Division Full-Time Regular 8/4 8/17 11 PW Sr. Facilities Maintenance Technician Full-Time Regular 6/16 7/18 12 PW Stormwater Maintenance & Construction Worker I/II Full-Time Regular 6/4 7/11 13 PW Utility Systems Mechanic/Sr. Utility Systems Mechanic Full-Time Regular 7/26 8/23 14 PW Water Treatment Plant Operator Full-Time Regular 5/11 6/30 Upcoming Recruitments No. Dept. Title Type Open Close 1 CS Front of House Coordinator Full-Time Regular TBD TBD 2 CS Recreation Leader I Seasonal TBD TBD 3 CS Recreation Coordinator Full-Time Regular TBD TBD 4 FIN Finance Manager Full-Time Regular TBD TBD 5 FIRE Fire Chief Full-Time Regular TBD TBD 6 PW Water Treatment Plant Manager Full-Time Regular TBD TBD CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Eric Heidemann, Director of Public Works DATE: August 11, 2021 SUBJECT: Public Works Department Bi-Weekly Report (July 26, 2021 – August 8, 2021) Work/Description Units Location/Description OPERATIONS Street Maintenance Asphalt Repairs (sq. ft.) 40 Installed asphalt berm in Lake Poway Park Parking Lot. Debris Removal 5 Removed glass from the bike lane on Pomerado Road. Removed illegal dumps from Old Pomerado Road, Carriage Road, Summer Sage Road, and the Poway Grade. Concrete Repairs (sq. ft.) 641 Removed and replaced sidewalk panels on Pomerado Road, Amso Street, Comuna Street, Stone Canyon, Valle Verde Park, Seiler Street, Eastvale Street, Conley Street. (596 sq. ft.). Performed sidewalk grinds in Zone #4. (45 sq. ft.) Signs 2 Repaired two “Keep Right” signs on Scripps Poway Parkway Vegetation (sq. ft.) 4000 Performed weed abatements on Pomerado Road, Poway Road, Scripps Poway Parkway and Espola Road. Graffiti 2 Removed graffiti from two city regulatory signs. Miscellaneous 1 Cleaned paving equipment Special Events 1 Dropped of “No Parking” barricades at the Sheriff’s Department. Stormwater & Flood Control Annual Concrete Channel Cleaning Program 7 Annual Channel Cleaning Program started on PomChans 10 – 15, and RSCKChan2 (Wanesta). Graffiti 3 Wanesta channel North and South ends (1000). Vegetation 2 Fallen branch removal at Espola Road and Danielson. Video Pipe Inspection 1 Video inspection of storm pipe at intersection of Garden Road and Neddick Road. Public Works Department Report – August 11, 2021 Page 2 Work/Description Units Location/Description Vehicle & Equipment Maintenance Work Orders 22 Scheduled/Unscheduled 15/7 Red Fleet Work Orders 4 Red Fleet Scheduled/Unscheduled 3/1 Facilities Maintenance Electrical & Lighting 6/0 Plumbing/HVAC 15/01 Miscellaneous 16/05 Contract Inspections Contracted landscaper to perform a weed abatement on Twin Peaks Road. Met with SDG&E for a temporary cut and cap of irrigation on Pomerado Road median. Cut and removed a large fallen tree limb on Espola Road. Attended bid walk for City Hall landscape maintenance (bidders: BrightView and Steven Smith). Attended Big 5 training, HMGP meeting, contacted KONE for an emergency elevator adjustment at City Hall. Contacted the janitorial service to perform a deep clean at the Iron Mountain restroom. Performed an irrigation repair on Levita Court. Work Orders Completed / In Progress 37/6 Parks, Trails & Landscape Maintenance Aubrey Park - Trimmed trees, shrubs and vines around the perimeter of the park and along walkways. City Hall - Trimmed trees, shrubs and vines around the Council Chambers. Cleaned out debris under the shrubs in the parking lot planters. City Owned Properties - Removed dead trees and debris and completed weed abatement at three properties along Sycamore Avenue. Prepared for herbicide application. Community Park - Provided support for multiple camp events and activities including Movie-in-the-Park. Provided support for a construction project in the maintenance yard. Trimmed trees and shrubs in parking lot planters. Removed a fallen tree branch in the Dog Park. Garden Road Park - Trimmed back the plant material along the fence line between the park and trail. Removed a damaged picnic table. Hilleary Park - Performed irrigation checks and repairs on the soccer fields and in planters. Provided support for multiple camp activities. Public Works Department Report – August 11, 2021 Page 3 Work/Description Units Location/Description Lake Poway Park - Supported the Lake campout Saturday evening – Sunday afternoon. Adjusted irrigation heads in the ADA construction area surrounding the volleyball gazebo area. Supported the last Summer concert on Sunday. Old Poway Park - Provided support for multiple activities and events. Trimmed trees, shrubs and vines in planters around the office. Pressure washed the Train Depot, Gazebo, and Museum boardwalk. Silverset Park - Fertilized the sports fields. Removed low hanging tree branches from the picnic areas and perimeter of the sports fields. Cleaned up along the field-view fence line. Replaced the ballfield home plate. Trimmed the acacia. Starridge Park - Removed abandoned homeless encampment. Provided support for groups using the facility. Valle Verde Park - Applied herbicide in the planters and along the fence lines and hardscapes. Planted an additional 50 plants along the trail planters. Adjusted and replaced irrigation heads. Miscellaneous Parks - Completed monthly Crosthwaite Materials Handling Yard maintenance duties. Assisted with moving a plastic picnic table to the Pond area. Miscellaneous Trails - Removed low hanging tree branches along the Tierra Bonita Trail. Removed discarded tires and wheels at the Metate staging area. Replaced trail brochure box in the Iron Mountain parking lot. Replaced two trail fence rails along the South Poway Trail. Emergency Response Emergency Response Callouts 19 Responded to an after-hours request to allow a Ranger into the landscaper garage, removed two incidents of tree limbs on sidewalks in LMDs, allowed park patrons access to leave from Hilleary Park and from Blue Sky Nature Preserve after hours, cleaned fecal matter from in front of the Arbolitos Park restroom, barricaded two knocked over signs, responded 11 times to water/irrigation/meter leaks and one smart cover alarm. UTILITIES Water Distribution System Operations Mark-Outs 78 Distribution Maintenance 317 Water System Shutdown 2 Leona Lane, highline KinderCare – Ted Williams Customer Service Tasks 3 Customer handles, meters leaks DM Repairs 4 Fire hydrants, Air release leaks Public Works Department Report – August 11, 2021 Page 4 Work/Description Units Location/Description Annual Test Reports 248 Backflows Tested 11 Large Meter Tests 0 Water Treatment Plant and Utility Systems Operations Lake Poway Rainfall (inches) 0 Lake Poway and Poway Dam (FSL) 930.3 Water Treatment Plant (FYTD-MG) 408.8 72 Average: 11.09 MGD Collection System Maintenance Sewer Mainlines Rodded (Vactor) Routine Mainline Rodding (l/ft.) 2,429 Monthly High Frequency Rodding (l/ft.) 3,181 Quarterly High Frequency Rodding (l/ft.) Special Mainline Rodding (l/ft.) 352 Total Mainline Rodded (l/ft.) 5,962 Sewer Mainlines Inspected (CCTV) Routine Mainline Inspection (l/ft.) 1,842 Special Mainline Inspection (l/ft.) 1,648 Total Mainlines Inspected (l/ft.) 3,490 Utility Crew Task Count Annual Lateral Assessments 47 Bi-Annual Lateral Assessments 0 Laterals Inspected 49 Laterals Rodded 31 Laterals Repaired 1 Lateral Blockage Mitigation 0 SSO Spill Volume Estimation 0 Manholes Located 0 Manholes Raised 0 Manholes Inspected 0 Easement Maintenance 0 Customer Service 2 Total of Division Tasks Completed 135 Recycled Water System Recycled Site Inspections 0 Four-Year, Four-Hour Potable Cross- Connection Tests 1 Four Year, 24 Hour Recycled Irrigation Test 1 Annual Recycled Site Inspection 12 Customer Service 0 DRC Plans Reviewed 4 Total Completed Tasks 18 Fats, Oils, Grease (FOG) Program Business License Review 13 Site Inspection 1 Public Works Department Report – August 11, 2021 Page 5 FOG Permit Issued 1 Customer Service 0 Total of Completed Tasks 15 Water Infrastructure Improvement Plan Poway staff met with the Kennedy Jenks team that will be directly involved in the Clearwell Bypass construction project. Additionally, this team met with the water treatment manager and operator to review in detail the Operations Plan when the bypass goes online. August 03, 2021 TO:Chris Hazeltine, City Manager City of Poway FROM:Michael Knobbe, Lieutenant Poway Station WEEKLY ACTIVITY REPORT FOR 7/23/2021 - 7/29/2021 San Diego County Sheriff's Department Post Office Box 939062 - San Diego, CA 92193-9062 William D. Gore, Sheriff Arrested Name Violations Arrest Location 07/23/2021 HURLEY, KYLE 14601.2 (A) VC - DRIV W/LIC SUSP/REV W/PRIOR DUI CONV (M) 14147 Twin Peaks Rd, Poway 07/23/2021 REYES, JESUS 647 (F) PC - DRUNK IN PUBLIC: ALCOHOL, DRUGS, COMBO OR TOLUENE (M) Comminity/kirkham Road, Poway 07/24/2021 BAUER, JOSHUA 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M); 11377 (A) HS - POSSESS CONTROLLED SUBSTANCE (M) 13425 Community Road, Poway 07/25/2021 WILLIAMS, MICHAEL 11377 (A) HS - POSSESS CONTROLLED SUBSTANCE (M) 13125 Vista View Dr, Poway 07/25/2021 MEJIA, DAVID 3056 PC - VIOLATION PAROLE:FELONY; 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M) 14251 Garden Road, Poway 07/25/2021 KEECH, JORDAN 11350 (A) HS - POSS NARCOTIC CONTROLLED SUBS (M); 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M) Poway Rd @ State Route 67, Poway 07/25/2021 EMERY, TRAVIS 459 PC - BURGLARY (VEHICLE) (F); 11350 (A) HS - POSS NARCOTIC CONTROLLED SUBS (M); 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M) Poway Rd @ State Route 67, Poway 07/25/2021 BELLO, WILLIAM 488 PC - PETTY THEFT(from Veh) (M)12649 Avenida De Espuela, Poway 07/27/2021 MASON, TORIN 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M) 13425 Community Road, Poway 07/27/2021 RAYNER, MARC 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M); 11377 (A) HS - POSSESS CONTROLLED SUBSTANCE (M) 13425 Community Road, Poway 07/28/2021 SMITH, SHAWNICE 273.5 (A) PC - SPOUSAL/COHABITANT ABUSE WITH MINOR INJURY (F) 13520 Tobiasson Rd, Poway 07/29/2021 ABAD, CAELAN 487 (A) PC - GRAND THEFT (Theft of Mot Veh Parts/Acc) (F); 11377 (A) HS - POSSESS CONTROLLED SUBSTANCE (M) 14149 Twin Peaks Rd, Poway Keeping the Peace Since 1850 07/29/2021 ABAD, CAELAN 30305 (A)(1) PC - PROHIBITED PERSON OWN/POSSESS/ETC AMMUNITION/ETC (F); 487 (A) PC - GRAND THEFT (Theft of Mot Veh Parts/Acc) (F); 496 (A) PC - RECEIVE/ETC KNOWN STOLEN PROPERTY (F); 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M); 466 PC - POSS BURGLA 12500 Poway Rd, Poway Category Arrests Felony 5 Misdemeanor 8 Total 13 Category Cases Felony 6 Misdemeanor 4 Total 10 Michael Knobbe, Lieutenant Poway Station Captain David M. Schaller, Poway Station Keeping the Peace Since 1850 August 09, 2021 TO:Chris Hazeltine, City Manager City of Poway FROM:Michael Knobbe, Lieutenant Poway Station WEEKLY ACTIVITY REPORT FOR 7/30/2021 - 8/5/2021 San Diego County Sheriff's Department Post Office Box 939062 - San Diego, CA 92193-9062 William D. Gore, Sheriff Arrested Name Violations Arrest Location 07/30/2021 ROHNER, MARY 11550 (A) HS - USE/UNDER INFL OF CONTROLLED SUBS (M) 12846 Stone Canyon Rd, Poway 07/31/2021 LEIVA, JONATHAN 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M) Poway Rd / Tarascan Dr, Poway 07/31/2021 JACKSON, BRIAN 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M); 11375 (B)(2) HS - POSS CNTL SUB W/O PRESCRIPTION (M) 13425 Community Rd. @ Walmart, Poway 08/01/2021 AGUILAR, ISAIAS 647 (F) PC - DRUNK IN PUBLIC: ALCOHOL, DRUGS, COMBO OR TOLUENE (M) 13314 Poway Road, Poway 08/01/2021 GUZMAN, WILLIAM 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M); 11377 (A) HS - POSSESS CONTROLLED SUBSTANCE (M) Pomerado Road & Robison Blvd, Poway 08/02/2021 LOPEZ, BRITTNEY 273.5 (A) PC - SPOUSAL/COHABITANT ABUSE WITH MINOR INJURY (F) 13326 Community Rd, Poway 08/05/2021 DRAKE, DANIEL 11364 HS - POSS CONTROLLED SUBS PARAPHERNALIA (M) 12775 Stowe Dr, Poway Category Arrests Felony 1 Misdemeanor 6 Total 7 Category Cases Felony 6 Misdemeanor 4 Total 10 Keeping the Peace Since 1850 Michael Knobbe, Lieutenant Poway Station Captain David M. Schaller, Poway Station Keeping the Peace Since 1850