Directors' Notes 08-29-18CITY OF POWAY
MEMORANDUM
TO: Tina White, City Manager
FROM: Nancy Neufeld, City Clerk
DATE: August 29, 2018
SUBJECT: City Clerk’s Office Notes (August 15 – August 28, 2018)
PUBLIC RECORDS REQUESTS
Completed:
Pending:
Deadline Reminder
The September 4, 2018 meeting has been cancelled. Due to the Labor Day holiday, agenda reports
for the September 18, 2018 City Council Meeting are due Friday August 31 by 9:00 a.m.
NOVEMBER 6, 2018 ELECTION
The Candidate List has been finalized and posted to the City Clerk’s elections webpage. The candidates
are listed in ballot order by their respective seat. Also included is their ballot designation and contact
information.
Name Subject of Request
Jon Ryan Additional Questions Related to the Claims Info Provided
AEI Consultants Open Violations, Building Code Requirements for 14215 Midland Road
AEI Consultants Fire Code Violations for 14215 Midland Road
BDR Inc Permits, Open Violations, Certificates of Occupancy, Plot Plan RE: 13424
Silver Lake Drive
Coral Fenech Zoning GIS Shapefiles
Amm Recovery Outstanding Warrants Check List
San Diego Taxpayers
Educational Foundation
Fixed & Variable Revenue & Expenses to Homelessness or Housing
Stability Services in Accordance with HUD
Elite RFP's or Bid Responses for Security Officers or Patrol Services Issued in
Past 6 Years
Precision Estimating
Services
Proposals for Mickey Cafagna Community Center
Carlin Law Group Bid No. 19-002 Community Park Electrical Upgrades Project
Name Subject of Request
Jonathan Ryan #1 & #2 All City Councilmember Emails; City Employee Emails (listed)
Susanne Godoy Single Family Open Code Violations for Past 6 Months
Cozen O'Connor Building Permits 2007-2009 for 14170 Kirkham Way
City Clerk’s Office
Notes – August 29, 2018
Page 2
Aug. 15 – Aug. 28, 2018 Fiscal Year To Date
Agreements Processed 9 25
Legal Ads Placed 9 17
Recorded Documents 9 33
Council Meeting DVDs 0 0
Notary Requests 0 2
Oaths of Office Administered 4 18
Subpoenas/Summons Processed 1 2
Public Records Requests 10 42
Permanent Records Archived 174 920
Election Related Inquiries 3 11
CITY OF POWAY MEMORANDUM
TO: Tina White, City Manager
FROM: Brenda Sylvia, Director of Community Services
DATE: August 29, 2018
SUBJECT: Community Services Department Bi-Weekly Report
Upcoming Events Date Time Location
Night Fishing Aug 31 & Sept 1 8pm–11:30pm Lake Poway
Kid’s Night Out Sept 7 4:30pm–9pm Community Park
Fall Camping Series Sept 14-15 5pm–10am Lake Poway
Teen Backyard Movie Night Sept 15 5pm–9pm Old Poway Park
Night Fishing Aug 31 & Sept 1 8pm–11:30pm Lake Poway
Kid’s Night Out Sept 7 4:30pm–9pm Community Park
Fall Camping Series Sept 14-15 5pm–10am Lake Poway
July Stats:
Facility Rentals Total Revenue
Indoor and Outdoor (buildings, parks, gazebos, fields, etc.) $36,099
Lake Poway Total Revenue
Fishing, Boating, Parking & Archery Permits $47,778
Camps & Classes Total Revenue
Day/Specialty Camps & Contract Classes $24,265
Volunteers Total Hours
Reserve Rangers, Docents, Ushers & Teens 669
CITY OF POWAY
MEMORANDUM
TO: Tina White, City Manager
FROM: Bob Manis, Director of Development Services
DATE: August 29, 2018
SUBJECT: Director’s Notes
PLANNING
Stop Work Notice Issued For Unauthorized Work on Hettick Property
Last week Engineering and Planning staff inspected the vacant Hettick property located at
13975 Rancho De Oro Road in the Millards Ranch area above Poway Grade after becoming
aware that unauthorized work had been undertaken at the site for the purpose of installation
of a septic system. The Hetticks are currently processing an MDRA and working through
site design issues for a new single family home and accessory dwelling unit on the
property. Since the MDRA has not been approved at this point, no site work (grading or
construction) is allowed. As part of the MDRA review the applicant is working with the City
and the Wildlife agencies (US. Fish and Wildlife and CA Fish and Wildlife) to address project
impacts to habitat and a proposal to swap out areas of an existing Biological Conservation
Easement (BCE) with non-BCE habitat areas on the property to accommodate the proposed
development building footprint including the required fire fuel management zones. With the
recent unauthorized site work there is concern that may have been encroachment into the
BCE. Staff is working with the Hetticks to address and resolve the matter.
CAPITAL IMPROVEMENTS
WTP Chemical Building & Tank Farm Upgrades Project
The project bid has been cancelled due to numerous contractors indicating an extended
lead time on manufacturing the valves being replaced as part of the project scope. The
valve replacement requires numerous shutdowns of the treatment plant which need to be
completed during winter months due to lower water usage during that time of year. To
ensure that shutdowns can occur during the winter months, the bid will be re-advertised in
February 2019 for construction in the following winter.
FY 17-18 ADA Barrier Removal – Lake Poway Pathways Project
Bids were opened on August 14, with five contractors submitting bids. The project was bid
with additive alternates to allow for the possibility of adding additional work at the time of
award, should the bids come in low enough. All five bids, not including any additive
alternates, were over the total project budget. Funding for this project is through the CDBG
Director’s Notes
August 29, 2018
Page 2
grant and no additional funds are available. On August 21, the City Council approved the
rejection of all bids and the re-advertising of the project with a revised scope that will keep
the project within budget.
Mickey Cafagna Community Center Project
The 50% design submittal has been received from the consultant. The submittal will be
routed for review by City staff and the Estimating Consultant.
2018-2019 Citywide Striping Project
Striping of the odd numbered Pavement Management Zones is ongoing. Zones 1 and 3 are
25% complete, Zone 5 is 80% complete and Zone 7 is 95% complete.
LAND DEVELOPMENT
General Atomics Building A40 Conduit Duct Bank
City staff has received the second submittal of the improvement plans for the fiber optic duct
bank and vaults proposed along Crosthwaite Circle and Stowe Drive (a portion east of
Crosthwaite Circle).
Chick-fil-A
City staff has received the second submittal of the grading plans associated with the Chick-
Fil-A restaurant proposed on Poway Rd.
Affleck Residence
The applicant has submitted mylar grading plans for the proposed single-family residence
on Oak Canyon Road. Staff is waiting on the submittal of the securities and the Storm Water
Facilities Maintenance Agreement to be finalized before proceeding with the grading permit.
Bourgeois Subdivision
The engineer of record has submitted redlined record drawings for the water improvement
plans for the 3-lot subdivision off of Millards Road. The owner has requested a list of
remaining items left to complete in order to close out the improvement plan project and the
grading permit. City staff has provided a complete list of remaining items to the owner.
Trading Post
The applicant has submitted the grading and improvement plans for third review of a mixed-
use development located on Poway Road between Community Road and Bowron Road.
Davis Residence
The applicant has submitted for second review of a boundary adjustment moving the
property line between Lots 4 and 5 of the Murel Trails Subdivision.
Director’s Notes
August 29, 2018
Page 3
Pouliot Residence
Redlined record drawings have been submitted for review of the illegal grading and retaining
wall at a residence on Northcrest Lane.
Poway Valley Center
The applicant has provided record drawings for the water improvement plans associated
with the improvements to the Poway Valley Center shopping plaza on Poway Road. The
additional water easement capturing the portion of the water main that was re-aligned due
to a previous construction change has been recorded.
Sage Highlands
The applicant has provided record drawings for the grading plans associated with the 10-
lot subdivision off Pomerado Road.
STORMWATER
City staff is working with our consultant D-Max Engineering, Inc. to prepare the Jurisdictional
Runoff Management Program (JRMP) Annual Report. The Annual Report will summarize
the following components of the City’s storm Water program including illicit discharge
detection and elimination, development planning, construction management, existing
development compliance for municipal, commercial, industrial and residential sites, public
education and fiscal analysis. The final JRMP Annual Report will be provided to the Water
Quality Improvement Plan (WQIP) group by the requested deadline which is expected to be
in late September 2018. The WQIP group is responsible for incorporating the JRMP Annual
Report forms into the WQIP Annual Report for each watershed and submitting to the
Regional Water Quality Control Board by January 31, 2019.
INSPECTION
Ridgeview Industrial Phase II
Kirkham Way (G16-0013) - A final punch list walkthrough was conducted. Completion of all
asphalt punch list items on Kirkham Way have been completed, leaving only slurry seal
placement along Kirkham Way. Slurry seal limits are being discussed prior to placement.
Director’s Notes
August 29, 2018
Page 4
General Atomics Parking Lot
Danielson Street (G16-0012) - A punch list walkthrough was performed. City staff met with
the General Atomics representative and the project contractor to discuss remaining items.
Poway Stowe Properties
Crosthwaite Circle (G17-0001) - The contractor has completed bio-basin grading and
contouring. Bio-basin irrigation and landscape are scheduled to begin this week. Removal
and replacement of the curb and gutter, driveway approach, and ADA ramps at the
intersection of Stowe Drive and Parkway Center Drive have been completed.
Poway Valley Center H2o
Poway Road (WI17-004) - Punch list work for both the water line and Little Sprouts Daycare
is complete. All punch list items have been completed. The project inspector has signed the
request for occupancy form. Work within Poway Road right-of-way continues. The contractor
has installed conduit, intercepted the existing SDG&E electrical line in the street and
completed backfill. Street restoration is scheduled to begin the end of next week.
Sage Highlands
Pomerado Road (G16-0002 & STI16-001) - Punch lists items for grading and improvements
are nearing completion. The final punch list walk will be scheduled once the contractor has
completed all items.
Thibodeaux Residence
Lomas Verdes Drive (G14-0017) - The contractor has placed the footing for the new portion
of retaining wall. This footing replaced the non-conforming footing and wall which was
previously built. After removal and then placement of the new footing the contractor began
wall construction. This newly constructed wall was found to be built with a curve that is not
per the approved plan and will need to be addressed.
Poway Tech Center West
Flint Place, Dearborn Place, Paine Place (G17-0003) - Forming of curb for the parking lot
for Buildings 1 and 6/7 continues. Installation of tilt-up panels for Buildings 11, 12/13 and 18
took place last week.
Bourgeois Residence
Millards Road (G15-0003) - The owner requested a release of his grading bond. The
inspector conducted a punch list inspection generating a list to confirm completion. Several
items, including what appeared to be a possible grading violation were noted. A stop work
notice requiring staking to confirm disturbance within the conservation easement limits on
Lot 1, and a punch list was provided to the owner. One of the three graded lots was sold and
the new owner began work prior to completion of project approval. Some of the work done
was within the biological conservation easement. Work continued and a stop work notice
was issued to the new property owner.
Director’s Notes
August 29, 2018
Page 5
Filhart Residence Improvements
Old Coach Road (WI18-001) - The water improvement preconstruction meeting has been
held. Prior to construction an AT&T line was found to conflict with the proposed water line.
The project engineer will work with City staff to correct.
Simeone Residence
Old Winemaster Way (MDRA17-033) - The preconstruction meeting for this single-family
residence has been held.
Neal Addition
Tierra Bonita Road (MDRA17-035) - The preconstruction meeting for this single-family
addition has been held.
Kassen Residence
Skyridge Road (MDRA16-001) - The preconstruction meeting for this single-family residence
is scheduled for this week.
SCHEDULED ROAD/LANE CLOSURES
Possible lane closure on Kirkham Way between General Atomics Way and Stowe
Drive, both directions, for work related to the Ridgeview Industrial Project.
Lane closure Twin Peaks at Silverset, Twin Peaks at Community Rd and Twin Peaks
at Midland Road in all directions for work related to the Traffic Signal Controller
Upgrades project.
Lane closure Community Road from Stowe Drive to Twin Peaks Road both directions
for work related to the SDG&E electrical line project design.
Lane shift Espola Road southbound lane between Northcrest Lane and Twin Peaks
Road for work related to the Espola Road Safety Improvement Project.
Lane closure on Poway Road westbound between Community Road and Bowron
Road for work related to the Poway Valley Center Preschool project.
Lane closures for Footman Lane and Court, Coachman Court, Pedriza Road and
Country Squire Drive all directions for work related to the SDG&E line upgrade.
Lane closure on Garden Road, Fairburn Street, Floral Ave, Aldrin Ave, and Bowdoin
Drive for work related to the SDG&E gas line upgrade.
Lane closure on Stowe Drive both directions and Parkway Center Drive both
directions for work related to the Stowe Properties intersection re-configuration work.
CITY OF POWAY
MEMORANDUM
TO: Tina White, City Manager
FROM: Donna Goldsmith, Director of Finance
DATE: August 29, 2018
SUBJECT: Finance Department Director’s Notes
Finance
• Munis Implementation Coordinators will be onsite regularly over the next several months with
Finance and HR Staff as we work toward roll out of Payroll in January 2019.
General Services
Bids:
Bid Number Project Title Bid Opening Engineer's
Estimate
Current Project
Balance
Awarded
Bid
Awarded
To
City
Council
Award Date
BID-19-001 Buehler Reservoir
Rehabilitation Project
9/17/18 @ 4:00 p.m.
(Council Chambers)
$700,000 $947,660 TBD TBD 10/16/18
BID-19-002 Community Park
Electrical Upgrades
8/22/18 @ 4:00 p.m.
(Council Chambers)
$90,000 $152,312 TBD TBD 9/18/18
BID 19-006 Twin Peaks Road Speed
Feedback Signs
8/28/18 @ 4:00 p.m.
(Council Chambers)
$30,000 $35,000 TBD TBD 9/18/18
BID 19-007 2018-2019 CMP Annual
Repair
9/4/18 @ 4:00 p.m.
(Council Chambers)
$320,000 $356,054 TBD TBD 10/2/18
BID-19-008 FY 17/18 ADA Barrier
Removal – Lake Poway
Pathways
9/18/18 @ 4 p.m.
(Main Conference
Room 2060)
$85,000 $94,122 TBD TBD 10/2/18
Service Proposals:
RFP
Number
Project Title Submittal
Deadline
Engineer's
Estimate
Budget Awarded To City Council
Award Date
RFP-18-022 Lake Poway Concession
Services
7/10/18 N/A N/A R & B Pinto
Properties, LLC
9/18/18
RFP-19-002 As-Needed Real Estate &
Financial Consultant Services
7/30/18 N/A $10,000/year Keyser Marston
and RSG, Inc.
TBD
RFP-19-003 Buehler Reservoir Rehabilitation
Project Coating, Painting and
Cathodic Protection Inspection
TBD $45,000 $947,660 TBD TBD
CITY OF POWAY
MEMORANDUM
TO: Tina White, City Manager
FROM: Jodene Dunphy, Director of Human Resources & Risk Management
DATE: August 29, 2018
SUBJECT: Human Resources & Risk Management Department Director’s Notes
HUMAN RESOURCES
Open Recruitments
No. Dept. Title Type
Opened Closes
1 CS Box Office Attendant Part-Time Temporary 1/17/17 Continuous
2 CS Front of House Assistant Part-Time Temporary 5/1 Continuous
3 CS Lifeguard Part-Time Temporary 3/19 Continuous
4 CS Recreation Leader I Part-Time Temporary 4/23 Continuous
5 DSD City Engineer Full-Time Regular 8/23 Continuous
Recruitments In Progress
No. Dept. Title Type
Opened Closed
1 CS Recreation Coordinator Full-Time Regular 7/20 8/12
2 DSD Senior Planner Full-Time Regular 6/7 7/6
3 PW Senior Utility System Mechanic
(Closed/Promotional)
Full-Time Regular 7/16 7/23
4 PW Water Utilities Crew Leader
(Closed/Promotional)
Full-Time Regular 8/20 8/27
RISK MANAGEMENT
Contractual Risk Transfer Training Workshops
Wednesday, September 5, 2018
8:30-9:45 – Insurance 101
10:00-11:30 – Contractual Risk Transfer
Risk Management is partnering with Alex Mellor of the California Joint Powers Insurance Authority (JPIA) to host
this training. City staff responsible for preparing and maintaining contracts will attend.
CITY OF POWAY
MEMORANDUM
TO: Tina White, City Manager
FROM: Michael Obermiller, P.E., Director of Public Works
DATE: August 29, 2018
SUBJECT: Public Works Department Bi-Weekly Report
(August 13, 2018 – August 26, 2018)
Work/Description Units Location/Description
OPERATIONS
Street Maintenance
Asphalt Repairs 1
2
200 sq. ft. scheduled paving in Zone 1
520 sq. ft. unscheduled paving due to small sink
hole and water utility trench repair
Debris Removal 4 Debris pick-ups at various locations
Concrete Repairs 1
2
Scheduled sidewalk repair in Zone 1 (50 sq. ft.)
Unscheduled sidewalk repairs (65 sq. ft.)
Sidewalk inspections in Zone 2
Signs
Vegetation 4
1
Sidewalk clearances – various locations
Emergency response for fallen tree
Graffiti 1 Graffiti abatement from electrical box
Special Events 1 Deliver information signs for Parade (12 labor
hours)
Miscellaneous 2
2
Placed “No Park” signs and assisted street
sweeper with cleaning of two areas which are
heavily parked on scheduled sweeping days.
Trainings: JPIA Big 5 and operating new Vactor
Guardrail (ln. ft.) 1 12’ concrete guardrail fence repair
Stormwater & Flood Control
Complete Annual Concrete Channel
Cleaning Program
4 Bounty Way, Espola Road, Francine Terrace and
Oak Knoll Road
Respond to illegal dumping 1 Pomerado Road
Vegetation Management 1 Hilleary Park and Rattle Snake Creek
Training GapVax and JPIA “Big Five”,
ERT
3 Fleet, Crew lounge and at Meadowbrook Lane
Miscellaneous cleaning jobs, service
awards, Call-ins
6 Throughout Poway
Public Works Department Report /August 29, 2018 / Page 2
Work/Description Units Location/Description
Vehicle & Equipment Maintenance
Regulatory Inspections -
Work Orders 22
Scheduled / Unscheduled 14/8
Facilities Maintenance
Electrical & Lighting 5 Neal Electric replaced a main breaker to the
circulation pump at the pool and tested switch gear
at the Library. Replaced light bulbs at Lake Poway
ballfield restroom, repaired lighting in City Hall
women’s restroom, replaced an outlet cover in the
Great Room and replaced lights in City Hall’s
stairwell.
Plumbing/HVAC 14 Stopped a toilet in Fleet from continually running.
Repaired a drinking fountain at Lake Poway
ballfield and at Aubrey Park, a flush handle at the
Senior Center, a leaky urinal at City Hall, a leaky
water heater in Fleet Maintenance. Worked on
AH-3 and VAV 2-47 at City Hall, a fan on the AC
unit at Old Poway Park Great Room. Cleaned out
a drain in Fire Station 3. Trained RJ on the AC
system at Aubrey Park. Researched and replaced
the ice maker at Fire Station 1, flushed out all floor
drains in Fire Station 3 apparatus bays and
checked out drain at Fleet Maintenance.
Miscellaneous 13 Finished Citywide change out of batteries on all
automatic flushers. Attended JPIA “Big 5” training.
Repaired the oven at Fire Station 1 and cleaned
behind it. Hung pictures of new City
Councilmember, repaired a loose toilet paper
dispenser at Fire Station 1, calculated square
footage of bathroom tiles for Fire Station 2.
Checked out holes in windows at Poway Center
for the Performing Arts and got a quote for
replacement. New locks were keyed for Fire
Station 3, repaired Coast Guard Marching song
button at Veterans Park, removed “Summer in the
Park” banner from the Auditorium, repaired the
gate at the fire training tower, assisted with a gate
repair at Fleet Maintenance and cleaned up
vandalism behind City Hall.
Work Orders Completed / In
Progress
31/1
Work Orders Scheduled /
Unscheduled
23/9
Parks, Trails & Landscape Maintenance
City Owned Properties - Performed weed abatement and mowed three
large properties at Community Road and Sycamore
Avenue.
Public Works Department Report /August 29, 2018 / Page 3
Work/Description Units Location/Description
Community Park - Removed graffiti from the southwest corner of the
park and repainted the group BBQ. Assisted the
tree contractor with trimming most of the trees at
Dog Park; continued addressing irrigation issues
adjacent to the Pool CIP Project.
Aubrey Park Completed repairs to a 2” irrigation mainline break.
Old Poway Park Supported and cleaned up after the Volunteer
Appreciation Event. Met with the Garden Club to
discuss potential irrigation modifications.
Garden Road Park - Replaced a 2” irrigation valve and made an
irrigation water line repair.
Lake Poway Park - Took down the 20’x20’ canopy used by the
summer camp and returned it to Community Park.
Relocated city vehicles to accommodate the
parking lot striping. Performed several drip
irrigation repairs in the medians and repaired an
irrigation lateral line break. Regraded the ballfield
warning track, filled in the low areas, removed the
small weeds and grass, fertilized the turf, removed
a large fallen tree limb and low hanging branch.
Trimmed the shrubs along the Water Treatment
fence-line and entry way. Hauled five truck-loads
of mulch from Lake Poway to Mini Arbolitos Park.
Silverset Park - Allowed the tree contractor access to the southern
portion of the park; 12 eucalyptus trees were side-
trimmed. Replaced several faulty irrigation heads
along the walking path.
Sycamore Creek Park - Performed multiple irrigation repairs caused by
root-intrusion; fertilized the turf and adjusted the
irrigation heads at East and West Parks.
Valle Verde Park - Trimmed shrubs along the front of the park and
along the walking path to the pocket park.
Removed low hanging tree branches in the pocket
park.
Miscellaneous Trails - Replaced six fence rails along the Old Coach Trail
and four rails along the Twin Peaks Trail near
Camino Del Norte. Removed damaged trail
fencing along Scripps Poway Parkway.
Miscellaneous Parks - Staff attended a one-half day safety training on
Tuesday.
Contract Inspections 28 LMD contract, bus stop, painting projects, general
maintenance projects and janitorial inspections.
Customer Inquiries 28
Streetlight Issues 34 Completed light check.
Traffic Signal / Emergency 7
USA Mark-Outs 17
Public Works Department Report /August 29, 2018 / Page 4
Work/Description Units Location/Description
Service Requests Work Orders 7 Completed all 18/19 PO’s for LMD areas.
Trimmed Boca Raton Reservoir, met with owner of
Ciros Landscaping, performed dead tree inspection
in the business park, removed fallen tree branch
on Camino Del Norte and cleaned the brow ditch
on Ted Williams. Removed a falling light pole at
Valle Verde Park and assisted Siemens get light
poles for knockdown replacements out of the yard.
Emergency Response
Emergency Response Call-outs
UTILITIES
Water Distribution System Operations
Mark-Outs 75
Distribution Maintenance 172 Assets Inspected – fire hydrants, valves and air
releases.
Water System Shutdown 1 Post indicator valve shutdown/repair
Locate and Raise lids 5 Vali Hai Road, Eastvale Road and Pomerado
Road
Service Replacement 1 Valle Verde Terrace
Customer Service Repairs:
Leaks, Automated Metering System
updates, non-operative
3 Fire hydrant High Valley; Automated Metering
System Savage Way, Boulder Mountain and
Holland Avenue
Annual Test Reports 115
Backflows Tested 3
Water Treatment Plant and Utility Systems Operations
Lake Poway Rainfall (inches) 0
Lake Poway and Poway Dam
(elevation feet)
930.1
Water Treatment Plant (Average flow
million gallons per day)
11.42 Installed new weather station.
CITY OF POWAY
MEMORANDUM
TO: Tina White, City Manager
FROM: Mark A. Sanchez, Director of Safety Services
DATE: August 29, 2018
SUBJECT: Safety Services Management Staff Notes
_____________________________________________________________________
FIRE DEPARTMENT
Incidents
Between Monday, August 13, and Sunday, August 26, Poway fire and paramedic crews
responded to 221 incidents of which 151 were medical aids.
TRAINING
Training Hours
Between Monday, August 13, and Sunday, August 26, personnel completed 881 hours
of training and activities. Topics included 515 hours of hazardous materials training, 253
hours of company training, and 47 hours of driver/operator training.
DISASTER PREPAREDNESS
Activities – Susy Turnbull
Date Activity
August 14 Meeting with Ham Radio group to discuss November field exercise
August 14 Meeting with college student to discuss Poway’s role in Emergency Planning
and Preparedness
August 16 Attended Unified Disaster Council Meeting
August 17 Meeting with Finance Department to discuss Continuity of Operations Plan
August 18 Taught Shelter Operations training for community members – 30 in attendance
August 21 Participated in Disaster Housing Recovery planning meeting
August 21 Meeting with Finance Department to discuss Continuity of Operations Plan
August 22 Audit of Urban Area Security Initiative (UASI) Grant Funding for FY ’15
spending
SSD Management Staff Notes
Page 2
SSD Management Staff Notes
Page 3
SSD Management Staff Notes
Page 4
SSD Management Staff Notes
Page 5