Loading...
Directors' Notes 07-31-191 of 2 City of Poway MEMORANDUM DATE: July 31, 2019 TO: Chris Hazeltine, City Manager FROM: Faviola Medina, CMC, City Clerk CONTACT: (858) 668-4535 or FMedina@poway.org SUBJECT: City Clerk’s Office Notes (July 17 – July 30, 2019) LEGISLATIVE: Deadline Reminder Agenda reports for the Tuesday, August 20, 2019 City Council Meeting are due Monday, August 5. Please make sure you are using the newest agenda report template. Processed July 17 – July 30, 2019 Fiscal Year to Date Agreements 8 24 Ordinances 0 0 Resolutions 0 10 Agenda Reports 0 1 Legal Ads Placed (Public hearings, ordinance summaries, bids, rfps) 3 16 Recorded Documents 4 17 Notary Requests 1 1 Oaths of Office Administered 2 5 Subpoenas/Summons Processed 0 0 Permanent Records Archived 992 1788 Election Related Inquiries 0 1 Pending: Name Subject of Request Abramowitz Tax and Lien Service Open/Expired Permits, Building, Fire, Code Violations Dept of Industrial Relations Permits from 1/1/13-1/1/14 for Baojim Sui aka Kevin Sui, 12340 Boulder View Drive NBC 7 San Diego Lost or Stolen City Property from 2014-2019 Scott Barnett Records Pertaining to Mayor Vaus LM Consultants Building and Fire Records for 12342 Poway Road 2 of 2 Completed: Name Subject of Request GG Homes Open and Closed Residential Code Violations from 6/18/19-7/18/19 FPPC Enforcement Division All 460’s from Candidates in Election 2018 Kaslin Ettema Cybersecurity Records Geotechnical Exploration, Inc Grading and Geo (Soil) Report for 14508 Highcrest Ct Tyson & Mendes Emergency Preparedness Training for Chabad of Poway Carrie Jones Engineers Report Landscape Maintenance District 86-3 for 1990-1998 RMG Recycling Recycling Franchise Agreement Hunsaker & Associates As-Builts for Poway Commons Vince Kattoula Car Wash Permits Transparent California 2018 Employee Compensation Report Sherri Dunlap ROW Permit Showing Lane Closure CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Brenda Sylvia, Director of Community Services DATE: July 31, 2019 SUBJECT: Community Services Department Bi-Weekly Report Upcoming Events Date Time Location Night Fishing Aug 2 & 3 8-11:30pm Lake Poway Family Campout Aug 3-4 5pm-9am Lake Poway Summer Movie in the Park Series: How to Train Your Dragon: The Hidden World Aug 3 6:00-9:45pm Poway Community Swim Center Summer Concerts in the Park: Blue Breeze Band Aug 4 5:30pm-7pm Lake Poway Fall Class Registration Aug 6 7:30am Online or In-Person at City Hall Night Fishing Aug 9 & 10 8-11:30pm Lake Poway Summer Concerts in the Park: Pomerado Community Band and The Summer Winds Aug 11 4-7pm Old Poway Park Night Fishing Aug 16 & 17 8-11:30pm Lake Poway Summer Movie in the Park Series: The Goonies Aug 17 6:30-9:45pm Old Poway Park June Stats Facility Rentals Total Revenue Indoor and Outdoor (buildings, parks, gazebos, fields, etc.) $5,2053.75 Lake Poway Total Revenue Fishing, Boating, Parking & Archery Permits $51,433.35 Camps & Classes Total Revenue Day/Specialty Camps & Contract Classes $62,086 Poway Center for Performing Arts Total Revenue Rentals, Tickets & Concessions $82,709 Swim Center Total Revenue Admission, Passes & Rentals $60,157.69 Volunteers Total Hours Reserve Rangers, Docents, Ushers & Teens 1,219 CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Bob Manis, Director of Development Services DATE: July 31, 2019 SUBJECT: Director’s Notes PLANNING New Single-Family Residence on a vacant lot on Beeler Canyon Road A Minor Development Review Application 19-030 (MDRA19-030) was submitted for a 6,110 square foot residence with a 1,180 square foot garage near the intersection of Creek Road and Beeler Canyon Road. The 20-acre parcel (APN 320-020-04) is zoned Open Space -1 Dwelling Unit (OS-1DU) and is within the mitigation area for the City’s Habitat Conservation Plan (HCP). Mobil Gas Station at 13556 Poway Road At the request of the staff, the owner of the Mobil gas station at northwest corner of Poway Road and Midland Road has been repainted again. The gas station had been painted a sky-blue color which was not consistent with the color scheme for the Poway Road Specific Plan. The gas station is now a light grey-tan color as requested by the owner and approved by Planning staff. CAPITAL IMPROVEMENTS Poway Road Turn Lane Extension Work is expected to begin the week of August 5. Staff is preparing a public outreach statement to notify the public of potential traffic delays. Staff is also working with the contractor to make some revisions to the traffic control plan prior to issuance of the Right of Way Permit. 2019-2020 Citywide Striping Striping work will begin this week with stop bars being placed first. The striping efforts will follow behind the 2019-2020 Street Maintenance project in Zone 8. PCPA Smoke Hatch Winch Replacement Work is expected to begin this week on the winch replacement. Exposed Sewer East of Martincoit The 50% design plan submittal is expected at the end of this week. Director’s Notes July 31, 2019 Page 2 LAND DEVELOPMENT Bazaz Residence (ESMT19-010 & 011) - The City returned comments on the first review of the proposed trail and archaeological easements at the proposed Bazaz residence on Coyotero Drive. 14135 York Avenue Residence (FLD19-0008) – The applicant has submitted plans and the application for first review of a floodplain development permit to legalize improvements to an existing structure in the floodway on York Avenue. AT&T Small Cell (STI19-002) – The applicant has submitted an improvement plan for first review to replace four public street light poles with new poles in order to install small cell antennas on them. Tobar Residence (G19-0004) - City staff has received and approved the third submittal of the Grading plans for the retaining wall proposed in the rear yard for a residence on Cumberland Drive. City staff has requested the submittal of mylar grading plans and grading securities. Mehdi Residence (G14-0018) – The applicant has submitted redlined record drawings for staff review consistency with the construction site. The residential addition on Spy Glass Terrace is nearing completion. INSPECTION Outpost Poway Road (G18-0002) (STI18-001) - Last week, work to control ground water continued. The contractor excavated a series of 3-foot-deep trenches in a grid pattern, sloped to a central location to settle and then be removed. Dewatering pumps continue to run around the clock. This week work to draw down groundwater will be continued. Sunview Garden Residential Care Facility Aubrey Street (G19-0001) - The contractor has completed two of the three retaining walls. Both walls work in conjunction to create the building pad. One wall remains that is a continuation of an existing wall which will help to support a proposed bio-swale. The owner/contractor has requested building permit issuance prior to completion of the remaining wall and other work on the grading plans. The owner would like to work on both the building and grading improvements simultaneously. GA Conduit Duct Bank Stowe Drive (STI18-002) - Construction continues for fiber optics conduit for General Atomics on Crosthwaite Circle and Stowe Drive. The duct bank consists of eight – 4-inch conduits evenly spaced and encased in concrete sand slurry. The contractor continues potholing ahead of work, sawcutting and removing sections of asphalt, excavating the trench and installing conduit. Work is proceeding on both Crosthwaite Circle and Stowe Drive. Duct bank installation continues this week. Director’s Notes July 31, 2019 Page 3 Webster Residence Belvedere Drive (G16-0011) - The grading and construction of this single-family residence is nearly complete. The contractor installed the driveway drainage system piping, pervious gravel layers and paver stones. Driveway width was not per plans nor was the radius of the fire department turn around. Both issues are being addressed by the contractor. Vantage Point Kirkham Way (G18-0008) (STI18-003) - The contractor continues to work on grading, cutting in areas and filling in others. Concrete building slab placement and forming tilt up panels on Building A is ongoing. Partial pad certification was approved for Building B and trenching has started for sewer inside building envelope on Building B. The contractor has been authorized to begin concrete placement at 4:00 a.m. and has completed approx. 7 placements. The approved time adjustment has proven to help the contractor avoid rush hour traffic and midday heat. Retaining wall and associated drainage construction is ongoing. Retaining wall construction is in a variety of different stages from footing excavation, geogrid placement, perforated back drains and all stages in between at several locations throughout the site. Wall construction will continue for several months. Stormdrain construction is ongoing with several concrete structures and pipe placement being constructed at different stages throughout the site. The contractor continues to install of 8-inch water main including 6-inch fire hydrants at Building A. Offsite water line A tie in continues this week. The construction of the 8-inch sewer main continues along the east side of General Atomics Way and up into the project. Poway Tech Center West Flint Place, Dearborn Place, Paine Place (G17-0003) (WI18-002) - All work is now complete. The inspector has verbally given the ok for occupancy. The form will be signed when received. Patel Residence Poway Road (MDRA14-042) - Work on the home is nearly complete. The contractor has completed the private road improvement minus the turnaround and driveway portion. Chick-Fil-A Poway Road (G18-0005) - Exterior and interior building construction continues. Stormdrain construction and the stormwater filtration system is proceeding. The contractor excavated the bio-basin, installed the non-permeable liner, aggregate and 6” perforated pipe. Last week the contractor completed the drive-thru turnaround and parking lot. This week the contractor is scheduled to complete the sewer line abandonment on Poway Road. Work will be done at night to avoid traffic congestion and high flow within the sewer line. Director’s Notes July 31, 2019 Page 4 Villa De Vida Oak Knoll Road (B19-0900) - The grading contractor continues to work on rock separation and hauling. Work on the waterline improvement has begun. The contractor is potholing in preparation for placement. SCHEDULED ROAD/LANE CLOSURES  Sidewalk closure south side of Poway Road between 13301 and 13245 for work related to the Outpost Project.  Possible lane closure on General Atomics Way in both directions, for work related to the Parkway Summit / Vantage Point Project.  Possible lane closure on Espola Road between Twin Peaks Road and Titan Way both directions for the undergrounding of utilities associated with the Espola Road Safety Improvements Project.  Lane closure with flaggers in the #1 lane on Poway Road eastbound between Community Road and Civic Center Drive for incoming and outgoing haul trucks. Work is related to the Outpost Project.  Lane closure on Pomerado Road between Bernardo Heights Parkway and 500 feet north of Stone Canyon Road in both directions for work related to the Pomerado Road Sewer Repair Project.  Lane closure on Poway Road westbound #2 lane for work related to the Chick-fil-A restaurant project. CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Jon Canavan, Fire Chief DATE: July 31, 2019 SUBJECT: Fire Department Management Staff Notes _____________________________________________________________________ INCIDENTS Between Monday, July 15, and Sunday, July 28, Poway fire and paramedic crews responded to 173 incidents of which 101 were medical aids. At 1:30pm on Sunday, July 21, Firefighters responded to a residential structure fire at 13115 Silver Saddle Lane. Firefighters encountered an exterior fire penetrating the attached garage of the residence. The fire was being fed by a broken gas line and melted gas meter. Firefighters searched the home and determined the occupants were not there at the time of the fire’s start. Firefighters extended hose lines and extinguished most of the fire but were unable to stop the gas-fed fire flames. Firefighters kept the fire in check while waiting for SDG&E gas control crews to arrive. SDG&E electric crews had to cut electrical service to the neighborhood in order to disconnect service to the home and its melted electrical meter panel. SDG&E gas crews had to dig a hole in the front yard and pinch the gas service line to stop the flow of gas. Firefighters were able to completely extinguish the fire. Major damage occurred to the garage, attic/roof, master bedroom and master bath. Residents returned to the home and were assisted by firefighters. The origin of the fire is at the electric panel and gas meter area. The cause appears to be a malfunctioned gas line or meter with escaping gas lit by nearby electrical equipment. There were no injuries and damage was estimated at $250,000. A family of three was displaced. At 12:45pm on Monday, July 29, firefighters responded to a structure fire in the La Privada Apartment Complex located at 13240 Community Road. Firefighters encountered a kitchen fire in a 2nd floor apartment. The occupants had evacuated the apartment prior to the arrival of fire responders. Firefighters extended hose lines and aggressively attacked the fire keeping it from extending into the attic area and from entering other rooms of the unit. Additionally, Firefighters used minimal water to extinguish the fire preventing water damage to the apartment unit below. The fire damage was confined to the kitchen area with minor smoke damage throughout the unit. The origin of the fire is the oven and exact cause is undetermined. There were no injuries and damage was estimated at $10,000. Red Cross was requested to assist with seven displaced occupants – two adults and five children. Fire Department Management Staff Notes Page 2 TRAINING Between Monday, July 15, and Sunday, July 28, personnel completed 308 hours of training and activities. Topics included 180 hours of company training, 52 hours of driver/operator training and 44 hours of officer training. DISASTER PREPAREDNESS Activities – Susy Turnbull Date Activity July 16 Attended CERT Grant Meeting July 16 Attended Active Shooter Training July 18 Discuss Hazard Mitigation Project with Izzy July 19 - 28 Vacation - Haiti CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Aaron Beanan, Director of Finance DATE: July 31, 2019 SUBJECT: Finance Department Director’s Notes Finance The deadline to enter and release FY 2018-19 invoices to Finance for payment is August 13. General Services Bids: Service Proposals: RFP Number Project Title Submittal Deadline Engineer's Estimate Budget Awarded To City Council Award Date RFP 19-021 Janitorial Services 7/15/2019 N/A TBD 8/20/19 $227,280 (multiyear; multiple accounts) RFP 20-001 Rattlesnake Creek Integrity Study 7/1/2019 N/A $50,000 Balance Hydrologics 8/6/2019 RFP 20-002 Vegetation Management 7/22/19 N/A $85,000/yr. DBI Services 8/6/19 RFP 20-003 Dead Animal Removal Services 8/5/19 N/A $25,440/yr. D&D Services 8/20/19 RFP 20-004 Big Stone Lodge Demolition EIR 8/5/19 N/A $100,000 TBD 9/17/19 Bid Number Project Title Bid Opening Engineer's Estimate Current Project Balance Awarded Bid Awarded To City Council Award Date BID 19-016 Inclined Wheelchair Lift Replacement 5/8/19 @ 3:00 p.m. (Council Chambers) $27,000 $43,750 TBD TBD TBD (no bids received) BID 19-024 City Hall Hydronic Piping Replacement Project 6/27/19 @ 4:00 p.m. (Council Chambers) $130,000 $135,649 $138,400 Hunter General Engineering 8/6/19 BID 20-001 Mickey Cafagna Community Center 7/22/19 @ 4:00 p.m. (Council Chambers) $10,176,000 $11,943,731 $8,590,790 (Additive: $1,153,194) EC Constructors, Inc. 8/20/19 BID 20-002 City Facilities Painting 2019/2020 7/25/19 @ 2:00 p.m. (Council Chambers) $76,875 $76,875 TBD TBD 9/3/19 CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Jodene Dunphy, Director of Human Resources & Risk Management DATE: July 31, 2019 SUBJECT: Human Resources & Risk Management Department Director’s Notes HUMAN RESOURCES Open Recruitments No. Dept. Title Type Opened Closes 1 CS Box Office Attendant Part-Time Temporary 1/17/17 Continuous 2 CS Front of House Assistant Part-Time Temporary 5/1 Continuous 3 PW Assistant Director of Public Works – Utilities Full-Time Regular 6/27 Continuous 4 PW Facilities Maintenance & Special Districts Supervisor Full-Time Regular 7/28 8/18 Recruitments In Progress No. Dept. Title Type Opened Closed 1 CS Administrative Assistant II Part-Time Regular 6/18 6/30 2 CS Box Office Coordinator 3/4-Time Regular 6/21 7/7 3 CS Recreation Coordinator Full-Time Regular 5/24 6/9 4 PW Water Utilities Worker I/II (2 vacancies) Full-Time Regular 6/6 6/30 5 SS Firefighter/Paramedic (2 vacancies) Full-Time Regular 7/1 7/25 Upcoming Recruitments No. Dept. Title Type Open Close 1 CS Aquatics Coordinator Full-Time Regular TBD TBD 2 CS Lifeguard Part-Time Temporary TBD TBD 3 CS Recreation Leader II Part-Time Temporary TBD TBD 4 DS Engineering Technician Full-Time Regular TBD TBD 5 PW Contract Specialist/Inspector Full-Time Regular TBD TBD 6 PW Director of Public Works Full-Time Regular TBD TBD 7 SS Deputy Fire Chief Full-Time Regular TBD TBD CITY OF POWAY MEMORANDUM TO: Chris Hazeltine, City Manager FROM: Michael Obermiller, P.E., Director of Public Works DATE: July 31, 2019 SUBJECT: Public Works Department Bi-Weekly Report (July 15, 2019 – July 28, 2019) Work/Description Units Location/Description OPERATIONS Street Maintenance Asphalt Repairs (sq. ft.) 54,530 Ground out and placed deep asphalt patches at Starridge and Arbolitos parks parking lots (7,395 sq. ft.) Zone #3 Grinding Program - completed. Sealed 14 assets in Zone #3 - Crack Seal Program completed (46,900 ft.) Assisted Water Division by paving a 90 sq. ft. utility trench on Gregg Street. Patched two potholes on Espola and Twin Peaks roads (2 sq. ft.) Repaired damaged area on Pomerado Road. (140 sq. ft.) Repaired three sunken areas on Stone Canyon Road. Debris Removal 5 Removed the following from roadways: a discarded mattress on Twin Peaks Road, lumber spilled on Espola Road, two mattresses from Waaypuk Trail and a recliner from Conley Street. Cleaned up sheetrock from the bike lane on Scripps Poway Parkway. Concrete Repairs (sq. ft.) 244 Completed sidewalk removal and replacement on Wanesta Drive (54 sq. ft.) and on Edina W ay (100 sq. ft.) Completed concrete sidewalk repair on Silverset Street (84 sq. ft.) Completed concrete sidewalk grind on La Venta Drive (6 sq. ft.) Vegetation (days) 8 Completed weed abatement along sidewalks on Twin Peaks, Espola, Old Pomerado and Martincoit roads. Public Works Department Report /July 31, 2019 /Page 2 Work/Description Units Location/Description ERT follow up: removed tree debris on Holland Place and cut up and hauled away a fallen tree from along Espola Road. Miscellaneous 2 Attended Active Shooter Training. Assisted contract sweeper with cleaning of area along Community Road where parked cars are a problem. Special Events Assisted City of San Marcos by participating in interviews for their Streets Department. Stormwater & Flood Control Annual Concrete Channel Cleaning Program 3/12 Three completed sections near Durhullen Drive, Midland Road at Aubrey Street, and Espola Road. Twelve other locations where vegetation was cut and site was prepped. Special Projects 2 Resident Rock Project off Espola Road, removed debris from SDGE Staging area off High Valley Road. Graffiti Removal 2 Near Midland culvert, at Rattlesnake Creek and Hilleary Park. Training 1 Attended Active Shooter Training. Vehicle & Equipment Maintenance Work Orders 29 Hazardous Material Inspection: No issues to report. Generator Inspections: No issues to report. UST Inspection: No issues to report. APCD UST- Vapor Recovery Inspection: No Issues to report. Scheduled/Unscheduled 21/8 Red Fleet Work Orders 2 Red Fleet Scheduled/Unscheduled 2/0 Facilities Maintenance Electrical & Lighting 4 Replaced light bulbs in the Library, repaired a light fixture in the Operations Warehouse mezzanine and the electrical system in the Lake Poway Concession, and installed a new outlet in the guard room for a copier at the Pool. Plumbing/HVAC 14 Unclogged a toilet at Valle Verde Park, a sink and floor drain at Fire Station 1, a drinking fountain at Garden Road Park and a toilet in the Lake Poway ballfield restroom. Repaired faucets at Fire Station 1, a leaky hose bib at Silverset Park, a leak on an angle stop in Council Chambers under the sink and started repair work on the hot water valves and damper actuators at City Hall. Researched new shower stations and ordered new wands for the showers at the Pool. Worked with a contractor on a leaky pipe in Fire Station 1 and repaired the wall after pipe work was Public Works Department Report /July 31, 2019 /Page 3 Work/Description Units Location/Description complete. Replaced a push cap on a faucet at City Hall. W orked with AO Reed to repair the air conditioning in the AV room in Council Chambers. Continued repairing VAV’s at City Hall. Miscellaneous 24 Installed seat cover and soap dispensers at the Library, attended Active Shooter Training, had keys made for paper towel dispensers throughout City, moved drawers/cabinets around in an office at City Hall and hung items on the wall, cleared out debris from the generator room and around AC units at City Hall/Council Chambers, and took the blowers to the Water Treatment Plant to alleviate the heat while waiting for a new air conditioning unit to arrive. Repaired a wall at the Library, a broken arm slide on a door at Public Works Operations, holes in an office wall at City Hall, the door to the Pool’s First Aid room and broken boardwalk boards at Old Poway Park. Checked out a bad odor in City Hall, an intermittent door problem at Fire Station 1 and an air leak in a compressor at Fire Station 3 (repair parts have been ordered). Replaced stained ceiling tiles at the PCPA and Fire Station 1, a missing tile at the Library and a refrigerator filter in Public Works. Turned off all air conditioning units, unplugged freezers and turned off gas to stoves and water heaters at the Auditorium and Senior Center. Work Orders Completed / In Progress 39/3 Work Orders Scheduled / Unscheduled 35/7 Parks, Trails & Landscape Maintenance City Owned Properties Performed weed abatement at four properties between York and Sycamore avenues. Performed weed abatement and mowed open lot across from Fire Station 2 and two properties off Community Road. Garden Road Park Replaced one older BBQ and performed gopher abatement. Lake Poway Park Removed a torn volleyball net (replacement has been ordered) and tree limbs that were hanging close to the upper playground. Replaced a park bench with a memorial bench near the fishing float, four fence posts around the Rose Garden and a broken toilet paper dispenser. Added memorial plaques to three benches and two picnic tables, installed three memorial benches, Public Works Department Report /July 31, 2019 /Page 4 Work/Description Units Location/Description moved two pallets of supplies from the warehouse to the storage yard, cleaned the base of the statue and the wall at the Tony Gwynn Memorial, supported the Saturday Evening Campout and Sunday Afternoon Concert, and performed gopher abatement along the volleyball court. Poway Oaks Park Added landscape mulch to the turf reduction areas. Trimmed the shrubs along the interior of the park. Silverset Park Repaired one and painted seven picnic tables. Aerated the turf and adjusted irrigation to help the recently installed turf. Aerated the ballfield. Trimmed acacia along the stairs and part of the walking path. Repaired one park bench and painted five picnic tables. Sycamore Creek Park Performed gopher abatement. Valle Verde Park Performed weed abatement between Espola Road and the ballfield. Removed low hanging tree limbs that were too close to the playground. Removed thatch build up in some of the older turf areas. Opened the sports field after the recent turf renovation project. Miscellaneous Trails Removed a stump from the center of the Metate staging area, a broken fence post near the pond, debris left by the Metate and Old Coach volunteer groups, multiple truckloads of artichoke tops removed by volunteers from the South Poway staging area, and a fallen tree from along Twin Peaks Road Trail near PUSD. Filled in ruts along the Tierra Bonita, Avocado link and Espola Trails. Added one picnic table to the Iron Mountain Trailhead. Performed weed abatement and mowed the Iron Mountain and Ellie Lane staging areas. Miscellaneous Parks Spent 17 hours making irrigation repairs, adjustments and replacements. Staff attended half day Active Shooter Training. In the pocket parks, cleaned the playground equipment, park benches and picnic tables due to spider concerns. Contract Inspections 13 Performed landscape inspections, arborist grid trim inspections, grove inspections and roofing inspections. Customer Inquiries 24 Streetlight Issues/ Park Lights 5/3 Public Works Department Report /July 31, 2019 /Page 5 Work/Description Units Location/Description Traffic Signal / Emergency 3/1 Measured pedestrian button heights at a couple locations and lowered the position. USA Mark-Outs 23 Service Requests Work Orders 13 Attended paint pre-bid meeting, Active Shooter Training, signal controller upgrade meeting and janitorial clarification meeting. Repaired multiple irrigation breaks and two valves at the Library. Researched LMD irrigation meter at Scripps Poway Parkway and General Atomics Way, and pull alarm events. Collected all fire extinguishers from the Senior Center, assisted staff with hanging items on wall at City Hall, selected coping colors for Operations and Fire Station 1 and finished working with contractors on Council Chambers cabinets and flooring. Emergency Response Emergency Response Call-outs 20 Halted an alarm at the Operations Lounge and at the train barn. Contained a water leak in Development Services. Removed and capped a sink in the park. Shut off water at the meter. Removed a fallen tree from roadway, lumber from Poway Road at Hwy 67, glass debris from Poway Road, a tree limb from Ezra Lane and three other debris in road responses. Stopped an irrigation leak and two water leaks. Responded to an interruption in water service and a water waste call. Opened a park to allow a patron to leave. Performed an emergency mark out and cable rodded a sewer line. UTILITIES Water Distribution System Operations Mark-Outs 78 Water System Shutdown 2 Gregg Street, General Atomics Way New meter sets 4 Poway Road FH Paint and caps 18 Customer Service Repairs: Leaks, AMS updates, non-ops. 6 Annual Test Reports 147 Backflows Tested 1 Water Treatment Plant and Utility Systems Operations Lake Poway and Poway Dam - Feet 925.73 Water Treatment Plant – MG (FY - YTD) 284.045 Average Flow: 11.26 MG. Collection System Maintenance Mainline Flushing (l/ft.) 6,770 Quarterly Flushing (l/ft.) 5,341 Lateral Blockage 1 Public Works Department Report /July 31, 2019 /Page 6 Customer Service 3 Recycled Water System Site Inspections 7 Plan Review 17 Customer Service 1 Fats, Oils, Grease (FOG) Program Business License Review 10 Site Inspection 1 Customer Service 2