Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Item 11 Visual Slideshow provided by Staff at Meeting
Streets –10 Projects Drainage –4 Projects Public Facilities –13 Projects Water –17 Projects Sewer –6 Projects 50 Projects –Total Funding $64.77 MIL Capital Improvement Program Completed Projects Mickey Cafagna Community Center 2020-21 Street Overlay 2020-21 ADA Barrier Removal –Lake Poway Picnic Areas Water Treatment Plant Clearwell Distribution Flow Meters Power to Blue Crystal Reservoir Poway Dam Emergency Action Plan 2020-21 ADA Barrier Removal –Lake Poway Pathways Streets Espola Road Bike Lanes Traffic Signal Controller Upgrades Neighborhood Sidewalks (Powers & Garden Areas) Local Road Safety Plan 2021-22 Street Overlay Espola Road Safety Improvements LED Street & Safety Lighting Conversion 2021-22 Street Maintenance 2021-22 Citywide Striping Espola Road Safety Improvements Espola Road Safety Improvements Espola Road Safety Improvements LED Street and Safety Lighting Conversion 2020-21 Street Maintenance and Citywide Striping Drainage Annual Corrugated Metal Pipe Annual Repair/Replace Annual Trash Capture Program Channel Rehabilitation –Carlson & Springvale Rattlesnake Creek Streambank Stabilization -Design Rattlesnake Creek Streambank Stabilization Design Public Facilities Public Facilities Renovation –2022 Roof Replacement Public Facilities Renovation –2022 General Maintenance Public Facilities Renovation –2022 HVAC Upgrade Public Facilities Renovation –2022 Painting City Hall HVAC Controls 2021-22 ADA Barrier Removal –Community Park Fire Station 1 Stairway Replacement Upper Lake Poway Playground Renovation Vehicle Maintenance Monument Sign PCPA Facility Maintenance Design Blue Sky Amphitheater Improvements Public Works Fleet Maintenance Lift Public Works Fleet Maintenance Lift Water Clearwell Replacement (Public Works) Clearwell Bypass (Public Works) SDCWA Treated Water Connection (Public Works) PRV Station Access Assessment WTP Electrical System Assessment Annual Valve Replacement Caustic Tank Rehabilitation Reservoir Overflow Modifications R-4 Reservoir Upgrades R-7 Reservoir Upgrades Washwater Tank No. 2 Upgrades Water Treatment Plant Upgrade Filters 1-8 Water Treatment Plant Security Upgrades Boulder Mountain Reservoirs 1 and 2 Rehabilitation Boulder Mountain Reservoirs 1 and 2 Rehabilitation Sewer Bowron Road Sewer Upsize Exposed Sewer East of Martincoit Sewer Line Repair/Replace (Pomerado at Stone Canyon) Sagewood Drive Sewer Upsize Butterfield Trail Sewer Upsize Annual Manhole Rehabilitation (Public Works) Bowron Road Sewer Upsize Exposed Sewer East of Martincoit Sewer Line Repair/Replace (Pomerado at Stone Canyon) Questions?