Loading...
Storm Water Facilities Maintenance Agreement 2022-0349712RECORDING REQUESTED BY: CITY OF POWAY AND WHEN RECORDED MAIL TO: CITY CLERK CITY OF POWAY P O BOX 789 POWAY, CA 92074 APN: 273-110-07, -08, -18 DOC# 2022-0349712 IIII IIII II11111111111111111111111111111111111111111111111111111111 Sep 01, 2022 08:53 AM OFFICIAL RECORDS Ernest J. Dronenburg, Jr., SAN DIEGO COUNTY RECORDER FEES: $199.00 (SB2 Atkins: $0.00) PCO : N/A PAGES: 58 (THIS SPACE FOR RECORDER'S USE) STORM WATER FACILITIES MAINTENANCE AGREEMENT The Farm (G21-0001) The undersigned grantor(s) declares: Documentary Transfer Tax is $ -0- pursuant to R & T Code 11922 (conveyance to a Government Agency) This AGREEMENT for the maintenance and repair of certain Storm Water Facilities is entered into between the Property Owner(s) THE FARM IN POWAY COMMUNITY ASSOCIATION and AG EHC II (LEN) CA 2, L.P., a Delaware limited partnership, (hereinafter referred to collectively as "OWNER") and the City of Poway (hereinafter referred to as "CITY") for the benefit of the CITY, the OWNER, the successors in interest to the CITY or the OWNER, and the public generally. WHEREAS, OWNER is the owner of certain real property located in the City of Poway, California, more particularly described as Lots B, D, F, H, I, P, Q, R, T, W, 161, 162, 164, and 166 through 169 of Map No. 16478 (The Farm Unit 1), and Lot B of Map No. 16479 (The Farm Unit 2), in the County of San Diego, State of California, both filed in the office of the County Recorder of San Diego County, October 27, 2021, (hereinafter referred to as the "PROPERTY"), which is being developed into a 226 lot subdivision, in accordance with applications for Development Review 21-002, Tentative Tract Map 21- 002, Specific Plan 18-001 and Grading Permit Number G21-0001, which are on file with the CITY. This Agreement is required as a condition of approval for such development. WHEREAS, in accordance with the California Regional Water Quality Control Board San Diego Region Order Number R9-2017-0077, (hereinafter referred to collectively as "Trash Amendment"), the City of Poway's Stormwater Management and Discharge Control Ordinance, Poway Municipal Code, Chapter 13 and 16 (the "Stormwater Ordinance"), the City of Poway Subdivision Ordinance, the City of Poway Zoning Ordinance, the City of Poway Grading Ordinance and/or other ordinances or regulations of CITY which regulate land development and urban runoff, OWNER has proposed that storm water runoff and trash generation from the PROPERTY be managed by the use of the following Storm Water Facilities which are identified as "Best Management Practices" or "BMPs": Six detention basins and accompanying Modular Wetland Biofiltration Unit Systems located throughout the site as shown on Exhibit "A". The precise location(s) and extent of the BMPs are indicated on the approved grading plans on file with CITY's Development Services Department as G21-0001. The manner and standards by which the BMPs must be repaired and maintained in order to retain their effectiveness and the approximate SWFMA (G21-0001) F location of the BMPs are as set forth in the Operation and Maintenance Plan (hereinafter "O&M PLAN"), which is attached hereto and incorporated herein as Exhibit "B". Because additional impervious area may require the addition of or alteration of storm water facilities and strategies, no impervious area or additional drains may be added to the project site without prior approval from the City Engineer. WHEREAS, OWNER's representations that the BMPs will be maintained have been relied upon by CITY in approving OWNER's development applications. It is the purpose of this Agreement to assure that the BMPs are maintained, by creating obligations that are enforceable against the OWNER and the OWNER's successors in interest in the PROPERTY. It is intended that these obligations be enforceable notwithstanding other provisions related to BMP maintenance that are provided by law. NOW, THEREFORE, for consideration of (a) CITY's approval of the above development applications and (b) the mutual covenants set forth herein, IT IS HEREBY AGREED AS FOLLOWS: Incorporation of Recitals. The recitals set forth above are incorporated herein by this reference and constitute a part of this AGREEMENT 2. Maintenance of Storm Water Facilities. OWNER agrees, for itself and its successors in interest, to all or any portion of the PROPERTY, to comply in all respects with the requirements of the Stormwater Ordinance with regards to the maintenance of BMPs, and in particular agrees to perform, at its sole cost, expense and liability, the following "MAINTENANCE ACTIVITIES": all inspections, cleaning, repairs, servicing, maintenance and other actions specified in the O&M PLAN, with respect to all of the BMPs listed above, at the times and in the manner specified in the O&M PLAN. OWNER shall keep records of this maintenance and provide copies of such records and annual certification of maintenance as requested by CITY. OWNER shall initiate, perform and complete all MAINTENANCE ACTIVITIES at the required time, without request or demand from CITY or any other agency. OWNER further agrees that "MAINTENANCE ACTIVITIES" shall include replacement or modification of the BMPs in the event of failure. Replacement shall be with an identical type, size and model of BMP, except that: (a) The City Engineer may authorize substitution of an alternative BMP if he or she determines that it will be as effective as the failed BMP; and (b) If the failure of the BMP, in the judgment of the City Engineer, indicates that the BMP in use is inappropriate or inadequate to the circumstances, the BMP must be modified or replaced with a more effective BMP to prevent future failure in the same or similar circumstances. 3. Notices. OWNER further agrees that it shall, prior to transferring ownership of any land on which any of the above BMPs are located, or any lot or portion of the PROPERTY which is served by the above BMPs, and also prior to transferring ownership of any such BMP, provide clear written notice of the above described maintenance obligations to the transferee. 4. CITY's Right to Perform Maintenance. It is agreed that CITY shall have the right, but not the obligation, to elect to perform any or all of the MAINTENANCE ACTIVITIES if, in the CITY's sole judgment, OWNER has failed to perform the same. Such maintenance by the CITY shall be conducted in accordance with the nuisance abatement procedures set forth in Poway Municipal Code Chapter 8.72. In the case of maintenance performed by the CITY, it may be performed by CITY forces, or a contractor hired by the CITY, at the CITY's sole election. It is recognized and understood that the CITY makes no representation that it intends to or will perform any of the MAINTENANCE ACTIVITIES, and any election by CITY to perform any of the SWFMA (G21-0001) Page 2 MAINTENANCE ACTIVITIES shall in no way relieve OWNER of its continuing maintenance obligations under this agreement. If CITY elects to perform any of the MAINTENANCE ACTIVITIES, it is understood that CITY shall be deemed to be acting as the agent of the OWNER and said work shall be without warranty or representation by CITY as to safety or effectiveness, shall be deemed to be accepted by OWNER "as is", and shall be covered by OWNER's indemnity provisions below. If CITY performs any of the MAINTENANCE ACTIVITIES, after CITY has demanded that OWNER perform the same and OWNER has failed to do so within a reasonable time stated in the CITY's demand, then OWNER shall pay all of CITY's costs incurred in performing the MAINTENANCE ACTIVITIES, plus an administrative fee. OWNER's obligation to pay CITY's costs of performing MAINTENANCE ACTIVITIES is a continuing obligation. If OWNER fails to pay CITY's costs for performing MAINTENANCE ACTIVITIES, CITY may assess a lien on the property or properties of the responsible parties pursuant to the procedures set forth in Poway Municipal Code Chapter 8.72. 5. Grant of Easement to CITY. OWNER hereby grants to CITY a perpetual easement over, under and across all of the PROPERTY, for purposes of accessing the BMPs, inspecting the BMPs, and performing any of the MAINTENANCE ACTIVITIES specified in Paragraph 1 above. CITY shall have the right, at any time and upon reasonable notice to OWNER, to enter upon any part of said area as may be necessary or convenient for such purposes. OWNER shall at all times maintain the PROPERTY so as to make CITY's access clear and unobstructed. 6. Administration of Agreement for CITY. CITY hereby designates the City Engineer as the officer charged with responsibility and authority to administer this Agreement on behalf of CITY. Any notice or communication to the City related to the implementation of this Agreement shall be addressed to: City Engineer City of Poway 13325 Civic Center Drive Poway, CA 92064 7. Defense and Indemnity. CITY shall not be liable for, and OWNER and its successors in interest shall defend and indemnify CITY and the employees and agents of CITY (collectively "CITY PARTIES"), against any and all claims, demands, liability, judgments, awards, fines, mechanic's liens or other liens, labor disputes, losses, damages, expenses, charges or costs of any kind or character, including attorneys' fees and court costs (hereinafter collectively referred to as "CLAIMS"), related to this Agreement (specifically including but not limited to OWNER's alleged noncompliance with the Trash Amendment or the Stormwater Ordinance), and arising either directly or indirectly from any act, error, omission or negligence of OWNER, OWNER's successors, or their contractors, licensees, agents, servants or employees, including, without limitation, claims caused by the concurrent negligent act, error or omission, whether active or passive, of CITY PARTIES. OWNER shall have no obligation, however, to defend or indemnify CITY PARTIES from a claim if it is determined by a court of competent jurisdiction that such claim was caused by the sole negligence or willful misconduct of CITY PARTIES. Nothing in this Agreement, CITY's approval of the development application or plans and specifications, or inspection of the work is intended to acknowledge responsibility for any such matter, and CITY PARTIES shall have absolutely no responsibility or liability therefore unless otherwise provided by applicable law. 8. Allocation of Costs. Following the sale or transfer of any individual residential lots by OWNER, the cost of the MAINTENANCE ACTIVITIES required by this Agreement shall be divided equally SWFMA (G21-0001) Page 3 by all lot owners, and paid by each lot owner or his or her heirs, assigns and successors in interest. This requirement shall be binding on all lot owners in the subdivision, and each shall be responsible for his or her equal share of the cost associated with the maintenance. 9. Agreement Binds Successors and Runs With the PROPERTY. It is understood and agreed that the terms, covenants and conditions herein contained shall constitute covenants running with the land and shall be binding upon the heirs, executors, administrators, successors and assigns of OWNER and CITY, shall be deemed to be for the benefit of all persons owning any interest in the PROPERTY (including the interest of CITY or its successors in the easement granted herein). It is the intent of the parties hereto that this Agreement shall be recorded and shall be binding upon all persons purchasing or otherwise acquiring all or any lot, unit or other portion of the PROPERTY, who shall be deemed to have consented to and become bound by all the provisions hereof. 10. OWNER's Continuing Responsibilities Where Work Commenced or Permit Obtained. Notwithstanding any other provision of this Agreement, no transfer or conveyance of the PROPERTY or any portion thereof shall in any way relieve OWNER of or otherwise affect OWNER's responsibilities for installation or maintenance of BMPs which may have arisen under the ordinances or regulations of CITY referred to in this Agreement, or other federal, state or CITY laws, on account of OWNER having obtained a permit which creates such obligations or having commenced grading, construction or other land disturbance work. 11. Amendment and Release. The terms of this Agreement may be modified only by a written amendment approved and signed by the Director of Development Services acting on behalf of CITY and by OWNER or OWNER's successor(s) in interest. This Agreement may be terminated and OWNER and the PROPERTY released from the covenants set forth herein, by a release, which CITY may execute if it determines that another mechanism will assure the ongoing maintenance of the BMPs or that it is no longer necessary to assure such maintenance. 12. Governing Law and Severability. This Agreement shall be governed by the laws of the State of California. Venue in any action related to this Agreement shall be in the Superior Court of the State of California, County of San Diego. OWNER hereby waives any right to remove any such action from San Diego County as is otherwise permitted by California Code of Civil Procedure Section 394. In the event that any of the provisions of this Agreement are held to be unenforceable or invalid by any court of competent jurisdiction, the validity, and enforceability of the remaining provisions shall not be affected thereby. 13. Attorney's Fees. The prevailing party in any action or proceeding to enforce or interpret the terms of this Agreement shall be entitled to recover all of its reasonable litigation expenses, including its expert fees, attorneys' fees, courts costs, arbitration costs, and any other fees. IN WITNESS WHEREOF, the parties have executed this Agreement on the dates set forth hereinafter. OWNER: THE FARM IN POWAY COMMUNITY ASSOCIATION By: Date: _ Chris ina Cornell President (signature must be notarized) SWFMA (G21-0001) Page 4 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT A notary public or other officer completing certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of San Diego On June 9 2022 before me, Diane Scott , Notary Public, personally appeared Christina Cornell , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/afe subscribed to the within instrument and acknowledged to me that he/she4hey executed the same in h+s/her�+4h& authorized capacity(ies), and that by his/her he# signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. I Diane Scott ®e— — .minis= aMy DIANE SCOTT Notary public - Californiaz San Diego County Commission k 22ET339 Comm. Expires May 30, 2023 (SEAL) OWNER: AG EHC II (LEN) CA 2, L.P., a Delaware limited partnership By: -- Steven S. Benson, the manager of Essential Housing Asset Management, LLC, an Arizona limited liability company, the Authorized Agent of AG EHC II (LEN) CA 2, L.P. (signature must be notarized) CITY OF POWAY: RbbeP J. Manis I - // i Director of Development Services (signature must be notarized) APPROVED AS TO FORM: Office of the City Attorney ('Xtt"� &/� Alan Fenstermacher City Attorney Attachments 1. Certificate of Acceptance 2. Exhibit A — Site Location of BMPs 3. Exhibit B — Operation and Maintenance Plan Date: � f Z Z Date: ` t� SWFMA (G21-0001) Page 5 Storm Water Facilities Maintenance Agreement- The Farm (G21-0001) STATE OF ARIZONA} COUNTY OF MARICOPA} BEFORE ME, the undersigned authority, a Notary Public in and for the State of danl , on this day personally appeared s`ygr7 , . ,then roa M (1/7 a f &?/ of Essential Housing Asset Management, LLC, an Arizona limited liability company, Authorized Agent of AG EHC II (LEN) CA 2, L.P., a Delaware limited partnership, known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that (_)he executed the same for the purposes and consideration therein expressed, in the capacity therein stated, and as the act and deed of said company. Given under my hand and seal of office this 2 day of �./wv- , 20ZZ . Notary's Signature Name typed or printed 07 /a, 1202 s Commission Expires Jaime Marie Adams Notary Public Ec., Maricopa County, Arizona My Comm. Expires 07-01-25 Commission No. 6070300 •RNIA ALL-PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ) County of San Diego ) On June 22, 2022 Date personally appeared before me, Yvonne Mannion, Notary Public Here Insert Name and Title of the Officer Robert J. Manis Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. -- �' WITNESS my hand and official seal. YVONNE MANNION Notary Public - California - San Diego County = Commission # 2363699 Signature `` `A _ �,., rsni 3 My Comm. Expires Jul 1, 1015 Signature of Notary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Storm Water Facilities Maintenance Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: lent G21-0001 Number of Pages: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: 02016 National Notary Association ' www.NationalNotary.org ' 1-800-US NOTARY (1-800-876-6827) Item #5907 CERTIFICATE OF ACCEPTANCE (Storm Water Facilities Maintenance Agreement) This is to certify that the interest in real property located in the City of Poway conveyed by the Grant of Easement described in Item 5 of the attached document dated ��lG q► from THE FARM IN POWAY COMMUNITY ASSOCIATION and AG EHC II (LEN) CA 2, L.P., a Delaware limited partnership, to the City of Poway, a political corporation and/or governmental agency, is hereby accepted by the undersigned officer or agent on behalf of the City Council pursuant to authority conferred by Resolution No. 17-007 adopted on April 18, 2017. Dated: �� �~' CITY OF POWAY Seal: SWFMA (G21-0001) By: R bert J. Mani Department of Development ices U ( Q O LL 0� U w a = J U lo— 'du ijodocinoio ' H 101 CD 3 101 oMo oNo o �^DLn CMDCND LO U +.0"W.l 00 o`to m mo `^° m to cD v ,— cD cD o cD JO 0 b9l 10l 910 E9l 1 _ O W v O ^ CO �n �n LO M U W O w I O O m Q H O H O D� R 10 M �X i 9 Q z CV O 9 M d �- N = m 0 W W = M c- M M =Q X W W rn N o M O a- wZ> m U) oLo J N N �, o Co O mQ�� � do �2 y O CD u7 U l F O co J O a7 N N � N M N c Zia 3a2i3n 311t/n .00 � I I Ili W DR. rn m rn � rn rn 0 0 ' ' O O Y O � 0 N O �* � a)O J � I ~ Z O (7) v 0 c� J NX Q ~ O rn i 0 Q z M Ln O .— - d NNN Q I— W LO zMoo w W Z U = O J "1 1— CO = U) X a w q N t- _ w W (n 0 ~O ua r� 0gL \ J f0t 010, JO 60t ESL co ch — sSL 00 SL N1 o�Ss� mrn mco m 0 J LO � �Y LO L.L n LLO O M ........... J Mn M aN'd 1NIt/S `y0 p Sbd N V zz o z zz M —U "� o J m ro LnLo00 z_N06 Z£l ' (n 0m�x J (A W � r M 0 � z v o M c- �, Z N (n �- N z M e'IT- � F- x I r N Q O �— m N m F— N CY) W zC7 IT to ?j J 0 p .- 1 cl Qz Q m�x cv Q mQ W z�� C6 W z Z Q z Q J U J Q cn W W� z W , � O m cWn op > Q z W 00 00 � O O) 1 b b 8 N � Q I- M M T �OJ M Cj c- C\j �N N n _! V) j OJ0 c- V) a w~ W U;---------------- Z Q <C J zcnW _z Q z J m I ' I ' i PRIVATE STREET'B' (LOT 162) LOT 13 Ii LOT 14 i f um SEE SHEET A-5 EXHIBIT "A-4" LOT D E I --------------� i i i LOT 12 THEFARM BASIN 1 COMBO DETENTION BASIN 1 r (PRIVATELY MAINTAINED} PERMANENT BASIN 10'x 10' RISER BOX BOT. AREA=46166 SF TOP ELEV.=595.00 BOT. ELEV. =586.50 lik COMBO DETENTION BASIN 1 (PRIVATELY MAINTAINED) PERMANENT BASIN 10'x 10' RISER BOX BOT. AREA=46166 SF TOP ELEV.=594.00 BOT. ELEV.=586.50 MWS-1 4 UNITS 8'x24' /------\------------. EXHIBIT »A_5» | | / / / 3'XJ' RISER BOX INTERNAL WEIR SEE RISER DETAILS RISER BOX -------------- THEFARM BASIN 1 ------------------ ld ------ 54" PUBLIC SD PER MODULAR WETLAND SYSTEMS MWS-L-8-24 SCALE: I"=10'(PRIVATELY MAINTAINED) EXHIBIT "A-6" THE FARM MWS DETAIL FROM BIOGLEAN - BASIN 1 SITE SPECIFIC DATA PROJECT NUMBER 12661 PROJECT NAME THE FARM PROJECT LOCATION POWAY, CA STRUCTURE ID MWS lA THROUGH 1D TREATMENT REOUIRED VOLUME BASED (CF) FLOW BASED (CFS) 18,657 N/A TREATMFNT 1I61 AVAILABLE (FT) 2.3 PEAK BYPASS REQUIRED (CFS) - IF APPLICABLE OFFLINE PIPE DATA 1. E. MATERIAL DIAMETER INLET PIPE 1 586.23 PVC 12" OUTLET PIPE 585.73 PVC 8" PRETREATMENT BIOFIL TRA TION DISCHARGE RIM ELEVATION 594.00 594.00 594.00 SURFACE LOAD PEDESTRIAN PEDESTRIAN PEDESTRIAN FRAME. & COVF_R .SEA 0.70 3EA 36" X 60" 2EA 030" WETLANDMEDIA VOLUME (CY) 7.99 ORIFICE SIZE (DIA. INCHES) 4 EA. 01.26" ORIFICE SPACING (fT) 0.58 NOTES: PRELIMINARY NOT FOR CONSTRUCTION. MWS IA THROUGH 10 TO EACH TREAT 18,657 CF (TOTAL WOV = 74,625 CF). INSTALLATION NOTES REQUIRED TREATMENT VOLUME (CF) 18,657 DRAINDOWN DURATION (HOURS) 28 AVERAGE DISCHARGE RATE PER MWS UNIT(GPM) 81.70 TOTAL DISCHARGE RATE FOR ALL MWS (CFS) 0,728 OPERATING HEAD (FT) 2.3 WETLANDMEDIA INFILTRATION RAFE (IN/HR) 40 OR WETLANDMEDIA LOADING RATE (GPM/SF) 1 0.40 1. CONTRACTOR TO PROVIDE ALL LABOR, EOUIPMENT, MATERIALS AND INCIDENTALS REQUIRED TO OFFLOAD AND INSTALL THE SYSTEM AND APPURTENANCES IN ACCORDANCE WITH THIS DRAWING AND THE MANUFACTURERS' SPECIFICATIONS, UNLESS OTHERWISE STATED IN MANUFACTURERS CONTRACT 2. UNIT MUST BE INSTALLED ON LEVEL BASE. MANUFACTURER RECOMMENDS A MINIMUM 6" LEVEL ROCK BASE UNLESS SPECIFIED BY THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE FOR VERIFYING PROJECT ENGINEERS RECOMMENDED BASF. SPECIFICATIONS. 4. CONTRACTOR TO SUPPLY AND INSTALL ALL EXTERNAL CONNECTING PIPES. ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF CONCRETE (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR. ALL PIPES SHALL BE SEALED WATERTIGHT PER MANUFACTURER'S STANDARD CONNECTION DETAIL. 5. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL PIPES, RISERS, MANHOLES, AND HATCHES. CONTRACTOR TO GROUT ALL MANHOLES AND HATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE. 6. VEGETATION SUPPLIED AND INSTALLED BY OTHERS, ALL UNITS WITH VEGETATION MUST HAVE DRIP OR SPRAY IRRIGATION SUPPLIED AND INSTALLED BY OTHERS. 7. CONTRACTOR RESPONSIBLE FOR CONTACTING 810 CLEAN FOR ACTIVATION OF UNIT. MANUFACTURERS WARRANTY IS VOID WITHOUT PROPER ACTIVATION BY A BLO CLEAN REPRESENTATIVE GENERAL NOTES 1. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS OTHERWISE NOTED, 2. ALL DIMENSIONS, ELEVATIONS, SPECIFICATIONS AND CAPACITIES ARE SUBJECT TO CHANGE. FOR PROJECT SPECIFIC DRAWINGS DETAILING EXACT DIMENSIONS, WEIGHTS AND ACCESSORIES PLEASE CONTACT BIO CLEAN. EXHIBIT "A-8" THE FARM MWS L-8-24 - MWS DETAIL FROM BIOCLEAN - BASIN 1 Stt NUILS UUWIV UNt PLAN vrEw CARTRIDGE --- v - 594.00 RIM/FG n 590.39 4 TOP OF VAULT FLOW CONTROL ° RISER TREATMENT HGL/ UPSTREAM BYPASS ML n n n n n n i i i vi LOT 'B' U IE OUT 6'— 24'-0' 6" 25'-0' ELEVATION VIEW EXHIBIT "A-9" THE FARM HMP-RISER-DETAILS BASIN 1 LOT'B' 10'x I O'RISER BOX RIGHT& LEFT SIDE --------------------- EIGHT 8" @ 3.90' 24" OUTLET 0 0 0 a,--- 0 0 0 PIPE U-) - ONE 1" @ 1.55" @ 586.5 12" OUTLETIJ-�T� PIPE @ 586.5' TO M ws 12" BYPASS PIPE @ 586.0 12" BYPASS PIPE @ 586.0 FRONT& BACK SIDE je-6" I-------------------- — 24" OUTLET 00000000000".. PIPE @ 586.5 3'x3'RISER BOX FRONT& BACKSIDE o INTERNAL WEIR 586.5 BOTT. OF BASIN F ONE 6" WQ OR06j� @ 586.5' RIGHT & LEFT SIDE I/Vir-KIVAL VVt:lK WALL TO TOP OF DIVERT WATER QUALITY ZDESIGN CAPTURE VOLUME S PE TO MODULAR WETLAND UNIT @ 1.55 FT ------ -----12" BYPASS PIPE TWO 6" WO ORIFICES @ 586.0 2" OUTLET PIPE @ @ 586.5' 586.5' TO M WS PLAN VIEW 72" OUTLET PIPE @ 586.5' Tn A,([A' 24" OUTLET PIPE @ 586.5 81, @ 3.40, INTERNAL WEIR WALL TO DIVERT WATER QUALITY DESIGN CAPTURE VOLUME TO MODULAR WETLAND UNIT @ 1.55 FT 1.85' EXHIBIT "A-10" THE FARM BASIN 2 LOT T DETENTION BASIN 2 (PRI VATEL Y MAINTAINED) PERMANENT BASIN 6'x3' RISER BOX BOT. AREA=13410 SF TOP ELEV.=658.00 BOT. ELEV. = 64 7.00 ZO PR/AT _ co it r R2 r -- ' r LOT I ' r � 2 8'x24' MWS UNITSrr -- ----- — -----' / / 1 ---------------- 'r---------------------- SEE SHEET A-11 EXHIBIT "A-11" 0 6'xY RISER BOX LOT I i --------- --- -----------647----- 650 2; 1 655 -� 3'x2' EMERG ECNCY RISER BOX 2 - - - - - - - - ----------------------- (,,18" SD Q1, 8'x24' `O MWS 8'x24' '� MWS r I \ r 1 r It r 0 MODULAR WETLAND SYSTEMS MWS-L-8-24 SCALE: V=10' (PRIVATELY MAINTAINED) THEFARM BASINj LOTT SITE SPECIFIC DATA PROJECT NUMBER 12661 PROJECT NAME THE FARM PROJECT LOCATION POWAY, CA STRUCTURE ID MWS 2A AND 28 TREATMENT REQUIRED VOLUME BASED (CF) FLOW BASED (CFS) 16,337.500000 N/A TREATMENT HGL AVAILABLE (FT) 2.3 PEAK BYPASS REQUIRED (CFS) - IF APPLICABLE OFFLINE PIPE DATA I.E. MATERIAL DIAMETER INLET PIPE 1 644.93 PVC 8" OUTLET PIPE 643.93 PVC 8" PRETREATMENT BIOFIL TRA TION DISCHARGE RIM ELEVATION 660.00 660.00 660.00 SURFACE LOAD PEDESTRIAN PEDESTRIAN PEDESTRIAN FRAME & COVER 3EA 030" 3E4 36" X 60" 2EA 030" WERANDMEDIA VOLUME (CY) 15.12 ORIFICE SIZE (DIA. INCHES) 5 EA. 01.39" ORIFICE SPACING (FT) 1.00 NOTES. • PRELIMINARY NOT FOR CONSTRUCTION. MWS 2A AND 28 TO EACH TREAT 16,338 CF (TOTAL WQV = 32,675 CF). INSTALLATION NOTES LOT T REQUIRED TREATMENT VOLUME (CF) 16,338 DRAINDOWN DURATION (HOURS) 13 AVERAGE DISCHARGE RATE PER MWS UNIT(GPM) 150.96 TOTAL DISCHARGE RATE FOR ALL MWS (CFS) 0.673 OPERATING HEAD (FT) 5.0 WETLANDMEDIA INFILTRATION RATE (IN/HR) 1 34 OR WETLANDMEDIA LOADING RATE (GPM/SF) 1 0.34 1. CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT, MATERIALS AND INCIDENTALS REQUIRED TO OFFLOAD AND INSTALL THE SYSTEM AND APPURTENANCES IN ACCORDANCE WITH THIS DRAWING AND THE MANUFACTURERS' SPECIFICATIONS, UNLESS OTHERWISE STATED IN MANUFACTURERS CONTRACT 2. UNIT MUST BE INSTALLED ON LEVEL BASE. MANUFACTURER RECOMMENDS A MINIMUM 6" LEVEL ROCK BASE UNLESS SPECIFIED BY THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE FOR VERIFYING PROJECT ENGINEER'S RECOMMENDED BASE SPECIFICATIONS. 4. CONTRACTOR TO SUPPLY AND INSTALL ALL EXTERNAL CONNECTING PIPES. ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF CONCRETE (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR. ALL PIPES SHALL BE SEALED WATERTIGHT PER MANUFACTURER S STANDARD CONNECTION DETAIL. 5. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL PIPES, RISERS, MANHOLES, AND HATCHES CONTRACTOR TO GROUT ALL MANHOLES AND HATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE. 6. VEGETATION SUPPLIED AND INSTALLED BY OTHERS ALL UNITS WITH VEGETATION MUST HAVE DRIP OR SPRAY IRRIGATION SUPPLIED AND INSTALLED BY OTHERS 7. CONTRACTOR RESPONSIBLE FOR CONTACTING 8/0 CLEAN FOR ACTIVATION OF UNIT. MANUFACTURERS WARRANTY IS VOID WITHOUT PROPER ACTIVATION BY A 810 CLEAN REPRESENTATIVE. GENERAL NOTES 1. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS OTHERWISE NOTED. 2. ALL DIMENSIONS, ELEVATIONS, SPECIFICATIONS AND CAPACITIES ARE SUBJECT TO CHANGE. FOR PROJECT SPECIFIC DRAWINGS DETAILING EXACT DIMENSIONS, WEIGHTS AND ACCESSORIES PLEASE CONTACT 8/0 CLEAN. EXHIBIT "A-14" THE FARM MWS L-8-24 - MWS DETAIL FROM BIOCLEAN - BASIN 2 SEE NOTES UUWN LIM PLAN VIEW CARTRIDGE --- V -- 660.00 R!M/FG �� n A F-1 TOP OF VAULT FLOW CONTROL RISER n n A n r-1 A 6 i TREATMENT NGL/ LUPSTREAM BYPASS !E IE OUT r- 25'-0" ELEVATION VIEW EXHIBIT "A-15" THE FARM HMP-RISER-DETAILS BASIN 2 6'x3' RISER BOX LOT 'I' RIGHT & LEFT SIDE ONE 0.5" @ 1.95' INTERNAL WEIR rn 647.0 BOTT. Zlf OF BASIN 18" —TWO 3.0" @ 647.0 igTl OUTLET WQ ORIFICE o _-18" OUTLET PIPE @ PIPE @ 643' 643' 8" OUTLET PIPE @ 645.83 TO MWS ONE 2" ORIFICE @ 3.55' FRONT & BACK SIDE 6.0' �' .�6" --------------------- INTERNAL WEIR WALL TO ' DIVERT WATER QUALITY $" OUTLET DESIGN CAPTURE VOLUME TO Lq PIPE TO @ .9 MODULAR FT ROM BOTT.UNI MWS _ 647.0 BOTT. }g" OF BASIN OUTLET"ej PIPE @ 643' 645.83 FOR 8" .. PIPE PLAN VIEW 3'x2' EMERGENCY RISER BOX FRONT & BACK SIDE RIGHT & LEFT SIDE •�2.01'' Try•••^ 00 (yR� , L ^l L PLAN VIEW 0 N INTERNAL WEIR WALL TO DIVERT WATER QUALITY DESIGN CAPTURE VOLUME TO MODULAR WETLAND UNIT @ 1.95 FT EXHIBIT "A-16" SEE SHEET A-17 LOT Q l 1 t \ 1 1 1 i i 1 l 1 � 1 1 0 3 THEFARM BASIN 3 LOTV LINE BASIN WITH 2 LAYERS OF 15 MIL PVC SHEETING PER SDCWA. SEE DETAIL ON SHT 5 PERMANENT BASIN 6'x3' RISER BOX BOT AREA= 6872 SF TOP ELEV. = 681.00 BOT ELEV.=675 8'x l2' MWS UNIT DETENTION BASIN 3 (PRIVATELY MAINTAINED) EXHIBIT "A-17" THE FARM BASIN 3 LOT V \\ , Xv 18" SD-=�_ 6'x3' RISER 80X LOT Q \ 1 \ i \� RIP RAP \ \ \ \ 1 MODULAR WETLAND SYSTEMS MWS-L-8-12 SCALE: 1"=10' (PRIVATELY MAINTAINED) EXHIBIT "A-18" THE FARM MWS DETAIL FROM BIOGLEAN - BASIN 3 SITE SPECIFIC DATA PROJECT NUMBER 12661 PROJECT NAME THE FARM PROJECT LOCATION POWAY, CA STRUCTURE ID MiYS 3 TREATMENT REQUIRED VOLUME BASED (CF) FLOW BASED (CFS) 10,893 N/A TREATMENT HGL AVAILABLE (FT) N/K PEAK BYPASS REQUIRED (CFS) - IF APPLICABLE N/A PIPE DATA 1, E. MATERIAL DIAMETER INLET PIPE 1 672.86 PVC 8" OUTLET PIPE 671,86 PVC 8' PRETREATMENT 810FIL TRA TION DISCHARGE RIM ELEVATION 681.00 681.00 681.00 SURFACE LOAD PEDESTRIAN PEDESTRIAN PEDESTRIAN FRAME & COVER 2EA O30" 30'X48" & v30'" o30" WETLANDMEDIA VOLUME (CY) 6.91 ORIFICE SIZE (DIA. INCHES) 5 EA 0 1.17" ORIFICE SPACING (fT) 0.92 NOTES: PRELIMINARY NOT FOR CONSTRUCTION. INSTALLATION NOTES i 11 REQUIRED TREATMENT VOLUME (CF) 10,893 DRAINDOWN DURATION (HOURS) 13 AVERAGE DISCHARGE RATE PER MWS UN1T(GPM) 106.20 DISCHARGE RATE (CFS) 0.237 OPERATING HEAD (FT) 4.6 WETLANDMEDIA INFILTRATION RATE (IN/HR) 52 OR WETLANDMEDIA LOADING RATE (GPM/SF) 1 0.52 1. CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT, MATERIALS AND INCIDENTALS REQUIRED TO OFFLOAD AND INSTALL THE SYSTEM AND APPURTENANCES IN ACCORDANCE WITH THIS DRAWING AND THE MANUFACTURERS' SPECIFICATIONS, UNLESS OTHERWISE STATED IN MANUFACTURER'S CONTRACT 2. UNIT MUST BE INSTALLED ON LEVEL BASE. MANUFACTURER RECOMMENDS A MINIMUM 6" LEVEL ROCK BASE UNLESS SPECIFIED BY THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE FOR VERIFYING PROJECT ENGINEERS RECOMMENDED BASE SPECIFICATIONS. 4. CONTRACTOR TO SUPPLY AND INSTALL ALL EXTERNAL CONNECTING PIPES. ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF CONCRETE (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR. ALL PIPES SHALL BE SEALED WATERTIGHT PER MANUFACTURER'S STANDARD CONNECTION DETAIL. 5. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL PIPES, RISERS, MANHOLES, AND HATCHES. CONTRACTOR TO GROUT ALL MANHOLES AND HATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE 6. VEGETATION SUPPLIED AND INSTALLED BY OTHERS. ALL UNITS WITH VEGETATION MUST HAVE DRIP OR SPRAY IRRIGATION SUPPLIED AND INSTALLED BY OTHERS. 7 CONTRACTOR RESPONSIBLE FOR CONTACTING 610 CLEAN FOR ACTIVATION OF UNIT MANUFACTURERS WARRANTY IS VOID WITHOUT PROPER ACTIVATION BY A 810 CLEAN REPRESENTATIVE. EXHIBIT "A-19" THE FARM MWS L-8-12 - MWS DETAIL FROM BIOCLEAN - BASIN 3 MANHOLE AC n n MANHOLE C/L n n a r, s' Yin 44$E LEFT END VIEW 9'-O" RIGHT END VIEW LOT 'Q' EXHIBIT "A-20" THE FARM MWS L-8-12 - MWS DETAIL FROM BIOCLEAN - BASIN 3 LOT 'Q' C/L VERTICAL WETLANDMEDIA UNDERDR41N BED MANIFOLD PATENTED PERIMETER �s VOID AREA ;s;ems' ! d t t i U PRE -FILTER } CARTRIDGE z ❑ r zJ.:J.I JJS.J INLET PIPE SEE NOTES OUTLET PIPE SEE NOTES DRAIN DOWN LINE PLAN VIEW 11 01 681.00 C/L RIM/f-G ,ea Rls4!...'it n n n nn n 677. TOP OF FAULT 676.45 TREATMENT HGL/ UPSTREAM BYPASS flow-- CONTROL i RISER 672.86 o !E IN 671.86-,— IE OUT 6" ---13'-O" ELEVATION VIEW t az 3.0'-' ONE 2.75- @ 675.0' WQ ORIFICE 8" OUTLET PIPE @ 673.83 TO M WS ----------- EXHIBIT "A-21" THE FARM HMP-RISER-DETAILS BASIN 3 LOT 6'x3'RISER BOX RIGHT& LEFT SIDE 18" OUTLET PIPE 18" OUTLET @ 671.50 @ 671.50 FRONT& BACK SIDE ,i 6.0'� r-r ------------ r SEVEN 4" @ 3. 0' 675.0 BOTT. OF THE BASIN 8" OUTLET PIPE @ 673.83 TO M Ws 8" OUTLET PIPE @ 673.83 673.83 AQ TO MWs FOR 8" PIPE PLAN VIEW INTERNAL WEIR WALL TO DIVERT WATER QUALITY DESIGN CAPTURE VOLUME TO MODULAR WETLAND U. @ 1.45 FT Nei ONE 1" @ 1.45` 675.0 BOTT. . OF THE BASIN INTERNAL WEIR WALL TO DIVERT WATER QUALITY DESIGN CAPTURE VOLUME TO MODULAR WETLAND UNIT @ 1.45 FT FROM BOTT. 18" OUTLET PIPE @ 671.50 EXHIBIT "A-22" THE FARM BASIN 4 LOT 'T' DETENTION BASIN 4 (PRIVATELY MAINTAINED) PERMANENT BASIN 4'x3' RISER BOX y BOT. AREA=4746 SF -- TOP ELEV.=668.00'l' , BOT. ELEV.=662.00 /--- -1 � f LOT T LOT R O� rob i SEE SHEET A-23 i LOT S - . %1'-------- --- BASIN 4 EXHIBIT "A-23" THE FARM BASIN 4 LOT 'T' MODULAR WETLAND SYSTEMS MWS-L-8-12 SCALE: 1"=10' (PRIVATELY MAINTAINED) EXHIBIT "A-24" THE FARM MWS DETAIL FROM BIOCLEAN - BASIN 4 SITE SPECIFIC DATA PROJECT NUMBER 12661 PROJECT NAME THE FARM PROJECT LOCATION POWAY, CA STRUCTURE /D MWS 2 TREATMENT REQUIRED VOLUME BASED (CF) FLOW BASED (CFS) 9,981 N/A TREATMENT HGL AVAILABLE (FT) N/K PEAK BYPASS REQUIRED (CFS) — IF APPLICABLE N/A PIPE DATA It MATERIAL DIAMETER INLET PIPE 1 660.50 PVC 8" OUTLET PIPE 658.50 PVC 8" PRETRE4TMENT BIOFIL IRA TION DISCHARGE RIM ELEVATION 668.00 668.00 668.00 SURFACE LOAD PEDESTRIAN PEDESTRIAN PEDESTRIAN FRAME & COVERI 2E4 e30 "" 30 X48" & d30" O30 " WER ANDMEDIA VOLUME (CY) 799 ORIFICE SIZE (DIA. INCHES) 5 EA 01.17" ORIFICE SPACING (FT) 0.92 NOTES: PRELIMINARY NOT FOR CONSTRUCTION. INSTALLATION NOTES LOT 'T' REQUIRED TREATMENT VOLUME (CF) 9,981 DRAINDOWN DURATION (HOURS) 15 AVERAGE DISCHARGE RATE PER MWS UNIT(GPM) 82.36 DISCHARGE RATE (CFS) 0.184 OPERATING HEAD (FT) 5.3 WETLANDMEDIA INFILTRATION RATE (IN/HR) 35 OR WETLANDMEDIA LOADING RATE (GPM/SF) 1 0.35 1, CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT MATERIALS AND INCIDENTALS REQUIRED TO OFFLOAD AND INSTALL THE SYSTEM AND APPURTENANCES IN ACCORDANCE WITH THIS DRAWING AND THE MANUFACTURERS' SPECIFICATIONS, UNLESS OTHERWISE STATED IN MANUFACTURERS CONTRACT 2. UNIT MUST BE INSTALLED ON LEVEL BASE. MANUFACTURER RECOMMENDS A MINIMUM 6" LEVEL ROCK BASE UNLESS SPECIFIED BY THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE FOR VERIFYING PROJECT ENGINEERS RECOMMENDED BASE SPECIFICATIONS. 4. CONTRACTOR TO SUPPLY AND INSTALL ALL EXTERNAL CONNECTING PIPES. ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF CONCRETE (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR. ALL PIPES SHALL BE SEALED WATERTIGHT PER MANUFACTURER'S STANDARD CONNECTION DETAIL. 5. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL PIPES, RISERS, MANHOLES, AND HATCHES. CONTRACTOR TO GROUT ALL MANHOLES AND HATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE. 6. VEGETATION SUPPLIED AND INSTALLED BY OTHERS, ALL UNITS WITH VEGETATION MUST HAVE DRIP OR SPRAY IRRIGATION SUPPLIED AND INSTALLED BY OTHERS. 7. CONTRACTOR RESPONSIBLE FOR CONTACTING Bl0 CLEAN FOR ACTIVATION OF UNIT. MANUFACTURERS WARRANTY IS VOID WITHOUT PROPER ACTIVATION BY A 8/0 CLEAN REPRESENTATIVE. GENERAL NOTES 1. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS OTHERWISE NOTED. 2. ALL DIMENSIONS, ELEVATIONS, SPECIFICATIONS AND CAPACITIES ARE SUBJECT TO CHANGE. FOR PROJECT SPECIFIC DRAWINGS DETAILING EXACT DIMENSIONS, WEIGHTS AND ACCESSORIES PLEASE CONTACT 8/0 CLEAN. EXHIBIT "A-25" THE FARM MWS L-8-12 - MWS DETAIL FROM BIOCLEAN - BASIN 4 xellm MANH4LE MANHOLE n A r- FI FI � m - A 9'-0" RIGHT END VIEW EXHIBIT "A-26" THE FARM MWS L-8-12 - MWS DETAIL FROM BIOCLEAN - BASIN 4 LOT 'T' CIL VERTICAL ---------- ---------- ------------------- WETLANDMEDIA UNDERDRAIN BED MANIFOLD - "" PATENTED a . ; PERIMETER :. VOID AREA f - ; s �y ^ 1, 1 I ! PRE —FILTER y CARTRIDGE i J wt El. INLET PIPE SEE NOTES OUTLET PIPE SEE NOTES DRAIN DOWN LINE PLAN VIEW 668.00 CIL RIM/FG �i n n . n t—i n 665.29 TOP OF VAULT 663.80 TREATMENT HGL/ UPSTREAM BYPASS f , f i FLAW CONTROL 66a5O RISER 1E IN 4 � i 658.50 IE OUT 6" 12'-0" 6" ELEVATION VIEW r .- F ..iu 662.0 BOTT. OF BASIN 17 18' OUTLET PIPE 0 659.50 ACTIA'Ar 662.0 8C BASIN 8" OUTLET PIPE 0 661.0 TO UK I EXHIBIT "A-27" THE FARM HMP-RISER-DETAILS BASIN 4 LOT'T'l 4'x3'RISER BOX RIGHT& LEFT SIDE .—3.0',r rr-6- r - - - - - Tl FOUR 2' 0 1.80' r7 - - - - - ----------- c" 662.0 BOTT. OF BASIN C14 ONE 2.25- 0 662'-- WQ ORIFICE 8- OUTLET PIPE"'� 0 661.0 TO MWS FRONT& BACK SIDE FOUR 3* 0 2.0' 18" OUTLET PIPE @ 659.50 PLAN VIEW ,,� 4. 0'----,r INTERNAL WEIR n-1 18' OUTLET PIPE @ 659.50 INTERNAL WEIR WALL TO DIVERT WATER QUALITY DESIGN CAPTURE VOLUME TO MODULAR WETLAND I 0 1.80 FT FROM BOTT. 8' OUTLET PIPE 661.0 TO MWS r2-4'-�", :F--661.0 FOR 8" PIPE 3. 0'--,or o INTERNAL WEIR WALL TO DIVERT WATER QUALITY DESIGN CAPTURE VOLUME TO MODULAR WETLAND UNIT 0 1.80 IT THE FARM BASIN 5 LOT 'W' z� 4� LOT 133 , Ov i io DETENTION BASIN 5 (PRIVATELYMAINTAINED) • LOT W ` PERMANENT BASIN i` 2'x3' RISER BOX BOT. AREA=3701 SF if TOP ELEV.=688.00 pRIVq 5�-����`'� ` BOT. ELEV.=681.00 (� p_T 168 EE7 'E, 8'x8' MWS UNIT i LOT V ---- i SEE SHEET A-29 BASIN 5 � l • \ RETAINING WALL PER SHEET 16 THE FARM BASIN 5 LOT W suBDlvrsrON BOUNDARY i 24" PUE PER STI,' i r 1 R" Sr) �f MODULAR WETLAND SYSTEMS MWS-L-8-8 SCALE: 1"=10' (PRIVATELY MAINTAINED) EXHIBIT "A-30" THE FARM SITE SPECIFIC DATA PROJECT NUMBER 12661 PROJECT NAME THE FARM PROJECT LOCATION POWAY, CA STRUCTURE ID MWS 5 TREATMENT REQUIRED VOLUME BASED (CF) FLOW BASED (CFS) 7,587 N/A TREATMENT HGL AVAILABLE (FT) 4.6 PEAK BYPASS REQUIRED (CFS) - IF APPLICABLE N/A PIPE DATA E. MATERIAL DIAMETER INLET PIPE 1 679.48 PVC 8" OUTLET PIPE 678.48 PVC 8" PRETREATMENT BIORLIRA TION DISCHARGE RIM ELEVATION 688.00 688.00 688.GO SURFACE LOAD PEDESTRIAN PEDESTRIAN PEDESTRIAN FRAME & COVER 030" 30" X 48" 024 " WETLANDMEDIA VOLUME (CY) 4.62 ORIFICE SIZE (DIA. INCHES) 5 EA 00.87" ORIFICE SPACING (FT) 0.92 NOTES. PRELIMINARY NOT FOR CONSTRUCTION. INSTALLATION NOTES MWS DETAIL FROM BIOCLEAN - BASIN 5 LOT 'W' REQUIRED TREATMENT VOLUME (CF) 7,587 DRAINDOWN DURATION (HOURS) 76 AVERAGE DISCHARGE RATE PER MKS UNIT(GPM) 58.55 DISCHARGE RATE (CFS) 0.130 OPERATING HEAD (FT) 4.6 WETLANDMEDIA INFILTRATION RATE (IN/HR) 43 OR WETLANDMEDIA LOADING RATE (GPM/SF) 0.43 1. CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT MATERIALS AND INCIDENTALS REQUIRED TO OFFLOAD AND INSTALL THE SYSTEM AND APPURTENANCES IN ACCORDANCE WITH THIS DRAWING AND THE MANUFACTURERS' SPECIFICATIONS, UNLESS OTHERWISE STATED IN MANUFACTURER'S CONTRACT. 2. UNIT MUST BE INSTALLED ON LEVEL BASE. MANUFACTURER RECOMMENDS A MINIMUM 6" LEVEL ROCK BASE UNLESS SPECIFIED BY THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE FOR VERIFYING PROJECT ENGINEER'S RECOMMENDED BASE SPECIFICATIONS, 4. CONTRACTOR TO SUPPLY AND INSTALL ALL EXTERNAL CONNECTING PIPES. ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF CONCRETE (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR. ALL PIPES SHALL BE SEALED WATERTIGHT PER MANUFACTURER'S STANDARD CONNECTION DETAIL, 5. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL PIPES, RISERS, MANHOLES, AND HATCHES. CONTRACTOR TO GROUT ALL MANHOLES AND HATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE. 6. VEGETATION SUPPLIED AND INSTALLED BY OTHERS. ALL UNITS WITH VEGETATION MUST HAVE DRIP OR SPRAY IRRIGATION SUPPLIED AND INSTALLED BY OTHERS, 7. CONTRACTOR RESPONSIBLE FOR CONTACTING 810 CLEAN FOR ACTIVATION OF UNIT MANUFACTURERS WARRANTY IS VOID WITHOUT PROPER ACTIVATION BY A BIO CLEAN REPRESENTATIVE. GENERAL NOTES 1. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS OTHERWISE NOTED. 2. ALL DIMENSIONS, ELEVATIONS, SPECIFICATIONS AND CAPACITIES ARE SUBJECT TO CHANGE. FOR PROJECT SPECIFIC DRAWINGS DETAILING EXACT DIMENSIONS, WEIGHTS AND ACCESSORIES PLEASE CONTACT 8l0 CLEAN. VERTICAL UNDERDR41N MANIFOLD EXHIBIT 11A-32" THE FARM MWS L-8-8 - MWS DETAIL FROM BIOCLEAN - BASIN 5 CfL LOT 'W' WETLANDME-91A BED PATENTED PERIMETER VD/D AREA U PRE—FIL TER CARTRIDGE INLET PIPE ORA/N DOWN LINE SEE NOTES PLAN VIEW 6 688.00 R/MfFG � C/L RR4 5R , TOP OF VAULT 68J of i TREATMENT HGLf I FLOW CONTROL UPSTREAM BYPASS RISER a 679.48 675.4,6 IE IN IE OUT 9'-0" ELEVATION VIEW EXHIBIT #'A-331f THE FARM HMP-RISER-DETAILS BASIN 5 3'x2'RISER BOX RIGHT& LEFT SIDE INTERNAL WEIR WALL TO DIVERT WATER QUALITY 3.01 6#t DESIGN CAPTURE VOLUME ----- TO MODULAR WETLAND UNIT @ 2.05 FT FROM BOTT. 681.0 BOTT.---' OF BASIN o 18" OUTLET PIPE @ 678.0 THREE 4" ORIFICES @ 2.05' INTERNAL WEIR 68 1. 0 BOTT. OF BASIN ,r2.0:I 6" ONE 8" ORIFICE -.7 THREE 4" @3. --ORIFICES @ � 2,05' o 8" OUTLET PIPE @ 679.83 TO MWS FRONT & BACK SIDE � --- PFOUR 3" C) ORIFICES @ 2.05' 18" OU* ' PIPE @ 678.0, PLAN VIEW .-3.0'--,I' INTERNAL WEIR WALL TO DIVERT WATER QUALITY cv DESIGN CAPTURE VOLUME TO MODULAR WETLAND UNIT @ 2.05 FT LOT'W' T-ONE 1.85" WQ ORIFICE @ 681.0 -'\8" OUTLET PIPE 0 679.83 TO MWS EXHIBIT "A-34" THE FARM BASIN 6 LOT 'B' on ST. ANDREWS DRIVE SEE SHEET A-35 'ZI 4'x 17' MWS UNIT r DETENTION BASIN 6 r ' (PRIVATELY MAINTAINED) i PERMANENT BASIN 3'x4' RISER BOX LOT B i �'— BOT. AREA=4814 SF i TOP ELEV. = 663.00 LOT 144 BOT. ELEV=657.00 LOT C i� -------- i- i--- i-------- p BASIN b EXHIBIT "A-35" 4'x 17' MWS I 3 i 18" SD i 3'x4' RISER LOT B TYPE '8-1 ' INLET UBDIVISION BOUNDARY 18" SD IRETAINING WALL BOX RIP r_ MODULAR WETLAND SYSTEMS MWS-L-4-17 SCALE: 1"=10' (PRIVATELY MAINTAINED) THE FARM BASIN 6 LOT 'B' EXHIBIT "A-36" THE FARM MWS DETAIL FROM BIOCLEAN - BASIN 6 SITE SPECIFIC DATA PROJECT NUMBER 12661 PROJECT NAME THE FARM PROJECT LOCATION POWAY, CA STRUCTURE ID ,LAWS 6 TREATMENT REQUIRED VOLUME BASED (CF) FLOW BASED (CFS) 6,220 N/A TREATMENT HGL AVAILABLE (f1) 4.1 PEAK BYPASS REQUIRED (CFS) - IF APPLICABLE OFFLINE PIPE DATA I.E. MATERIAL DIAMETER INLET PIPE 1 654.59 PVC 8' OUTLET PIPE 654.09 PVC 8' PRETREATMENT 810FIL TRA TION DISCHARGE RIM ELEVATION 663.00 663 00 663 DO SURFACE LOAD PEDESTRIAN PEDESTRIAN PEDESTRIAN FRAME & COVER m30" 30' X 48" 024" WETLANDMEDIA VOLUME (CY) 5.32 ORIFICE SIZE (DIA. INCHES) 5 EA 00.89" ORIFICE SPACING (FT) 0.82 NOTES: PRELIMINARY. NOT FOR CONSTRUCTION. INSTALLATION NOTES REQUIRED TREATMENT VOLUME (CF) 6220 DRAINDOWN DURATION (HOURS) 13 AVERAGE DISCHARGE RATE PER MN/S UNIT(GPM) 58.45 DISCHARGE RATE (CFS) 0.130 OPERATING HEAD (FT) 4.1 WETLANDMEDIA INFILTRATION RATE (IN/HR) 54 WETLANOMEDIA LOADING RATE (GPM/SF) 0.54 1. CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT, MATERIALS AND INCIDENTALS REQUIRED TO OFFLOAD AND INSTALL THE SYSTEM AND APPURTENANCES IN ACCORDANCE WITH THIS DRAWING AND THE MANUFACTURERS SPECIFICATIONS, UNLESS OTHERWISE STATED IN MANUFACTURERS CONTRACT 2. UNIT MUST BE INSTALLED ON LEVEL BASE. MANUFACTURER RECOMMENDS A MINIMUM 6" LEVEL ROCK BASE UNLESS SPECIFIED BY THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE TO VERIFY PROJECT ENGINEERS RECOMMENDED BASE SPECIFICATIONS. J. ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF CONCRETE. (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR. ALL GAPS AROUND PIPES SHALL BE SEALED WATER TIGHT WITH A NON -SHRINK GROUT PER MANUFACTURERS STANDARD CONNECTION DETAIL AND SHALL MEET OR EXCEED REGIONAL PIPE CONNECTION STANDARDS 4. CONTRACTOR TO SUPPLY AND INSTALL ALL EXTERNAL CONNECTING PIPES. 5 CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL RISERS, MANHOLES, AND HATCHES. CONTRACTOR TO GROUT ALL MANHOLES AND HATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE. 6. DRIP OR SPRAY IRRIGATION REQUIRED ON ALL UNITS WITH VEGETATION. 7. CONTRACTOR RESPONSIBLE FOR CONTACTING MODULAR WETLANDS FOR ACTIVATION OF UNIT MANUFACTURES WARRANTY IS VOID WITH OUT PROPER ACTIVATION BY A MODULAR WETLANDS REPRESENTATIVE. GENERAL NOTES 1. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS OTHERWISE NOTED. 2. ALL DIMENSIONS, ELEVATIONS, SPECIFICATIONS AND CAPACITIES ARE SUBJECT TO CHANGE. FOR PROJECT SPECIFIC DRAWINGS DETAILING EXACT DIMENSIONS, WEIGHTS AND ACCESSORIES PLEASE CONTACT MANUFACTURER. EXHIBIT "A-37" THE FARM MWS L-4-17 - MWS DETAIL FROM BIOCLEAN - BASIN 6 LOT 'B' MANHOLE OfL R n n i t i ! R � I I o h e s, � Gn 4� O" t!CC " R 5'-0" to LEFT END VIEW MANHOLE R Cft n n S ! t i S R R � yl ^I i 1 ' ! 6" Ml . BASE R h RIGHT END VIEW PRE -FILTER —A , 7 7 CARTRIDGE n--y INLET PIPE SEE NOTES EXHIBIT "A-38" THE FARM MWS L-4-17 - MWS DETAIL FROM BIOCLEAN - BASIN 6 LOT'B' PERIMETER VOID AREA CIL VERTICAL UNOERDRAIN MANIFOLD -/OUTLET PIPE SEE NOTES v.no+u�' - uro'°"*'• .v, r'°�te gra-v.i�l..��;�ix Q 00 WETLANDMEZ)b4 BED PLAN VIEW DRAIN DOWN LINE owe Cz. aWz 663.00 i i cn w CAL iif 5 C- RIMIFG F7 TOP OF VAULT 658.20 TREATMENT HGLI UPSTREAM BYPASS CIO FLOW CONTROL 654.59 RISER 1E IN . . . 654.09 IE OUT 17'-0' f -6- —W-o'— ELEVATION VIEW ONE 1" @ 1.20' ONE 2. 0" @ 657.0' WQ ORIFICE 8" OUTLET PIPE @ 656.0 TO MWs 657.0 BOTT. OF BASIN 8" OUTLET PIPE @ 656.0 TO MW'S---= 656.0 FOR 8" PIPE EXHIBIT "A-3911 THE FARM HMP-RISER-DETAILS BASIN 6 LOT'B' 4'x3'RISER BOX RIGHT& LEFT SIDE 657.0 BOTT. OF BASIN 18" OUTLET PIPE @ 18" OUTLET 654.0 PIPE @ 654.0 FRONT& BACK SIDE If-- 4. ol —r FOUR J" @ 2. 0' 7 7iri. 3i 18" OUTLET PIPE @ 654.0 PLAN VIEW INTERNAL WEIR WALL TO N, DIVERT WATER QUALITY DESIGN CAPTURE VOLUME TO MODULAR WETLAND UNIT @ 1.20 FT INTERNAL WEIR I (N INTERNAL WEIR WALL TO DIVERT WATER QUALITY moo DESIGN CAPTURE VOLUME TO MODULAR WETLAND UNIT @ 1.20 FT FROM BOTT. '8" OUTLET PIPE @ 656.0 TO MWS DETENTION BASIN EXHIBIT "B-1" Threshold/Indicator Maintenance Action Typical Maintenance Frequency Accumulation of sediment, litter, Remove and properly dispose of • Inspect monthl%-. If the or debris in forcbay and/or basin accumulated materials, (without damage foreba)° is 27'%4 full* or more to vegetation when applicable). in one month, increase inspection frequency to monthly phis after (mery• 0.1- inch or larger storm event. * Remove any accumulated materials found within the basin area at each Inspection. • NX-hen the 13111? 1nClUdcs a foreba)?, materials must be removed from the forcbay when the forebay is 25% full*, or if accumulation within the foreba}' blocks flow to the basin. Obstructed inlet or outlet Clear blockage. • Inspect monthly and after structure evcry 0.5-inch or larger storm event. • Remove anv accumulated materials found at each inspection. Poor vegetation establishment, itc-seed, re -plant, or re-establish • Inspect monthly. (when the IINIP includes vegetated vegetation per original plans. • NIaintain when needed, surCacc by designs) EXHIBIT "B-2" Threshold/Indicator Maintenance Action Typical Maintenance Frequency Dead or diseased vegetation (when Remove dead or diseased vegetation, • Inspect monthly. Ole BAII' includes vegetated re -seed, rc-plant, or re-establish surface by design) vegetation per original plans. * Ill 1ltltanl when Ileedkd. Overgro\vn vegetation (when the A4ow or trim as appropriate. • Inspect lnonthl\ BNIP includes vegetated Surface by design) * Nfaintatn When needed. I :rosion due to concentrated Repair/re-seed/re-plant eroded areas • Inspect monthly. irrigation flow and adjust the irrigation system. . maintain when needed. I :rosion due to concentrated Repair/re-seed/rc-plant eroded areas, • Inspect after every 0.5-Inch or storm water runoff flow quid make appropriate corrective larger storm event. IF erosion measures such as adding erosion due to storm water flow has control blankets, adding stone at flow been observed, increase entry points, or minor re -grading to ulspkction frequency to after restore proper drainage according to every 0.1.-inch or larger storm the original plan. If the issue is not event. corrected by restoring the l3AIP to the 9 Maintain when needed. if the original plan and grace, the City Engineer shall be contacted prior to any issue is not corrected by additional repairs or reconstruction. 13 the. restoring AIP to the origillil plan a13 grade, the Gtx Engineer shall be contacted prior to any additional repairs or reconstruction. Standing water in above -;round \take appropriate corrective measures • insix. v monthly and after BAIP for longer than )G hours such as adjusting irrigation s\.stem, cvery 0.5-inch or larger storm following a storm event removing obstructions of debris or event. if standing water is invasive vegetation, or observed, increase inspection. removing/replacing clogged or frequency to after every 0.1- compacted surface treatments and/or inch or larger storm event. scarifying or tilting native soils. Always remove deposited sediments before Maintain when needed. scarification, and use a hand -guided rotary tiller. If it is dctkrllliiled that talk drainage of the basin relics on infiltration and the uncerlying native soils have been compacted or do not have the infiltration capacity expected, the City Engineer shall be contacted prior to any additional repairs or reconstruction. EXHIBIT "B-3" Threshold/indicator Maintenance Action Typical Maintenance Frequency Presence of mosquitos/larvae If inosquitos/larvae are observed: first, • Inspect monthly and after immediately remove and properly every 0.5-inch or larger storm Forimages of egg rafts, larva, pupa, dispose any standing; water; second , event. if mosquia>s arc and adult mosquitos, see make corrective' measures as applicable observed, increase inspection to restore H Il drainage to prevent frequency to after every 0.1- htq�://w1�-*.rnoscito.c>rg/biolr�r•�' standing water.. F'or underground inch or larger storm event. detention basins, ensure access covers .Maintain when needed are. tight fittirig, with gaps or holes no greater than 1/16 inch, and/or install harriers such as inserts or screens that prevent mosquito access to the subsurface storage. If mosquitos persist following corrective measures to remove standing; water, or if the BMP design does not meet the 96-hour drawdown criteria due to release rates controlled by an on ice installed on the underdrain, the City I.nginccr shall be contacted to determine a solution. r1 different BNW type, or a Vector Management Plan prepared with concurrence from the County of San Diego Department of Environmental IIcalth, may be required. t)amage to structural components Repair or replace as applicable. • Inspect annually. such as -weirs, inlet or outlet w Maintain when needed. structures EXHIBIT "B-4" The iollowing inspection and maintenance activities shall be pci'fonned and completed as indicated. Maintenance Program for inlet Stenciling Inspection Frequency/indications: Ia[ Waial2nli2a Before wet season begins (September); After wet season A rii . Maintenance Indications Maintenance Activities Inlet stencifing/signage begins to weather or U Re -stamp signage fade CI Broken or dams ed structure ❑ Re air or re lace sin a structure Maintenance Program for Modular Wetland Bio#iitration Units Inspection Frequency/Indications: Bggular Maintenance Inspections ❑ Monthly during wet season Annually before wet season (September) Performance Inspection ❑ 72 hrs after rainfall events greater than 0.5 in. Maintenance Indications Maintenance Activities ❑ Excessive trash, debris, or sediment in unit ❑ Remove trash and debris within 15 days. Empty (i.e., sump is 85 percent full or sump is unit when the unit is 85 percent full or 50 percent full during two consecutive monthly 50 percent full during two consecutive monthly inspections) inspections, or annually in May. ❑ Presence of trash and debris in weir box. ❑ Remove trash and debris while onsite conducting inspection ❑ When standing water in sump is observed ❑ If standing water cannot be removed or remains - during annual and performance inns. ection. through the wet season, notify vector control. ❑ Minor structural damage (i.e., screen becomes ❑ Clean screen, re -fasten screen if appropriate. cloUUed, damaged or loose) U Cracked or fatigued neoprene vector seals I❑ Replace damaged seal ❑ Major damage to structures (i.e., holes in ❑ Immediately consult with engineer and screen, large debris, damage to housing or weir manufacturers representative to develop a box) course of action and effect repairs prior to the wet season. Waste Disposal Sediment, other pollutants, and all other waste shall be properly disposed of in a licensed landfill or by another appropriate disposal method in accordance with local, state, and federal re ulations. EXHIBIT 1113-511 M 0 D U L A R WEIFLAND'_S. Maintenance Guidelines for Modular Wetland System - Linear Maintenance Summary • Remove Trash from Screening Device —average maintenance interval is 6 to 12 months. (9 n7inute average service Ame). • Remove Sediment from Separation Chamber — average maintenance interval is 12 to 24 months. a (101771ntiteaverage service tin7e). • Replace Cartridge Filter Media — average maintenance interval 12 to 24 months. 3 ( 10- 15 n*7ule per cartridge average age service timo). • Replace Drain Down Filter Media — average maintenance interval is 12 to 24 months. 11 (5177irruteaverage service time). • Trim Vegetation — average maintenance interval is 6 to 12 months. 0 (Service time varies). System Diagram Inflow Pipe (optional) P C Access to screening device, separation chamber and cartridge filter www.modularwetiands.com u1suldlye Chamber rain low EXHIBIT "B-6" M 0 D U L A R F I �,\/ETLAND"-) Maintenance Procedures Screening Device 1. Remove grate or manhole cover to gain access to the screening device in the Pre - Treatment Chamber. Vault type units do not have screening device, Maintenance can be performed without entry. 2. Remove all pollutants collected by the screening device. Removal can be done manually or with the use of a vacuum truck. The hose of the vacuum truck will not damage the screening device. 3. Screening device can easily be removed from the Pre -Treatment Chamber to gain access to separation chamber and media filters below. Replace grate or manhole cover when completed. Separation Chamber 1. Perform maintenance procedures of screening device listed above before maintaining the separation chamber. Z With a pressure washer spray down pollutants accumulated on walls and cartridge filters. 3. Vacuum out Separation Chamber and remove all accumulated pollutants. Replace screening device, grate or manhole cover when completed, Cartridge Filters 1. Perform maintenance procedures on screening device and separation chamber before maintaining cartridge filters. 2. Enter separation chamber. 3. Unscrew the two bolts holding the lid on each cartridge filter and remove lid. 4. Remove each of 4 to 8 media cages holding the media in place. 5. Spray down the cartridge filter to remove any accumulated pollutants. 6. Vacuum out old media and accumulated pollutants. 7. Reinstall media cages and fill with new media from manufacturer or outside supplier. Manufacturer will provide specification of media and sources to purchase. 8. Replace the lid and tighten down bolts. Replace screening device, grate or manhole cover when completed. Drain Down Filter 1. Remove hatch or manhole cover over discharge chamber and enter chamber. 2. Unlock and lift drain down filter housing and remove old media block. Replace with new media block. Lower drain down filter housing and lock into place. 3. Exit chamber and replace hatch or manhole cover. vANw.modularwetlands.com EXHIBIT "B-7" M 0 D U L A R W E T L .!BIND Maintenance Notes 1. Following maintenance and/or inspection, it is recommended the maintenance operator prepare a maintenance/inspection record. The record should include any maintenance activities performed, amount and description of debris collected, and condition of the system and its various filter mechanisms. 2. The owner should keep maintenance/inspection record(s) for a minimum of five years from the date of maintenance. These records should be made available to the governing Municipality for inspection upon request at any time. 3. Transport all debris, trash, organics and sediments to approved facility for disposal in accordance with local and state requirements. 4. Entry into chambers may require confined space training based on state and local regulations. 5. No fertilizer shall be used in the Biofiltration Chamber. 6. Irrigation should be provided as recommended by manufacturer and/or landscape architect. Amount of irrigation required is dependent on plant species. Some plants may require irrigation. www.modularwetiands.com EXHIBIT "B-8" M 0 D U L A R '�X/FETLANDS Maintenance Procedure Illustration Screenip_qDevice The screening device is located directly under the manhole or grate over the Pre -Treatment Chamber. It's mounted directly underneath for easy access and cleaning. Device can be cleaned by hand or with a vacuum truck. Separation Chamber The separation chamber is located directly beneath the screening device. It can be quickly cleaned using a vacuum truck or by hand. A pressure washer is useful to assist in the cleaning process. EXHIBIT "A-9" Cartridge Filters The cartridge filters are located inthe Pre -Treatment chamber connected ko the wall adjacent to the biVfi|tnabon chamber. The cartridges have removable tops Uoaccess the individual media filters. Once the cartridge isopen media can be easily removed and replaced byhand O[avacuum truck. Drain Down Filter The drain down filter is located in the Discharge Chamber. The drain filter unlocks from the wall mount and hinges up. Remove filter block and replace with new block. wmww.modu8w*mwetiands.comm EXAIA|T"B-10" _DUL ?JE|i AK|D -S Trim Vegetation Vegetation should bemaintained inthe same manner aesurrounding vegetation and trimmed aoneeded. Nofertilizer shall be used oDthe plants. |niQaduO per the recommendation ofthe manufacturer and orlandscape architect. Different types ufvegetation requires different amounts of mmxw.mmoduUsvrwetUands.comm