Loading...
Item 7 - Visual Slideshow provided by Staff at MeetingRequest Acceptance of the Clearwell Bypass Project as Complete and Water Infrastructure Improvement Program UpdateFebruary 7, 2023 Clearwell Replacement ProjectClearwell Replacement ProjectTreated Water Facilities ProjectsTreated Water Facilities ProjectsWater Infrastructure Improvement Program ComponentsClearwell Bypass Project Clearwell Bypass Project • Enables the replacement of the existing 10-million-gallon water storage reservoir• Two temporary steel tanks are required for water storage• A pump station is required to pump water to the tanks• Temporary 24” above-ground piping and pressure regulating station is required to move water to and from the tanks• Permanent 36” below-ground pipeline is required to move water into the distribution system• Construction: Sept. 2021-Sept. 2022• Construction Contact: $7.3M• Final Contract Amount: $7.6M• Change Orders: 4.2%• Total Project Savings: $800,000 Clearwell Bypass Project Clearwell Replacement ProjectTreated Water Facilities ProjectsTreated Water Facilities ProjectsWater Infrastructure Improvement ProgramClearwell Bypass ProjectClearwell Bypass Project Clearwell Replacement Project• Replace the existing Clearwell floating cover structure with two concrete tanks • Replace the original inlet, outlet and drain valves and replace the outlet piping• Removal of the temporary bypass facilities and restoration of the softball fieldStatus:• Design: Final Stage• Bidding: Spring 2023• Construction Start: Summer 2023• Construction Completion: Fall 2025 Clearwell Replacement ProjectClearwell Replacement ProjectTreated Water Facilities ProjectsWater Infrastructure Improvement ProgramClearwell Bypass ProjectClearwell Bypass Project SDCWA POW-5 Turnout and Flow Control Facility• First treated water connection to the San Diego County Water Authority• Flow control facility on the westside of Espola RoadStatus:• Basis of Design Report: Completed• 50% Design: Spring 2023• Bidding: Winter 2024• Construction: Summer 2024-Spring 2025 Poway Treated Water Facilities and Redundant Pipeline Project• Treated water conveyed to the Clearwell tanks via a new 36” transmission pipeline, pump station and forebay tank• The 36” pipeline will also improve redundancy for Poway’s water distribution systemStatus:• Basis of Design Report: Completed• 50% Design: Spring 2023• Bidding: Winter 2024• Construction: Summer 2024-Winter 2026 Thank You