Directors' Notes 06-28-23
DATE: June 28, 2023
TO: Chris Hazeltine, City Manager
FROM: Carrie Gallagher, City Clerk
CONTACT: (858) 668–4535 or cgallagher@poway.org
SUBJECT: City Clerk Notes (June 14 – June 27, 2023)
Upcoming Agenda Deadlines
Council Meeting Staff Reports Due Agenda Posted
July 18 6/27 7/11
August 1 7/17 7/25
August 15 7/31 8/8
Legal Notices
Order No. Project Title Publishing Date(s) Dept.
23-011 STARRIDGE PARK AND COMMUNITY PARK PATHWAYS
EXTENSION; BID NO. 23-011
6/8 & 6/15
23-012 AN ORDINANCE ADDING CHAPTER 8.26 TO TITLE 8 (HEALTH
AND SAFETY) OF THE POWAY MUNICIPAL CODE
ESTABLISHING REGULATIONS FOR CAMPING AND STORAGE
OF PERSONAL PROPERTY IN PUBLIC AREAS
6/22
23-013 RESOLUTION 23-022 TO LEVY AND COLLECT ASSESSMENTS
FOR LMD NO 83-1 FOR FY 2023-24 AND APPROVE ENGINEER’S
REPORT
6/29
23-014 RESOLUTION 23-023 TO LEVY AND COLLECT ASSESSMENTS
FOR LMD NO 86-1 FOR FY 2023-24 AND APPROVE ENGINEER’S
REPORT
6/29
23-015 RESOLUTION 23-024 TO LEVY AND COLLECT ASSESSMENTS
FOR LMD NO 86-2 FOR FY 2023-24 AND APPROVE ENGINEER’S
REPORT
6/29
23-016 RESOLUTION 23-025 TO LEVY AND COLLECT ASSESSMENTS
FOR LMD NO 86-3 FOR FY 2023-24 AND APPROVE ENGINEER’S
REPORT
6/29
23-017 RESOLUTION 23-026 TO LEVY AND COLLECT ASSESSMENTS
FOR LMD NO 87-1 FOR FY 2023-24 AND APPROVE ENGINEER’S
REPORT
6/29
23-018 RESOLUTION 23-027 TO LEVY AND COLLECT ASSESSMENTS
FOR LMD NO 19-1 FOR FY 2023-24 AND APPROVE ENGINEER’S
REPORT
6/29
23-019 RESOLUTION 23-028 TO LEVY AND COLLECT ASSESSMENTS 6/29
City Clerk’s Office
Legal Notices continued:
Order No. Project Title Publishing Date(s) Dept.
Page 2 of 6
FOR POWAY LIGHTING DISTRICT FOR FY 2023-24 AND
APPROVE ENGINEER’S REPORT
23-020 AN ORDINANCE TO RELINQUISH AN APPROXIMATE 0.07-ACRE
PORTION OF AN EXISTING CITY-OWNED TRAIL EASEMENT IN
EXCHANGE FOR APPROXIMATELY 0.07-ACRES OF TRAIL
EASEMENT ON THE SAME PARCEL (APN 273-102-01-00)
7/6
23-021 RESOLUTION RENEWING THE FIRE PROTECTION SPECIAL TAX
TO BE COLLECTED ON THE PROPERTY TAX ROLL FOR FISCAL
YEAR 2023-24
7/6 & 7/13
Public Records Requests:
Name Subject of Request Date Closed
2022-287
Assi, Hani
Espola Road Safety Improvements - phase 2. 1. planning, design
& construction. 2. all submittals & resubmittals 3. All RFI's
relating to this project 4. All Communications (see attachment to
this)
Extension
notice sent
2022-288
Assi, Hani
Espola Road Safety Improvements - phase 1. 1. planning, design
& construction. 2. all submittals & resubmittals 3. All RFI's
relating to this project 4. All Communications (see attachment to
this)
Extension
notice sent
2023-039
McClellan Law Firm
All DOCUMENTS relating to vehicle parking at the Iron Mountain
trailhead at SR 67 & Poway Rd.
All DOCUMENTS relating to vehicles parking along SR 67 near
the Iron Mountain trailhead just south of the SR 67 & Poway Rd
intersection.
All COMMUNICATIONS between CALTRANS d the CITY OF
POWAY regarding vehicles parking along SR 67 near the Iron
Mountain trailhead.
All City Council meeting minutes relating to vehicle parking at
the Iron Mountain trailhead at SR 67 & Poway Rd.
All comments and complaints relating to vehicles parking along
SR 67 near the Iron Mountain trailhead just south of the SR 67 &
Poway Road intersection.
All comments & complaints relating to bicycle safety along SR
67.
All contracts, plans, or proposals for modifications to parking
near the Iron Mountain trailhead just south of the SR 67 &
Poway Rd intersection.
All internal memos & communications relating to vehicles
parking along SR 67 near the Iron Mountain trailhead just south
of the SR 67 & Poway Road intersection.
Extension
notice sent
City Clerk’s Office
Public Records Requests continued:
Name Subject of Request Date Closed
Page 3 of 6
2023-052
Trails Law Group
1. Any and all records related to the Administrative Clearing
Permit (ACP) 22-0006.
2. All communications with any agent or representative of New
Pointe Communities related to ACP 22-0006.
3. All communications regarding ACP 22-0006.
4. Any and all records related to the catch basin at the southeast
end of line G for the New Pointe Communities development
APN:314-37-05-00.
5. Any and all communications regarding the catch basin at the
southeast end of line G for the New Pointe Communities
development APN:314-37-05-00.
6. Any and all records related to the catch basin (at the
southeast end of line G) redesign/shoring building permit for
the New Pointe Communities development APN:314-37-05-00.
7. Any and all communications regarding the catch basin (at the
southeast end of line G) redesign/shoring building permit for
the New Pointe Communities development APN:314-37-05-00.
8. Any and all records related to any inspection of the New Point
Communities development APN:314-37-05-00, from April 1,
2021 to the present.
9. Any and all communications related to any inspection of the
New Pointe Communities development APN:314-37-05-00, from
April 1, 2021 to the present.
10. Any and all records related to any inspection of the
properties adjacent (APN:314-371-30-00 and APN:314-371-31-
00) to the New Pointe Communities development APN:314-37-
05-00, from April 1, 2021 to the present.
11. Any and all communications related to any inspection of the
properties adjacent (APN:314-371-30-00 and APN:314-371-31-
00) to the New Pointe Communities development APN:314-37-
05-00, from April 1, 2021 to the present.
12. Any and all communications about Billy or Sandy Sheldon.
13. Any and all communications with Tyler Sandstrom from April
1, 2021 to the present.
14. Any and all communications with Scott Sandstrom from April
1, 2021 to the present.
15. Any and all communications with Neils Manley from April 1,
2021 to the present.
16. Any and all records of inspection for erosion control at the
New Pointe Communities development APN:314-37-05-00 from
April 1, 2021 to the presentation.
17. Any and all records of inspection for compliance with noise
pollution regulations at the New Pointe Communities
development APN:314-37-05-00 from April 2, 2021 to the
present. 18. Any and all records of trespass on adjacent
properties (APN:314-371-30-00 and APN:314-371-31-00) by any
agent or representative of New Pointe Communities.
Extension
notice sent
City Clerk’s Office
Public Records Requests continued:
Name Subject of Request Date Closed
Page 4 of 6
19. Any and all records of complaints related to the New Pointe
Communities development APN:314-37-05-00 from April 1, 2021
to the present.
20. Any and all records of violations, citations, or penalties
issued to the New Pointe Communities development APN:314-
37-05-00 from April 1, 2021 to the present.
21. Any and all records related to soil sampling reports for
APN:314-37-05-00, APN:314-371-30-00 and APN:314-371-31-00
from January 1, 2021 to the present.
22. Any and all records related to repairs to property (APN:314-
371-30-00) damaged by the New Pointe Communities from
January 1, 2021 to the present.
23. Any and all communications regarding repairs to property
(APN:314-371-30-00) damaged by the New Pointe Communities
from January 1, 2021 to the present.
2023-056
Cruse, Chris
I am requesting all documents, phone records, memos, emails,
or other communications between staff and/or council
members and Kevin McNamara, Time Life agents or anyone else
who had some communications in regards to the traffic study
addendum for TheFarm or the methodology used for the traffic
study addendum. If this PRR#2 takes additional time, please do
not delay PRR#1 so that it will coincide with PRR#2.
Extension
notice sent
2023-060
Thomas, Cheryl
Please provide all records related to the Larchmont Street
Subdivision, APNs 314-032-01 and 314-370-05. Including but not
limited to, any compliance issues or complaints (written or verbal)
by neighbors and others, as well as the resolution of any such
issues
Extension
notice sent
2023-102
Schmidt, Jeffrey
I would to get the following documents related to the adoption of
Poway's Subarea Habitat Conservation Plan/Natural Community
Conservation Plan (PSHCP/NCCP).- NOP for the draft EIR
- Public Comments on the NOP
- Draft EIR (DEIR)
- Public comments on the DEIR
- final EIR with the City’s responses to the public’s comments on
the DEIR
- CEQA Findings
- any related Resolutions the City Council adopted.
6/27/2023
2023-103
Tracy, Adam
For all Pierce apparatus purchased by the city of Poway, I request
the specifications (main pump capabilities, any aux pump
capabilities, water tank size, foam tank/cell size, etc.), any South
Coast Fire Equipment (and/or Pierce) proposal sheets, graphic
drawings, and approval drawings.Purchased through South Coast
Fire Equipment:
2015 Pierce Arrow XT pumper (Pierce SN#27782)
6/27/2023
City Clerk’s Office
Public Records Requests continued:
Name Subject of Request Date Closed
Page 5 of 6
2010 Pierce Arrow XT pumper (Pierce SN#23598)
2010 Pierce Arrow XT pumper (Pierce SN#23172)
2006 Pierce Dash 2000 aerial (Pierce SN#18062)
2003 Volvo VHD 6x4 / Pierce tanker (Pierce SN#13957)
2x 2002 Pierce Dash 2000 pumpers (Pierce Job#12884; SN#12884-
01, 12884-02) Purchased directly through Pierce:
1994 Pierce Arrow pumper (Pierce SN#E8198)
1993 Pierce Arrow pumper (Pierce SN#E7813) I have attached
examples of a graphic drawing (Page 1 of attached pdf), approval
drawing (Page 2 of attached pdf), and proposal sheet (pages 3-127
of attached pdf).
2023-105
Blain, Tony
Can you please send me 2021 and 2022 costs for the following?
1) total sheriff budget and cost to City
2) total fire station budget and cost to City
3 cost of gurneys to the City for the last 5 years
6/19/2023
2023-106
Gomez
Any and all code enforcement records including but not limited to
Notices of Violation, Abatement Orders, Citations, Photographs,
Code Enforcement Reports, etc. regarding the Midas at Poway
located at 12672 Poway Rd, Poway, CA 92064.
Any and all Building Department and/or Planning Records
regarding the Midas at 12672 Poway Rd, Poway, CA 92064. This
includes but is not limited to plans, applications, inspection
records, Planning Commission Hearings, and minutes.
Extension
notice sent
2023-107
Gomez
Any and all business licenses associated with the Midas at Poway
located at 12672 Poway Rd, Poway, CA 92064. This includes
applications for business licenses and any records related to the
same
6/22/2023
2023-108
Freedom Foundation
On behalf of the Freedom Foundation and pursuant to the
California Public Records Act, I hereby request the following public
records within the possession and control of Poway . I am
requesting electronic copies, preferably of an excel or spreadsheet
file, for ALL employees working within ALL Departments in the city
of Poway.
1. First name
2. Middle name
3. Last name
4. Gender
5. Public office address
6. Zip Code of Public office address
7. Job title
8. Hire date
9. Agency/Department
10. Work email address, and naming convention and domain
11. Work telephone number
12. Respective bargaining unit
13. Bargaining unit Local number
If there are any fees or costs associated with procuring these
records, please inform me of the cost. However, I request you
6/22/2023
City Clerk’s Office
Public Records Requests continued:
Name Subject of Request Date Closed
Page 6 of 6
waive any costs, given that I am seeking this information in the
public interest.
2023-109
PacRim Engineering
Request copy of drainage report for TM 86-02R (Poway Corporate
Center)
6/19/2023
2023-110
Childress Fire
Investigations
I am requesting the fire reports for 2 separate fires in Poway:
13300 Alpine Drive, Poway - fire occurred on 6/15/2023
16367 Martincoit Road, Poway - fire occurred on 6/17/2023
2023-111
Lisa Chatar /
SmartProcure
SmartProcure is submitting a public records request to the City of
Poway for any and all purchasing records from 2/28/2023 to
current. The request is limited to readily available records without
physically copying, scanning, or printing paper documents. Any
editable electronic document is acceptable.The specific
information requested from your record-keeping system is:1.
Purchase order number. If purchase orders are not used a
comparable substitute is acceptable, i.e., invoice, encumbrance, or
check number
2. Purchase date
3. Line item details (Detailed description of the purchase)
4. Line item quantity
5. Line item price
6. Vendor ID number, name, address, contact person and their
email address
6/27/2023
2023-112
Doroudi, Sina
For Parcel# 317 611 0100 Requesting a 2000 environmental hazard
report, biological & soil engineering reports & agricultural reports.
Need reports by July 11, partial release of info is okay.
2023-113
Martinez, Ab
We are in need of any permits showing for the property located at:
17706 Villa Moura Dr. Poway Parcel #273-110-17-02
2023-114
Schmidt, Jeffrey
Please provide a copy of any surveys, reports, and environmental
documents related to the Meadowbrook Lane Subdivision project
which may have been received after 7/1/2022. If no further
reports were submitted since 7/1/2022 please let me if
outstanding reports are expected for this project. If possible I
would appreciate to be notified when new reports for this project
are received by the city. In particular, I am interested in the
Focused study on the Western Spadefoot Toad for this project
which I understand is an outstanding request by the CDFW and
The USFWS.
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Audrey Denham, Director of Community Services
DATE: June 28, 2023
SUBJECT: Community Services Department Bi-Weekly Report
Upcoming Date Time Location
Inflatable Days – Every Friday
through August 4
June 30 4:30pm – 7:30pm Swim Center
Lake Poway Family Campout July 1 & 2 6:00am – 10:00am Lake Poway
Summer Movie in the Park:
DC League of Super-Pets
July 1 Sunset Community Park
Old-Fashioned Fourth of July July 4 10:00am – 4:00pm Old Poway Park
Fourth of July Fireworks July 4 9:00pm Sportsplex & Poway
High School Stadium
Night Fishing July 7 & 8 6:00pm – 11:30pm Lake Poway
Summer Concert Series:
Pop Viny
July 9 5:30pm – 7:00pm Lake Poway
Night Fishing July 14 & 15 6:00pm – 11:30pm Lake Poway
Lake Poway Family Campout July 15-16 6:00am – 10:00am Lake Poway
Kumeyaay-Ipai Interpretive Center
Open House
July 15 10:00am – 1:00pm Kumeyaay-Ipai
Interpretive Center
Summer Movie in the Park:
Minions: The Rise of Gru
July 15 Sunset Swim Center
The 2023 Summer Movies in the Park Series kicked off on Saturday,
June 17 at Community Park with Soul. Over 225 moviegoers found
their way to the big screen. Next up is DC League of Super-Pets on
July 1 at Community Park.
43 people attended the Kumeyaay-Ipai
Interpretive Center Open House on June
17, where they learned about the ancient
people who inhabited this Pauwai
community. Docents were on hand to lead tours of the grounds and educate about
the many artifacts found onsite and in the visitor center. The next Open House will
take place on July 15.
CSD Bi-Weekly Report
June 28, 2023
Page 2
Calling All Junior Nature Rangers! 11 youth participated in the June 17 Junior Nature
Ranger program where they learned about the native plants and wildlife of Blue Sky
Reserve. At the end of the program, all received a certificate. The next one will take
place on July 15.
On June 21, a group of 10 hikers trekked through Blue Sky to observe the official arrival
of Summer from Lake Ramona. This was the last docent-led hike before the summer
heat. Blue Sky docent hikes will resume in the fall when the weather cools down.
The annual, pre-summer lifeguard training took place June 10
at the Swim Center. Staff reviewed policies, expectations,
and practiced their lifesaving and rescue skills in preparation
for the busy summer season.
Summer swim lessons kicked off in the cloudy conditions on
June 12. The pool is now abuzz with lessons, as well as
camps!
On June 17, Lake Poway hosted the first of three Summer Family Camp
Outs for over 75 families. Ranger-led night hikes, smores, and a magic
show were a few of the activities enjoyed by all. The event generated
$4,200 in registration revenue. The July 1 campout is already sold out!
The Summer Concert Series is off to a great start! The Blue
Breeze Band kicked off the series on June 25 at Lake Poway
with classic hits. Born in Brooklyn and Taco Picasso were
on sight serving up delicious food to the concert goers. In
addition, the Lake Poway parking lot just about filled right
before the music started. Parking generated over $4,300 in
revenue.
CSD Bi-Weekly Report
June 28, 2023
Page 3
The magic that the PCPA holds isn’t surface-level showmanship.” The 2022-23 season is complete and
reviews like this make us smile.
From the rehearsal to the performances, it was our pleasure to host the
36th annual RJAD year-end recital. 900 patrons, $2,306 in concession/bar
revenue and countless smiles and memories.
PCPA staff supported a private catered event on the theatre stage for the
announcement of the Poway OnStage 2023-24 season. Information about
the performances and ticket purchase options will be publicly available on
July 15 at www.powaycenter.com.
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Bob Manis, Director of Development Services
DATE: June 28, 2023
SUBJECT: Director’s Notes
PLANNING
New Single-Family Residence on 14650 Valleyview Road
A Minor Development Review Application was submitted to construct a 3,176 square-foot single-
family residence with an attached 941 square-foot garage and a detached 1,200-square-foot ADU.
The project site is a vacant 4.85-acre property located at 14650 Valleyview Road in the Rural
Residential A (RR-A) zone.
New Single-Family Residence on Espola Road
A Minor Development Review Application was submitted to construct a 4,246 square-foot single-
family residence with an attached 879 square-foot garage on a vacant 0.5-acre property located on
Espola Road in the Rural Residential C (RR-C) zone.
CAPITAL IMPROVEMENTS
Water Treatment Plant Security Project
The construction team met for a kick-off meeting last Thursday. The contractor will now place orders
for the servers, switches and cameras. The suppliers will then be able to tell us how long the lead
time is for the equipment and that will inform the contractor as to when he will start construction.
Community Park CDBG Project
The bids came in at double the engineer’s estimate and nearly double the budget. Staff is evaluating
how to proceed.
Annual Trash Capture Project
The contractor completed device installation in existing drainage structures throughout the Poway
Business Park area. Multiple locations were not compliant with specifications when devices were
installed and have been corrected by the contractor. Final inspections are to occur this week.
FY2021-22 Annual CMP Repair/Replace
The contractor is working on punch list items to close out the project.
2022-2023 Street Overlay Project
Corte Rayito, Casa Avenida, and La Manda streets have been resurfaced with new asphalt
concrete. The remaining residential streets identified for asphalt overlay will be prepared and paved
on July 1st. There have been a few localized issues with groundwater surfacing under sidewalks
and pavement which can cause minor delays while mitigation efforts are considered.
Director’s Notes
June 28, 2023
Page 2
2023-2024 Street Maintenance Project
The award for this project has been approved by the City Council and will proceed to execution with
the contractor. Once the contract has been signed and cleared by Risk Management, the contractor
can proceed with the slurry coat in Zone 6. Close coordination with the last of Public Works repairs
will be necessary to maintain production and avoid conflicting road closures.
2023-2024 Street Striping Project
The award for this project has been approved by the City Council and will proceed to execution with
the contractor. This activity is performed in overnight shifts and will be closely coordinated with the
Street Maintenance Project to stripe freshly slurried streets as soon as practicable.
Fire Station 1 Interior Stairwell Project
The contractor completed the texture and painting in the stairwell and the second-floor storage room.
The ceiling has been installed and will be completed after the fire pole is relocated to the stairwell.
The wall cap and handrail are due back from the milling contractor and should be installed this week.
Director’s Notes
June 28, 2023
Page 3
Lake Poway Upper Playground Project
The contractor mobilized last week. This includes
the set-up of fencing, an office trailer and
stormwater Best Management Practices (BMP’s).
Survey staking will be completed this week in
anticipation of demolition scheduled to start the
first week of July.
LAND DEVELOPMENT
McKee Orchard Precise Grading
City staff received the second submittal of the precise grading plans for the 20-lot subdivision
proposed at the terminus of Holly Oak Way.
Brown Residence
City staff received the first submittal of the grading plans and reports associated with the proposed
single-family residence on Valleyview Road.
Birch Properties
City staff received the third submittal for the proposed lot merger of two properties on Carlson Court.
The Farm
City staff received the second submittal of the proposed construction change for the revised 54-inch
storm drain and trail at the southeast corner of the development.
Ted Williams Parkway at Pomerado Road Signal Modifications
The applicant has provided the required public improvement securities and signed standard
agreement for the proposed traffic signal modifications located at the intersection of Ted Williams
Parkway and Pomerado Road. The traffic signal modifications are required as a part of a proposed
development project west of the City of Poway jurisdiction.
Clough Residence
City staff provided comments on the fourth submittal of the grading plans and reports associated
with the proposed single-family residence on Misty Meadow Road.
Navidi Workshop
City staff approved the grading plans associated with a proposed garage/workshop for an existing
residence on Twin Peaks Road. Staff has requested mylar plans and payment of securities and
fees.
NATIONAL FLOOD INSURANCE PROGRAM
FEMA Community Rating System
The National Flood Insurance Program (NFIP) provides federally backed flood insurance within
communities that enact and enforce floodplain regulations. To be covered by a flood insurance
policy, a property must be in a community that participates in the NFIP.
Director’s Notes
June 28, 2023
Page 4
To qualify for the NFIP, a community adopts and enforces a floodplain management ordinance to
regulate development in flood hazard areas. Additionally, there is the Community Rating System
(CRS) which is a national program developed by FEMA. Under the CRS program, communities can
be rewarded for doing more than simply regulating construction of new buildings to the minimum
national standards. The City participates in the CRS program for several reasons, one of which is
the discounted flood insurance premiums it provides for the City’s residents and businesses. In order
to participate in the CRS program, City staff must implement activities to reduce flood damage to
existing buildings, manage development in areas not mapped by the NFIP, protect new buildings
beyond the minimum NFIP protection level, preserve and/or restore natural functions of floodplains,
help insurance agents obtain flood data, and help people obtain flood insurance. Each year, the City
must recertify that it is continuing to implement the activities for which it has earned credit and meets
the requirements for its level of participation. City staff is currently working on this recertification
package to submit to FEMA by August 1st.
STORMWATER
Los Penasquitos & San Dieguito Water Quality Improvement Plan (WQIP) Annual Reports
City staff has received the review comment letters from the Regional Water Quality Control Board
for the Los Penasquitos and San Dieguito WQIP Annual Reports submitted in January of 2023 with
the other Copermittees in the watershed. Staff is in the process of reviewing the letters, along with
the other Copermittees and preparing responses to the questions, comments, and requests for
information from the Board.
San Dieguito Watershed
As a part of the revised Water Quality Improvement Plan (WQIP) prepared in 2020, Poway
committed to additional education and outreach to its residents in the San Dieguito Watershed
regarding fertilizer and irrigation practices to address nutrients and bacteria pollutants. This outreach
is targeted to homeowner associations and residents with septic systems within the watershed.
Poway also committed to increased inspections of Residential Management Areas (RMA) within the
watershed with a focus on over-irrigation practices, proper fertilizer application and general best
management practices. City staff mailed out the educational materials to the targeted sites for this
year and has completed the RMA inspections.
INSPECTION
The Farm
Stoneridge Country Club Lane (G21-0001, STI21-
001) - The contractor has requested occupancy for
the Cottages lots 1-12 and 25 & 26 with a few issues
being noted. Items found during the punch list
inspection are complete and have been inspected.
Occupancy was approved on Monday, June 26th, for
lots 5-12. Occupancy is expected to be approved for
lots 1-4 and 25 & 26 on Friday, June 30th.
Director’s Notes
June 28, 2023
Page 5
Last week occupancy was granted for Homestead
lot 129, on Abbey Road.
Occupancy for Homestead lots 138–144 along Saint Andrews Drive was requested and there were
only minor issues associated with these lots. These issues were addressed, and occupancy is
expected to be approved on Friday, June 30th. Only one lot (lot 142) is not sold, and occupancy
was not requested on this lot.
Kirovski Residence
Tooth Rock Road (G22-0012) - The grading has been completed. The slope was inspected to ensure
compaction and the berm at top of the slope was installed. Rock on the existing trail easement was
removed and pad and soil certifications are anticipated to be forthcoming.
Director’s Notes
June 28, 2023
Page 6
Sklar Residence
Millards Ranch Lane (MDRA21-016) - The pre-construction meeting for the construction of a single-
family residence has been held. The contractor began construction by over-excavating the
previously placed pad. The contractor removed the top 18-inches of soil followed by replacement of
soil and compaction. A geotechnical engineer was on-site to observe.
McKee Orchard
Holly Oak Way (G22-0006) - Last week, the contractor
completed the installation of the 8-inch sewer main
and laterals. Completion took place this week of the
tie-in of the sewer main to an existing sewer manhole.
The contractor also began work on the waterline by
staking the proposed water main and water services.
Fairfield
Poway Road (G21-0007, STI21-002) Asphalt was
placed on the remainder of the project last week.
Subgrade was compacted, tested and base material
was placed. Prior to asphalt placement, the base
material was checked for compaction and line and
grade. Construction of all five buildings is ongoing.
Lyon Estates
Larchmont Street (G21-0013) (STI21-003) The contractor continues to grade lots 4 and 8. Fill is
being placed over the top of the proposed concrete spillway between lots 3 and 4. Rock drilling and
removal on private street A continues.
Director’s Notes
June 28, 2023
Page 7
The masonry wall is being constructed inside of bio-basin 2. The contractor has excavated the
footing, installed reinforcing steel and is working on staking block for the retaining wall south of Lot
10. The contractor grouted the masonry wall and started installing the 4-inch perforated back drain
for the retaining wall south of lot 9. Footing and reinforcement steel placement was completed for
the retaining wall footing south of lot 10. Both walls run along the southern property line.
The contractor placed concrete for footings and slabs for the homes on lots 1, 9 &10.
On private streets A and B, the contractor continued trenching, backfilling and installing gas and
electric after SDG&E inspected and approved the trench.
Director’s Notes
June 28, 2023
Page 8
SCHEDULED ROAD/LANE CLOSURES
Possible lane closure on Poway Road between Carriage Road and Civic Center Drive for work
related to the Fairfield project.
Possible lane closure for underground utilities and haul trucks entering and exiting on Espola
Road, Saint Andrews Drive and surrounding streets for work related to the Farm project.
Lane closure on Pomerado Road southbound in between Oak Knoll Road and Metate Lane for
the SDG&E Integrity Management/Pipeline Repair Project. Southbound traffic will be reduced to
one lane and shifted around the construction site. Northbound traffic will maintain two lanes.
Closures of the westbound number 1 and 2 lanes of Poway Road with a closure on Carriage
Road northbound from Poway Road to Robison Blvd. Detours will take place on Poway Road in
both the east and westbound directions.
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Tim McDermott, Interim Director of Finance
DATE: June 28, 2023
SUBJECT: Finance Department Director’s Notes
Finance
• FY 2022-23 year-end processes are underway.
Customer Services
• There are 25 businesses that received their first invoice for repayment of their loans under the PEARL
Program. Customer Services staff continue to provide additional outreach and follow-up regarding
repayment status, to answer questions, and verify contact information.
Information Technology
• Network connections between City Hall and Fire Station 2 and City Hall and Fire Station 3 were
significantly upgraded this week. These upgrades will improve network speeds at those sites when
accessing applications, documents, the internet, and any other network related processes.
General Support Services
Bids:
BID Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded Amount Awarded Vendor Council Award Date
BID 23-009 Lester J. Berglund Water Treatment Plant Clearwell Replacement Project (Project No. WTR0027)
6/22/23 $30M-$35M $30,172,636.44 TBD TBD 9/19/23
BID 23-010 FY 2022-23 ADA Barrier Removal - Community Park
6/21/23 $130,000 $159,000 TBD TBD 7/18/23
BID 23-011 Community Park and Starridge Park Sidewalk and Pathway Extension
6/28/23 $210,000 $216,000 TBD TBD 8/1/23
Finance Department Director’s Notes
Page 2
BID Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded Amount Awarded Vendor Council Award Date
BID 23-012 Unappropriated Encampments & Nuisance Cleanup
7/20/23 N/A $20,000 / Fiscal Year TBD TBD N/A
Requests for Proposals:
RFP Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded Amount Awarded Vendor Council Award Date
RFP 22-003 PCPA Architectural and Engineering Design Services
8/27/21
N/A $500,000 $679,090 Sillman Wright Architects 7/18/23
RFP 23-009 Wireless Communication Facilities Consulting Services
5/31/23 N/A TBD TBD TBD 8/1/23
RFP 23-013 Hazardous Waste Cleanup and Disposal Services
7/3/2023 N/A TBD TBD Ocean Blue Environmental Services Inc.
7/18/23
RFP 23-017 Occupant Public Notice Mailing Services 7/6/23 N/A $7,500 / Fiscal Year TBD TBD N/A
RFP 24-001 Dead Animal Disposal Services 8/15/23
N/A $22,200 / Fiscal Year TBD TBD N/A
RFP 24-002 False Alarm Tracking and Billing Services 8/15/23 N/A $20,200 / Fiscal Year TBD TBD N/A
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Jeff Chumbley, Fire Chief
DATE: June 28, 2023
SUBJECT: Fire Department Management Staff Notes
FIRE ADMINISTRATION
1 Unified Disaster Council meeting and approved the Zonehaven map zones and the Mutli-
Jurisdictional Hazard Mitigation Plan approval of grant cost sharing.
2 Had the final discussion with our new medical directors, Dr. Gary Vilke and Dr. Christian Sloane,
and are processing the contract through the proper channels.
3 Coordinating the safety discussions with PUSD and City personnel for the Fourth of July
fireworks.
FIRE PREVENTION
Activity between 06/12 - 06/25
Business Cert Reviews 17
Fire Inspections 56
Plan Reviews 10
Site Visits/Consultations 3
Temporary Use Permits 1
Fire Inspections
FD Management Staff Notes
Page 2
Fire Prevention Division Highlights
Real Estate Defensible Space Inspections (AB38)
Matteucci Residence – 12748 Larchmont St – Approved
Fire Department Permit Plan Checks
Gaslight Court Residence - 14415 Gaslight Ct – Residential Fire Sprinkler – Approved
Grenier Res. - 14215 Ipava DR – Residential Fire Sprinkler - Requires Resubmit
13530 Hilleary Pl – Residential Fire Sprinkler - Requires Resubmit
Construction Parking at Mesa View Baptist Church - 13230 Pomerado – Approved
GA Bldg. 18 – Commercial Fire Sprinkler – Approved
Brian Cox Mechanical – Fire Backflow Preventer – Approved
Business Certificate Reviews
Poway Healthcare – Approved
Quality Recycling - Approved
Development Reviews
Maderas – Landscape Review – Requires Resubmit
Planet Fitness – Conditional Use Review – Requires Resubmit
Touch of Class – Minor Conditional Use Review - Approved
Fire Inspections
The Cottages at The Farm – Lots 27-34 – Residential Fire Sprinkler – Approved
The Cottages at The Farm – Lots 13-24 – Residential Fire Sprinkler – Final – Approved
The Garden at The Farms – Lots 125, 128-130 – Residential Fire Sprinkler – Final – Approve
GA Bldgs. 16, 17, 20, 24, 98 – Requires Re-Inspections
Poway Honda – Fire Underground – Approved
Maderas – Fire Alarm – Approved
Fire Consultations
Davis Residence – Home Hardening
Lyons Project – Fuel Management Zones
Sportsplex/Cohu – 4th of July Fuel Management
Fire Prevention Departmental Activity
Senior Fire Safety Inspector attended and passed Fire Marshal 1C: Fire Investigation Program
Management training course.
FD Management Staff Notes
Page 3
EMERGENCY PREPAREDNESS
1 Refresher training was provided to the CERT Team for search and rescue and cribbing techniques.
2 Met with staff from the Community Church of Poway regarding the use of their facility as an
emergency shelter.
3 The Poway Auxiliary Communications Team (PACT) participated in the American Relay Radio
League’s annual field day exercise at Lake Poway.
EMS / TECHNOLOGY
1 Completed 2023/2024 EMS Protocol Update CE Course series with C Division.
2 Attended Base Station Physician Committee and Prehospital Audit Committee meetings.
3 Completed transition of paramedic program medical director from County of San Diego to Gary
Vilke, MD and Christian Sloane, MD.
SAFETY
1
Completed CA 219 firing boss class. This class is designed to learn about firing operations on a
wildland fire. This is a required class to complete the Strike Team Leader task book to be able to
take strike teams out on vegetation fires.
2 Attended the annual SDGE Battalion Chief refresher class. This class offers chief officers training
and knowledge on how to manage gas and electrical emergencies.
3
Distributed Safety Stand Down 2023. This focuses on our common goals in multiple areas,
including physical and behavioral wellness, cancer prevention and awareness, fire ground/station
safety, NFPA 1500, and Cal-OSHA regulations.
TRAINING
1 Poway Fire hosted S-290 Intermediate Wildland Training in which four fire department members
attend, provided by Red Helmet Training.
2 Two Battalion Chiefs attended CA-219 Firing Operations class that was held in Chula Vista.
3 C Division attended and participated in yearly RT-130 hands-on wildland refresher training.
FD Management Staff Notes
Page 4
Between Monday, June 12th and Sunday, June 25th, personnel completed 531 hours of training and
activities. The top three topics included 286 hours of
Company Training, 72 hours of Driver/Operator
Training, and 64 hours of Officer Training.
TRAINING & PROFESSIONAL
DEVELOPMENT HOURS
OPERATIONS
1 Fire Station 1 CIP staircase project completed framing, drywall, and painting portions.
2 Poway hosted the Metro Zone Operations meeting at Fire Station 3.
3 Completed the design and specification process for a Battalion Chief command vehicle.
4 4th of July Incident Action Plan (IAP) was completed in preparation for the two fireworks shows.
Between Monday, June 12th and Sunday, June
25th, the Poway Fire Department responded to
175 incidents.
FD Management Staff Notes
Page 5
Fire Department - Training Highlights
Crews complete RT-130 Wildland Fire Refresher Training.
Incident Category Types of Incidents between 06/12/23-06/25/23
Canceled, Good Intent Dispatched and canceled enroute; no incident found on arrival at
dispatch address; Smoke scare, odor of smoke
False Alarm Alarm system sounded due to malfunction; smoke detector activation,
no fire; alarm system sounded – no fire
Fire Building fire, passenger vehicle fire, brush or brush-grass mixture fire
Hazardous Condition Gas leak (natural gas or LPG)
Rescue & EMS Medical aids; motor vehicle accident with no injuries; motor vehicle
accident with injuries; removal of victim from stalled elevator
Service Call Assist invalid, snake removal; lock-out
Backfiring Operations
FD Management Staff Notes
Page 6
Brush 91 out supporting the firing operations for
CA 219 firing boss class.
CERT members practice cribbing techniques.
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Jodene Dunphy, Director of Human Resources & Risk Management
DATE: June 28, 2023
SUBJECT: Human Resources & Risk Management Department Director’s Notes
HUMAN RESOURCES
New Hire
Position/Title Department Start Date
Firefighter/Paramedic (2) Fire 6/26/2023
Current Active/In Progress Recruitments
No. Dept. Title Type
Opened Closed/Close
1 CS Recreation Leader I Part-Time Temporary 4/10 7/10
2 CS Senior Lifeguard Full-Time Regular 6/22 7/11
3 CS Stage Technician Part-Time Temporary 6/20 9/24
4 DSD Assistant/Associate Civil Engineer
Full-Time Regular 3/27 4/24
5 DSD City Planner Full-Time Regular 3/13 Continuous
6 DSD Code Compliance Officer Full-Time Regular 3/24 4/21
7 DSD Development Services Aide Full-Time Regular 6/14 7/2
8 HR Human Resources Technician I Full-Time Regular 6/14 7/5
9 HR Senior Human Resources Analyst Full-Time Regular 6/14 7/12
10 LS Executive Assistant Full-Time Regular 6/14 6/18
11 PW Construction Maintenance Worker Full-Time Regular 6/22
7/10
12 PW Parks Maintenance Worker I Part-Time Regular 6/22 7/14
13 PW SCADA Electrical, Instrumentation &
Controls Supervisor
Full-Time Regular 6/14 7/5
14 PW Seasonal Parks Maintenance Worker Seasonal 10/18 Continuous
15 PW Utility Systems Mechanic Crew Lead Full-Time Regular 6/15 6/22
16 PW Water Treatment Plant Operator I/II/III Full-Time Regular 4/4 5/2
Upcoming Recruitments
No. Dept. Title Type
Open Close
1 CS Front of House Assistant Part-Time Temporary TBD TBD
2 CS Recreation Coordinator Full-Time Regular TBD TBD
3 DSD Senior Planner Full-Time Regular TBD TBD
4 Fire Firefighter/Paramedic Full-Time Regular TBD TBD
5 Fire Fire Safety Inspector Full-Time Regular TBD TBD
6 HR Management Analyst Full-Time Regular TBD TBD
7 PW Senior Electrical, Instrumentation &
Controls Technician
Full-Time Regular TBD TBD
HR & Risk Management Director’s Notes
Page 2
8 PW Water Utilities Worker I/II Full-Time Regular TBD
TBD
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Eric Heidemann, Director of Public Works
DATE: June 28, 2023
SUBJECT: Public Works Department Bi-Weekly Report
(June 12, 2023 – June 25, 2023)
Work/Description Units Location/Description
OPERATIONS
Street Maintenance
Asphalt Repairs (sq. ft.) 37,400 Asphalt Deep Patch Zone #6
Debris Removal 2 Removed debris from Scripps Poway Parkway
and Poway Road.
Stormwater & Flood Control
Annual Concrete Channel Cleaning
Program
Request Closed
12
3
Cut and drop vegetation.
Lake Poway Road, Jeff Park Lane, Birchbrook
Court.
Graffiti
Training
2
1
Wanesta Channel, Budwin Channel
8 Sites - 60 sq. ft.
Forklift Safety/Operation
Open Task Closed
Vegetation Abatement
10
3
Inlet cleaning throughout City
Easements at Wanesta, McFeron, Hilleary
Vehicle & Equipment Maintenance
Work Orders 30
Scheduled/Unscheduled 25/5
Red Fleet Work Orders 10
Red Fleet Scheduled/Unscheduled 7/3
Facilities Maintenance
Contract Inspections LMDs
Inspections: 86-1, 86-2A and B.
Volunteer tree removals: 83-1A.
Trash abatement: 86-2A.
Dead tree removal: Espola Road at Bounty Way.
Facility inspection: PCPA.
ROW inspections: Titan Way, Midland Road and
Garden Road.
Median inspections: Valle Verde, Summerfield,
and Poway Road.
Public Works Department Report – June 28, 2023 Page 2
Work/Description Units Location/Description
Bus stop inspections: South Poway - graffiti
removed from Pomerado Road and Poway
Road.
Fire Extinguisher yearly service at PCPA.
Fire Extinguisher service at Public Works, Fleet
and Fire Station #3.
Janitorial inspections: City-wide
Install decorative lights near Skate Park.
Investigate sinkhole near Valley Elementary.
Investigate phonelines Kumeyaay and library.
Attended - cubic traffic signal technology.
Chair delivery to Public Works admin.
Dig alerts on Pomerado.
Investigate speed radar – at Twin Peaks and
Meadowbrook Middle School.
Flood light repairs.
Repaired roof hatch sensor on the pool roof.
Installed new door magnets – PCPA
Customer Inquiries Streetlights; traffic signals, pedestrian buttons
Streetlight Issues Del Marno
Traffic Signal / Emergency Retimed traffic signal at Pomerado at Casa
Avenida.
Repaired pedestrian push buttons at Danielson
and Scripps Poway Parkway.
USA Mark outs Performed Mark Outs:
Pomerado at Robison, Pomerado at Stone
Canyon, Pomerado at Nacido, Poway at Gate;
Pomerado at Oak Knoll; Pomerado at Valencia;
Pomerado at Bernardo Heights and
Pomerado at Monte Vista;
Parks, Trails & Landscape Maintenance
Aubrey Park Cleared weeds and debris from entry. Repaired
and adjusted irrigation in planters. Removed trash
after end-of-school parties and softball
tournaments. Trimmed trees and shrubs along the
pathways.
City Owned Properties Mowed the open lot along Community Road using
the forestry attachment and the hack mower.
Community Park Cleaned up following multiple end-of-school year
parties and activities. Provided support for
camps and activities. Continued replacing
wooden picnic tables with plastic. Abated
multiple incidents of graffiti and vandalism.
Replenished playground chips in tot-lot area.
Garden Road Park Irrigation system check, head adjustments and
two head replacements.
Public Works Department Report – June 28, 2023 Page 3
Work/Description Units Location/Description
Hilleary Park Addressed multiple incidents of graffiti. Provided
support for end-of-school year parties and
activities. Provided support for summer camps.
Repaired irrigation in the entry planters and on
the soccer field. Replenished playground chips in
tot-lot area.
Lake Poway Park Performed gopher abatement in the west and
bowl areas of the park. Applied herbicide in the
bowl area and the campground picnic area, and
around the restroom building. Removed the low
hanging tree branches in the bowl area.
Supported the Saturday campout and Sunday
first concert. Replaced three broken fence posts
along the parking lot. Removed a wooden picnic
table. Started removing useable parts from the
upper playground equipment prior to contractor
work beginning.
Old Poway Park Supported end-of-school year activities and
multiple weekend events. Repaired trail fencing
along the train tracks. Trimmed trees and
shrubs.
Poway Oaks Park Spread 10 yards of playground mulch at Poway
Oaks Park.
Silverset Park Trimmed a section of the walking path shrubs.
Performed weed abatement along the south
walking path. Spread 40 yards of playground
mulch. Lateral irrigation line repair.
Starridge Park Added 18 yards of playground chips in tot-lot
area.
Valle Verde Park Herbicide application along the creek, planters,
and fence lines. Performed inspections of former
RDA property.
Miscellaneous Trails Picked up bags of green waste from a scout trail
cleanup project on Westridge Trail. Spread base
material on the Dearborn Trail and Lake Poway
Trail to fill ruts. Landscape contractor performed
weed abatement along the Del Pointe, Avocado
Trail link and Lake Poway Fisherman’s Trail.
Emergency Response
Emergency Response Callouts 17 ERT Responded to:
3 incidents of debris in the road.
1 unlocked patron from park after hours.
1 call to accident – damage to LMD Landscape.
1 Emergency Mark Out.
1 Fire hydrant flushing.
1 Water fountain overflowing in park.
2 Fire called ERT to accident scene to cordon
area and then picked up barricades after.
Public Works Department Report – June 28, 2023 Page 4
Work/Description Units Location/Description
2 Water in meter box – replaced gaskets.
1 Resident can’t shut off water – crimped line until
resident’s plumber can respond.
1 Water meter unlock for Customer Services.
1 Water leak from main
1 Resident water leak – nothing found in City’s
system meter is not running
DEPARTMENT TRAINING
Forklift Safety All Crews
UTILITIES
Water Distribution System Operations
Mark-Outs 184
Repair Water Service 3 St Andrews, Lomas Verdes, Acton Ave
Water System Shutdown 3
Valve Replace 4 Primrose C, Cumberland, Brookstone x2
Water Quality 5 Business Park Flushing
Customer Service Repairs:
Leaks, AMS updates, non-ops.
5
Annual Test Reports 147
Backflows Tested 8
Large Meter Tests 1
Water Treatment Plant and Utility Systems Operations
Lake Poway Rainfall (inches)
Lake Poway and Poway Dam 931.7 No drafting or filling of lake water currently.
Water Treatment Plant 13288 Water treatment plant chemical upgrade project
is complete. All chemical pumps are now auto-
pacing and fully connected to SCADA. Plant
flows are increasing with the warmer weather;
average flows of 9mgd. Level indicator fixed on
Permanganate chemical tank. State Project
Water is now 40% of raw water blend.
Collection System Maintenance
Sewer Mainlines Rodded (Vactor)
Routine Mainline Rodding (l/ft.) 4,878
Monthly High Frequency Rodding (l/ft.) 3,210
Quarterly High Frequency Rodding
(l/ft.)
0
Special Mainline Rodding (l/ft.) 295
Total Mainline Rodded (l/ft.) 8,383
Sewer Mainlines Inspected (CCTV)
Routine Mainline Inspection (l/ft.) 3,406
Special Mainline Inspection (l/ft.) 0
Total Mainlines Inspected (l/ft.) 3,405
Utility Crew Task Count
Annual Lateral Assessments 9
Bi-Annual Lateral Assessments 0
Laterals Inspected 9
Public Works Department Report – June 28, 2023 Page 5
Laterals Rodded 7
Laterals Repaired 0
Lateral Blockage Mitigation 1 private
SSO Spill Volume Estimation 1
Manholes Located 0
Manholes Raised 0
Manholes Inspected 0
Easement Maintenance 0
Customer Service 2
Total of Division Tasks Completed 84
Recycled Water System
Recycled Site Inspections 0
Four-Year, Four-Hour Potable Cross-
Connection Tests
1
Four Year, 24 Hour Recycled Irrigation
Test
1
Annual Recycled Site Inspection 1
Customer Service 0
DRC Plans Reviewed 17
Total Completed Tasks 20
Fats, Oils, Grease (FOG) Program
Business License Review 9
Site Inspection 3
FOG Permit Issued 3
Customer Service 1
Total of Completed Tasks 16
June 26, 2023
TO:Chris Hazeltine, City Manager
City of Poway
FROM:Lon Nguyen, Lieutenant
Poway Station
WEEKLY ACTIVITY REPORT FOR 6/9/2023 - 6/15/2023
San Diego County Sheriff's Department
Post Office Box 939062 - San Diego, CA 92193-9062
Kelly A. Martinez, Sheriff
Arrested Name Violations Arrest Location
06/09/2023 TILTON, HAROLD 647 (F) PC - DISORD CONDUCT:ALC (M)12175 Tech Center
Drive, Poway
06/09/2023 WILSON, JONATHAN 243 (E)(1) PC - BATTERY:SPOUSE/EX
SPOUSE/DATE/ETC (M)
12941 Cree Ct, Poway
06/11/2023 CLARK, RICHARD 647 (F) PC - DISORD CONDUCT:ALC (M)13095 Poway Rd,
Poway
06/12/2023 ORTIZ, TYLER OW-M ZZ - MISDEMEANOR OTHER
AGENCY'S WARRANT
Pomerado Road /
Glen Oak Road,
Poway
06/12/2023 RAMIREZ, GUILLERMO 647 (F) PC - DISORD CONDUCT:ALC (M)12326 Poway Road,
Poway
06/13/2023 THOMSON, JEREMY 11364(A) HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M)
Poway Road /
Carriage Road, Poway
06/13/2023 SHREVE, CHELSIE 14601.1 (A) VC - DRVG WHILE LIC SUSP OR
REVOKED:OTHER REASONS (M)
Poway Road /
Carriage Road, Poway
06/15/2023 HORAN, JUSTIN 11350 (A) HS - POSS NARCOTIC
CONTROLLED SUBS (M); 11364(A) HS -
POSS CONTROLLED SUBS
PARAPHERNALIA (M); 11377 (A) HS -
POSSESS CONTROLLED SUBSTANCE (M);
OW-M ZZ - MISDEMEANOR OTHER
AGENCY'S WARRANT
13425 Community
Road, Poway
Keeping the Peace Since 1850
Category Arrests
DUI 2
Misdemeanor 8
Total 10
Category Cases
Felony 12
Misdemeanor 8
Total 20
Lon Nguyen, Lieutenant
Poway Station
Captain Nancy Blanco, Poway Station
Keeping the Peace Since 1850
June 26, 2023
TO:Chris Hazeltine, City Manager
City of Poway
FROM:Lon Nguyen, Lieutenant
Poway Station
WEEKLY ACTIVITY REPORT FOR 6/16/2023 - 6/22/2023
San Diego County Sheriff's Department
Post Office Box 939062 - San Diego, CA 92193-9062
Kelly A. Martinez, Sheriff
Arrested Name Violations Arrest Location
06/19/2023 JUVENILE 245 (A)(1) PC - ASSAULT W/DEADLY
WEAPON:NOT F/ARM (F)
Poway
06/19/2023 JUVENILE 245 (A)(1) PC - ASSAULT W/DEADLY
WEAPON:NOT F/ARM (F)
Poway
06/19/2023 JUVENILE 245 (A)(1) PC - ASSAULT W/DEADLY
WEAPON:NOT F/ARM (F)
Poway
06/19/2023 JUVENILE 148 (A)(1) PC - OBSTRUCT/RESIST PEACE
OFCR/EMER MED TECH (M); 25662 (A) BP -
MINOR POSS ALC (M); 647 (F) PC - DISORD
CONDUCT:ALC (M)
Poway
06/20/2023 GOMEZ, MARVIN OW-M ZZ - MISDEMEANOR OTHER
AGENCY'S WARRANT
14000 Block Del
Poniente Road, Poway
06/20/2023 COPPOTELLI, ANTHONY 602 PC - TRESPASSING (M)15615 Pomerado
Road, Poway
06/20/2023 MARTINEZ CEDILLO,
JESSE
647 (F) PC - DISORD CONDUCT:ALC (M)14122 Midland Rd,
Poway
06/20/2023 DIAZ-BRIDGES, DAVID 647 (F) PC - DISORD CONDUCT:ALC (M)14122 Midland Rd,
Poway
06/20/2023 HILSCHER, KYLIE 243 (E)(1) PC - BATTERY:SPOUSE/EX
SPOUSE/DATE/ETC (M)
13824 Powers Rd,
Poway
06/22/2023 MATSCH, KRISTOPHER 21310 PC - CARRY CONCEALED DIRK OR
DAGGER (F); 148 (A)(1) PC -
OBSTRUCT/RESIST PEACE OFCR/EMER
MED TECH (M)
13438 Poway Road,
Harbor Freight,
Poway
06/22/2023 KINNEY, LOU 11364(A) HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M)
12342 Poway Road,
Poway
Keeping the Peace Since 1850
Category Arrests
DUI 1
Felony 4
Misdemeanor 7
Total 12
Category Cases
Felony 8
Misdemeanor 5
Total 13
Lon Nguyen, Lieutenant
Poway Station
Captain Nancy Blanco, Poway Station
Keeping the Peace Since 1850