Directors' Notes 08-09-23
DATE: August 9, 2023
TO: Chris Hazeltine, City Manager
FROM: Carrie Gallagher, City Clerk
CONTACT: (858) 668–4535 or cgallagher@poway.org
SUBJECT: City Clerk Notes (July 25 – August 8, 2023)
Upcoming Agenda Deadlines
Council Meeting Staff Reports Due Agenda Posted
September 5 8/21 8/29
September 19 8/31 9/12
October 3 9/18 9/26
Legal Notices
Order No. Project Title Publishing Date(s) Dept.
23-023 ADOPTION - AN ORDINANCE OF THE CITY COUNCIL OF THE
CITY OF POWAY, CALIFORNIA, ADDING CHAPTER 8.26 TO
TITLE 8 (HEALTH AND SAFETY) OF THE POWAY MUNICIPAL
CODE ESTABLISHING REGULATIONS FOR CAMPING AND
STORAGE OF PERSONAL PROPERTY IN PUBLIC AREAS
7/27 CCO
23-024 LEGAL SUMMARY - ORDINANCE OF THE CITY OF POWAY TO
RELINQUISH APPROXIMATELY 0-07-ACRES OF AN EXISTING
CITY-OWNED TRAIL EASEMENT IN EXCHANGE FOR
APPROXIMATELY 0.07-ACROES OF TRAIL EASEMENT TO
ACCOMMODATE AN EXISTING CITRUS ORCHAGES (APN 273-
102-01-00).
7/27 DSD
Public Records Requests:
Name Subject of Request Date Closed
2022-287
Assi, Hani
Espola Road Safety Improvements - phase 2. 1. planning, design
& construction. 2. all submittals & resubmittals 3. All RFI's
relating to this project 4. All Communications (see attachment to
this)
8/7/2023
(Request
withdrawn)
2022-288
Assi, Hani
Espola Road Safety Improvements - phase 1. 1. planning, design
& construction. 2. all submittals & resubmittals 3. All RFI's
relating to this project 4. All Communications (see attachment to
this)
8/7/2023
(Request
withdrawn)
City Clerk’s Office
Public Records Requests continued:
Name Subject of Request Date Closed
Page 2 of 6
2023-039
McClellan Law Firm
All DOCUMENTS relating to vehicle parking at the Iron Mountain
trailhead at SR 67 & Poway Rd.
All DOCUMENTS relating to vehicles parking along SR 67 near
the Iron Mountain trailhead just south of the SR 67 & Poway Rd
intersection.
All COMMUNICATIONS between CALTRANS d the CITY OF
POWAY regarding vehicles parking along SR 67 near the Iron
Mountain trailhead.
All City Council meeting minutes relating to vehicle parking at
the Iron Mountain trailhead at SR 67 & Poway Rd.
All comments and complaints relating to vehicles parking along
SR 67 near the Iron Mountain trailhead just south of the SR 67 &
Poway Road intersection.
All comments & complaints relating to bicycle safety along SR
67.
All contracts, plans, or proposals for modifications to parking
near the Iron Mountain trailhead just south of the SR 67 &
Poway Rd intersection.
All internal memos & communications relating to vehicles
parking along SR 67 near the Iron Mountain trailhead just south
of the SR 67 & Poway Road intersection.
Extension
notice sent
2023-117
Schmidt, Jeffrey
Please provide a copy of all internal and external correspondence
related to the Meadowbrook Lane Subdivision Project.
7/27/2023
2023-121
Grennan, Lori
Records request for the Rimbach Road Development. APN# 317-
52-0060 & # 317-52-0050 TTM# 21-005 Request for current bio
report submitted this year, & any related documents (traffic study,
perk test results, Poway Fire Department's report, etc.)
7/28/2023
2023-127
Bernal, Janelle
Request for blueprint records of newly developed house in Poway.
Address: 13345 Jimmy Way, Poway, CA 92064. I’m specifically
needing all the measurements of the house, interior/exterior.
7/28/2023
2023-129
Partner Engineering
and Science Inc
14170 Kirkham Way (APN: 3235002200) Variances, Special
Exceptions, Zoning Reliefs/Waivers, or Conditional/ Special Use
Permits. Current open/active zoning, building, and fire code
violations on file. Please provide inspection reports and Notice(s)
of Violation Certificates of Occupancy (COs) or Temporary
Certificate(s) of Occupancy (if under construction) for the shell of
the building(s) & any current tenants. Copies of any current or
future plans for roadway construction, repaving/resurfacing
projects, easements, land condemnation proceedings, or other
such activity that would affect the placement of property lines,
immediately surrounding roads, disrupt traffic flow in proximity of
the Subject, &/or impede access to the property. Approved Site
7/31/2023
City Clerk’s Office
Public Records Requests continued:
Name Subject of Request Date Closed
Page 3 of 6
Plan &/or conditions of approval for building height, setbacks,
parking, density, uses, & lot size.
2023-130
Partner Engineering
and Science Inc
14105 Kirkham Way (APN: 3235002300) Variances, Special
Exceptions, Zoning Reliefs/Waivers, or Conditional/ Special Use
Permits. Current open/active zoning, building, and fire code
violations on file. Please provide inspection reports and Notice(s)
of Violation Certificates of Occupancy (COs) or Temporary
Certificate(s) of Occupancy (if under construction) for the shell of
the building(s) & any current tenants. Copies of any current or
future plans for roadway construction, repaving/resurfacing
projects, easements, land condemnation proceedings, or other
such activity that would affect the placement of property lines,
immediately surrounding roads, disrupt traffic flow in proximity of
the Subject, &/or impede access to the property. Approved Site
Plan &/or conditions of approval for building height, setbacks,
parking, density, uses, & lot size.
7/31/2023
2023-131
Partner Engineering
and Science Inc
14253 Kirkham Way (APN: 3235003000) Variances, Special
Exceptions, Zoning Reliefs/Waivers, or Conditional/ Special Use
Permits. Current open/active zoning, building, and fire code
violations on file. Please provide inspection reports and Notice(s) of
Violation Certificates of Occupancy (COs) or Temporary
Certificate(s) of Occupancy (if under construction) for the shell of
the building(s) & any current tenants. Copies of any current or
future plans for roadway construction, repaving/resurfacing
projects, easements, land condemnation proceedings, or other
such activity that would affect the placement of property lines,
immediately surrounding roads, disrupt traffic flow in proximity of
the Subject, &/or impede access to the property. Approved Site
Plan &/or conditions of approval for building height, setbacks,
parking, density, uses, & lot size.
7/31/2023
2023-132
Partner Engineering
and Science Inc
14177 Kirkham Way (APN: 3235002900) Variances, Special
Exceptions, Zoning Reliefs/Waivers, or Conditional/ Special Use
Permits. Current open/active zoning, building, and fire code
violations on file. Please provide inspection reports and Notice(s)
of Violation Certificates of Occupancy (COs) or Temporary
Certificate(s) of Occupancy (if under construction) for the shell of
the building(s) & any current tenants. Copies of any current or
future plans for roadway construction, repaving/resurfacing
projects, easements, land condemnation proceedings, or other
such activity that would affect the placement of property lines,
immediately surrounding roads, disrupt traffic flow in proximity of
the Subject, &/or impede access to the property. Approved Site
Plan &/or conditions of approval for building height, setbacks,
parking, density, uses, & lot size.
7/31/2023
2023-133
Partner Engineering
and Science Inc
14311 Kirkham Way (APN: 3230911000) Variances, Special
Exceptions, Zoning Reliefs/Waivers, or Conditional/ Special Use
Permits. Current open/active zoning, building, and fire code
violations on file. Please provide inspection reports and Notice(s)
of Violation Certificates of Occupancy (COs) or Temporary
Certificate(s) of Occupancy (if under construction) for the shell of
the building(s) & any current tenants. Copies of any current or
7/31/2023
City Clerk’s Office
Public Records Requests continued:
Name Subject of Request Date Closed
Page 4 of 6
future plans for roadway construction, repaving/resurfacing
projects, easements, land condemnation proceedings, or other
such activity that would affect the placement of property lines,
immediately surrounding roads, disrupt traffic flow in proximity of
the Subject, &/or impede access to the property. Approved Site
Plan &/or conditions of approval for building height, setbacks,
parking, density, uses, & lot size.
2023-134
Partner Engineering
and Science Inc
14250 Kirkham Way (APN: 3235001500) Variances, Special
Exceptions, Zoning Reliefs/Waivers, or Conditional/ Special Use
Permits. Current open/active zoning, building, and fire code
violations on file. Please provide inspection reports and Notice(s)
of Violation Certificates of Occupancy (COs) or Temporary
Certificate(s) of Occupancy (if under construction) for the shell of
the building(s) & any current tenants. Copies of any current or
future plans for roadway construction, repaving/resurfacing
projects, easements, land condemnation proceedings, or other
such activity that would affect the placement of property lines,
immediately surrounding roads, disrupt traffic flow in proximity of
the Subject, &/or impede access to the property. Approved Site
Plan &/or conditions of approval for building height, setbacks,
parking, density, uses, & lot size.
7/31/2023
2023-135
Thompson, Anne M.
Because the Annual Comprehensive Financial Report (ACFR) was
known as the Comprehensive Annual Financial Report during part
of the document retention period, all references to the ACFR audit
may include the audit of the Comprehensive Annual Financial
Report depending on the terminology used in a given year Records
Description
Request for proposals and/or requests for bids for external audit
services for the annual comprehensive financial report (ACFR).
Copies of all proposals and bids received for the request for
proposals and/or bids for external audit services for the ACFR,
including proposals received from firms who were not selected.
Records documenting the government’s evaluation of the
proposals described above including, but not limited to, scoring
and comparisons of the proposals.
Documents supporting the government’s recommendation for the
selection of the external auditor and the government’s decision for
external auditor selection
Fees paid to the external auditor by the nature of the service
provided for each year.
Documents, if any, the external auditor for the ACFR provided to
the city regarding its use of subcontractors for the ACFR audit.
7/28/2023
2023-136
Bourne, Doug
13103 Decant Dr: This is a request for either or permits and/or
approvals relating to roof installion at my home address
7/31/2023
2023-137
Cruse, Chris
I am requesting copies of all communications between staff and/or
councilmembers/mayor and staff at CA Department of Housing
and Community regarding Poway’s 6th cycle housing element.
Extension
notice sent
2023-138
Cruse, Chris
I would like to find out how many picnic tables the city gave to
various businesses during covid, and the number of tables that
8/8/2023
City Clerk’s Office
Public Records Requests continued:
Name Subject of Request Date Closed
Page 5 of 6
were returned, and the the number of tables that were then
relocated to parks in Poway, and how many went to each park. I
am requesting to see any records that you have that provide
responsive data for the information I am seeking, I would also like
to know the names of businesses that retained picnic tables.
2023-140
Ibarra, Robert
Planning Department records regarding a Phase I Environmental
Assessment, Subarea 4 of Poway Road Brownfields Grant Area,
California dated April 5, 2006 for APN: 317-130-47 or 13644 Poway
Road, Poway, 92064
Extension
notice sent
2023-141
American
Transparency
This is a request for an electronic copy of all payment transactions
for calendar year 2022 or fiscal year 2021-2022. This could be
considered one of the following reports: Vendor Payment
Checkbook Report, Checkbook Register, Expenditure Data,
Transactional Detail Payments, Online Checkbook, or
Disbursements.
7/27/2023
2023-142
Blain, Tony
I am requesting Form 460 forms for all Poway Mayor and City
Council candidates for election years 2016 & 2014
8/7/2023
2023-143
MKArchitects
Building plans for 14020 Stowe Drive, Poway 92064. Permit Plans
for building shell, tenant improvement plans for Teledyne Marine,
site plan, building sections and MPE if available
8/7/2023
2023-144
Schmidt, Jeffrey
Please provide correspondence and planning documents for
planned housing developments or other projects falling in the
following parcels.
31702115/31702116/31702117/31702118/31702119.
2023-145
Rodd, Reza
I would like to request the building records for this property: Im
considering buying this property and would like to get the existing
records for the building and land.
8/8/2023
2023-146
Schmidt, Jeffrey
Please provide me with a list or spreadsheet of building permit
applications for new residential construction that have been
submitted to the City of Poway from Jan 1, 2023 to the present
date. Please indicate approval stage in the approval process for
each, i.e. under review or approved.
Please indicate each parcel number where a proposed project is
intended to be built (parcel for the building permit).
If building permit has already been approved please tell me the
latest status of each project that was approved.
Please indicate the number of units planned for each project. I am
seeking information to tell me where new housing is actively being
planned & the current status. If there is a more efficient way for
me to access the information please call me so we can discuss it
2023-147
Ebner, Keith
Re: 13644 Poway Rd, Poway, CA 92064 Is there a record the
current lateral that ties into a private or public main? We know is
the existing 6 inch lateral leaves the front of the building & heads
out the parking lot towards Poway Rd. Any sewer maps of this
area?
2023-148
Schmidt, Jeffrey
01/2020 through current: Please provide internal and external
correspondence including any correspondence to of from any City
official regarding plans for housing development on the following
parcels: 3160200800 / 3163213700 Please provide a copy of all
City Clerk’s Office
Public Records Requests continued:
Name Subject of Request Date Closed
Page 6 of 6
documents regarding any project plans on these parcels that are in
process of planning (no past abandoned plans necessary).
2023-149
Spangler, Amy
I would like to request a copy of the City's list of Outstanding
checks that are over 90 days old & greater than $500.
8/8/2023
2023-150
Partner Engineering
and Science
12250 Kirkham Rd., Poway - APN: 317-223-01-00 As part of the
assessment we would like to request copies of historical permit
records (Building Department): Permit to construct • Grading
Permits• Permit to demolish (if any)• Certificates of Occupancy•
Spray Booth Permits• Septic or Sewer hookup permits• Permits to
install or remove underground tanks, fueling dispensers•
Emergency Generators (fire pump rooms)• Permits for sumps,
clarifiers, grease interceptors, underground or aboveground tanks,
silos
2023-151
Boeller, Cheryl
correspondence internal & external & planning documents
submitted for the following parcels since January 2020 - 321-260-
31-00 / 321-260-30-00 / 321-260-09-00 / 321-260-08-00 / 321-
260-07-00 / 321-260-06-00
2023-152
Blain, Tony
Requesting all documents containing “ Landscape Maintenance
District (LMD)” 2010-present, (Following request to Blain for
clarification of an overly broad PRR) New request: Initially, I want
list of all Poway LMDs and map showing where they are located
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Audrey Denham, Director of Community Services
DATE: August 9, 2023
SUBJECT: Community Services Department Bi-Weekly Report
Upcoming Date Time Location
Night Fishing Aug 11 & 12 6:00pm – 11:30pm Lake Poway
Summer Movie in the Park:
Alice in Wonderland (1951)
Aug 12 Sunset Old Poway Park
Summer Concert Series:
Pomerado Community Band
Aug 13 5:30pm – 7:00pm Old Poway Park
Congregate Meal Program:
Congregate Carnival
Aug 14 11:00am – 12:30pm Community Park
Night Fishing Aug 18 & 19 6:00pm – 11:30pm Lake Poway
Kumeyaay-Ipai Interpretive
Center Open House
Aug 19 10:00am – 1:00pm Kumeyaay-Ipai
Interpretive Center
Night Fishing Aug 25 & 26 6:00pm – 11:30pm Lake Poway
Older Adult Special Activity:
Animal Encounter
Aug 31 12:30pm – 1:30pm Community Park
Kid’s Night Out Sep 1 5:00pm-9:00pm Community Park
Night Fishing Sep 1 & 2 6:00pm – 11:30pm Lake Poway
Fall class registration got off to a quick start, with more people choosing to come into the office than
we have had in recent years. Overall, registrations were up 36% and revenue was up 30% over the
first day last year.
Lisa Sanders continued the Summer Concert Series at Old
Poway Park on July 30 with her soulful Country blues. As
always, a large crowd gathered to dance and enjoy the
summer evening!
CSD Bi-Weekly Report
August 9, 2023
Page 2
Over 300 moviegoers watched the animal gang go
from bad to good during a showing of The Bad Guys
at Community Park on Saturday, July 29. Up next,
Alice in Wonderland (1951) at Old Poway Park on
Saturday, August 12, to conclude the series.
July’s special event at the Congregate Meal Program was a
Red, White, & BBQ Picnic. Over 93 diners enjoyed a traditional
picnic lunch and exciting Bluegrass entertainment presented by
Fast Heart Martin Stamper and Smokey Joe.
Along with the newly installed corner garden, the new sign is up
and looking fabulous!
CSD Bi-Weekly Report
August 9, 2023
Page 3
The final Lake Poway concert of the season went off with a
bang! The parking lot was completely full by 4:30pm and the
MTS shuttle made 10 trips from Poway High School parking lot
so more folks could enjoy the sounds of the Beatles tribute
band Britain’s Finest. Non-resident parking fees generated a
total of $3,210 in revenue. The Summer Concerts at Lake
Poway were once again a great success in providing the
community a beautiful outdoor setting to enjoy wonderful
musical entertainment.
This past weekend, the Swapanthi Dance Academy presented
a two-hour solo Indian classical dance performed by Naisha
Patel. The 9 individual dances were the culmination of her 11-
year Bharatanatyam learning experience and a graceful
expression of emotion. The performance and a catered dinner
in the courtyard were enjoyed by 286 members of her family and
friends.
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Bob Manis, Director of Development Services
DATE: August 9, 2023
SUBJECT: Director’s Notes
PLANNING
New Single-Family Residence on a Vacant Lot Located at 15157 Huntington Court
On July 31st, a Variance and a Minor Development Review Application were submitted to construct
a new 3,826 square-foot (sf) single-family residence with an attached 705 sf garage on a vacant lot
located at 15157 Huntington Court in the Residential Single Family 2 (RS-2) zone. The applicant is
requesting a Variance to observe a 20-foot front yard setback when 30 feet is required.
CAPITAL IMPROVEMENTS
Lake Poway Upper Playground Project
Demolition is complete and the grading is now substantially complete. Due to demolition, three
existing irrigation laterals below the concrete and directly in/around the play equipment had been
broken. The contractor has been diligent to repair these lines so that irrigation can continue to take
place during construction. During the grading work, substantial subgrade shrinkage was
encountered, and it was discovered that the northern keystone retaining wall was compromised by
tree roots. A change order is being prepared to bring in additional import fill to address the subgrade
shrinkage and to remove and replace the compromised retaining wall.
Water Treatment Plant Security Project
The contractor has placed the order for servers, switches, and cameras and will mobilize ahead to
complete all infrastructure in order to be ready for camera installation upon delivery. Some of the
long lead items are scheduled for delivery in September and December. The contractor has a
tentative mobilization date of September as long as the network items arrive as scheduled.
FY2021-22 Annual Corrugated Metal Pipe (CMP) Repair/Replace
The contract work is complete. However, City staff is currently coordinating with property owners
regarding easements for the emergency repairs on Holland Road, Indian Trail Road and Country
Squire. The contractor is willing to be on standby until further direction is given regarding this
additional work. Otherwise, the contract can be closed out and the repair work will be added to next
year’s list of CMP repair project.
FY2023-2024 Street Maintenance Project
Work continues this week in the Green Valley area. The City website includes a map
(Poway.org/roads) of planned work and will be updated weekly to reflect upcoming street
closures. Weekend work has been scheduled for August 12 to August 13 in order to accommodate
local businesses and medical offices during off peak time. The scheduled weekend work is part of
the contract work and will not have any premium charges or additional costs from the contractor.
Director’s Notes
August 9, 2023
Page 2
FY2023-2024 Citywide Striping Project
The striping work has begun in Zone 6, which includes fresh striping in the greater Poway area. The
striping activity occurs overnight with minimal disruption to traffic and local residents.
LAND DEVELOPMENT
Hamidy Residence
City staff has returned comments and redlines on the first submittal of the biological conservation
and open space easements associated with the proposed single-family residence on Iron Mountain
Drive.
The Farm
City staff approved the proposed construction change for the revised 54-inch storm drain and
pedestrian trail at the southeast corner of the development.
Okolo Residence
City staff provided comments and redlines of the third submittal for a proposed single-family
residence on Augusta Court.
Palomar Health Driveway
City staff received the first submittal of the grading plan to modify one of the onsite driveway
entrances.
Russell Residence
City staff received the first submittal of the grading plan for a single-family residence on Old Coach
Road.
Sage at Old Coach
City staff approved the first construction change for the six-lot subdivision located on Old Coach
Road. The construction change included storm drain and retaining wall modifications.
Birch Properties
City staff has received the signed merger documents for the proposed lot merger of two properties
on Carlson Court. Once the documents are signed internally and recorded, the merger will be
complete.
Rahimzadeh Residence
City staff has returned comments and redlines on the first submittal of the grading plan package for
an accessory dwelling unit at an existing residence on Claire Drive.
Director’s Notes
August 9, 2023
Page 3
NATIONAL FLOOD INSURANCE PROGRAM
FEMA Community Rating System
The National Flood Insurance Program (NFIP) provides federally backed flood insurance within
communities that enact and enforce floodplain regulations. To be covered by a flood insurance
policy, a property must be in a community that participates in the NFIP. To qualify for the NFIP, a
community adopts and enforces a floodplain management ordinance to regulate development in
flood hazard areas. Additionally, there is the Community Rating System (CRS) which is a national
program developed by FEMA. Under the CRS program, communities can be rewarded for doing
more than simply regulating construction of new buildings to the minimum national standards. The
City participates in the CRS program for several reasons, one of which is the discounted flood
insurance premiums it provides for the City’s residents and businesses. In order to participate in the
CRS program, City staff must implement activities to reduce flood damage to existing buildings,
manage development in areas not mapped by the NFIP, protect new buildings beyond the minimum
NFIP protection level, preserve and/or restore natural functions of floodplains, help insurance agents
obtain flood data, and help people obtain flood insurance. Each year, the City must recertify that it
is continuing to implement the activities for which it has earned credit and meets the requirements
for its level of participation. Last week, City staff submitted the recertification package to FEMA.
INSPECTION
Zeitoune Residence
Stagecoach Road (G22-0004) - The contractor has removed and recompacted the pad area. Work
on the storm drain system has begun. Last week, the contractor installed and backfilled the 30”
drainage pipe. The contractor began construction of the headwalls and has requested the inspector
perform a preliminary inspection on the first headwall. No issues were noted, and headwall
construction continues.
Director’s Notes
August 9, 2023
Page 4
Sage at Old Coach
Old Coach Road (G22-0005) - The concrete footings
and slabs for the buildings on lot 2, 3 and 4 were
placed.
The contractor completed constructing the masonry
retaining wall for bio-basin 1. Furthermore, for bio-basin
1, footing was placed, block was stacked, and the
horizontal and vertical reinforcing steel was installed.
Last week, the wall grout was placed followed by water
proofing material.
Lyon Estates
Larchmont Street (G21-0013) (STI21-003) - The
contractor continues to work on grading and drainage
installation on lots 5, 6 and 7.
The contractor completed all water line testing for the first
section of proposed water main. Bacteriological samples
were drawn and tested. Passing results were confirmed by
the laboratory. The contractor completed the water main tie
in at the entrance of the project.
Excavation and compaction of street sub-grade has been
performed. Last week, the contractor continued to place
curb and gutter for a section of Private Street “A” and Private
Street “B” as well as began placing and compacting class II
base. The streets adjacent and around Larchmont will be
slurried as part of the City’s Street maintenance program.
However, Larchmont will not be done since work on the
development continues and access is needed. Once the
Lyon Estates project is complete, the contractor will be
required to slurry the street.
The Farm
Stoneridge Country Club Lane (G21-0001, STI21-001) G21-0001) - Lennar requested occupancy for
additional homes in the Cottages and Homestead neighborhoods. The cross gutter along Valle Verde
was poured. It was noted the newly installed sewer manhole frame and cover were damaged via
saw cut, and it has been determined the frame and cover will need to be replaced.
Director’s Notes
August 9, 2023
Page 5
All trenches crossing Espola Road and Saint Andrews Drive have been ground down and repaved.
The walking trail and landscape along Espola Road fronting the project has been installed. The City’s
landscape inspector is working with the contractor to perform the required inspections.
Director’s Notes
August 9, 2023
Page 6
Wiersum Residence & ADU
Misty Meadows (G22-0009) - The preconstruction meeting for the construction of a single-family
residence and ADU has been held. The owner and contractor have signed all applicable paperwork.
Biscayne Recreational Facility
Biscayne Place (G22-0001) - The contractor started excavating footing for the upper masonry wall
to the north and east of the home/fitness facility.
SCHEDULED ROAD/LANE CLOSURES
Possible lane closure on Poway Road between Carriage Road and Civic Center Drive for work
related to the Fairfield Project.
Possible lane closure for haul trucks entering and exiting on Espola Road, Saint Andrews Drive
and surrounding streets. Work is related to the Farm Housing Development.
Possible lane closure for underground utilities and haul trucks entering and exiting on Espola
Road and Old Coach Road. Work is related to the Sage at Old Coach project.
Lane closures for underground utility installation along southbound Pomerado Road. Work is
related to the Verizon Fiber Optic Upgrade Project.
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Judy B. Tran, Director of Finance
DATE: August 9, 2023
SUBJECT: Finance Department Director’s Notes
Finance
• FY 2022-23 year-end processes continue. Final audit fieldwork by the City’s independent auditor firm
of Davis Farr LLP is scheduled for early October 2023.
Customer Services
Business Registration July 2023
Business Certificates 161
Home Occupation Permits 25
Regulatory Licenses 7
Utility Billing Start Service 103
Close Service 97
Cycle Bills Processed 6595
Past Due Notices Sent 187
Red Tags Shut Off Notice 80
Service Disconnections 23
General Support Services
Requests for Proposals:
RFP Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded Amount Awarded Vendor Council Award Date
RFP 23-009 Wireless Communication Facilities Consulting Services
5/31/23 N/A TBD TBD TBD TBD
RFP 23-017 Occupant Public Notice Mailing Services 7/6/23 N/A $7,500 / Fiscal Year TBD TBD N/A
RFP 24-001 Dead Animal Disposal Services 8/15/23
N/A $22,200 / Fiscal Year TBD TBD N/A
Finance Department Director’s Notes
Page 2
RFP Number Project Title Submittal Deadline Engineer's Estimate Funding Available Awarded Amount Awarded Vendor Council Award Date
RFP 24-002 False Alarm Tracking and Billing Services 8/15/23 N/A $20,200 / Fiscal Year TBD TBD N/A
RFP 24-003 Community Park Concrete Ribbon Drain Assessment
9/5/23 N/A $75,000 TBD TBD 10/17/23
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Jeff Chumbley, Fire Chief
DATE: August 9, 2023
SUBJECT: Fire Department Management Staff Notes
FIRE ADMINISTRATION
1 Met with Wittman Enterprises and Revenue and Operations Manager to maintain/improve
efficiencies in the ambulance billing process specific to ambulance billing.
2 Met with AT&T to discuss potential benefits of using FirstNet for cell phone devices.
3 Attended the NextGen RCS Board meeting as the County Fire Chiefs representative.
4 Welcomed our new Fire Chaplain and presented him with his chaplain badge.
5
Attended an Ambulance Patient Offload Times (APOT) meeting to discuss the impact on
transporting agencies of ambulance offload delays at local hospitals. This is a concern Statewide
for fire agencies dealing with extended offload delays exceeding 30 minutes. Poway will
participate in data collection in support of the County Fire Chiefs holding hospitals accountable
for the “wall time” issues.
6 Chief and Deputy Chief attended San Diego County Sheriff’s National Night Out at Lake Poway.
FIRE PREVENTION
Activity between 07/24 - 08/06
Business Certificate Reviews 27
Fire Inspections 41
Plan Reviews 56
Site Visits/Consultations 4
Temporary Use Permits 2
Fire Inspections
FD Management Staff Notes
Page 2
Fire Prevention Division Highlights
Real Estate Defensible Space Inspections
Sanders Residence - 13744 Fairgate Dr – Approved
Fire Department Permit Plan Checks
Fathi Residence - 14989 Orchard View Dr. – Fire Sprinkler – Approved
Panda Residence – 17987 Highlands Ranch Terrace – Fire Sprinkler – Not Approved
Chef Works – 12325 Kerran St. - High Pile Storage – Approved
Cohn ADU – 13663 Paseo De La Huerta – Fire Sprinkler – Not Approved
Garden Elementary School – State Licensing Review – Approved
Business Certificate Reviews
Sella Anatomica – Approved
Light Composites - Approved
Development Reviews
Pomerado Hospital – New Driveway – Approved
General Atomics Bldg 37 – Mechanical Yard - Approved
Fire Inspections
Discovery Isle – 11740 Creek Rd. - State Licensing 850 Fire Clearance – Approved
Bungalows at The Farm – Lots 110 – 115 – Fire Sprinkler – Approved
Cottages at The Farm – Lots 55 – 58 – Fire Sprinkler – Approved
Bilstein - 13135 Danielson St. Unit 209 – High Pile Storage – Approved
Grenier Res. - 14215 Ipava Dr. - Fire Sprinkler – Approved
Corovan – New RPDA Backflow – Approved
General Atomics Bldg. 20 – Annual Inspection - Requires Re-Inspection
A1 Storage – New Business Inspection – Approved
Poway Honda – New RPDA Backflow - Approved
Fire Consultations
General Atomics Bldg. 24 ITER – High-Pile Storage
POME Battery Energy Systems – Fire Department Comments
Lyon Estates – Fuel Modification Zones
Fire Prevention Activity
Fire Prevention Division LIV Demo for new inspection software program
Senior Fire Inspector passed Incident Safety Awareness for the Hired Vendors course.
A1 Storage – replaced Knox Box keys
FD Management Staff Notes
Page 3
EMS / TECHNOLOGY
1 Completed quality assurance review on 127 EMS reports.
2 Met with Customer Services to discuss data collection for the upcoming Medicare cost study.
Between Monday, July 24th and Sunday, August 6th, personnel completed 238 hours of training and
activities. The top three topics included 81 hours of
Company Training, 60 hours of Driver/Operator
Training, and 52 hours of Facility Training.
SAFETY
1 Hosted the City Safety Committee meeting. The committee reviews accidents, safety inspections,
and injury reports within the City of Poway.
2 Attended a Leadership speech given by Admiral McRaven in Coronado.
TRAINING
1 Attended San Diego County Sheriff Office’s National Night Out at Lake Poway along with E92 and
M91 who provided a show and tell of the apparatus and equipment.
2 E92 participated in a show and tell for the City’s summer camp at Lake Poway.
3 Began process of firefighter applications for Fall class at Palomar College for Fire 98.
TRAINING & PROFESSIONAL
DEVELOPMENT HOURS
OPERATIONS
1
The CIP staircase project has finally reached completion. Crews have moved all office equipment and
are now operating upstairs. The Battalion Chief dorm and office have also been located on the
second floor of the fire station.
2 The application period for the Firefighter/Paramedic recruitment process was opened in
collaboration with Human Resources. The Department currently has two open positions.
FD Management Staff Notes
Page 4
Incident Category Types of Incidents between 07/24/23-08/06/23
Canceled, Good Intent Dispatched and canceled enroute
False Alarm
Alarm system sounded due to malfunction; CO detector activation due
to malfunction; Smoke detector activation, no fire; alarm system
activation, no fire
Fire Passenger vehicle fire; Strike Team-Brush, vegetation, woodland
Rescue & EMS Medical aids; motor vehicle accident with injuries; motor vehicle
accident with no injuries; extrication rescue
Service Call Assist invalid, snake removal; water or steam leak
Between Monday, July 24th and Sunday, August
6th, the Poway Fire Department responded to
185 incidents.
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Jodene Dunphy, Director of Human Resources & Risk Management
DATE: August 9, 2023
SUBJECT: Human Resources & Risk Management Department Director’s Notes
HUMAN RESOURCES
Promotions
Position/Title Department Start Date
Executive Assistant LS 7/31/2023
New Hire
Position/Title Department Start Date
Director Finance 7/31/2023
Senior Administrative Assistant DSD 7/31/2023
Current Active/In Progress Recruitments
No. Dept. Title Type
Opened Closed/Close
1 CS Front of House Assistant Part-Time Temporary 7/25 10/25
2 CS Lifeguard Part-Time Temporary 7/28 10/29
3 CS Recreation Coordinator Full-Time Regular 7/6 7/27
4 CS Stage Technician Part-Time Temporary 6/20 9/24
5 DSD Senior Planner Full-Time Regular 7/6 7/31
6 Fire Firefighter/Paramedic Full-Time Regular 8/3 9/3
7 HR Human Resources Technician I Full-Time Regular 6/14 7/5
8 HR Senior Human Resources Analyst Full-Time Regular 6/14 7/12
9 PW Construction Maintenance Worker I/II Full-Time Regular 6/22 7/10
10 PW Parks Maintenance Worker I Part-Time Regular 6/22 7/14
11 PW SCADA Electrical, Instrumentation &
Controls Supervisor
Full-Time Regular 6/14 7/5
12 PW Senior Electrical, Instrumentation &
Controls Technician
Full-Time Regular 7/12 8/6
13 PW Water Utilities Worker I/II Full-Time Regular 7/17
8/6
Upcoming Recruitments
No. Dept. Title Type
Open Close
1 DSD Administrative Assistant III Full-Time Regular TBD TBD
2 FIN Customer Services Technician I/II Full-Time Regular TBD TBD
3 FIN Senior Accounting Technician Full-Time Regular TBD TBD
4 Fire Fire Safety Inspector Full-Time Regular TBD TBD
5 HR Management Analyst Full-Time Regular TBD TBD
HR & Risk Management Director’s Notes
Page 2
6 PW Park Ranger – ¾ Time Three-Quarter Regular TBD TBD
7 PW Stormwater Maintenance &
Construction Worker I/II
Full-Time Regular TBD TBD
8 PW Water Treatment Plant Operator I/II/III Full-Time Regular TBD TBD
CITY OF POWAY
MEMORANDUM
TO: Chris Hazeltine, City Manager
FROM: Eric Heidemann, Director of Public Works
DATE: August 9, 2023
SUBJECT: Public Works Department Bi-Weekly Report
(July 24, 2023 – August 6, 2023)
Work/Description Units Location/Description
OPERATIONS
Street Maintenance
Asphalt Repairs (sq. ft.) 14,000 Applied crack sealant to Pomerado Road.
Debris Removal 2 Removed drywall debris from Poway Road.
Concrete Repairs (sq. ft.) 25 Replaced sidewalk in Zone #6.
Signs Performed sign inspections in Zones #1 and #2.
Vegetation 1 Performed weed abatement on Scripps Poway
Parkway from Danielson Street to the city limit.
Graffiti 2 Covered graffiti on a sidewalk on Community
Road, and on an SDGE box on Poway Road.
Miscellaneous 15 Loads of recycled asphalt material removed from
Crosthwaite Yard.
Stormwater & Flood Control
Annual Concrete Channel Program
Inlet Medallions Installed
Graffiti Removed
4
16
1
Completed Channels – 145 yards silt/vegetation
removed.
Per JRMP – installation of “No Dumping”
medallions over storm inlets.
Wanesta Channel – 1 site 50 sq ft. covered and
documented.
Request Closed
Training
1
1
Garden Road tree trim request – dispatched West
Coast Arborists.
BBP/ Hearing/ Biohazards/ Heat.
Vegetation Management 5 5 locations easement vegetation clearances;
Wanesta, Robison, Ezra, Hilleary Park, Fairburn.
Vehicle & Equipment Maintenance
Work Orders 28
Scheduled/Unscheduled 20/8
Red Fleet Work Orders 5
Red Fleet Scheduled/Unscheduled 4/1
Facilities Maintenance
Electrical & Lighting 4 -Replaced burnt out lights at Garden Road Park &
Lake Poway Park staff lounge.
Public Works Department Report – August 9, 2023 Page 2
Work/Description Units Location/Description
-Repaired and restored power to an electrical
outlet in the laundry room at Fire Station #3.
Plumbing/HVAC 16 -Installed 2 AC units at Old Poway Park - behind
Rose Room.
-Replaced a leaking hot water heater at Lake
Poway concession (replaced 100 gal with 80 gal)
-Replaced shower cartridge in Swim Center
men's locker room.
-Repaired running or leaking toilets and urinals at
Lake Poway upper Men's restroom, Aubrey Park
and Garden Road Park.
-Unclogged a toilet at Valle Verde Park.
-Unclogged apparatus floor drain at Fire Station
#2 and a washer drain at Fire Station #3.
-Rebuilt faucet in men's restroom at Lake Poway
gazebo #6.
-Replaced hose bib at Old Poway Park (near the
orchard)
-Flushed and cleaned debris from the ice
machine drain hose in the multipurpose block
hallway at the Community Center.
-Hydro jetted the sewer line at Fire Station #1 and
replaced all sink strainers.
-Repaired duct work for AC service to Fire Station
upstairs.
-Installed a drinking fountain at Community Park
near the playground/pool.
-Repaired a vandalized drinking fountain at
Arborlitos Sports Park and adjusted the water
flow.
Miscellaneous 17 -Replaced a latch and handle on a trash
enclosure at the Hamburger Factory.
-Welded a handrail at Fieldview Way.
-Replaced soap dispensers in the men's shower
area at the Swim Center.
-Refastened a loose rail at the Swim Center.
-Reattached a paper towel dispenser in upper
Lake Poway women's restroom.
-Replaced a toilet paper dispenser, in Public
Works Admin women's restroom.
-Replaced toilet handles in PCPA Backstage
Women's Restroom.
-Affixed a new nameplate under the photo of
retired Councilmember Barry Leonard.
-Replaced men's restroom sign at Temper's Hall
-Replaced a fence at OPP after AC units were
installed.
Public Works Department Report – August 9, 2023 Page 3
Work/Description Units Location/Description
-Secured a toilet seat in the women's restroom at
City Hall.
-Repaired the waste oil tank at HHW and paint.
-Touched up paint around new windows in PW
Admin.
-Adjusted lobby door at Community Center and
key entry.
-Removed and disposed of 3 broken office chairs
from City Hall.
-Resolved a phone line/fire alarm at Nelson
House.
Contract Inspections -Inspected LMDs 83-1 A, B, C., north bus stops,
ROWs, OPP, Aubrey, Twin Peaks corridor.
-Marked out for tree removals on Twin Peaks.
BrightView completed planter updates at Del
Poniente and Huntington Gate, Aubrey ROW,
Stowe/Crosthwaite, LMD 86-3B, Community
Road medians.
- Steven Smith planted three trees in City Hall
parking lot.
-Post construction irrigation inspection on
Pomerado Road
-Performed trash abatement in 86-2A and on
Poway Road.
-Inspected irrigation tie-in at the Triangle Park.
-Removed volunteer trees from LMD 83-1A - Ted
Williams.
- Old Poway Park fire phone line investigation
- Street maintenance zone 6 nighttime inspection
-Battery back up installations
- Blue Sky access road quote for light repairs
Customer Inquiries Pedestrian light at Hilleary and Poway Road
Streetlight Issues Park lights at Community Park (dog park)
-need to trench and pull new wiring.
Traffic Signal / Emergency Hill n Dale at Twin Peaks southbound, Aubrey at
Community Road.
Markouts – Poway and Carriage Heights Way,
Twin Peaks and Midland
Community and Poway road pedestrian signal
Iron Mountain parking lot light investigation
Work Orders Completed / In
Progress
37/33
Parks, Trails & Landscape Maintenance
Aubrey Park Aerated and fertilized grass. Mulched planters
and walkways. Replaced an irrigation isolation
valve. Checked and adjusted irrigation systems.
City Owned Properties Mowed weeds along the back of York Avenue
property and along Community Road.
Public Works Department Report – August 9, 2023 Page 4
Work/Description Units Location/Description
Community Park Applied herbicide along the fence lines, ballfield
warning tracks, walkways and in planters.
Provided support for multiple summer camps
and activities.
Garden Road Park Applied herbicide in the picnic areas, large,
mulched areas, and trail.
Hilleary Park Provided support for multiple summer camps.
Performed irrigation repairs and adjustments in
entry planters.
Lake Poway Park Prepared and supported the Saturday evening
campout and Sunday afternoon concert.
Irrigation system check including head
adjustments, replacements and valve repairs.
Assisted the playground contractor with irrigation
issues. Removed low hanging tree branches
from the mulberry trees in the bowl.
Old Poway Park Provided support for multiple activities and
events. Supported contractor installing new AC
system. Trimmed planters around the fountain,
gazebo and orchard. Aerated and fertilized grass
areas.
Poway Oaks Park Repaired master irrigation valve and started
replacing turf irrigation heads.
Silverset Park Raked up tree/leaf debris along the Fieldview
entrance. Performed gopher abatement in the
sports field. Irrigation head adjustments and
replacements. Weed abatement along the
outside of the ballfield fence line. Trimmed
shrubs in the parking lot median.
Starridge Park Removed volunteer trees from the border
planters. Trimmed the acacia hedge along
Starridge Street. Spread mulch piles in open
areas. Checked and adjusted irrigation systems
in grass areas, replacing old rotors.
Sycamore Creek Park Removed low hanging tree branches along
Sycamore Park West.
Valle Verde Park Irrigation system check including irrigation head
adjustments/replacements. Spread landscape
mulch in parking lot planters and medians with
the assistance of the ARC crew.
Miscellaneous Trails Repaired trail crossing on Sumac Trail. Erosion
repairs to the Iron Mountain parking lot. Secured
several fence post rails and mowed weeds on
the Tierra Bonita, Espola Road, and Del
Poniente Trails. Removed excess plant material
at Lake Poway Trail heads. Performed weed
abatement; tree and plant trimming on the
Pomerado Trail.
Public Works Department Report – August 9, 2023 Page 5
Work/Description Units Location/Description
Miscellaneous Parks Staff attended a half day Calsense irrigation
training, and Big 5 safety training.
Emergency Response
Emergency Response Callouts 24 5 – Debris in road, 4 trees and limbs and one
couch.
1 – Water main hit by contractor.
4 – Irrigation Leaks.
1 – Excessive water in brow ditch. Draining some
water off reservoir.
4 – Meter leaks.
3 – Sets of patrons in parks after-hours.
1 – Power out at reservoir.
1 – Sink hole – condoned will address on Monday
1 - Resident concern about water in channel –
naturally occurring.
1 – Afterhours meter unlock.
1 – Small amount of water coming up through
asphalt, distribution informed and will address on
Monday.
1 – Water pressure issue – resident’s regulator
not working properly.
DEPARTMENT TRAINING
UTILITIES
Water Distribution System Operations
Mark-Outs 118
Distribution Maintenance 216
Water System Shutdown 4 The Farm, Pomerado Road, Larchmont St
Emergency Main Repair 1 Pomerado Road
Water Service Leak Repair 2 St Andrews Drive, Silverlake Drive
Customer Service Repairs:
Leaks, AMS updates, non-ops.
14 New Meters – The Farm
Fire hydrant hit – Scripps Poway
Annual Test Reports 87
Backflows Tested 13
Large Meter Tests 8
Water Treatment Plant and Utility Systems Operations
Lake Poway Rainfall (inches)
Lake Poway and Poway Dam 931.5 Middle lake screen removed for rehabilitation.
New screen placed on middle intake.
Water Treatment Plant 13728 Chlorine and alum deliveries received. All
analyzers calibrated. The DDW Sanitary Survey
Final Report was received, work begins on
recommended action items.
Collection System Maintenance
Sewer Mainlines Rodded (Vactor)
Routine Mainline Rodding (l/ft.) 1,710
Monthly High Frequency Rodding (l/ft.) 0
Public Works Department Report – August 9, 2023 Page 6
Quarterly High Frequency Rodding
(l/ft.)
0
Special Mainline Rodding (l/ft.) 0
Total Mainline Rodded (l/ft.) 1,710
Sewer Mainlines Inspected (CCTV)
Routine Mainline Inspection (l/ft.) 0 1st week transfer of computer hardware from old
CCTV vehicle to new vehicle. 2nd week 3-days of
field training on new equipment for all
wastewater staff.
Special Mainline Inspection (l/ft.) 0
Total Mainlines Inspected (l/ft.) 0
Utility Crew Task Count
Annual Lateral Assessments 1
Bi-Annual Lateral Assessments 0
Laterals Inspected 1
Laterals Rodded 0
Laterals Repaired 2
Lateral Blockage Mitigation 0
SSO Spill Volume Estimation 0
Manholes Located 0
Manholes Raised 0
Manholes Inspected 4
Easement Maintenance 0
Customer Service 1
Total of Division Tasks Completed 19
Recycled Water System
Recycled Site Inspections 0
Four-Year, Four-Hour Potable Cross-
Connection Tests
1
Four Year, 24 Hour Recycled Irrigation
Test
0
Annual Recycled Site Inspection 7
Customer Service
DRC Plans Reviewed 5
Total Completed Tasks
Fats, Oils, Grease (FOG) Program
Business License Review 6
Site Inspection 1
FOG Permit Issued
Customer Service
Total of Completed Tasks
July 31, 2023
TO:Chris Hazeltine, City Manager
City of Poway
FROM:Lon Nguyen, Lieutenant
Poway Station
WEEKLY ACTIVITY REPORT FOR 7/21/2023 - 7/27/2023
San Diego County Sheriff's Department
Post Office Box 939062 - San Diego, CA 92193-9062
Kelly A. Martinez, Sheriff
Arrested Name Violations Arrest Location
07/21/2023 SANDOVAL, ESTEBAN 14601.2 (A) VC - DRIV W/LIC SUSP/REV
W/PRIOR DUI CONV (M)
Twin Peaks/espola
Rd, Poway
07/23/2023 ADAME RAGA, BRAYAN 14601.2 (A) VC - DRIV W/LIC SUSP/REV
W/PRIOR DUI CONV (M)
Scripps Poway
Pkwy/danielson St,
Poway
07/23/2023 BRIDGES, DAVID 368 (B)(1) PC - CAUSE HARM/DEATH OF
ELDER /DEPENDENT ADULT (F)
15529 Pomerado Rd,
Poway
07/26/2023 CASTRO, HELEODORO 16028 (A) VC - FAIL TO PROVE FIN
RESPONSIBILITY:PEACE OFCR REQUEST
(I); 4000 (A)(1) VC - EXPIRED
REGISTRATION (I); 11364(A) HS - POSS
CONTROLLED SUBS PARAPHERNALIA (M)
Glenoak Rd & Teri
Dr, Poway
07/26/2023 COLONA, ABDUL-AZEEZ 243 (A) PC - BATTERY ON PERSON (M)14500 Kirkham Way,
Poway
07/26/2023 BAKER, GARY 245 (A)(4) PC - ADW WITH
FORCE:POSSIBLE GBI (F)
14068 Stowe Drive,
Poway
07/26/2023 LINDER, CHRISTOPHER 11364(A) HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M); BW-M ZZ -
MISDEMEANOR BENCH WARRANT (OUR
AGENCY)
13425 Community
Road, Poway
07/27/2023 COOPER, MICHAEL 597(A) PC - INTENTIONAL CRUELTY TO
ANIMAL/S (F)
14436 Midland Rd,
Poway
07/27/2023 CHAVEZ, JUAN 243 (A) PC - BATTERY ON PERSON (M)14436 Midland Rd,
Poway
07/27/2023 MAIORANO, ROSA 273.6 (A) PC - VIOLATE DOMESTIC
VIOLENCE COURT ORDER (M)
13490 Poway Road,
Poway
Keeping the Peace Since 1850
Category Arrests
Felony 3
Misdemeanor 7
Total 10
Category Cases
Felony 5
Misdemeanor 7
Total 12
Lon Nguyen, Lieutenant
Poway Station
Captain Nancy Blanco, Poway Station
Keeping the Peace Since 1850
August 07, 2023
TO:Chris Hazeltine, City Manager
City of Poway
FROM:Lon Nguyen, Lieutenant
Poway Station
WEEKLY ACTIVITY REPORT FOR 7/28/2023 - 8/3/2023
San Diego County Sheriff's Department
Post Office Box 939062 - San Diego, CA 92193-9062
Kelly A. Martinez, Sheriff
Arrested Name Violations Arrest Location
07/28/2023 DELEON, OSWALD 11364(A) HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M); 11377 (A) HS -
POSSESS CONTROLLED SUBSTANCE (M);
14601.1 (A) VC - DRVG WHILE LIC SUSP OR
REVOKED:OTHER REASONS (M)
Scripp Poway Pkwy
And Kirkham Road,
Poway
07/28/2023 VASQUEZ, ALBERTO 11364(A) HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M)
L -
Amphetamines/metha
mphetamines, Poway
07/28/2023 ULLOA, HECTOR 11550 (A) HS - USE/UNDER INFL OF
CONTROLLED SUBS (M)
12202 Adobe Ridge
Road, Poway
07/31/2023 GREEN, ROBERT 647 (F) PC - DISORD CONDUCT:ALC (M)13867 Poway Rd,
Poway
08/01/2023 JUVENILE 182 (A)(1) PC - CONSPIRACY:COMMIT
CRIME (M); 459.5 PC - SHOPLIFTING (M)
Poway
08/01/2023 FRAZIER, ADRIENNE BW-F ZZ - FELONY BENCH WARRANT
(OUR AGENCY)
12735 Poway Rd,
Poway
08/02/2023 BLANCO, JACOB 11550 (A) HS - USE/UNDER INFL OF
CONTROLLED SUBS (M)
13321 Ann O Reno
Lane, Poway
08/02/2023 NAUGHTON, BRIAN 11364(A) HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M); BW-M ZZ -
MISDEMEANOR BENCH WARRANT (OUR
AGENCY)
13630 Poway Rd,
Poway
08/02/2023 GHIO, CARLO BW-M ZZ - MISDEMEANOR BENCH
WARRANT (OUR AGENCY)
13630 Poway Rd,
Poway
08/03/2023 FLORES, HENRY 594 (B)(1) PC - VANDALISM ($400 OR
MORE) (F)
13409 Midland Road,
Poway
08/03/2023 FERRIS, NATASHA 11364(A) HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M); 11377 (A) HS -
POSSESS CONTROLLED SUBSTANCE (M);
11550 (A) HS - USE/UNDER INFL OF
CONTROLLED SUBS (M)
14907 Heath Drive,
Poway
Keeping the Peace Since 1850
08/03/2023 COCCO, VINCENT 11364(A) HS - POSS CONTROLLED SUBS
PARAPHERNALIA (M)
14907 Heath Drive,
Poway
Category Arrests
DUI 1
Felony 2
Misdemeanor 10
Total 13
Category Cases
Felony 4
Misdemeanor 7
Total 11
Lon Nguyen, Lieutenant
Poway Station
Captain Nancy Blanco, Poway Station
Keeping the Peace Since 1850