Res 08-083
,.
RESOLUTION NO 08-083
A RESOLUTION OF THE CiTY COUNCIL OF THE CITY OF POWA Y
ADOPTING A MASTER SCHEDULE OF FEES
WHEREAS, the City Council of the City of Poway has the authority to establish
fees for City services, and
WHEREAS, the City Council finds it necessary to recover the costs for City
services, and
WHEREAS, the City completed an Overhead Cost Allocation Study and resulting
Cost Allocation Plan, that was accepted by the City Council on May 15, 2007, and
WHEREAS, the Overhead Cost Allocation Plan identified a General City
Overhead Rate and allows for cost recovery to the General Fund, paid from other funds,
and
WHEREAS, a comprehensive review of the City's fees has been conducted,
using the 2007 cost allocation model, which has revealed that many of the City's fees
need to be adjusted, either higher or lower, to appropriately recover the City's costs of
providing the services, and
WHEREAS, an updated fee schedule has been developed which is consistent
with the City Council's direction regarding cost recovery, which is set forth in the
attached Master Schedule of Fees, and
WHEREAS, the proposed fees do not exceed the reasonable costs of providing
the services for which the fees are imposed, and
WHEREAS, the proposed fees will supersede any previously established fee for
the specified City services, and
WHEREAS, a duly noticed public hearing has been held, allowing for
public comment on the establishment of said fees.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Poway as follows
Section 1. The foregoing recitals are true and correct, and the City Council so
finds and determines.
Section 2. That the fees shown in the attached Master Fee Schedule (Exhibit
A) are hereby adopted, and supersede any previously established fee for the identified
City service
Resolution No 08-083
Page 2
Section 3. The fees shown in Table 1 of the attached Master Fee Schedule
shall become effective January 1, 2009
Section 4 The fees shown in Table 2 of the attached Master Fee Schedule
shall become effective February 2, 2009
Section 5 The fees shown in Table 3 of the attached Master Fee Schedule
shall become effective February 2, 2009
PASSED, ADOPTED, AND APPROVED by the City Council of the City of
Poway, State of California this 2nd day of December 2008
ro67c1
Michael P Caf n , ayor
ATTEST
.
V/Tro an, MMC, City Clerk
Resolution No 08-083
Page 3
STATE OF CALIFORNIA )
)SS
COUNTY OF SAN DIEGO)
I, Linda A. Troyan, MMC, City Clerk of the City of Poway, do hereby certify under
penalty of perjury that the foregoing Resolution No 08-083 was duly adopted by the
City Council at a meeting of said City Council held on the 2nd day of December 2008,
and that it was so adopted by the following vote
AYES BOYACK, EMERY, HIGGINSON, REXFORD, CAFAGNA
NOES NONE
ABSENT NONE
DISQUALIFIED' NONE
City of Poway
Master Fee Schedule Effective 2009
. .. '..I!/, ;,,,,"
;I~~jlJlji!'~~1ffifj~~IWIII~
~~lfI~"t~)'_'::l.'I_,j'/' ...
REGULATORY LICENSING' - - . -
Amusement Establishments $ 259 New License
$ 77 Renewal
Bin90 License $ 160 New License
$ 66 Renewal
Add Staff Worker $ 21 New License
Carnival/Go-Cart Centers $ 15 Renewal
Temporary $ 217 New License
$ 15 Renewal
Permanent $ 217 New License
Dance License $ 35 Renewal
Class A - Daily/Nightly $ 259 New License
$ 77 Renewal
Class B-3 Days/Nights in a Calendar Week $ 259 New License
$ 77 Renewal
Class C - One Day/Night Only $ 259 New License
$ 77 Renewal
Class D - Fraternal, Social Club $ 259 New License
$ 77 Renewal
Juvenile Class A $ 259 New License
$ 77 Renewal
Juvenile Class B $ 259 New License
Entertainment License $ 77 Renewal
Class I (Professional) $ 259 New License
$ 77 Renewal
Class II (Topless) $ 259 New License
$ 77 Renewal
Class III (Non-Professional) $ 259 New License
$ 77 Renewal
Firearms Sales License $ 457 New License
Holistic Health Practitioner $ 275 Renewal
$ 15 New License
Junk Yards / Auto Wrecking $ 273 New License
$ 91 Renewal
Massage Establishments $ 377 New License
$ 177 Renewal
Massage Technician/Trainee $ 123 New License
$ 108 Renewal
Merchandise Coupon Book $ 303 New License
$ 121 Renewal
Secondhand Dealers $ 480 New License
$ 280 Renewal
Solicitor's License $ 105 New License
$ 107 Renewal
Master Fee Schedule Table 1, Effective January 'I 2009
Page 1 of 17
~"""'~l~~~'I."",~~~~",.,_.,
'-- '.>.~_..-~~w~_-,_'_ ,r.,' _;, '. . .... -'-1 :. ._A~..9E~ijb-~_-.':'''fk:;Z$' . ,'i;.;lEr" -,'r~,,'f! '
Solicitor's ID Card $ 105 New License
$ 107 Renewal
Solicitor's License (Charitable) $ 105 New License
$ 107 Renewal
BUSINESS REGISTRATIONS
Business Certification $ 100 New Certificate
$ 15 Renewal
OTHER
Fin er rintin $ 25 Each time
UTILITY and PASSPORT-RELATED FEES
Hardship Variance processing fee $ 100
Tag Fee $ 31
Turn-oils/Restoration of Service $ 52
After Hours - Weekdays & Saturdays $ 68
After Hours - Sundays & Holidays $ 83
Hydrant Meter Billing/Closing Account $ 93
Customer Request for Meter Testing $ 67
Passport Applications $ 25 Plus Fee set by Federal Govt.
Pass ort Photos $ 15
GENERAL OVERHEAD (all departments) 12% applied to contract/materials costs and
fully-weighted personnel costs.
Master Fee Sr:heduie Table 1, Effective January 1, 7009 Page 2 of 17
City of Poway
Master Fee Schedule EHective 2009
~Kw.lll!B~~~_~tllI1
FACILITY USE fees vary by category of organization as follows:
A. Local Public Agency (City & PUSD)
B: LPA social! Non-resident PA meetings
C. NP Social/ Youth Leagues I PA Affiliates I poway Chamber of Commerce
D' Resident
E. Resident Local Business I Non-resident Non-profit
F Non-resident individual and business
N/A. Indicates faciliti is NOT AVAILABLE for use b certain categories of or anizations
Communit Park Per Hour
N/C A
$ 34 B (hourly rate)
Auditorium $ 52 C (hourly rate)
$ 69 D (hourly rate)
$ 103 E (hourly rate)
$ 121 F (houri rate
N/C A
$ 27 B (hourly rate)
Bill Bond Hall Room 1 $ 41 C (hourly rate)
$ 54 D (hourly rate)
$ 80 E (hourly rate)
$ 94 F (hourly rate
N/C A
N/C B (hourly rate)
Bill Bond Room 2 $ 30 C (hourly rate)
$ 41 D (hourly rate)
$ 61 E (hourly rate)
$ 71 F (hourly rate)
N/C A
N/C B (hourly rate)
Bill Bond Room 3 $ 30 C (hourly rate)
$ 41 D (hourly rate)
$ 61 E (hourly rate)
$ 71 F hourI rate
N/C A
N/C B (hourly rate)
Nutrition Room $ 21 C (hourly rate)
$ 28 D (hourly rate)
$ 43 E (hourly rate)
$ 49 F (houri rate
N/C A
$ 14 B (hourly rate)
Kitchen (large) $ 21 C (hourly rate)
$ 28 D (hourly rate)
$ 42 E (hourly rate)
$ 49 F (hourly rate)
Master Fee Schedule Table 1 Effechve,Ji'lnuary 1, 20D!:! Page 3 of17
~~~~.~ll'~ffl~_~]il~~
. N/C A
N/C B (hourly rate)
$ 21 C (hourly rate)
Activity Room 1 $ 28 D (hourly rate)
$ 42 E (hourly rate)
$ 49 F (houri rate
N/C A
N/C B (hourly rate)
$ 21 C (hourly rate)
Activity Room 2 $ 28 D (hourly rate)
$ 42 E (hourly rate)
$ 49 F hourI rate
Do Park A
N/C
$ 6 B (hourly rate)
$ 8 C (hourly rate)
Dog Park 1 $ 11 D (hourly rate)
$ 18 E (hourly rate)
$ 21 F (hourly rate)
N/C A
$ 6 B (hourly rate)
$ 8 C (hourly rate)
Dog Park 2 $ 11 D (hourly rate)
$ 18 E (hourly rate)
$ 21 F houri rate
N/C A
$ 6 B (hourly rate)
$ 8 C (hourly rate)
Dog Park 3 $ 11 D (hourly rate)
$ 18 E (hourly rate)
$ 21 F (hourly rate)
N/C A
$ 5 B (hourly rate)
$ 8 C (hourly rate)
Park Area $ 10 D (hourly rate)
$ 17 E (hourly rate)
$ 19 F (houri rate
N/C A
$ 5 B (hourly rate)
$ 8 C (hourly rate)
Bocce Courts $ 10 D (hourly rate)
$ 16 E (hourly rate)
$ 19 F (hourly rate)
Table 1 Effeclrve January 1 2009 Page 4 of 17
Master Fee Schedule
. .
" . - ir.r.'i'~~'f';rw~~~~'liilil_
~~~!1~-mJi1~,!J~, I 11'\ 't. ,. ~,l..aj..r.w;:. c.'il~ H' .._ ,_~,n ,,,,,_#~;;r
,,~ .,,: ", .,~,i_ :"~. 1',:-:r,J;: '-,jj .,~... -.. ~,. 1 .'JII I "'-. m
Gymnasiums N/C A
$ 24 B (hourly rate)
$ 37 C (hourly rate)
Twin Peaks Gymnasium $ 49 D (hourly rate)
$ 73 E (hourly rate)
$ 86 F (hourly rate
N/C A
$ 24 B (hourly rate)
$ 37 C (hourly rate)
Meadowbrook Gymnasium $ 49 D (hourly rate)
$ 73 E (hourly rate)
$ 86 F houri rate
N/C A
N/C B
$ 27 C (hourly rate)
Stage/Activity Room $ 36 D (hourly rate)
$ 53 E (hourly rate)
$ 63 F (houri rate)
Old Powa Park
N/C A
S 21 B (hourly rate)
S 31 C (hourly rate)
T emplars Hall S 43 D (hourly rale)
$ 64 E (hourly rate)
$ 74 F houri rate)
N/C A
$ 10 B (hourly rate)
$ 17 C (hourly rate)
Gazebo $ 22 D (hourly rate)
$ 32 E (hourly rale)
$ 38 F (hourly rate)
N/C A
NIC B
$ 22 C (hourly rate)
Porter House - Great Room $ 30 D (hourly rate)
$ 45 E (hourly rate)
$ 52 F (hourly rate)
N/C A
N/C B
$ 22 C (hourly rate)
Porter House - Parlour $ 30 D (hourly rate)
$ 45 E (hourly rate)
$ 52 F (houri rate
N/C A
N/C B
$ 22 C (hourly rate)
Porter House Kitchen $ 30 D (hourly rate)
$ 45 E (hourly rate)
$ 52 F (hourly rate)
Table 1 Effective January 1, 2009 Page 5 of 17
Master Fec Schedule
.'
ili;~~,. ~'11l I r lb 'J,-, I~o.t l,~J1jt;..~~.. ~".ru
Lakp. Poway N/C A
S 22 B (hourly rate)
S 33 C (hourly rate)
Pavilion and Outdoor Area $ 44 D (hourly rate)
$ 66 E (hourly rate)
$ 77 F (houri rate)
N/C A
$ 10 B (hourly rate)
$ 16 C (hourly rate)
Pavilion Outdoor Area $ 21 D (hourly rate)
$ 31 E (hourly rate)
$ 37 F hourI rate
N/C A
$ 10 B (hourly rate)
$ 16 C (hourly rate)
Gazebo Area $ 21 D (hourly rate)
$ 31 E (hourly rate)
$ 37 F hourly rate
N/C A
$ 5 B (hourly rate)
$ 7 C (hourly rate)
Park Area $ 10 D (hourly rate)
$ 16 E (hourly rate)
$ 18 F (hourly rate)
N/C A
$ 8 B (hourly rate)
$ 13 C (hourly rate)
Archery Range $ 17 D (hourly rate)
$ 26 E (hourly rate)
$ 30 F (houri rate)
N/C A
$ 10 B (hourly rate)
$ 16 C (hourly rate)
Fire Ring Areas 3. 5. 18 $ 21 D (hourly rate)
$ 31 E (hourly rate)
$ 37 F (houri rate
N/C A
$ 52 B flat fee
$ 78 C flat fee
Deep Pt BBQ Area - Flat Fee $ 105 D flat fee
$ 157 E flat fee
$ 183 F flat fee
NIC A
N/A B
$ 3 C (hourly rate)
Concession N/A D
NIA E
N/A F
Table 1 Effective January 1 2009 Page 6 of 17
Master Fee Schedule
- . ~
N/C A
N/C B
$ 7 C (per day)
Campground Site $ 10 D (per day)
$ 16 E (per day)
$ 18 F er da
Powa Community Libra N/C A
$ 36 B (hourly rate)
$ 53 C (hourly rate)
Meeting Room (includes $50 premium) $ 71 D (hourly rate)
$ 107 E (hourly rate)
$ 124 F hourI rate
N/C A
N/C B
$ 33 C (hourly rate)
Patio $ 44 D (hourly rate)
$ 66 E (hourly rate)
$ 77 F (houri rate)
Poway Athletic Fields N/C A
$ 8 B (hourly rate)
$ 13 C (hourly rate)
Baseball field use (unlined, unmarked) $ 17 D (hourly rate)
$ 25 E (hourly rate)
$ 29 F (houri rate
N/C A
$ 6 B (hourly rate)
$ 8 C (hourly rate)
Soccer field use (unlined, unmarked) $ 11 D (hourly rate)
$ 18 E (hourly rate)
$ 21 F houri rate)
N/C A
$ 4 B (hourly rate)
$ 6 C (hourly rate)
Basketball court use $ 8 D (hourly rate)
$ 13 E (hourly rate)
$ 14 F (houri rate
N/C A
S 16 B (hourly rate)
S 16 C (hourly rate)
Ballfield Lights S 16 D (hourly rate)
S 16 E (hourly rate)
S 16 F (hourly rate
N/C A
S 18 B (hourly rate)
$ 18 C (hourly rate)
Soccer Field Lights $ 18 D (hourly rate)
$ 18 E (hourly rate)
$ 18 F (houri rate
Table 1 Effective January 1, 2009 Page 7 of 17
Master Fcc Schedule
.- ,ft' ,;
!lfli!lj!ll~.'''''''''''''ild.l!i!~i%~''~~,f.~rfll'iml'n\':1flmB:iiif;~Dj'J:lit,~
, -" _ ~= --,-.ili-,~~; ,~l- ft.." II I'" ~... _ _ ,~" ~ "m~. -- ~_'__"M_ ~-____ ____
Powa Center for Performing Arts
N/C A
Center" five-hour minimum $ 940 Non-Profit Group hourly rate
$1,410 For-Profit Grou houri rate
N/C A
Center" additional hours $ 210 Non-Profit Group hourly rate
$ 340 For-Profit Grou houri rate
N/C A
Center' 12-hour flat fee $1,670 Non-Profit Group hourly rate
$2,560 For-Profit Grou houri rate
N/C A
Court yard- with Performance/Exhibition only $ 52 Non-Profit Group hourly rate
$ 78 For-Profit Grou houri rate
N/C A
Lobby - with Performance/Exhibition only $ 78 Non-Profit Group hourly rate
S 105 For-Profit Grou houri rate
N/C A
Lobby - Art Receptions (flat fee) S 78 Non-Profit Group hourly rate
S 78 For~Profit Grou houri rate
N/C A
Garden Room (meetings) S 26 Non-Profit Group hourty rate
S 26 For-Profit Group hourly rate
N/C A
Garden Room (receptions) S 52 Non~Profjt Group hourly rate
S 78 For-Profit Grou hourly rate
Cit Hall Rental
N/C A
$ 114 B (hourly rate)
Chambers $ 171 C (hourly rate)
S 228 D (hourly rate)
$ 343 E (hourly rate)
$ 399 F houri rate)
N/C A
$ 48 B (hourly rate)
Courtyard $ 71 C (hourly rate)
$ 95 D (hourly rate)
$ 143 E (hourly rate)
$ 167 F hourly rate
N/C A
$ 22 B (hourly rate)
Kitchen $ 32 C (hourly rate)
$ 44 D (hourly rate)
$ 65 E (hourly rate)
$ 76 F (hourly rate)
Master Fee Schedule Table 1 Effective January 1 2009 Page 8 of 17
City of Poway
Master Fee Schedule Effective 2009
Permits
Airbounce Permit Fee $ 31
Alcohol Perinit Established by the Joint Powers Insurance Authority
Rental Deposits
Indoor Spaces, Ongoing Nonprofit Meetings $ 25 rental deposit
PCPA - First day $ 300
PCPA - Each additional da $ 150
Cleaning/Damage Deposits
Community Swim Center - Swim Meets $ 200 refundable cleaning/damage deposit
Indoor Spaces $ 100 refundable cleaning/damage deposit
Indoor Spaces when serving food $ 200 refundable cleaning/damage deposit
Indoor Spaces when serving alcohol $ 300 refundable cleaning/damage deposit
PCPA $ 300 refundable cleaning/damage deposit
Commercial Filmin $ 200
Cancellation Fees - if applicable (call 858-668-4570 for deadline details)
Community Park Swim Center - Swim Meets $ 200
PCPA Full deposit forfeit
All Other Facilities $ 25
Class Withdrawal b $ 15
Processing Fees
Air Bounce $ 3
Facilities Use Permit (FUP) $ 3
Refund - Facility Use Applications $ 16
Commercial Filmin $ 3
Staffing Fees - Per Hour
Park Ranger during nonregular hours $ 43 per hour
Recreation Leader 1 during nonregular hours $ 30 per hour
Technical Theatre Coordinator acting as TES in $ 42 per hour
excess of twelve (12) hours
Stage Technician eight (8) hours/day-Level 1 $ 23 per hour
Stage Technician eight (8) hours/day-Level 2 $ 34 per hour
Front of House Coordinator in excess of 5 hours $ 23 per hour
Box Office Attendant in excess of 4 hours $ 17 per hour
Poway Youth Sports Associated Organized League Play Organized League Play
Regular Season Fields No Charge
Lighting $ 12
Off-Season Fields $ 3
Ticketing Fees - PCPA
Printing Included in Rental
Consignment - Per show $ 52
Handling $ 1
Online Purchases $ 4
Master Fee Schedule Table 1, E.ffective January 1 2009 Page g of 17
. . ~
~~if~.~~I'~I~~~~,r;,r.""'I~~1!!iliif'i!!l
,,- ~..",.' 'Hi .. _. _' ;..rl.i'&...... ,',1111 11'1. h4f. .~. ~,i!' ,~,~~'mL. ffi.;W; ,_....~!;;iji
Other Fees
Group Liability Insurance Fee Established by Joint Powers Ins. Authority
Non-Resident Registration $ 10
Non-Intermission Fee - PCPA $ 105
Merchandise Sales Commission - PCPA 15% Nonprofit! 20% For Profit
Contract Class Recital Fee - PCPA $ 3
Commission - City Hall/Facility Art Displays 15% Nonprofit / 20% For Profit
Piano Tuning - PCPA Actual cost
Additional Equipment - PCPA Actual cost
Cano Use - PCPA $ 261
Special Use Fee: Commercial Advertising and Motion Pictures (this fee is in addition to existing fees)
Non-published Print (maximum of 8 hours) No Charge
Published Print
Maximum of 8 hours $ 188
Additional Hours $ 63
Outside normal hours $ 63 Plus overtime staffing fees
Commercial Film
Maximum of 8 hours $ 376
Additional Hours $ 63
Outside normal hours $ 63 Plus overtime staffing fees
Recreation (201)
Contract Class Registration
Skate Park Programs No Charge
Day Camp $ 125
Day Camp - CIT $ 52
Candyland Youth $ 5
Candyland Adult $ 3
Community Day-Booth Fee, Non-Profit $ 78
Community Day-Booth Fee, Non-Profit w/food $ 84
Community Day-Booth, Commercial $ 105
Community Day-Booth, Commercial w/food $ 157
Community Day-Booth Fee, Political $ 89
Community Day- Canopies $ 47
Community Day- Electricity $ 42
Community Day- more space $ 26
Gyms 3 on 3 Basketball $ 68
Gyms Youth VB League $ 26
Magic Mountain $ 68
Ski Trip $ 68
Teen Campouts $ 10
4th of Jul- A es 12 and u 2
Master Fee Schedule Table 1 Effective January 1, 2009 Page 100f17
,~~.~'n'.
Lake Operations (202)
Family Campouts (up to 5 family members) $ 52
Each additional family member (if more than 5) $ 10
Youth Fishing Derby (in addition 10 Fishing Permit Fee) No Charge
2-Day Fishing Derby (each day)
Adult (In addition to Fishing Permit Fee) $ 10
Youth In addition to Fishin Permit Fee $ 5
Catfish Craze
Adult (In addition to Fishing Permit Fee) $ 10
Youth In addition to Fishin Permit Fee $ 5
Boating Permits
Motorboat
Full Day $ 24
Half Day $ 18
Per Hour $ 13
Senior Full Day (Thurs&Fri) - Military Fri $ 16
Senior 1/2 Day (Thurs&Fri)- Military Fri $ 11
Rowboat
Full Day $ 16
Half Day $ g
Per Hour $ 8
Senior Fult Day (Thurs&Fri) - Military Fri $ 10
Senior 1/2 Day (Thurs&Fri)- Military Fri $ 6
14 ft. Sailboat
Per Hour $ 15
Pedal boat
Per Hour $ 13
Per 1/2 Hour $ 8
Float Tube Launch
Full Da $ 3
Fishing Permits
Youth (7 & Under) No Charge
Youth (8-15) $ 3
Adult (16 & Older) $ 6
Senior (Thursday only) $ 3
MilitarylSenior (Friday only) $ 4
10-Day Adult Permit $ 54
10-Day Youth (anytime) Senior (Thurs only) $ 27
Archery Range Card $ 10
Nonresident Parking Fees
Auto-Weekends $ 5
Motorcycles $ 2
RVs 1 Buses $ 5
Non-resident employees @ Poway Business $ 3
Functions
Master Fee Schedule Table 1 Effective January 1, 2009 Page 11 of 17
:. ..
ll1ii~~~~~~~~rffi~I\1l,.J:.'~:l,'!I!11l!\iiijljiJ.IIl!R.!
Aquatics (203)
Youth Day - Prepurchase $ 13
Youth Day - Day of Event $ 17
Youth Day - Aftercare $ 5
Water Aerobics No Charge
Swim-in Movie - Y outh/Senior $ 3
Swim-in Movie - Adult $ 4
Swim-in Movie - Family $ 12
Birthda Parties $ 52
Community Park Swim Center
Daily Admission - Resident
Youth/Senior $ 2
Adult $ 2.50
Daily Admission Non-Resident
Youth/Senior $ 4
Adult $ 5
Family Swim - Sat/Sun 10:30 a.m. to 1 p.m.
Resident $ 8
Non-Resident $ 11
Lap Passes - Resident
Youth/Senior $ 20
Adult $ 25
Lap Passes - Nonresident
Youth/Seior $ 40
Adult $ 50
Season Pass - Resident
Youth 1 Senior $ 73
Adult $ 94
Family $ 157
Season Pass - Non-Resident
Youth 1 Senior $ 105
Adult $ 125
Famil $ 256
Annual Pass - Resident
Youth 1 Senior $ 183
Adult $ 225
Family $ 392
Annual Pass - Non-Resident
Youth ISenior $ 261
Adult $ 355
Famil $ 643
Team Use During Closed Hours
Pool Fee - Resident - Exclusive $ 39 per hour
Pool Fee - Resident - Shared $ 21 per hour
Pool Fee - Non-Resident - Exclusive $ 50 per hour
Pool Fee - Non-Resident - Shared 33 per hour
Master Fee Schedule Table 1 Effective January 1 2009 Page 12 of 17
. .
"i!€ll1:;i1fi"~'B~~ii!l;:(il1!!1~"4i.~f;'~I'-:l' ~'\_:~1!llii0f~~"~'~l'iii
m '" 1~~' "~,~,,",~, ~.;..., -'_W~~~ -_.~ '"'. "..if _~. II II .J.!.1'1. -I J '\~_ "";~. ~, . .+ .,. IX?' )11._. ;r!;,l',.. '.
Communit Park Swim Center continued
Tournament Fees
Resident Teams $ 57 per hour
Non-Resident Teams $ 78 per hour
Preparation Fee - Resident $ 157 flat fee
Pre aration Fee - Non-Resident $ 314 flat fee
Team Use During Open Hours
Lane Use - Hourly - Resident $ 5 (at least 51% Poway residents)
Lane Use - Hourly - Non-Resident $ 6 (less than 51 % Poway residents)
Swim Lessons - Per Meeting $ 6.50
Private Lessons $ 26
Locke, Rentals $ 0.25
Old Poway Park (205)
4th of July - Booths 15% of Gross Sales (Non-Profit Groups)
20% of Gross Sales For-Profit Grou s
$ 37
$ 4
Christmas in the Park - Booths 15% of Gross Sales (Non-Profit Groups)
20% of Gross Sales For-Profit Grou s
Community Band Festival - Booths $ 37
Tour Pro ram Cit receives $2.00 $ 4
Interpretive Services
Earth Arbor Day Booth No Charge Non-Profit Group
$ 37 Commercial
Class Registration
Stargazing $ 3
Insects at Night $ 3
Hoot, Howl & Prowl $ 5
Owl Prowl $ 3
School Program $ 4
Evening Wildlikfe Program $ 2
Kid's Nature Hunt $ 2
Bats $ 3
Master Fee Schedule Table 1 Effective January 1, 2009 Page 13 of 17
City of Poway
Master Fee Schedule Effective 2009
~ . :
!lili,;~'~.~~llWl.![~~1\!it~~.fi.___U"{tll~~~
Annual CFC Permit and Inspection Fees (as listed within PMC 15_24.150)"
1-3 permits for the same occupancy are charged at 100%, Each permit in excess of 3 for the same occupancy will be
charged 50% of the listed amounts for the remaining permit feels)
If compliance issues are noted during the initial inspection, a second (follow-up) inspection will be conducted at no
additional cost. If identified issues are not resolved during the second inspection, all subsequent (third and beyond)
inspections are subject to the reinspection fee.
Aerosol products $ 105 Initial Fee
$ 52 Reinspection
Amusement buildings $ 105 Initial Fee
$ 52 Reinspection
Aviation facilities $ 163 Initial Fee
$ 82 Reinspection
Carnivals and fairs $ 163 Initial Fee
$ 82 Reinspection
Cellulose nitrate film $ 82 Initial Fee
$ 41 Reinspection
Christmas Tree Lots $ 52 Initial Fee
$ 26 Reinspection
Combustible dust-producing operations $ 117 Initial Fee
$ 59 Reins ection
Combustible fibers $ 117 Initial Fee
$ 52 Reinspection
Compressed gases
One Type $ 117 Initial Fee
$ 52 Reinspection
Multiple Types $ 117 Initial Fee
$ 59 Reins ection
Cry0genic liquids
One Type $ 117 Initial Fee
$ 52 Reinspection
Multiple Types $ 187 Initial Fee
$ 82 Reins ection
Cutting and Welding $ 117 Initial Fee
$ 52 Reinspection
Dry cleaning plants $ 117 Initial Fee
$ 52 Reins ection
Exhibits and trade shows $ 105 Initial Fee
$ 52 Reinspection
Explosives $ 59 Initial Fee
$ 29 Reinspection
Master Fee Schedule Table 1 Effective January 1 2009 Page 14 of 17
$ Initial Fee
$ Reins ection
$ Initial Fee
>30 gallons Class 1 $ Reinspection
$ Initial Fee
>25 gallons < 120 gallons Class II or III $ Reinspection
$ Initial Fee
> 120 gallons Class II or III $ Reinspection
$ Initial Fee
Floor finishing $ Reinspection
$ Initial Fee
Fruit and crop ripening $ Reins ection
$ Initial Fee
Fumigation and thermal insecticidal fogging $ Reinspection
Green waste Recycling, Mulching, $ Initial Fee
Com ostin o erations $ Reins ection
Hazardous materials $ 117 Initial Fee
One Product $ 59 Reins ection
$ 117 Initial Fee
Multiple Products $ 59 Reinspection
HPM facilities $ 210 Initial Fee
Single Product $ 105 Reinspection
$ 235 Initial Fee
Multiple Products $ 117 Reinspection
High-Pile Storage $ 117 Initial Fee
501 - 20,000 square feet $ 52 Reinspection
$ 176 Initial Fee
>20,000 square feet $ 88 Reinspection
$ 82 Initial Fee
Hot work operations $ 41 Reinspection
$ 117 Initial Fee
Industrial ovens $ 52 Reinspection
Liquid- or gas-fueled vehicles or equipment in $ 117 Initial Fee
$ 52 Reins ection
assembl buildin s $ 117 Initial Fee
LP-gas $ 52 Reinspection
$ 187 Initial Fee
Lumber yards and woodworking plants $ 105 Reinspection
$ 82 Initial Fee
Magnesium $ 41 Reins ection
$ 117 Initial Fee
Miscellaneous combustible storage $ 52 Reinspection
$ 82 Initial Fee
Open burning $ 41 Reins ection
$ 82 Initial Fee
Open names and torches $ 41 Reinspection
Table 1 Effective January 1, 2009 Page 15 ot 17
Master Fee Schedule
-: 81.
'i!l1l~"!..~~".F"_'ii'~~."fl1I8k~'~j..IiIl~'!lUil'"
~,,; .;;;r/~~"':~f~"._.', .~;",,~__- .-'~':.-.~~--:':i;&,"--~'~ "I..L:J....:._: :.."'~:f.1ir;;-~,_u..."r'__;;ill1l'-"_:- ~~_'J<'~-~',_. 1" '-Ji;",:iiii
Open ftames and candles $ 82 Initial Fee
$ 41 Reinspection
Organic coatings $ 140 Initial Fee
$ 70 Reinspection
Places of assembly
50 to 300 $ 82 Initial Fee
$ 41 Reinspection
More than 300 $ 163 Initial Fee
$ 82 Reinspection
Pyrotechnic special effects material $ 163 Initial Fee
$ 82 Reinspection
Pyroxylin plastics $ 82 Initial Fee
$ 41 Reins ection
Refrigeration equipment $ 100 Initial Fee
$ 52 Reinspection
Repair garages and Motor Fuel-dispensing $ 117 Initial Fee
facilities $ 52 Reinspection
Spraying or Dipping Operations $ 117 Initial Fee
$ 52 Reinspection
Storage of Scrap Tires and Tire Byproducts $ 117 Initial Fee
$ 59 Reinspection
Temporary membrane structures, tents and canopies
Normal Business Hours $ 82 Initial Fee
$ 41 Reinspection
Non-business hours $ 152 Initial Fee
$ 76 Reinspection
Tire-Building plants $ 210 Initial Fee
$ 82 Reins ection
Waste handling $ 187 Initial Fee
$ 82 Reins ection
$ 117 Initial Fee
Wood products $ 52 Reins ection
Annual Multi-family Inspection Fees
1-14 Units $ 82 Initial Fee
$ 38 Reins ection
15-50 Units $ 153 Initial Fee
$ 64 Reinspection
Each Additional 50 or part thereof $ 153 Initial Fee
$ 64 Reinspection
'Annual Permit and Inspection Fees are being phased in to achieve 100% cost-recovery over a three-year period. 2010
rates will be at 100% cost recovery
Master Fee Schedule Table 1 Effective January 1 2009 Page 16 of 17
. ..
~~~~l!I" " '
. !l1.- ., II .- ;M4, 'U-"'~_
Emergency Medical Services and Ambulance Transport
Base Charge-Advanced Life Support $ 1,013 Resident
$ 1,350 Non-resident
Base Charge-Basic Life Support $ 850 Resident
$ 1,180 Non-resident
Treatment and Release $ 150 Resident
$ 150 Non-resident
Per-Mile Charge $ 16 Resident
$ 16 Non-resident
Oxygen $ 66 Resident
$ 66 Non-resident
Other Services
Apparatus/EquipmenUPersonnel Standby & Cleanup
Engine, Ladder, or Brush Company $ 121 per hour
Paramedic Unit $ 71 per hour
Utility Vehicle $ 35 per hour
Chief Officer $ 97 per hour
Training Tower Facility
Environmental Room $ 209 per day
Tower and Drill Ground $ 418 per day
Artificial Smoke $ 16 per hour
Ventilation Prop $ 157 per day(excludes expendable materials)
Draftino/Pumo Test Pit $ 52 per apparatus/per dav
False Alarm (within a 12 month period)
First response NiC
Second response N;~ All response fees pertain to responses within a 12-month
Third response $
Fourth response $ 150 period
Each additional response thereafter $ 250
Master Fee Schedule Table 1 Effective January 1 2009 Page 170117
City of Poway
Master Fee Schedule ERective 2009
- . ~
Fire Alarm and Extin uisher Systems $ 449 Initial Inspection
Monitoring Non-Addressable Systems $ 152 Reinspection & Resubmittals
$ 601 Initial Inspection
Monitoring Addressable Systems $ 225 Reins eclion & Resubmittals
Clean Agent Fire Extin uishing Systems $ 531 Initial Inspection
FM 200 System $ 199 Reins ection & Resubmittals
$ 398 Initial Inspection
Intergen, Argon, Halon Systems $ 133 Reinspection & Resubmittals
Commercial Automatic Fire S rinkler S stem 60% of CBC Plan Check fee
Underground Mains Plan Check and Inspection $ 303 Initial Inspection
Underground Fire Service Main-per system $ 152 Reinspection & Resubmittals
$ 303 Initial Inspection
Underground Fire Service Main-Fire Pumps $ 152 Reinspection & Resubmittals
ection
$ 265 Initial Inspection
Under 10,000 Square Feet $ 133 Reinspection & Resubmittals
$ 398 Initial Inspection
10,000 Square Feet and over $ 199 Reins ection & Resubmittals
Residential S rinkler S stems Plan Review $ 225 Initial Inspection
$ 265 Initial Inspection
Alteration to Sprinkler System more than 6 heads $ 133 Reinspection & Resubmittals
Compressed Gas S stems - per s stem $ 303 Initial Inspection
Less than 12.000 cubic feet $ 152 Reinspection & Resubmittals
$ 449 Initial Inspection
More than 12,000 cubic feet $ 152 Reinspection & Resubmittals
Hi h-Piled Combustible Stock 8tora e Plan Check & Ins ection. .
$ 303 Initial Inspection
Less than 20,000 SF $ 152 Reinspection & Resubmittals
$ 531 Initial Inspection
Greater than 20,000 SF $ 152 Reinspection & Resubmittals
$ 303 Initial Inspection
Spray Booths Plan Check & Inspection-per unit $ 152 Reinspection & Resubmittals
Under round Tanks 152 Initial Inspection (per tank)
$
Underground Tank Plan Check $ 152 Reinspection & Resubmittals
$ 398 Initial Inspection (per tank)
Underground Tank Installation Field Inspection $ 152 Reinspection & Resubmittals (per tank)
$ 398 Initial Inspection (per tank)
Underground Tank Removal $ 152 Reins ection & Resubmittals per tank
Master Fee Schedule T ahle 2. Effective February 2, 2009 Page 1 of 7
~~~r,o;ll..:il:.lillojrrnflr~[i:rIl'r11J,~m'!tlltlill\lj':iiiJ~
Tenanllm rovement Initial Plan Submittal $ 0,06 er s uare foot, with $250 minimum
Tenant Improvement Field Inspection $ 133 Initial Inspection
$ 66 Reins ection & Resubmitlals
Hood & Duct System Plan Check/Inspection $ 133 Initial Inspection
$ 66 Reinspection & Resubmitlals
Plan Check/lnspection Commercial Bldgs (new 50% of CBC
construction)
Plan Check - Residential Buildin s $ 0.06 er s uare foot, with $250 minimum
Inpection of Residential Building $ 133 Initial Inspection
$ 66 Reins ect;on & Resubmitlals
Tract Map-Subdivision Minor (up to 5 lots) $ 265 Initial Inspection
$ 133 Reinspection & Resubmitlals
Tract Map-Subdivision Major (more than 5 lots) $ 601 Initial Inspection
$ 152 Reinspection & Resubmitlals
Tentative Parcel Map $ 303 Initial Inspection
$ 152 ReinspeclJon & Resubmitlals
Water Tanks $ 265 Initial Inspection
$ 133 Reinspectlon & Resubmitlals
Fire Prevention Time/Materials er hour $ 133 Initial Inspection
M~ster Fee Sc!l2cJule Table 2. Effective February 2, 2009 Page 2 of 7
City of Poway
Master Fee Schedule Effective 2009
'Designated fees shall be doubled if construction starts or if use is eslablishedbefore a permit is issued.
Hlf grading is done prior to obtaining a Grading Permit, a deposit of $3,000 will be required
Adminish'ative CleaririPermit' $ 695
Conditional Use Permit (CUP)' $ 3,299
Concurrent with another land use permit' $ 1,597
Modification Of Revocation" $ 1,942
Time Extension $ 504
Minor Modification Staff A roval' $ 319
Minor Conditional Use PermW $ 1,542
Concurrent with another land use permit' $ 799
Modification or Revocation' $ 664
Time Extension $ 479
Minor Modification Staff A $ 504
Development Review'
City Council Approval' $ 1.622
Modification or Revocation' $ 1,143
Time Extension $ 479
Administrative Approval' $ 1,143
Modification or Revocation' $ 504
Time Extension $ 160
Minor Development Review'
City Council Approval
Single Family Residence (SFR) Hillside Ridgeline Review
Not within a Subdivision' $ 2,366
Within a Subdivision' $ 1,622
Modification' $ 823
Construction of addition to single farnily
home, a detached accessory bldg, or $ 823
reconstruction of a single family home
Adding a gate to a road' $ 799
Modificatign unless otherwise indicated' $ 504
Time Extension $ 479
Administrative Approval
Sing Ie, Family. Residence
No! within a Subdivision' $ 1,942
Within a, subiiivCsion' $ 863
Modification' $ 504
RecreationCi:>urt $ 479
Construction of an addition to'a single family
home, a detached accessory building or $ 479
reconstruction of a single family'home'
.
Masler'F",e'Schedule Table 2, Effective February 2,2009 Page 3 of7
r'l> -, ~11t,1l1i t.' ,..' Ser'vice" Description I \~tr!.m~!r;'j P"fJI, " ~~ ;~~, I:' 'nli~ ~~~~l~~lln. ~~< ~~~~~~~fflil~t . ":i!fee\jl~~" '''_'~'~IMt1:~I~l~~kli;l1l.YM''M'~~' ~tr,J
'1'.' II
100 _ . -_ ' _._ . lJ'l~'-;' _41't.!.j"~,.,,.f+ 'hll':.,(\",~ Ikl/i~'~I.llj,,j~1 '.,:uf,... ,("\t.. _" ,',,"Il-~"'_~
~~.1~iflll~illl!J.lflIWII_iiJ!ii\1~,'fffl;'.'i'~'M:!i'lifl'tl1l;ilil!l111,1~1~!!JJ1~fillll!ll~t.1~f,II:lmlJ!:I~~"iJioo!iW!J;!~I!IfiIJPlIimilil"
MinoiDevelopmentReview~ (continued)
Remodeling, alteration~ ~r addition of
commercial or industrial buildings of less than
10,000 square feet or 25% ofthe existing $ 1,622
building square.footage. whichever is less'
Modification to a commercial or industrial $ 823
approval'
Second dwelling unit' $ 823
Utility box (Without another land use permit)' $ 756
Telecornmunications facilitv' $ 743
Amateur Radio Antenna' $ 719
Modification, unless otherwise indicated' $ 264
Time Extension, unless otherwise indicated $ 160
Variance
Without another land use permit' $ 799
Concurrent with another land use perrnit' $ 319
Specific Plan
I nitiation of Specific Plan $ 479
Specific Plan $ 5,000 Deposit, full cost. recovery
Specific Plan,Arnendment. $ 2,875
General Plan and Zoning Ordinance
Pre-General Plan Amendment (PGPA) $ 479
General Plan Amendment (GPA) $ 1,917 Deposit, full cost recovery
Zone Change (ZC) Amendment to land use map $ 1,917 Deposit, full cost recovery
GPA and ze $ 5,000 Deposit, full cost recovery
Zonino Ordinance Amendmentltext chanoe) $ 6,000 Deposit; full cost recovery
Development Agreement
Not in conjunction with a project $ 5,000 Deposit, full cost recovery
In conjunction with a project $ 3,000 Deposit, full cost recovery
Modification to existina aareement $ 2,000 Deoosit, full cost recovery
Annexation $ 5,000 Deposit, full, costrecoverv
Signs
Sign Permit' $ 72
'Comprehensive Sign Program (CSP)' $ 573
.Modification to, esP' $ 430
Miscellaneous' Permits & Activities
Horne:Occupation Permit' $ 103
Adrninistrative Outdoor Display Permit" $ 221
Ternp'orai'y Use Permit (TUP) I
CityCou ncil, App roval' $ 466
All other TUPs' $ 172
Tree Removal Permit' $ 102
Administrative Remedy Letter $ 294
Appeals toCily Councilor ProjectRehearing $ 765
Appeals for Wildfire Defensible, Space Program $ 200
Pre-Application Review
Master Fee,Schedule Table 2, Effective February 2, 2009 Page 4 of 7
Miscellaneous Permits '&Actlvities (continued)
Pre-Development Conference N/C
Lighting Exemption
City Council Approval' $ 736
Administrative Approval' $ 294
Underground Waiver
City Council Approval' $ 1,178
Administrative Approval' $ 294
Renaming existing streets (City Council Approval) $ 600 Deposit, full cost recovery
Research r uires written re uest to the DireCtor $ 500 Deposit, full cost recove
Subdivision Rei/iew
Tentative Parcel Map $ 2,711
Modification $ 1,145
Time Extension $ 494
Tentative Tract Map $ 4,174
Modification $ 1,928
Time extension $ 494
Environmental Review
Categorical Exemption $ 79
Negative Declaration $ 635
Environmental Impact Report Initial deposit equivalent to contract cost plus 10% for staff time, full
cost recove
Subdivision Plan Check & Inspection
Gradin Permit' $ 264
Grading & Stormwater Plan Check & Processing
$1 - $25,000 (up to 3 plan checks)" $ 1,367
$1 - $25,000 (each additional plan check over 3) $ 205 15% of original plan check
$25,001 - $100,000 $ 3,000 Deposit, full cost recovery
$100,001 - $500,000 $ 5,000 Deposit, full cost recovery
Over $500,000 $10,000 De osit, full cost recove
Grading Inspection
51 - $25,000 $ 659
525,001 - $100,000 $ 5,000 Deposit, full cost recovery
5100,001 - $500,000 $ 10,000 Deposit, full cost recovery
Over, $500,000 $ 15,000 De osit, full cost recove
Improvement Plan Check and Processin9
$1 -$25,000 (up to 3 plan checks) $ 1,128
$1 -$25,000 (each additional plan check over 3) $ 169 15% of original plan check
$25,001 - $100,000 $ 2,500 Deposit, full cost recovery
$100,001 - $500,000 $ 3,000 Deposit, full cost recovery
Over $500,000 $ 5,000 De osit, full cost recove
Improvement Inspection
,$,1 - $25,000 $ 659
$25,001 - $,100,000 $ 5,000 Deposit, full cosl recovery
$100,001 - $500,000 $ 10,000 Deposit, full cost recovery
Over $500,000 $ 15,000 De osit, full cost recove
Master Fee Scheduie Table 2, Effective February 2, 2009 Page 5 of 7
-
. .
~~~~~11illl'~r;r.Y'l"I'"'~'IT.fft~iil~!r""""'~~Iilii~!iiJ1f._~"~~'
~_ lm~ffil _~.- _ " ,~"'. _ ':' "j.t ;f#!';!l, -,.. - _'. "'~ - i t,'.;~ L~j . . II 'HI ~ A.~. '_ _'",,.&-~.lli1'~ ' ~ " ilW...ij:,,,. ..d."", ....W,;;-.ilIE: . . lli
Pool Dirt Plan Check $ 132
Final Map $ 1,100 per sheet
Soils Report Review (subject to additional fee for review by consultant currently on contract)
1-3 Houses $ 132 plus consultant fees
4~30 Houses or 1-3 Commercialllndustrial Lots $ 132 plus consultant fees
Project wi Improvements up to $5,000,000 $ 132 plus consultant fees
Special Project w/lmprovements >$5,000,000 $ 132 Ius consultant fees
Soils Compaction Report Review (subject to add'lfee for review by consultant currently on contract)
1-3 Houses $ 132 plus consultant fees
4-30 Houses or 1.3 Commercial/lndustrial Lots $ 132 plus consultant fees
Project wi Improvements up to $5,000,000 $ 132 plus consultant fees
Special Project w/lmprovements > $5,000,000 $ 132 plus consultant fees
Stormwater Pollution Review Inspection
SFR Room Addition $ 527
SFR Without Grading $ 1,318
SFR With Grading $ 1,054
Commercial I Industrial $ 2,636
Construction Change $ 395
Inspection Overtime (min 3 hrs) $ 395
Sewer Video Inspection $ 395
Miscellaneous Subdivision Activities
Flood Plain Permit major w/engineering study' $ 770
Flood Plain Permit minor, no engineering study' $ 231
Boundary Adjustment $ 1,232
Certificate of Compliance $ 770
Lot Merger (w/o Parcel Map) fiat fee $ 770
Easement Dedication $ 770
Reimbursement A ,eement $ 770
Right-of-Way Permits
Right-of-Way (ROW) Permit Fee $ 136
ROW Inspection c driveways or sewer lateral $ 273
ROW Ins ection - All Others $ 273
Pool Dirt Inspection $ 109 Dirt moved out of Poway
$ 218 Dirt on Site
Miscellaneous Subdivision Activities
Temporary Water and Sewer $ 2,617
Moving Permit - Single $ 16
Moving Permit - Annual $ 90
Easement Vacations-Summary $ 462 without public hearing
Easement Vacations-Summary $ 462 with public hearing
Residential Water System Analysis
1-4 lots/units $ 300 plus consultant fees
5-30 lots/units $ 300 plus consultant fees
31-10010ts/units $ 300 plus consultant fees
Greater than 200 lots/units $ 300 Ius consultant fees
Commercial/Industrial Water System Analysis (subject to add'l fee for review by consultant currenliy on contract)
One fire service $ 300 plus consultant fees
Two fire services $ 300 plus consultant fees
More than 2 services or looped onsite system $ 300 plus consultant fees
Master Fee Schedule Table 2. Effective February 2, 2009 Page 6 of 7
. .
~i!I~J!'jw'"""iliffi!''''.~I~"i:ll;U:!lf~~'illl!l''Y'~'''''''-''''ililil!iil''if,:iiili!!lili!!I!'.llllll.~_..'I1l!Il~'~
~,...rJi!.k'~.;~J~!Th1tf.tii'~' :;.." ~ .JJ "",>~I~~ '" .. '-~..~,' 'illl'll, ~r. "':'; "\lli\iW;\fti;r1h;;,w!fWI~JCJ!", ,,Ill ,', ",""", c-..,;At;'
Miscellaneous Subdivision Activities (continued)
Plan Sheet Copies - Up to 24" x 36" $ 12
Plan Sheet Copies. Oversized $ 15
Blasting Permits $ 308
Encroachment Removal Agreement $ 308
Standard Agreement Time Extension $ 308
Certificate of Correction Final/Parcel Ma $ 308
Other Fees
jI,bandoned Vehicle Abatement (Applicable 179 Plus. towing and dismantling fees as charged by towing
when the County reimbursement program $ service.
ends)
Nuisance Abatement $ 178
Weed Abatement er $ 175
$ 100 1 st violation
Citation Appeal $ 200 2nd violation within 1 year of the 1 st
$ 500 3rd violation within 1 year of the 1 st
$ 1,000 Each add'l violation within 1 yr of 1 st
Alarm Permit $ 69 City receives 60%, alarm company receives 40%)
Late Fee Penalt $ 69 Cit receives 60%, alarm company receives 40%)
Permits under Developer Deposits (Time/Material)
Development Permits & Review $ 160 per hour
Sign Permits $ 143 per hour
Miscellaneous Permits & Activities $ 147 per hour
Subdivision Review $ 157 per hour
Environmental Review $ 159 per hour
Subdivision Plan Check & Inspection $ 132 per hour
Miscellaneous Subdivision Activities $ 154 per hour
Contracted Building Services $ 143 per hour
Pre-Application Conferences $ 142 per hour
NPDES I JURMP Activities $ 132 per hour
Traffic Control Review $ 133 per hour
Other Activities
Right of Way $ 109 per hour
Pool Dirt $ 104 per hour
Traffic Control Review $ 103 per hour
Landscape Plan Review $ 152 per hour
Other Fee Activities (abatements, false $ 139 per hour
alarms, etc,)
Misc. Meetings, Complaints $ 111 per hour
Long-range Planning $ 176 per hour
Master Fee Schedule Table 2. Effective February 2. 2009 Page 7 of7
City of Po way
Master Fee SchedLile Effective;.2009
+.. "'.-" .'
- .
I .,1..
Building Plan Review'and'lnspectlon
Valuation $1 to,$tOO - $ 2544
Valuation $501 10 $2,060 $ 2544 for first $500 plus $3.18 eachadd'l $100 or fraction
. thereof, to. and incJudin $2;000
Valuation $2,001 to $25,000 $ 7680 for first'$2,000 plus $14 for each add'l $1;000 or
. fraction thereof, to and ineludin $25,000
Valuation $25,001 to $50,000 $ 39880 for first'$25,000 plus $9 54 for each add'! $1,0000
. fraction' thereof: to and includin $50,000
Valuation $50,001 to $100,000 $ 63730 for first $50;000 plus $6,60 each add', $1,000 or
fraction thereof. to and includin $100,000
Valuation $100,00110 $500,000 $ 98730 for first $100,000 plus $5,36 for each add'l $1,000
or fraction thereof, to and including $500,000
Valuation $500,001 to $1,000,000 $313130 for first $500,000plus $4 45 each add'! $1,000 or
, fraction thereof, to and ineludin $1.000,000
Valuation $1,000,000 and greater $5356,30 for first.$1 ,000,000 plus $2.86 each add'l $1,000 or
, fraction thereof,
Individual Permits
Permit Issuance $ 45 per permit
Plumbing Perrnit $ 175
Electrical permit $ 175
Mechanical permit $ 175
Water heater permit $ 85
Solar Waler Heater $ 130
Solar Water Voltaic.S stem $ 130
In Combination with Building Permit
Plumbing permit 6% of Building Permit Fee
Multi-Family Plumbing permit 10% of Building Permit Fee
Electrical permit 6% of Building Permit Fee
Multi-Family Electrical permit 10% of Building Permit Fee
Mechanical.perrnit 6% of Building Permit Fee
Multi-Farnily Mechanical permit 10% of Building Permit Fee
Ener Com liance Fee 15% of Buildin Permit Fee
Disabled Access Compliance Fee' (applies to
Commercial, Industrial, Assembly, Educational 10% of Building Permit Fee
. -, ,
and Mlilti:Familytypeprojects as required by
State Buildin.Code.
Plan Check Fee (Residential sub-division or tract 75% of Building Permit Fees
development projects may have produ~tion units 25% of Plumbing, Electrical or Mechanical.Fee (when plan
that:areduplicates of the model units reduced to
30%,of the permit fee) check is required for an individual permit)
NOTE:
~.Building Permit:shall inClude' only a,single issuance fee if the permit has a combination of activities, i.e. Building, Plumbing,
Electrical or Mechanical.
Expedited processing is only available for unusual circumstances as deemed appropriate by City Staff. Charges for'expedlted
services shall be determined by using an hourly rate of two times the current preferred hourly rate as established by EsGiI
Corporation.
Pr9je",~req!liljl]g a[j(jilional inspections, additional re-inspection or add'ltional plan check of revised plans shall be determined
usingttie'<::L1fr.~ntpr~ferred hourly.rate established by EsGil Corporation (one'hour minimum).
:MasterFee Schedule' Table 3, Effective February 2, 2009 Page 1 of 5
~
City of Poway
Master Fee Schedule EHective 2009
~~~~~Bl:_~
Occupancy Type of Construction Valuation
Apartment Houses 'Type I or II-F.R. $120.83
Apartment Houses Type V or III (Masonry) $98.66
Apartment Houses Type V Wood Frame $90.90
Apartment Houses Type I Basement Garage $42.13
Banks 'Type I or II-F.R $164.D7
Banks Type 1I1-Hour $120,83
Banks Type II-N $117.51
Banks Type III 1-Hour $133.03
Banks Type III-N $128.59
Banks Type V 1-Hour $12083
Banks Type V-N $116.40
Car Washes Type 1I11-Hour $77 60
Car Washes Type III-N $74.27
Car Washes Type V 1-Hour $66.51
Car Washes Type V-N $62,08
Churches Type I or II-F.R, $10975
Churches Type 1I1-Hour $83.14
Churches Type lieN $78.71
Churches Type 11I1-Hour $89.79
Churches Type III-N $85,36
Churches Type V 1-Hour $84.25
Churches Type V-N $78.71
Convalescent Hospitals 'Type I or II-F.R. $15409
Convalescent Hospitals Type 1I1-Hour $107.53
Convalescent Hospitals Type 1I11-Hour $109.75
Convalescent Hospitals Type V 1-Hour $103.10
Dwellings *** Type V Adobe $135.24
Dwellings *** Type V Masonry $10753
Dwellings ,.. Type V Wood Frame $10199
Dwellings *** Basements (semi-finished) $25.50
Dwellings *** Additions - Wood Frame $121,94
Dwellings *** Solariums $103.10
Dwellings *** Cabana - Pool House (Type V) $95.34
Fire Stations Type I or II-F.R. $126.38
Fire Stations Type II 1-Hour $83.14
Fire Stations Type II-N $78.71
Fire Stations Type 1I11-Hour $90,90
Fire Station5 Type III-N $87.58
Fire Stations Type V 1-Hour $85.36
Fire Stations Type V'N $80.92
Fitness Centers Same values as Office Buildings
Hospitals "Type I or II-F.R $180.69
Hospitals Type 1I11-Hour $14965
Hospitals Type V 1-Hour $143,00
Hotels & Motels 'Type I or II-F.R. $111.96
Hotels & Motels Type III 1-Hour $97.55
Hotels & Motels T pe III-N $92.01
Master Fee Schedule Table 3. Effective February 2, 2009 Page 2 of 5
. .
Occupancy Type of Construction Valuation
Hotels & Motels Type V 1-Hour $84.25
Hotels & Motels Type V-N $83.14
Industrial Piants Type I or II-F.R, $63.19
Industrial Plants Type 111-Hour $44.34
Industrial Plants Type II N (Stock) $41.02
Industrial Plants Type 1I11-Hour $48.78
Industrial Plants Type III-N $45.45
Industrial Plants Tilt-up $33,26
Industrial Plants Type V 1-Hour $45.45
Industrial Plants Type V-N $42.13
Medical Offices 'Type I or II-F.R. $133.03
Medical Offices Type 1I1-Hour $101.99
Medical Offices Type II-N $97,55
Medical Offices Type 11I1-Hour $110.86
Medical Offices Type III-N $103,10
Medical Offices Type V 1-Hour $99.77
Medical Offices Type V-N $96.44
Offices 'Type I or II-F.R. $118.62
Offices Type II 1-Hour $79.82
Offices Type II-N $75.38
Offices Type 11I1-Hour $85 36
Offices Type III-N $82.03
Offices Type V 1-Hour $79.82
Offices Type V-N $75.38
Private Garages Wood Frame - Finished $26.61
Private Garages Wood Frame - Unfinished $26.61
Private Garages Masonry $31.04
Private Garages Open Carports $18.85
Public Buildings "Type I or II-F.R. $136.35
Public Buildings Type 111-Hour $110.86
Public Buildings Type II-N $106.42
Public Buildings Type 1111-Hour $115.29
Public Buildings Type III-N $110.86
Public Buildings Type V 1-Hour $105.31
Public Buildings Type V-N $101,99
Public Garages 'Type I or II-F.R. $54,32
Public Garages 'Type I or II Open Parking $41.02
Public Garages Type II-N $31.04
Public Garages Type 1111-Hour $41.02
Public Garages Type III-N $36.58
Public Garages Type V 1-Hour $37.69
Restaurants Type 1I11-Hour $108.64
Restaurants Type III-N $104.20
Restaurants Type V 1-Hour $98.66
Restaurants Type V~N $95.34
Schools Type I or II-F.R. $123.05
Schools Type 1I1-Hour $84.25
Schools Type III 1-Hour $89.79
Schools Type III-N $86.4 7
Schools Type V 1-Hour $84.25
Schools T eV-N $80.92
Master Fee Schedule Table 3, Effective February 2, 2009 Page 3 of 5
, .' .
iiI!ltll~~~llTI!li'!~~~~.
': OJ, .g,j:",.: .' . .:.' ;;::. I_~.~ . ,,- _ >.. .... . . _ . .. _ _' __' '.' , tt. ,:.:,~_-- :.:. ., '. _.'..
Occupancy Type of Construction Valuation
Service Stations Type II-N $74.27
Service Stations Type 11I1-Hour $77.60
Service Stations Type V 1-Hour $66.51
Service Stations Canopies $31,04
Stores 'Type I or II-FR. $90,90
Stores Type 1I1-Hour $55.43
Stores Type II-N $54,32
Stores Type 1I11-Hour $67.62
Stores Type III-N $64,30
Stores Type V 1-Hour $57.64
Stores Type V-N $53.21
Stores Retail Garden Center (Type V-N) $4410
Theatres Type I or II-FR, $121.94
Theatres Type 1I11-Hour $88.68
Theatres Type III-N $84.25
Theatres Type V 1-Hour $83.14
Theatres Type V-N $78.71
Warehouses ** Type I or II-FR. $54 32
Warehouses ** Type 111-Hour $32.15
Warehouses ** Type II-N $31.04
Warehouses ** Type 1I11-Hour $36.58
Warehouses ** Type III-N $35.4 7
Warehouses ** Type V 1-Hour $32.15
Warehouses ** Type V-N $31.04
MISCELLANEOUS
Agricultural Building. $18.85
Aluminum Siding. $5.54
Antennas Radio over 30 It. high $3,569.54
Antennas Dish, 10 It, dia.w/decoder $4,339.98
Awning or Canopy
(supported by building) Aluminum $21.06
Awning or Canopy
(supported by building) Canvas $8.87
Balcony $14.41
Decks (wood) $14.41
Demolition of Building $4.43
Fence or Freestanding Wall Wood or Chain Link $2.22
Fence or Freestanding Wall Wood Frame with Stucco $5.54
Fence or Freestanding Wall Wire $2.22
Fence or Freestanding Wall Masonry $8.87
Fence or Freestanding Wall Wrought Iron $5.54
Foundation Only (25% of value of whole
building). Remainder of building will be
valued at 75% of the building
Greenhouse $5.54
Manufactured Housing (25% of
value of "site built" house) $24.39
Mobile Home $24.39
Patio Wood Frame with Cover $8.87
Patio Metal Frame with Cover $11.09
Patio Wood Frame Cover & Walls $12.19
Master Fee Schedule Table 3, Effective February 2, 2009 Page 4 of 5
Occupancy Type of Construction Valuation
Patio Metal Frame Cover & Walls $1441
Patio Screen or Plastic Walls $3,33
Plastering Inside $3.33
Plastering Outside $3.33
Retaining Wall Concrete or Masonry $17 74
Reroofing (1 square = 100 square feet) Built-up $135.24
Reroofing (1 square = 100 square feet) Composition Shingles $126.38
Reroofing (1 square = 100 square feet) Fiberglass Shingles $126.38
Reroofing (1 square = 100 square feet) Asbestos Cement Shingles $300.42
Reroofing (1 square = 100 square feet) Wood Shingles (Class C min) $300 42
Reroofing (1 square = 100 square feet) Wood Shakes (Class C min) $300 42
Reroofing (1 square = 100 square feet) Aluminum Shingles $453.40
Reroofing (1 square = 100 square feet) Clay Tile $380.23
Reroofing (1 square = 100 square feet) Concrete Tile $321 48
Roof Structure Replacement $1441
Saunas (Steam) $8,909.44
Spa or Hot Tub ("Jacuzzi@") $7,309.80
Stairs $1441
Stone and Brick Veneer $8.87
Storage Racks per CF $111
Swimming Pool (per sf surface area) Vinyl-lined $34,37
Swimming Pool (per sf surface area) Gunite $37,69
Swimming Pool (per sf surface area) Fiberglass $41.02
Medical offices, restauran~s,
Tenant Improvements hazardous 'h' occupancies $46.56
Tenant Improvements Other such as stores & offices $34.37
General Additions and Modifiers
Fire Sprinkler System $2.88
Air Conditioning-Commercial $466
Air Conditioning-Residential $3.88
Fireplace-Concrete or masonry $3,569.54
Fireplace-prefabricated metal $2,426 62
Pile Foundations Cast-in-place concrete piles $23.28
Pile Foundations Steel piles $57.64
Alterations to Existing Structures
(with no additional Floor Area or Roof Cover)
Interior PartitIon $53.21
Install Windows or Sliding Glass Doors $16.63
Close Exterior Wall Opening $15,52
Shell Buildings 80% of completed
"Deduct 11 percent for mini-warehouses.
"'For subdivisions with 10 or more single-family dwellings which have plan check and building permit
issuances in groups of 10 or more, the valuation of the plan check and building permit fees may be
decreased by 10 percent.
Master Fee Schedule Table 3, Effective February 2. 2009 Page 5 of 5