Loading...
Res 325RESOLUTION NO. 325 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA RESCINDING RESOLUTION NO. 253 AND ESTABLISHING A SCHEDULE OF FEES AND DEPOSITS FOR GRADING, SUBDIVISION, AND PERMIT ACTIVITIES WHEREAS, Sections 87.216 through 87.220 of the City Code, as enacted by Ordinance No. 77, authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of grading plans and permits by resolution, and WHEREAS, Sections 81.402, 81.406, 81.407, 81.502, 81.701.4, and 81.801 of the City Code, as enacted by Ordinance No. 80, authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of subdivision maps, parcel maps, boundary adjustments, improvement plans and public and private improvements by resolution, and WHEREAS, Sections 51.511.2, 71.314, 71.315, and 71.408 of the City Code authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of street and curb permits, utility permits, construction and excavation permits, and other activities within public rights of way, by resolution. NOW, THEREFORE, BE IT RESOLVED, by the City Council of Poway that: 1. Resolution No. 253, establishing a schedule of fees and deposits is hereby rescinded. That the attached "Schedule of Fees and Deposits for Grading, Subdivision, and Permit Activities" is hereby adopted and established for the above. That the deposits adopted herein are to cover the expenses of the City of Poway, its officers, employees, agents, contractors, and assigns incurred for all its engineering, administrative, professional and technical services, including, but not limited to, all those necessary to accept, process, check, examine, revise, administer, prepare and approve. Grading plans, erosion control plans, grading permits, landscape and irrigation plans, improvement plans, subdivision maps, parcel maps, boundary adjustments, reversions, mergers, certificates of compliance, plats, dedications, convenants, agreements, and related reports, studies, calculations, exhibits, and permits, and to inspect and administer the construction of same, and to ascertain or determine their compliance with the Grading Ordinance, Subdivision Ord- inance, State Subdivision Map Act, and any other applicable local, county, state or federal code, statute, policy or regulation. Resolution No. 325 Page 2 5o That from time to time, the City Engineer or other duly authorized officer, may cause an accounting to be made of the City's charges against any such deposits. If the actual costs incurred by the City, including a reasonable charge for overhead, exceed the deposits paid, the applicant, subdivider, permittee, owner, or appropriate party shall, upon demand by the City, deposit with the City, an additional sum in an amount deemed sufficient by the City Engineer, to complete the work in progress or to make up any shortage. If such additional deposit is not paid upon demand, the City may recover the same by action in any court of competent jurisdiction. Until any such additional deposit is made, any pending sub- division map or parcel map shall not be submitted to the City Council for final map approval, nor shall the City Engineer issue any grading permit or grant any other approval, nor accept for review, any grading or improvement plans or final maps, nor shall any im- provements be accepted or improvement securities be released, which are related to the deficit account. That should an accounting show that any deposit is in excess of the charges incurred, including overhead, such excess shall be returned to the depositor within a reasonable period after completion of the required improvements on the subdivision or parcel map and their final inspection and approval by the City Engineer and/or City Council, or after the recordation of the final subdivision or parcel map, where no im- provements are required, or after the completion and approval of the grading, or other permitted work, whichever shall be the case. PASSED, ADOPTED, and APPROVED by the City Council of the City of Poway, California, at a regular meeting thereof this 28th day of December, 1982. ATTEST: Ma~ Shep~{rdson, Mayor Marjor~ie~.K. Wahlsten, City Clerk CITY OF POWAY Schedule of Fees and Deposits for Grading, Subdivision, and Permit Activities 1. GRADING PERMIT FEE so Regular Permit ...................... $6.00 per 1,000 cu. yd. up to (Section 87.218) 100,000 cu. yd, and $4.00 per 1,000 cu. yd. thereafter; minimum: $10 bo Permit issued after start ........... Regular permit fee plus $50 of grading. (Section 87.220) 2. GRADING PLAN CHECKING DEPOSIT (Section 87.216 and 87.217) a. Preliminary deposit: to be paid prior to any review or checking) Grading Plans ....................... $300/sheet; if four or more sheets: erosion control plans: ............ $200/sheet Landscape/irrigation plans .......... $300/sheet; if four of more sheets: $200/sheet Report review ....................... $50/report. Geotechnical, geologic, geohydrolic, and agronomic) b. Final deposit: to be paid prior to permit issuance) Grading, erorion control, land-. .... 3 1/2% of improvement costs scape/irrigation plans: NOTE: Preliminary checking deposits shall be credited against the final checking deposit amounts. If the preliminary checking deposit exceeds the final deposit, no final deposit is required. GRADING INSPECTION DEPOSIT~ ............. 3% of Improvement Costs (Section 87.219) NOTE: Improvement costs shall include grading, landscaping and irrigation of slopes; and on-site drainage control. Total cost estimate shall include 10% for contingencies and is subject to the approval of the City Engineer. -2- FINAL MAP CHE~ING DEPOSIT (Section 81.402) Includes subdivision maps, parcel maps, ................ $300/sheet reversion maps, condominium maps, merger maps 5. BOUNDARY ADJUSTMENT REVIEW DEPOSIT (Section 81.502 Including adjustment Certificate of Compliance ......... $450 6. CERTIFICATE OF COMPLIANCE DEPOSIT ..................... $350 7. CERTIFICATE OF COMPLIANCE DEPOSIT (Final Map Waiver)...$400 8. MERGER (WITHOUT PARCEL MAP) DEPOSIT (Section 81.408.2).$250 9. REPRODUCIBLE MYLAR COPY OF RECORDED MAP AND PRINTS ..... Actual cost of (Section 81.406) if not provided by subdivider duplication plus $10 10. MAp RECORDATION FEE (Section 81.406) .................. Actual cost per County (if recorded by City) Recorder's schedule plus $10 11. STAY APPLICATION DEPOSIT (Section 81.309) .............. $400 12. IMPROVEMENT PLAN CHECKING DEPOSIT (Section 81.704.1) a. Preliminary deposit (to be paid prior .............. $400/sheet; if four to any review or checking) or more sheets: $250/shee b. Final deposit (to be paid prior to ................. 3 1/2% of improvement cost plan approval, or approval of any final map, whichever occurs first) NOTE: Preliminary plan checking deposit shall be credited against the final checking deposit. If the preliminary deposit exceeds the final deposit, no final deposit is required. 13. IMPROVEMENT INSPECTION DEPOSIT (Section 81.801) ........ 3% of improvement costs NOTE: Improvement cost amounts shall include 10% for contingencies and is subject to the approval of the City Engineer. 14. CONSTRUCTION PERMIT FEES a. Issuance Fee: ...................................... $10/each permit -3- b. Miscellaneous Inspection ..................... $ 5 minimum on each) 1. curb and gutter .......................... $ 0.15 per linear foot 2. sidewalk ................................. $ 0.05 per square foot 3. driveway (curb cut% ...................... $ 30 each 4. pipeline or conduit installation ......... $ 0.05 per linear foot 5. pavement or pavement replacement ......... $ 0.05 per square foot 6. curb drains .............................. $ 10 each 15. UTILITY PERMITS~ Applicable to Pacific Telephone, SDG&E, Cable TV franchises, and other bone fide public utilities and franchise holders, as defined by State law. a. Issuance Fee ............................. $ 10/each permit or $200/yr. b. Inspection ............................... Office engineering and in- spection costs at actual cost, plus overhead.