Loading...
Storm Water Management Facilities Maintenance Agreement 2011-0327700RECORDING REQUESTED BY: CITY OF POWAY �� 1 AND WHEN RECORDED MAIL TO: DOC# 2011-0327700 IIIIIIIIIIIIIIIIIIIIIIIIIINdlllllllilllllllllllllllllllllllllill CITY CLERK 1, CITY OF POWAY P O BOX 789 POWAY, CA 92074 JUN 28, 2011 12:56 PM OFFICIAL RECORDS SAN DIEGO COUNTY RECORDER'S OFFICE Ernest J. Dronenburg, Jr., COUNTY RECORDER FEES: 0.00 WAYS: 2 OC: NA PAGES: 29 (THIS SPACE FOR RECORDER'S USE) APN: 277 - 220 -34 STORM WATER MANAGEMENT FACILITIES MAINTENANCE AGREEMENT (G1631-09) The undersigned grantor(s) declares: Documentary Transfer Tax is $ -0- pursuant to R & T Code 11922 (conveyance to a Government Agency) This AGREEMENT for the maintenance and repair of certain Storm Water Management Facilities is entered into between the Kathawa Family Trust 7 -24 -03 (hereinafter referred to as "OWNER ") and the City of Poway (hereinafter referred to as "CITY ") for the benefit of the CITY, the OWNER, the successors in interest to the CITY or the OWNER, and the public generally. WHEREAS, OWNER is the owner of certain real property located in the City of Poway, California, more particularly described in Exhibit "A" hereto (hereinafter referred to as the "PROPERTY "), and has proposed that the PROPERTY be developed as a single - family residence in accordance with MDRA 08 -22 and Grading Permit No. G1631 -09, which are on file with the CITY. This Agreement is required as a condition of approval for such development. WHEREAS, in accordance with the City of Poway's Standard Urban Storm Water Mitigation Plan, Poway Municipal Code, Chapter 16, Division VI (the "SUSMP Ordinance "), the City of Poway Subdivision Ordinance, the City of Poway Zoning Ordinance, the City of Poway Grading Ordinance and /or other ordinances or regulations of CITY which regulate land development and urban runoff, OWNER has proposed that storm water runoff from the PROPERTY be managed by the use of the following Storm Water Management Facilities which are identified as "Best Management Practices" or "BMPs Self- retaining drainage management areas located to the northwest of the residence as shown on the approved grading plans; Pervious paver sections located in the driveway as shown on the approved grading plans; and A bio- retention area located in the center of the driveway turnaround area as shown on the approved grading plans. The precise location(s) and extent of the BMPs that are required are indicated on the Grading and Drainage Plan dated July 24, 2009, on file with CITY's Development Services Department as I1 -08"3 G1631 -09. The manner and standards by which the BMPs must be repaired and maintained in order to retain their effectiveness are as set forth in the Operation and Maintenance Plan (hereinafter "O &M PLAN ") which is attached hereto and incorporated herein as Exhibit "B ". WHEREAS, OWNER's representations that the BMPs will be maintained have been relied upon by CITY in approving OWNER's development applications. It is the purpose of this Agreement to assure that the BMPs are maintained, by creating obligations that are enforceable against the OWNER and the OWNER's successors in interest in the PROPERTY. It is intended that these obligations be enforceable notwithstanding other provisions related to BMP maintenance that are provided by law. NOW, THEREFORE, for consideration of (a) CITY's approval of the above development applications and (b) the mutual covenants set forth herein, IT IS HEREBY AGREED AS FOLLOWS: Maintenance of Storm Water Management Facilities. OWNER agrees, for itself and its successors in interest, to all or any portion of the PROPERTY, to comply in all respects with the requirements of the SUSMP Ordinance with regards to the maintenance of BMPs, and in particular agrees to perform, at its sole cost, expense and liability, the following "MAINTENANCE ACTIVITIES ": all inspections, cleaning, repairs, servicing, maintenance and other actions specified in the O &M PLAN, with respect to all of the BMPs listed above, at the times and in the manner specified in the O &M PLAN. OWNER shall keep records of this maintenance and provide copies of such records and annual certification of maintenance as requested by CITY. OWNER shall initiate, perform and complete all MAINTENANCE ACTIVITIES at the required time, without request or demand from CITY or any other agency. OWNER further agrees that "MAINTENANCE ACTIVITIES" shall include replacement or modification of the BMPs in the event of failure. Failure shall be defined as a loss of volume /capacity and /or permeability of the BMPs. In the event of a failure OWNER may elect to hire an Engineer to confirm the failure, but the City must make the final determination after considering all information. Replacement shall be with an identical type, size and model of BMP, except that: (a) At OWNER's request, the CITY's Engineer may authorize substitution of an alternative BMP if he or she determines that it will be as effective as the failed BMP; and (b) If the failure of the BMP, in the judgment of the CITY's Engineer indicates that the BMP in use is inappropriate or inadequate to the circumstances, the BMP must be modified or replaced with a more effective BMP to prevent future failure in the same or similar circumstances. This could only occur in the event of a failure. 2. Notices. OWNER further agrees that it shall, prior to transferring ownership of any land on which any of the above BMPs are located, and also prior to transferring ownership of any such BMP, provide clear written notice of the above maintenance obligations associated with that BMP to the transferee. OWNER further agrees to provide evidence to CITY Engineer that OWNER has requested the California Department of Real Estate to include in the public report issued for the development of the PROPERTY, a notification regarding the BMP maintenance requirements described herein. 3. CITY's Right to Perform Maintenance. It is agreed that CITY shall have the right, but not the obligation, to elect to perform any or all of the MAINTENANCE ACTIVITIES if, in the CITY's judgment, OWNER has failed to perform the same. OWNER may hire 2 an engineer to confirm the necessity for maintenance, but the final determination will be made by the CITY. Such maintenance by the CITY shall be conducted in accordance with the nuisance abatement procedures set forth in Poway Municipal Code Chapter 8.72. In the case of maintenance performed by the CITY, it may be performed by CITY forces, or a contractor hired by the CITY, at the CITY's sole election. It is recognized and understood that the CITY makes no representation that it intends to or will perform any of the MAINTENANCE ACTIVITIES, and any election by CITY to perform any of the MAINTENANCE ACTIVITIES shall in noway relieve OWNER of its continuing maintenance obligations under this agreement. If CITY elects to perform any of the MAINTENANCE ACTIVITIES, it is understood that CITY shall be deemed to be acting as the agent of the OWNER and said work shall be without warranty or representation by CITY as to safety or effectiveness, shall be deemed to be accepted by OWNER "as is ", and shall be covered by OWNER's indemnity provisions below. Prior to CITY performing any maintenance, CITY shall contact OWNER and give them a reasonable amount of time to perform the maintenance. The time to perform will be based on the types of BMP, the severity of the < maintenance needed, and the requirements of the O&M plan. If CITY performs any of the MAINTENANCE ACTIVITIES, after CITY has demanded that OWNER perform the same and OWNER has failed to do so within the time stated in the CITY's demand, then OWNER shall pay all of CITY's costs incurred in performing the MAINTENANCE ACTIVITIES, plus an administrative fee. OWNER's obligation to pay CITY's costs of performing MAINTENANCE ACTIVITIES is a continuing obligation. The City shall give the owner at least 30 days to pay the City's cost of performing the maintenance activities. If OWNER fails to pay CITY's costs for performing the MAINTENANCE ACTIVITIES, CITY may assess a lien on the property or properties of the responsible parties pursuant to the procedures set forth in Poway Municipal Code Chapter 8.72. 4. Grant of Easement to CITY. OWNER hereby grants to CITY a perpetual easement over, under and across that portion of the PROPERTY described in Exhibit "C hereto, for purposes of accessing the BMPs, inspecting the BMPs, and performing any of the MAINTENANCE ACTIVITIES specified in Paragraph 1 above. Prior to routine inspection by the CITY, as required by the Municipal Permit, the CITY shall provide the OWNER a minimum of 3 days' notice prior to entering the property; however, in the event the OWNER fails to provide required maintenance documentation, or in the event a complaint is received related to the performance of the BMPs, or if evidence exists of discharge or potential discharge from the site, the CITY shall have the right, at any time after notice is provided to the OWNER, to enter upon any part of said easement as may be necessary or convenient for such purposes. OWNER shall at all times maintain the PROPERTY so as to make CITY's access clear and unobstructed. 5. Administration of Agreement for CITY. CITY hereby designates the City Engineer as the officer charged with responsibility and authority to administer this Agreement on behalf of CITY. Any notice or communication to CITY related to the implementation of this Agreement shall be addressed to: City Engineer City of Poway 13325 Civic Center Drive Poway, CA 92064 3 The City Engineer is also granted authority to enter into appropriate amendments to this Agreement on behalf of CITY, provided that the amendment is consistent with the purposes of this Agreement as set forth above. 6. Defense and Indemnity. CITY shall not be liable for, and OWNER and its successors in interest shall defend and indemnify CITY and the employees and agents of CITY (collectively "CITY PARTIES "), against any and all claims, demands, liability, judgments, awards, fines, mechanic's liens or other liens, labor disputes, losses, damages, expenses, charges or costs of any kind or character, including attorneys' fees and court costs (hereinafter collectively referred to as "CLAIMS "), related to this Agreement and arising either directly or indirectly from any act, error, omission or negligence of OWNER, OWNER's successors, or their contractors, licensees, agents, servants or employees, including, without limitation, claims caused by the concurrent negligent act, error or omission, whether active or passive, of CITY PARTIES. OWNER shall have no obligation, however, to defend or indemnify CITY PARTIES from a claim if it is determined by a court of competent jurisdiction that such claim was caused by the sole negligence or willful misconduct of CITY PARTIES. Nothing in this Agreement, CITY's approval of the development application or plans and specifications, or inspection of the work is intended to acknowledge responsibility for any such matter, and CITY PARTIES shall have absolutely no responsibility or liability therefore unless otherwise provided by applicable law. 7. Agreement Binds Successors and Runs With the PROPERTY. It is understood and agreed that the terms, covenants and conditions herein contained shall constitute covenants running with the land and shall be binding upon the heirs, executors, administrators, successors and assigns of OWNER and CITY, shall be deemed to be for the benefit of all persons owning any interest in the PROPERTY (including the interest of CITY or its successors in the easement granted herein). It is the intent of the parties hereto that this Agreement shall be recorded and shall be binding upon all persons purchasing or otherwise acquiring all or any lot,' unit or other portion of the PROPERTY, who shall be deemed to have consented to and become bound by all the provisions hereof. 8. OWNER's Continuing Responsibilities Where Work Commenced or Permit Obtained. Notwithstanding any other provision of this Agreement, no transfer or conveyance of the PROPERTY or any portion thereof shall in any way relieve OWNER of or otherwise affect OWNER's responsibilities for installation or maintenance of BMPs which may have arisen under the ordinances or regulations of CITY referred to in this Agreement, or other federal, state or CITY laws, on account of OWNER having obtained a permit which creates such obligations or having commenced' grading, construction or other land disturbance work. 9. Amendment and Release. The terms of this Agreement may be modified only by a written amendment approved and signed by the City Council or the CITY Engineer acting on behalf of CITY and by OWNER or OWNER's successor(s) in interest. This Agreement may be terminated and OWNER and the PROPERTY released from the covenants set forth herein, by a release, which CITY may execute if it determines that another mechanism will assure the ongoing maintenance of the BMPs or that it is no longer necessary to assure such maintenance. 10. Governing Law and Severability. This Agreement shall be governed by the laws of the State of California. Venue in any action related to this Agreement shall be in the Superior Court of the State of California, County of San Diego. In the event that any of the 4 provisions of this Agreement are held to be unenforceable or invalid by any court of competent jurisdiction, the validity, and enforceability of the remaining provisions shall not be affected thereby. IN WITNESS WHEREOF, the parties have executed this Agreement on the dates set forth hereinafter. 5q Wt / Ly r-T 7-1 f 03 OWNER: Date: 2 / Mary C. Kathawa, Trustee CITY OF POWAY: - Date: 6112ehl kcibert J. Man' Director of Development ices APPROVED AS TO FORM: Office of the City Attorney APPROVED AS TO CONTENT: Engineering Division 6 &'14' Mor an L. ey, Cit Attorney Attachments: EXHIBIT A EXHIBIT B EXHIBIT C M:\ engsery \Clapp\Agreements\Soares Storm Water Agmt.docx Z-'� to Crosby, P.E. City Engineer 5 CALIF ORNIA • ACKNOWLED State of California County of /���� /f D On Me 1 G before me, �i��G L :Siy/ ////° �--- Date Here I Nam rt Na and TWe of the Officer // personally appeared ! / C� . �i who proved to me on the basis of satisfactory evidence to be the personN whose namel)4 is/a*subscribed to the within instrument and acknowledged to me that )*she/th* examded the same in (her /tlVz authorized capacity(iW and that by fw(her/11*11 signature(Kon the instrument the person( or the entity upon behalf of PHYLLIS SHINN which the person(Octed, executed the instrument. Commission #t 177611198 Notary Public - California I certify under PENALTY OF PERJURY under the laws San Diego County of the State of California that the foregoing paragraph is MCO"Y"...:Noi9 20 11 t true and correct. WITNESS my han and official senl Signature Place Notary Seal Above Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Signer's Name: ❑ Individual ❑ Individual ❑ Corporate Officer - Title(s): ❑ Corporate Officer — Title(s): ❑ Partner - ❑ Limited ❑ General ❑ Partner - ❑ Limited ❑ General ❑ Attorney in Fact ❑ Attorney in Fact El Trustee Top of thumb here El Trustee Top of thumb here ❑ Guardian or Conservator ❑ Guardian or Conservator ❑ Other: ❑ Other: Signer Is Representing: Signer Is Representing: 02007 National Notary Association • 9350 De Soto Ave., P.O. Box 2402 -Chatsworth, CA 91313 -2402 • www.Nationa[Notmyorg Item #5907 Reorder: Call Too- Free 1- 800 - 876.6627 ■ CALIF • ACKNO WLEDGMENT State of California �� County of = /1� — cc" o On A/E d Z011 before me, 1 LG I �f , L I C— , Date � � Here Insert Name and Title of the Office personally appeared OA 4 /07 `Lf � /.S Name(s) of Signer(s) s who proved to me on the basis of satisfactory evidence to be the person% whose name( is/oe subscribed to the within instrument and acknowledged to me that he /s't tt�y executed the same in his,4Kr/tIj6r authorized capacity(io), and that by his/Krr/tWr signaturelly on the instrument the person(k , or the entity upon Ahalf of which the person(Kacted, executed the instrument. 5�K7 PNY Uis SHiNN ornrniulon # 1778a9i1 I certify under PENALTY OF PERJURY under the laws Notary Pubnc - California of the State of California that the foregoing paragraph is Son DkW County true and correct. Cflrrrr� Nolr9 2011 WITNESS my han5Vrd official seal. Signature Place Notary Seal Above Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Signer's Name: ❑ Individual ❑ Individual ❑ Corporate Officer — Title(s): ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General _ ❑ Partner — ❑ Limited ❑ General ❑ Attorney in Fact - ❑ Attorney in Fact El Trustee Top Top of thumb here of thumb here El Trustee ❑ Guardian or Conservator ❑ Guardian or Conservator ❑ Other: ❑ Other: Signer Is Representing: Signer Is Representing: 02007 National Notary Association • 9350 De Soto Ave., P.O. Box 2402 • Chatsworth, CA 91313 -2402 • www.NabonalNotary.org Item #5907 Reorder: Call Toll -Free 14800. 876 -6827 F War CERTIFICATE OF ACCEPTANCE C/pY IN THE GO This is to, certify that the interest in real property conveyed by the grant of easement contained in the Storm Water Facilities Maintenance Agreement dated April 25, 2011, by the Kathawa Family Trust 7- 24 -03, Grantor, to the City of Poway, Grantee, a political corporation and /or governmental agency is hereby accepted by the undersigned officer or agent on behalf of the City Council pursuant to authority conferred by Resolution No. 34 adopted on January 20, 1981, and the grantee consents to recordation thereof by its duly authorized officer. Dated: CITY OF POWAY Seal: y: L' da A. Troyan, MM ity Clerk E "A" PARCEL 1 LOT 34 OF CITY OF POWAY TRACT NO. 98--02 HERITAGE RANCH ESTATES, IN THE CITY OF POWAY, COUNTY OF SAN D IEGO, STATE OF CALIFORN ACCORDING TO MAP THEREOF NANO. 1438£3, FILED I N THE OFFICE OF T COUNTY RECORDER OF SAN D COUNTY, MAY 8, 2002 PARCEL 2: AN EASEMENT AND RIGHT OF WAY FOR ROAD AND UTILITY PURPOSES, LIVER., UNDER, ALONG AND ACROSS LOT "F" (COMMONLY I <NOWN, AG ` "OLD COACH DRIVE "), LOT "H " (COMMONLY KNOWN AS 'OLD COACH DRIVE " ) OT " (COMMONLY KNOWN AS "OLD COACH DRIVE " AND LOT "'K" (COMMONLY KNOWN AS "OLD COACH WAY ") , OF CITY OF POWAY TRACT ,N(I , 8.9 -13Nt, THE HENt I TALE , PHASE 1 ; UN IT 1 ; ACCORDING TO MAP THEREOF NO. 13708, FILED IN SAID COUNTY RECORDER' OFF PARCEL 3: NONEXCLUSI EASEMENTS FOR A I NGRESS, EGRESS, INSPECTION MAINTENANCE, REPAI DRAINAGE ENCROACHMENT, SUPPORT. AND FOR OTHER PURPOSES, A LL AS DESCR 1,8ED . I N THE IIECLAI ATION, AND ANY AMENOMI51 S THERETO. t7��+Cr�i4�?Z/26J9�•i� EXHIBIT "B" Lot 34, Heritage Ranch Estates Operation and Maintenance plan for Treatment BMPs G163 -09 City of Poway, Ca. - October 14, 2010 Prepared For: Keith Soares 14170 ]Bryce Point Poway, CA 92064 pR4FE K F, y9� Prepared By: :° "� Goss Florez Engineering fZ,� 10732 Charbono Terrace 9 �F c /Vti,'"� San Diego CA, 92131 (8S$) 229 -2493 1) C 1 3 2010 DEV CIT O F PowAY MENT SEFi%CES TABLE OF CONTENTS INTRODUCTION BIOFILTERS 3.0 GRASS SWALE 3.1 INSPECTION FREQUENCY 3.2 ESTHETIC AND FUNCTIONAL MAINTENANCE 3.3 PREVENTIVE MAINTENANCE 3.4 CORRECTIVE MAINTENANCE 3.5 MAINTENANCE FREQUENCY 4.0 PERMEABLE PAVERS 4.1 DESCRIPTION AND PURPOSE 4.2 DESIGN ALTERNATIVES 4.3 EFFECTIVENESS 4.4 FEATURES 4.5 INFILTRATION RATE AND DRAINAGE 4.6 STONE PAVERS MAINTENANCE 5.0 FISCAL RESOURCES - POST BMP MAINTENANCE AND MAINTENANCE ASSURANCE 5.1 MAINTENANCE MECHANISM TO BE IN PLACE BEFORE ACCEPTANCE 5.2 VERIFICATION MECHANISMS 5.3 RESPONSIBLE PARTY ATTACHMENT A. POST - CONSTRUCTION BMP PLAN VICINITY MAP ° NCH Ro HERTITABE SITE DR. O� 9 C� BISCAYN a � FL MADERAS GO LF CL UB VICINITY MAP SCALE 'THOMAS BROS: 1150 - G6 1.0 INTRODUCTION This operation and maintenance plan is provided to establish mechanisms and guidelines for maintaining post- construction BMWs listed in the Water Quality Technical Report for-Lot 34, Heritage Ranch Estates. This plan will address maintenance funding methods in accordance with the City of Poway. This plan categorizes the maintenance activities to assure post- construction BMW's will be adhered to. 2.0 BIOFILTERS - GRASS SWALE & STONE PAVERS A grass -lined bio filtration swale and strips of permeable stone pavers will be developed and incorporated into the final design to assist in reducing cumulative impacts to downstream bodies of water to the maximum extend practicable. 3.0 GRASS SWALE The operational and maintenance needs of a grass Swale are: w • Vegetation management to maintain adequate hydraulic functioning and to limit habitat .for disease - carrying animals. • Periodic sediment removal to optimize performance. +� Trash, debris and grass trimmings to prevent obstruction of a Swale and monitoring equipment. + Removal of standing water, which may contribute to the development of aquatic plant communities or mosquito breeding areas. 3.1 Inspection Frequency • Once a month at a minimum. • After every large storm (after every storm monitored or those storms with more than 0.50 inch of precipitation.) • On a weekly basis during extended periods of wet weather. 3.2 Aesthetic and Functional Maintenance Functional ma"mtenance is important for performance and safety reasons. Aesthetic Maintenance The following activities will be included in the aesthetic maintenance program: • Grass Trimming. Trimming of grass will be done on the swale, around fences, at the inlet and outlet structures, and sampling structures. • Weed Control. Weeds will be removed through mechanical means. Herbicide will not be used because these chemicals may impact the water quality monitoring. Functional Maintenance Functional maintenance has two components: Preventive maintenance and Corrective maintenance. 3.3 Preventive Maintenance Preventive maintenance activities to be instituted at a grass swale are: • Grass Mowing. Vegetation seed mix (Bermuda grass or similar) within the swale is designed to be kept short not to exceed 2/3 of the flow depth to maintain adequate hydraulic functioning and to limit the development of faunal habitats. • Trash and Debris. During each inspection and maintenance visit to the site, debris and trash removal will be conducted to reduce the potential for inlet and outlet structures and other components from becoming clogged and inoperable during storm events. • Sediment Removal. Sediment accumulation, as part of the operation and maintenance program at a Swale, will be monitored once a month during the dry season, after every large storm (0.50 inch). Specifically, if sediment reaches a level at or near plant height, or could interfere with flow or operation, the sediment will be removed. If accumulation of debris or sediment is determined to be the cause of decline in design performance, prompt action (i.e., within ten working days) will be taken to restore the Swale to design performance standards. Actions will include using additional fill and vegetation and/or removing accumulated sediment to correct channeling or ponding. Characterization and Appropriate disposal of sediment will comply with applicable local, county, state, or federal requirements. The swale will be regraded, if the flow gradient has changed, and then replanted with sod. • Removal of Standing Water. Standing water must be removed if it contributes to the development of aquatic plant communities or mosquito breeding areas. • Fertilization and Irrigation. The vegetation seed mix (Bermuda grass or similar) has been designed so that fertilization and irrigation is not necessary. Fertilizers and irrigation will not be used to maintain the vegetation. • Eliminatidn of Mosquito Breeding Habitats. The most effective mosquito control program is one that eliminates potential breeding habitats. 3.4 Corrective Maintenance Corrective maintenance is required on an emergency or non - routine basis to correct problems and to restore the intended operation and safe function of a Swale. Corrective maintenance activities include: • Removal of Debris and Sediment. Sediment, debris, and trash„ which impede the hydraulic functioning of a Swale and prevent vegetative growth, will be removed and properly disposed. Temporary arrangements will be made for handling the sediments until a permanent arrangement is made. Vegetation will be re- established after sediment removal. • Structural Repairs. Once deemed necessary, repairs to structural components of a Swale and its inlet and outlet structures will be done within 10 working days. Qualified individuals (i.e., the designers or contractors) will conduct repairs where structural damage has occurred. • Embankment and Slope Repairs. Once deemed necessary, damage to the embankments and slopes of Swales will be repaired within 10 working days). • Erosion Repair. Where a reseeding program has been ineffective, or where other factors have created erosive conditions (i.e., pedestrian traffic, concentrated flow, etc.), corrective steps will be taken to prevent loss of soil and any subsequent danger to the performance of a Swale. There are a number of corrective actions than can be taken. These include erosion control blankets, riprap, sodding, or reduced flow through the area. Designers or contractors will be consulted to address erosion problems if the. solution is not evident.. • General Facility Maintenance. In addition to the above elements of corrective maintenance, general corrective maintenance will address the overall facility and its associated components. If corrective maintenance is being done to one component, other components will be inspected to see if maintenance is needed. 3.5 Maintenance Frequency Maintenance of vegetative swales primarily involves maintenance of the grass cover. Slopes should be inspected for erosion or rills or gullies on an annual basis (semi - annual first year). The maintenance program can be part of the regular landscape maintenance of the site, administered by the responsible party, N 4.0 PERMEABLE PAVERS 41 DESCRIPTION AND PURPOSE Porous pavements have the potential to be an effective ultra -urban BMP. Different types of porous pavements commercially available include porous asphalt and concrete surfaces, as well as several types of lattice -type pavers (hollow concrete blocks and paving stones). Vhle conventional pavement results in increased rates and volumes of surface runoff, porous pavements, when properly constructed and maintained, allow some of the stormwater to percolate naturally through the pavement and enter the soil below. This helps to retain the natural iri$ltration rate facilitating groundwater recharge and maintaining base flows in urbanized streams while providing the structural and functional features needed for the roadway, parking lot, or sidewalk. The paving surface, subgrade, and installation requirements of porous pavements are more complex than those for conventional asphalt or concrete surfaces. For porous pavements to function properly over an expected life span of 15 to 20 years, they must be properly sited and carefully designed and installed, as well as periodically maintained. A failure to properly test for soil drainage capacity and water table height, and a failure to protect paved areas from construction - related sediment losses, can result in their premature clogging and failure. The proper operation of porous pavements may also be a problem in regions that apply large amounts bf road salt and where heavy truck loads are a problem. 4.2 DESIGN ALTERNATIVES Porous pavement systems generally consist of at least four different layers of material. The top or wearing layer consists of either asphalt or concrete with a greater than normal percentage of voids (typically 1220 percenf in the case of asphalt). The wearing layer may also be comprised of lattice -type pavers (either hollow concrete blocks or paving stones made from solid conventional concrete or stone) that are set in a bedding material (sand, pea -sized gravel or turf grass). Below the wearing layer, a stone reservoir layer or a thick layer of aggregate (e.g., 50 mm [2 in] stone). provides the bulk of the water storage capacity for a porous pavement system. In the pavement design, it is important to ensure that this reservoir layer retains its load bearing capacity under saturated conditions because it may take several days for complete drainage to . occur. . Typically, porous pavement designs include two (or more) transition layers that can be constructed from 25 to 50 mm diameter stone. One transition layer separates the top wearing layer from the underlying stone reservoir layer. Another transition layer is used to separate the stone reservoir from the undisturbed subgrade soil. Some designs also add a geotextile layer to this bottom layer or some combination of stones and geotextile. Porous asphalt pavement, for example, consists of open grade asphalt mixture ranging. in depth from 50 to 100 mm with 16 percent voids. The thickness selected depends on bearing strength and pavement design requirements. This layer sits on a 25 to 50 mm transition layer located over a stone reservoir. The bottom layer completes the transition to the underlying undisturbed soil using a combination- transition/filter fabric layer, Modular paving stones are also used to create porous pavements. These pavements can be constructed in situ by pouring concrete into special frames or by using preformed blocks. The top layer for these porous pavements consists of conventional concrete, with the intervening void areas filled with either turf or sand. A transition or bedding layer is used to make the transition to the reservoir layer. These lattice -type pavers or hollow concrete blocks are often used in conjunction with turf grasses and are used in low - traffic parking lots, lanes, or driveways. Porous pavements using paving stones have similar construction, but can be designed to have a much higher load bearing capacity, and therefore have more widespread applicability. Construction guidelines and design specifications are available from the manufacturers of these products. 4.3 EFFECTIVENESS When operating properly, porous pavements are as effective at removing pollutants from stormwater as other infiltration devices. Also like other infiltration BMPs, porous pavements are not designed to sustain a high removal rate for suspended sediment. While initial removal rates for suspended sediment are very high, the removal process causes clogging of the pavement and subsequently reduces its infiltration capacity. As the infiltration capacity decreases, so does the capture and treatment of runoff pollutants. Careful attention to maintenance~ is necessary to reduce the potential for clogging. In addition, all adjacent areas should be stabilized to prevent sediment from washing onto the pavement surface to prevent premature clogging. Hossain and Scofield (199 1) found that a test section of porous pavement performed satisfactorily over five years. Although a slight decrease in the infiltration rate occurred, both the infiltration rate and storage capacity were above design values. Typical removal rates based on load reductions observed are summarized in Table 17. Table 17. Pollutant removal effectiveness for porous pavement ( °�) Study I TSSZ z TP I TN NO3 l M l Comments MWCi (1983) 95 160 f 88 - 99 .Rainfall Hogland et al. (1987) 1 95 171 -3051 - 1607 1 ; 33 -96 f Snow: i Prior agricultural land use in the area. 2 High loadings of TSS significantly reduce the life expectancy of porous pavement Bws. 4.4 FEATURES Features of PAVING STONES The unique design features funnel -like openings in the pavement surface which facilitate rainwater infiltration, thereby reducing or eliminating stormwater runoff and maximizing groundwater recharge and/or storage. • Lessens or eliminates downstream flooding, stream bed and bank erosion and mitigates pollution impact >on surrounding surface waters. • Decreases project costs by reducing or eliminating drainage and retention systems required by impermeable pavements and reduces cost of compliance with many stormwater regulatory requirements. • Permits better land -use planning, allowing more efficient use of available land for greater economic value • Provides a highly durable, yet permeable pavement surface capable of supporting vehicular loads. g 4.5 INFMTRATION RATE AND DRAINAGE The permeability and amount of infiltration are dependent on the infiltration rates of the joint and drainage open material, the bedding layer material, and base materials. With permeable subgrades, all the water may be drained directly into the subgrade, or if desired, may be diverted to lateral storage or drainage systems. To help maximize infiltration, the subgrade should have less than 5% passing the No. 200 (0.075 mm) sieve, though other soils may drain adequately depending on site conditions and specific characteristics. With virtually all pavements, including permeable pavements, compaction of the subgrade soil is required to ensure adequate structural stability and to minimize rutting. However, compaction does reduce the infiltration rate of soils. Therefore, this should be considered in the drainage design calculations for the project. Typically, the soil subgrade should be compacted to at least 95% standard Proctor density for pedestrian pavements, and to a minimum 95% modified Proctor density for vehicular applications. Some native soils, typically silty sands and sands, have enough strength (a soaked CBR of at least 5 %) that compaction may not be required. TYP. NO.8 AGGREGATE IN OPENINGS ECO -STONE CONCRETE PAVERS 3 1/8" (80 mm) THICK CURB/EDGE RESTRAINT WITH CUT-OUTS FOR OVERFLOW DRAINAGE (CURB SHOWN) BEDDING COURSE 1 112" TO 2" (40 TO 50 mm) THICK (TYP. NO., 8 AGGREGATE) 4;4100 MM) THICK NO. 57 STONE O EN- GRADED BASE MIN. 6" (150 MM) THICK NO.2 STONE SUBBASE OPTIONAL GEOTEXTILE ON BOTTOM AND SIDES OF OPEN - GRADED BASE PERFORATED PIPES SPACED AND SLOPED TO DRAIN ALL STORED WATER OUTFALL PIPE(S) SLOPED TO STORM SEWER OR STREAM SOIL SUBGRADE SLOPED TO DRAIN TYPICAL PAVER SECTION 4.6. STONE PAVERS INSPECTION & MAINTENANCE The primary maintenance requirement for permeable pavers is to clean the surface drainage voids Fine debris and dirt accumulate in the drainage openings and reduce the pavement's flow capacity: It is natural for clogging to occur over time, but routine maintenance can reduce this problem. A maintenance checklist follows: • Inspection of the site should occur monthly for the fast few months after construction. Then inspections are to occur on an annual basis, preferably after rain events when clogging will be obvious. Conventional street sweepers equipped with vacuums, water, and brushes can be used to restore permeability. Vacuum sweep four (4) times a year, properly disposing of the removed material. Follow the sweeping with high-pressure hosing of the surface pores. If necessary, add additional aggregate fill material made up of clean gravel. Damaged interlocking paying blocks are to be replaced. Even though some irreplaceable loss in permeability should be expected over the paver's lifetime, you can increase the longevity of the system by following the maintenance schedule for vacuum sweeping and high-pressu washing, restricting the area's use by heavy vehicles, limiting the use of de -icing chemicals and sand, and implementing a stringent sediment control plan. 0 $A FISCAL RESOURCES — Post BMP Maintenance and Maintenance Assurance 51 Maintenanee mechanism to be in place before acceptance. (Section 16.108.010 of MC) • Structural BMWs shall not be considered "effective," and shall not be accepted as meeting the MEP standard, unless a mechanism is in place that will ensure ongoing long -term maintenance of all structural BWs. As part of project review, if aproject proponent is required to include interim or permanent structural BWs in project plans, and if the Director of Development Services does not provide a mechanism for BMW maintenance, the project proponent shall provide verification of maintenance requirements through such means as may be appropriate, at the discretion of the Director of Development Services, including, but not limited to covenants, legal agreements, maintenance agreements, and/or conditional use permits. (Ord. 569 § 2, 2002) 5.2 Verification mechanisms. (Section 16.108.030 of MC) • In all instances, the project proponent shall provide proof of execution of an approved method of maintenance repair and replacement before the issuance of construction approvals. r The party responsible for the structural BW maintenance shall provide to the City annual written verification of effective operation and maintenance of each approved treatment control BMP. (Ord. 671 § 67, 2008; Ord. 569 § 2, 2002) 5.3 Responsible Party. • The property owners are responsible for all inspection and maintenance activities as outlined in this plan. , N Lot 34, Heritage Ranch Estates Operation and Maintenance plan for Treatment BMPs G1631 - ADDENDUM City of Poway, Ca. April 13, 2011 Prepared For: Keith Soares 14170 Bryce Point Poway, CA 92064 Prepared By: Florez Engineering 10732 Charbono Terrace San Diego CA, 92131 (858) 229 -2493 K w a No. 0055555 EXP. 12 -31_ �2 INTRODUCTION 1.0 SELF TREATING AREAS 2.0 OPERATION AND MAINTENANCE (Self Treating Areas) 2.1 MOWING 2.2 GENERAL MAINTENANCE 2.3 INSPECTION FREQUENCY AND REQUIREMENTS 2.4 MAINTENANCE FREQUENCY AND REQUIREMENTS 3.0 BIO RETENTION CELLS 4.0 OPERATION AND MAINTENANCE (Bioretention Cells) 4.1 GENERAL MAINTENANCE 4.2 INSPECTION FREQUENCY AND REQUIREMENTS 4.3 MAINTENANCE FREQUENCY AND REQUIREMENTS INTRODUCTION The purpose of this addendum to the operation and maintenance plan is to propose the use of self - retaining areas as an LID measure as an alternative to the originally proposed grass Swale for water quality treatment for the upper section of the proposed concrete driveway. This addendum is intended to replace Section 3 of the original O &M plan. 1.0 Self- Retaining Areas Self- retaining areas are designed to retain the first one inch of rainfall without producing any runoff. The technique works best on flat, heavily landscaped areas such as the area available for treatment in this project. To create self - retaining turf and landscape areas in flat areas depress the grade into a concave cross- section so that these areas will retain the first inch of rainfall. Specify slopes, if any, toward the center of the pervious area. Inlets of area drains, if any, should be set 3 inches above the low point to allow ponding. Areas draining to self - retaining areas. Runoff from the impervious driveway can be managed by routing it to the proposed self - retaining pervious areas. The driveway can be sloped toward the landscaped areas. The maximum ratio is 2 parts impervious area for every I part pervious area. The drainage from the impervious area must be directed to and dispersed within the pervious area, and the entire area must be designed to retain an inch of rainfall without flowing off -site. In this case the maximum ratio of 2 parts impervious area into l part pervious area is used, then the pervious area must absorb 3 inches of water over its surface before overflowing to an off- -site drain to retain an inch of rainfall. 2.0 Operation and Maintenance (Self - retaining Areas) The proper functioning of self-retaining areas depends on their long -term maintenance. While maintenance is relatively minimal and similar to regular landscaped areas, extra care must be taken to maintain the area's pollutant removal and infiltration capacity. This is accomplished by maintaining soil structure; caring for soil invertebrates, mulching as needed, and periodic removal of debris. In general, maintenance strategies should reflect a commitment to environmentally sensitive methods. Such methods typically favor physical labor over chemical applications; the use of low- toxicity, low - residue compounds; and strategies such as Integrated Pest Management. ■ 2.1 Mowing Mowing is recoirnmended for grassed areas where turf grass is the only plant - type. Minimal grass height should not be shorter than 2" for turf grasses and 3" for native grasses. Mowing should be scheduled so as to maintain a neat, trim appearance. High -use areas should be mowed at a frequency of once a week during the peak growing season (late spring and early fall). However, these areas should be mowed less frequently during early spring, mid- summer and late fall when blade growth is much slower. Low use areas should be mowed less frequently, perhaps as infrequently as once a year, as dictated by on -site needs and landowner preference. 2.2 General Maintenance Trash and Debris. During each inspection and maintenance visit to the site, debris and trash removal will be conducted to reduce the potential for inlet and outlet structures and other components from becoming clogged and inoperable during storm events. Sediment Removal. Sediment accumulation, as part of the operation and maintenance program at a self retaining area will be monitored once a month during the dry season, after every large storm (0.50 inch). Specifically, if sediment reaches a level at or near plant height, or could interfere with flow or operation, the sediment will be removed. If accumulation of debris or sediment is determined to be the cause of decline in design performance, prompt action (i.e., within ten working days) will be taken to restore the self - retaining area to design performance standards. Actions will include .using additional fill and vegetation and/or removing accumulated sediment to correct channeling or ponding. Characterization and Appropriate disposal of sediment will comply with applicable local, county, state, or federal requirements. Removal of Standing Water. Standing water must be removed if it contributes to the development of aquatic plant communities or mosquito breeding areas. Fertilization and Irrigation. The vegetation seed mix (Bermuda grass or similar) has been designed so that fertilization and irrigation is not necessary. Fertilizers and irrigation will not be used to maintain the vegetation. 2.3 Inspection Frequency and Requirements Frequency • Once a month at a minimum. • After every large storm (after every storm monitored or those storms with more than 0.50 inch of precipitation.) On a weekly basis during extended periods of wet weather. Requirements(Visu al Observation) • Monitor height of grass. • Inspect for debris accumulation. • Inspect for accumulated sediment around yard drains 2.4 Maintenance Frequency and Requirements Frequency • Twice a month at a minimum during peak growing season (late spring and early fall). • Once a month when blade growth is much slower (early spring, mid- summer and late fall). Requirements • Mowing maintenance of the grass cover. • Removal of debris and sediment accumulation. • Weed Control. 3.0 Bioretention Cells Bioretention cells are a terrestrial- based, water quality and water quantity control practice using the chemical, biological, and physical properties of plants, microbes, and soils for removal of pollutants from stormwater runoff. Some of the processes that may take place in a bioretention facility include sedimentation, adsorption, filtration, volatilization, ion exchange, decomposition, phytoremediation, bioremediation, and storage capacity. 4.0 Operation and Maintenance (Bioretention Cell) The proper functioning of bioretention cells depends on their long -term maintenance. While maintenance is relatively minimal and similar to regular landscaped areas, extra care must be taken to maintain the area's pollutant removal and infiltration capacity. This is accomplished by maintaining soil structure, caring for soil invertebrates, mulching as needed, and periodic removal of debris. In general, maintenance strategies should reflect a commitment to environmentally sensitive methods. Such methods typically favor physical labor over chemical applications; the use of low- toxicity, low- residue compounds; and strategies such as Integrated Pest Management. 4.1 General Maintenance Trash and Debris. During each inspection and maintenance visit to the site, debris and trash removal will be conducted to reduce the potential for outlet pipes and other components from becoming clogged and inoperable during storm events. Sediment Removal. Sediment accumulation, as part of the operation and maintenance program at a bioretention cell will be monitored once a month during the dry season, after every large storm. (0.50 inch). Specifically, if sediment reaches a level at or near plant height, or could interfere with flow or operation, the sediment will be removed. If accumulation of debris or sediment is determined to be the cause of decline-in design performance, prompt action (i.e., within ten working days) will be taken to restore the self - retaining area to design performance standards. Actions will include using additional fill and vegetation and/or removing accumulated sediment to correct channeling or ponding. Characterization and Appropriate disposal of sediment will comply with applicable local, county, state, or federal requirements. Removal of Standing Water. Standing water must be removed if it contributes to the development of aquatic plant communities or mosquito breeding areas. 4.2 Inspection Frequency and Requirements Frequency • Once a month at a minimum. • After every large storm (after every storm monitored or those storms with more than 0.50 inch of precipitation.) • On a weekly basis during extended periods of wet weather. Requirements (Visual Observation) • Inspect the bioretention area for proper drawdown or evidence of clogging • Inspect for debris accumulation. • Inspect for accumulated sediment around yard drains 4.3 Maintenance Frequency and Requirements Frequency • Once a month at a minimum during peak growing season (late spring and early fall). Requirements • Removal of debris and sediment accumulation. • Check condition of soil mix and replace as necessary • Check condition of the outlet pipe and replace if cracked or damaged l EXHIBIT "C" That portion of lot 34 of Heritage Ranch Estates Subdivision, in the County of San Diego, State of California, according to Map thereof No. 14388, More particularly described as follows. Beginning at the most Southeast corner of said lot 34, which point is on the west side of a 40.00 foot right -of -way, having a curve concaved to the southeast, a radius of 420.00 feet, also having a radial bearing of N 78 °43'26" W, thence northeast along said right -of -way through a central angle of 4 °4839 ", a length of 35.26 feet to the TRUE POINT OF BEGINNING; thence continuing northeasterly along said curve and right -of -way, through a central angle of 3 °2439" a length of 25.00 feet; thence leaving said curve N 72 °12'29" W, a distance of 23.69 feet to the beginning of a tangent curve concaved to the northeast having a radius of 122.50 feet; thence northerly along said curve through a central angle of 95 °11'51 ", a length of 203.53 feet to a tangent line; thence N 22 °59 22 " E, 27.00 feet, thence N 35 °13'33" E, a distance of 84.86 feet; thence N 36 °40'52" W, a distance of 229.02 feet to an intersection with the north line of said lot 34; thence along said north line S 52 °38'13" W, a distance of 35.51 feet; thence leaving said north line S 11 °30'48 W, a distance of 82.26 feet; thence S 12 °49'13" E, a distance of 33.29 feet; thence S 43 °13 "50" E, a distance of 149.06 feet; thence S 22 "59'22 " W, a distance of 27.00 feet to a tangent curve concaved northeast, having a radius of 147.50 feet; thence southerly along said curve through a central angle of 95 °11'51 ", a length of 245.07 feet to a tangent line; thence S 72 °12'29" E, a distance of 23.69 feet to the TRIBE POINT OF BEGINNING. 0.678 ACRES Legal description prepared by; Kappa Surveying, Inc. 7 date.May9,2011 Allen R. A. Turner III, PLS Registration expires December 31, 2012 . EXH IB I T "C" " LOT 32 / EXISTING OPEN SPACE EASEMENT I S52 °38'13 "W / PER FINAL MAP 14388 (TYP) I 35.51 LOT 34 I S11 ° 30'48 "W • 82.26' �� • . • INDICATES AREA FOR 60.14 a'° ACCESS /MAINTENANCE I O, OF PERMANENT BMP'S ' i PER OPERATIONS & \ �'' �, •• MAINTENANCE PLAN S 12 ° 49' 13iE �sr / 33.29' 0 \ u i \ O, - ii? N35 T3'33 "E F loll :Z(4 . 86 ' �-- �� go � PROPOSED STORMWATER / n' 6 '• �� AGREEMENT EASEMENT LIMITS (TYP) S22 59' 22" 27.00' -=-N22 ° 59'22 "E I / 27.00 i 3 D x=95 ° 11'51" R= 122.50' L= 203.53' / S \ C N72 ° 12'29 "W `o. \ 23.69 L =25.00 R= 420.00 S72 012'29 "E &--03024'390 23.69' _ _ X04 ° 48'39" N89 45 5 9 234.90 R= 420.Oo' E ! 80 TPOB 1 L =35.26' SURVEY EXHal r OF BRYCE POINT LOT 34, MAP 14388, HER /TAGS RANCH ESTA TES ARM: 277 - 220 -34 SURVEYING 8707 La Mesa Blvd (819) 485 -8948 La Mesa, Calif. 91942 FAX(819) 485 -8410 VEY DA TE.• NONE JOB NO.: 227411 PLA T DA TE.• 4128111 DRAFTER. ART LAN s A. T a q * EXP. DEC 31 12 �. NO. 7844 OF CAj+i Allen R �. r ID PIS