Loading...
Res 86-139RESOLUTION NO. 86-139 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA RESCINDING RESOLUTION NO. 325 AND ESTABLISHING A SCHEDULE OF FEES AND DEPOSITS FOR GRADING, SUBDIVISION, AND PERMIT ACTIVITIES WHEREAS, Sections 16.44.170 through 16.44.210 of the City's Municipal Code, as enacted by Ordinance No. 77, authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of grading plans and permits by resolution; and WHEREAS, Sections 16.12.020, 16.12.060, 16.12.070, 16.14.020, 16.18.010, and 16.20.010(F) of the City's Municipal Code, as enacted by Ordinance No. 80, authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of subdivision maps, parcel maps, boundary adjustments, improvement plans and public and private improvements by resolution; and WHEREAS, Sections 12.12.140, 12.12.150, and 12.16.090 of the City's Municipal Code authorizes the City Council to establish certain fees and deposits for the processing, checking, and in- spection of street and curb permits, utility permits, construction and excavation permits, and other activities within public rights- of-way, by resolution. NOW THEREFORE, BE IT RESOLVED, by the City Council of Poway that: Resolution No. 325 establishing a schedule of fees and deposits is hereby rescinded. That the attached "Schedule of Fees and Deposits for Grading, Subdivision, and Permit Activities", Exhibit A, is hereby adopted and established for the above. That the deposits adopted herein are to cover the expenses of the City of Poway, its officers, employees, agents, contractors, and assigns incurred for all its engineering, administrative, professional and technical services, in- cluding, but not limited to, all those necessary to accept, process, check, examine, revise, administer, prepare, and approve. Grading plans, erosion control plans, grading permits, landscape and irrigation plans, improvement plans, subdivision maps, parcel maps, boundary adjustments, revisions, mergers, certificates of compliance, plats, dedications, covenants, agreements, and related reports, studies, calculations, exhibits, and permits, and to inspect and administer the construction of same, and to ascertain or determine their compliance with the grading ordinance, subdivision ordinance, state subdivision map act, and any other applicable local, county, state or federal code, statute, policy or regulation. Resolution No. 86-139 Page 2 That from time to time, the City Engineer or other duly authorized officer, may cause an accounting to be made of the City's charges against such deposits. If the actual costs incurred by the City, including a reasonable charge for overhead, exceed the deposits paid, the applicant, subdivider, permittee, owner, or appropriate party shall, upon demand by the City, deposit with the City, an additional sum in an amount deemed sufficient by the City Engineer, to complete the work in progress or to make up any shortage. If such ad- ditional deposit is not paid upon demand, the City may recover the same by action in any court of competent jurisdiction. Until any such additional deposit is made, any pending subdivision map or parcel map shall not be submitted to the City Council for final map approval, nor shall the City Engineer issue any grading permit or grant any other approval, nor accept for review, any grading or improvement plans or final maps, nor shall any improvements be accepted or improvement securities be released, which are related to the deficit account. That should an accounting show that any deposit is in excess of the charges incurred, including overhead, such excess shall be returned to the depositor within a reasonable period after completion of the required improvements on the subdivision or parcel map and their final inspection and approval by the City Engineer and/ or City Council, or after the recordation of the final subdivision or parcel map, where no improvements are required, or after the completion and approval of the grading, or other permitted work, whichever shall be the case. PASSED, ADOPTED, AND APPROVED by the City Council of the City of Poway, California, at a regular meeting thereof this 23rd day of December, 1986. ATTEST: Marjo~ie K. Wahlsten, City Clerk CITY OF POWAY Schedule of Fees and Deposits for Gradinq~ Subdivision, and Permit Activities e e 7. 8. 9. 10. GRADING P~IT ~'~ a. Regular Permit ................................... b. Permit issued after start ........................ of grading. 2. PLAN CHECKING DEPOSIT ............................... Preliminary cost est/mate shall be s~b~i~ 'tted with the first plan check for deposit calculation purposes. .$6.00 per 1,000 cu. yd. up to 100,000 cu. yd., and $4.00 per 1,000 cu. yd. thereafter; minimum: $100 .Regular permit fee plus $50 .3%% up to $ 100,000 2%% $100,000 - $ 500,000 2 % $500,000 - 2,500,000 $50,000 over $ 2,500,000 INSPECTION DEPOSIT. ................................... 3% up to $100,000 (Min. $75) 2%% $100,000-$500,00 2% $500,000-$2,500,000 $50,000 over $2,500,00 4. FINAL MAP CH~CK/NG DEPOSIT Includes subdivision maps, parcel maps ................ $300/Sheet revision maps, condominium maps, merger maps 5. BOUNDARY ADJUSq/~T REVIEW DEPOSIT Including adjustment Certificate of Cu~liance ........ $450 CERTIFICATE OF C/IMPT.TANCE DEPOSIT ..................... $350 CW. RTIFICATE OF O0MPLIANCE DEPOSIT (Fins] Map Waiver)..$400 MERGER (WITHOUT PAROdi. ~P) DEPOSIT ................... $250 REPRODUCIBLE MYLAR OOPY OF REOORDED MAP AND PRINTS .... Actual cost of duplication If not provided by subdivider plus $10 MAP RECORDATION e'~ ................................... Actual cost per County Recorder's (if recorded by City) schedule plus $10 1. STAY APPLICATION DEPOSIT .............................. $400 EXHIBIT "A" TO RESOLUTION NO. 86-139 -2- .2. OONSTRUCTION PERMIT FEES a. Issuance Fee ...................................... $15/each permit b. Inspection Fee .................................... 3% of approved cost estimate ($25minimum) 13. UTILITY PERMITS Applicable to Pacific Telephone, SDG&E, Cable TV franchises, and other bone fide public utilities and franchise holders, as defined by State law. a. Issuance Fee ...................................... $ 10/each permit or $200/year b. Inspection ........................................ Office engineering and inspection costs at act~] cost, plus overhead ($25 minimum) EXHIBIT "A" TO RESOLUTION NO. 86-139