Loading...
Res 88-107RESOLUTION NO. 88-107 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA, IMPLEMENTING A FLAT FEE SYSTEM FOR PLAN CHECK AND INSPECTION SERVICES, AND RESCINDING RESOLUTION NO. 88-093 WHEREAS, on September 6, 1988, the City Council implemented a flat fee schedule for plan check and inspection services; and WHEREAS, the flat fee schedule did not contain the intended procedure for calculating the fee; and WHEREAS, Sections 16.44.170 through 16.44.210 of the Poway Municipal Code authorizes the City Council to establish certain fees and deposits for the processing, checking and inspection of grading plans and permits by resolution; and WHEREAS, Sections 16.12.020, 16.12.060, 16.12.070, 16.14.020, 16.18.050, and 16.20.010 of the Poway Municipal Code authorizes the City Council to establish certain fees and deposits for the processing, checking and inspection of subdivision maps, parcel maps, boundary adjustments, improvement plans and public and private improvements by resolution. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Poway that: Section 1. The attached "Schedule of Fees for Grading and Subdivision, Activities" is hereby adopted and established as shown in Exhibit 1. Section 2. The fees adopted herein are to cover the expenses of the City of Poway, its officers, employees, agents, contractors, and assigns incurred for all its engineering, administrative, professional and technical services, including, but not limited to, all those necessary to accept, process, check, examine, revise, administer, prepare and approve. Grading plans, erosion control plans, grading permits, improvement plans, subdivision maps, parcel maps, boundary adjustments, reversions, mergers, certificates of compliance, plats, dedications, covenants, agreements, and related reports, studies, calcu- lations, exhibits, and permits, and to inspect and administer the construction of same, and to ascertain or determine their compliance with the Grading Ordinance, Subdivision Ordinance, State Subdivision Map Act, and any other applicable local, county, state or federal code, statute, policy or regulation. Section 3. The attached "Unit Prices for Improvement and Bonding Cost Estimates" is hereby adopted and established as shown in Exhibit 2. Section 4. Resolution No. 88-093 is hereby rescinded. PASSED, ADOPTED AND APPROVED, by the City Council of the City of Poway, California, at a regular meeting thereof this 27th day of September, 1988. ATTEST: Marjorie K~ Wahlsten, City Clerk Robert C. Emery, Mayor R/FEE6/CPSL Resolution No. 88-107 Page 2 STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) I, Marjorie K. Wahlsten, City Clerk of the City of Poway, do hereby certify under penalty of perjury that the foregoing Resolution No. 88-107 was duly adopted by the City Council at a meeting of said City Council held on the 27th day of September, 1988, and that it was so adopted by the following vote: AYES: BRANNON, HIGGINSON, KRUSE, TARZY, EMERY NOES: NONE ABSTAIN: NONE ABSENT: NONE Resolution No. 88-107 Page 3 RESOLUT I NMOS88-1N0. 07 SCHEDULE OF FEE~ FOR GRADZI~IG AI~ SUBDZ¥ISZON ACTZVZTZE$ TOTAL CITY FEE FINAl. ~ GRADII~ PLAI~ $1,O00/Sheet A. Grading Permit Fee $ 100 per permit B. Plan Check and Processing** Improvement Costs o - $ lO,OOO 10,001 - 100,000 100,001 - 500,000 500,001 - 2,000,000 2,000,001 - 5,000,000 over 5,000,000 5OO 5.0% of Impr. Costs 4.0% of Impr. Costs 3.5% of Impr. Costs 3.0% of Impr. Costs Time and Materials C. Inspection Improvement Costs** 0 - $ 20,000 20,001 - 100,000 100,001 - 500,000 500,001 - 2,000,000 2,000,001 - 5,000,000 over 5,000,000 5OO 5.0% of Impr. Costs 4.0% of Impr. Costs 3.5% of Impr. Costs 3.0% of Impr. Costs Time and Materials GEOTECHNICAL REVIE~ A. Soils Report Reviews Small Projects (1- 3 houses) ...... $ 250 Medium Projects (3-30 houses OR 1-3 commercial/industrial lots... $ 450 Large Projects {impr. costs up to $5,000,000) ................ $1,800 Special Projects {impr. costs over $5,000,000} ................ Time and Materials B. Soils Compaction Reports and Grading Inspection Small Projects (1-3 houses) ....... $ 250 Medium Projects (3-30 houses OR 1-3 commercial/industrial lots... $ 450 Large Projects {impr. costs up to $5,000,000) ..................... $1,600 Special Projects (impr. costs over $5,000,000) ................ Time and Materials ResolutiOn No. 88-107 Page 4 -2- 4, I#PROYEI(I:'I(I' PLANS A. Improvement Plan Administration Fee ...... $ lO0/Sheet B. Plan Checking and Processing** ............ Same as Grading C. Inspection** .............................. Same as Grading 5, BOUI~Y ADdUSTNENT 6, CERTIFICATE OF I"ONPLIAMCE MIgoN DEVELOPMENT REVIE~ INSPECTION & 10, 11, 12, N~GER (without parcel map) REIMBURSENENTAh'I~EENENT (includes reimbursement processing) RIG~rOFWAY PERMIT INSPECTION* TENPt~M~Y MATER AgO SEI~R APPLICATIONS $EWER ANNEXATION (does not include State of CA fees) 13, APN FEE WORI~IP$ 14, VACATIONS 15, SPECIAL STUDIES (includes water system analysis) $1,000 Per Application $1,000 Per Application $ 500 Per Lot $ 800 Per Application $1,000 + 1% total reimbursement amount 5% of est. cost of work ($100 minimum) $ 300 Per Application $ 475 + $400/acre $ 50/parcel $1,500 Per Application Based on proposal from con- sultant plus admin, overhead * If no other inspection fee applies. ** These fees are calculated incrementally as the project improvement costs increase. 6/R.FEES.A-B Resolution No. 88-107 Page 5 CITY OF POWAY UNIT PRICES FOR IMPROVEMEN~AND BONDIN~ COST ESTIMATE SEPT-~BE~, 1988 Item Description Unit Price A. ErO~l~ Control & Landm¢mDinq Plastic Sheets visquene Sand Bags Hydroseeding Trees Removal Planting Landscaping & Irrigation (Erosion Control) Embankment Import or Export Rock Excavation Structure Excavation C. Pavin~ a.co A.B. C.T.B. D.G. P.C.C. Pavement Removal 0 - 1,000 1,001 - 10,000 10,001 - 30,000 30,001 - 60,000 60,001 - 500,000 over 500,000 SF EA SF EA EA SF CY CY CY CY CY CY CY 0.06 1.20 .25 470.00 80.00 1.15 7.80 3.90 2.70 2.40 2.10 1.40 7.20 Blasting CY $ 12.00 No Blasting CY $ 35.00 CY Asphalt Concrete SF/IN Agregate Base SF/IN Cement Treated Base SF/IN Decomposed Granite TON Portland Cement Concrete SF/IN 19.80 .36 .13 .18 22.00 .39 Existing AC SF $ .66 Existing PCC SF $ 1.80 Item Description Resolution No. 88-107 Page 6 Unit Price Saw Cut Existing Paving Subgrade Preparation D. St~mmtz Berm, AC Concrete Cross Gutter Curbs Curb Curb & Gutter Driveway 6" Type "A", RSD G-5 8" Type "B", RSD G-5 Pattern Stamped 6" PCC, RSD G-12, G-13 6" PCC, RSD G-1 8" PCC, RSD G-1 6" PCC, RSD G-2 8" PCC, RSD G-2 LF $ 2.50 SF $ .25 LF $ 7.75 LF $ 8.50 SF $ 4.50 SF $ 4.00 LF $ 10.00 LF $ 10.50 LF $ 11.00 LF $ 12.75 4" PCC, RSD G-10, G-18 SF 6" PCC, RSD G-10, G-14, G-15, G-16 SF $ 3.00 $ 3.65 4' High LF $ 9.60 5' High LF $ 11.40 6' High LF $ 16.20 Fence Chain Link (RSD M-5, M-6, M-20) Wood Guard Post & Barricade Header 2" X 6" Redwood Lights, Street RSD M-9 20 LF $ 600.00 LF $ 3.50 90 Watt L.P.S.V., RSD E-i, E-2, E-33 EA 180 Watt L.P.S.V., RSD E-i, E-2, E-33 EA Metal Beam Barricade RSD M-7, M-8 LF Monuments RSD M-10, M-11, M-12, M-13 EA Pedestrian Ramp EA Regulatory Signs RSD G-27, G-28, G-29, G-30, G-31, G-32, Caltrans N8-B EA 3,000.00 3,275.00 36.00 300.00 700.00 Stop, NO Parking, Speed Limit, Etc. Removal of Existing Curb Existing Curb & Gutter $ 175.00 LF $ 3.60 LF $ 4.50 Sidewalk SF $ 1.25 Retaining Walls Masonry RSD C-1 to C-8 SF 15.00 -2- Item Description Resolution No. 88-107 Page 7 Unit Price Sidewalk 4" PCC, RSD G-7, G-9, G-ii SF Street Name Sign RSD DS-13 EA Traffic Signal Single & Two Phase EA Multiple Phase - Additional Phases EA Trail Equestrian/Pedestrian LF Trench Asphalt Restoration RSD G-24, G-25 LF wall Cut-off Pavement Cleanout Cleanout (Sewer Force Main) Cradle (Concrete) Dead End Encasement Lateral Main RSD G-22, G-23 EA RSD S-3 EA RSD S-16 EA RSD S-6 LF PMWD P-4 EA (Concrete) Type A,B PMWD P-ii,P-12 LF Manhole Manhole Adjust Rim to Grad Pressure Sewer Pipe 4" - 30' Long EA 6" - 30' Long EA 6" VCP/PVC LF 8" VCP/PVC LF 10" VCP/PVC LF 12" VCP/PVC LF 16" VCP/PVC LF 18" VCP/PVC LF 21" VCP/PVC LF PMWD P-l, P-2, P-3 EA 4" LF 6" LF 8" LF RSD S-ii LF Concrete Protective Slap Shoring Stub & Plug 3.00 175.00 $52,000.00 $ 7,000.00 $ 9.00 $ 12.5o $ 650.00 Over 5 Feet Deep LF 6" or 8" EA 760.00 1,000.00 31.00 300.00 35.00 900.00 1,000.00 22.00 28.00 30.00 36.00 45.00 49.00 54.00 2,100.00 400.00 22.00 24.00 28.00 10.60 11.00 125.00 Item Description Resolution No. 88-107 Page 8 Unit Price wall Concrete Anchor Cut-Off PMWD P-16 PMWD P-17 Air & Vacuum Valve Assembly Anchor Block Blow-off Assembly Cut-off Wall Fire Hydrant Assembly Fire Hydrant Relocation Fittings (22~, 45°, 90°, Tee Flange, etc.) Main (Ail Materials including normal excavation) PMWD SD- 8 PMWD SD-2 2" , PMWD SD-10 4", PMWD SD-10 PMWD SD- 3 PMWD SD-6, RSD M-19 6" 10" 12" 14" Manual Air Release Assembly Pipe, Steel Reducer Relocate Water Meter Service 10" 12" PMWD SD-9 1", PMWD SD-ii, RSD W-25 ih", PMWD SD-13, RSD W-25 2", PMWD SD-13, RSD W-25 Trust Block Valve Assembly, Gate Valve Assembly, Butterfly PMWD S.D. 1 6", PMWD SD-4 8", PMWD SD-4 10" , PMWD SD-4 10", PMWD SD 5-A 12", PMWD SD 5-B CY $ 625.00 EA $ 130.00 EA $ 1,200.00 EA $ 625.00 EA $ 950.00 EA $ 1,500.00 EA $ 130.00 EA $ 3,000.00 EA $ 1,650.00 EA $ 175.00 EA $ 205.00 EA $ 235.00 LF $ 20.00 LF $ 24.00 LF $ 28.00 LF $ 32.00 LF $ 40.00 LF $ 42.00 EA $ 1,350.00 LF $ 24.00 LF $ 26.00 EA $ 205.00 EA $ 500.00 EA $ 585.00 EA $ 725.00 EA $ 1,000.00 EA $ 240.00 EA $ 690.00 EA $ 900.00 EA $ 1,250.00 EA $ 1,220.00 EA $ 1,400.00 -4- Item Description Resolution No. 88-107-- Page 9 Unit Price G. Channel Lining PCC, RSD D-70, D-71 Clean Outs Type "A", RSD D-9 Type "B ", RSD D-10 Culverts Pipe (Ail Materials) SDRSD D-60,D-61 SF $ 5.00 EA $ 3,000.00 EA $ 4,000.00 4" (Private Only) LF 6" (Private Only) LF 8" (Private Only) LF 10" (Private Only) LF 12" (Private Only) LF 15" (Private Only) LF 18" LF 21" LF 24" LF 27" LF 30" LF 33" LF 36" LF 39" LF 42" LF 48" LF 54" LF 60" LF 66" LF 72" LF 0 - 20 CY 20 + CY Cast in Place PCC Structures Ditch Brow Ditch RSD D-75 LF Earthen Ditch LF Energy Dissipator RSD D-41, D-42, D-43 EA Headwalls Gravity Type Wing Type 12.00 17 00 21 00 24 00 30 00 36 00 60 00 64 00 68 00 75.00 77.00 82.00 88.00 96.00 106.00 114.00 132.00 150.00 160.00 185.00 Inlets Private Catch Basin 500.00 400.O0 Catch Basin 11.25 4.00 $ 6,250.00 RSD D-32, D-33 EA $ 1,800.00 RSD D-34 EA $ 3,000.00 RSD D-35 EA $ 3,480.00 12" X 12" EA 18" X 18" EA Type "G", RSD D-8, D-ii EA Type "F", RSD D-7, D-ii EA Type "I", RSD D-11, D-29 EA $ 250.00 $ 450.00 $ 3,000.00 $ 2,500.00 $ 3,000.00 CSP Inlet EA $ 2,000.00 -5- Item Description Resolution No. 88-107 Page 10 Unit Price Curb Inlet Types A, B, C RSD D-1,D-2,D-3,D-11,D-12 L : 4' to 10' EA L = 11' to 20' EA L = 21' to 28' EA Inlet Apron RSD D-39 Lug Concrete, RSD D-63 Outlets Curb Cutlet Sidewalk Underdrain Pipe Sidewalk Underdrain 2,900.00 3,500.00 4,000.00 EA $ 1,300.00 EA $ 740.00 Type "A", RSD D-25 EA RSD D-27 EA Type "A" D-25 EA $ 400.00 $ 400.00 $ 2,000.00 Pipe Collar RSD D-62 EA $ 625.00 Riprap Dumped RSD D-40 CY $ 100.00 Placed RSD D-40 CY $ 120.00 Channel Protection RSD D-74 CY $ 90.00 Engineering Fabric SF $ .07 Sand CY $ 24.00 Wall Curtain RSD D-38 EA $ 460.00 cut-off, Drain RSD D-72 EA $ 520.00 NOTE: Cost Estimates for bonding and securities for improvements shall include a 10% contingency amount added to the construction estimate. Total amount (construction plus con- tingency) should be rounded to the next highest $100 for the bond amount.