Res 88-107RESOLUTION NO. 88-107
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF POWAY, CALIFORNIA,
IMPLEMENTING A FLAT FEE SYSTEM FOR
PLAN CHECK AND INSPECTION SERVICES, AND
RESCINDING RESOLUTION NO. 88-093
WHEREAS, on September 6, 1988, the City Council implemented a flat fee
schedule for plan check and inspection services; and
WHEREAS, the flat fee schedule did not contain the intended procedure for
calculating the fee; and
WHEREAS, Sections 16.44.170 through 16.44.210 of the Poway Municipal Code
authorizes the City Council to establish certain fees and deposits for the
processing, checking and inspection of grading plans and permits by resolution;
and
WHEREAS, Sections 16.12.020, 16.12.060, 16.12.070, 16.14.020, 16.18.050, and
16.20.010 of the Poway Municipal Code authorizes the City Council to establish
certain fees and deposits for the processing, checking and inspection of
subdivision maps, parcel maps, boundary adjustments, improvement plans and
public and private improvements by resolution.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Poway
that:
Section 1. The attached "Schedule of Fees for Grading and Subdivision,
Activities" is hereby adopted and established as shown in Exhibit 1.
Section 2. The fees adopted herein are to cover the expenses of the City
of Poway, its officers, employees, agents, contractors, and assigns incurred for
all its engineering, administrative, professional and technical services,
including, but not limited to, all those necessary to accept, process, check,
examine, revise, administer, prepare and approve. Grading plans, erosion
control plans, grading permits, improvement plans, subdivision maps, parcel
maps, boundary adjustments, reversions, mergers, certificates of compliance,
plats, dedications, covenants, agreements, and related reports, studies, calcu-
lations, exhibits, and permits, and to inspect and administer the construction
of same, and to ascertain or determine their compliance with the Grading
Ordinance, Subdivision Ordinance, State Subdivision Map Act, and any other
applicable local, county, state or federal code, statute, policy or regulation.
Section 3. The attached "Unit Prices for Improvement and Bonding Cost
Estimates" is hereby adopted and established as shown in Exhibit 2.
Section 4. Resolution No. 88-093 is hereby rescinded.
PASSED, ADOPTED AND APPROVED, by the City Council of the City of Poway,
California, at a regular meeting thereof this 27th day of September, 1988.
ATTEST:
Marjorie K~ Wahlsten, City Clerk
Robert C. Emery, Mayor
R/FEE6/CPSL
Resolution No. 88-107
Page 2
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO )
I, Marjorie K. Wahlsten, City Clerk of the City of Poway, do hereby certify
under penalty of perjury that the foregoing Resolution No. 88-107 was duly
adopted by the City Council at a meeting of said City Council held on the 27th
day of September, 1988, and that it was so adopted by the following vote:
AYES: BRANNON, HIGGINSON, KRUSE, TARZY, EMERY
NOES: NONE
ABSTAIN: NONE
ABSENT: NONE
Resolution No. 88-107
Page 3
RESOLUT I NMOS88-1N0. 07
SCHEDULE OF FEE~ FOR GRADZI~IG AI~ SUBDZ¥ISZON ACTZVZTZE$
TOTAL CITY FEE
FINAl. ~
GRADII~ PLAI~
$1,O00/Sheet
A. Grading Permit Fee
$ 100 per permit
B. Plan Check and Processing**
Improvement Costs
o - $ lO,OOO
10,001 - 100,000
100,001 - 500,000
500,001 - 2,000,000
2,000,001 - 5,000,000
over 5,000,000
5OO
5.0% of Impr. Costs
4.0% of Impr. Costs
3.5% of Impr. Costs
3.0% of Impr. Costs
Time and Materials
C. Inspection Improvement Costs**
0 - $ 20,000
20,001 - 100,000
100,001 - 500,000
500,001 - 2,000,000
2,000,001 - 5,000,000
over 5,000,000
5OO
5.0% of Impr. Costs
4.0% of Impr. Costs
3.5% of Impr. Costs
3.0% of Impr. Costs
Time and Materials
GEOTECHNICAL REVIE~
A. Soils Report Reviews
Small Projects (1- 3 houses) ...... $ 250
Medium Projects (3-30 houses OR
1-3 commercial/industrial lots... $ 450
Large Projects {impr. costs up to
$5,000,000) ................ $1,800
Special Projects {impr. costs
over $5,000,000} ................ Time and Materials
B. Soils Compaction Reports and Grading Inspection
Small Projects (1-3 houses) ....... $ 250
Medium Projects (3-30 houses OR
1-3 commercial/industrial lots... $ 450
Large Projects {impr. costs up to
$5,000,000) ..................... $1,600
Special Projects (impr. costs
over $5,000,000) ................ Time and Materials
ResolutiOn No. 88-107
Page 4
-2-
4, I#PROYEI(I:'I(I' PLANS
A. Improvement Plan Administration Fee ...... $ lO0/Sheet
B. Plan Checking and Processing** ............ Same as Grading
C. Inspection** .............................. Same as Grading
5, BOUI~Y ADdUSTNENT
6, CERTIFICATE OF I"ONPLIAMCE
MIgoN DEVELOPMENT REVIE~ INSPECTION
&
10,
11,
12,
N~GER (without parcel map)
REIMBURSENENTAh'I~EENENT
(includes reimbursement processing)
RIG~rOFWAY PERMIT INSPECTION*
TENPt~M~Y MATER AgO SEI~R APPLICATIONS
$EWER ANNEXATION
(does not include State of CA fees)
13, APN FEE WORI~IP$
14, VACATIONS
15, SPECIAL STUDIES
(includes water system analysis)
$1,000 Per Application
$1,000 Per Application
$ 500 Per Lot
$ 800 Per Application
$1,000 + 1% total reimbursement
amount
5% of est. cost of work
($100 minimum)
$ 300 Per Application
$ 475 + $400/acre
$ 50/parcel
$1,500 Per Application
Based on proposal from con-
sultant plus admin, overhead
* If no other inspection fee applies.
** These fees are calculated incrementally as the project improvement
costs increase.
6/R.FEES.A-B
Resolution No. 88-107
Page 5
CITY OF POWAY
UNIT PRICES FOR IMPROVEMEN~AND BONDIN~ COST ESTIMATE
SEPT-~BE~, 1988
Item Description Unit
Price
A. ErO~l~ Control & Landm¢mDinq
Plastic Sheets visquene
Sand Bags
Hydroseeding
Trees
Removal
Planting
Landscaping & Irrigation (Erosion Control)
Embankment
Import or Export
Rock Excavation
Structure Excavation
C. Pavin~
a.co
A.B.
C.T.B.
D.G.
P.C.C.
Pavement Removal
0 - 1,000
1,001 - 10,000
10,001 - 30,000
30,001 - 60,000
60,001 - 500,000
over 500,000
SF
EA
SF
EA
EA
SF
CY
CY
CY
CY
CY
CY
CY
0.06
1.20
.25
470.00
80.00
1.15
7.80
3.90
2.70
2.40
2.10
1.40
7.20
Blasting CY $ 12.00
No Blasting CY $ 35.00
CY
Asphalt Concrete SF/IN
Agregate Base SF/IN
Cement Treated Base SF/IN
Decomposed Granite TON
Portland Cement Concrete SF/IN
19.80
.36
.13
.18
22.00
.39
Existing AC SF $ .66
Existing PCC SF $ 1.80
Item Description
Resolution No. 88-107
Page 6
Unit Price
Saw Cut Existing Paving
Subgrade Preparation
D. St~mmtz
Berm, AC
Concrete
Cross Gutter
Curbs
Curb
Curb & Gutter
Driveway
6" Type "A", RSD G-5
8" Type "B", RSD G-5
Pattern Stamped
6" PCC, RSD G-12, G-13
6" PCC, RSD G-1
8" PCC, RSD G-1
6" PCC, RSD G-2
8" PCC, RSD G-2
LF $ 2.50
SF $ .25
LF $ 7.75
LF $ 8.50
SF $ 4.50
SF $ 4.00
LF $ 10.00
LF $ 10.50
LF $ 11.00
LF $ 12.75
4" PCC, RSD G-10, G-18 SF
6" PCC, RSD G-10, G-14, G-15, G-16 SF
$ 3.00
$ 3.65
4' High LF $ 9.60
5' High LF $ 11.40
6' High LF $ 16.20
Fence
Chain Link
(RSD M-5, M-6, M-20)
Wood
Guard Post & Barricade
Header 2" X 6" Redwood
Lights, Street
RSD M-9 20 LF
$ 600.00
LF $ 3.50
90 Watt L.P.S.V., RSD E-i, E-2, E-33 EA
180 Watt L.P.S.V., RSD E-i, E-2, E-33 EA
Metal Beam Barricade RSD M-7, M-8 LF
Monuments RSD M-10, M-11, M-12, M-13 EA
Pedestrian Ramp EA
Regulatory Signs
RSD G-27, G-28, G-29, G-30,
G-31, G-32, Caltrans N8-B
EA
3,000.00
3,275.00
36.00
300.00
700.00
Stop, NO Parking, Speed
Limit, Etc.
Removal of
Existing Curb
Existing Curb & Gutter
$ 175.00
LF $ 3.60
LF $ 4.50
Sidewalk SF $ 1.25
Retaining Walls
Masonry
RSD C-1 to C-8 SF
15.00
-2-
Item Description
Resolution No. 88-107
Page 7
Unit Price
Sidewalk 4" PCC, RSD G-7, G-9, G-ii SF
Street Name Sign RSD DS-13 EA
Traffic Signal
Single & Two Phase EA
Multiple Phase - Additional Phases EA
Trail Equestrian/Pedestrian LF
Trench Asphalt Restoration RSD G-24, G-25 LF
wall
Cut-off Pavement
Cleanout
Cleanout (Sewer Force Main)
Cradle (Concrete)
Dead End
Encasement
Lateral
Main
RSD G-22, G-23
EA
RSD S-3 EA
RSD S-16 EA
RSD S-6 LF
PMWD P-4 EA
(Concrete) Type A,B PMWD P-ii,P-12 LF
Manhole
Manhole Adjust Rim to Grad
Pressure Sewer Pipe
4" - 30' Long EA
6" - 30' Long EA
6" VCP/PVC LF
8" VCP/PVC LF
10" VCP/PVC LF
12" VCP/PVC LF
16" VCP/PVC LF
18" VCP/PVC LF
21" VCP/PVC LF
PMWD P-l, P-2, P-3
EA
4" LF
6" LF
8" LF
RSD S-ii LF
Concrete Protective Slap
Shoring
Stub & Plug
3.00
175.00
$52,000.00
$ 7,000.00
$ 9.00
$ 12.5o
$ 650.00
Over 5 Feet Deep
LF
6" or 8" EA
760.00
1,000.00
31.00
300.00
35.00
900.00
1,000.00
22.00
28.00
30.00
36.00
45.00
49.00
54.00
2,100.00
400.00
22.00
24.00
28.00
10.60
11.00
125.00
Item Description
Resolution No. 88-107
Page 8
Unit Price
wall
Concrete Anchor
Cut-Off
PMWD P-16
PMWD P-17
Air & Vacuum Valve Assembly
Anchor Block
Blow-off Assembly
Cut-off Wall
Fire Hydrant Assembly
Fire Hydrant Relocation
Fittings
(22~, 45°, 90°,
Tee Flange, etc.)
Main (Ail Materials
including normal
excavation)
PMWD SD- 8
PMWD SD-2
2" , PMWD SD-10
4", PMWD SD-10
PMWD SD- 3
PMWD SD-6, RSD M-19
6"
10"
12"
14"
Manual Air Release Assembly
Pipe, Steel
Reducer
Relocate Water Meter
Service
10"
12"
PMWD SD-9
1", PMWD SD-ii, RSD W-25
ih", PMWD SD-13, RSD W-25
2", PMWD SD-13, RSD W-25
Trust Block
Valve Assembly, Gate
Valve Assembly,
Butterfly
PMWD S.D. 1
6", PMWD SD-4
8", PMWD SD-4
10" , PMWD SD-4
10", PMWD SD 5-A
12", PMWD SD 5-B
CY $ 625.00
EA $ 130.00
EA $ 1,200.00
EA $ 625.00
EA $ 950.00
EA $ 1,500.00
EA $ 130.00
EA $ 3,000.00
EA $ 1,650.00
EA $ 175.00
EA $ 205.00
EA $ 235.00
LF $ 20.00
LF $ 24.00
LF $ 28.00
LF $ 32.00
LF $ 40.00
LF $ 42.00
EA $ 1,350.00
LF $ 24.00
LF $ 26.00
EA $ 205.00
EA $ 500.00
EA $ 585.00
EA $ 725.00
EA $ 1,000.00
EA $ 240.00
EA $ 690.00
EA $ 900.00
EA $ 1,250.00
EA $ 1,220.00
EA $ 1,400.00
-4-
Item
Description
Resolution No. 88-107--
Page 9
Unit Price
G.
Channel Lining
PCC, RSD D-70, D-71
Clean Outs
Type "A", RSD D-9
Type "B ", RSD D-10
Culverts
Pipe (Ail Materials)
SDRSD D-60,D-61
SF $ 5.00
EA $ 3,000.00
EA $ 4,000.00
4" (Private Only) LF
6" (Private Only) LF
8" (Private Only) LF
10" (Private Only) LF
12" (Private Only) LF
15" (Private Only) LF
18" LF
21" LF
24" LF
27" LF
30" LF
33" LF
36" LF
39" LF
42" LF
48" LF
54" LF
60" LF
66" LF
72" LF
0 - 20 CY
20 + CY
Cast in Place PCC Structures
Ditch
Brow Ditch RSD D-75 LF
Earthen Ditch LF
Energy Dissipator RSD D-41, D-42, D-43
EA
Headwalls
Gravity Type
Wing Type
12.00
17 00
21 00
24 00
30 00
36 00
60 00
64 00
68 00
75.00
77.00
82.00
88.00
96.00
106.00
114.00
132.00
150.00
160.00
185.00
Inlets
Private Catch Basin
500.00
400.O0
Catch Basin
11.25
4.00
$ 6,250.00
RSD D-32, D-33 EA $ 1,800.00
RSD D-34 EA $ 3,000.00
RSD D-35 EA $ 3,480.00
12" X 12" EA
18" X 18" EA
Type "G", RSD D-8, D-ii EA
Type "F", RSD D-7, D-ii EA
Type "I", RSD D-11, D-29 EA
$ 250.00
$ 450.00
$ 3,000.00
$ 2,500.00
$ 3,000.00
CSP Inlet EA $ 2,000.00
-5-
Item Description
Resolution No. 88-107
Page 10
Unit Price
Curb Inlet
Types A, B, C
RSD D-1,D-2,D-3,D-11,D-12
L : 4' to 10' EA
L = 11' to 20' EA
L = 21' to 28' EA
Inlet Apron
RSD D-39
Lug
Concrete, RSD D-63
Outlets
Curb Cutlet
Sidewalk Underdrain Pipe
Sidewalk Underdrain
2,900.00
3,500.00
4,000.00
EA $ 1,300.00
EA $ 740.00
Type "A", RSD D-25 EA
RSD D-27 EA
Type "A" D-25 EA
$ 400.00
$ 400.00
$ 2,000.00
Pipe Collar RSD D-62 EA $ 625.00
Riprap
Dumped RSD D-40 CY $ 100.00
Placed RSD D-40 CY $ 120.00
Channel Protection RSD D-74 CY $ 90.00
Engineering Fabric SF $ .07
Sand CY $ 24.00
Wall
Curtain RSD D-38 EA $ 460.00
cut-off, Drain RSD D-72 EA $ 520.00
NOTE:
Cost Estimates for bonding and securities for improvements
shall include a 10% contingency amount added to the
construction estimate. Total amount (construction plus con-
tingency) should be rounded to the next highest $100 for the
bond amount.