Res 90-029 RESOLUTION NO. 90- 029
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY,
STATE OF CALIFORNIA, MODIFYING A FLAT FEE SYSTEM
FOR PLAN CHECK AND INSPECTION SERVICES
AND RESCINDING RESOLUTION NO. 88-107
WHEREAS, on September 6, 1988, the City Council implemented a flat fee
schedule for plan check and inspection services; and
WHEREAS, the flat fee schedule did not contain the intended procedure for
calculating the fee; and
WHEREAS, Sections 16.44.170 through 16.44.210 of the Poway Municipal Code
authorizes the City Council to establish certain fees and deposits for the pro-
cessing, checking and inspection of grading plans and permits by resolution; and
WHEREAS, Sections 16.12.020, 16.12.060, 16.12.070, 16.14.020, 16.18.050, and
16.20.010 of the Poway Municipal Code authorizes the City Council to establish
certain fees and deposits for the processing, checking and inspection of sub-
division maps, parcel maps, boundary adjustments, improvement plans and public
and private improvements by resolution.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway
that:
Section 1. The attached "Schedule of Fees for Grading and Subdivision
Activities" is hereby adopted and established as shown in Exhibit 1.
Section 2. Resolution No. 88-107 is hereby rescinded.
Section 3. The fees adopted herein are to cover the expenses of the City of
Poway, its officers, employees, agents, contractors, and assigns incurred for
all its engineering, administrative, professional and technical services,
including, but not limited to, all those necessary to accept, process, check,
examine, revise, administer, prepare and approve. Grading plans, erosion
control plans, grading permits, improvement plans, subdivision maps, parcel
maps, boundary adjustments, reversions, mergers, certificates of compliance,
plats, dedications, covenants, agreements, and related reports, studies, calcu-
lations, exhibits, and permits, and to inspect and administer the construction
of same, and to ascertain or determine their compliance with the Grading
Ordinance, Subdivision Ordinance, State Subdivision Map Act, and any other
applicable local, county, state or federal code, statute, policy or regulation.
Section 4. The attached "Unit Prices for Improvement and Bonding Cost
Estimates" is hereby adopted and established as shown in Exhibit 2.
Section 5. A developer deposit fee system for plan check and inspection
services may be used for planned con~nunity developments or projects which are
financially supported by both private and public interests with the approval of
the Director of Engineering Services.
Section 6. The City Manager is authorized to amend existing engineering
agreements with BSI Consultants, Inc. and Geopacifica to implement Section 5 of
this resolution.
Resolution No. 90- 029
Page 2
PASSED, ADOPTED, AND APPROVED, by the City Council of the City of Poway,
California, at a regular meeting this 27th day of February, 1990.
Don Higginson; ~or
ATTEST:
Marjori~. Wahlsten, ' y erk
STATE OF CALIFORNIA )
) SS.
COUNTY OF SAN DIEGO )
I, Marjorie K. Wahlsten, City Clerk of the City of Poway, do hereby certify
under the penalty of perjury, that the foregoing Resolution, No. 90- 029, was
duly adopted by the City Council at a meeting of said City Council held on the
27th day of February, 1990 and that it was so adopted by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
BRANNON, EMERY, GOLDSMITH, KRUSE, HIGGINSON
NONE
NONE
NONE
Marjoriq K~ Wahlsten, City er
City of~_~ay
Resolution No. 90-029
Page 3
SCHEDULE OF FEES FOR GRADING AND SUBDIVISION ACTIVITIE%
FINAL NAP
GRADING PLANS
A. Grading Permit Fee
B. Plan Check and Processinq**
Improvement Costs
o - $ lO,OOO
10,001 - 100,000
100,001 - 500,000
500,001 - 2,000,000
2,000,001 - 5,000,000
over 5,000,000
C. Inspection Improvement
o - $ 2o,ooo
20,001 - 100,000
100,001 - 500,000
500,001 - 2,000,000
2,000,001 - 5,000,000
over 5,000,000
TOTAL CITY FEE
$1,000/Sheet
$ 100 per permit
Costs**
5OO
5.0% of Impr. Costs
4.0% of Impr. Costs
3.5% of Impr. Costs
3.0% of Impr. Costs
Time and Materials
500
5.0% of Impr. Costs
4.0% of Impr. Costs
3.5% of Impr. Costs
3.0% of Impr. Costs
Time and Materials
3, GEOTECHNICAL REVIEWS
A. Soils Report Reviews
Small Projects {1- 3 houses) ...... $ 250
Medium Projects (3-30 houses OR
1-3 commercial/industrial lots... $ 450
Large Projects {impr. costs up to
$5,000,000) ................ $1,800
Special Projects (impr. costs
over $5,000,000} ................ Time and Materials
B. Soils Compaction Reports and Grading Inspection
Small Projects {1-3 houses) ....... $ 250
Medium Projects (3-30 houses OR
1-3 commercial/industrial lots... $ 450
Large Projects {impr. costs up to
$5,000,000) ..................... $1,600
Special Projects (impr. costs
over $5,000,000) ................ Time and Materials
Resolution No., 90-029
Page 4
4, I#PROVEMEHT PLAN~
$,
7,
9,
10,
-2-
11,
12,
A. Improvement Plan Administration Fee ...... $ lO0/Sheet
B. Plan Checking and Processing** ............ Same as Grading
C. Inspection** .............................. Same as Grading
BOUNDARY AI~IUSTHENT
CERTIFICATE OF CO#PLIAHCF
MINOR DEVELOPNEMT REVIEW IHSPECTZOM
MERGE~ (without parcel map)
REIMBURSEMEHTAGREEMEHT
~'includes reimbursement processing)
RIGHT OF WAY PERMIT INSPECTION*
TEMPORARY WATER AND SEWER APPLICATION%
SEWER ANNEXATION
(does not include State of CA fees)
13, APN FEE WORKUPS
14, VACATIONS
15, SPECIAL STUDIES
~ system analysis)
$1,000 Per Application
$1,000 Per Application
$ 500 Per Lot
$ 800 Per Application
$1,000 + 1% total reimbursement
amount
5% of est. cost of work
($100 minimum)
$ 300 Per Application
$ 475 + $400/acre
$ 50/parcel
$1,500 Per Application
Based on proposal from con-
sultant plus admin, overhead
* If no other inspection fee applies.
** These fees are calculated incrementally as the project improvement
costs increase.
6/R.FEES.A-B
Resolution No. 90-029
Page 5
CITY POWAY
UNIT PRICES FOR IMPROVEMENT AND BONDING COST ESTIMATE
SEPTEMBER, 1988
Item
Description Uni~
A. ~ro~on Control ~ LandscaD~nq
Plastic Sheets Visquene
Sand Bags
Hydroseeding
Trees
Removal
Planting
Landscaping & Irrigation (Erosion Control)
SF
EA
SF
EA
EA
Price
0.06
1.20
.25
Embankment
Import or Export
Rock Excavation
Structure Excavation
C. P~aving
0 - 1,000
1,001 - 10,000
10,001 - 30,000
30,001 - 60,000
60,001 - 500,000
over 500,000
Blasting CY $ 12.00
No Blasting CY $ 35.00
CY
CY
CY
CY
CY
CY
CY
CY
'7.80
3.90
2.70
2.40
2.10
1.40
7.20
19.80
a.co
A.B.
C.T.B.
D.G.
P.C.C.
Pavement Removal
Asphalt Concrete SF/IN
Agregate Base SF/IN
Cement Treated Base SF/IN
Decomposed Granite TON
Portland Cement Concrete SF/IN
Existing AC SF $ .66
Existing PCC SF $ 1.80
$
$
$
$
$
.36
.13
.18
22.00
.39
1.15
SF
$
$
470.00
80.00
Item
Saw Cut
Subgrade Preparation
Description
Resolution No. 90-029
Page 6
Unit
Price
Existing Paving
LF $ 2.50
SF $ .25'
Berm, AC
Concrete
Cross Gutter
Curbs
Curb
Curb & Gutter
Driveway
6" Type "A", RSD G-5
8" Type "B", RSD G-5
Pattern Stamped
6" PCC, RSD G-12, G-13
6" PCC, RSD G-1
8" PCC, RSD G-1
6" PCC, RSD G-2
8" PCC, RSD G-2
LF $ 7.75
LF $ 8.50
SF $ 4.50
SF $ 4.00
LF $ 10.00
LF $ 10.50
LF $ 11.00
LF $ 12.75
4" PCC, RSD G-10, G-18 SF
6" PCC, RSD G-10, G-14, G-15, G-16 SF
Fence
Chain Link 4' High LF
(RSD M-5, M-6, M-20) 5' High LF
Wood 6' High LF
Guard Post & Barricade
RSD M-9 20 LF
Header 2" X 6" Redwood
Lights, Street
$ 3.00
$ 3.65
RSD G-27, G-28, G-29, G-30,
G-31, G-32, Caltrans NS-B
$ 9.60
$ 11.40
$ 16.20
$ 600.00
LF $ 3.50
90 Watt L.P.S.V., RSD E-i, E-2, E-33 EA
180 Watt L.P.S.V., RSD E-i, E-2, E-33 EA
Metal Beam Barricade RSD M-7, M-8 LF
Monuments RSD M-10, M-11, M-12, M-13 EA
EA
Pedestrian Ramp
Regulatory Signs
Removal of
Existing Curb
Stop, No Parking, Speed
Limit, Etc.
EA
$ 3,000.00
$ 3,275.00
$ 36.00
$ 300.00
$ 70O.00
$ 175.00
LF $ 3.60
LF $ 4.50
Existing Curb & Gutter
Sidewalk
Retaining Walls
Masonry
SF $ 1.25
RSD C-1 to C-8 SF
$ 15.00
-2-
Item Description
Resolution No. 90-029
Page 7
Unit
Price
Sidewalk 4" PCC, RSD G-7, G-9, G-11
Street Name Sign RSD DS-13
Traffic Signal
Single & Two Phase
Multiple Phase - Additional Phases
Trail Equestrian/Pedestrian
Trench.Asphalt Restoration RSD G-24, G-25
Wall
Cut-off Pavement
E. Sewer
Cleanout
Cleanout (Sewer Force Main)
Cradle (Concrete)
Dead End
Encasement
Lateral
Main
RSD G-22, G-23
RSD S-3
RSD S-16
RSD S-6
PMWD P-4
(Concrete) Type A,B PMWD P-ii,P-12
4" - 30' Long
6" - 30' Long
6" VCP/PVC
8" VCP/PVC
10" VCP/PVC
12" VCP/PVC
16" VCP/PVC
18" VCP/PVC
21" VCp/PVC
Manhole PMWD P-l,
Manhole Adjust Rim to Grad
Pressure Sewer Pipe
Concrete Protective Slap
Shoring
Stub & Plug
P-2, P-3
4 t!
6"
8"
RSD S-11
Over 5 Feet Deep
6" or 8"
SF
EA
EA
$ 3.00
$ 175.00
$52,000.00
$ 7,000.00
LF $ 9.00
LF
EA
EA
EA
LF
EA
LF
EA
EA
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
EA
$ 12.50
$ 650.00
760.00
1,000.00
31.00
3OO.00
35.OO
9O0.00
1,000.00
22.00
28.O0
30.O0
36.00
45.0O
49.00
54.0O
2,100.00
400.00
22.00
24.00
28.00
10.60
11.00
125.00
-3-
Item Description
Resolution No. 90-029
Page 8
Unit Price
Wall
Concrete Anchor
Cut-off
PMWD P-16
PMWD P-17
CY $ 625.00~
EA $ 130.00
Water
Air & Vacuum Valve Assembly
Anchor Block
Blow-off Assembly
Cut-off Wall
Fire Hydrant Assembly
Fire Hydrant Relocation
Fittings
(22~, 45°, 90°
Tee Flange, etc.)
Main
(Ail Materials
including normal
excavation)
PMWD SD-8
PMWD SD-2
2", PMWD SD-10
4", PMWD SD-10
PMWD SD-3
PMWD SD-6, RSD M-19
6"
8"
10"
12"
14"
Manual Air Release Assembly
Pipe, Steel 6"
8"
Reducer
Relocate Water Meter
Service
10"
12"
PMWD SD-9
1", PMWD SD-11, RSD W-25
1½", PMWD SD-13, RSD W-25
2", PMWD SD-13, RSD W-25
Trust Block
Valve Assembly, Gate
Valve Assembly,
Butterfly
PMWD S.D. 1
6" PMWD SD-4
,
8" PMWD SD-4
10", PMWD SD-4
10" PMWD SD 5-A
,
12", PMWD SD 5-B
EA $ 1,200.00
EA $ 625.00
EA $ 950.00
EA $ 1,500.00
EA $ 130.00
EA $ 3,000.00
EA $ 1,650.00
EA $ 175.00
EA $ 205.00
EA $ 235.00
LF $ 20.00
LF $ 24.00
LF $ 28.00
LF $ 32.00
LF $ 40.00
LF $ 42.00
EA $ 1,350.00
LF $ 24.00
LF $ 26.00
EA $ 205.00
EA $ 500.00
EA $ 585.00
EA $ 725~00
EA $ 1,000.00
EA $ 240.00
EA $ 690.00
EA $ 900.00
EA '$ 1,250.00
EA $ 1,220.00
EA $ 1,400.00
-4-
Item
Description
Resolution No. 90-029
Page 9
Unit
Price
G. Storm
Channel Lining
Clean Outs
PCC, RSD D-70, D-71
Type "A", RSD D-9
Type "B", RSD D-10
Culverts
Pipe (All Materials)
SDRSD D-60,D-61
4" (Private Only)
6" (Private Only)
8" (Private Only)
10" (Private Only)
12" (Private Only)
15" (Private Only)
18"
21"
24"
27"
30"
33"
36"
39"
42"
48"
54"
60"
66"
72"
Cast in Place PCC Structures
SF $ 5.OO
EA $ 3,000.00
EA $ 4,000.00
Ditch
Brow Ditch
Earthen Ditch
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
Energy Dissipator
Headwalls
Gravity Type
wing Type
0 - 20 CY
20 + CY
12.00
17.00
21.oo
24.00
30.00
36.00
60.00
64.00
68.00
75.OO
77.00
82.00
88.00
96.00
106.00
114.00
132.00
150.00
160.00
185.00
$ 500.00
$ 400.00
RSD D-75 LF $ 11.25
LF $ 4.00
RSD D-41, D-42, D-43 EA
RSD D-32, D-33 EA
RSD D-34 EA
RSD D-35 EA
Inlets
Private Catch Basin 12" X 12" EA
18" X 18" EA
Catch Basin Type "G", RSD D-8, D-11 EA
Type "F", RSD D-7, D-11 EA
Type "I", RSD D-11, D-29 EA
CSP Inlet
EA
$ 6,250.00
$ 1, sOo. oo
$ 3,000.00
$ 3,480.00
$ 250.00
$ 450.00
$ 3,000.00
$ 2,500.OO
$ 3,0O0.00
$ 2,000.00
-5-
Item
Description
Resolution No. 90-029
Page 10
Unit
Price
Curb Inlet
Types A, B, C
RSD D~i,D-2,D_3,D_ll,D_12
Inlet Apron
Lug
RSD D-39
L = 4' to 10'
L = 11' to 20'
L = 21' to 28'
Concrete, RSD D-63
Outlets
Curb Outlet
Sidewalk Underdrain Pipe
Sidewalk Underdrain
Pipe Collar
EA
EA
EA
EA
EA
Type "A", RSD D-25 EA
RSD D-27 EA
Type "A" D-25 EA
RSD D-62
$ 2,900.00.
$ 3,500.00
$ 4,000.00
$ 1,300.00
$ 740.00
$ 400.00
$ 400.00
$ 2,000.00
EA $ 625.00
Riprap
Dumped RSD D-40 CY $ 100.00
Placed RSD D-40 CY $ 120.00
Channel Protection RSD D-74 CY $ 90.00
Engineering Fabric
Sand SF $ .07
CY $ 24.00
Wall
Curtain RSD D-38 EA $ 460.00
Cut-off, Drain RSD D-72 EA $ 520.00
NOTE:
Cost Estimates for bonding and securities for im rovements
shall include a 10% contin .... P
W~ncy amoun~ added to the
construction estimate. Total amount (construction plus con-
tingency) should be rounded to the next highest $100 for the
bond amount.
-6-