Res 91-056RESOLUTION NO. 91-056
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY,
CALIFORNIA AMENDING THE FEE SCHEDULE FOR GRADING AND
SUBDIVISION ACTIVITIES OF THE ENGINEERING SERVICES DEPARTMENT
AND RESCINDING RESOLUTION NO. 90-175
WHEREAS, on August 28, 1990, the City Council implemented an amended flat
fee schedule for plan check and inspection services; and
WHEREAS, Sections 16.44.170 through 16.44.210 of the Poway Municipal Code
authorizes the City Council to establish certain fees and deposits for the pro-
cessing, checking, and inspection of grading plans and permits by resolution;
and
WHEREAS, Sections 16.12.020, 16.12.060, 16.12.070, 16.14.020, 16.18.050,
and 16.20.010 of the Poway Municipal Code authorizes the City Council to
establish certain fees and deposits for the processing, checking, and inspec-
tion of subdivision maps, parcel maps, boundary adjustments, improvement plans,
and public and private improvements by resolution.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway
that:
Section 1. Resolution No. g0-175 is hereby rescinded.
Section 2. The attached "Schedule of Fees for Grading and Subdivision
Activities" is hereby amended and adopted as shown in Exhibit 1.
Section 3. The fees adopted herein are to cover the expenses of the City of
Poway, its officers, employees, agents, contractors, and assigns, incurred for
all engineering, administrative, professional and technical services,
including, but not limited to, all those necessary to accept, process, check,
examine, revise, administer, prepare, and approve, grading plans, erosion
control plans, grading permits, improvement plans, subdivision maps, parcel
maps, boundary adjustments, reversions, mergers, certificates of compliance,
plats, dedications, covenants, agreements, and related reports, studies, calcu-
lations, exhibits, and permits, and to inspect and administer the construction
of same, and to ascertain or determine their compliance with the Grading
Ordinance, Subdivision Ordinance, State Subdivision Map Act, and any other
applicable local, county, state or federal code, statute, policy or regulation.
Section 4. The attached "Unit Prices for Improvement and Bonding Cost
Estimates" is hereby adopted and established as shown in Exhibit 2.
Section 5. A developer deposit fee system for plan check and inspection
services may be used for planned co~mmunity developments or projects which are
financially supported by both private and public interests with the approval of
the Director of Engineering Services.
Section 6. This revised fee schedule will take effect sixty {60} days from
the date of approval of this resolution.
Resolution No. 91-056
Page 2
PASSED, ADOPTED, AND APPROVED, by the City Council of the City of Poway,
California, at a regular meeting this 4t~day of June, 1991.
Go~ th ,/Mayor
ATTEST:
STATE OF CALIFORNIA
) $$o
COUNTY OF SAN DIEGO
I, Marjorie K. Wahlsten, City Clerk of the City of Poway, do hereby
certify under penalty of perjury that the foregoing Resolution No.91-056
was duly adopted by the City Council at a meeting of said City Council held
on the 4th day of June 1991, and that it was so adopted by the following
vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
EMERY, HIGGINSON, MCINTYRE, SNESKO, GOLDSMITH
NONE
NONE
NONE
Marjori~ I~. Wahlsten, City Clerk
City of L~Uway
Resolution No. 91-056
Page 3
RESOLUTION NO. 91-
,~:~HEIXILE IX: FEE'~ F1)R 6RAI)II~ ~ ,~UBI)I¥I$IIX~ N:;TIVlTIE$
PLAN CtlECK AND II~PECTIIX~ FEE~
1. ~RN)II~ A~D IMPROV~ Pt.J~
A. Grading Permit Fee
(Including paving, stockpiling, and
Administrative clearing permits)
B. Plan Check and Processing**
Improvement Costs
o - $ lO,OOO
10,001 - 100,000
100,001 - 500,000
500,001 - 2,000,000
2,000,001 - 5,000,000
over 5,000,000
C. Inspection Improvement Costs**
0 - $ 20,000
20,001 - 100,000
100,001 - 500,000
500,001 - 2,000,000
2,000,001 - 5,000,000
over 5,000,000
D. Improvement Plan Administrative Fee
3. tEOTEt~INICAL REVIEW~
TOTAL FEE
$ 100 per permit
5OO
5.0% of Impr. Costs
4.0% of Impr. Costs
3.5% of Impr. Costs
3.0% of Impr. Costs
Time and Materials
5OO
5.0% of Impr. Costs
4.0% of Impr. Costs
3.5% of Impr. Costs
3.0% of Impr. Costs
Time and Materials
$ lO0/Sheet
$1,O00/Sheet
A. Soils Report Reviews
Small Projects (1- 3 houses)
Medium Projects (3-30 houses OR
1-3 commercial/industrial lots
Large Projects (impr. costs up to
$5,000,000)
Special Projects (lmpr. costs
over $5,000,000)
$ 250
$ 450
$1,8oo
Time and Materials
B. Soils Compaction Reports and Grading Inspection
$ 25O
$ 450
$1,600
Time and Materials
Small Projects (1-3 houses)
Medium Projects (3-30 houses OR
1-3 commercial/industrial lots
Large Projects {impr. costs up to
$5,000,000)
Special Projects (impr. costs
over $5,000,000)
-1-
4. ~)I~TION ~
5. ~HSPk'~TIQfl QV~TI~HE
6. SEWER VIDEO IN~PECTIOH
7. NZNQP. 0EVELOPNEHT REVZEW ZI~PEGTZQN
Il, NI~CELLAHEOU~ FEE~
1. BOUHDARY AI)OU~TNEHT
2. CERTIFICATE OF C011)LIKE
3. NERGER (without parcel map)
4. EA~ENENT I)EDICATIQN~
5. REINBURSENEHT AGREB~NT
(Includes reimbursement processing)
6. RZGHT-~-IMY PEP. MIT FEE
7. R~GHT-OF-WAY PERNIT ZNSPEGTZON*
SFR Driveway or sewer lateral
A11 others
Se
10.
11.
12.
TENP(NL~RYNATERAHI)$EWERAPPLZCATZQN~
SEIdERAHHF. XATZON
(does not include State of CA fees)
APN FEE I~RKUP$
VACATIOI~
~TEIt SYSTENANALY$I$
A. Residential
Small Projects {1-4 Lots)
Medium Projects {5-30 Lots)
Large projects {31-100 Lots)
Greater than 100 Lots
B. Commercial/Industrial
One Fire Service
Two Fire Services
More Than Two Fire Services or
Looped 0nsite System
Resolution No. 91..056
Page 4
$ 200
$ 75/hour approved
overtime
(with 2 hour minimum)
$ 1/L.F.,
or $400 minimum
$ 500/Lot
$1,000 Per Application
$1,000 Per Application
$ 800 Per Application
$ 500 Per Application
$1,000 + 1% total reim-
bursement amount
$ 5O
$ 100 minimum, 5% of est.
cost of work
$ 250 minimum, 5% of est.
cost of work
300 Per Application
475 + $400/acre
$ 50/parcel
$1,500 Per Application
$1,250
$2,325
$3,100
Based on Proposal
$1,250
$1,850
$2,800
-2-
13. 8LUEPItlI~I~
14.
15.
16.
Resolution No. 91-056
Page 5
18" X 26" $ 5/Sheet
24" X 36" $ 6/Sheet
Oversize $ lO/Sheet
BL~TING PERHIT~
~ PERNIT~
$ 50 Per Permit
$ 100
Based on proposal from
consultant plus admln, overhead
* If no other inspection fee applies.
** These fees are calculated incrementally as the project improvement
costs increase.
Resolution No. 91-056
Page 6
CITY OF P(Y~AY
t~41T I~ICE~ M~ IMM~VEMEHT AND BONOlHtl ~)~T E~TI~T£
M~H ,, 199!
ITEM
DESCRIPTION UNIT PRICE
Plastic Sheets
Visquene
Sand Bags (including maintenance & replacement)
Hydroseedlng
Trees
Removal
Planting
Landscaping & Irrigation (Erosion Control)
B. rm lng
Clearing and Grubbing
Cribwall
Embankment
Import or Export
0 - 1,000
1,001 - 10,000
10,001 - 30,000
30,001 - 60,000
60,001 - 500,000
over 500,000
Rock Excavation
{Removal or
Relocation}
Structure Excavation
Blasting
No Blasting
Subdrains
C. P~vtng
4" (w/rock & fabric)
6" (w/rock & fabric)
A.C.
A.B.
C.T.B.
D.G.
P.C.C.
Asphalt Concrete
Agregate Base
Cement Treated Base
Decomposed Granite
Portland Cement Concrete
Pavement Crack Sealing
Pavement Reinforcing Fabric
SF
EA
SF
EA
EA
SF
Acre
SF
CY
CY
CY
CY
CY
CY
CY
CY
CY
CY
LF
LF
SF/IN
SF/IN
SF/IN
TON
SF/IN
LF
SY
.15
2.00
.27
495.00
85.00
1.21
3,600.00
19.00
8.20
4.10
2.85
2.50
2.20
1.50
7.60
37.00
12.50
20.85
18.00
21.00
.38
.14
.19
23.20
.41
1.10
1.10
2 F-UNIT1 -1-
ITEM
DESCRIPTION
Resolution No. 91-056
UN~ge 7 PRICE
De
Pavement Removal
Existing AC
Existing PCC
Existing AC Berm
Saw Cut
Existing Paving
Grinding
Existing Paving
Subgrade Preparation
Berm, AC
6" Type "A", RSD G-5
8" Type "B", RSE G-5
Concrete
Pattern Stamped
Cross Gutter
6" PCC, RSD G-12, G-13
Curbs
Curb
Curb & Gutter
SF $ .70
SF $ 1.90
LF $ 3.10
LF $ 2.65
SF $ 2.35
SF $ .26
LF $ 8.00
LF $ 9.00
SF $ 4.75
SF $ 4.20
6" PCC, RSD G-1 LF $
8" PCC, RSD G-1 LF $
6" PCC, RSD G-2 LF $
8" PCC, RSD G-2 LF $
Driveway 4" PCC, RSD G-lO, G-18
6" PCC, RSD G-lO, G-14,
G-15, G-16
Fence
Chain Link 4' High, RSD M-5, M-6, M-20
5' High, RSD M-5, M-6, M-20
6' High, RSD M-5, M-6, M-20
Wood 6' High
Guard Post & Barricade RSD M-g
Guardrail
RSD E-l, E-2, E-33
RSD E-l, E-2, E-33
Header 2" X 6" Redwood
Lights, Street
go Watt - L.P.S.V.
180 Watt - L.P.S.V.
Loop Detector Replacement
Metal Beam Barricade RSD M-7, M-8
Monuments
Pavement Legends
Pavement Markers
RSD M-lO, M-11, M-12, M-13
10.50
11.00
11.50
13.50
Pedestrian Ramp
RSD G-27, G-28, G-2g, G-30,
G-31, G-32, Caltrans NS-B
SF $ 3.15
SF $ 3.85
LF $ 10,10
LF $ 12,00
LF $ 15,80
LF $ 17,00
20 LF $
630.00
LF $ 19.00
LF $ 3.70
EA $ 3,160.00
EA $ 3,450.00
EA $ 4O0.00
LF $ 37.90
EA $ 315.00
EA $ 200.00
EA $ 5.50
EA $ 740.00
F-UNIT2 -2-
ITEM DESCRIPTION
Resolution No. 91-056
Page 8
UNIT PRICE
Ee
Regulatory Signs Stop, No Parking, Speed
Limit, Etc.
Removal of
Existing Curb
Existing Curb & Gutter
Sidewalk
Retaining Walls
Masonry
Sidewalk
Street Name Sign
Striping
Traffic Control
Traffic Signal
Trai 1
Trench Asphalt Restoration
Wal 1
Cut-off Pavement
Sewer
Cleanout
Cleanout {Sewer Force Main)
Cradle {Concrete)
Dead End
RSD C-1 to C-8
4" PCC, RSD G-7, G-9, G-11
RSD DS-13
4" White
8" White
4" Double Yellow
4" White Skip
Per Lane Closure Per Day
Equestrian/Pedestrian
RSD G-24, G-25
RSD G-22, G-23
RSD S-3
RSD S-16
RSD S-6
PMWD P-4
Encasement (Concrete) Type A, B PMWD P-11, P-12
Lateral
4" - 30' Long
6" - 30' Long
Main
8" VCP/PVC
10" VCP/PVC
12" VCP/PVC
16" VCP/PVC
18" VCP/PVC
21" VCP/PVC
Manhole
PMWD P-l, P-2, P-3
Manhole (Adjust Rim to Grade)
EA $ 185.00
LF $ 3.80
LF $ 4.75
SF $ 1.35
SF $ 16.00
SF $ 3.20
EA $ 185.00
LF $ .30
LF $ .30
LF $ .45
LF $ .20
LN/DAY $ 300.00
EA $ 84,200.00
LF $ 9.50
LF $ 13.15
EA $ 685.00
EA $ 800.00
EA $ 1,050.00
LF $ 32.50
EA $ 315.00
LF $ 37.00
EA $ 950.00
EA $ 1,050.00
LF $ 2g.50
LF $ 31.50
LF $ 38.00
LF $ 47.50
LF $ 51.50
LF $ 57.00
EA $ 2,200.00
EA $ 420.00
F-UNIT3 -3-
ITEM DESCRIPTION
Resolution No. 91-056
Page 9
UNIT PRICE
Es
Pressure Sewer Pipe
6"
8'1
Concrete Protective Slab RSD S-11
Shoring
Over 5 Feet Deep
Stub & Plug
6" or 8"
Tie-in to Existing Manhole
Wall
Concrete Anchor PMWD P-15
Cut-Off PMWD P-17
Adjust Valve, B.O., or MAR to Grade
Air & Vacuum Valve Assembly PMWD SD-8
Anchor Block
Blow-off Assembly
Cut-off Wall
PMWD SD-2
2", PMWD SD-lO
4", PMWD SD-lO
PMWD SD-3
Fire Hydrant Assembly PMWD SD-6, RSD M-lg
Fire Hydrant Relocation
Fittings
(22¼°, 45°, 8"
90°, Tee 10"
Flange, etc.) 12"
Main (All Materials
including normal
excavation)
Manual Air Release Assembly
Pipe, Steel
Post Indicator Valve
Protection Post
Reducer
,1
6"
8"
10"
12"
14"
16"
LF $ 23.00
LF $ 25.00
LF $ 29.50
LF $ 11.15
LF $ 11.50
EA $ 132.00
EA $ 1.350.00
N
4" X 85" Steel
CY $ 660.00
EA $ 140.00
EA $ 125.00
EA $ 1,265.00
EA $ 660.00
EA $ 1,000.00
EA $ 1,580.00
EA $ 140.00
EA $ 3,150.00
EA $ 1,750.00
EA $ 185.00
EA $ 215.00
EA $ 250.00
LF $ 21.00
LF $ 25.00
LF $ 29.50
LF $ 34.00
LF $ 42.00
LF $ 44.00
LF $ 51.50
PMWD SD-9 EA $ 1,420.00
LF $ 25.00
LF $ 27.00
EA $ 1,050.00
EA $ 140.00
EA $ 215.00
F-UNIT4 -4-
ITEM DESCRIPTION
Resolution No. 91-056
Page 10
UNIT PRICE
Relocate Water Meter
Service
1", PMWD SD-11, RSD W-25
1~", PMWD SD-13, RSD W-25
2", PMWD SD-13, RSD W-25
Tie-in to Main
Daytime 4" - 8"
10" - Up
Nighttime 4" - 8"
10" - Up
{Additional inspection fees will be
charged for nighttime tie-ins)
Thrust Block
EA $ 525.00
Valve Assembly, Gate
EA $ 615.00
EA $ 765.00
EA $ 1,050.00
Valve Assembly,
Butterfly
PMWD S.D. i EA
G. Storm Ormln
6", PMWD SD-4 EA
8", PMWD SD-4 EA $
10", PMWD SD-4 EA $
10", PMWD SD 5-A EA $
12", PMWD SD 5-B EA $
14" EA $
16" EA $
Channel Lining PCC, RSD D-70, D-71
Clean Outs
Type "A", RSD D-9
Type "B", RSD D-lO
Culverts
Pipe
{All Materials)
SDRSD D-60,D-61
$ 650.00
$ 900.00
$ 1,200.00
$ 2,ooo.oo
250.00
725.00
950.00
1,315.00
1,285.00
1,475.00
1,580.00
1,680.00
SF $ 5.25
EA $
EA
3" {Private Only) LF $
4" (Private Only) LF $
6" (Private Only) LF $
8" {Private Only) LF $
10" {Private Only) LF $
12" (Private Only) LF $
15" {Private Only) LF $
18" LF $
21" LF $
24" LF $
27" LF $
30" LF $
33" LF $
36" LF $
39" LF $
42" LF $
48" LF $
54" LF $
60" LF $
66" LF $
72" LF $
0 - 20 CY $
20 + CY $
Cast in Place PCC Structures
3,150.00
4,200.00
10.50
12.75
18.00
22.00
25.00
31.50
38.00
63.00
67.50
71.50
79,00
81.00
86.50
93.00
101.00
111.50
120.00
139.00
158.00
168.50
195.00
525.00
420.00
F-UNIT5 -5-
ITEM DESCRIPTION
Resolution No. 91']056
Page 11
UNIT PRICE
Ditch
Brow Ditch
Earthen Ditch
RSD D-75
Energy Dissipator RSD D-41, D-42, D-43
Headwalls
Gravity Type
Wing Type
LF $ 12.00
LF $ 4.20
EA $ 6,575.00
RSD D-32, D-33 EA $ 1,go0.o0
RSD D-34 EA $ 3,150.00
RSD D-35 EA $ 3,650.00
Inlets
Private Catch Basin Less than 12"
12" X 12"
18" X 18"
Catch Basin Type "G", RSD D-8
Type "F", RSD D-7
Type "I", RSD D-29
CSP Inlet
Curb Inlet
(Types A, B, C, J;
RSD D-l, D-2, D-3,
D-11, D-12)
Inlet Apron
EA $ 105.00
EA $ 265.00
EA $ 475.00
EA $ 3,150.00
EA $ 2,650.00
EA $ 3,150.00
Lug
EA $ 2,100.00
Outlets
Curb Outlet
Sidewalk Underdrain Pipe
Sidewalk Underdrain
L = 4' to 10' EA $ 3,050.00
L = 21' to 20' EA $ 3,700.00
L = 21' tO 28' EA $ 4,200.00
RSD D-39 EA $ 1,375.00
All Types EA $ 780.00
Type "A", RSD D-25 EA $ 420.00
RSD D-27 EA $ 420.00
Type "A", D-25 EA $ 2,100.00
Pipe Collar RSD D-62 EA $ 660.00
Riprap
Dumped RSD D-40 CY $ 105.00
Placed RSD D-40 CY $ 125.00
Channel Protection RSD D-74 CY $ 95.00
Engineering Fabric SF $ .08
Sand CY $ 25.00
Velocity Reducing Ring
Up to 36" EA $ 160.00
Over 36" EA $ 370.00
Wall
Curtain RSD D-38 EA $ 485.00
Cut-off Drain RSD D-72 EA $ 550.00
NOTE:
Cost Estimates for bonding and securities for improvements shall
include a 10% contingency amount added to the construction estimate.
Total amount {construction plus contingency) should be rounded to the
next highest $100 for the bond amount.
F-UNIT6 -6-