Loading...
Res 93-049RESOLUTION NO. 93-049 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA, ADOPTING THE FEE SCHEDULE SET FORTH HEREIN FOR BUILDING INSPECTION SERVICES AND RESCINDING RESOLUTIONS 83-061 AND 87-095 WHEREAS, Section 15.02.080 et. seq. of the Poway Municipal Code authorizes the City Council to establish fees for various building, electrical, plumbing, and mechanical permit applications by resolution. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Poway as follows: Section 1: Resolution Nos. 83-061 and 87-095 are hereby rescinded. Section 2: The fees schedule as set forth in the attached Exhibit A for building inspection services is hereby adopted and shall become effective on June 6, 1993. PASSED and ADOPTED by the City Council of the City of Poway, California, this 6th day of April, 1993. ATTEST: Don Higginson, Mayo~(_~ i~_~ Wahlsten, City Clerk Resolution No. 93-049 Page 2 STATE OF CALIFORNIA ) ) SS. COUNTY OF SAN DIEGO ) I, Marjorie K. Wahlsten, City Clerk of the City of Poway, do hereby certify, under the penalty of perjury, that the foregoing Resolution, No.93-049 , was du61~hadopted by the City Council at a meeting of said City Council held on the day of April , 1993, and that it was so adopted by the following vote: AYES: CALLERY, SNESKO, HIGGINSON NOES: NONE ABSTAIN: NONE ABSENT: CAFAGNA, EMERY Marjori~ ~. Wahlsten, City Clerk City of P~_~ay IJS: REPORT\FEEUPDAT. RES BUILDING PERMIT FEEs Resolution No. 93-049 Page 3 TOTAL VALUATION FEE $1.00 to $500.00 $501.00 to $2,000.00 $2,001.00 to $25,000.00 $25,001.00 to $50,000.00 $50,001.00 to $100,000.00 $100,001.00 to $500,000.00 $500,001.00 to $1,000,000.00 $1,000,000.00 and up $20.00 $20.00 for the first $500.00 plus $2.50 for each additional $100.00 or fraction thereof, to and including $2,000.00 $57.50 for the first $2,000.00 plus $11.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 $310.50 for the first $25,000.00 plus $7.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 $498.00 for the first $50,000.00 plus $5.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 $773.00 for the first $100,000.00 plus $4.25 for each additional $1,000.00 or fraction thereof $2,473.00 for the first $500,000.00 plus $3.50 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 $4,223.00 for the first $1,000,000.00 plus $2.25 for each additional $1,000.00 or fraction thereof Other Inspections and Fees: Resolution No. 93-049 Page 4 e o Be Inspections outside of normal business hours (minimum charge one hour) $50.00 per hour Reinspection fees assessed under provisions of Section 305(g) $50.00 each Inspection for which no fee is specifically indicated (minimum charge one hour) $50.00 per hour Additional plan review required by changes, additions or revisions to approved plans (minimum charge one hour) $50.00 per hour Permit History Survey $50.00 Demolition Permit Fee $60.00 Investigation Fee. The fee shall be equal to, and in addition to, the permit fee for the work, whether or not, a permit is issued. Plan Review Fee. When a plan or other data is required to be submitted for plan review, a plan review fee shall be paid at the time of submitting plans and specifications for review. Said plan review fee shall be 65% of the building permit fee as established after disabled access inspection fees and energy code inspection fees have been added to the building permit fee. 9. Permit Issuance Fee (Non-refundable) $30.00 10. Disabled Access Inspection Fee (applies to all projects required by State law to be accessible to the physically disabled) 10% of building permit fee 11. Energy Code Inspection Fee (applies to all projects required by State law to comply with the energy conservation standards of the California Energy Commission) 15% of building permit fee Resolution No. 93-049 Page 5 ELECTRICAL PERMIT FEES For Issuance of each Permit (Non Refundable) ........... $30.00 In Addition--either one of the following: (a) New permanent service, including fixtures and outlets. Fees are based on carrying capacity of each set of service entrance conductors. 0 to 40 amperes ............................ $24.00 41 to 60 amperes ............................ 26.00 61 to 70 amperes ............................ 30.00 71 to 100 amperes ........................... 36.00 101 to 150 amperes ........................... 42.00 151 to 200 amperes ........................... 54.00 201 to 300 amperes ........................... 60.00 301 to 400 amperes ........................... 72.00 over 400 amperes ............................. 72.00 Plus $15.00 for each 100 amperes or fraction thereof over 400 amperes. (b) Temporary service, including fixtures and outlets: Construction (expires 180 days from issuance)..$20.00 Testing (expires 30 days from issuance) ........ 20.00 Carnivals (expires 30 days from issuance) ...... 20.00 T.O.P. (expires when building permit expires).. 20.00 (c) Miscellaneous additional wiring, outlets, fixtures, or similar work with no change in service entrance - conductors .......................... $25.00 Neon sign ...................................... 10.00 Sign - other than neon ......................... 10.00 Overhead service to underground service ........ 20.00 --no change in capacity Other Fee: When the project requires a plan check of the electrical plan, a plan check fee, equal to twenty-five percent of the calculated electrical permit fee, shall be paid. PLUMBING PERMIT FEES Resolution No. 93-049 Page 6 1. Plumbing Issuance Fee ............................. $30.00 ea. 2. Bathtub ........................................... 3.50 ea. 3. Dental Unit/Cuspidor .............................. 3.50 ea. 4. Floor Drain ....................................... 3.50 ea. 5. Gas Piping System of 1 to 5 Outlets ............... 10.00 ea. 6. Gas Outlets Ea (over 5) ........................... 1.00 ea. 7. Building Sewer .................................... 12.00 ea. 8. Interceptors/Pump ................................. 3.00 ea. 9. Lavatory .......................................... 6.00 ea. 9a. Lavatory (more than one) .......................... 3.50 ea. 10. Laundry Tubs ...................................... 3.50 ea. 11. Backflow Preventer ................................ 4.00 ea. 12. Receptor & Floor Sink ............................. 3.50 ea. 13. Shower Drain ...................................... 3.50 ea. 14. Sink - Kitchen .................................... 3.50 ea. 15. Sink - Other ...................................... 3.50 ea. 16. Urinal ............................................ 3.50 ea. 17. Washing Machine Drain ............................. 3.50 ea. 18. Water Closet ...................................... 6.00 ea. 18a. Water Closet (more than one) ...................... 3.50 ea. 19. Water Heater ...................................... 6.00 ea. 19a. Water Heater (more than one) ....... 20. Water Pipe Repair/Repl ............. 21. Water Softener ..................... 22. Drain-Vent Repair/Alter ............ 23. Hose Bibb .......................... 24. Drinking Fountain .................. 4 3.50 ea. 6.00 ea. 3.50 ea. 6.00 ea. 3.50 ea. 3.50 ea. OTHER INSPECTIONS AND FEES Resolution No. 93-049 Page 7 When the project requires a plan check of the plumbing plan, a plan check fee, equal to twenty-five percent of the calculated plumbing permit fee, shall be paid. Inspections outside of normal business hours (minimum charge one hour) ................... $50.00 per hour Reinspection Fee .................................. $50.00 each Inspections for which no fee is specifically indicated (minimum charge one hour) ............... $50.00 per hour MECHANICAL PERMIT FEES 1. For the issuance of each permit .............. $30.00 2. For issuing each supplemental permit ......... 10.00 Unit Fee Schedule For the installation or relocation of each forced air or gravity type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h ........................................ 12.00 For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h ........................................ 15.00 For the installation or relocation of each floor furnace, including vent ....................................... 12.00 For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater ............................................... 12.00 For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit ..................................... 6.50 e For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorbtion unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code ....................... 12.00 For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to an including 100,000 Btu/h ....... 12.00 e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. Resolution No. 93-049 Page 8 For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu/h and including 500,000 Btu/h ........................... 25.00 For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h and including 1,000,000 Btu/h ............................. 32.00 For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h ................ 47.00 For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h ................ 78.00 For each air-handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto ..... 9.00 Note: This fee shall not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code. For each air-handling unit over 10,000 cfm ............ 15.00 For each evaporative cooler other than portable type.. 9.00 For each ventilation fan connected to a single duct... 6.00 For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit ................................................ 9.00 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood .................................................. 20.00 For the installation or relocation of each domestic- type incinerator ...................................... 15.00 For the installation or relocation of each commercial or industrial-type incinerator ........................... 60.00 For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code ............. 10.00 Resolution No. 93-049 Page 9 21. When Chapter 12 is applicable (see Section 103), permit fees for fuel-gas piping shall be as follows: For each gas-piping system of one to four outlets .......................................... 10.00 For each gas-piping system of five or more outlets per outlet ....................................... 1.00 Other Inspections and Fees: Inspections outside of normal business hours ....... $50.00/hr (minimum charge one hour) Reinspection fee assessed under provisions of Section 305(f) ................................... $50.00/each e Inspections for which no fee is specifically indicated (minimum charge one hour) .............. $50.00/hr. 0 Additional plan review required by changes, additions or revisions to approved plans (minimum charge one hour) ........................................ $50.00/hr. Be When the project requires a plan check of the mechanical plan, a plan check fee, equal to twenty-five percent of the calculated mechanical permit fee, shall be paid. D:\general\powayres.712