Loading...
Res 94-084 Resolution No. 94-084 ~--, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY CONSOLIDATING THE FOLLOWING SEWER RELATED FEES: SEWER CONNECTION FEES, NORTH BASIN SURCHARGE, INDIRECT BENEFIT FEE, ANNEXATION FEES, SEWER LINE CHARGE, SEWER EXTENSION LINE CHARGE, INSPECTION, AND CONSTRUCTION FEES FOR SEWER SERVICE; RESCINDING RESOLUTIONS 83-050, 83-052, 84-004, AND 87-156; AND ESTABLISHING CRITERIA FOR SEWER CONNECTIONS WHEREAS, Ordinance No. 107 has been adopted by the City Council authorizing all sewer fees and charges to be set by resolution of the Council; and WHEREAS, Ordinance No. 428 has been adopted by the City Council authorizing the sewer extension line charge; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Poway does hereby resolve as follows: Section 1: Schedule of Sewer Connection Fees The following schedule of fees applies to sewer connections from unit(s) to City's main, transmission, or collector lines: Sinqle Family Residences (1 unit) ........................ $2,356.00 Duplexes and Triplexes (per unit) ........................ $2,356.00 Other Multiple Dwellinqs or Condominiums (per unit) ...... $2,356.00 A unit is defined as a family living space(s) consisting of, but not limited to, a kitchen, bath, living rooms, and bedrooms under a common roof or airspace. General Retail, Commercial, and Industrial Buildings not exceeding 2,000 square feet in gross area (1 unit) ................................... $2,356.00 Buildings in excess of 2,000 square feet and less than or equal to 10,000 square feet will be charged for one (1) EDU for the first 2,000 square feet plus one (1) EDU for each additional 2,000 square feet of gross area. Portions less than 2,000 square feet shall be prorated to the nearest one tenth (0.1) of an EDU. (Per EDU) .............................. $2,356.00 Buildings in excess of 10,000 square feet will be charged one (1) EDU for the first four (4) or less fixture units plus one (1) EDU for every additional four (4) fixture units. Additional fixture units less than four (4) shall be prorated to the nearest one tenth (0.1) of an EDU. (Per EDU) ........................................................... $2,356.00 A fixture unit is any device(s) or appliance(s) which are supplied with water or which receive liquid or liquid borne wastes and discharge such waste into the sewer system. Each device or appliance shall count as one (1) fixture regardless of its load-producing effects. EDU's for industrial or commercial processes will be calculated based on waste water discharged. Food Servers Food Service Facilities not exceeding 2,000 square feet in gross area ............................................ $2,356.00 Resolution No. 94-084 Page 2 Food service facilities greater than 2,000 square feet of gross area will be charged one (1) EDU for the first four (4) or less fixture units plus one (1) EDU for every additional four (4) fixture units. Additional fixture units less than four (4) shall be prorated to the nearest one tenth (0.1) of an EDU. A food server is any retail establishment selling a food product. (Per EDU) ........................................................... $2,356.00 Laundromats (per unit) ................................... $2,356.00 A unit is defined as 2 (two) washing machines. Schools (public and private)/Student Facilities (per unit) .......................................................... $2,356.00 A unit is defined as, but not limited to: Facility design (student capacity) times 12 (gallons per day per person) divided by 250 gallons per day. {School Capacity) x 12 = Units 25O The units shall be rounded to the nearest one tenth (0.1). Other school facilities (administration and maintenance) are the same as for General Retail, Commercial, and Industrial Buildings. Churches (per unit) ...................................... $2,356.00 Churches will be charged one (1) EDU for the first four or less fixture units plus one (1) EDU for every additional four (4) fixture units. Additional fixture units less than four (4) shall be prorated to be nearest one tenth (0.1) of an EDU. Motels First unit ............................................... $2,356.00 Second and succeeding units .............................. $2,356.00 Motel units are defined, but not limited to, a separate living facility customarily rented by the day, week, or month. Mobile Home Park (including common facilities) (per mobile home unit) ................................... $2,356.00 Unclassified Uses In the event that a proposed use does not fall within one of the foregoing classifications, the applicant for a connection to the City's sewer system shall submit the proposed use to the Director of Engineering Services. The Director of Engineering Services shall set an appropriate usage and subsequent connection fee for the proposed use based upon an estimate of the daily sewer flow. Resolution No. 94-084 Page 3 Section 2: North Basin Surcharqe A surcharge for wastewater capital improvements in the amount of one thousand dollars ($1,000.00) per equivalent sewer unit, will be charged for all new sewer connections in the North Basin of Poway. A map indicating the approximate dividing line between the North and South Basin is attached as Exhibit "A." This charge shall be in addition to any other fees and charges set forth in City of Poway resolutions. Section 3: Indirect Benefit Fee All properties using facilities constructed with the Green Valley Improvement District 80-1 and the Valle Verde/Green Valley Trunk Sewer, that receive sewer service through sewer extensions from these systems shall pay an Indirect Benefit Fee of five hundred dollars ($500.00) per equivalent dwelling unit. The Indirect Benefit Fee shall be in addition to any other fees and charges set forth in City of Poway resolutions. Section 4: Annexation Fees A. Annexation Fee The minimum fee for annexation to the City sewer service shall be four hundred dollars ($400.00). For property in excess of one (1) acre an additional fee of forty dollars ($40.00) shall be charged for each one tenth (0.1) of an acre or any portion thereof. B. Annexation Administration Fee An annexation administration fee of four hundred and seventy-five dollars ($475.00) shall be charged to process the annexation. This fee is in addition to the annexation fee stated in the above section. C. State Fee The State Board of Equalization processing fee is dependant upon the gross acreage of the property to be annexed and is as shown in the following table. Acreaqe Fee 0 - 10 $ 160.00 11 - 20 $ 180.00 21 - 60 $ 250.00 61 - 100 $ 350.00 101 - 660 $ 480.00 661 - 1500 $ 700.00 1501 - 3000 $ 900.00 3001 - 6000 $1,200.00 over 6000 $1,750.00 The Annexation fee, administration fee, and State fee are due and payable to the City of Poway at the time of application for sewer capacity and prior to connection. Resolution No. 94- 084 Page 4 Section 5: Sewer Line Charqe A minimum sewer line charge of two thousand dollars ($2,000.00) shall be payable to the City for all sewer lateral connections made to existing sewer lines which have been constructed and paid for by the City or persons other than the current property owners or their predecessors in ownership receiving the benefit of the line. Owners whose property frontage along the main is in excess of 100 feet shall pay an additional twenty dollars ($20.00) per lineal foot for each foot or portion thereof in excess of lO0-feet to the nearest tenth (0.01) of a foot. Properties that are adjacent to more than one sewer main (corner lots) shall pay line charges based on frontage of the sewer main into which their lateral connects. Those properties deriving the benefit of an existing sewer line for which a reimbursement agreement between the developer and the City is valid shall pay a line charge according to the terms of the reimbursement agreement. The sewer line charge shall be in addition to any other fees and charges set forth in City of Poway ordinances and resolutions with the exception of the sewer extension line charge. Section 6: Sewer Extension Line Charqe At the time of application for connection to a sewer main installed by the City and funded by the Sewer Fund and constructed after February 17, 1994, the applicant shall pay a sewer extension line charge. Said line charge shall be $5,600.00 per parcel. For those properties whose sewer connections are subject to the sewer extension line charge, the sewer line charge is not applicable. Otherwise, the sewer extension line charge stated herein shall be in addition to any other fees and charges set forth in City of Poway resolutions. This charge shall be collected at building permit issuance for new construction or application to construct a sewer lateral for existing dwellings. Section 7: Inspection and Construction Fees All applicants for new connections to the City's disposal system shall be required to pay at the time of executing an application for new service the following fees: A. Inspection Fee This is a fee to cover the costs of inspecting such new connections for compliance with the City standards and specifications for such new connections. The inspection fee shall be twenty-five dollars ($25.00) for each connection for single family residences (subdivisions and individual lots), office buildings, commercial/industrial buildings, apartments, motels, and other structures requiring one lateral connection to City's facilities regardless of size of lateral connection. B. Construction Fee This is a fee to cover the labor and material costs for the installation of a cleanout box at the edge of the City's right-of-way. The construction fee shall be fifty dollars ($50.00) per lateral cleanout for single family residences, office buildings, commercial/industrial building, apartments, motels, and other structures requiring one lateral connection to City's facilities. Resolution No. 94- 084 Page 5 For subdivisions and other developments whereby the subdivider or developer installs a right-of-way cleanout along with construction of the main and individual laterals, the sewer lateral right-of-way cleanout will be adjusted to grade by City forces after final lot grading and in conjunction with the water meter installation. The construction fee is fifty dollars ($50.00) per lateral. PASSED, ADOPTED, AND APPROVED, by the City Council of the City of Poway, California, at a regular meeting this 2nd of August , 1994. ATTEST: Marjori~ Wahlsten, City Clerk STATE OF CALIFORNIA ) ) SS. COUNTY OF SAN DIEGO ) I, Marjorie K. Wahlsten, City Clerk of the City of Poway, do hereby certify under the penalty of perjury, that the foregoing Resolution No. 94- 084 was duly adopted by the City Council at a meeting of said City Council held on 2nd day of August , 1994 and that it was so adopted by the following vote: AYES: CAFAGNA, EMERY, HIGGINSON, SNESKO NOES: NONE ABSTAIN: NONE ABSENT: CALLERY Marjorle J~. Wahlsten, City Clerk City o~ay Resolution No. 94-084 Page 6 =,~T, BAS~U SOUTH BASIN mm m mm ,J EXHIBIT "A"