Res 95-006 Resolution No. 95-006
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY
AMENDING THE FEE SCHEDULE FOR GRADING AND
SUBDIVISION ACTIVITIES OF THE ENGINEERING SERVICES DEPARTMENT
AND RESCINDING RESOLUTION NO. 91-056
WHEREAS, on June 4, 1991, the City Council implemented an amended flat
fee schedule for plan check and inspection services; and
WHEREAS, Sections 16.46.010 through 16.46.080 of the Poway Municipal
Code authorizes the City Council to establish certain fees and deposits for
the processing, checking, and inspection of grading plans and permits by
resolution; and
WHEREAS, Section 16.12.020, 16.12.060, 16.12.070, 16.14.020, 16.18.050,
and 16.20.010 of the Poway Municipal Code authorizes the City Council to
establish certain fees and deposits for the processing, checking, and
inspection of subdivision maps, parcel maps, boundary adjustments, improvement
plans, and public and private improvements by resolution.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway
that:
Section 1. Resolution No. 91-056 is hereby rescinded.
Section 2. The attached "Schedule of Fees for Grading and Subdivision
Activities" is hereby amended and adopted as shown in Exhibit 1.
Section 3. The fees adopted herein are to cover the expenses of the
City of Poway, its officers, employees, agents, contractors, and assigns
incurred for all engineering, administrative, professional, and technical
services including, but not limited to, all those necessary to accept,
process, check, examine, revise, administer, prepare, and approve grading
plans, erosion control plans, grading permits, improvement plans, subdivision
maps, parcel maps, boundary adjustments, reversions, mergers, certificates of
compliance, plats, dedications, covenants, agreements, and related reports,
studies, calculations, exhibits, and permits, and to inspect and administer
the construction of same, and to ascertain or determine their compliance with
the Grading Ordinance, Subdivision Ordinance, State Subdivision Map Act, and
any other applicable local, county, state, or federal code, statute policy, or
regulation.
Section 4. The attached "Unit Prices for Improvement and Bonding Cost
Estimates" is hereby adopted and established as shown in Exhibit 2.
Section 5. A developer deposit fee system for plan check and inspection
services may be used for planned community developments or projects which are
financially supported by both private and public interests with the approval
of the Director of Engineering Services.
Section 6. This revised fee schedule will take effect sixty (60) days
from the date of approval of this resolution.
Resolution No. 95-006
Page 2
PASSED, ADOPTED, AND APPROVED, by the City Council of the City of Poway,
California, at a regular meeting this 7th day of February, 1995.
obert Emery, Presidi~er
ATT EST:
Marjor~ii]V~ahlsten, City Clerk
STATE OF CALIFORNIA )
) ss.
COUNTY OF SAN DIEGO )
I, Marjorie Wahlsten, City Clerk of the City of Poway, do hereby certify under
the penalty of perjury, that the foregoing Resolution No. 95-006 was duly
adopted by the City Council at a meeting of said City Council held on the 7th
day of February, 1995 and that it was so adopted by the following vote:
AYES:
CAFAGNA, EMERY, REXFORD
NOES: NONE
ABSTAIN: NONE
ABSENT: CALLERY, HIGGINSON
Marjo~ie~K. Wahlsten, City Clerk
City o~ !~way
Resolution No. 95-006
Page 3
CITY OF POWAY
UNIT PRICES FOR IMPROVEMENT ANO BONOING COST ESTIMATE
JANUARY, lgg5
ITEM DESCRIPTION UNIT
A. Erosion Control & Landscaping
Plastic Sheets Visquene SF
Sand Bags (including maintenance & replacement) EA
Hydroseeding SF
Trees
Removal EA
Planting EA
Landscaping & Irrigation (Erosion Control) SF
B. Grading
Clearing and Grubbing Acre
Cribwall
Embankment
Import or Export
Rock Excavation
(Removal or
Relocation)
SF
0 - 1,000 CY
1,001 - 10,000 CY
10,001 - 30,000 CY
30,001 - 60,000 CY
60,001 - 500,000 CY
over 500,000 CY
Structure Excavation
Subdrains
CY
Paving
A,Co
A.B.
C.T.B.
D.G.
P.C.C.
Blasting CY
No Blasting CY
4" (w/rock & fabric)
6" (w/rock & fabric)
Asphalt Concrete
Aggregate Base
Cement Treated Base
Decomposed Granite
Portland Cement Concrete
CY
LF
LF
PRICE
$ .15
$ 2.00
$ .27
$ 495.00
$ 85.00
$ 1.21
$ 3,600.00
$ 19.00
$ 8.20
$ 4.10
$ 2.85
$ 2.50
$ 2.20
$ 1.50
$ 7.60
$ 37.00
$ 12.50
$ 20.85
$ 18.00
$ 21.00
SF/IN $ .38
SF/IN $ .14
SF/IN $ .19
Ton $ 23.20
SF/IN $ .41
-1-
ITEM DESCRIPTION
Pavement Crack Sealing
Pavement Reinforcing Fabric
Pavement Removal Existing AC
Existing PCC
Existing AC Berm
Saw Cut Existing Paving
Grinding Existing Paving
Subgrade Preparation
Streets
Berm, AC
Concrete
Cross Gutter
Curbs
Curb
Curb & Gutter
Driveway
Fence
Chain Link
6" Type "A", RSD G-5
8" Type "B", RSD G-5
Pattern Stamped
6" PCC, RSD G-12, G-13
6" PCC, RSD G-1
8" PCC, RSD G-1
6" PCC, RSD G-2
8" PCC, RSD G-2
4" PCC, RSD G-lO, G-18
6" PCC, RSD G-lO, G-14,
G-15, G-16
Wood
4' High, RSD M-5, M-6, M-20
5' High, RSD M-5, M-6, M-20
6' High, RSD M-5, M-6, M-20
6' High
Guard Post & Barricade RSD M-9
Guardrail
Header 2" X 6" Redwood
Lights, Street
90 Watt - L.P.S.V.
180 Watt - L.P.S.V.
RSD E-l, E-2, E-33
RSD E-l, E-2, E-33
Loop Detector Replacement
Metal Beam Barricade
Resolution No. 95-006
Page 4
UNIT PRICE
LF $ 1.10
SY $ 1.10
SF $ .7O
SF $ 1.90
LF $ 3.10
LF $ 2.65
SF $ 2.35
SF $ .26
LF
LF
SF
SF
$ 8.00
$ 9.00
$ 4.75
$ 4.20
LF
LF
LF
LF
SF
SF
$ 10.50
$ 11.00
$ 11.50
$ 13.50
$ 3.15
$ 3.85
LF
LF
LF
LF
20 LF
LF
LF
$ 10.10
$ 12.00
$ 15.80
$ 17.00
$ 630.00
$ 19.00
$ 3.70
EA
EA
EA
LF
$ 3,160.00
$ 3,450.00
$ 400.00
$ 37.90
-2-
ITEM
Monuments
Pavement Legends
Pavement Markers
Pedestrian Ramp
Regulatory Signs
Removal of
Existing Curb
DESCRIPTION
RSD M-lO, M-11, M-12, M-13
RSD G-27, G-28, G-29, G-30,
G-31, G-32, CalTrans NS-B
Stop, No Parking Speed
Limit, Etc.
Existing Curb & Gutter
Sidewalk
Retaining Walls
Masonry
Sidewalk
Street Name Sign
Striping
RSD C-1 to C-8
4" PCC, RSD G-7, G-g, G-11
RSD DS-13
4" White
8" White
4" Double Yellow
4" White Skip
Traffic Control
Traffic Signal
Trail
Trench Asphalt Restoration
Wall
Cut-off Pavement
Sewer
Cleanout
Cleanout (Sewer Force Main)
Cradle (Concrete)
Dead End
Encasement (Concrete)
Per Lane Closure Per Day
Equestrian/Pedestrian
RSD G-24, G-25
RSD G-22, G-23
PS-3
RSD S-16
RSD S-6
RSD S-7
Resolution No. 95 -006
Page 5
UNIT PRICE
EA $ 315.00
EA $ 200.00
EA $ 5.50
EA $ 740.00
EA $ 185.00
LF $ 3.80
LF $ 4.75
SF $ 1.35
SF $ 16.00
SF $ 3.20
EA $ 185.00
LF $ .30
LF $ .30
LF $ .45
LF $ .20
LN/DAY $ 300.00
EA $ 84,200.00
LF $ 9.50
LF $ 13.15
EA $ 685.00
EA $ 8O0.00
EA $ 1,050.00
LF $ 32.50
EA $ 315.00
LF $ 37.00
-3-
ITEM
DESCRIPTION
Lateral
4" - 30' Long
6" - 30' Long
Main
8" VCP/PVC
10" VCP/PVC
12" VCP/PVC
16" VCP/PVC
18" VCP/PVC
21" VCP/PVC
Manhole
RSD S-2, S-17
Manhole (Adjust Rim to Grade)
Pressure Sewer Pipe
11
6"
8"
Concrete Protective Slab
Shoring Over 5 Feet Deep
Stub & Plug 6" or 8"
Tie-in to Existing Manhole
Wall
Concrete Anchor RSD S-9
Cut-Off PS-lO
Water
Adjust Valve, B.O., or MAR to Grade
Air & Vacuum Valve Assembly PW-4
Anchor Block
Blow-off Assembly
Cut-off Wall
Fire Hydrant Assembly
Fire Hydrant Relocation
RSD S-11
PW-19.1, 19.2, RSD 1-20
2", PW-6
4", PW-6
PW-IO, RSD M-19
Fittings
(22%°, 45°
90°, Tee
Flange, etc.)
10"
12"
UNIT
EA
LF
LF
LF
LF
LF
LF
EA
EA
LF
LF
LF
LF
LF
EA
EA
CY
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
Resolution No. 95 -006
Page 6
PRICE
$ 950.00
$ 1,050.00
$ 29.50
$ 31.50
$ 38.00
$ 47.50
$ 51.50
$ 57.00
$ 2,200.00
$ 420.00
$ 23.00
$ 25.00
$ 29.50
$ 11.15
$ 11.50
$ 132.00
$ 1,350.00
$ 660.00
$ 140.00
$ 125.00
$ 1,265.00
$ 660.00
$ 1,000.00
$ 1,580.00
$ 140.00
$ 3,150.00
$ 1,750.00
$ 185.00
$ 215.00
$ 250.00
-4-
Resolution No. 95-006
Page 7
ITEM
DESCRIPTION
Main (All Materials
including normal
excavation)
6"
8"
10"
12"
14"
16"
Manual Air Release Assembly PW-3
UNI!
LF
LF
LF
LF
LF
LF
LF
EA
Pipe, Steel 6" LF
8" LF
Post Indicator Valve
Protection Post 4" X 85" Steel
PW-1
PW-2.1
PW-2.1
Reducer
Relocate Water Meter
Service
Tie-In to Main
Daytime 4" - 8"
10" - Up
Nighttime 4" - 8"
10" - Up
(Additional inspection fees will be charged
for nighttime tie-ins)
Thrust Block PW-17
PW-12
PW-12
PW-12
Valve Assembly, Gate
Valve Assembly, Butterfly
G. Storm Drain
PW-19.1
PW-19.2
PW-19.2
PW-19.2
Channel Lining PCC, RSD D-70, D-71
Type "A", RSD D-9
Type "B", RSD D-lO
Clean Outs
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
SF
FA
EA
PRICE
$ 21.00
$ 25.00
$ 29.50
$ 34.00
$ 42.00
$ 44.00
$ 51.50
$ 1,420.00
$ 25.00
$ 27.00
$ 1,050.00
$ 140.00
$ 215.00
$ 525.00
$ 615.00
$ 765.00
$ 1,050.00
$ 650.00
$ 900.00
$ 1,200.00
$ 2,000.00
$ 250.00
$ 725.00
$ 950.00
$ 1,315.00
$ 1,285.00
$ 1,475.00
$ 1,580.00
$ 1,680.00
$ 5.25
$ 3,150.00
$ 4,200.00
-5-
Resolution No. 95-006
Page 8
ITEM
DESCRIPTION
Culverts
Pipe
(All Materials)
SDRSD D-60,D-61
3" (Private Only)
4" (Private Only)
6" (Private Only)
8" (Private Only)
10" (Private Only)
12" (Private Only)
15" (Private Only)
18"
21"
24"
27"
30"
33"
36"
39"
42"
48"
54"
60"
66"
72"
Cast in Place PCC Structures 0 - 20
20 +
Ditch
Brow Ditch
Earthen Ditch
RSD D-75
Energy Dissipator RSD D-41, D-42, D-43
Headwalls
Gravity Type
Wing Type
RSD D-30, D-31, D-32, D-33
RSD D-34
RSD D-35
Inlets
Private Catch Basin
Catch Basin
Less than 12"
12" X 12"
18" x 18"
Type "F", RSD D-7
Type "G", RSD D-8
Type "I", RSD D-29
CSP Inlet
Curb Inlet
(Types A, B, C,
RSD D-l, D-2, D-3,
D-11, D-12)
Inlet Apron
L : 4' to 10'
L : 11' to 20'
L = 21' to 28'
RSD D-39
Lug
All Types
UNIT
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
CY
CY
LF
LF
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
PRICE
$ 10.50
$ 12.75
$ 18.00
$ 22.00
$ 25.00
$ 31.50
$ 38.00
$ 63.00
$ 67.50
$ 71.50
$ 79.00
$ 8].00
$ 86.50
$ 93.00
$ lO1.00
$ 111.50
$ 120.00
$ 139.00
$ 158.00
$ 168.50
$ lg5.00
$ 525.00
$ 420.00
$ 12.00
$ 4.20
$ 6,575.00
$ 1,900.00
$ 3,150.00
$ 3,650.00
$ 105.00
$ 265.00
$ 475.00
$ 2,650.00
$ 3,150.00
$ 3,150,00
$ 2,100.00
$ 3,050.00
$ 3,700.00
$ 4,200.00
$ 1,375.00
$ 780.00
-6-
Resolution No. 95-006
Page 9
ITEM
DESCRIPTION
Outlets
Curb Outlet
Sidewalk Underdrain Pipe
Sidewalk Underdrain
UNIT PRICE
Type "A", RSD D-25 EA
RSD D-27 EA
Type "A", RSD D-25 EA
$ 420.00
$ 420.00
$ 2,100.00
Pipe Collar RSD D-62 EA $ 660.00
Riprap
Dumped RSD D-40 CY $ 105.00
Placed RSD D-40 CY $ 125.00
Channel Protection RSD D-74 CY $ 95.00
Engineering Fabric SF $ .08
Sand CY $ 25.00
EA $ 160.00
EA $ 370.00
Velocity Reducing Ring Up to 36"
Over 36"
1
Curtain RSD D-38 EA $ 485.00
Cut-off Drain RSD D-72 EA $ 550.00
Wal
NOTE:
Cost Estimates for bonding and securities for improvements shall
include a 10% contingency amount added to the construction estimate.
Total amount (construction plus contingency) should be rounded to the
next highest $100 for the bond amount.
-7-
Resolution No. 95 -006
Page 10
CITY OF POWAY
SCHEDULE OF FEES FOR GRADING AND SUBDIVISION ACTIVITIES
,)ANUARY, 1995
PLAN CHECK AND INSPECTION FEES
I. GRADING AND IMPROVENENT PLANS
A. Grading Permit Fee
(Including paving, stockpiling, and
administrative clearing permits)
B. Plan Check and Processing **
Improvement Costs
0 - $ 10,000
10,001 - 100,000
100,001 - 500,000
500,001 - 2,000,000
2,000,001 - 5,000,000
over 5,000,000
TOTAL FEE
$ 100 Per Permit
500
5.0% of Impr. Costs
4.0% of Impr. Costs
3.5% of Impr. Costs
3.0% of Impr. Costs
Time and Materials
C. Inspection Improvement Costs**
0 - $ 10,000
10,001 - 100,000
100,001 - 500,000
500,001 - 2,000,000
2,000,001 - 5,000,000
over 5,000,000
D. Improvement Plan Administrative Fee
FINAL HAP
GEOTECHNICAL REVIEWS
5OO
5.0% of Impr. Costs
4.0% of Impr. Costs
3.5% of Impr. Costs
3.0% of Impr. Costs
Time and Materials
$ lO0/Sheet
$1,000/Sheet
A. Soils Report Reviews
Small Project (1-3 houses) $ 250
Medium Projects (3-30 houses OR
1-3 commercial/industrial lots) $ 450
Large Projects (impr. costs up to
$5,000,000) $I,800
Special Projects (impr. costs over
$5,000,000) Time and Materials
B. Soils Compaction Reports and Grading Inspection
Small Project (1-3 houses) $ 250
Medium Projects (3-30 houses OR
1-3 commercial/industrial lots)
Large Projects (impr. costs up to
$5,ooo,ooo)
Special Projects (impr. costs over
$5,000,000)
$ 450
$1,800
Time and Materials
4. CONSTRUCTION CHANGES $ 200
-1-
Resolution No. 95 -006
Page 11
II.
5. INSPECTION OVERTIHE
6. SEWER VIDEO INSPECTION
7. MINOR DEVELOPNENT REVIEW
HISCELLANEOUS FEES
1. BOUNDARY ADJUSTMENT
2. CERTIFICATE OF COMPLIANCE
3. MERGER (Without Parcel Map)
4. EASEMENT DEDICATIONS
5. REIHBURSEMENT AGREEMENT
(includes reimbursement processing)
6. RIGHT-OF-WAY PERMIT FEE
7. RIGHT-OF-WAY PERHIT INSPECTION*
SFR Driveway or sewer lateral
Utility Companies
(Construction Costs >$5,000.00)
All Others
10.
11.
12.
TEMPORARY WATER AND SEWER APPLICATIONS
SEWER ANNEXATION
(Does not include State of CA fees)
APN FEE WORKUPS
VACATIONS
WATER SYSTEM ANALYSIS
A. Residential
Small Projects {1-4 Lots)
Medium Projects {5-30 Lots)
Large Projects (31-100 Lots)
Greater than 200 Lots
B. Commercial/Industrial
One Fire Service
Two Fire Services
More than Two Fire Services or
Looped Onsite System
-2-
$ 75/Hour Approved
Overtime
(With Two Hour Minimum)
$ 1/L.F.,
or $400 Minimum
$ 500/Lot
$1,000 Per Application
$1,000 Per Application
$ 800 Per Application
$ 500 Per Application
$1,000 + 1% Total Reim-
bursement Amount
$ 5O
$ 100 Minimum, 5% of
Est. Cost of Work
Time and Materials
$ 250 minimum, 5% of
Est. Cost of Work
$ 300 Per Application
$ 475 + $ 400/Acre
$ 50/Parcel
$1,500 Per Application
$1,250
$2,325
$3,100
Based on Proposal
$1,250
$1,850
$2,800
Resolution No. 95 -006
Page 12
13. BLUEPRINTS
18" X 26"
24" X 36"
Oversize
14. BLASTING PERHITS
15. ENCROACHHENT PERHITS
16, SPECIAL STUDIES
$ 5/Sheet
$ 6/Sheet
$ lO/Sheet
$ 50 Per Permit
$ 100
Based on proposal from
consultant plus admin.
overhead.
*If no other inspection fee applies.
**These fees are calculated incrementally as the project improvement costs
increase.
-3-