Loading...
Res 95-006 Resolution No. 95-006 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY AMENDING THE FEE SCHEDULE FOR GRADING AND SUBDIVISION ACTIVITIES OF THE ENGINEERING SERVICES DEPARTMENT AND RESCINDING RESOLUTION NO. 91-056 WHEREAS, on June 4, 1991, the City Council implemented an amended flat fee schedule for plan check and inspection services; and WHEREAS, Sections 16.46.010 through 16.46.080 of the Poway Municipal Code authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of grading plans and permits by resolution; and WHEREAS, Section 16.12.020, 16.12.060, 16.12.070, 16.14.020, 16.18.050, and 16.20.010 of the Poway Municipal Code authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of subdivision maps, parcel maps, boundary adjustments, improvement plans, and public and private improvements by resolution. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway that: Section 1. Resolution No. 91-056 is hereby rescinded. Section 2. The attached "Schedule of Fees for Grading and Subdivision Activities" is hereby amended and adopted as shown in Exhibit 1. Section 3. The fees adopted herein are to cover the expenses of the City of Poway, its officers, employees, agents, contractors, and assigns incurred for all engineering, administrative, professional, and technical services including, but not limited to, all those necessary to accept, process, check, examine, revise, administer, prepare, and approve grading plans, erosion control plans, grading permits, improvement plans, subdivision maps, parcel maps, boundary adjustments, reversions, mergers, certificates of compliance, plats, dedications, covenants, agreements, and related reports, studies, calculations, exhibits, and permits, and to inspect and administer the construction of same, and to ascertain or determine their compliance with the Grading Ordinance, Subdivision Ordinance, State Subdivision Map Act, and any other applicable local, county, state, or federal code, statute policy, or regulation. Section 4. The attached "Unit Prices for Improvement and Bonding Cost Estimates" is hereby adopted and established as shown in Exhibit 2. Section 5. A developer deposit fee system for plan check and inspection services may be used for planned community developments or projects which are financially supported by both private and public interests with the approval of the Director of Engineering Services. Section 6. This revised fee schedule will take effect sixty (60) days from the date of approval of this resolution. Resolution No. 95-006 Page 2 PASSED, ADOPTED, AND APPROVED, by the City Council of the City of Poway, California, at a regular meeting this 7th day of February, 1995. obert Emery, Presidi~er ATT EST: Marjor~ii]V~ahlsten, City Clerk STATE OF CALIFORNIA ) ) ss. COUNTY OF SAN DIEGO ) I, Marjorie Wahlsten, City Clerk of the City of Poway, do hereby certify under the penalty of perjury, that the foregoing Resolution No. 95-006 was duly adopted by the City Council at a meeting of said City Council held on the 7th day of February, 1995 and that it was so adopted by the following vote: AYES: CAFAGNA, EMERY, REXFORD NOES: NONE ABSTAIN: NONE ABSENT: CALLERY, HIGGINSON Marjo~ie~K. Wahlsten, City Clerk City o~ !~way Resolution No. 95-006 Page 3 CITY OF POWAY UNIT PRICES FOR IMPROVEMENT ANO BONOING COST ESTIMATE JANUARY, lgg5 ITEM DESCRIPTION UNIT A. Erosion Control & Landscaping Plastic Sheets Visquene SF Sand Bags (including maintenance & replacement) EA Hydroseeding SF Trees Removal EA Planting EA Landscaping & Irrigation (Erosion Control) SF B. Grading Clearing and Grubbing Acre Cribwall Embankment Import or Export Rock Excavation (Removal or Relocation) SF 0 - 1,000 CY 1,001 - 10,000 CY 10,001 - 30,000 CY 30,001 - 60,000 CY 60,001 - 500,000 CY over 500,000 CY Structure Excavation Subdrains CY Paving A,Co A.B. C.T.B. D.G. P.C.C. Blasting CY No Blasting CY 4" (w/rock & fabric) 6" (w/rock & fabric) Asphalt Concrete Aggregate Base Cement Treated Base Decomposed Granite Portland Cement Concrete CY LF LF PRICE $ .15 $ 2.00 $ .27 $ 495.00 $ 85.00 $ 1.21 $ 3,600.00 $ 19.00 $ 8.20 $ 4.10 $ 2.85 $ 2.50 $ 2.20 $ 1.50 $ 7.60 $ 37.00 $ 12.50 $ 20.85 $ 18.00 $ 21.00 SF/IN $ .38 SF/IN $ .14 SF/IN $ .19 Ton $ 23.20 SF/IN $ .41 -1- ITEM DESCRIPTION Pavement Crack Sealing Pavement Reinforcing Fabric Pavement Removal Existing AC Existing PCC Existing AC Berm Saw Cut Existing Paving Grinding Existing Paving Subgrade Preparation Streets Berm, AC Concrete Cross Gutter Curbs Curb Curb & Gutter Driveway Fence Chain Link 6" Type "A", RSD G-5 8" Type "B", RSD G-5 Pattern Stamped 6" PCC, RSD G-12, G-13 6" PCC, RSD G-1 8" PCC, RSD G-1 6" PCC, RSD G-2 8" PCC, RSD G-2 4" PCC, RSD G-lO, G-18 6" PCC, RSD G-lO, G-14, G-15, G-16 Wood 4' High, RSD M-5, M-6, M-20 5' High, RSD M-5, M-6, M-20 6' High, RSD M-5, M-6, M-20 6' High Guard Post & Barricade RSD M-9 Guardrail Header 2" X 6" Redwood Lights, Street 90 Watt - L.P.S.V. 180 Watt - L.P.S.V. RSD E-l, E-2, E-33 RSD E-l, E-2, E-33 Loop Detector Replacement Metal Beam Barricade Resolution No. 95-006 Page 4 UNIT PRICE LF $ 1.10 SY $ 1.10 SF $ .7O SF $ 1.90 LF $ 3.10 LF $ 2.65 SF $ 2.35 SF $ .26 LF LF SF SF $ 8.00 $ 9.00 $ 4.75 $ 4.20 LF LF LF LF SF SF $ 10.50 $ 11.00 $ 11.50 $ 13.50 $ 3.15 $ 3.85 LF LF LF LF 20 LF LF LF $ 10.10 $ 12.00 $ 15.80 $ 17.00 $ 630.00 $ 19.00 $ 3.70 EA EA EA LF $ 3,160.00 $ 3,450.00 $ 400.00 $ 37.90 -2- ITEM Monuments Pavement Legends Pavement Markers Pedestrian Ramp Regulatory Signs Removal of Existing Curb DESCRIPTION RSD M-lO, M-11, M-12, M-13 RSD G-27, G-28, G-29, G-30, G-31, G-32, CalTrans NS-B Stop, No Parking Speed Limit, Etc. Existing Curb & Gutter Sidewalk Retaining Walls Masonry Sidewalk Street Name Sign Striping RSD C-1 to C-8 4" PCC, RSD G-7, G-g, G-11 RSD DS-13 4" White 8" White 4" Double Yellow 4" White Skip Traffic Control Traffic Signal Trail Trench Asphalt Restoration Wall Cut-off Pavement Sewer Cleanout Cleanout (Sewer Force Main) Cradle (Concrete) Dead End Encasement (Concrete) Per Lane Closure Per Day Equestrian/Pedestrian RSD G-24, G-25 RSD G-22, G-23 PS-3 RSD S-16 RSD S-6 RSD S-7 Resolution No. 95 -006 Page 5 UNIT PRICE EA $ 315.00 EA $ 200.00 EA $ 5.50 EA $ 740.00 EA $ 185.00 LF $ 3.80 LF $ 4.75 SF $ 1.35 SF $ 16.00 SF $ 3.20 EA $ 185.00 LF $ .30 LF $ .30 LF $ .45 LF $ .20 LN/DAY $ 300.00 EA $ 84,200.00 LF $ 9.50 LF $ 13.15 EA $ 685.00 EA $ 8O0.00 EA $ 1,050.00 LF $ 32.50 EA $ 315.00 LF $ 37.00 -3- ITEM DESCRIPTION Lateral 4" - 30' Long 6" - 30' Long Main 8" VCP/PVC 10" VCP/PVC 12" VCP/PVC 16" VCP/PVC 18" VCP/PVC 21" VCP/PVC Manhole RSD S-2, S-17 Manhole (Adjust Rim to Grade) Pressure Sewer Pipe 11 6" 8" Concrete Protective Slab Shoring Over 5 Feet Deep Stub & Plug 6" or 8" Tie-in to Existing Manhole Wall Concrete Anchor RSD S-9 Cut-Off PS-lO Water Adjust Valve, B.O., or MAR to Grade Air & Vacuum Valve Assembly PW-4 Anchor Block Blow-off Assembly Cut-off Wall Fire Hydrant Assembly Fire Hydrant Relocation RSD S-11 PW-19.1, 19.2, RSD 1-20 2", PW-6 4", PW-6 PW-IO, RSD M-19 Fittings (22%°, 45° 90°, Tee Flange, etc.) 10" 12" UNIT EA LF LF LF LF LF LF EA EA LF LF LF LF LF EA EA CY EA EA EA EA EA EA EA EA EA EA EA EA Resolution No. 95 -006 Page 6 PRICE $ 950.00 $ 1,050.00 $ 29.50 $ 31.50 $ 38.00 $ 47.50 $ 51.50 $ 57.00 $ 2,200.00 $ 420.00 $ 23.00 $ 25.00 $ 29.50 $ 11.15 $ 11.50 $ 132.00 $ 1,350.00 $ 660.00 $ 140.00 $ 125.00 $ 1,265.00 $ 660.00 $ 1,000.00 $ 1,580.00 $ 140.00 $ 3,150.00 $ 1,750.00 $ 185.00 $ 215.00 $ 250.00 -4- Resolution No. 95-006 Page 7 ITEM DESCRIPTION Main (All Materials including normal excavation) 6" 8" 10" 12" 14" 16" Manual Air Release Assembly PW-3 UNI! LF LF LF LF LF LF LF EA Pipe, Steel 6" LF 8" LF Post Indicator Valve Protection Post 4" X 85" Steel PW-1 PW-2.1 PW-2.1 Reducer Relocate Water Meter Service Tie-In to Main Daytime 4" - 8" 10" - Up Nighttime 4" - 8" 10" - Up (Additional inspection fees will be charged for nighttime tie-ins) Thrust Block PW-17 PW-12 PW-12 PW-12 Valve Assembly, Gate Valve Assembly, Butterfly G. Storm Drain PW-19.1 PW-19.2 PW-19.2 PW-19.2 Channel Lining PCC, RSD D-70, D-71 Type "A", RSD D-9 Type "B", RSD D-lO Clean Outs EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA SF FA EA PRICE $ 21.00 $ 25.00 $ 29.50 $ 34.00 $ 42.00 $ 44.00 $ 51.50 $ 1,420.00 $ 25.00 $ 27.00 $ 1,050.00 $ 140.00 $ 215.00 $ 525.00 $ 615.00 $ 765.00 $ 1,050.00 $ 650.00 $ 900.00 $ 1,200.00 $ 2,000.00 $ 250.00 $ 725.00 $ 950.00 $ 1,315.00 $ 1,285.00 $ 1,475.00 $ 1,580.00 $ 1,680.00 $ 5.25 $ 3,150.00 $ 4,200.00 -5- Resolution No. 95-006 Page 8 ITEM DESCRIPTION Culverts Pipe (All Materials) SDRSD D-60,D-61 3" (Private Only) 4" (Private Only) 6" (Private Only) 8" (Private Only) 10" (Private Only) 12" (Private Only) 15" (Private Only) 18" 21" 24" 27" 30" 33" 36" 39" 42" 48" 54" 60" 66" 72" Cast in Place PCC Structures 0 - 20 20 + Ditch Brow Ditch Earthen Ditch RSD D-75 Energy Dissipator RSD D-41, D-42, D-43 Headwalls Gravity Type Wing Type RSD D-30, D-31, D-32, D-33 RSD D-34 RSD D-35 Inlets Private Catch Basin Catch Basin Less than 12" 12" X 12" 18" x 18" Type "F", RSD D-7 Type "G", RSD D-8 Type "I", RSD D-29 CSP Inlet Curb Inlet (Types A, B, C, RSD D-l, D-2, D-3, D-11, D-12) Inlet Apron L : 4' to 10' L : 11' to 20' L = 21' to 28' RSD D-39 Lug All Types UNIT LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF CY CY LF LF EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA PRICE $ 10.50 $ 12.75 $ 18.00 $ 22.00 $ 25.00 $ 31.50 $ 38.00 $ 63.00 $ 67.50 $ 71.50 $ 79.00 $ 8].00 $ 86.50 $ 93.00 $ lO1.00 $ 111.50 $ 120.00 $ 139.00 $ 158.00 $ 168.50 $ lg5.00 $ 525.00 $ 420.00 $ 12.00 $ 4.20 $ 6,575.00 $ 1,900.00 $ 3,150.00 $ 3,650.00 $ 105.00 $ 265.00 $ 475.00 $ 2,650.00 $ 3,150.00 $ 3,150,00 $ 2,100.00 $ 3,050.00 $ 3,700.00 $ 4,200.00 $ 1,375.00 $ 780.00 -6- Resolution No. 95-006 Page 9 ITEM DESCRIPTION Outlets Curb Outlet Sidewalk Underdrain Pipe Sidewalk Underdrain UNIT PRICE Type "A", RSD D-25 EA RSD D-27 EA Type "A", RSD D-25 EA $ 420.00 $ 420.00 $ 2,100.00 Pipe Collar RSD D-62 EA $ 660.00 Riprap Dumped RSD D-40 CY $ 105.00 Placed RSD D-40 CY $ 125.00 Channel Protection RSD D-74 CY $ 95.00 Engineering Fabric SF $ .08 Sand CY $ 25.00 EA $ 160.00 EA $ 370.00 Velocity Reducing Ring Up to 36" Over 36" 1 Curtain RSD D-38 EA $ 485.00 Cut-off Drain RSD D-72 EA $ 550.00 Wal NOTE: Cost Estimates for bonding and securities for improvements shall include a 10% contingency amount added to the construction estimate. Total amount (construction plus contingency) should be rounded to the next highest $100 for the bond amount. -7- Resolution No. 95 -006 Page 10 CITY OF POWAY SCHEDULE OF FEES FOR GRADING AND SUBDIVISION ACTIVITIES ,)ANUARY, 1995 PLAN CHECK AND INSPECTION FEES I. GRADING AND IMPROVENENT PLANS A. Grading Permit Fee (Including paving, stockpiling, and administrative clearing permits) B. Plan Check and Processing ** Improvement Costs 0 - $ 10,000 10,001 - 100,000 100,001 - 500,000 500,001 - 2,000,000 2,000,001 - 5,000,000 over 5,000,000 TOTAL FEE $ 100 Per Permit 500 5.0% of Impr. Costs 4.0% of Impr. Costs 3.5% of Impr. Costs 3.0% of Impr. Costs Time and Materials C. Inspection Improvement Costs** 0 - $ 10,000 10,001 - 100,000 100,001 - 500,000 500,001 - 2,000,000 2,000,001 - 5,000,000 over 5,000,000 D. Improvement Plan Administrative Fee FINAL HAP GEOTECHNICAL REVIEWS 5OO 5.0% of Impr. Costs 4.0% of Impr. Costs 3.5% of Impr. Costs 3.0% of Impr. Costs Time and Materials $ lO0/Sheet $1,000/Sheet A. Soils Report Reviews Small Project (1-3 houses) $ 250 Medium Projects (3-30 houses OR 1-3 commercial/industrial lots) $ 450 Large Projects (impr. costs up to $5,000,000) $I,800 Special Projects (impr. costs over $5,000,000) Time and Materials B. Soils Compaction Reports and Grading Inspection Small Project (1-3 houses) $ 250 Medium Projects (3-30 houses OR 1-3 commercial/industrial lots) Large Projects (impr. costs up to $5,ooo,ooo) Special Projects (impr. costs over $5,000,000) $ 450 $1,800 Time and Materials 4. CONSTRUCTION CHANGES $ 200 -1- Resolution No. 95 -006 Page 11 II. 5. INSPECTION OVERTIHE 6. SEWER VIDEO INSPECTION 7. MINOR DEVELOPNENT REVIEW HISCELLANEOUS FEES 1. BOUNDARY ADJUSTMENT 2. CERTIFICATE OF COMPLIANCE 3. MERGER (Without Parcel Map) 4. EASEMENT DEDICATIONS 5. REIHBURSEMENT AGREEMENT (includes reimbursement processing) 6. RIGHT-OF-WAY PERMIT FEE 7. RIGHT-OF-WAY PERHIT INSPECTION* SFR Driveway or sewer lateral Utility Companies (Construction Costs >$5,000.00) All Others 10. 11. 12. TEMPORARY WATER AND SEWER APPLICATIONS SEWER ANNEXATION (Does not include State of CA fees) APN FEE WORKUPS VACATIONS WATER SYSTEM ANALYSIS A. Residential Small Projects {1-4 Lots) Medium Projects {5-30 Lots) Large Projects (31-100 Lots) Greater than 200 Lots B. Commercial/Industrial One Fire Service Two Fire Services More than Two Fire Services or Looped Onsite System -2- $ 75/Hour Approved Overtime (With Two Hour Minimum) $ 1/L.F., or $400 Minimum $ 500/Lot $1,000 Per Application $1,000 Per Application $ 800 Per Application $ 500 Per Application $1,000 + 1% Total Reim- bursement Amount $ 5O $ 100 Minimum, 5% of Est. Cost of Work Time and Materials $ 250 minimum, 5% of Est. Cost of Work $ 300 Per Application $ 475 + $ 400/Acre $ 50/Parcel $1,500 Per Application $1,250 $2,325 $3,100 Based on Proposal $1,250 $1,850 $2,800 Resolution No. 95 -006 Page 12 13. BLUEPRINTS 18" X 26" 24" X 36" Oversize 14. BLASTING PERHITS 15. ENCROACHHENT PERHITS 16, SPECIAL STUDIES $ 5/Sheet $ 6/Sheet $ lO/Sheet $ 50 Per Permit $ 100 Based on proposal from consultant plus admin. overhead. *If no other inspection fee applies. **These fees are calculated incrementally as the project improvement costs increase. -3-