Res 95-104Resolution No. 95-104
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY
AMENDING THE FEE SCHEDULE FOR GRADING AND
SUBDIVISION ACTIVITIES OF THE ENGINEERING SERVICES DEPARTMENT
AND RESCINDING RESOLUTION NO. 95-006
WHEREAS, on June 4, 1991, the City Council implemented an amended flat
fee schedule for engineering, plan check, and inspection services; and
WHEREAS, Sections 16.46.010 through 16.46.080 of the Poway Municipal
Code authorizes the City Council to establish certain fees and deposits for
the processing, checking, and inspection of grading plans and permits by
resolution; and
WHEREAS, Section 16.12.020, 16.12.060, 16.12.070, 16.14.020, 16.18.050,
and 16.20.010 of the Poway Municipal Code authorizes the City Council to
establish certain fees and deposits for the processing, checking, and
inspection of subdivision maps, parcel maps, boundary adjustments, improvement
plans, and public and private improvements by resolution.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway
that:
Section 1. Resolution No. 95-006 is hereby rescinded.
Section 2. The attached "Schedule of Fees for Grading and Subdivision
Activities" is hereby amended and adopted as shown in Exhibit 1.
Section 3. The fees adopted herein are to cover the expenses of the
City of Poway, its officers, employees, agents, contractors, and assigns
incurred for all engineering, administrative, professional, and technical
services including, but not limited to, all those necessary to accept,
process, check, examine, revise, administer, prepare, and approve grading
plans, erosion control plans, grading permits, improvement plans, subdivision
maps, parcel maps, boundary adjustments, reversions, mergers, certificates of
compliance, plats, dedications, covenants, agreements, and related reports,
studies, calculations, exhibits, and permits, and to inspect and administer
the construction of same, and to ascertain or determine their compliance with
the Grading Ordinance, Subdivision Ordinance, State Subdivision Map Act, and
any other applicable local, county, state, or federal code, statute policy, or
regulation.
Section 4. The attached "Unit Prices for Improvement and Bonding Cost
Estimates" is hereby adopted and established as shown in Exhibit 2.
Section 5. A developer deposit fee system for plan check and inspection
services may be used for planned community developments or projects which are
financially supported by both private and public interests with the approval
of the Director of Engineering Services.
Section 6. This revised fee schedule will take effect sixty (60) days
from the date of approval of this resolution.
Resolution No. 95- 104
Page 2
PASSED, ADOPTED, AND APPROVED, by the City Council of the City of Poway,
California, at a regular meeting this 12th day of September, 1995.
Do~ Hig~inson; a~
ATTEST:
MarjOri~ K. Wahlsten, City Clerk
STATE OF CALIFORNIA )
) SS.
COUNTY OF SAN DIEGO )
I, Marjorie K. Wahlsten, City Clerk of the City of Poway, do hereby certify
under the penalty of perjury, that the foregoing Resolution No. 95-104 was
duly adopted by the City Council at a meeting of said City Council held on
12th day of September, 1995 and that it was so adopted by the following vote:
AYES: CAFAGNA, EMERY, REXFORD, HIGGINSON
NOES: NONE
ABSTAIN: NONE
ABSENT: CALLERY
. Wahlsten, City Clerk
City of pOway
Resolution No. 95-104
Page 3
CITY OF POWAY
SCHEDULE OF FEES FOR GRADING AND SUBDIVISION ACTIVITIES
SEPTENBER, 1995
PLAN CHECK AND INSPECTION FEES
1. GRADING
A. Grading Permit Fee
(Including paving, stockpiling, and
administrative clearing permits)
B. Plan Check and Processing*
Grading
I - $ 25,OOO
25,001 - $ 50,000
50,001 - $ 100,000
100,001 - $ 500,000
over 500,000
C. Inspection Grading Costs*
1 - $ 25,000
25,001 - $ 50,000
50,001 - $ 100,000
100,001 - $ 500,000
over 500,000
2. IMPROVEMENT PLANS
A. Improvement Plan Administrative Fee
B. Plan Check and Processing*
Improvement Costs
1 - $ 25,000
25,001 - $ 50,000
50,001 - $ 100,000
100,001 - $ 500,000
over 500,000
TOTAL FEE
$ 100 Per Permit
5% of Imp. Costs ($500
min.)
4% of Imp. Costs
3% of Imp. Costs
2% of Imp. Costs
Time and Materials**
5% of Imp. Costs ($500
min.)
4% of Imp. Costs
3% of Imp. Costs
2% of Imp. Costs
Time and Materials**
TOTAL FEE
$ lO0/Sheet
5% of Imp. Costs ($500
min.)
4% of Imp. Costs
3% of Imp. Costs
2% of Imp. Costs
Time and Materials**
o
C. Inspection Improvement Costs**
1 - $ 25,000
25,001 - $ 50,000
50,001 - $ 100,000
100,001 - $ 500,000
over 500,000
FINAL HAP
5% of Imp. Costs ($500
min.)
4% of Imp. Costs
3% of Imp. Costs
2% of Imp. Costs
Time and Materials
$1,000/Sheet
-1-
Resolution No. 95 -104
Page 4
II.
o
GEOTECHNICAL REVIEWS
A.
Bo
Soils Report Reviews
Small Project (1-3 houses) $ 360
Medium Projects (3-30 houses OR
1-3 commercial/industrial lots) $ 650
Large Projects (impr. costs up to
$5,000,000) $2,300
Special Projects (impr. costs over
$5,000,000) Time and Materials**
Soils Compaction Reports and Grading Inspection
Small Project (1-3 houses) $ 360
Medium Projects (3-30 houses OR
1-3 commercial/industrial lots) $ 650
Large Projects (impr. costs up to
$5,000,000) $2,300
Special Projects (impr. costs over
$5,OOO,OO0)
CONSTRUCTION CHANGES
INSPECTION OVERTIME
Week-days
Week-ends
7. SEWER VIDEO INSPECTION
8. MINOR DEVELOPMENT REVIEW
MISCELLANEOUS FEES
1. BOUNDARY ADJUSTMENT
2. CERTIFICATE OF COMPLIANCE
3. MERGER {Without Parcel Map}
4. EASEMENT DEDICATIONS
5. REIMBURSEMENT AGREEMENT
{includes reimbursement processing)
6. RIGHT-OF-WAY PERMIT FEE
Time and Materials**
$ 50/hr.
(With Two Hour Min.)
$ 75/Hour Approved
Overtime
(With Two Hour Min.)
$ 75/Hour Approved
Overtime
(With Four Hour Min.)
$ 1/L.F.,
or $400 Minimum
$ 500/Lot
$1,000 Per Application
$1,000 Per Application
$ 800 Per Application
$1,000 Per Application
$1,000 + 1% Total Reim-
bursement Amount
$ 50
-2-
Resolution No. 95-104
Page 5
14.
15.
16.
RIGHT-OF-WAY PERMIT INSPECTION*
SFR Driveway or sewer lateral
Utility Companies
(Construction Costs >$5,000.00)
All Others
$ 100 Minimum, 5% of
Est. Cost of Work
Time and Materials
$ 250 minimum, 5% of
Est. Cost of Work
8. TEMPORARY WATER AND SEWER APPLICATIONS
9. SEWER ANNEXATION
{Does not include State of CA fees}
10. APN FEE WORKUPS $ 50/Parcel
11. EASEMENT VACATIONS
Summary without Public Hearing
With Public Hearing
12. WATER SYSTEM ANALYSIS
A. Residential
Small Projects (1-4 Lots)
Medium Projects (5-30 Lots)
Large Projects {31-100 Lots)
Greater than 200 Lots
B. Commercial/Industrial
One Fire Service $1,250
Two Fire Services $1,850
More than Two Fire Services or $2,800
Looped Onsite System
13. BLUEPRINTS
18" X 26" $ 5/Sheet
24" X 36" $ 6/Sheet
Oversize $ lO/Sheet
BLASTING PERMITS
ENCROACHMENT PERMITS $ 100
SPECIAL STUDIES
$ 500 Per Application
$ 475 + $ 400/Acre
$1,500 Per Application
$2,500 Per Application
$1,250
$2,325
$3,100
Based on Proposal
$ 50 Per Permit
Based on proposal from
consultant plus admin.
overhead.
17. STANDARD AGREEMENT TIME EXTENSION $ 300
18. CERTIFICATE OF CORRECTION - FINAL/PARCEL MAP $ 100
*These fees are calculated incrementally as the project improvement costs increase.
**Time and materials include salary, benefits, and City overhead of 55%.
-3-
Resolution No. 95-104
Page 6
CITY OF POWAY
UNIT PRICES FOR IMPROVEMENT AND BONDING COST ESTIMATE
SETEMBER, 1995
ITEM DESCRIPTION UNIT
A. Erosion Control & Landscaping
Plastic Sheets Visquene SF
Sand Bags (including maintenance & replacement) EA
Hydroseeding SF
Trees
Removal EA
Planting EA
Landscaping & Irrigation (Erosion Control) SF
Silt Fencing 3' High Minimum LF
B. Grading
Clearing and Grubbing Acre
Cribwall
Embankment
Import or Export
Rock Excavation
(Removal or
Relocation)
SF
1 - 1,000 CY
1,001 - 10,000 CY
10,001 - 30,000 CY
30,001 - 60,000 CY
60,001 - 500,000 CY
over 500,000 CY
Structure Excavation
Subdrains
CY
Paving
A.C.
A.B.
C.T.B.
D.G.
P.C.C.
Blasting CY $
No Blasting CY $
4" (w/rock & fabric)
6" (w/rock & fabric)
Asphalt Concrete
Aggregate Base
Cement Treated Base
Decomposed Granite
Portland Cement Concrete
CY
LF
LF
SF/IN
SF/IN
SF/IN
Ton
SF/IN
PRICE
.15
2.00
.27
495.00
85.00
1.21
.50
3,600.00
19.00
8.20
4.10
2.85
2.50
2.20
1.50
7.60
37.00
12.50
20.85
18.00
21.00
.38
.14
.19
23.20
.41
-1-
ITEM DESCRIPTION
Pavement Crack Sealing
Pavement Reinforcing Fabric
Pavement Removal Existing AC
Existing PCC
Existing AC Berm
Saw Cut Existing Paving
Grinding Existing Paving
Subgrade Preparation
Streets
Dikes, AC
Concrete
Cross Gutter
Curbs
Curb
Curb & Gutter
Gutter
Driveway
Fence
Chain Link
Wood
6" Type "A" "D" "E"
8" Type "B" "C"
Pattern Stamped
7" PCC
6" PCC
8" PCC
6" PCC
8" PCC
18" wide, 6" PCC
5~" PCC
4' High
5' High
6' High
6' High
Guard Post & Barricade
Guardrail
Header 2" X 6" Redwood
Lights, Street
90 Watt - L.P.S.V.
180 Watt - L.P.S.V.
Loop Detector Replacement
Metal Beam Barricade
-2-
Resolution No. 95-104
Page 7
UNIT
LF
SY
SF
SF
LF
LF
SF
SF
PRICE
$ 1.10
$ 1.10
$ .70
$ 1.90
$ 3.10
$ 2.65
$ 2.35
$ .26
LF
LF
SF
SF
$ 8.00
$ 9.00
$ 4.75
$ 4.20
LF
LF
LF
LF
LF
SF
$ 10.50
$ 11.00
$ 11.50
$ 13.50
$ 11.50
$ 3.85
LF
LF
LF
LF
20 LF
LF
LF
$ 10.10
$ 12.00
$ 15.80
$ 17.00
$ 630.00
$ 19.00
$ 3.70
EA
EA
EA
LF
$ 3,160.00
$ 3,450.00
$ 400.00
$ 37.90
Eo
ITEM
Monuments
Pavement Legends
Pavement Markers
Pedestrian Ramp
Regulatory Signs
DESCRIPTION
Stop, No Parking Speed
Limit, Etc.
Removal of
Existing Curb
Existing Curb & Gutter
Sidewalk
Retaining Walls
Masonry
Sidewalk
4" White
8" White
4" Double Yellow
4" White Skip
Street Name Sign
Per Lane Closure Per Day
Striping
Traffic Control
Traffic Signal
Trail Equestrian/Pedestrian
Trench Asphalt Restoration
Wall
Cut-off Pavement
Sewer
Cleanout
Cleanout (Sewer Force Main)
Cradle (Concrete)
Dead End Cap
Encasement (Concrete)
UNIT
EA
EA
EA
EA
EA
Resolution No. 95 -104
Page 8
PRICE
$ 315.00
$ 200.00
$ 5.5O
$ 74O.OO
$ 185.00
LF
LF
SF
SF
SF
EA
LF
LF
LF
LF
LN/DAY
EA
LF
LF
EA
$ 3.80
$ 4.75
$ 1.35
$ 16.00
$ 3.20
$ 185.00
$ .3O
$ .30
$ .45
$ .2O
$ 300.00
$ 84,200.00
$ 9.50
$ 13.15
$ 685.00
EA
EA
LF
EA
LF
$ 800.00
$ 1,050.00
$ 32.50
$ 315.00
$ 37.00
-3-
ITEM
DESCRIPTION
Lateral
4" - 30' Long
6" - 30' Long
Main
8" VCP/PVC
10" VCP/PVC
12" VCP/PVC
16" VCP/PVC
18" VCP/PVC
21" VCP/PVC
Manhole
Manhole (Adjust Rim to Grade)
Pressure Sewer Pipe
6"
8"
Concrete Protective Slab
Shoring
Over 5 Feet Deep
Stub & Plug 6" or 8"
Tie-in to Existing Manhole
Wall
Concrete Anchor
Cut-Off
Water
Adjust Valve, B.O., or MAR to Grade
Air & Vacuum Valve Assembly
Anchor Block
Blow-off Assembly
Cut-off Wall
Fire Hydrant Assembly
Fire Hydrant Relocation
UNIT
EA
EA
LF
LF
LF
LF
LF
LF
EA
EA
LF
LF
LF
LF
LF
EA
EA
CY
EA
EA
EA
EA
EA
EA
EA
EA
EA
Fittings
(22¼°, 45° 8" EA
90°, Tee 10" EA
Flange, etc.) 12" EA
-4-
Resolution No. 95-104
Page 9
PRICE
$ 950.00
$ 1,050.00
$ 29.50
$ 31.50
$ 38.00
$ 47.50
$ 51.50
$ 57.00
$ 2,200.00
$ 420.00
$ 23.00
$ 25.OO
$ 29.50
$ 11.15
$ 11.50
$ 132.00
$ 1,350.00
$ 660.00
$ 140.00
$ 125.00
$ 1,265.00
$ 660.00
$ 1,000.00
$ 1,580.00
$ 140.00
$ 3,150.00
$ 1,750.00
$ 185.00
$ 215.00
$ 250.00
Resolution No. 95-104
Page 10
ITEM
DESCRIPTION
Main (All Materials
including normal
excavation)
6"
8"
10"
12"
14"
16"
Manual Air Release Assembly
UNIT
LF
LF
LF
LF
LF
LF
LF
EA
Pipe, Steel 6" LF
8" LF
Post Indicator Valve
Protection Post 4" X 85" Steel
3j ,, and 1"
1Y2"
2"
Reducer
Relocate Water Meter
Service
Tie-In to Main
Daytime 4" - 8"
10" - Up
Nighttime 4" - 8"
10" - Up
(Additional inspection fees will be charged
for nighttime tie-ins)
Thrust Block
,!
6"
8"
12"
Valve Assembly, Gate
Valve Assembly, Butterfly
G. Storm Drain
Channel Lining
Clean Outs Type "A"
Type "B"
6"
8"
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
SF
EA
EA
PRICE
$ 21.00
$ 25.00
$ 29.50
$ 34.00
$ 42.00
$ 44.00
$ 51.50
$ 1,420.00
$ 25.00
$ 27.00
$ 1,050.00
$ 140.00
$ 215.00
$ 525.00
$ 615.00
$ 765.00
$ 1,050.00
$ 650.00
$ 9OO.OO
$ 1,200.00
$ 2,000.00
$ 250.00
$ 725.00
$ 950.00
$ 1,315.00
$ 1,535.00
$ 1,285.00
$ 1,475.00
$ 1,580.00
$ 1,680.00
$ 5.25
$ 3,150.00
$ 4,200.00
-5-
Resolution No. 95-104
Page 11
ITEM
DESCRIPTION
Culverts
Pipe
(All Materials)
3" (Private Only)
4" (Private Only)
6" (Private Only)
8" (Private Only)
10" (Private Only)
12" (Private Only)
15" (Private Only)
18"
21"
24"
27"
30"
33"
36"
39"
42"
48"
54"
60"
66"
72"
Cast in Place PCC Structures
0 - 20
20 +
Ditch
Brow Ditch
Earthen Ditch
Energy Dissipator
Headwalls
Gravity Type
Wing Type
For 12" to 36" pipe
For 42" to 84" pipe
"L" Type
Inlets
Private Catch Basin
Catch Basin
Less than 12"
12"X 12"
18" x 18"
Type "F"
Type "G"
Type "I"
CSP Inlet
Curb Inlet
(Types A, B, CT
Inlet Apron
L = 4' to 10'
L = 11' to 20'
L = 21' to 28'
Lug
All Types
UNIT
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
CY
CY
LF
LF
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
PRICE
$ 10 50
$ 12 75
$ 18 O0
$ 22 O0
$ 25 O0
$ 31 50
$ 38.00
$ 63.00
$ 67.50
$ 71.50
$ 79.00
$ 81.00
$ 86.50
$ 93.00
$ 101.00
$ 111.50
$ 120.00
$ 139.00
$ 158.00
$ 168.50
$ 195.00
$ 525.00
$ 420.00
$ 12.00
$ 4.20
$ 6,575.00
$ 1,900.00
$ 3,150.00
$ 3,650.00
$ 3,650.00
$ 105.00
$ 265.00
$ 475.00
$ 2,650.00
$ 3,150.00
$ 3,150.00
$ 2,100.00
$ 3,050.00
$ 3,700.00
$ 4,200.00
$ 1,375.00
$ 780.00
-6-
Resolution No. 95-104
Page 12
ITEM DESCRIPTION UNIT PRICE
Outlets
Sidewalk Underdrain Pipe
Sidewalk Underdrain
EA $ 420.00
Type "A" EA $ 2,100.00
Pipe Collar EA $ 660.00
Riprap
Dumped CY $ 105.00
Placed CY $ 125.00
Channel Protection CY $ 95.00
Engineering Fabric SF $ .08
Sand CY $ 25.00
Velocity Reducing Ring Up to 36"
Over 36"
EA $ 160.O0
EA $ 370.00
Wall
Curtain EA $ 485.00
Cut-off Drain EA $ 550.00
NOTE:
Cost Estimates for bonding and securities for improvements shall
include a 10% contingency amount added to the construction estimate.
Total amount (construction plus contingency) should be rounded to the
next highest $100 for the bond amount.
-7-