Loading...
Res 95-104Resolution No. 95-104 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY AMENDING THE FEE SCHEDULE FOR GRADING AND SUBDIVISION ACTIVITIES OF THE ENGINEERING SERVICES DEPARTMENT AND RESCINDING RESOLUTION NO. 95-006 WHEREAS, on June 4, 1991, the City Council implemented an amended flat fee schedule for engineering, plan check, and inspection services; and WHEREAS, Sections 16.46.010 through 16.46.080 of the Poway Municipal Code authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of grading plans and permits by resolution; and WHEREAS, Section 16.12.020, 16.12.060, 16.12.070, 16.14.020, 16.18.050, and 16.20.010 of the Poway Municipal Code authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of subdivision maps, parcel maps, boundary adjustments, improvement plans, and public and private improvements by resolution. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway that: Section 1. Resolution No. 95-006 is hereby rescinded. Section 2. The attached "Schedule of Fees for Grading and Subdivision Activities" is hereby amended and adopted as shown in Exhibit 1. Section 3. The fees adopted herein are to cover the expenses of the City of Poway, its officers, employees, agents, contractors, and assigns incurred for all engineering, administrative, professional, and technical services including, but not limited to, all those necessary to accept, process, check, examine, revise, administer, prepare, and approve grading plans, erosion control plans, grading permits, improvement plans, subdivision maps, parcel maps, boundary adjustments, reversions, mergers, certificates of compliance, plats, dedications, covenants, agreements, and related reports, studies, calculations, exhibits, and permits, and to inspect and administer the construction of same, and to ascertain or determine their compliance with the Grading Ordinance, Subdivision Ordinance, State Subdivision Map Act, and any other applicable local, county, state, or federal code, statute policy, or regulation. Section 4. The attached "Unit Prices for Improvement and Bonding Cost Estimates" is hereby adopted and established as shown in Exhibit 2. Section 5. A developer deposit fee system for plan check and inspection services may be used for planned community developments or projects which are financially supported by both private and public interests with the approval of the Director of Engineering Services. Section 6. This revised fee schedule will take effect sixty (60) days from the date of approval of this resolution. Resolution No. 95- 104 Page 2 PASSED, ADOPTED, AND APPROVED, by the City Council of the City of Poway, California, at a regular meeting this 12th day of September, 1995. Do~ Hig~inson; a~ ATTEST: MarjOri~ K. Wahlsten, City Clerk STATE OF CALIFORNIA ) ) SS. COUNTY OF SAN DIEGO ) I, Marjorie K. Wahlsten, City Clerk of the City of Poway, do hereby certify under the penalty of perjury, that the foregoing Resolution No. 95-104 was duly adopted by the City Council at a meeting of said City Council held on 12th day of September, 1995 and that it was so adopted by the following vote: AYES: CAFAGNA, EMERY, REXFORD, HIGGINSON NOES: NONE ABSTAIN: NONE ABSENT: CALLERY . Wahlsten, City Clerk City of pOway Resolution No. 95-104 Page 3 CITY OF POWAY SCHEDULE OF FEES FOR GRADING AND SUBDIVISION ACTIVITIES SEPTENBER, 1995 PLAN CHECK AND INSPECTION FEES 1. GRADING A. Grading Permit Fee (Including paving, stockpiling, and administrative clearing permits) B. Plan Check and Processing* Grading I - $ 25,OOO 25,001 - $ 50,000 50,001 - $ 100,000 100,001 - $ 500,000 over 500,000 C. Inspection Grading Costs* 1 - $ 25,000 25,001 - $ 50,000 50,001 - $ 100,000 100,001 - $ 500,000 over 500,000 2. IMPROVEMENT PLANS A. Improvement Plan Administrative Fee B. Plan Check and Processing* Improvement Costs 1 - $ 25,000 25,001 - $ 50,000 50,001 - $ 100,000 100,001 - $ 500,000 over 500,000 TOTAL FEE $ 100 Per Permit 5% of Imp. Costs ($500 min.) 4% of Imp. Costs 3% of Imp. Costs 2% of Imp. Costs Time and Materials** 5% of Imp. Costs ($500 min.) 4% of Imp. Costs 3% of Imp. Costs 2% of Imp. Costs Time and Materials** TOTAL FEE $ lO0/Sheet 5% of Imp. Costs ($500 min.) 4% of Imp. Costs 3% of Imp. Costs 2% of Imp. Costs Time and Materials** o C. Inspection Improvement Costs** 1 - $ 25,000 25,001 - $ 50,000 50,001 - $ 100,000 100,001 - $ 500,000 over 500,000 FINAL HAP 5% of Imp. Costs ($500 min.) 4% of Imp. Costs 3% of Imp. Costs 2% of Imp. Costs Time and Materials $1,000/Sheet -1- Resolution No. 95 -104 Page 4 II. o GEOTECHNICAL REVIEWS A. Bo Soils Report Reviews Small Project (1-3 houses) $ 360 Medium Projects (3-30 houses OR 1-3 commercial/industrial lots) $ 650 Large Projects (impr. costs up to $5,000,000) $2,300 Special Projects (impr. costs over $5,000,000) Time and Materials** Soils Compaction Reports and Grading Inspection Small Project (1-3 houses) $ 360 Medium Projects (3-30 houses OR 1-3 commercial/industrial lots) $ 650 Large Projects (impr. costs up to $5,000,000) $2,300 Special Projects (impr. costs over $5,OOO,OO0) CONSTRUCTION CHANGES INSPECTION OVERTIME Week-days Week-ends 7. SEWER VIDEO INSPECTION 8. MINOR DEVELOPMENT REVIEW MISCELLANEOUS FEES 1. BOUNDARY ADJUSTMENT 2. CERTIFICATE OF COMPLIANCE 3. MERGER {Without Parcel Map} 4. EASEMENT DEDICATIONS 5. REIMBURSEMENT AGREEMENT {includes reimbursement processing) 6. RIGHT-OF-WAY PERMIT FEE Time and Materials** $ 50/hr. (With Two Hour Min.) $ 75/Hour Approved Overtime (With Two Hour Min.) $ 75/Hour Approved Overtime (With Four Hour Min.) $ 1/L.F., or $400 Minimum $ 500/Lot $1,000 Per Application $1,000 Per Application $ 800 Per Application $1,000 Per Application $1,000 + 1% Total Reim- bursement Amount $ 50 -2- Resolution No. 95-104 Page 5 14. 15. 16. RIGHT-OF-WAY PERMIT INSPECTION* SFR Driveway or sewer lateral Utility Companies (Construction Costs >$5,000.00) All Others $ 100 Minimum, 5% of Est. Cost of Work Time and Materials $ 250 minimum, 5% of Est. Cost of Work 8. TEMPORARY WATER AND SEWER APPLICATIONS 9. SEWER ANNEXATION {Does not include State of CA fees} 10. APN FEE WORKUPS $ 50/Parcel 11. EASEMENT VACATIONS Summary without Public Hearing With Public Hearing 12. WATER SYSTEM ANALYSIS A. Residential Small Projects (1-4 Lots) Medium Projects (5-30 Lots) Large Projects {31-100 Lots) Greater than 200 Lots B. Commercial/Industrial One Fire Service $1,250 Two Fire Services $1,850 More than Two Fire Services or $2,800 Looped Onsite System 13. BLUEPRINTS 18" X 26" $ 5/Sheet 24" X 36" $ 6/Sheet Oversize $ lO/Sheet BLASTING PERMITS ENCROACHMENT PERMITS $ 100 SPECIAL STUDIES $ 500 Per Application $ 475 + $ 400/Acre $1,500 Per Application $2,500 Per Application $1,250 $2,325 $3,100 Based on Proposal $ 50 Per Permit Based on proposal from consultant plus admin. overhead. 17. STANDARD AGREEMENT TIME EXTENSION $ 300 18. CERTIFICATE OF CORRECTION - FINAL/PARCEL MAP $ 100 *These fees are calculated incrementally as the project improvement costs increase. **Time and materials include salary, benefits, and City overhead of 55%. -3- Resolution No. 95-104 Page 6 CITY OF POWAY UNIT PRICES FOR IMPROVEMENT AND BONDING COST ESTIMATE SETEMBER, 1995 ITEM DESCRIPTION UNIT A. Erosion Control & Landscaping Plastic Sheets Visquene SF Sand Bags (including maintenance & replacement) EA Hydroseeding SF Trees Removal EA Planting EA Landscaping & Irrigation (Erosion Control) SF Silt Fencing 3' High Minimum LF B. Grading Clearing and Grubbing Acre Cribwall Embankment Import or Export Rock Excavation (Removal or Relocation) SF 1 - 1,000 CY 1,001 - 10,000 CY 10,001 - 30,000 CY 30,001 - 60,000 CY 60,001 - 500,000 CY over 500,000 CY Structure Excavation Subdrains CY Paving A.C. A.B. C.T.B. D.G. P.C.C. Blasting CY $ No Blasting CY $ 4" (w/rock & fabric) 6" (w/rock & fabric) Asphalt Concrete Aggregate Base Cement Treated Base Decomposed Granite Portland Cement Concrete CY LF LF SF/IN SF/IN SF/IN Ton SF/IN PRICE .15 2.00 .27 495.00 85.00 1.21 .50 3,600.00 19.00 8.20 4.10 2.85 2.50 2.20 1.50 7.60 37.00 12.50 20.85 18.00 21.00 .38 .14 .19 23.20 .41 -1- ITEM DESCRIPTION Pavement Crack Sealing Pavement Reinforcing Fabric Pavement Removal Existing AC Existing PCC Existing AC Berm Saw Cut Existing Paving Grinding Existing Paving Subgrade Preparation Streets Dikes, AC Concrete Cross Gutter Curbs Curb Curb & Gutter Gutter Driveway Fence Chain Link Wood 6" Type "A" "D" "E" 8" Type "B" "C" Pattern Stamped 7" PCC 6" PCC 8" PCC 6" PCC 8" PCC 18" wide, 6" PCC 5~" PCC 4' High 5' High 6' High 6' High Guard Post & Barricade Guardrail Header 2" X 6" Redwood Lights, Street 90 Watt - L.P.S.V. 180 Watt - L.P.S.V. Loop Detector Replacement Metal Beam Barricade -2- Resolution No. 95-104 Page 7 UNIT LF SY SF SF LF LF SF SF PRICE $ 1.10 $ 1.10 $ .70 $ 1.90 $ 3.10 $ 2.65 $ 2.35 $ .26 LF LF SF SF $ 8.00 $ 9.00 $ 4.75 $ 4.20 LF LF LF LF LF SF $ 10.50 $ 11.00 $ 11.50 $ 13.50 $ 11.50 $ 3.85 LF LF LF LF 20 LF LF LF $ 10.10 $ 12.00 $ 15.80 $ 17.00 $ 630.00 $ 19.00 $ 3.70 EA EA EA LF $ 3,160.00 $ 3,450.00 $ 400.00 $ 37.90 Eo ITEM Monuments Pavement Legends Pavement Markers Pedestrian Ramp Regulatory Signs DESCRIPTION Stop, No Parking Speed Limit, Etc. Removal of Existing Curb Existing Curb & Gutter Sidewalk Retaining Walls Masonry Sidewalk 4" White 8" White 4" Double Yellow 4" White Skip Street Name Sign Per Lane Closure Per Day Striping Traffic Control Traffic Signal Trail Equestrian/Pedestrian Trench Asphalt Restoration Wall Cut-off Pavement Sewer Cleanout Cleanout (Sewer Force Main) Cradle (Concrete) Dead End Cap Encasement (Concrete) UNIT EA EA EA EA EA Resolution No. 95 -104 Page 8 PRICE $ 315.00 $ 200.00 $ 5.5O $ 74O.OO $ 185.00 LF LF SF SF SF EA LF LF LF LF LN/DAY EA LF LF EA $ 3.80 $ 4.75 $ 1.35 $ 16.00 $ 3.20 $ 185.00 $ .3O $ .30 $ .45 $ .2O $ 300.00 $ 84,200.00 $ 9.50 $ 13.15 $ 685.00 EA EA LF EA LF $ 800.00 $ 1,050.00 $ 32.50 $ 315.00 $ 37.00 -3- ITEM DESCRIPTION Lateral 4" - 30' Long 6" - 30' Long Main 8" VCP/PVC 10" VCP/PVC 12" VCP/PVC 16" VCP/PVC 18" VCP/PVC 21" VCP/PVC Manhole Manhole (Adjust Rim to Grade) Pressure Sewer Pipe 6" 8" Concrete Protective Slab Shoring Over 5 Feet Deep Stub & Plug 6" or 8" Tie-in to Existing Manhole Wall Concrete Anchor Cut-Off Water Adjust Valve, B.O., or MAR to Grade Air & Vacuum Valve Assembly Anchor Block Blow-off Assembly Cut-off Wall Fire Hydrant Assembly Fire Hydrant Relocation UNIT EA EA LF LF LF LF LF LF EA EA LF LF LF LF LF EA EA CY EA EA EA EA EA EA EA EA EA Fittings (22¼°, 45° 8" EA 90°, Tee 10" EA Flange, etc.) 12" EA -4- Resolution No. 95-104 Page 9 PRICE $ 950.00 $ 1,050.00 $ 29.50 $ 31.50 $ 38.00 $ 47.50 $ 51.50 $ 57.00 $ 2,200.00 $ 420.00 $ 23.00 $ 25.OO $ 29.50 $ 11.15 $ 11.50 $ 132.00 $ 1,350.00 $ 660.00 $ 140.00 $ 125.00 $ 1,265.00 $ 660.00 $ 1,000.00 $ 1,580.00 $ 140.00 $ 3,150.00 $ 1,750.00 $ 185.00 $ 215.00 $ 250.00 Resolution No. 95-104 Page 10 ITEM DESCRIPTION Main (All Materials including normal excavation) 6" 8" 10" 12" 14" 16" Manual Air Release Assembly UNIT LF LF LF LF LF LF LF EA Pipe, Steel 6" LF 8" LF Post Indicator Valve Protection Post 4" X 85" Steel 3j ,, and 1" 1Y2" 2" Reducer Relocate Water Meter Service Tie-In to Main Daytime 4" - 8" 10" - Up Nighttime 4" - 8" 10" - Up (Additional inspection fees will be charged for nighttime tie-ins) Thrust Block ,! 6" 8" 12" Valve Assembly, Gate Valve Assembly, Butterfly G. Storm Drain Channel Lining Clean Outs Type "A" Type "B" 6" 8" EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA SF EA EA PRICE $ 21.00 $ 25.00 $ 29.50 $ 34.00 $ 42.00 $ 44.00 $ 51.50 $ 1,420.00 $ 25.00 $ 27.00 $ 1,050.00 $ 140.00 $ 215.00 $ 525.00 $ 615.00 $ 765.00 $ 1,050.00 $ 650.00 $ 9OO.OO $ 1,200.00 $ 2,000.00 $ 250.00 $ 725.00 $ 950.00 $ 1,315.00 $ 1,535.00 $ 1,285.00 $ 1,475.00 $ 1,580.00 $ 1,680.00 $ 5.25 $ 3,150.00 $ 4,200.00 -5- Resolution No. 95-104 Page 11 ITEM DESCRIPTION Culverts Pipe (All Materials) 3" (Private Only) 4" (Private Only) 6" (Private Only) 8" (Private Only) 10" (Private Only) 12" (Private Only) 15" (Private Only) 18" 21" 24" 27" 30" 33" 36" 39" 42" 48" 54" 60" 66" 72" Cast in Place PCC Structures 0 - 20 20 + Ditch Brow Ditch Earthen Ditch Energy Dissipator Headwalls Gravity Type Wing Type For 12" to 36" pipe For 42" to 84" pipe "L" Type Inlets Private Catch Basin Catch Basin Less than 12" 12"X 12" 18" x 18" Type "F" Type "G" Type "I" CSP Inlet Curb Inlet (Types A, B, CT Inlet Apron L = 4' to 10' L = 11' to 20' L = 21' to 28' Lug All Types UNIT LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF CY CY LF LF EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA PRICE $ 10 50 $ 12 75 $ 18 O0 $ 22 O0 $ 25 O0 $ 31 50 $ 38.00 $ 63.00 $ 67.50 $ 71.50 $ 79.00 $ 81.00 $ 86.50 $ 93.00 $ 101.00 $ 111.50 $ 120.00 $ 139.00 $ 158.00 $ 168.50 $ 195.00 $ 525.00 $ 420.00 $ 12.00 $ 4.20 $ 6,575.00 $ 1,900.00 $ 3,150.00 $ 3,650.00 $ 3,650.00 $ 105.00 $ 265.00 $ 475.00 $ 2,650.00 $ 3,150.00 $ 3,150.00 $ 2,100.00 $ 3,050.00 $ 3,700.00 $ 4,200.00 $ 1,375.00 $ 780.00 -6- Resolution No. 95-104 Page 12 ITEM DESCRIPTION UNIT PRICE Outlets Sidewalk Underdrain Pipe Sidewalk Underdrain EA $ 420.00 Type "A" EA $ 2,100.00 Pipe Collar EA $ 660.00 Riprap Dumped CY $ 105.00 Placed CY $ 125.00 Channel Protection CY $ 95.00 Engineering Fabric SF $ .08 Sand CY $ 25.00 Velocity Reducing Ring Up to 36" Over 36" EA $ 160.O0 EA $ 370.00 Wall Curtain EA $ 485.00 Cut-off Drain EA $ 550.00 NOTE: Cost Estimates for bonding and securities for improvements shall include a 10% contingency amount added to the construction estimate. Total amount (construction plus contingency) should be rounded to the next highest $100 for the bond amount. -7-