Loading...
Res 99-009RESOLUTION NO. 99-009 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA APPROVING SPECIFIC PLAN 98-02 "THE BROOKVIEW SENIOR HOUSING PROJECT" APN: 3t7-.~2t-02, 03, 04 WHEREAS, Chapter 17.47 (Specific Plan Regulations) of the Poway Municipal Code (Zoning Ordinance) provides for the initiation, preparation and adoption of specific plans in accordance with Section 65450, et seq. of the California Government Code (Article 8. Specific Plan); and WHEREAS, the City Council has designated the site suitable for affordable family housing by adoption of the AH (Affordable Housing) oveday; and WHEREAS, the approval of an affordable housing project under the AH designation requires the preparation and adoption of a specific plan for the site; and WHEREAS, the objective of the Specific Plan is to encourage that the design and development of an affordable housing project is compatible with and complimentary to existing and potential surrounding development; and WHEREAS, the proposed Specific Plan 98-02 involves three vacant parcels of land having an area of 6.7 acres which is more specifically identified as Assessor Parcel Numbers 317-521-02,03 and 04; and WHEREAS, Specific Plan 98-02 embodies the development standards which shall apply to development located within the Specific Plan boundaries; and WHEREAS, on February 9, 1999, the Poway City Council held a properly noticed public hearing in accordance with the California Government Code and the California Environmental Quality Act to consider Specific Plan 98-02. NOW, THEREFORE, the City Council of the City of Poway does hereby resolve as follows: Section 1: Environmental Findings The City Council finds that Specific Plan 98-02, with the implementation of mitigation measures, will not result in any significant impact on the environment and hereby issues a Negative Declaration. Section 2: Findings Specific Plan 98-02 is a component of the Poway General Plan and has been prepared to be fully consistent with the goals, objective and policies of the General Plan and its constituent elements. Resolution No. 99-009 Page 2 Specific Plan 98-02 provides the regulations and development standards that will ensure that the location, design and operating characteristics will be compatible with surrounding residential and commercial development. Section 3: The City Council of the City of Poway does hereby adopt The Brookview Senior Housing Project Specific Plan (SP 98-02). APPROVED and ADOPTED by the City Council of the City of Poway, State of California, this 9th day of February, 1999. ATTEST: Lori A~-ne Peoples, City Clerk Michael L. STATE OF CALIFORNIA ) )SS. COUNTY OF SAN DIEGO ) I, Lori Anne Peoples, City Clerk of the City of Poway, do hereby certify, under the penalty of perjury, that the foregoing Resolution, No. 99- 009 , was duly adopted by the City Council at a meeting of said City Council held on the 9th day of ,1999, and that it was so adopted by the following vote: February AYES: EMERY, HIGGINSON, REXFORD, CAFAGNA NOES: NONE ABSTAIN: NONE ABSENT: GOLDBY Lori/~nne Peo~le~, city'Cler~T-- - City of Poway N:\PLANNING\REPORT~SP9802.RSO I1. II1. TABLE OF CONTENTS INTRODUCTION LEGAL DESCRIPTION AUTHORITY AND SCOPE IV. PROPERTY ANALYSIS VI. RELATIONSHIP TO THE POWAY GENERAL PLAN AND MUNICIPAL CODE DEVELOPMENT STANDARDS/LAND USES VII. IMPLEMENTATION PROCEDURES VIII. ENVIRONMENTAL REVIEW IX. AMENDMENTPROCEDURES I. INTRODUCTION II. III. IV, In 1992 the City of Poway began a process to identify sites that would assist the City in meeting its local and regional share of affordable housing units. Staff first established criteda for evaluating potential sites. The criteria included proximity to food stores, public transit and medical facilities. The zoning of the parcel was not a major factor in the site evaluations and as a result selected parcels could be residentially or commercially zoned. As such, the program also required that a specific plan be created in association with a development plan on any of the selected sites. The specific plan would detail, for a specific site, development standards and density for the project. The City's Redevelopment and Housing Committee held public hearings on 36 potential affordable housing sites. Five properties, or combinations thereof, were ultimately selected from the list as acceptable affordable housing sites. To secure this designation, the City Council adopted a resolution that attached an Affordable Housing Oveday to each parcel. Aisc assigned to each site, was a classification as to whether it was to serve as a senior or multiple family facility. This specific plan has been prepared to comply with the guidelines of the affordable housing program. It addresses a plan to construct a 102-unit senior housing development with a permitted density of up to 25 units per acre. LEGAL DESCRIPTION/PROPERTY OWNERSHIP The subject three parcels, with a combined size of 6.70 acres, are located west of Pomerado Road, east of the Poway Estates residential subdivision, immediately north of the P.C.-N-Sat Shopping Center and south of the Poway Baptist Church. The parcels are further defined as APN.: 317-521-02,03 and 04 and legally defined as a portion of the western half of Section 14, Township 14S and Range 2W, of North San Bernardino Meridian. The property is owned in fee title by the Poway Redevelopment Agency. AUTHORITY AND SCOPE Section 65450, et seq. of the California Government Code enables local governments to adopt specific plans for the systematic implementation of their General Plans. The code requires that specific plans be consistent with the agency's General Plans. It is the intent of this specific plan to define appropriate land uses and development standards necessary to ensure that the development of the subject parcels is transitional, compatible and sensitive to the surrounding standards. PROPERTY ANALYSIS The subject area consists of three contiguous parcels that range in size from 1.33 Brookview Specific Plan Page to 2.92 acres in size. All three parcels are currently vacant. Pomerado Creek, a tributary to Poway Creek, bisects the property in a northeast/.southwest direction. The stream is both part of the flood control system and a natural creek. In order to enhance drainage flows through the creek system, improve the biotic condition of the channel and to eliminate the potential flooding of the site, the channel must be improved. The stream is regulated by the Department of Fish and Game, Army Corps of Engineers and the California Regional Water Quality Control Board. The developer must first secure the necessary permits from each of these agencies, which will require mitigation, before site work can begin. The subject parcels were used as a storage area for excess soil during the development of the Poway Estates residential subdivision immediately to the west. As a result, approximately one-third of the site still contains a large mound of fill material. Vegetation on the site consists almost exclusively of Eucalyptus trees. The trees range in size from saplings to mature trees four feet across. The site design should incorporate, where appropriate and reasonable, the use of these trees in the project design. RELATIONSHIP TO THE POWAY GENERAL PLAN AND MUNICIPAL CODE Specific Plan 98-02 has been prepared in accordance with the governing City plans and ordinances and State law pertaining to specific plans. The development of the subject property shall be consistent with the objectives and policies of the Poway General Plan and constituent elements. VI. LAND USE AND DEVELOPMENT STANDARDS This section presents site-specific development standards for the subject properties. The land use and development standards are divided into two sections. The first section lists land uses permitted on the property. The second section discusses specific site and building standards. A. LIST OF PERMITTED AND CONDITIONAL USES Where the symbol "C" appears, those uses noted so shall require a approval of a conditional use permit, uses that noted by the symbol "X" are not permitted. All other uses not mentioned shall be considered prohibited. RESIDENTIAL USES Multiple Dwellings · Rental C · Individual ownership X · Condominium conversion X Brookviaw Specific Plan Page 2 2. Group residential, including but not C limited to dormitories, independent living and board and care GENERAL REQUIREMENTS The purpose of the General Requirements section is to provide guidance to potential developers with specific regards to the site characteristic of the property. Site Design The entire three parcel, 6.7 acre site shall be developed as one integrated project. The site design should incorporate the creative use of open space, the creek, sidewalks, and landscaping. Design features, such as individualized entrances, common areas to share and overlook, and trellised walkways will help create a cohesive neighborhood effect. · Density: Maximum living units per net acre; 25 With a 25% density bonus issued by the City Council for AH projects. · Site Area (minimum, in acres) 2 · Site Coverage 50% · Distance between buildings 10 Ft. · Building Height 35 Ft. or two stories, whichever is less · Front yard setback 10 Ft. · Side yard setback 10/10 Ft. · Rear yard setback 10 Ft. Parking One/two bedroom: one space plus a percentage of guest parking, plus one per employee. 1.10 spaces combined total per living unit · Required Covered Parking 30% of available Brookview Specific Plan Page 3 spaces Architectural Design Development in the project area shall reflect an architectural style that incorporates the wooded element of the site and should contain design components and architectural elements that exist in the surrounding area. The basic design elements of scale, proportion, context and color that references and blends with the environment shall be carried throughout the project. All development shall conform with the goals, objectives, policies standards and regulations of this Specific Plan and all other applicable codes, including the Poway Municipal Code, State Building Code, the Uniform Building Code and the Paguay Redevelopment Plan. Development standards not specifically referenced in this Specific Plan shall defer to development criteria found in Chapter 17.39 Residential Senior Citizen Standards and Chapter 17.08 Residential Apartment Standards. · Building heights should relate to open spaces so as to allow maximum solar exposure and ventilation. The building design should incorporate significant articulation of exterior walls and multi-planed, pitched roofs. The use of awnings, recessed doorways and windows, extended roof eaves and balconies are encouraged to enhance the depth and appearance of the buildings. · Rear and side building facades should be designed to be consistent with the architectural style of the building and the design of the primary facade. Building illumination and architectural lighting shall be indirect in nature and shall complement and accent the design of the building. Site lighting should be designed to eliminate the intrusions of glare onto adjacent properties. Lighting should also emphasize walking areas so as to clearly identify the pedestrian walkways and direction of travel. Noise Attenuation The subject property is located near the intersection of Pomerado Road and Poway Road. A 1998 traffic volume survey indicated that Pomerado Road Brookview Specific Plan Page 4 presently carries over approximately 20,000 vehicle trips per day. A solid masonry wall of sufficient height to mitigate traffic noise shall be installed along the east property line for the full length of Pomerado Road, except for access points. An acoustical analysis shall be required to determine the appropriate height of the wall. The wall shall be constructed of a material and design that is similar to that utilized on other walled sections along Pomerado Road. Emergency Access Access to the site shall be from the intersection of Pomerado Road and Robison Boulevard. A traffic analysis shall determine road access widths and whether the intersection should be signalized. In addition, the Fire Department will require a secondary emergency access from Valewood Court located in the adjoining Poway Estates subdivision. Said access would be for emergency vehicles only and shall be secured by a locked gate. Utility Location All utility services, including electricity, telephone and gas shall be located below ground. All utility transformers shall be located near property boundaries, away from the main entrance and building entry areas and screened. Pro!ect Safety To secure the privacy and safety of the senior residents in this project, a six foot high wall shall be required around the perimeter of the project boundaries. The walls are intended to preclude or limit non-resident access through the site. The walls may be constructed from wood or concrete block, but should be of a design and location as to blend with the design of the buildings, landscape theme of the project and to coordinate with, and not cause the removal of, perimeter trees. Public Transit A location criteria for senior housing is its proximity to public transit. A public transit stop should be incorporated into the design of the project. It could be located near the intersection of Pomerado Road and Robison Boulevard or further south. The stop should include a standard City design bus shelter or one that is customized to compliment the design of the housing project. If a public transit stop is not incorporated into the project, provisions should be made for a project resident van that would be available to provide transit to the project residents. Age Requirement Brookview Specific Plan Page 5 At least one member of each household shall be 55 years of age or older. In all cases, administration of the age requirement for this specific plan shall be consistent with State and Federal Fair Housing regulations. VII. IMPLEMENTATION PROCEDURES The development of the land within the boundaries of the specific plan area shall follow normal City of Poway procedures with regard to development review, conditional use permits and the subdivision of land. Development of an affordable housing project will require approval of a development review and conditional use permit. This Specific Plan proposes development standards for the subject property. Where development standards differ from those listed in the Poway Municipal Code, the provisions contained within this Specific Plan shall take precedence. Where the Specific Plan is silent, the Poway Municipal Code standards shall govern. VIII. ENVIRONMENTAL REVIEW Staff conducted an on-site investigation and prepared an environmental initial study based on the implementation of a specific plan and a proposed affordable housing project and determined that the approval of the Specific Plan and subsequent Conditional Use Permit 98-09 and Development Review 98-34 could have a significant effect on the environment in the areas of Hydrology, Flora, Fauna, Socio-Economic Factors, Transportation and Aesthetics. However, mitigation measures incorporated into the design of the project, have reduced the potential impacts to a level of insignificance. The details of the mitigation measures are noted in the attached environmental initial study. The issuance of a Mitigated Negative Declaration is recommended. Pomerado Creek, a tributary to Poway Creek bisects the property. To increase drainage flows and reduce potential flooding of the project site, the channel must be improved. Prior to the disturbance of any wetland habitat or Waters of the United States a Section 1600-03 Streambed Alteration Permit (California Department of Fish & Game), Section 401 (Regional Water Quality Board), and a Section 404 (Army Corps of Engineers) permit must first be acquired. Mitigation for the loss of any wetland habitat will also be required. The amount of loss and mitigation required will be determined based on the final configuration of the channel. IX. AMENDMENT PROCEDURES Brookview Specific Plan Page 6 Any amendment, whether City-initiated or private, to Specific Plan 98-02 shall be processed in accordance with the Specific Plan regulations of the Poway Municipal Code and shall be, if approved, adopted by City Council resolution. Brookview Specific Plan Page 7