Item 6 - Water Treatment Plant Improvement Program Status Report AGENDA REPORT SUMMARY Honorable Chairman and Members of the Redevel opment Agency I~OM: James L. Bowersox, City Manager/Execu Director INITIATED BY: John D. ,~!tch, Assistant City Manage,~l ~ Mark S.,:ston, Director of Engineering Services Alan F. Schuler, Senior Civil Enginee~ e~'( DATE: January 17, 1995 SUBJECT: Water Treatment Plant Improvement Program Status Report ABSTRACT: Staff has updated cost estimates and funding sources for this Water Treatment Plant Improvement Program. FISCAL IMPACT Funds for this purchase have been budgeted with the overall improvement program. ENVIRONMENTAL REVIEW This authorization is categorically exempt under Section 15301 and 15311 of the CEQA. ADDITIONAL PUBLIC NOTIFICATION AND CORRESPONDENCE None. RECOMMENDATION It is recommended that the City Council adopt the Improvement Program and Financing Plan recommended in this report. This action includes the transfer of $211,450 from Fund 510-1714 to Fund 510-1718, the appropriation of $200,000 from the Sewer Fund Reserves (520) to Fund 510-1718. ACTION ;JAN 17 1995 Ii'EM 6 lof 4 'AGENDA REPORT CITY OF POWAY TO: Honorable Mayor and Members of the City Council ' Honorable Chairman and Members of the Redevelopment Agency . ~-.~ FROM: James L. Bowersox, City Manager/Executive Dire~ INITIu&]~ED BY: John O. Fitch, Assistant City Manage~)~k~ ~ Mark S. Weston, Director of Engineering Service~6~ Alan F. Schuler, Senior Civil Engineer~ ~t" DATE: January 17, 1995 SUBJECT: Water Treatment Plant Improvement Program Status Report BACKGROUND City Council has authorized upgrading the Lester d. Berglund Water Treatment Plant in order to meet Federal and State drinking water treatment requirements contained in the Surface Water Treatment Rule promulgated from the Safe Drinking Water Act. Work has begun on the traveling bridge repairs (Phase I). Malcolm Pirnie Engineers are currently completing plans and specifications for the largest phase (Phase II) of the improvements. They will complete the Distribution Control System PS&E in several months. Under a separate design contract design has begun on a new Public Services Administration Building and Operations Center Improvements (Phase III). The final phase (Phase IV) of improvements will be the currently unscheduled replacement of the floating cover on the Clearwell. The basic elements of work and current cost estimate follows: Phase I- Traveling Bridge Repairs (underway) $ 300,000 Phase II- New Filters 2,300,000 Chemical System Improvements 890,000 Existing Filter Improvements 1,440,000 Standby Power Improvements 19,000 Distribution Control System 625,000 Pressure Reducing Station 92,000 Control Building Improvements 260,000 Phase III- Administration Building 400,000 Operations Center Improvements 100,000 ACTION: 7 1995 I'~'~'M 6 2of 4 Agenda Report - Water Treatment Plant Improvement Program Status Report _ January 17, 1995 Page 2 Phase IV- Replace Clearwell Cover 300,000 Subtotal: $6,726,000 Studies and Predesign Tasks (Completed) $ 240,000 Design (underway) 595,000 Construction Management 758,000 Total Improvement Costs: $8,319,000 The funding sources identified for this project include: Water Fund RDA Funds (1993 Bonds) $2,500,000 Revenue Bonds 2,500,000 Pilot Plant Study (510-1714) 211,450 Water Fund Reserves (510) 2.908.500 Subtotal: $8,119,950 Sewer Fund Sewer Fund ResJrves (520) $ 200,000 Total: $8,319,950 FINDINGS The improvement program is designed to meet the Surface Water Treatment Rule and Safe Drinking Water Act requirements. Expansion of the Control Building (1,200 sq. ft.) was added to house the control system for the remote sites and the plant. The Administration Building (3,900 sq. ft.) and Operations Center improvements were added with partial funding from the Sewer Fund. Sewer funds also finance a the portion of the Control System Improvements associated with monitoring remote sewer pumping and metering stations. The replacement for the Clearwell Cover will be constructed after the plant improvements are completed. The State Department of Health Services is still reviewing our analysis of alternatives to recycle waste wash water. Staff and our consultants feel that the best option is to continue to return the settled waste wash water to the headworks of the treatment plant. We have requested a five year deferral in order to conduct additional studies to analyze the options in more depth. FISCAL IMPACT Funds for this improvement program were budgeted with the overall improvement program. Staff is recommending the transfer of $211,450 from Fund 510-1714 (Pilot Plant Study for Water Treatment) and $200,000 from unappropriated Sewer Fund Reserves to this project. JAN1?1995 ITEM .6 3of 4 Agenda Report - Water Treatment Plant Improvement Program Status Report January 17, 1995 Page 3 ENVIRONMENTAL REVIEW This authorization is categorically exempt under Section 15301 and 15311 of the CEQA. ADDITIONAL PUBLIC NOTIFICATIONAND CORRESPONDENCE None. RECOMMENDATION It is recommended that the City Council adopt the Improvement Program and Financing Plan recommended in this report. This action includes the transfer of $211,450 from Fund 510-1714 to Fund 510- 1718, the appropriation of $200,000 from the Sewer Fund Reserves (520) to Fund 510-1718. ,gAN 1 ? 1995 ITEM 6 4of4