Loading...
Item 15 - Adoption of Resolution Amending Fee Schedule for Grading/Subdivision Activities " AGENDA REPORT SUMMARY TO: DATE: Honorable Mayor and Members of the City Council James L. Bowersox, City Man~ .^ John D. Fitch, Assistant City ManagerCfJt" jJ Mark S. Weston, Director of Engineerin~ Service~ Javid Siminou, Senior Civil Engineer ~ February 7, 1995 FROM: INITIATED BY: SUBJECf: Adoption of a Resolution Amending the Fee Schedule for Grading and Subdivision Activities of the Engineering Services Department ABSTRACf Staff recommends that the City Council close the public hearing and adopt the resolution amending the fee schedule for grading and subdivision activities of the Engineering Services Department. ENVIRONMENTAL REVIEW This action is not subject to C. E.Q.A. review. FISCAL IMPACT The amendment will allow for cost recovery plus City overhead for plan check and inspection costs associated with land development in Poway. ADDITIONAL PUBLIC NOTIFICATION AND CORRESPONDENCE Notice was published in the Powav News Chieftain. RECOMMENDATION It is recommended that the City Counc il close the public hearing and adopt the attached resolution (Attachment 1) modifying the fi xed fee system for grading and subdivision activities. ACTION FEB 7 1995 ITEM 5 1 of 15 ~ AGENDA REPOR~ CITY OF POW A Y TO: FROM: INITIATED BY: Honorable Mayor and Members of the City Council James L, Bowersox, City Mana~ John D. Fitch, Assistant Cit~nager~ - J Mark S. Weston, Director of Engineerin~ Service~ Javid Siminou, Senior Civil Engineer ~ February 7, 1995 DATE: SUBJECT: Adoption of a Resolution Amending the Fee Schedule for Grading and Subdivision Activities of the Engineering Servi ces Deoartment BACKGROUND: In June, 1991, the City Council adopted Resolution 91-056 implementing an amended fee schedule for plan check, inspection, and other engineering services. Through implementation of this system, staff has determined that City expenses for right-of-way permits for utilities companies greatly exceed the fees collected for processing and inspection. The fee system, in general, has worked well for the City and developers and these proposed changes are a small refinement of the system. We propose to collect inspection fees from utility companies on projects exceeding $5,000.00 construction cost on a time and material basis. The right-of-way permit minimum inspection fee will remain $100 for individual single family driveway approaches, sewer laterals, or minor street repairs. The minimum inspection fee for all other right-of- way permits will remain at $250 to recover inspection costs. On all nonutility company projects exceeding $5,000.00 construction cost, the fee will continue to be calculated at 5% of the cost estimate, In addition, we have changed the inspection improvement costs to match that of plan check and processing. FINDINGS: Staff has reviewed administrative and inspection time expended on a large sample of right-of-way permits and determined that the proposed fees approximate the City's minimum costs. These inspection fees are reasonable for the service provided and are a small fraction of total development costs. The attached unit price list has been revised to reflect current standard drawings for construction of private and public improvements. ACTION: 2 of 15 FEB j ITEM 5 7 1995 Adoption of a Resolutil - Amending the Fee Schedule February 7, 1995 Page 2 FISCAL IMPACT: The amendment will allow for cost recovery plus City overhead for plan check and inspection costs associated with land development in Poway. ENVIRONMENTAL IMPACT: This action is not subject to C,E.Q.A. review. PUBLIC NOTIFICATION' CORRESPONDENCE: Notice was published in the Poway News Chieftain. RECOMMENDATION: It is recommended that the City Council close the public hearing and adopt the attached resolution (Attachment 1) modifying the fixed fee system for grading and subdivision activities. JLB:JDF:MSW:JS:KLC:bw ATTACHMENTS: 1. Resolution Amending the Fee Schedule FEB 7 1995 ITEM 5 3 of 15 Resolution No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY AMENDING THE FEE SCHEDULE FOR GRADING AND SUBDIVISION ACTIVITIES OF THE ENGINEERING SERVICES DEPARTMENT AND RESCINDING RESOLUTION NO. 91-056 WHEREAS, on June 4, 1991, the City Council implemented an amended flat fee schedule for plan check and inspection services; and WHEREAS, Sections 16.46.010 through 16.46.080 of the Poway Municipal Code authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of grading plans and permits by resolution; and WHEREAS, Section 16.12.020, 16.12.060, 16.12.070, 16.14.020, 16.18.050, and 16.20.010 of the Poway Municipal Code authorizes the City Council to establish certain fees and deposits for the processing, checking, and inspection of subdivision maps, parcel maps, boundary adjustments, improvement plans, and public and private improvements by resolution. that: NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway Sect ion 1. Resolution No. 91-056 is hereby rescinded. Section 2. The attached "Schedule of Fees for Grading and Subdivision Activities" is hereby amended and adopted as shown in Exhibit 1. Section 3. The fees adopted herein are to cover the expenses of the City of Poway, its officers, employees, agents, contractors, and assigns incurred for all engineering, administrative, professional, and technical services including, but not limited to, all those necessary to accept, process, check, examine, revise, administer, prepare, and approve grading plans, erosion control plans, grading permits, improvement plans, subdivision maps, parcel maps, boundary adjustments, reversions, mergers, certificates of compliance, plats, dedications, covenants, agreements, and related reports, studies, calculations, exhibits, and permits, and to inspect and administer the construction of same, and to ascertain or determine their compliance with the Grading Ordinance, Subdivision Ordinance, State Subdivision Map Act, and any other applicable local, county, state, or federal code, statute policy, or regulation. Section 4. The attached "Unit Prices for Improvement and Bonding Cost Estimates" is hereby adopted and established as shown in Exhibit 2. Section 5. A developer deposit fee system for plan check and inspection services may be used for planned community developments or projects which are financially supported by both private and public interests with the approval of the Director of Engineering Services. Section 6. This revised fee schedule will take effect sixty (60) days from the date of approval of this resolution. ATTACHMENT 1 FEB 7 1995 ITEM 5 4 of 15 ,solution No. 95- Page 2 PASSED, ADOPTED, AND APPROVED, by the City Council of the City of Poway, California, at a regular meeting this 7th day of February, 1995. Don Hlgginson, Mayor ATTEST: MarJorie K. Wahlsten, Clty Clerk STATE OF CALIFORNIA) ) ss. COUNTY OF SAN DIEGO) I, Marjorie K. Wahlsten, City Clerk of the City of Poway, do hereby certify under the penalty of perjury, that the foregoing Resolution No. 95- was duly adopted by the City Council at a meeting of said City Council held on 7th day of February, 1995 and that it was so adopted by the following vote: AYES: NOES: ABSTAIN: ABSENT: MarJorie K. Wahlsten, City Clerk City of Poway FEB 7 1995 ITEM 5 5 of 15 -. ----------------- ---.--..----------..-.----------.--------.-------.---.-- --------- Resolution No. 95 Page CITY OF POWAY SCHEDULE OF FEES FOR GRADING AND SUBDIVISION ACTIVITIES JANUARY, 1995 I. PLAN CHECK AND INSPECTION FEES 1. GRADING AND IMPROVEMENT PLANS A. Grading Permit Fee (Including paving, stockpiling, and administrative clearing permits) B. Plan Check and Processing ** Improvement Costs 0 - $ 10,000 10,001 - 100,000 100,001 - 500,000 5DO,001 - 2,000,000 2,000,001 - 5,000,000 over 5,000,000 C. Inspection Improvement Costs** 0 - $':I¡¡:¡ØØq 10,001 -100;000 100,001 - 500,000 500,001 - 2,000,000 2,000,001 - 5,000,000 over 5,000,000 D. Improvement Plan Administrative Fee $ 29, ggg 2. FINAL MAP 3. GEOTECHNICAL REVIEWS A. Soils Report Reviews Small Project (1-3 houses) Medium Projects (3-30 houses OR 1-3 commercial/industrial lots) Large Projects (impr. costs up to $5,000,000) Special Projects (impr. costs over $5,000,000) B. Soils Compaction Reports and Grading Sma 11 Project (1-3 houses) Medium Projects (3-30 houses OR 1-3 commercial/industrial lots) Large Projects (impr. costs up to $5,000,000) Special Projects (impr. costs over $5,000,000) 4. CONSTRUCTION CHANGES -1- 6 of 15 TOTAL FEE $ 100 Per Permit $ 500 5.0% of Impr. Costs 4.0% of Impr. Costs 3.5% of Impr. Costs 3.0% of Impr. Costs Time and Materials $ 500 5.0% of Impr. Costs 4.0% of Impr. Costs 3.5% of Impr. Costs 3.0% of Impr. Costs Time and Materials $ 100/Sheet $I,OOO/Sheet $ 250 $ 450 $1,800 Time and Materials Inspection $ 250 $ 450 ~ Time and Materials $ 200 FEB ITEM 5 7 1995 5. INSPECTION OVERTIME 6. SEWER VIDEO INSPECTION 7. MINOR DEVELOPMENT REVIEW INSPECTION II. MISCELLANEOUS FEES 1. BOUNDARY ADJUSTMENT 2. CERTIFICATE DF COMPLIANCE 3. MERGER (Without Parcel Map) 4. EASEMENT DEDICATIONS 5. REIMBURSEMENT AGREEMENT (includes reimbursement processing) 6. RIGHT-OF-WAY PERMIT FEE 7. RIGHT-OF-WAY PERMIT INSPECTION* SFR Driveway or sewer lateral 8. TEMPORARY WATER AND SEWER APPLICATIONS 9. SEWER ANNEXATION (Does not include State of CA fees) 10. APN FEE WORKUPS 11. VACATIONS 12. WATER SYSTEM ANALYSIS A. Residential Small Projects (1-4 Lots) Medium Projects (5-30 Lots) Large Projects (31-100 Lots) Greater than 200 Lots B. Commercial/Industrial One Fire Service Two Fire Services More than Two Fire Services or Looped Onsite System - -2- 7 of 15 Resolution No. 95 Page $ 75/Hour Approved Overtime (With Two Hour Minimum) $ I/L. F., or $400 Minimum $ 500/Lot $1,000 Per Application $1,000 Per Application $ 800 Per Application $ 500 Per Application $1,000 + 1% Total Reim- bursement Amount $ 50 $ 100 Minimum, 5% of Est. Cost of Work $ 300 Per Application $ 475 + $ 400/Acre $ 50/Parcel $1,500 Per Application $1,250 $2,325 $3,100 Based on Proposal $1,250 $1,850 $2,800 FEB 7 1995 ITEM 5 Resolution No. 95 Page 13. BLUEPRINTS 18" X 26" 24" X 36" Oversize $ $ $ $ 5/Sheet 6/Sheet 10/Sheet 14. BLASTING PERMITS 15. ENCROACHMENT PERMITS 50 Per Permit $ 100 16. SPECIAL STUDIES Based on proposal from consultant plus admin. overhead. *If no other inspection fee applies. **These fees are calculated incrementally as the project improvement costs increase. FEB 7 1995 ITEM 5 -3- B of 15 - Resolution No. 95 Page CITY OF POWAY UNIT PRICES FOR IMPROVEMENT AND BONDING COST ESTIMATE JANUARY, 1995 ITEM A. DESCRIPTION Erosion Control' Landscaping Plastic Sheets Visquene Hydroseeding Sand Bags (including maintenance & replacement) Trees Removal Planting B. Landscaping & Irrigation (Erosion Control) Grading Cribwall Clearing and Grubbing Embankment Import or Export Rock Excavat ion (Removal or Relocation) Structure~avat ion Subdrains C. Paving A.C. A.B. C.T.B. D.G. P.C.C. 9 of 15 0 - 1,000 1,001 - 10,000 10,001 - 30,000 30,001 - 60,000 60,001 - 500,000 over 500,000 Blasting No Blasting 4" (w/rock & fabric) 6" (w/rock & fabric) Asphalt Concrete Aggregate Base Cement Treated Base Decomposed Gran i te Portl and Cement Concrete -1- UNIT SF EA SF EA EA SF Acre SF CY CY CY CY CY CY CY CY CY CY LF LF SF/IN SF /IN SF /IN Ton SF /IN FEB PRICE $ $ $ .15 2.00 .27 $ $ $ 495.00 85.00 1. 21 $ 3,600.00 $ $ $ $ $ $ $ 19.00 8.20 4.10 2.85 2.50 2.20 1. 50 $ $ $ 7.60 37.00 12.50 $ $ $ 20.85 18.00 21.00 $ $ $ $ $ .3B .14 .19 23.20 .41 71995 ITEM 5 Resolution No. 95 Page ITEM DESCRIPTION UNIT PRICE Pavement Crack Sealing LF $ 1.10 Pavement Reinforcing Fabric Sy $ 1.10 Pavement Removal Existing AC SF $ .70 Existing PCC SF $ 1.90 Existing AC Berm LF $ 3.10 Saw Cut Existing Paving LF $ 2.65 Grinding Existing Paving SF $ 2.35 Subgrade Preparation SF $ .26 D. Streets Berm, AC 6" Type "A", R~P G-5 LF $ 8.00 8" Type "B",g§q G-5 R£f LF $ 9.00 Concrete Pattern Stamped SF $ 4.75 Cross Gutter 6" PCC, RSD G-12, G-13 SF $ 4.20 Curbs Curb 6" PCC, RSD G-l LF $ 10.50 8" PCC, RSD G-l LF $ 11. 00 Curb & Gutter 6" PCC, RSD G-2 LF $ 11.50 8" PCC, RSD G-2 LF $ 13.50 Driveway 4" PCC, RSD G-I0, G-18 SF $ 3.15 6" PCC, RSD G-I0, G-14, SF $ 3.85 G-15, G-16 Fence Chain Link 4' High, RSD M-5, M-6, M-20 LF $ 10.10 5' High, RSD M-5, M-6, M-20 LF $ 12.00 6' High, RSD M-5, M-6, M-20 LF $ 15.80 Wood 6' High LF $ 17.00 Guard Post & Barricade RSD M-9 20 LF $ 630.00 - Guardra il LF $ 19.00 Header 2" X 6" Redwood LF $ 3.70 Lights, Street 90 Watt - L.P.S.V. RSD E-l, E-2, E-33 EA $ 3,160.00 180 Watt - L.P.S.V. RSD E-l, E-2, E-33 EA $ 3,450.00 Loop Detector Replacement EA $ 400.00 Metal Beam Barricade LF $ 37.90 FEB 7 1995 ITEM 5 -2- 10 of 15 ITEM Monuments Pavement Legends Pavement Markers Pedestrian Ramp Regulatory Signs DESCRIPTION RSD M-I0, M-l1, M-12, M-13 RSD G-27, G-28, G-29, G-30, G-31, G-32, CalTrans N8-B Stop, No Parking Speed Limit, Etc. Removal of Existing Curb Existing Curb & Gutter Sidewal k Retaining Walls Masonry Sidewalk Street Name Sign Striping Traffic Control Traffic Signal Trail RSD C-l to C-8 4" PCC, RSD G-7, G-9, G-ll RSD DS-13 4" White 8" White 4" Double Yellow 4" White Skip Per Lane Closure Per Day Equestrian/Pedestrian Trench Asphalt Restoration Wall Cut-off Pavement E. Sewer - Cleanout RSD G-24, G-25 RSD G-22, G-23 PS-3 Cleanout (Sewer Force Main) RSD S-16 Cradle (Concrete) Dead End RSD S-6 PM', [) P 4 Encasement (Concrete) ¡¡SI:ì$;4Z Tne A, BPMI.'I;rpll, P 12 11 of 15 -3- - Resolution No. 95 Page UNIT PRICE EA $ 315.00 EA $ 200.00 EA S 5.50 EA $ 740.00 EA $ 185,00 LF $ 3.80 LF $ 4.75 SF $ 1. 35 SF $ 16.00 SF $ 3.20 EA $ 185.00 LF $ .30 LF $ .30 LF $ .45 LF $ .20 LN/DAY $ 300.00 EA $ 84,200.00 LF $ 9.50 LF $ 13.15 EA $ 685.00 EA $ 800.00 EA $ 1,050,00 LF $ 32.50 EA $ 315.00 LF $ 37.00 FEB 7 1995 ITEM 5 ITEM Latera 1 Main DESCRIPTION 4" - 30' Long 6" - 30' Long 8" VCP/PVC 10" VCP/PVC 12" VCP/PVC 16" VCP/PVC 18" VCP/PVC 21" VCP/PVC Manhole Pressure Sewer Pipe Manhole (Adjust Rim to Grade) Concrete Protective Slab Shoring Stub & Plug PM\!D P 1, P 2, P 3 4" 6" 8" RSO S-ll Over 5 Feet Deep 6" or 8" Tie-in to Existing Manhole Wall Concrete Anchor Cut-Off F. Water PM\!Ð P 16 PM'.!Ð P 17 Adjust Valve, B.D., or MAR to Grade Air & Vacuum Valve Assembly PM\/Ð SD 8 Anchor Block PM'oIÐ SÐ 2 Blow-off Assembly - Cut-off Wall Fire Hydrant Assembly 2", 4" , PM',!Ð SÐ 1 9 PM~/Ð SÐ 1 9 PMI/D SO 3 RWBlj}¡ij$pMiì!! pw,m~¡:¡b;~~¡:¡R 19 Fire Hydrant Relocation Fittings (22'4°, 45° 90°, Tee Flange, etc.) 12 of 15 8" 10" 12" -4- Resolution No. 95 Page UNIT PRICE EA $ 950.00 EA $ 1,050.00 LF $ 29.50 LF $ 31. 50 LF $ 38.00 LF $ 47.50 LF $ 51.50 LF $ 57.00 EA $ 2,200.00 EA $ 420.00 LF $ 23.00 LF $ 25.00 LF $ 29.50 LF $ 11.15 LF $ 11.50 EA $ 132.00 EA $ 1,350.00 CY $ 660.00 EA $ 140.00 EA $ 125,00 EA $ 1,265.00 EA $ 660.00 EA $ 1,000.00 EA $ 1,580.00 EA $ 140.00 EA $ 3,150.00 EA $ 1,750.00 EA $ 185.00 EA $ 215.00 EA $ 250.00 FEB 7 1995 ITEM 5 ITEM DESCRIPTION Main (All Materials including normal excavation) 4" 6" 8" 10" 12" 14" 16" Manual Air Release Assembly Pipe, Steel PM',iD S9 9 6" 8" Post Indicator Valve Protect i on Post 4" X B5" Steel Reducer Relocate Water Meter Service 1",PM~9 S9 11, R59 W 25 1!!,.",PMIIÐ S9 13, RS9 II 25 2" ,PMliD 59 13, R59 \I 25 Tie-In to Main Daytime 4" - 8" 10" - Up 4" - 8" 10" - Up (Additional inspection fees will for nighttime tie-ins) Nighttime be charged Resolution No. 95 Page UNIT PRICE LF $ 21. 00 LF $ 25.00 LF $ 29.50 LF $ 34.00 LF $ 42.00 LF $ 44.00 LF $ 51. 50 EA $ 1,420.00 LF $ 25.00 LF $ 27.00 EA $ 1,050.00 EA $ 140.00 EA $ 215.00 EA 525.00 EA $ 615.00 EA $ 765.00 EA $ 1,050.00 $ 650.00 $ 900.00 $ 1,200.00 $ 2,000.00 Thrust Block P',!9 S.9. 1 EA $ 250.00 Valve Assembly, Gate 6" , PM',JÐ 50 4 EA $ 725.00 8",PM'..'Ð 59 1 EA $ 950.00 10",PMliD S9 4 EA $ 1,315.00 Valve Ass§!l!l1ly, 10", PM',/Ð S9 5 A EA $ 1,285.00 ButterfTy- 12", PM'.!Ð 59 5 ^ EA $ 1,475.00 l¥ EA $ 1,580.00 HJ!. EA $ 1,680.00 G. Storm Drain Channel Lining PCC, RSD D-70, D-71 SF $ 5.25 Clean Outs Type "A", RSD D-9 EA $ 3,150.00 Type "B", RSD 0-10 EA $ 4,200,00 -5- 13 of 15 FEB 7 1995 ITEM 5 ITEM Culverts Pipe (All Materials) SORSD D-60,D-61 DESCR I PTION 3" (Private Only) 4" (Private Only) 6" (Private Only) B" (Private Only) 10" (Private Only) 12" (Private Only) 15" (Private Only) 18" 21 " 24" 27" 30" 33" 36" 39" 42" 48" 54" 60" 66" 72" Cast in Place PCC Structures Ditch Brow Ditch Earthen Ditch 0 - 20 20 + RSD D-75 Energy Dissipator RSD 0-41, D-42, D-43 Headwalls Gravity Type Wing Type RSD RSD RSD D-35 D-32, D-33 Inlets Private Catch Basin Catch fisì n Less than 12" 12" X 12" 18" x IB" Type "F", RSD D-7 Type "G", RSD D-8 Type "I", RSD D-29 CSP Inlet Curb Inlet (Types A, B, C, RSO D-l D-2 D-3 D-ll, D~12)' , Inlet Apron Lug 14 of 15 L = 4' to 10' L = 11' to 20' L=21't028' RSD D-39 All Types -6- Resolution No. 95 Page UNIT PRICE LF $ 10.50 LF $ 12.75 LF $ 18.00 LF $ 22.00 LF $ 25.00 LF $ 31.50 LF $ 38.00 LF $ 63.00 LF $ 67.50 LF $ 71. 50 LF $ 79.00 LF $ 81.00' LF $ B6. 50 LF $ 93.00 LF $ 101.00 LF $ 111. 50 LF $ 120.00 LF $ 139.00 LF $ 158.00 LF $ 168.50 LF $ 195.00 CY $ 525.00 CY $ 420.00 LF $ 12.00 LF $ 4.20 EA $ 6,575.00 EA $ 1,900.00 EA $ 3,150.00 EA $ 3,650.00 EA $ 105.00 EA $ 265.00 EA $ 475.00 EA $ 2,650.00 EA $ 3,150.00 EA $ 3,150.00 EA $ 2,100.00 EA $ 3,050.00 EA $ 3,700,00 EA $ 4,200.00 EA $ 1,375.00 EA 780.00 FEB 7 1995 ITEM 5 Resolution No. 95 Page ITEM DESCRIPTION UNIT PRICE Outlets Curb Outlet Type "A", RSD D-25 EA $ 420.00 Sidewalk Underdrain Pipe RSD D-27 EA $ 420.00 Sidewalk Underdrain Type "A", RSD D-25 EA $ 2,100.00 Pipe Collar RSD D-62 EA $ 660.00 Riprap Dumped RSD D-40 CY $ 105.00 Pl aced RSD 0-40 CY $ 125,00 Channel Protection RSD D-74 CY $ 95.00 Engineering Fabric SF $ .08 Sand CY $ 25.00 Velocity Reducing Ring Up to 36" EA $ 160,00 Over 36" EA $ 370.00 Wall Curtain RSD D-38 EA $ 485.00 Cut-off Drain RSD D- 72 EA $ 550.00 NOTE: Cost Estimates for bonding and securities for improvements shall include a 10% contingency amount added to the construction estimate. Total amount (construction plus contingency) should be rounded to the next highest $100 for the bond amount. ~= -7- FEB 7 1995 ITEM 5 15 of 15