Loading...
Res P-86-56RESOLUTION NO. P-86-56 A OF THE CITY COUNCIL OF THE CITY OF POWAY, PARCEL MAP 86-01 ASSESSOR'S PARCEL NUMBER 321-200-35, 36, 37, AND 39 Parcel Map No. 86-01, hereinafter "Map" by Connole Co. Inc., for the purpose of the real in the City of Poway, County of San Diego, State of described as of the south half of the northeast quarter and the quarter of the , and the quarter of the quarter of Section 7, 14S Range 1 West, San Base and into 2 lots, regularly came before the City Council for public hearing and action on July 22, 1986; and the of approval of the Map subject to all Planning report; and has set forth in the and has the City Council has read and said report other at the public hearing. NOW, resolve as the City Council of the City of Poway does Section 1: Findin The city Council makes the in regard to Parcel No. 86-01 and the Map a. The parcel is with all applicable general and plans; be The design or of the parcel is will all applicable general and specific plans; The site is for the type of d. The site is for the density of the The design of the humans and wildlife or is not damage and their likely to cause injury to f. The parcel is not likely to cause serious public health Resolution No. P-86-56 Page 2 The design of the parcel will not conflict with any acquired by the public at large, now of record, for access through or use of the within the That this project will not create adverse impacts on the and a is issued; The effect of approval on the housing needs the San Diego region has been considered and against the public service needs of Poway and fiscal and and of The design of the has provided, to the extent for future passiv? or natural heating or cooling in the Section the of the 1. Parcel Map No. 86-01, a copy of which is on file in office, is hereby approved subject to all The ' shall City for the Road and Poway Road. shall be in The Said offer to to the and slope rights and of Espola and ~ith the City offer of shall be made on the final parcel map. Public water, or any including but not limited to road, and sewer shall be until further of either parcel in this A of shall be by the 's civil or land sur- veyor stating that public imp to both parcels will be by the City as a of further or the of either pa cel in this This shall be sub ect to review and approval by the City and Cit Attorney prior to recordation in the office of the San Di go County It shall also be placed in the final parcel map. No. P-86-56 Page 3 e Ail related development fees, except as noted below, shall be paid prior to map approval. Prior to furthe of either parcel or any grading beyond hat requ red for a single family resi- dence, the sha 1 a focused t 1 study for b ology an . Should o and be found m tigation in compliance with CEQA shall be sub- m tted to the City for If are found, test shall be to the if any, of These tests shall the and extent and define the general nature and content of any subsur- face These tests shall the full of the site and be reporte~ in a form to the of If it is that the deposit is significant, it is that the gical site shall be placed in an open space zone. An the for the future and of the in a natural open space zone shall be to the City or other agency. If the site has deposit and only if it is unfeasi le ko include the site in an open space zone, the site s all be archaeologically to the by a salvage removal A design to this salvage shall be d and approved in advance by the City. A report the results of this salvage program shall be in a form suitable to the of Within 30 days of writing that all the of shall submit in have been read and Prior to final of Parcel Map 86-01, shall an / waiting area at the corner of Poway Road and Espola Road to the of the of Public Resolution No. P-86-56 Page 4 e Prior to final of Parcel Map 86-01, applicant shall grant license for public use of exisitng trails on- site subject to the of the City and of Section 3: the Parcel Map No. 86-01, a copy of which is on file in office, is hereby approved subject to the I. SHALL CONTACT THE OF WITH THE A. SITE 1. Site shall be d in plans on file in the ditions herein. AND with the site and the con- of this request shall not waive with all of the Zoning Development Code and all other appli- cable City in effect at the time of permit e For a new unit(s), the shall pay fees at the rate. Such fees may but not be limited to: Permit and Plan Fees, School Fees (in with policy and/or ), Water and Sewer Service Fees. These fees shall be paid prior to building permit Street names shall be by the prior to the of the final map, and street shall be provided prior to the of B. PARKING AND ACCESS No C. NO D. S,IGNS No Conditions No. P-86-56 Page 5 e RECREATION On lots having a private or public / trail on or adjacent to their property, the developer is required to have within the C.C.&R.'s the In the home, I have read the C.C.&R.'s and understand that said lot is subject to an for the purpose of / The shall improve the / trail system in with the adopted sign and to the of the of Public and permit ' prior to An open space shall be granted to the Czty over, upon, across and under the area defined on the final maps as an trail and no or other things shall be erected, placed or ed on subject except for the and of said trail and to the trail. the Master planned of the in / trails to the of the of Public and with the Master Plan of Trails 5. or payment of Park Fees at the rate shall be made prior to permit F. No G. UIRED 1. Review or Minor · prior to the II. SHALL CONTACT THE PUBLIC WITH THE Review shall be of a permit. GRADING Grading of the subject shall Uniform Code, City Grading plan and report, and be in grading with the grading Resolution No. P-86-56 Page 6 The grading plan shall contain a certificate signed by a registered civil engineer that the grading plan has preserved a of 100 square feet of solar access for each unit and for each future site within the A soils report shall be prepared by a qualified by the State of to perform such work at first of grading plan check. A geological report shall be prepared by a or and at the time of gra~ing ~lan check. f~r The final grading plan shall be subject to review and b the and Public and s all be prior to of the final sub- d vision map or of building permit, comes f rst. A surv y of property shall be to the satisfact on oof the City Engineer prior to any rock Seism c shall be taken for all and sba 1 occur only at and levels by the City STREETS AND Ail Element roads to Element road of the of Public further or shall be and and to the This item of either parcel. until The developer shall pay a pro-rata share for the or of the traffic signals at Poway Road and Espola Road prior to final map This item until further or of either parcel. the or access rights to Element roads shall be to the City of Poway and labeled on the final map to of the of Public or by This item until further of either parcel. Ail and to public street or public streets shall be This item until further of either parcel. No. P-86-56 Page 7 (4.5 / 8) feet in width shall be on (both/one) si e(s) of Poway and Espola Roads priorto final map pproval for he of the parcel or prior to perm t if occurs prior to resub- Th s item until further or o either parcel. access and and/or shall be access to all parcels over private roads, drives or parking areas and thereof to the of the of Public This item until further or of either parcel. Street and signing shall tion of the of Public until further division or d be ~ to the This item of either parcel. Ail street by the deferred until further parcel. shall be to, and of Public This item or development of either Street pans on size sheets by a Registered Civil shall be for by the of Publ c Plan chec and inspection shall be pa d by the T is item deferred until further or o~ ei her parcel. 10. Ail str et shall be prior to of to the of the of Publ c This item until further or of either parcel. 11. Street ' that ' but are not limited to: X a. X e. X b. Driveways __f · X c. Wheel chair ramps X g. X d. Curb and gutter __h. Cross gutter Alley gutter Street paving Alley paving 12. shall be ~ prior to the of the units to the of the of Public This item until further or of either parcel. Ail damaged public works trees, shall be repaired or replaced prior to bonds and imp of Public parkway of to the satisfaction of the Department Resolution No. P-86-56 Page 8 13. Prior to any work being performed in the public right-of-way, an permit shall be from the Public office and fees paid, in to any other permits 14. Street ' with City further or and shall be made in This item until of either parcel. 15. The shall pay the Traffic Fee at the rate prior to final map This item until further or of either parcel. Je AND FLOOD CONTROL the si6n or drains will be at 1 of Public and in This item of either parcel. specified by with until further divi- A system capable of and of all sur- face water within the an all surface waters that may flow onto the ro lands, shall be Said system s al in lude any and as required by the of Public to properly handle the drainage. Th s item deferred until further or of either parcel. e cement water crosses the or cross gutters shall be where This item deferred until further of either parcel. The Master Plan of · rate in prior to final map or Fee shall be paid at the with the This item until further of either parcel. be flows across This item of either parcel. and/or shall not until further or Ke Ail Element roads and/or deferred until further parcel. within the project shall be along less than 34.5 KV. This item or d of either Resolution No. P-~6-56 Page 9 e Utility ease ents shall be provided to serving util ty and the This item until further either parce . the specification of the of Public or of The shall be for the and of public as This item until further ' ' or of either parcel. Water, sewer, and fire systems plans shall be and to meet of the City of Powa~ and the Health of the County of San Diego. This item deferred until further division or development of either parcel. Prior to to the sewer until further of property for sewer area shall occur. This item or of either parcel. The applicant shall pa for a water system to the proper s ze and for the public water system. The amount wi 1 be by the cost of the ana- lysis and shall be pai prior to final map This item until further or of either parcel. The shall, within 30 days afte of the tract map, parce map, use permit, ok development review, apply for a Letter o y (LOA) to reserve sewerage availability and post w t the city, a nonre- fee equal to 20% of t e fee in effect at the t me the LOA is issued~ This item until further or ment of either parcel. 8. shall a light system to City of Poway Standards at no cost to the public, subject to the Cut-off shall be which will provide true 90 degree cutoff and prevent of light above the from the lowest ~oint of the lamp or light or device. b. Ail shall use a clear, low sodium vapor light source. Resolution No. P-86-56 Page 10 Le C. Advance energy charges and engineering charges shall be paid by the to the shall be ' and ev dence of and payment of lighting fees shall e to the City prior to final map or permit occurs first. This item deferred until further division or development of either parcel. Cable The for shall be provided and installed shall notify the Cable company when is to be AND APPROVALS Final plans from will be Final parcel and tract maps shall conform to City standards and Should this be further divided, each final map shall be for by the of Public Ail of the of the Poway Code shall be met as they relate to the of land. Prior to final map all of the above ' and shall be ' and or by within two years from map or prior to building permit ' whichever occurs first, by the of a performance secured with in a form by the city All fees, and charges shall be paid prior to final map approval· Prior to final map all and granted as above. shall be made No. P-86-56 Page 11 APPROVED and ADOPTED by the City Council of the City of Poway, State of California, theis 22nd day ~uly, 1986. Carl R. Kruse, Mayor ATTEST: K. City Clerk