Loading...
Res P-86-73NO. P-86-73 A OF THE CITY COUNCIL OF THE CITY OF POWAY, APPROVING TENTATIVE TRACT MAP 86-04 PARCEL NUMBER · 02 Tract Map No. 86-04, hereinafter "Map" by Fred and Carol Van Houten, for the purpose of the real in the City of Poway, County of San Diego, State of as a portion of the nort 8 acres of the south 13 acres of the SE quarter of Section , TS 14S, R2W, SBBM, County of San Diego, State of into ten (10) lots, came before the City Council or public hearing and action on October 14, 1986; and Planning the of of the map subject to all report; and has set forth in the and has the City Council has read and said report other at the public NOW, resolve as the City Council of the City of Poway does Section 1 : The City Council makes the Tract No. 86-04 and the map in regard to The tract is with all interim and proposed general and specific plans because it meets all and for The design or with all general and Plan for of the tract is interim and plans because it meets General design and The site is physically opment because it to the type of for the type of devel- is flat and no d. The site is for the density of the because it is flat and The design of the substantial to humans and tial impacts can be Resolution No. P-86-73 Page 2 is not likely to cause 1 damage and avoidable injury or their habitat because poten- by of the 1. The tract is not likely to cause serious public health because City and will be T e design of the tract will not w th any by the public at large, now o record, for access through or use of the property w thin the proposed That this project will not create adverse impacts on the and a is issued with ~or nois~, removal of vege- tation, and ~ncil Tract Map No. 86-04 is hereby subject to all Within 30 days of the writing that all of shall submit in have been read and The east side of Midland Road shall be and improved to standards for a secondary except that a width from mately 47 feet from at the south end of the tract to 42 feet at the north end shall be the ' shall vary from 37 feet to 32 feet. The property line radius at street shall have a 20-foot radius. The exact of this /' shall be based upon an study of and along Midland Road to be prepared by the subdiv~der's and by the City A paved taper lane shall be on Midland north of the project to provide a smooth from the widened street to and 3. The north side of Janette Lane shall be to urban local Resolution No. P-86-73 Page 3 The south side of Road shall be offered for dedication and improved to urban local stan- dards. The offer of will not be at this time, and Road will remain as a private street. The ho se and garage on lots 4 and 5 shall be removed within ifteen days of of TTM 86-04. Should the fail to remove the this shall ecome null and void. areas and the noise cent to Midland Road shall be ' L~ndscape of to the barrier adja- and placed in a of the The will be on-site drainage f Public for of all required by the of if ment, shall be capped and to be joined by new pave- as needed for a smooth Sewer, water, d shall be and any other t6 the City as by the City 10. 11. 12. 13. The Midland and sight eucalytus tree at the corner of shall be removed to provide at this Prior to the of any units, a noise wal~, or wall and earthen berm, shall be provided to reduce noise levels to 60 CNEL or less. noise levels shall be reduced to 45 CNEL by A fire hydrant shall be at the of Midland Road and Road. corner Prior to final map and may be by . tion within two years from map permit by the mance secured with approve~ by the City All fees shall be paid prior to ~inal map all of the above or prior to of a perfor- bonds, in a form Resolution No. P-86-73 Page 4 e Section 3: Tract Map No. 86-04 is hereby subject to the SHALL CONTACT THE OF WITH THE AND SITE Site shall be in plans on file in the ditions herein. with the site and the con- site plans and all conditions of approval shall be submitted to the Plann%ng prior to ' of Approval of this request shall not waive ' with all of the Zoning Development Code and all other appli- cable City in effect at the time of permit The to City of shall provide a of 5% of the lots with area for veh cle storage and the C.C.&R.'s shal the storage in the ront yard Mail boxes, on lots 10,000 square feet or less in size and in areas where are shall be and located by the d subject to approval by the Prior to any use of the project site or being all of herein shall be to the of the of Planning Prior to the of permits for shall be to the of Safety that water supply and for fire pro- tection is ' Where fire is by the of Safety it shall be ser- prior to the time of Resolution No. P-86-73 Page 5 or a new residential unit(s), the shall pay evelopment fees at the established rate. Such fees may but not be limited to: Permit and Plan Fees, chool Fees (in with policy and/or , Water and Sewer Service Fees. These fees shall be paid prior to building permit Street names shall be by the Department prior to the recordation of the final map, and street shall be prior to the of PARKING AND ACCESS - No A Master Plan of the to the permits and prior to shall be on-site trees shall be prior to the ' of to which trees on-site trees shall be and shall be trimmed and/or top ed. Dead, or trees shall be for removal at the of the Planning during the review of the Master Plan of on- ite trees. Those trees which are for removal shall e on a basis as by the Street trees, a of 15 gallon size or larger, shall be installed in accordance with the City of Poway Ordinance and shall be planted at an average of every 30 feet on streets and 20 feet on SIGNS Any signs for this shall be and in with the Sign Parkland Dedication or payment of Park Fees at the rate shall be made prior to ' permit sewage and/or capped to comply with the Uniform Plumbing Code. shall be filled grading and Resolution No. P-86-73 Page 6 e e Se RED Review or Minor Development Review shall be prior to the of a permit. The developer shall display a current Zoning and Land Use Map in the sales office at all times, and/or to the of the of Ail sales maps that are public shall include but not parks, and or made available to the be limited to trails, future and The shall provide a noise display board in the sales office to the of the The display shall include the site plan and noise study. Working shall include a exp~rt that the noise ordinance will be met. by a of the City of Poway's At the of and prior o and CNEL shall be b at d expense. Tests to be conducte b expert. No permits shal b G-7 is met to the of the (latest ad opted "Sound field testing a recognized granted until Code # II. H. 1. e SHALL CONTACT THE PUBLIC WITH THE GRADING Grading of the subject Uniform Building Code, plan and shall be in with the City Grading approved grading report, and accepted grading The gradi o unit and g plan shall contain a signed civil that the grading plan has 100 square feet of solar access for each or each future site within the by a a A soils report shall be licensed by the State of to permit by a to perform suc~ work prior The final grading plan shall be subject to review and by the and Public and shall be prior to of the final sub- map or of building permit, comes first. No. P-86-73 Page 7 e Be STREETS AND Ail to of the the Element roads Element road of Public shall be and and to the access rights to Element roads shall be to the city of Poway and labeled on the final map to of the of Public or by d Ail and to public street public streets shall be acc ss and and/or shall be access to all parcels over private roads, drives or park ng areas and thereof to the o the of Public Street tion of the Ail street by the and signing shall be of Public to the shall be to, and of Public Street imp pans prepared on standard size sheets by a Civil shall be for by th~ of Publ c Plan check and ' shall be pa d by the Ail damaged trees, shall be bonds and of Public public works facilities, ] parkway or prior to of to the of the Prior to any work being performed in the public , an permit shall be from the ~ublic office and fees paid, in to any other permits 10. The J. 1. shall pay the Traffic rate prior to permi~ Fee at the AND FLOOD CONTROL A system capable of and of all sur- face water ] within the subd' and all surface waters that may flow onto the subdivision from adjacent lands, shall be Said system shall include any and as by the of Public to properly handle the Resolution No. P-86-73 Page 8 e Portland cement cross gutters shall be installed where water crosses the roadways. The Master Plan of rate in prior to building permit ' Fee shall be paid at the with the Drainage be p flows across and/or shall not Ail proposed Element roads and/or within the project shall be ' along less than 34.5 KV. Utility serving utility shall be to the of the and the of Public The developer shall be 3 of for the and public as required. Water, sewer, and fire and Powa~ and the Health systems plans shall be to meet of the City of of the County of San Diego. Prior to to the sewer of property for sewer area shall occur. The shall pay for a water system to establish the proper size and location for the public water system. The amount will be by the cost of the and shall be paid prior to permit The applicant shall, within 30 days after approval of the tract map, parcel map, use permit, ok review, apply for a Letter of (LOA) to reserve and post with the City, a nonre- fundable fee equal to 20% of the fee in effect at the time the LOA is issued~ Developer shall a light system ~ to City of Poway at no cost to the public, subject to the Cut-off shall be which will provide true 90 degree cutoff and prevent of light above the from the lowest ~oint of the lamp or light refractor or device. No. P-86-73 Page 9 Ail fixtures shall use a clear, 10w pressure sodium vapor light source. c. Advance energy charges and charges shall be paid by the developer. to the and of shall e or permit shall be and payment of fees to the City prior to finai map occurs first. Cable The shall be provided and shall notify the Cable company when is to be for GENERAL REQ AND ~ Prior to and/or The borne ~y the a Notice of to form shall be filed with the City costs in shall be 2. Final parcel and tract maps shall to City standards and Ail of land. of the of the Poway Code shall be met as they relate to the division Prior to final map all of the above and req shall be installed and provided, or deferred by . within two years from map or prior to permit occurs first, by the of a secured with in a form approved by the city . All fees, deposits, and charges shal'l be paid prior to final map Prior to final map all ded' and granted as above. shall be made Th un ess an pr or to map shall expire on October 14, 1988 for time is 90 days with the City's Resolution No. P-86-73 Page 10 and ADOPTED by the Cit~ouncil of the City of Poway, State of California, this 14th day/~f/October 1986. Carl R. Kruse, Mayor ATTEST: