Res P-88-79NO. P-88-79
A OF THE CITY COUNCIL
OF THE CITY OF POWAY,
APPROVING PARCEL MAP 88-03
PARCEL NUMBER
WEEREAS, Parcel Map No. 88-03, ereinafter "Map" sub-
mitte by ERB Inc., an Robert L.
' owner, for t~e purpose of the real
in the City of Poway, County of San iego, State of
California, described as Parcel 2, Parcel Map 4783 into two lots,
came before the City Council for public hearing and
action on July 12, 1988; and
the of
of the Map subject to all
report; and
has
set forth in the
the
other
the City Council has read and considered said report,
initial study, . and
at the public '
NOW,
resolve as
the City Council of the City of Poway does
Section 1: :
The City Council finds that the project will not have a signi-
ficant adverse impact on the and hereby issues a
Section i :
The City Council makes the in regard to
Parcel Map 88-03 and the Map
The parcel map is
general and plans,
the site for
poses two lots for
with all
in that the General Plan
use and the map pro-
The design or
with all
in that the
and
zone
of the parce ma is
general and lans,
parcels meet or exceed the ot ize
of the Rural B4
The site is
ment in that
al to the
for the type of
the will be
which will require little
topography.
No. P- 88-79
-- Page 2
The site is suitable for the density of the
proposed in that the overall slope of the site
is 14.4 There is more than one acre ' on
each lot with a slope of less than 25 percent to
a pad for a single family home as
by the RR-B4~zone.
The design of the is not likely to cause
sub amage and avoidable injury to
humans and wildlife or the r in that the site, as
it exists today, has been with an orchard and is
with other and uses.
The arcel map is not likely to cause serious
public health in that City water will be pro-
vided to both arcels and the of permits
will require d sign of a septic system which meets City of
Poway
The design of the parcel map will not
with any by the public at large, now of
record, for access through or use of the within
the
That this project will not create adverse
and a is
in combination with
to be will
level of all
impacts on the
issued, because
those
and reduce to a
S
the
1.
Parcel Map 88-03, a copy of which is on file in the
office, is hereby subject to all of
Within 30 days of the
writing that all of
shall submit in
have been read and
healthy trees on site shall be
Grading shall be limited to what is to
the and pads for the house and
No. P- 88-79
Page 3
Stre
Kingman R ad, Oak Canyon Road, and Road, con-
tiguous w th the , shall be
to City o Poway's rural local street stan-
dards 12.20.110 and 12.20.120 of the
Poway Code).
Ail frontage roads
have a 20 foot
and height
providing Fire
width,
of 13' 6".
al
access shall
Water
A fire hydrant shall be on the
Parcel One in the of the
grove road.
of
Sewer
A leach field layout shall be
and prior to permit
to the City for review
plans for the
Oak Can on Road, and Road,
shall be
prior to parcel map
for the
and
to Kingman Road,
and wate main line
to the City or review and
In the
sha 1 be posted
shall be made for an fire
if exceed 150 feet in length.
SHALL CONTACT THE
WITH THE
OF
SITE
Prior to delivery of le building materials on site,
water system shall satisf pass all tests and
be to the public water system. In the
first lift of asphalt paving shall be in place to provide ade-
quate, access for The final lift
of asphalt shall not be ' until all other
has been to the
of the City.
No. P-88-79
Page 4
C.
D.
E.
He
For a new residential dwelling unit(s), the applicant shall pay
fees at the rate. Such fees may
but not be limited to: Permit and Plan Fees,
School Fees (in with policy and/or
), Water and Sewer Service Fees. These fees shall be
paid prior to permit
PARKING AND
SIGNS - NONE
ACCESS - NONE
- NONE
and improve the Master planned /
trail along Kingman. Road to the of the
of Public and in with the Master
Plan of Trails
- NONE
Review or Minor
accomplished prior to the
Review shall be
of a building permit.
SHALL CONTACT PUBLIC
WITH THE
GRADING
Grading of the subject
Uniform Code,
plan and
shall be in
City Grading
report, and
grading
with the
grading
The gradi g plan shall contain a signed by a
civil that the grading plan has
o 100 square feet of solar access for each
unit and or each future site within the
a
A soils report shall be by
by the State of
first of a grading plan.
a
to perform such work at
A report shall be by a
or and at the time of
gra~ing plan check.
f~r
No. P~8-79
-- Page 5
The final grading plan shall be subject to review and
by the and Public and
shall be prior to of the final sub-
division map or of building permit, whichever comes
first.
A surv y of
to the of the City
Seism c shall
and sha 1 occur only at
by the City
STREETS AND
shall be
prior to any rock
be taken for all
and levels
Ail street shall be ~ to, and
by the of Public
Stre t imp plans including water main ins allation pre-
pare on standard size sheets by a ] Civ 1
shal be for by th~ o Pubiic
Plan check and sba 1 be paid by
the
Ail street shall be prior to
of to the of the
of Public
4. Street ' that '
but are not limited to:
a. Sidewalks e.
b. f.
c. Wheel chair ramps X g.
d. Curb and gutter __h.
Cross gutter
Alley gutter
Street paving
Alley paving
shall be
date of
tion of street
prior to building permit
of the for the
, comes first.
or the
Ail damaged public works , parkway
trees, shall be or prior to of
bonds and to the of the
of Public
P ior to any work being performed in the public , a
permit shall be from the Pubiic
o ~ice and fees paid, in to any other per-
m ts required.
No. P- 88-79
Page 6
7. Street imp
e
The
the
but a
shall
for
and
be made in accordance with City
rural streets (Local) per
of the Poway Code.
shall pay the T affic. Fee at the
rate at the date he fina ' or the date
of s issue , occurs later,
deposit shall e poste prior to permit
Je
e
K.
1.
2.
AND FLOOD CONTROL
A system capable of handling and
face water within the
waters that may flow onto the rom
shall be Said drainage system s all
and as by the
to handle the
cement
water crosses the
cross gutters shall be
The Master Plan of Fee shall be paid at
rate in accordance with t~e Drainage Ordinance
final or at the date the
issued, occurs later, but a
posted prior to permit
] of all sur-
and all surface
lands,
in61ude any
of Public
be
where
the
at the date o
of s
deposit shall e
flows across and/or shall not
Utility shall be
serving utility companies and the
to the of the
of Public
Water,
Health
and fire systems plans shall be and
to meet of the City of Poway and the
of the County of San Diego.
The shall pay for
the proper size an
system. The amount will be
ysis and shall be paid upon
water system to
for the public water
by the cost of the anal-
emand by the City.
Cable shall be and
if The shall notify the Cable
company when for is to be '
No. p- 88-79
Page 7
L. GENERa2
1. Final parcel and tract maps shall conform to City
and
2. Should this be further
shall be for by the
each final map
of Public
Ail
land.
of the of the Poway
Code shall be met as they relate to the
Those of the subject to be held
under common shall be labeled such and
a lot number on the final map.
of
5. Th map
un ess an
pr or to
by
shall expire on July 12, 1990
for time is 90 days
in with the City's
State of
ATTEST:
and ADOPTED by the City Council of the City of Poway,
No. P- 88-79
Page 8
STATE OF )
) ss.
COUNTY OF SAN DIEGO )
I, K. City Clerk of the City of Poway, do
hereby certify, under the penalty of perjury, that the foregoing
No. P-88-79 , was duly adopted by the City Council at
a meeting of said City Council held on the 12th day of July
1988, and that it was so adopted by the vote:
AYES: BRANNON,
NOES: NONE
NONE
ABSENT: TARZY
R-R-7-12.12-19
· KRUSE, EMERY
Marj~ri~ [ty Clerk
City o~ Poway