Loading...
Res P-88-93NO. P-88-93 A OF THE CIT OF THE CITY OF POWAY, REVIEW 88-1 PARCEL NUMBER COUNCIL AND 14-193-42 88-07 by Camino Air Cond the o and the CG ( a Review 88-12 and 88-07, Inc., applicant, requests approval of 4,992 sales The is located on Midland Road in zone; and WHEREAS, on August 30, 1988, the City Council held a hearing on the item. NOW, the City Council does hereby resolve as The issued on October 1, 1985 the of CEQA. Devel 1. That the is in Poway General Plan in that the General Plan the site for That the d health, safety, impact upon with the will not have an adverse or related 3. That the proposed development is in Zoning in that all met through project with the will be That the pro osed encourages the orderly and of and within the City in hat the will details, and colors that will be to Poway's rural 88-07 That there are special to the size and shape, and because of this, the strict of the Zoning the No. p-88-93 Page 2 of pri¥11eges enjoyed by other in the under zoning in that the City has of street which changes the position of the proposed building in to the street sideyard That the or its is for the and of a tial property right ~ by othe~ in the same and zone and denied to the for which the is sought; in that other in the are located closer than the present required That the or its materially to the public health, or to the or such ~nd zone in which the in that the roadway and future will enhance the public welfare. will not be safety or in is e The of this does not cial' with the other in the and zone is situated. a spe- upon in which such The of this which is not the zoning does not allow a use or by the parcel of 6. That the or its will not be with the Poway City General Plan. Secti .il The City Council hereby 88-07 subject to the Review 88-12 and Within 30 days of (1) The in writing that al of and ~; an (2) the Notice of on Real shall submit have been read owner shall execute a The shall, within 30 days after appro- val of the review, apply for a Letter of Availability (LOA) to reserve and post with the City a fee equal Page 3 No. P- 88-93 to 20 percent of the fee in effect at the time the LOA is issued~ Failure to comply with this within the time limit will cause this project to become null and void. Road Ii The shall pay the City of Poway prior to building permit a cash deposit for the value of road ments to Midland Road and Aubrey Street with the project. The a ount of said cash deposit shail be from a co t to be by the 's Civil ut su ject to City Said amount sh~ll ut is not to be limited to, design, cost, and a ten percent of the overall cost. The driveway access from the north shall be a 30 inch high wall shall be the edge of the parking lot, to the of the of A style fire hydrant shall be the Midland Road to the and along along of the Fire T e sign.on the parapet is in however, t e design shall be to and by t e of prior to of a s gn permit. shall be a alley curb of 35 feet in width with The design of the eight inch sewer line from Adrian Street to Aubrey Street shall be prior to or with building permit Sewer shall be and a 20 foot public sewer shall be granted to the City of Poway prior to A drainage shall be return of Midland Road, exiting the of the City City , this work may be' the Cit~ work in the area. to along the curb ke Creek, to If by the until the time of No. p-88-93 Page 4 ae SHALL CONTACT TEE WITH THE OF SITE Site shall be in plans on file in the ditions ~ herein. with the site and the con- Revised all site plans and of approval shall be prior to to the of building Approval of of cable City this request shall not waive compliance with all the Zoning Code and all other appll- in effect at the time of permit Trash shall be wall with gates shall be subject to by a 6 foot high masonry to City by the Ail roof fered from air shall be from view and sound buf- and streets as by the Prior to any use of the project site or ~ all conditions of shall be to the of the being herein of The ' shall comply with the latest adopted Uniform Code, Uniform Code, Uniform Code, Code, Uniform Fire Code, and all other appli- cable codes and in effect at the time of permit Prior to of on site, water and sewer systems shall ~ Dass all tests and be to the public water and sewer The first and fina lifts of asphalt paving shall not be until al other has been to the of the City. Page 5 No. P- 88-93 10. 11. 12. B. 1. For a new n ees at the e limited to: ervice Fees. mit or or addition to the shall pay rate. Such fees may but not Permit and Plan Checking Fees, Water and Sewer These fees shall be paid prior to per- This approval shall become null and void if building permits are not issued for this project within one year from the date of project identification and/or addresses shall be placed on all new and so as to be plainly visible from the street or access road; color of and/or shall with their color. Roof numbers shall be of Safety on new meeting PARKING AND ACCESS Ail parking lot shall consist of a minimum of one fifteen (15) gallon s ze tree for every three (3) parking spaces. For parking lot a minimum 12 inch wide walk to parking stalls sba 1 be provided and be fr6m vehi- cular areas by a six nch high, six inch wide portland cement Parking lot lights shall be low sodium and have a height of (18) feet from the finished grade the parking surface ~nd be ' away from all lines, streets and of Ail two-way traffic aisles shall be a minimum of 24 feet wide and access shall be free and clear, a ' of 24 feet wide at all times during tion in with Safety ments. Ail parking spaces shall be double A and and by the of plan shall be to prior to the No. p-88-93 Page 6 He Street trees, a of 15 gallon size or larger, in with the City of Poway shall be planted at an average of every 30 feet on streets and 20 feet on shall be and Ail SIGNS areas shall be in a healthy and free from weeds, trash, and debris. Any signs for this shall be and in with the Sign - NONE - NONE - NONE SHALL CONTACT THE PUBLIC WITH THE GRADING Grading of the subject shall be in with the Uniform Building Code, City Grading Ordinance, approved grading plan and report, and grading A soils report shall be licensed by the State of to permit by a to t)erform such work Prior The final grading plan shall be subject to by the and Public shall be prior to of review and and permit. STREETS AND Street that but are not limited to: X a. X b. X c. X d. X e. f. Wheel chair ramps X g. Curb and gutter __h. Cross gutter Alley gutter Street paving Alley paving shall be for by cash deposit prior to the of the units to the of the of Public Page 7 No. p_85-93 Ail damaged public works trees, shall be or bonds and to the of Public prior to of the parkway of Prior to any work being public works permit shall be office and appropriate fees paid, mits in the public , a from the Pubiic in addition to any other per- Street and shall be made in with City standards for Urban AND FLOOD CONTROL A drainage system capable of handling and isposing of all sur- face water within the and all surface waters that may flow onto the rom lands, shall be Said system s all include any and as ' by the of Public to properly handle the drainage. cement water crosses the cross gutters shall be where The Master Plan of Fee shall be paid at the · rate in with the at the date of final or at the date t~e of is issued, occurs later. flows across and/or shall not be Ail within the project shall be along roads and/or highways less than 34.5 KV. Element Utility serving utility shall be to the of the and the of Public The shall be for the and und of public as required. Water, sewer, and fire designed and Poway and the Health systems plans shall be ~ to meet of the City of of the County of San Diego. No. P-88-93 Page 8 5. Developer shall Poway a light system conforming to City of at no cost to the public, subject to the ae be Cut-off shall be ' which will provide true 90 degree cutoff and prevent of light above the from the lowest ~oint of the lamp or light or device. All shall use a clear, low sodium vapor light source. Advance energy charges and shall be paid by the to the lighting and of shall be time of final or whichever occurs first. charges shall be accomplished · at the of . , Cable trenching for The d shall be and shall notify the Cable is to be accomplished. company when GENE~ Ail of the above and or years or prior to by the of ficient prior to Prior to The August City's AND and req shall be installed by . within two permit occurs first, a secured with suf- in a form approved by the City All fees, and charges shall be paid permit all d final granted as review and 0, 1989 unless an 90 days prior to above. shall be made and for in shall expire on time is with the No. P-88-93 Page 9 State of ATTEST: and ADOPTED by the City Council of the City of Poway, this 30th day of August, 1988. Marjq~: City Clerk STATE OF ) ) ss. COUNTY OF SAN DIEGO ) I, K. City Clerk of the City of Poway, do hereby certify, under the penalty of perjury, that the foregoing No. P-88-93 , was duly adopted by the City Council at a meeting of said City Council held on the 30th day of August 1988, and that it was so adopted by the vote: AYES: BRANNCN, NOES: NCINE NC~E ABSENT: TARZf R? ~2 Marjori~ K. Wahlsten, City Clerk City c~f Poway