Res P-88-93NO. P-88-93
A OF THE CIT
OF THE CITY OF POWAY,
REVIEW 88-1
PARCEL NUMBER
COUNCIL
AND
14-193-42
88-07
by Camino Air Cond
the o
and
the CG (
a
Review 88-12 and 88-07,
Inc., applicant, requests approval of
4,992 sales
The is located on Midland Road in
zone; and
WHEREAS, on August 30, 1988, the City Council held a hearing on
the item.
NOW,
the City Council does hereby resolve as
The issued on October 1, 1985
the of CEQA.
Devel
1.
That the is in
Poway General Plan in that the General Plan
the site for
That the d
health, safety,
impact upon
with the
will not have an adverse
or related
3. That the proposed development is in
Zoning in that all
met through project
with the
will be
That the pro osed encourages the orderly and
of and within
the City in hat the will
details, and colors that will be
to Poway's rural
88-07
That there are special to the
size and shape, and because of this, the strict
of the Zoning the
No. p-88-93
Page 2
of pri¥11eges enjoyed by other in the
under zoning in that the City
has of street
which changes the position of the proposed building in
to the street sideyard
That the or its is
for the and of a
tial property right ~ by othe~ in the
same and zone and denied to the for
which the is sought; in that other in
the are located closer than the present
required
That the or its
materially to the public health,
or to the or
such ~nd zone in which the
in that the roadway and future
will enhance the public welfare.
will not be
safety or
in
is
e
The of this does not
cial' with the
other in the and zone
is situated.
a spe-
upon
in which such
The of this
which is not
the zoning
does not allow a use or
by
the parcel of
6. That
the or its will not be
with the Poway City General Plan.
Secti .il
The City Council hereby
88-07 subject to the
Review 88-12 and
Within 30 days of (1) The
in writing that al of
and ~; an (2) the
Notice of on Real
shall submit
have been read
owner shall execute a
The shall, within 30 days after appro-
val of the review, apply for a Letter of
Availability (LOA) to reserve and
post with the City a fee equal
Page 3
No. P- 88-93
to 20 percent of the fee
in effect at the time the LOA is issued~ Failure to
comply with this within the time limit
will cause this project to become null and void.
Road Ii
The shall pay the City of Poway prior to building
permit a cash deposit for the value of road
ments to Midland Road and Aubrey Street with the
project. The a ount of said cash deposit shail be
from a co t to be by the 's Civil
ut su ject to City Said amount
sh~ll ut is not to be limited to, design,
cost, and a ten percent of the overall
cost.
The driveway access from the north shall be
a 30 inch high wall shall be
the edge of the parking lot, to the
of the of
A style fire hydrant shall be
the Midland Road to the
and
along
along
of the Fire
T e sign.on the parapet is in however,
t e design shall be to and by
t e of prior to of a
s gn permit.
shall be a
alley curb
of 35 feet in width with
The design of the eight inch sewer line from Adrian Street
to Aubrey Street shall be prior to or
with building permit Sewer shall
be and a 20 foot public sewer shall be
granted to the City of Poway prior to
A drainage shall be
return of Midland Road, exiting
the of the City
City , this work may be'
the Cit~ work in the area.
to
along the curb
ke Creek, to
If by the
until the time of
No. p-88-93
Page 4
ae
SHALL CONTACT TEE
WITH THE
OF
SITE
Site shall be in
plans on file in the
ditions ~ herein.
with the
site
and the con-
Revised all
site plans and
of approval shall be
prior to
to the
of building
Approval of
of
cable City
this request shall not waive compliance with all
the Zoning Code and all other appll-
in effect at the time of permit
Trash shall be
wall with gates
shall be subject to
by
a 6 foot high masonry
to City
by the
Ail roof
fered from
air shall be
from view and sound buf-
and streets as by the
Prior to any use of the project site or
~ all conditions of
shall be to the of the
being
herein
of
The ' shall comply with the latest adopted Uniform
Code, Uniform Code, Uniform Code,
Code, Uniform Fire Code, and all other appli-
cable codes and in effect at the time of
permit
Prior to of on site,
water and sewer systems shall ~ Dass all
tests and be to the public water and sewer
The first and fina lifts of asphalt paving shall not be
until al other has been
to the of the City.
Page 5
No. P- 88-93
10.
11.
12.
B.
1.
For a new
n
ees at the
e limited to:
ervice Fees.
mit
or or addition to
the shall pay
rate. Such fees may but not
Permit and Plan Checking Fees, Water and Sewer
These fees shall be paid prior to per-
This approval shall become null and void if building permits
are not issued for this project within one year from the date
of project
identification and/or addresses shall be placed on all
new and so as to be plainly visible from the
street or access road; color of and/or
shall with their color.
Roof numbers shall be
of Safety
on new meeting
PARKING AND
ACCESS
Ail parking lot shall consist of a minimum of one
fifteen (15) gallon s ze tree for every three (3) parking spaces.
For parking lot a minimum 12 inch wide walk
to parking stalls sba 1 be provided and be fr6m vehi-
cular areas by a six nch high, six inch wide portland
cement
Parking lot lights shall be low sodium and have a
height of (18) feet from the finished grade
the parking surface ~nd be ' away from all
lines, streets and
of
Ail two-way traffic aisles shall be a minimum of 24 feet wide
and access shall be free and
clear, a ' of 24 feet wide at all times during
tion in with Safety
ments.
Ail parking spaces shall be double
A and
and by the
of
plan shall be to
prior to the
No. p-88-93
Page 6
He
Street trees, a of 15 gallon size or larger,
in with the City of Poway
shall be planted at an average of every 30 feet on
streets and 20 feet on
shall be
and
Ail
SIGNS
areas shall be in a healthy and
free from weeds, trash, and debris.
Any signs for this shall be and
in with the Sign
- NONE
- NONE
- NONE
SHALL CONTACT THE PUBLIC
WITH THE
GRADING
Grading of the subject shall be in with the
Uniform Building Code, City Grading Ordinance, approved grading
plan and report, and grading
A soils report shall be
licensed by the State of
to permit
by a
to t)erform such work Prior
The final grading plan shall be subject to
by the and Public
shall be prior to of
review and
and
permit.
STREETS AND
Street
that
but are not limited to:
X a.
X b.
X c.
X d.
X e.
f.
Wheel chair ramps X g.
Curb and gutter __h.
Cross gutter
Alley gutter
Street paving
Alley paving
shall be for by cash deposit prior to the of
the units to the of the of Public
Page 7
No. p_85-93
Ail damaged public works
trees, shall be or
bonds and to the
of Public
prior to
of the
parkway
of
Prior to any work being
public works permit shall be
office and appropriate fees paid,
mits
in the public , a
from the Pubiic
in addition to any other per-
Street and shall be made in
with City standards for Urban
AND FLOOD CONTROL
A drainage system capable of handling and isposing of all sur-
face water within the and all surface
waters that may flow onto the rom lands,
shall be Said system s all include any
and as ' by the of Public
to properly handle the drainage.
cement
water crosses the
cross gutters shall be
where
The Master Plan of Fee shall be paid at the
· rate in with the at
the date of final or at the date t~e of
is issued, occurs later.
flows across and/or shall not
be
Ail within the project shall be
along
roads and/or highways less than 34.5 KV.
Element
Utility
serving utility
shall be to the of the
and the of Public
The shall be for the and
und of public as required.
Water, sewer, and fire
designed and
Poway and the Health
systems plans shall be
~ to meet of the City of
of the County of San Diego.
No. P-88-93
Page 8
5. Developer shall
Poway
a light system conforming to City of
at no cost to the public, subject to the
ae
be
Cut-off shall be ' which will provide
true 90 degree cutoff and prevent of light
above the from the lowest ~oint of the lamp or
light or device.
All shall use a clear, low sodium vapor
light source.
Advance energy charges and
shall be paid by the
to the lighting
and of shall be
time of final or
whichever occurs first.
charges
shall be accomplished
· at the
of . ,
Cable
trenching for
The d
shall be and
shall notify the Cable
is to be accomplished.
company when
GENE~
Ail of the above
and or
years or prior to
by the of
ficient
prior to
Prior to
The
August
City's
AND
and req shall be installed
by . within two
permit occurs first,
a secured with suf-
in a form approved by the City All
fees, and charges shall be paid
permit
all d
final
granted as
review and
0, 1989 unless an
90 days prior to
above.
shall be made and
for
in
shall expire on
time is
with the
No. P-88-93
Page 9
State of
ATTEST:
and ADOPTED by the City Council of the City of Poway,
this 30th day of August, 1988.
Marjq~:
City Clerk
STATE OF )
) ss.
COUNTY OF SAN DIEGO )
I, K. City Clerk of the City of Poway, do
hereby certify, under the penalty of perjury, that the foregoing
No. P-88-93 , was duly adopted by the City Council at
a meeting of said City Council held on the 30th day of August
1988, and that it was so adopted by the vote:
AYES: BRANNCN,
NOES: NCINE
NC~E
ABSENT: TARZf
R?
~2
Marjori~ K. Wahlsten, City Clerk
City c~f Poway