Loading...
Res P-89-87RESOLUTION NO. P- 89-87 OF HE CIT CO NCIL F TH C Y OF P WAY, C LIF RNIA AP ROVI G NTATIV PARCE MA 89-08 ASSESS R'S AR L NUMB R 317- 23- 2, 23, 24 WHEREAS, Tenta ive Parcel Map 89-08, hereinafter "Map", s.bmitted by Poway Industrial Propert es, pplicant, for the urpose of subdivid ng the real o- perry situated in he Cty of Poway, Count of San Diego, Sta e of C described as Lots 3 an 26 of Pomerado Bu iness Park, Phase , Map No. 11 2, and Parcel 1 of Parcel ap 15625 into two ots, regularly came before the ty Council for public hear ng and action on August 22, 1989; and WHEREAS, the Director of Planning Services has reconmended approval of the Map subject to all conditions set forth in the Planning Services Department report; and WHEREAS, the City Council has read and considered said report, and has con- sidered other evidence presented at the public hearing. NOW, THEREFORE, the City Council of the City of Poway does resolve as follows: Section 1: Envl F' : The City Council finds that the potential environmental impacts of this pro- ject were adequately discussed in the EIR and Subsequent EIR for the South Poway Planned Community. Sectic s: The City Council makes the following findings in regard to Tentative Parcel No. 89-08 and the Map thereof: The tentative parcel map is consistent with all applicable general and specific plans, because the project will accommodate Light Industrial uses and the zone designation on the site is Light Industrial. e The des gn or improvement of the tentative parcel map is consistent with al applicable general and specific plans; in that the lot size and con iguration, and access to the site meet the standards contained in the PPC Development Plan. The site is physically suitable for the type of development proposed; in that the property has been graded in accordance with approved grading plans. The site is physically suitable for the density of the development pro- posed; in that the proposed lots meet the acreage requirements of the SPPC Development Plan. Resolution No, P- 89-87 Page 2 The design o the arcel map is not likely to cause substantial nvironmenta dama e and avoidable injury to humans and wildlife or heir habita , bec use the existing site has been fully graded and no onger provi es a abltat and there are no residential uses in the mmediate vicinity. The parcel map is not likely to cause serious public health problems, because City water and sewer service are available to the site. e The design of the parcel map will not conflict with any ease- ment acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. 8. That this project will not create adverse impacts on the because mitigation measures have been required for all potential impacts. Section 3: C ll Decision: Tentative Parcel Map No. 89-08, a copy of which is on file in the Planning Services office, is hereby approved subject to the following conditions: Within 30 days of approval, the applicant shall submit in writing that all conditions of approval have been read and understood. APPLICANT SHALL CONTACT THE DEPARTMENT OF PLANNING SERVICES REGARDING COMPLIANCE WITH THE FOLLOWING CONDITIONS: SITE DEVELOPMENT 1. All conditions of Resolution No. P-88-72 approving Development Review 88-07 are applicable. Prior to any use of the project site or business activity being thereon, all conditions of approval contained herein shall be completed to the satisfaction of the Director of Planning Services. ADDITIONAL APPROI ~RED Development Review or Minor Development Review shall be accomplished prior to the issuance of a building permit. APPLICANT SHALL CONTACT THE PUBLIC SERVICES DEPARTMENT REGARDING COMPLIANCE WITH THE FOLLOWING CONDITIONS: GRADING 1. An as-built grading plan for the stockpile on Parcel 2 shall be submitted and approved prior to recordation of the final map. R No. P- 89-87 Page 3 2. Buildings and retaining walls shall not encroach into finished slopes. Grading of the subject property shall be in with the Uniform Building Code, City Grading 0 approved grading plan and geotech- nical report, and the development standards for the South Poway Planned Community. A soils report shall be prepared by a qualified engineer licensed by the State of California to perfoFm such work at first submittal of a grading plan. The final grading plan sh ll be subject to review and approval by the Planning Services and Pub ic Services Department and shall be completed prior to recordation of he final subdivision map or issuance of grading permit, whichever comes f rst. STREETS AND SIDEWALKS 1. Future driveway for Parcel 2 shall be located at least 50 feet from the existing driveway on Parcel 1 or combined with it into a common driveway. Curb, gutter, and a curb return shall be installed along the eastern edge of the existing driveway on the east side of Parcel 2 prior to recordation of the final map. 3. All interior and exterior public streets shall be constructed to public street standards. e 1 access and maintenance and/or agreements shall be provided insuring access to all parcels over private roads, drives or parking areas and maintenance thereof to the satisfaction of the Director of Public Services. 5. All street structural sections shall be submitted to, and approved by the Director of Public Services. Se Grading and improvement plans prepared on standard size sheets by a Registered Civil Engineer shall be submitted for approval by the Director of Public Services. Plan check and inspection expenses shall be paid by the developer. 7. Street improvements that include, but are not limited to: __a. ldewalks X e. oss gutter __b. rlveways --f. ley gutter __c. 'heel chair ramps X g. reet paving __d. urb and gutter h. ley paving shall be constructed prior to the occupancy of the units to the satisfaction of the Director of Public Services. Resolution No. P- 89-87 Page 3 m All damaged off-site public works facilities, including parkway trees, shall be repaired or replaced prior to of bonds and to the of the of Public Prior to any work being performed in the public right-of-way, an encroach- ment permit shall be obtained from the Public Services office and ~e fees paid, in addition to any other permits required. DRAINAGE AND FLOOD CONTROL A drainage sy tem capable of handling and disposing of all sur ace water origlnattn w thin the subdi tsion, and all surface waters tha may flow onto the s bd vision from ad acent lands, shall be required, aid drainage system sba 1 nclude any eas merits and structures as required y the Director o Public Services o properly handle the drainage. Concentrated flows across driveways and/or sidewalks shall not be permitted. UTILITIES 1. All proposed utilities within the project shall be installed underground. 2. Utility easements shall be provided to the specification of the serving uti- lity companies and the Director of Public Services. Water, sewer, and fire protection systems plans shall be designed and constructed to meet requirements of the City of Poway and the Health Department of the County of San Diego. ® The applicant shall pay for a water system analysis to establish the proper size and location for the public water system. The amount will be deter- mined by the cost of the analysis and shall be paid Prior to building permit APPLICANT SHALL CONTACT THE DEPARTMENT OF SAFETY SERVICES REGARDING COMPLIANCE WITH THE FOLLOWING CONDITION: All conditions are being considered with Development Review 88-07. ~ AND APPROVALS 1. Final parcel and tract maps shall conform to City standards and procedures. 2. Should this subdivision be further divided, each final map shall be sub- mitted for approval by the Director of Public Services. Resolution No. P- 89-87 Page 4 3. All provisions of the Subdivision Ordinance of the Poway Municipal Code shall be met as they relate to the division of land. 4. Prior to final map approval, all dedications shall be made and easements granted as required above. The tentative map approval shall expire on August 22, 1991. application for time extension must be received 90 days prior to expiration in accordance with the City's Subdivision Ordinance. APPROVED and ADOPTED by the City Council California, this 22nd day of August, 198g. o~~e City of Poway, State of 'use, Mayor ATTEST: Resolution No. P-89-87 Page 5 STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) I, Mar orie K. Wahlsten, City Clerk of the City of oway, do hereby certify, under the enalty of perjury, that the foregoing No. P-89-87 , was duly adopt d by the City Council at a meeting of said Cty Council held on the 22nd day o , 1989, and that it was so adop ed by the following vote: AYES: NOES: NONE ABSTAIN: NONE ABSENT: HIGGINSON BRANNON, EMERY, GOLDSMITH, KRUSE Ma~jor~t~/K. Ha l~ten,~Ci~t~y C City ~f ~oway R/R-8-22.26-31