Loading...
Res P-92-05NO. p-92-05 A OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA APPROVING PARCEL MAP 91-14 P~-RCEL NUMBERS 12, 13, 14, 17 & 18 Tentative Parcel Map No. 91-14, hereinafter referred to as "Map", submitted by Parkway Business Centre , Ltd., applicant, for the purpose of resubdividing the real pro erty situated in the City of Poway, County of San Diego, Sta e of California, described as Lots 27, 35, 36, 37, 40, and 41 o Map 12556 into six lots regularly came before the City Counc 1 on January 21, 1992; and the of Planning has approval of the map subject to all conditions set forth Planning Services Department report; and in the and has the City Council has read and considered said report other evidence p at the public hearing. NOW, the City Council does hereby resolve as follows: Section 1: Environm~ : The y certified Subsequent tal Impact Repor (SEIR) of July 26, 1988, and the previously certified EIR o 1985 f r the South Poway Planned Community have been an found to be adequate for this parcel map in that t e map is to conform to the adopted South Poway Panned Community. The City Council makes the following findings regarding Tentative Parcel Map 91-14 and the Map thereof: The tentative parcel map is consistent with the updated General Plan of the City of Poway and the specific plan for the South Poway Planned Community. e The design or improvement of the tentative parcel map is consistent with all applicable general and specific plans; in that the improvements adhere to the development standards of the planned community. he site is physically suitable for the type of evelopment proposed in that the development plans will ncorporate contour grading, minimum grading methods, and ilding siting and landscaping to soften slopes. No. P- 92-05 Page 2 The site is physically suitable proposed. The net adhere to the acreage allocated community. for the density of the buildable areas will in the adopted planned The design of the subdivision is not likel- to cause ubstantial environmental dama e and avoidabl injury to umans and wildli e or othe habitat in hat thes actors were in he Impac eport (EIR) as we as the ~bsequent EIR (SEIR) an indings made in Ju 1985 for the planned community an he overall project includes open space lots on nort acing slopes and mitigation to address impacts o flora and fauna. The tentative par el map is not likely to cause serious public health pro lems; in that all lots will be served by public water an sanitary sewer service and be subject to County regulat ons concerning hazardous materials. The design of the parcel map will not conflict with any easement by the public at large, now of record, for access through or use of the property within the proposed subd Tentative Parcel Map 91-14, copy of which is on file in the Planning Services office, is hereby approved subject to all of the following conditions: Within 30 days of approval, the applicant shall submit in writing that all conditions of approval have been read and understood. Ail applicable conditions of Resolutions No. P-88-85 and P-90-45 for the approval of Tentative Tract Map 87-13 and 87-13R shall be completed prior to filing the final map. SHALL CONTACT THE OF FOR WITH THE A mitigation monitoring program, as required by AB 3180, shall be implemented for the conditions pertaining to Traffic System Management (TSM). Any additional costs for the monitoring shall be borne by the applicants. No. p-92-05 Page 3 4 5 6 7 8 9 Traffic System Management - Participate in Mid-County Trans~ ion (TMA), implement TSM Nations o~ the eventual development on these properties, inclu lng the transit center proposed by the Transportation Tas Force final report. The orientation of buildings and the ~ of bay doors will be addressed as part of development review applications on all of the lots per the South Poway Development Standards. SHALL CONTACT THE WITH THE OF ~ FOR Grading of the subject property shall be in accordance with the Uniform Building Code, City Grading Ordinance, approved grading plan and § report, and accepted grading P A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work at first submittal of a grading/private imp plan. The grading/private improvement plan prepared on standard size sheets at 20 scale by a registered civil engineer shall be subject to review and approval by the Planning and Engineering Services Departments and shall be completed prior to issuance of a grading permit. Ail new slopes shall be a minimum of 2:1 (horizontal to vertical). A final compaction report shall be submitted and approved prior to of building permits. Site grading shall be certified by the project civil engineer prior to issuance of building permits. Buildings and parking lots shall be at least five feet from tops and toes of slopes. Grading shall be compatible with the existing grades for TTM 87-13R. Should this subdivision be further divided, each final map shall be submitted for approval by the Director of Engineering Resolution No. P- 92-05 Page 4 10. Ail p land. of the Subdivision Ordinance of the Poway Code shall be met as they relate to the of 11. Prior to final map approval, all dedications shall be made and easements granted as required above. STI~ETS AND 5 Ail parking lot st shall be submitted to and approved by the City Engineer. Pavement sections shall conform to the minimum required by the Poway Municipal Code Section Ail exterior street improvements shall be constructed prior to of building permits, to the satisfaction of the Director of Engineering 3. Street improvements that include, but are not limited to: X Sidewalks X X Driveways X X wheel chair ramps X Curb and gutter Cross gutter Alley gutter Street paving Alley paving shall be constructed prior to the occupancy of the units to the satisfaction of the Director of Engineering Ail damaged off- ire public works facilities, including parkway trees, s all be repaired or replaced prior to exoneration of bon s and improvements, to the satisfaction of the Department of ngineering Prior to any w rk being performed in the public right-of-way, an encroachmen permit shall be obtained from the Engineering Services Depar ment and appropriate fees paid, in addition to any other perm ts required. Driveways shall have a width of 30 feet and shall be designed as an alley apron with ten foot radius. where driveways are adjacent to sidewalks, pedestrian ramps shall be required. Existing settlement monuments shall be identified on the grading/private imp plans and protected during construction, ts shall be permanently protected or relocated when they conflict with the permanent improvement. Resolution No. P-92-05 Page 5 Street improvements shall include curb, gutter, paving, street lights, underground striping, and traffic control devices. Prior to occupancy, the following streets shall be improved to the satisfaction of the City Engineer: Parkway Centre Drive from Stowe Drive southerly to Street. b. Crosthwaite Circle from Stowe Drive southerly to Danielson Street. Ce Stowe Drive from the westerly subdivision boundary to the intersection with Danielson Street. Street from the westerly subdivision boundary through the intersection with Stowe Drive. Blaisdell Place from Crosthwaite Circle to Danielson Street. AND FLOOD COBTKOL A drainage system capable of handling and di posing of all surface water originating within the subdiv sion, and all s, rface waters that may flow onto the s,, division f om a Jacent lands, shall be required. This rainage sys em s all include any easements and structures as required by he D rector of Engineering Services to properly handle he drainage, and it shall conform to the previous studies done for the business park. Portland cement concrete cross gutters shall be installed where water crosses the roadways. Concentrated flows across driveways and/or sidewalks shall not be permitted. Prior to occupancy, the sewer and water systems serving the project shall be installed to the satisfaction of the City Engineer. On-site drainage shall connect to the existing stubs unless otherwise approved by the City Engineer. Check existing sewer, water and fire service lateral locations to determine if they front the proposed revised lots. Resolution No. P-92-05 Page 6 Ail proposed utilities within the project shall be installed underground. Utility easements shall be provided to the specification of the serving utility companies and the Director of Eng Services. The developer shall be responsible for the and undergrounding of existing public utilities as required. Water, sewer, and fire protection systems plans shall be designed and constructed to meet requirements of the City of Poway and the County of San Diego Department of Health. The applicant shall pa- for a water system analysis to establish the proper siz and location for the public water system. The amount wil be determined by the cost of the analysis and shall be pa d upon demand by the City. Developer shall a light system ] to City of Poway standards at no cost to the public, subject to the following: Se Cut-off 1 shall be ' which will provide true 90 degree cutoff and prevent projection of light above the horizontal from the lowest point of the lamp or light emitting refractor or device. Ail fixtures shall use a clear, low pressure sodium vapor light source. Ce Advance energy charges and District engineering charges shall be paid by the developer. de Annexation to the lighting district shall be accomplished and evidence of annexation shall be accomplished at the time of final inspection or Certificate of Occupancy, whichever occurs later. Existing telephone, gas, electric, and all other public utilities and appurtenances shall be shown on the grading/private improvement plans. Ail on-site water mains shall be public. A 20 foot easement shall be dedicated to the City over public water mains prior to occupancy. Resolution No. P- 92-05 Page 7 10. 11. GE1 1. Ail on-site private sewer standards for public sewers improvement plans. mains shall be ~ to and shown on the grading/private Improvement lans for the on-site water mains shall be prepared on tandard size sheets at 20 scale, signed by a registered c vil engineer, and submitted to the City for approval. T e plans must be signed prior to of a building permit. Prior to acceptance of property for sewer service, annexation to the sewer improvement area shall occur. SHALL CONTACT THE OF SAFETY FOR WITH T~E ~ (I Review and, if y, relocate fire hydrant 1 based on approved plan by the City Fire Marshal. AND A Traffic System Managemen (TSM) program has been prepared for the South Poway Planne Community to the satisfaction of the Directors of Engineer ng and Planning Services. When completed, this program wi 1 be adopted in form by the City. At a minimum, the TSM program will insure that project generated traffic is limited to the level identified in the Final EIR and t EIR f r the South Poway Planned y. The rogram shall inc ude such techniques as carpooling and van ooling, alterna ire transportati n modes, nontraditional wok scheduling, an others intended o reduce peak hour traf ic volumes. T is applicant wi 1 participate in this program along with the other proper y owners in the Pomerado Park. Should this property be further divided, each final map shall be submitted for approval by the Director of Engineering Ail provisions of the Subdivision Ordinance of the Poway Municipal Code shall be met as they relate to the division of land. Prior to occupancy, all dedications shall be made and easements granted as required above. This approval is based on the existing represented on the proposed site plan and improvement plan. If the actual conditions site conditions grading/private vary from those No. P- 92-05 Page 8 rep the site plan must be changed to reflect he actual Any changes to the site p an must be approved by the Director of Planning and he City Engineer and may require approval of the City Counci A bond in an amount acceptable to the City Engineer shall be posted prior to final map. Th tentative map approval shall expire on January 21, 1994 un ess an application for a time is 90 days pr or to expiration in accordance with the City's Subdivision Or inance. and State of California, ATTEST: by the City Council of the City of Poway, this 21st day of January, 19~2. Jar Resolution No. P-92-05 Page 9 STATE OF ) ) COUNTY OF SAN DIEGO ) SS. I, MarJorie K. Wahlsten, City Clerk of the City of Poway, do hereby certify, under the penalty of perjury, that the foregoing Resolution, No. P-92-05 , was duly adopted by the City Council at a meeting of said City Council held on the 21st day of__ Janua~ , 1992, and that it was so adopted by the following vote: AYES: EMERY, HIGGINSON, MCINTYRE, SNESKO, GOLDSMITH NOES: NONE NONE ABSENT: NONE City Clerk City o~oway