Loading...
Res P-92-17NO. P- 92-17 A OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA APPROVING DEVELOPMENT REVIEW 90-18M PARCEL NUMBERS 317-280-43, 44, AND 46 Development Review 90-18M, submitted by Mission DAI Industrial Part ership/Anacomp, applicants, request approval to a d 23,558 quare ~et to the floor of an existing 311,1 7 square oot in ustrial building under construction on Lots 10 , 102, an 103 o Parkway Business Centre located on the north' si e of Cros hwaite Circle in the South Poway Planned Community; and on April 28, 1992, the City Council held a hearing on the above-referenced item. NOW, the City Council does hereby resolve as follows: Section 1: tal ~ : The City Council finds that the potential 'kal impacts of this project were adequately discussed in the 1985 EIR and the 1988 Subsequent EIR for the South Poway Planned Community (SPPC). Sectio : The proposed project is consistent with the existing specific plan and general plan. That the proposed development will not have an ad'erse aesthetic, health, safety, o architecturally ated impact upon adjoining propert e , because the a tion affects the interior of the bu 1 lng only and add onal parking needs will be minimize t rough implementa on of an approved Transportation Deman Management Plan (TDM). That the proposed development is in compliance with all applicable South Poway Development Standards and the South Poway Planned Community Development Plan. That the proposed development encourages the orderly and harmonious appearance of structures and property within the City through its consistency with the SPPC requirements. Se, cil The City Council hereby approves Development Review 90-18M subject to the following conditions: APPLICANT SITE 1. Resolution No. P-92-17 Page 2 within 30 days of approval (1) the applicant shall submit in writing that all conditions of approval have been read and understood; and (2) the property owner shall execute a Covenant on Real The project shall comply with all requirements of City Council Resolution P-91-40 except as modified herein. SHALL CONTACT THE OF WITH THE Prior to issuance of building permits for this project, a revised building square footage allocation for the lots in Parkway Center shall be submitted to the City. The revised allocation plan shall reflect a building square footage of 334,715 square feet on the Anacomp site. The parking for Anacomp shall be subject to a yearly review by the Planning Services Department. If parking is found to be to meet the needs of this spaces shall be added as required by the Planning Department. Parking shall be deemed deficient if cars or trucks are frequently parked so as to block access to driveways· fire lanes, or loading areas· or if on-street parking or parking in unpaved areas is utilized. A Transportation Demand Management Program shall be submitted prior to final occupancy of the building. The Tr nsportation Demand Management plan may be revised each year o reflect changes in the employee base for this facili y; however an approved TDM plan must be on file for the site a all times. A minimum of 773 parking spaces shall be provided for the project. The porti n o Lot 103 not improved as parking area shall be landscape wi h low water use groundcover, hardscape, shrubs and trees o t e satisfaction of the City Landscape Architect. A revised an scape plan shall be submitted if the amount of paving is reduced from what was shown on the building permit. The applicant shall comply with the latest adopted Bui ding Code, Uniform Mechanical Code, Uniform Plumbing Code, Nat onal Electric Code, Uniform Fire Code, and all other app icable codes and ordinances in effect at the time of bui ding permit i Resolution No. P-92-17 Page 3 For additions to existing industrial development, the applicant shall pay development fees at the established rate. Such fees may but not be limited to: School Fees, Permit and Plan Fees, Water and Sewer Service Fees. These fees shall be paid prior to building permit i This approval shall become null and void if building permits are not issued for this project within two years from the date of this project modification approval. SHAt.r, THE OF SAFETY WITH T~E ~: The new addition to the will be required to install an a proved fire sprinkler system. The entire system is to be desi ~.ed and plan checked prior to installation. New hydr ulic calculations shall be submitted to prove the exis lng system can handle the building area. Architect to provide a floor plan and detail new use in expanded first floor and area, prior to construction. New technical reports may be required by the Safety Department based on proposed new use. and State of California, this ATTEST: by the City Council of the City of Poway, 28th day of April 199~ STATE OF CALIFORNIA ) ) COUNTY OF SAN DIEGO ) SS. Page 4 No. P-9£-17 I, MarJorie K. Wahlsten, City Clerk of the City of Poway, do hereby certify, under the penalty of perjury, that the foregoing Resolution, No. P-91-17 , was duly adopted bY the City Council at a meeting of said City Council held on the28th day of April , 1992, and that it was so adopted by the following vote: AYES: NOES: ABSENT: EMERY, HIGGINSON, MCINTYRE, SNESKO, GOLDSMITH NONE NONE NONE