Res P-92-17NO. P- 92-17
A OF THE CITY COUNCIL
OF THE CITY OF POWAY, CALIFORNIA
APPROVING DEVELOPMENT REVIEW 90-18M
PARCEL NUMBERS 317-280-43, 44, AND 46
Development Review 90-18M, submitted by Mission DAI
Industrial Part ership/Anacomp, applicants, request approval to a d
23,558 quare ~et to the floor of an existing 311,1 7
square oot in ustrial building under construction on Lots 10 ,
102, an 103 o Parkway Business Centre located on the north' si e
of Cros hwaite Circle in the South Poway Planned Community; and
on April 28, 1992, the City Council held a hearing on
the above-referenced item.
NOW, the City Council does hereby resolve as
follows:
Section 1: tal ~ :
The City Council finds that the potential 'kal
impacts of this project were adequately discussed in the 1985
EIR and the 1988 Subsequent EIR for the South Poway Planned
Community (SPPC).
Sectio :
The proposed project is consistent with the existing
specific plan and general plan.
That the proposed development will not have an ad'erse
aesthetic, health, safety, o architecturally ated
impact upon adjoining propert e , because the a tion
affects the interior of the bu 1 lng only and add onal
parking needs will be minimize t rough implementa on of
an approved Transportation Deman Management Plan (TDM).
That the proposed development is in compliance with all
applicable South Poway Development Standards and the
South Poway Planned Community Development Plan.
That the proposed development encourages the orderly and
harmonious appearance of structures and property within
the City through its consistency with the SPPC
requirements.
Se, cil
The City Council hereby approves Development Review 90-18M
subject to the following conditions:
APPLICANT
SITE
1.
Resolution No. P-92-17
Page 2
within 30 days of approval (1) the applicant shall submit
in writing that all conditions of approval have been read
and understood; and (2) the property owner shall execute
a Covenant on Real
The project shall comply with all requirements of City
Council Resolution P-91-40 except as modified herein.
SHALL CONTACT THE OF
WITH THE
Prior to issuance of building permits for this project, a
revised building square footage allocation for the lots in
Parkway Center shall be submitted to the City. The
revised allocation plan shall reflect a building square
footage of 334,715 square feet on the Anacomp site.
The parking for Anacomp shall be subject to a yearly review by
the Planning Services Department. If parking is found to be
to meet the needs of this
spaces shall be added as required by the Planning
Department. Parking shall be deemed deficient if cars or
trucks are frequently parked so as to block access to
driveways· fire lanes, or loading areas· or if on-street
parking or parking in unpaved areas is utilized.
A Transportation Demand Management Program shall be submitted
prior to final occupancy of the building.
The Tr nsportation Demand Management plan may be revised each
year o reflect changes in the employee base for this
facili y; however an approved TDM plan must be on file for the
site a all times.
A minimum of 773 parking spaces shall be provided for the
project.
The porti n o Lot 103 not improved as parking area shall be
landscape wi h low water use groundcover, hardscape, shrubs
and trees o t e satisfaction of the City Landscape Architect.
A revised an scape plan shall be submitted if the amount of
paving is reduced from what was shown on the building permit.
The applicant shall comply with the latest adopted
Bui ding Code, Uniform Mechanical Code, Uniform Plumbing Code,
Nat onal Electric Code, Uniform Fire Code, and all other
app icable codes and ordinances in effect at the time of
bui ding permit i
Resolution No. P-92-17
Page 3
For additions to existing industrial development, the
applicant shall pay development fees at the established rate.
Such fees may but not be limited to: School Fees,
Permit and Plan Fees, Water and Sewer Service Fees.
These fees shall be paid prior to building permit i
This approval shall become null and void if building permits
are not issued for this project within two years from the date
of this project modification approval.
SHAt.r, THE OF SAFETY
WITH T~E ~:
The new addition to the will be required to install
an a proved fire sprinkler system. The entire system is to be
desi ~.ed and plan checked prior to installation. New
hydr ulic calculations shall be submitted to prove the
exis lng system can handle the building area.
Architect to provide a floor plan and detail new use in
expanded first floor and area, prior to
construction.
New technical reports may be required by the Safety
Department based on proposed new use.
and
State of California, this
ATTEST:
by the City Council of the City of Poway,
28th day of April 199~
STATE OF CALIFORNIA )
)
COUNTY OF SAN DIEGO )
SS.
Page 4
No. P-9£-17
I, MarJorie K. Wahlsten, City Clerk of the City of Poway, do
hereby certify, under the penalty of perjury, that the foregoing
Resolution, No. P-91-17 , was duly adopted bY the City Council
at a meeting of said City Council held on the28th day of
April , 1992, and that it was so adopted by the following
vote:
AYES:
NOES:
ABSENT:
EMERY, HIGGINSON, MCINTYRE, SNESKO, GOLDSMITH
NONE
NONE
NONE