Loading...
Res P-99-36RESOLUTION NO. P- 99-36 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POWAY, CALIFORNIA APPROVING DEVELOPMENT REVIEW 99-05 ASSESSOR'S PARCEL NUMBER 317-151-64 WHEREAS, Development Review 99-05 submitted by Frank Helmuth, Applicant, requests approval to build a 4,700 square foot office and warehouse building on a 14,000 square foot lot located at 12316 Oak Knoll Road in the Community Business District; and WHEREAS, pursuant to G l Code Section 66020(d)(1), NOTICE iS FURTHER GIVEN that the 90-day period to protest the imposition of any fee, dedication, or otb described in this resolution begins on the effective date of th' :1 any such protest must I; that complies with Section 66020. WHEREAS, on May 4, 1999, the City Council held a hearing to solicit from the public, both pro and con, relative to this application. NOW, THEREFORE, the City Council does hereby follows: The City hereby issues a Negative Declaration (indicating no significant adverse Iai impacts anticipated). The approved project is consistent with the Poway General Plan in that it proposes the of a office/warehouse building in a area of th :y where th = The approved project will not have an aC, :hetic, health, safety, or architecturally related impact upon adjoining properties, because the site and the building have been designed with reference to the surrounding buildings on Oak Knoll Road, utilizing similar size, scale, and other architectural features. = The approved project encourages the ordedy and h of structures and property within the City through its Zoning Ordinance which provides high standards for throughout th :y. ;~pearance ! with the development Resolution No, P- 9 9 - 3 6 Page 2 The City Council hereby approves Development Review 99-05 subject to the following conditions: Within 30 days of approval the applicant shall submit in wdting that all conditions of approval have been read and understood. SITE DEVELOPMENT Site shall be developed in accordance with the approved site plans on file in the Development Services Department and the condir :1 herein. Revised site plans and building elevar )orating all conditions of approval shall be submitted to the Development Services Department prior to ' : building permits. Approval of this request shall not 31lance with all = the Sot;th Poway Development Standards the Zoning Ordinance and all other applicable City Ord :l:ect at the time of building permit issuance. All roof appurl :ling air conditioners, shall be architecturally integrated, screened from view and sound buffered from adjacent properties and streets as required by the Development Services Department. Trash receptacles shall be enclosed by a six foot high masonry wall with view- obstructing gates pursuant to City standards. L ~all be subject to approval by the Development Services Department. The applicant shall comply with the latest adopted Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, National Electric Code, Uniform Fire Code, and all other applicable codes and ord ~'ect at the time of building permit issuance. 7. Disabled access shall be provided for all buildings. This approval shall b II and void if building p project within two years from the date of project approval. : issued for this {EMENTS Zoning approval and a Poway Business Certificate shall be obtained from the City of Poway prior to the execution of lease ag :h tenants. Resolution No. p-9 9- 3 6 Page 3 1. All parking spaces shall be double stdped. The parking lot design shall comply with the Americans with Disabilities Act, i.e. 1:25 ratio 1' 31e spaces with one van accessible space. Parking lot lights shall be Iow p :lium and have a height of 18 feet from the finished grade of the parking surface and be directed away from all property lines, adjacent :1 buildings on adjacent lots. 3. No parking shall be permitted on Oak Knoll Road. LANDSCAPING A detailed landscape and irrigation plan shall be submitted to and approved by the Development Services Department prior to the ' ~ building permits. The landscaping plan shall also address planting the landscape areas along the property frontage in order to provide a dense landscape screen. All landscaped areas shall b from weeds, trash and debris. J in a healthy and thdving condition, free The mature deodar cedar tree shall be protected during the grading operation and shall be retained and maintained within this project. The existing California pepper trees located along the western property line shall also be retained. SIGNS Any signs proposed for this development shall be designed and approved in lh the Sign Ordinance. A comprehensive sign program for this building shall be submitted to the Development Services Department for review prior to issuance of sign permits. Approval of the CSP shall be by the City Council. COMPLIANCE WITH THE FOLLOWING CONDITIONS IS REQUIRED. COMPLIANCE SHALL BE APPROVED BY THE ENGINEERING SERVICES DIVISION. SI' WENT A plan check fee shall be paid upon the submittal of a drainage plan for the proposed development. A grading permit and plan will be required for any grading ofth :50 cubic yards. Development fees, including irrig service fees shall be paid prior to building permit issuance. Resolution No. P9 9 - 3 6 Page 4 All existing public utilities, including water and sewer, and the appurl lall be shown on the drainage plan. E lrol, including but not limited to desiltation basins, shall be installed and :1. ^ plan shall be prepared and submitted as part of the drainage plan. The developer shall make provisions to ensure Prol: of all erosion control devices throughout their intended life. All pavement structural sections shall be submitted to and approved by the City Engineer. Pavement lall conform to th ' ' :luired by the Poway Municipal Code Section 12.20.080. TIES All proposed utilities within the project shall be installed underground. Utility shall be provided to the specification of the serving utility companies and the City Engineer, if required. The developer shall be responsible for the existing public utilities as required. and undergrounding of any Water, sewer, and fire protection systems shall be designed and :1 to meet the req of the City of Poway and the County of San Diego Department of Health. Should there be a need for a new fire hydrant, the applicant shall pay for a water system analysis to establish the proper size and location of the public water system. The amount shall be determined by the cost of the analysis and shall be paid prior to submittal of improvement plans per the following table. Water System Analysis fees are as follows, and they may change at any time without p ' One Fire Service Two Fire Services More than Two Fire S _ looped Onsite System $1,250.00 $1,850.00 $2,800.00 ND APPROVALS 1. This approval is based on the existing site conditions represented on the proposed Resolution No. P-99 - 36 Page 5 site plan. If the actual conditions vary from representations, the site plan must be changed to reflect the actual conditions. Any substantial changes to the site plan must be approved by the Director of Development S d the City Engineer, and may require approval of the City Council. Prior to building permit' 3prop :1 sewer fees shall be paid to the City's Development Services Department. These 1' tly in effect and are subject to change: Sewer C =$5,890.00 This is based on 2,400 square feet of building which is equal to 2.5 EDU's at $2,356.00 per EDU. Prior I ! building permit, applicant shall submit plumbing unit fixture count. Additional sewer fees shall be paid if EDU's exceed 2.5 where four fixture units equal one EDU. Sewer Cleanout Sewer Inspection =$50.00 =$25.00 The adequacy of th :1 their corresponding sizes (not less than one inch in size) shall be determined by the applicant/developer. Depending on the size of wa1 to be installed, the water fees shall be based on the following: Size Lateral Cost WA Fee* 1"meter $1,430.00 $270.00 $6,678.00 2,536.00 1.5" Cost $600.00 $10,388.00 4,755.00 2" Cost $800.00 $16,694.00 8,242.00 For a 'listed above, pi' 'Engineering Division. *This fee is subject to change without further notice. Applicable only 1 for (~ The amount to be paid shall be that in effect at time of payment. 3. The following fees shall be paid, .7 bond posted, prior to th the bulding permit. Drainage Traffic Mitigation Inspection $1,200.00 $1,551.00 $500.00 COMPLIANCE WITH THE FOLLOWING CONDITIONS IS REQUIRED. COMPLIANCE SHALL BE APPROVED BY THE DEPARTMENT OF SAFETY SERVICES. Resolution No. P- 99-36 Page 6 o 10. The buildings shall display their numeric address in a manner visible from the access street. M' ' ~ building numbers shall be six inches on the front facade of building. Building addresses shall also be displayed on the roof in a manner satisfactory to the Director of Safety Services, and meeting Sheriff DepartmentJ ASTREA criteria. Every building hereafter :1 shall be accessible to Fire Department apparatus by way of :lways with all-weather driving surface of not less than 20 feet of unobstructed width, with adequate roadway turning radius capable of supporting the imposed loads of fire apparatus having a minimum of 13'6" of vertical The road surface type shall be approved by the City Engineer, pursuant to the City of Poway Municipal Code. A "Knox" Security Key Box shall be required for the building at a location determined by the City Fire Marshal. A "Knox" padlock shall be required for the fire sprinkler system Post Indicator Valve. Fire Department access for use of fire fighting equipment shall be provided to the immediate job construction sites at the start of construction and :1 at all times until is completed. Permanent -lways for fire apparatus shall be designated as "Fire Lanes" with appropriate signs and curb markings. A 2A:10BC fire extinguisher(s) is/are required for orr' feet and 75' travel distance. 3,000 square If medical gases are planned to be used in this building, they shall be installed to meet requirements of Uniform Fire Code Article 74-Compressed Gases. Material Safety Data Sheets shall be required for all hazardous and/or toxic sub J in each building. Prior to delivery of combustible building material on site, water and sewer systems shall satisfactorily pass all required tests and b J to the public water and sewer systems. In addition, the first lift of asphalt paving shall be in place to provide adequate, permanent access for emergency vehicles. The final lift of asphalt shall not be installed until all otb ~y has been substantially completed to the sa1 : the City. N.F.P.A. Standard 704, Hazardous Material Labeling, shall be provided as necessary throughout the building. Resolution No. P- 9 9- 3 6 Page 7 APPROVED and ADOPTED by the City Council of the City of Poway, State of California, this 4th day of May, 1999. A-I'~'~ EST: ~:~ii A~ n:~eoples, Cindy Cl~rk STATE OF CALIFORNIA ) ) SS. COUNTY OF SAN DIEGO) I, Lori Anne Peoples, City Clerk of the City of Poway, do hereby certify, under the penalty of perjury, that the foregoing Resolution No. P-99 - 36was duly adopted by the City Council at a meeting of said City Council held on the 4th day of May, 1999 and that it was so adopted by the following vote: AYES: EMERY, GOLDBY, HIGGINSON, REXFORD NOES: NONE ABSTAIN: NONE ABSENT: CAFAGNA Lori ~nne Peoples, City'of Poway